ML102920103: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML102920103
| number = ML102920103
| issue date = 12/10/2009
| issue date = 12/10/2009
| title = Subject: Emailing: !Request #9_NRC SIT Question#3 Information.Docx Attachments: !Request #24_NRC SIT Question#18 Information.Docx; !Request #9 NRC SIT Question#3 Information.Docx
| title = Subject: Emailing: !Request 9_NRC SIT Question 3 Information.Docx Attachments: !Request 24_NRC SIT Question 18 Information.Docx; !Request 9 NRC SIT Question 3 Information.Docx
| author name = Lake L
| author name = Lake L
| author affiliation = NRC/RGN-II/DRS/EB3
| author affiliation = NRC/RGN-II/DRS/EB3
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Lake, Louis From: Sent: To:  
{{#Wiki_filter:Lake, Louis From:
Sent:
To:


==Subject:==
==Subject:==
Attachments:
Attachments:
Lake, Louis 1_ýýThursday, December 10, 2009 8:42 AM Dan naus Emailing:  
Lake, Louis 1_ýý Thursday, December 10, 2009 8:42 AM Dan naus Emailing: !Request #9_NRC SIT Question#3 Information.docx
!Request #9_NRC SIT Question#3 Information.docx
!Request #24_NRC SIT Question#18 Information.docx; !Request #9_NRC SIT Question#3 Information.docx t _ *.-*
!Request #24_NRC SIT Question#18 Information.docx;  
.71  
!Request #9_NRC SIT Question#3 Information.docx t_ .71 /L2 Attached is a re sponse to Question #9 for your review.Lou The message is ready to be sent with the following file or link attachments:
/L2 Attached is a re sponse to Question #9 for your review.
!Request #9_NRC SIT Question#3 Information.docx Note: To protect against computer viruses, e-mail programs may prevent sending or receiving certain types of file attachments.
Lou The message is ready to be sent with the following file or link attachments:
Check your e-mail security settings to determine how attachments are handled.1 911(90 License Request# 24, NRC SIT Question#18 Information 18 What were results of the last three IWE/IWL surveillance reports (provide actual complete reports)?
!Request #9_NRC SIT Question#3 Information.docx Note: To protect against computer viruses, e-mail programs may prevent sending or receiving certain types of file attachments. Check your e-mail security settings to determine how attachments are handled.
Provide inspection procedures and including qualification of personnel information?
1 911(90
 
License Request# 24, NRC SIT Question#18 Information 18 What were results of the last three IWE/IWL surveillance reports (provide actual complete reports)? Provide inspection procedures and including qualification of personnel information?
Enclosed in this folder in response to the above question [Note: Since the IWL rules went into effect in 2001 there have only been 2 IWL examinations performed (5 year requirement)]:
Enclosed in this folder in response to the above question [Note: Since the IWL rules went into effect in 2001 there have only been 2 IWL examinations performed (5 year requirement)]:
Breakdown of the "IWE/IWL -Examination History" Folder: Folder: RF011 -IWE Sub Folder: RFO11 Examination Files: RFO-11 IWE Examination.pdf Sub Folder: RFO11 Personnel Sub Folder: RFO11 Procedures Folder: RF012 -IWE-IWL Sub Folder: RF012 IWE-IWL Examination Files: CR3_2001_IWEIWLEXAMVol 1.pdf Files: CR3_2001_IWEIWLEXAMVol 2.pdf Sub Folder: RF012 Personnel Sub Folder: RF012 Procedures Folder: RF014- IWE Sub Folder: RF014 IWE Examination Files: 2005 Containment Inspection Program Summary.doc Files: wo 702983-16 for IWE prior to ILRT 2005.pdf Sub Folder: RF014 Personnel Sub Folder: RF014 Procedures Folder: RF015 -IWE-IWL Sub Folder: R15 IWE-IWL Examination Files: R15 IWE-IWL Results.xls 4-Files: R15 WO 681043-08
Breakdown of the "IWE/IWL - Examination History" Folder:
-Liner-Containment Inspection.pdf Files: R15 WO 681043-08
Folder: RF011 - IWE Sub Folder: RFO11 Examination Files: RFO-11 IWE Examination.pdf Sub Folder: RFO11 Personnel Sub Folder: RFO11 Procedures Folder: RF012 - IWE-IWL Sub Folder: RF012 IWE-IWL Examination Files: CR3_2001_IWEIWLEXAMVol 1.pdf Files: CR3_2001_IWEIWLEXAMVol 2.pdf Sub Folder: RF012 Personnel Sub Folder: RF012 Procedures Folder: RF014-IWE Sub Folder: RF014 IWE Examination Files: 2005 Containment Inspection Program Summary.doc Files: wo 702983-16 for IWE prior to ILRT 2005.pdf Sub Folder: RF014 Personnel Sub Folder: RF014 Procedures Folder: RF015 - IWE-IWL Sub Folder: R15 IWE-IWL Examination Files: R15 IWE-IWL Results.xls
-Liner Inspection (supplement 1).pdf Files: R15 WO 681043-08
 
