ML19254D908: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19254D927
| number = ML19254D927
| issue date = 10/22/1979
| issue date = 10/22/1979
| title = Forwards LER 79-087/01T-1
| title = LER 79-087/01T-1:on 791015,during Verification of Computer Analysis of Seismic Restraints,Svc Water Reservoir 151 Found Inadequately Designed.Svc Water Reservoir Redesigned & Replaced
| author name = Cooper J
| author name = Cooper J
| author affiliation = FLORIDA POWER CORP.
| author affiliation = FLORIDA POWER CORP.

Latest revision as of 18:53, 23 January 2020

Forwards LER 79-087/01T-1
Date released: 09/25/2019 Download: ML19254D908


LER 79-087/01T-1:on 791015,during Verification of Computer Analysis of Seismic Restraints,Svc Water Reservoir 151 Found Inadequately Designed.Svc Water Reservoir Redesigned & Replaced
ML19254D927
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/22/1979
From: Cooper J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19254D927 (2)
Forwards LER 79-087/01T-1
ML19254D907
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/26/1979
From: Stewart W
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19254D907 (1)