ML19247B765: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19247B767
| number = ML19247B767
| issue date = 08/06/1979
| issue date = 08/06/1979
| title = Forwards LER 79-085/03L-0
| title = LER 79-085/03L-0 on 790718:higher Flow on Return Line to Reactor Vessel than Inlet Flow to Sys Indicated by Reactor Water Cleanup Leak Detection Sys.Cause Unknown.Sys Run to Obtain Flow Curves & Equipment Recalibr
| author name = Nix R
| author name = Nix R
| author affiliation = GEORGIA POWER CO.
| author affiliation = GEORGIA POWER CO.

Latest revision as of 21:59, 23 January 2020

Forwards LER 79-085/03L-0
Date released: 09/18/2019 Download: ML19247B765


LER 79-085/03L-0 on 790718:higher Flow on Return Line to Reactor Vessel than Inlet Flow to Sys Indicated by Reactor Water Cleanup Leak Detection Sys.Cause Unknown.Sys Run to Obtain Flow Curves & Equipment Recalibr
ML19247B767
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 08/06/1979
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19247B767 (1)
Forwards LER 79-085/03L-0
ML19247B764
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 08/06/1979
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19247B764 (1)