{{#Wiki_filter:Lake, Louis From: Sent: To:  
{{#Wiki_filter:Lake, Louis From:                     Lake, Louis 1_ýý Sent:                     Thursday, December 10, 2009 8:42 AM To:                       Dan naus


==Subject:==
==Subject:==
Attachments:
Emailing: !Request #9_NRC SIT Question#3 Information.docx Attachments:              !Request #24_NRC SIT Question#18 Information.docx; !Request #9_NRC SIT Question#3 Information.docx                   t_   /L2
Lake, Louis 1_ýýThursday, December 10, 2009 8:42 AM Dan naus Emailing:  
                                                                *.-*                          .71 Attached is a re sponse to Question #9 for your review.
!Request #9_NRC SIT Question#3 Information.docx
Lou The message is ready to be sent with the following file or link attachments:
!Request #24_NRC SIT Question#18 Information.docx;  
!Request #9_NRC SIT Question#3 Information.docx Note: To protect against computer viruses, e-mail programs may prevent sending or receiving certain types of file attachments. Check your e-mail security settings to determine how attachments are handled.
!Request #9_NRC SIT Question#3 Information.docx t_ .71 /L2 Attached is a re sponse to Question #9 for your review.Lou The message is ready to be sent with the following file or link attachments:
1 911(90
!Request #9_NRC SIT Question#3 Information.docx Note: To protect against computer viruses, e-mail programs may prevent sending or receiving certain types of file attachments.
 
Check your e-mail security settings to determine how attachments are handled.1 911(90 License Request# 24, NRC SIT Question#18 Information 18 What were results of the last three IWE/IWL surveillance reports (provide actual complete reports)?
License Request# 24, NRC SIT Question#18 Information 18 What were results of the last three IWE/IWL surveillance reports (provide actual complete reports)? Provide inspection procedures and including qualification of personnel information?
Provide inspection procedures and including qualification of personnel information?
Enclosed in this folder in response to the above question [Note: Since the IWL rules went into effect in 2001 there have only been 2 IWL examinations performed (5 year requirement)]:
Enclosed in this folder in response to the above question [Note: Since the IWL rules went into effect in 2001 there have only been 2 IWL examinations performed (5 year requirement)]:
Breakdown of the "IWE/IWL -Examination History" Folder: Folder: RF011 -IWE Sub Folder: RFO11 Examination Files: RFO-11 IWE Examination.pdf Sub Folder: RFO11 Personnel Sub Folder: RFO11 Procedures Folder: RF012 -IWE-IWL Sub Folder: RF012 IWE-IWL Examination Files: CR3_2001_IWEIWLEXAMVol 1.pdf Files: CR3_2001_IWEIWLEXAMVol 2.pdf Sub Folder: RF012 Personnel Sub Folder: RF012 Procedures Folder: RF014- IWE Sub Folder: RF014 IWE Examination Files: 2005 Containment Inspection Program Summary.doc Files: wo 702983-16 for IWE prior to ILRT 2005.pdf Sub Folder: RF014 Personnel Sub Folder: RF014 Procedures Folder: RF015 -IWE-IWL Sub Folder: R15 IWE-IWL Examination Files: R15 IWE-IWL Results.xls 4-Files: R15 WO 681043-08
Breakdown of the "IWE/IWL - Examination History" Folder:
-Liner-Containment Inspection.pdf Files: R15 WO 681043-08
Folder: RF011 - IWE Sub Folder: RFO11 Examination Files: RFO-11 IWE Examination.pdf Sub Folder: RFO11 Personnel Sub Folder: RFO11 Procedures Folder: RF012 - IWE-IWL Sub Folder: RF012 IWE-IWL Examination Files: CR3_2001_IWEIWLEXAMVol 1.pdf Files: CR3_2001_IWEIWLEXAMVol 2.pdf Sub Folder: RF012 Personnel Sub Folder: RF012 Procedures Folder: RF014- IWE Sub Folder: RF014 IWE Examination Files: 2005 Containment Inspection Program Summary.doc Files: wo 702983-16 for IWE prior to ILRT 2005.pdf Sub Folder: RF014 Personnel Sub Folder: RF014 Procedures Folder: RF015 - IWE-IWL Sub Folder: R15 IWE-IWL Examination Files: R15 IWE-IWL Results.xls
-Liner Inspection (supplement 1).pdf Files: R15 WO 681043-08
 
