ML18016A869: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
(One intermediate revision by the same user not shown)
Line 13: Line 13:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 4
| page count = 4
| project =
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:CATEGORY REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
{{#Wiki_filter:CATEGORY RECIPIENT ID CODE/NAME PD2-1 PD COPIES LTTR ENCL 1
ACCESSION NBR:9903300323             DOC.DATE:   99/03/18     NOTARIZED: NO             DOCKET  ¹ FACXL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina                       05000400 AUTH.NAME             AUTHOR   AFFILIATION AVERETT,T.B.         Affiliation Not      Assigned RECIP.NAME           RECIPIENT AFFILIATION REYES,L.A.           Region 2 (Post 820201,'
1 RECIPIENT ID CODE/NAME FLANDERS,S COPIES LTTR ENCL 1
UBJECT: Forwa ds     resolution adopted by Lee County, North Carolina Board of Commissioners re proposed expansion of high-level                             C radioactive waste storage facilities at Carolina Power &.
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
Light   She'aron   Harris Nuclear     Power   Plant.
ACCESSION NBR:9903300323 DOC.DATE: 99/03/18 NOTARIZED: NO FACXL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION AVERETT,T.B.
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR l ESSCL'                     SIZE:
AffiliationNot Assigned RECIP.NAME RECIPIENT AFFILIATION REYES,L.A.
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response                                     E NOTES:Application     for permit renewal filed.                                       05000400 Q
Region 2
RECIPIENT            COPIES            RECIPIENT            COPIES ID  CODE/NAME          LTTR ENCL        ID CODE/NAME        LTTR ENCL PD2-1 PD                  1     1       FLANDERS,S                1 INTERNAL: ACRS                        2    2      AEOD/SPD/RAB              1     1 AEOD                      1"    1       DEDRO                    1     1 ZLE CENTER                1     1       NRR/DRCH/HOHB             1    1 DRP    PECB          1    1      NRR/DRPM/PERB             1  . 1 NUDOCS-ABSTRACT            1     1       OE DXR                    1     1 OGC/HDS2                  1     1       RGN2    FILE    01      1     1 EXTERNAL. LMXTCO MARSHALL              1     1       NOAC                      1     1             D NRC PDR                    1     1       NUDOCS FULLTEXT          l     1 M
(Post 820201,'
N NOTE TO ALL "RZDS" RECIPIENTS:
UBJECT: Forwa ds resolution adopted by Lee County, North Carolina Board of Commissioners re proposed expansion of high-level radioactive waste storage facilities at Carolina Power Light She'aron Harris Nuclear Power Plant.
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION OR REDUCE THE NUMBER OF COPZES RECEIVED BY YOU OR YOUR ORGANIZATION, LZSTS CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION si15-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR               19   ENCL     .19
DISTRIBUTION CODE:
IE01D COPIES RECEIVED:LTR l
ESSCL' SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:Application for permit renewal filed.
DOCKET ¹ 05000400 C
E 05000400 Q
INTERNAL: ACRS AEOD ZLE CENTER DRP PECB NUDOCS-ABSTRACT OGC/HDS2 EXTERNAL. LMXTCO MARSHALL NRC PDR 2
2 1"
1 1
1 1
1 1
1 1
1 1
1 1
1 AEOD/SPD/RAB DEDRO NRR/DRCH/HOHB NRR/DRPM/PERB OE DXR RGN2 FILE 01 NOAC NUDOCS FULLTEXT 1
1 1
1 1
1 1
1 1
1 1
1 1
1 l
1 D
M N
NOTE TO ALL "RZDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LZSTS OR REDUCE THE NUMBER OF COPZES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION si15-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 19 ENCL
.19


Bfl                   f Department of Community Development P.O. Box 3729, Sanford, N.C. 27331                                     Reginald T. Scales, AICP (919) 775-8242 ~ Fax: (919) 775-8207                                           Director March 18, 1999 Mr. Luis A. Reyes Regional Administrator US Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street SW Suite 23T85 Atlanta, GA 30303-3415
Bfl f Department ofCommunity Development P.O. Box 3729, Sanford, N.C. 27331 (919) 775-8242
~ Fax: (919) 775-8207 Reginald T. Scales, AICP Director March 18, 1999 Mr. Luis A. Reyes Regional Administrator US Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street SW Suite 23T85 Atlanta, GA 30303-3415