-Liner UT lnspection.pdf Sub Folder: RF015 Personnel Sub Folder: RF015 Procedures Breakdown of the "IWL -Tendon Surveillance History" Folder: 6th Surveillance:
4-Files: R15 WO 681043 Liner-Containment Inspection.pdf Files: R15 WO 681043 Liner Inspection (supplement 1).pdf Files: R15 WO 681043 Liner UT lnspection.pdf Sub Folder: RF015 Personnel Sub Folder: RF015 Procedures Breakdown of the "IWL - Tendon Surveillance History" Folder:
6th Surveillance:
File: WR 341602 6th-Surv.pdf:
File: WR 341602 6th-Surv.pdf:
General Contents:
General Contents:
Pages 1-57, Work Request, general documents, parts lists.Pages 58-59, Surveillance Plan Pages 60-82, PSC Equipment lists and calibration certifications Pages 83-114, FPC Evaluation of the 6 th Surveillance (Section 5.0 relates to evaluation of the tendon lift-off testing and potential cause discussions)
Pages 1-57, Work Request, general documents, parts lists.
Pages 115 -end, FPC Surveillance Procedure SP-182, Rev. 13 File: 6TH TENDON SURVEL TEST REPT.pdf: General Contents:
Pages 58-59, Surveillance Plan Pages 60-82, PSC Equipment lists and calibration certifications Pages 83-114, FPC Evaluation of the 6 th Surveillance (Section 5.0 relates to evaluation of the tendon lift-off testing and potential cause discussions)
Pages (All), PSC 2 0 th Year Surveillance of the Post-Tensioning System at the Crystal River Nuclear Plant Unit 3 -Final Report. (Pages 34-39 relate to the tendon lift-off and detensioning, pages 42-45 relate to the tendon retensioning.)
Pages 115 - end, FPC Surveillance Procedure SP-182, Rev. 13 File: 6TH TENDON SURVEL TEST REPT.pdf:
General Contents:
Pages (All), PSC 2 0 th Year Surveillance of the Post-Tensioning System at the Crystal River Nuclear Plant Unit 3 - Final Report. (Pages 34-39 relate to the tendon lift-off and detensioning, pages 42-45 relate to the tendon retensioning.)
7th Surveillance:
7th Surveillance:
File: WR 368426-1_7th-Surv.pdf:
File: WR 368426-1_7th-Surv.pdf:
General Contents:
General Contents:
Pages 1-47, Work Request, general documents, parts lists.Pages 48-50, FPC Evaluation of the 7 th Surveillance (page 49 relates to evaluation of the tendon force measurements)
Pages 1-47, Work Request, general documents, parts lists.
Pages 48-50, FPC Evaluation of the 7 th Surveillance (page 49 relates to evaluation of the tendon force measurements)
Pages 51-113, PSC Equipment lists and calibration certifications.
Pages 51-113, PSC Equipment lists and calibration certifications.
Pages 114- 184, Misc. personnel information and certifications.
Pages 114-184, Misc. personnel information and certifications.
File: 7TH TENDON SURVEL TEST REPT.pdf: General Contents:
 
