ML19247B765

From kanterella
Jump to navigation Jump to search
Forwards LER 79-085/03L-0
Date released: 09/18/2019 Download: ML19247B765


LER 79-085/03L-0 on 790718:higher Flow on Return Line to Reactor Vessel than Inlet Flow to Sys Indicated by Reactor Water Cleanup Leak Detection Sys.Cause Unknown.Sys Run to Obtain Flow Curves & Equipment Recalibr
ML19247B767
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 08/06/1979
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19247B767 (1)
Forwards LER 79-085/03L-0
ML19247B764
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 08/06/1979
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19247B764 (1)