==Dear Mr. Reyes:==
==Dear Mr. Reyes:==
Enclosed is a copy ofa resolution, which was adopted by the Lee County, North Carolina Board ofCommissioners, regarding the proposed expansion ofhigh-level radioactive waste storage facilities at Carolina Power and Light's Shearon Harris Nuclear Power Plant. The Lee County Commissioners request that additional information be provided to the public about this expansion and an opportunity forpublic comment and questions.
Thank you for consideration ofthis request.
Sincerely, Trevis B. Averett Asst. Director tba Enclosure cc:Mr. Richard J. Laufer, Project Manager US Nuclear Regulatory Commission Rockville, MD Mr. Richard Fry, Director NC Division ofRadiation Raleigh, NC z>p ol Mr. James Scarola, Vice President Shearon Harris Nuclear Plant Newhill, NC 300005
'P'703300323 990318 PDR ADOCK 05000400 P
PDR


Enclosed is a copy of a resolution, which was adopted by the Lee County, North Carolina Board of Commissioners, regarding the proposed expansion of high-level radioactive waste storage facilities at Carolina Power and Light's Shearon Harris Nuclear Power Plant. The Lee County Commissioners request that additional information be provided to the public about this expansion and an opportunity for public comment and questions.
ARESOLUTION REGARDING PROPOSED EXPANSIONOF HIGHLEVEL RADIOACIIVEWASTE STORAGE FACILITIESATCP&L'S SHEARON HARRIS NUCLEARPOWER PLANT t
Thank you for consideration        of this request.
WHEREAS, the Lee County Board of Commissioners were advised as to plans for the expansion of the high level radioactive waste facilities at Carolina Power & Light's Shearon Harris nuclear power plant in Wake County; and WHEREAS, the Lee County Board of Commissioners have been apprised of the potential risks inherent with the'doubling of the storage capacity of the temporary storage pools for high level radioactive waste for the purpose of long term storage of high level radioactive waste, not only &om the Shearon Harris plant, but also &om two other nuclear power plants &om elsewhere in North and South Carolina; and WHEREAS, citizens of Lee County who are alarmed about the plans to expand the waste storage capacity at the Shearon Harris facilityand the lack ofpublic input into the approval process for those plans have requested that the Lee County Board ofCommissioners intervene in the plan approval process on behalf of the citizens of Lee County to ensure that no such expansion occurs without the public's knowledge and consent; and WHEREAS, the Lee County Environmental Affairs Board has asked that the Lee County Board ofCommissioners request that an appropriate entity hold public hearings in which Carolina Power and Lightwillprovide additional information about its plans to expand its storage capacity at Shearon Harris and respond to questions about long term storage of high level radioactive wastes:
Sincerely, Trevis B. Averett Asst. Director tba Enclosure cc:Mr. Richard      J. Laufer, Project Manager US Nuclear Regulatory Commission Rockville, MD Mr. Richard Fry, Director NC Division of Radiation Raleigh, NC                                                                      z>p ol Mr. James Scarola, Vice President Shearon Harris Nuclear Plant Newhill, NC 300005
NOW, THEREFORE BE IT RESOLVED that the Lee County Board of Commissioners requests that the North Carolina Department ofEnvironment, Health, and Natural Resources and the Nuclear Regulatory Commission conduct public hearings in which Carolina Power & Light and appropriate regulatory staff: 1) explain the plans to expand the storage facilities for high level radioactive waste at the Shearon Hams nuclear power plant; 2) outline the risks or lack thereof and explain the risk assessment methodology employed to develop risk projections related to the use offacilities designed for short term storage ofhigh level radioactive wastes for long term storage; 3) outline the risks or lack thereof and explain the risk assessment methodology employed to develop risk projections associated with the transportation and handling of materials &om other distant nuclear power generating facilities; and 4) accept and consider public comments relative to support for or opposition to operating or expanding such a facilityin this area.
'P'703300323      990318 PDR    ADOCK      05000400 P                        PDR
This, the 19 day ofJanuary 1999.
 