Pages 1-56, PSC 251h Year Surveillance of the Post-Tensioning System at the Crystal River Nuclear Plant Unit 3 -Final Report. (Pages 27-30 relate to the tendon lift-off and detensioning, pages 33, 35-39 relate to the tendon retensioning.)
File: 7TH TENDON SURVEL TEST REPT.pdf:
Page 56-End, Calculation S01-0019, Preparation of Tendon Force Curves for the 7 th Tendon Surveillance at CR3.8th Surveillance:
File: 8TH TENDON SURVEL TEST REPT- Original.pdf:
General Contents:
General Contents:
Pages 2-4, PEF Evaluation and acceptance of PSC Tendon Surveillance Results.Pages 5-61, PSC Final Report for the 3 0 th Year Containment IWL Inspection, 301h Year Tendon Surveillance (pages 45-49, Section 8.0 relates to tendon lift-off and re-stressing, pages 52-53, Section 10.0 relates to tendon re-stressing, pages 68-69, testing conclusions)
Pages 1-56, PSC 251h Year Surveillance of the Post-Tensioning System at the Crystal River Nuclear Plant Unit 3 - Final Report. (Pages 27-30 relate to the tendon lift-off and detensioning, pages 33, 35-39 relate to the tendon retensioning.)
Pages 61-463, Final Report App. A -PSC field data sheets.Pages 464-475, Final Report App. B -Testing Laboratory results.Pages 476-489, Final Report App. C -PSC Nonconformance reports.Pages 490-491, Final Report App. D -Field Changes Pages 492-523, Final Report App. E -PSC Calibration records.Pages 524-770, Final Report App. F -PSC Inservice Inspection Manual (procedures)
Page 56-End, Calculation S01-0019, Preparation of Tendon Force Curves for the 7 th Tendon Surveillance at CR3.
Pages 771-End, Final Report App. G -PSC Calibration verification reports.
8th Surveillance:
Pages 48-50, FPC Evaluation of the 7 th Surveillance (page 49 relates to evaluation of the tendon force measurements)
File: 8TH TENDON SURVEL TEST REPT-Original.pdf:
General Contents:
Pages 2-4, PEF Evaluation and acceptance of PSC Tendon Surveillance Results.
Pages 5-61, PSC Final Report for the 3 0 th Year Containment IWL Inspection, 301h Year Tendon Surveillance (pages 45-49, Section 8.0 relates to tendon lift-off and re-stressing, pages 52-53, Section 10.0 relates to tendon re-stressing, pages 68-69, testing conclusions)
Pages 61-463, Final Report App. A - PSC field data sheets.
Pages 464-475, Final Report App. B - Testing Laboratory results.
Pages 476-489, Final Report App. C - PSC Nonconformance reports.
Pages 490-491, Final Report App. D - Field Changes Pages 492-523, Final Report App. E - PSC Calibration records.
Pages 524-770, Final Report App. F - PSC Inservice Inspection Manual (procedures)
Pages 771-End, Final Report App. G - PSC Calibration verification reports.
 
Pages 48-50, FPC Evaluation of the 7th Surveillance (page 49 relates to evaluation of the tendon force measurements)
Pages 51-113, PSC Equipment lists and calibration certifications.
Pages 51-113, PSC Equipment lists and calibration certifications.
Pages 114- 184, Misc. personnel information and certifications.
Pages 114-184, Misc. personnel information and certifications.
File: 7TH TENDON SURVEL TEST REPT.pdf: General Contents:
File: 7TH TENDON SURVEL TEST REPT.pdf:
Pages 1-56, PSC 25th Year Surveillance of the Post-Tensioning System at the Crystal River Nuclear Plant Unit 3 -Final Report. (Pages 27-30 relate to the tendon lift-off and detensioning, pages 33, 35-39 relate to the tendon retensioning.)
Page 56-End, Calculation S01-0019, Preparation of Tendon Force Curves for the 7 th Tendon Surveillance at CR3.8th Surveillance:
File: 8TH TENDON SURVEL TEST REPT- Original.pdf:
General Contents:
General Contents:
Pages 2-4, PEF Evaluation and acceptance of PSC Tendon Surveillance Results.Pages 5-61, PSC Final Report for the 30th Year Containment IWL Inspection, 30th Year Tendon Surveillance (pages 45-49, Section 8.0 relates to tendon lift-off and re-stressing, pages 52-53, Section 10.0 relates to tendon re-stressing, pages 68-69, testing conclusions)
Pages 1-56, PSC 25th Year Surveillance of the Post-Tensioning System at the Crystal River Nuclear Plant Unit 3 - Final Report. (Pages 27-30 relate to the tendon lift-off and detensioning, pages 33, 35-39 relate to the tendon retensioning.)
Pages 61-463, Final Report App. A -PSC field data sheets.Pages 464-475, Final Report App. B -Testing Laboratory results.Pages 476-489, Final Report App. C -PSC Nonconformance reports.Pages 490-491, Final Report App. D -Field Changes Pages 492-523, Final Report App. E -PSC Calibration records.Pages 524-770, Final Report App. F -PSC Inservice Inspection Manual (procedures)
Page 56-End, Calculation S01-0019, Preparation of Tendon Force Curves for the 7 th Tendon Surveillance at CR3.
Pages 771-End, Final Report App. G -PSC Calibration verification reports.  
8th Surveillance:
.-.~ 4.Request #9, NRC SIT Question#3 Information
File: 8TH TENDON SURVEL TEST REPT-Original.pdf:
: 3. Was there any analysis of why re-tensioning was required in past tendon surveillance activities (done at that time of surveillance testing)?Response:
General Contents:
There was no analysis performed during past surveillance testing years in which tendons were re-tensioned.
Pages 2-4, PEF Evaluation and acceptance of PSC Tendon Surveillance Results.
Additional information in response to the above question:
Pages 5-61, PSC Final Report for the 30th Year Containment IWL Inspection, 30th Year Tendon Surveillance (pages 45-49, Section 8.0 relates to tendon lift-off and re-stressing, pages 52-53, Section 10.0 relates to tendon re-stressing, pages 68-69, testing conclusions)
See License Request No. 24- NRC SIT Question#
Pages 61-463, Final Report App. A - PSC field data sheets.
18 folder, under sub-folder: "IWL -Tendon Surveillance History" for information, discussions and actions taken related to tendon lift-off testing and re-tensioning.
Pages 464-475, Final Report App. B -Testing Laboratory results.
Below shows the breakdown of the information contained in that folder and highlights specific areas related to the tendon lift-off testing and re-tensioning.
Pages 476-489, Final Report App. C - PSC Nonconformance reports.
Breakdown of the "IWL -Tendon Surveillance History" Folder: 6th Surveillance:
Pages 490-491, Final Report App. D - Field Changes Pages 492-523, Final Report App. E - PSC Calibration records.
Pages 524-770, Final Report App. F - PSC Inservice Inspection Manual (procedures)
Pages 771-End, Final Report App. G - PSC Calibration verification reports.
 
