ML19210D059: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19210D067 | | number = ML19210D067 | ||
| issue date = 11/16/1979 | | issue date = 11/16/1979 | ||
| title = | | title = LER 79-087/03L-0:on 791025,torus Water Temp Reached 106 F, Exceeding Allowable Max.Caused by Extended Operation of HPCI Turbine to Obtain Bearing Temp Data.Procedures Which Necessitate High Temps Being Revised | ||
| author name = Tollison A | | author name = Tollison A | ||
| author affiliation = CAROLINA POWER & LIGHT CO. | | author affiliation = CAROLINA POWER & LIGHT CO. |
Latest revision as of 03:07, 24 January 2020
Date released: 08/12/2019 | Download: ML19210D059 |
---|---|
ML19210D067 | |
Person / Time | |
---|---|
Site: | Brunswick |
Issue date: | 11/16/1979 |
From: | Tollison A CAROLINA POWER & LIGHT CO. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19210D067 (1) | |
ML19210D058 | |
Person / Time | |
---|---|
Site: | Brunswick |
Issue date: | 11/16/1979 |
From: | Tollison A CAROLINA POWER & LIGHT CO. |
To: | OREILLY J P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19210D058 (1) | |