Herbert A. Hincks, Chaiman a
A RESOLUTION REGARDING PROPOSED EXPANSION OF HIGH LEVEL RADIOACIIVEWASTE STORAGE FACILITIESAT CP&L'S SHEARON HARRIS NUCLEAR POWER PLANT t
ell e, Clerk to e Board K. R. Hoyl ty Attorney}}
WHEREAS, the Lee County Board of Commissioners were advised as to plans for the expansion of the high level radioactive waste facilities at Carolina Power & Light's Shearon Harris nuclear power plant in Wake County; and WHEREAS, the Lee County Board of Commissioners have been apprised of the potential risks inherent with the'doubling of the storage capacity of the temporary storage pools for high level radioactive waste for the purpose of long term storage of high level radioactive waste, not only &om the Shearon Harris plant, but also &om two other nuclear power plants &om elsewhere in North and South Carolina; and WHEREAS, citizens of Lee County who are alarmed about the plans to expand the waste storage capacity at the Shearon Harris facility and the lack of public input into the approval process for those plans have requested that the Lee County Board of Commissioners intervene in the plan approval process on behalf of the citizens of Lee County to ensure that no such expansion occurs without the public's knowledge and consent; and WHEREAS, the Lee County Environmental Affairs Board has asked that the Lee County Board of Commissioners request that an appropriate entity hold public hearings in which Carolina Power and Light willprovide additional information about its plans to expand its storage capacity at Shearon Harris and respond to questions about long term storage of high level radioactive wastes:
NOW, THEREFORE BE IT RESOLVED that the Lee County Board of Commissioners requests that the North Carolina Department of Environment, Health, and Natural Resources and the Nuclear Regulatory Commission conduct public hearings in which Carolina Power & Light and appropriate regulatory staff: 1) explain the plans to expand the storage facilities for high level radioactive waste at the Shearon Hams nuclear power plant; 2) outline the risks or lack thereof and explain the risk assessment methodology employed to develop risk projections related to the use of facilities designed for short term storage of high level radioactive wastes for long term storage; 3) outline the risks or lack thereof and explain the risk assessment methodology employed to develop risk projections associated with the transportation and handling of materials &om other distant nuclear power generating facilities; and 4) accept and consider public comments relative to support for or opposition to operating or expanding such a facility in this area.
This, the 19 day   of January 1999.
Herbert A. Hincks, Chaiman a   ell   e, Clerk to e Board                             K. R. Hoyl           ty Attorney}}

Latest revision as of 05:54, 7 January 2025

Forwards Resolution Adopted by Lee County,North Carolina Board of Commissioners Re Proposed Expansion of high-level Radioactive Waste Storage Facilities at Carolina Power & Light Shearon Harris Nuclear Power Plant
ML18016A869
Person / Time
Site: Harris 
Issue date: 03/18/1999
From: Averett T
AFFILIATION NOT ASSIGNED
To: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 9903300323
Download: ML18016A869 (4)


Text

CATEGORY RECIPIENT ID CODE/NAME PD2-1 PD COPIES LTTR ENCL 1

1 RECIPIENT ID CODE/NAME FLANDERS,S COPIES LTTR ENCL 1

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9903300323 DOC.DATE: 99/03/18 NOTARIZED: NO FACXL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION AVERETT,T.B.

AffiliationNot Assigned RECIP.NAME RECIPIENT AFFILIATION REYES,L.A.

Region 2

(Post 820201,'

UBJECT: Forwa ds resolution adopted by Lee County, North Carolina Board of Commissioners re proposed expansion of high-level radioactive waste storage facilities at Carolina Power Light She'aron Harris Nuclear Power Plant.

DISTRIBUTION CODE:

IE01D COPIES RECEIVED:LTR l

ESSCL' SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:Application for permit renewal filed.