~
4.
Request #9, NRC SIT Question#3 Information
: 3.
Was there any analysis of why re-tensioning was required in past tendon surveillance activities (done at that time of surveillance testing)?
Response: There was no analysis performed during past surveillance testing years in which tendons were re-tensioned.
Additional information in response to the above question: See License Request No. 24-NRC SIT Question# 18 folder, under sub-folder: "IWL - Tendon Surveillance History" for information, discussions and actions taken related to tendon lift-off testing and re-tensioning. Below shows the breakdown of the information contained in that folder and highlights specific areas related to the tendon lift-off testing and re-tensioning.
Breakdown of the "IWL -Tendon Surveillance History" Folder:
6th Surveillance:
File: WR 341602 6th-Surv.pdf:
File: WR 341602 6th-Surv.pdf:
General Contents: Pages 1-57, Work Request, general documents, parts lists.Pages 58-59, Surveillance Plan Pages 60-82, PSC Equipment lists and calibration certifications Pages 83-114, FPC Evaluation of the 6 th Surveillance (Section 5.0 relates to evaluation of the tendon lift-off testing and potential cause discussions)
General Contents:
Pages 115 -end, FPC Surveillance Procedure SP-182, Rev. 13 File: 6TH TENDON SURVEL TEST REPT.pdf: General Contents: Pages (All), PSC 20th Year Surveillance of the Post-Tensioning System at the Crystal River Nuclear Plant Unit 3 -Final Report. (Pages 34-39 relate to the tendon lift-off and detensioning, pages 42-45 relate to the tendon retensioning.)
Pages 1-57, Work Request, general documents, parts lists.
Pages 58-59, Surveillance Plan Pages 60-82, PSC Equipment lists and calibration certifications Pages 83-114, FPC Evaluation of the 6 th Surveillance (Section 5.0 relates to evaluation of the tendon lift-off testing and potential cause discussions)
Pages 115 - end, FPC Surveillance Procedure SP-182, Rev. 13 File: 6TH TENDON SURVEL TEST REPT.pdf:
General Contents:
Pages (All), PSC 20th Year Surveillance of the Post-Tensioning System at the Crystal River Nuclear Plant Unit 3 - Final Report. (Pages 34-39 relate to the tendon lift-off and detensioning, pages 42-45 relate to the tendon retensioning.)
7th Surveillance:
7th Surveillance:
File: WR 368426-1_7th-Surv.pdf:
File: WR 368426-1_7th-Surv.pdf:
General Contents: Pages 1-47, Work Request, general documents, parts lists.}}
General Contents:
Pages 1-47, Work Request, general documents, parts lists.}}

Latest revision as of 02:28, 14 January 2025

Subject: Emailing: !Request 9_NRC SIT Question 3 Information.Docx Attachments: !Request 24_NRC SIT Question 18 Information.Docx; !Request 9 NRC SIT Question 3 Information.Docx
ML102920103
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/10/2009
From: Lake L
NRC/RGN-II/DRS/EB3
To: Naus D
- No Known Affiliation
References
FOIA/PA-2010-0116
Download: ML102920103 (6)


Text

Lake, Louis From:

Sent:

To:

Subject:

Attachments:

Lake, Louis 1_ýý Thursday, December 10, 2009 8:42 AM Dan naus Emailing: !Request #9_NRC SIT Question#3 Information.docx

!Request #24_NRC SIT Question#18 Information.docx; !Request #9_NRC SIT Question#3 Information.docx t _ *.-*

.71

/L2 Attached is a re sponse to Question #9 for your review.

Lou The message is ready to be sent with the following file or link attachments:

!Request #9_NRC SIT Question#3 Information.docx Note: To protect against computer viruses, e-mail programs may prevent sending or receiving certain types of file attachments. Check your e-mail security settings to determine how attachments are handled.

1 911(90

License Request# 24, NRC SIT Question#18 Information 18 What were results of the last three IWE/IWL surveillance reports (provide actual complete reports)? Provide inspection procedures and including qualification of personnel information?

Enclosed in this folder in response to the above question [Note: Since the IWL rules went into effect in 2001 there have only been 2 IWL examinations performed (5 year requirement)]:

Breakdown of the "IWE/IWL - Examination History" Folder:

Folder: RF011 - IWE Sub Folder: RFO11 Examination Files: RFO-11 IWE Examination.pdf Sub Folder: RFO11 Personnel Sub Folder: RFO11 Procedures Folder: RF012 - IWE-IWL Sub Folder: RF012 IWE-IWL Examination Files: CR3_2001_IWEIWLEXAMVol 1.pdf Files: CR3_2001_IWEIWLEXAMVol 2.pdf Sub Folder: RF012 Personnel Sub Folder: RF012 Procedures Folder: RF014-IWE Sub Folder: RF014 IWE Examination Files: 2005 Containment Inspection Program Summary.doc Files: wo 702983-16 for IWE prior to ILRT 2005.pdf Sub Folder: RF014 Personnel Sub Folder: RF014 Procedures Folder: RF015 - IWE-IWL Sub Folder: R15 IWE-IWL Examination Files: R15 IWE-IWL Results.xls

4-Files: R15 WO 681043 Liner-Containment Inspection.pdf Files: R15 WO 681043 Liner Inspection (supplement 1).pdf Files: R15 WO 681043 Liner UT lnspection.pdf Sub Folder: RF015 Personnel Sub Folder: RF015 Procedures Breakdown of the "IWL - Tendon Surveillance History" Folder:

6th Surveillance:

File: WR 341602 6th-Surv.pdf:

General Contents:

Pages 1-57, Work Request, general documents, parts lists.

Pages 58-59, Surveillance Plan Pages 60-82, PSC Equipment lists and calibration certifications Pages83-114, FPC Evaluation of the 6 th Surveillance (Section 5.0 relates to evaluation of the tendon lift-off testing and potential cause discussions)

Pages 115 - end, FPC Surveillance Procedure SP-182, Rev. 13 File: 6TH TENDON SURVEL TEST REPT.pdf:

General Contents:

Pages (All), PSC 2 0 th Year Surveillance of the Post-Tensioning System at the Crystal River Nuclear Plant Unit 3 - Final Report. (Pages 34-39 relate to the tendon lift-off and detensioning, pages 42-45 relate to the tendon retensioning.)

7th Surveillance:

File: WR 368426-1_7th-Surv.pdf:

General Contents:

Pages 1-47, Work Request, general documents, parts lists.

Pages 48-50, FPC Evaluation of the 7 th Surveillance (page 49 relates to evaluation of the tendon force measurements)

Pages51-113, PSC Equipment lists and calibration certifications.

Pages 114-184, Misc. personnel information and certifications.

File: 7TH TENDON SURVEL TEST REPT.pdf:

General Contents:

Pages 1-56, PSC 251h Year Surveillance of the Post-Tensioning System at the Crystal River Nuclear Plant Unit 3 - Final Report. (Pages 27-30 relate to the tendon lift-off and detensioning, pages 33, 35-39 relate to the tendon retensioning.)