DOCKET ¹ 05000400 C

E 05000400 Q

INTERNAL: ACRS AEOD ZLE CENTER DRP PECB NUDOCS-ABSTRACT OGC/HDS2 EXTERNAL. LMXTCO MARSHALL NRC PDR 2

2 1"

1 1

1 1

1 1

1 1

1 1

1 1

1 AEOD/SPD/RAB DEDRO NRR/DRCH/HOHB NRR/DRPM/PERB OE DXR RGN2 FILE 01 NOAC NUDOCS FULLTEXT 1

1 1

1 1

1 1

1 1

1 1

1 1

1 l

1 D

M N

NOTE TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LZSTS OR REDUCE THE NUMBER OF COPZES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION si15-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 19 ENCL

.19

Bfl f Department ofCommunity Development P.O. Box 3729, Sanford, N.C. 27331 (919) 775-8242

~ Fax: (919) 775-8207 Reginald T. Scales, AICP Director March 18, 1999 Mr. Luis A. Reyes Regional Administrator US Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street SW Suite 23T85 Atlanta, GA 30303-3415

Dear Mr. Reyes:

Enclosed is a copy ofa resolution, which was adopted by the Lee County, North Carolina Board ofCommissioners, regarding the proposed expansion ofhigh-level radioactive waste storage facilities at Carolina Power and Light's Shearon Harris Nuclear Power Plant. The Lee County Commissioners request that additional information be provided to the public about this expansion and an opportunity forpublic comment and questions.

Thank you for consideration ofthis request.

Sincerely, Trevis B. Averett Asst. Director tba Enclosure cc:Mr. Richard J. Laufer, Project Manager US Nuclear Regulatory Commission Rockville, MD Mr. Richard Fry, Director NC Division ofRadiation Raleigh, NC z>p ol Mr. James Scarola, Vice President Shearon Harris Nuclear Plant Newhill, NC 300005

'P'703300323 990318 PDR ADOCK 05000400 P

PDR

ARESOLUTION REGARDING PROPOSED EXPANSIONOF HIGHLEVEL RADIOACIIVEWASTE STORAGE FACILITIESATCP&L'S SHEARON HARRIS NUCLEARPOWER PLANT t

WHEREAS, the Lee County Board of Commissioners were advised as to plans for the expansion of the high level radioactive waste facilities at Carolina Power & Light's Shearon Harris nuclear power plant in Wake County; and WHEREAS, the Lee County Board of Commissioners have been apprised of the potential risks inherent with the'doubling of the storage capacity of the temporary storage pools for high level radioactive waste for the purpose of long term storage of high level radioactive waste, not only &om the Shearon Harris plant, but also &om two other nuclear power plants &om elsewhere in North and South Carolina; and WHEREAS, citizens of Lee County who are alarmed about the plans to expand the waste storage capacity at the Shearon Harris facilityand the lack ofpublic input into the approval process for those plans have requested that the Lee County Board ofCommissioners intervene in the plan approval process on behalf of the citizens of Lee County to ensure that no such expansion occurs without the public's knowledge and consent; and WHEREAS, the Lee County Environmental Affairs Board has asked that the Lee County Board ofCommissioners request that an appropriate entity hold public hearings in which Carolina Power and Lightwillprovide additional information about its plans to expand its storage capacity at Shearon Harris and respond to questions about long term storage of high level radioactive wastes:

NOW, THEREFORE BE IT RESOLVED that the Lee County Board of Commissioners requests that the North Carolina Department ofEnvironment, Health, and Natural Resources and the Nuclear Regulatory Commission conduct public hearings in which Carolina Power & Light and appropriate regulatory staff: 1) explain the plans to expand the storage facilities for high level radioactive waste at the Shearon Hams nuclear power plant; 2) outline the risks or lack thereof and explain the risk assessment methodology employed to develop risk projections related to the use offacilities designed for short term storage ofhigh level radioactive wastes for long term storage; 3) outline the risks or lack thereof and explain the risk assessment methodology employed to develop risk projections associated with the transportation and handling of materials &om other distant nuclear power generating facilities; and 4) accept and consider public comments relative to support for or opposition to operating or expanding such a facilityin this area.

This, the 19 day ofJanuary 1999.

Herbert A. Hincks, Chaiman a

ell e, Clerk to e Board K. R. Hoyl ty Attorney