Page 56-End, Calculation S01-0019, Preparation of Tendon Force Curves for the 7 th Tendon Surveillance at CR3.

8th Surveillance:

File: 8TH TENDON SURVEL TEST REPT-Original.pdf:

General Contents:

Pages 2-4, PEF Evaluation and acceptance of PSC Tendon Surveillance Results.

Pages 5-61, PSC Final Report for the 3 0 th Year Containment IWL Inspection, 301h Year Tendon Surveillance (pages 45-49, Section 8.0 relates to tendon lift-off and re-stressing, pages 52-53, Section 10.0 relates to tendon re-stressing, pages 68-69, testing conclusions)

Pages61-463, Final Report App. A - PSC field data sheets.

Pages 464-475, Final Report App. B - Testing Laboratory results.

Pages 476-489, Final Report App. C - PSC Nonconformance reports.

Pages 490-491, Final Report App. D - Field Changes Pages 492-523, Final Report App. E - PSC Calibration records.

Pages 524-770, Final Report App. F - PSC Inservice Inspection Manual (procedures)

Pages 771-End, Final Report App. G - PSC Calibration verification reports.

Pages 48-50, FPC Evaluation of the 7th Surveillance (page 49 relates to evaluation of the tendon force measurements)

Pages51-113, PSC Equipment lists and calibration certifications.

Pages 114-184, Misc. personnel information and certifications.

File: 7TH TENDON SURVEL TEST REPT.pdf:

General Contents:

Pages 1-56, PSC 25th Year Surveillance of the Post-Tensioning System at the Crystal River Nuclear Plant Unit 3 - Final Report. (Pages 27-30 relate to the tendon lift-off and detensioning, pages 33, 35-39 relate to the tendon retensioning.)

Page 56-End, Calculation S01-0019, Preparation of Tendon Force Curves for the 7 th Tendon Surveillance at CR3.

8th Surveillance:

File: 8TH TENDON SURVEL TEST REPT-Original.pdf:

General Contents:

Pages 2-4, PEF Evaluation and acceptance of PSC Tendon Surveillance Results.

Pages 5-61, PSC Final Report for the 30th Year Containment IWL Inspection, 30th Year Tendon Surveillance (pages 45-49, Section 8.0 relates to tendon lift-off and re-stressing, pages 52-53, Section 10.0 relates to tendon re-stressing, pages 68-69, testing conclusions)

Pages61-463, Final Report App. A - PSC field data sheets.

Pages 464-475, Final Report App. B -Testing Laboratory results.

Pages 476-489, Final Report App. C - PSC Nonconformance reports.

Pages 490-491, Final Report App. D - Field Changes Pages 492-523, Final Report App. E - PSC Calibration records.

Pages 524-770, Final Report App. F - PSC Inservice Inspection Manual (procedures)

Pages 771-End, Final Report App. G - PSC Calibration verification reports.

~

4.

Request #9, NRC SIT Question#3 Information

3.

Was there any analysis of why re-tensioning was required in past tendon surveillance activities (done at that time of surveillance testing)?

Response: There was no analysis performed during past surveillance testing years in which tendons were re-tensioned.

Additional information in response to the above question: See License Request No. 24-NRC SIT Question# 18 folder, under sub-folder: "IWL - Tendon Surveillance History" for information, discussions and actions taken related to tendon lift-off testing and re-tensioning. Below shows the breakdown of the information contained in that folder and highlights specific areas related to the tendon lift-off testing and re-tensioning.

Breakdown of the "IWL -Tendon Surveillance History" Folder:

6th Surveillance:

File: WR 341602 6th-Surv.pdf:

General Contents:

Pages 1-57, Work Request, general documents, parts lists.

Pages 58-59, Surveillance Plan Pages 60-82, PSC Equipment lists and calibration certifications Pages83-114, FPC Evaluation of the 6 th Surveillance (Section 5.0 relates to evaluation of the tendon lift-off testing and potential cause discussions)

Pages 115 - end, FPC Surveillance Procedure SP-182, Rev. 13 File: 6TH TENDON SURVEL TEST REPT.pdf:

General Contents:

Pages (All), PSC 20th Year Surveillance of the Post-Tensioning System at the Crystal River Nuclear Plant Unit 3 - Final Report. (Pages 34-39 relate to the tendon lift-off and detensioning, pages 42-45 relate to the tendon retensioning.)

7th Surveillance:

File: WR 368426-1_7th-Surv.pdf:

General Contents:

Pages 1-47, Work Request, general documents, parts lists.