-Liner UT lnspection.pdf Sub Folder: RF015 Personnel Sub Folder: RF015 Procedures Breakdown of the "IWL -Tendon Surveillance History" Folder: 6th Surveillance:
4-Files: R15 WO 681043 Liner-Containment Inspection.pdf Files: R15 WO 681043 Liner Inspection (supplement 1).pdf Files: R15 WO 681043 Liner UT lnspection.pdf Sub Folder: RF015 Personnel Sub Folder: RF015 Procedures Breakdown of the "IWL - Tendon Surveillance History" Folder:
6th Surveillance:
File: WR 341602 6th-Surv.pdf:
File: WR 341602 6th-Surv.pdf:
General Contents:
General Contents:       Pages 1-57, Work Request, general documents, parts lists.
Pages 1-57, Work Request, general documents, parts lists.Pages 58-59, Surveillance Plan Pages 60-82, PSC Equipment lists and calibration certifications Pages 83-114, FPC Evaluation of the 6 th Surveillance (Section 5.0 relates to evaluation of the tendon lift-off testing and potential cause discussions)
Pages 58-59, Surveillance Plan Pages 60-82, PSC Equipment lists and calibration certifications Pages 83-114, FPC Evaluation of the       6 th Surveillance (Section 5.0 relates to evaluation of the tendon lift-off testing and potential cause discussions)
Pages 115 -end, FPC Surveillance Procedure SP-182, Rev. 13 File: 6TH TENDON SURVEL TEST REPT.pdf: General Contents:
Pages 115 - end, FPC Surveillance Procedure SP-182, Rev. 13 File: 6TH TENDON SURVEL TEST REPT.pdf:
Pages (All), PSC 2 0 th Year Surveillance of the Post-Tensioning System at the Crystal River Nuclear Plant Unit 3 -Final Report. (Pages 34-39 relate to the tendon lift-off and detensioning, pages 42-45 relate to the tendon retensioning.)
General Contents:         Pages (All), PSC 2 0 th Year Surveillance of the Post-Tensioning System at the Crystal River Nuclear Plant Unit 3 - Final Report. (Pages 34-39 relate to the tendon lift-off and detensioning, pages 42-45 relate to the tendon retensioning.)
7th Surveillance:
7th Surveillance:
File: WR 368426-1_7th-Surv.pdf:
File: WR 368426-1_7th-Surv.pdf:
General Contents:
General Contents:         Pages 1-47, Work Request, general documents, parts lists.
Pages 1-47, Work Request, general documents, parts lists.Pages 48-50, FPC Evaluation of the 7 th Surveillance (page 49 relates to evaluation of the tendon force measurements)
Pages 48-50, FPC Evaluation of the     7 th Surveillance (page 49 relates to evaluation of the tendon force measurements)
Pages 51-113, PSC Equipment lists and calibration certifications.
Pages 51-113, PSC Equipment lists and calibration certifications.
Pages 114- 184, Misc. personnel information and certifications.
Pages 114- 184, Misc. personnel information and certifications.
File: 7TH TENDON SURVEL TEST REPT.pdf: General Contents:
 
Pages 1-56, PSC 251h Year Surveillance of the Post-Tensioning System at the Crystal River Nuclear Plant Unit 3 -Final Report. (Pages 27-30 relate to the tendon lift-off and detensioning, pages 33, 35-39 relate to the tendon retensioning.)
File: 7TH TENDON SURVEL TEST REPT.pdf:
Page 56-End, Calculation S01-0019, Preparation of Tendon Force Curves for the 7 th Tendon Surveillance at CR3.8th Surveillance:
General Contents:     Pages 1-56, PSC 251h Year Surveillance of the Post-Tensioning System at the Crystal River Nuclear Plant Unit 3 - Final Report. (Pages 27-30 relate to the tendon lift-off and detensioning, pages 33, 35-39 relate to the tendon retensioning.)
Page 56-End, Calculation S01-0019, Preparation of Tendon Force Curves for the   7 th Tendon Surveillance at CR3.
8th Surveillance:
File: 8TH TENDON SURVEL TEST REPT- Original.pdf:
File: 8TH TENDON SURVEL TEST REPT- Original.pdf:
General Contents:
General Contents:     Pages 2-4, PEF Evaluation and acceptance of PSC Tendon Surveillance Results.
Pages 2-4, PEF Evaluation and acceptance of PSC Tendon Surveillance Results.Pages 5-61, PSC Final Report for the 3 0 th Year Containment IWL Inspection, 301h Year Tendon Surveillance (pages 45-49, Section 8.0 relates to tendon lift-off and re-stressing, pages 52-53, Section 10.0 relates to tendon re-stressing, pages 68-69, testing conclusions)
Pages 5-61, PSC Final Report for the 3 0 th Year Containment IWL Inspection, 301h Year Tendon Surveillance (pages 45-49, Section 8.0 relates to tendon lift-off and re-stressing, pages 52-53, Section 10.0 relates to tendon re-stressing, pages 68-69, testing conclusions)
Pages 61-463, Final Report App. A -PSC field data sheets.Pages 464-475, Final Report App. B -Testing Laboratory results.Pages 476-489, Final Report App. C -PSC Nonconformance reports.Pages 490-491, Final Report App. D -Field Changes Pages 492-523, Final Report App. E -PSC Calibration records.Pages 524-770, Final Report App. F -PSC Inservice Inspection Manual (procedures)
Pages 61-463, Final Report App. A - PSC field data sheets.
Pages 771-End, Final Report App. G -PSC Calibration verification reports.
Pages 464-475, Final Report App. B - Testing Laboratory results.
Pages 48-50, FPC Evaluation of the 7 th Surveillance (page 49 relates to evaluation of the tendon force measurements)
Pages 476-489, Final Report App. C - PSC Nonconformance reports.
Pages 490-491, Final Report App. D - Field Changes Pages 492-523, Final Report App. E - PSC Calibration records.
Pages 524-770, Final Report App. F - PSC Inservice Inspection Manual (procedures)
Pages 771-End, Final Report App. G - PSC Calibration verification reports.
 
Pages 48-50, FPC Evaluation of the   7 th Surveillance (page 49 relates to evaluation of the tendon force measurements)
Pages 51-113, PSC Equipment lists and calibration certifications.
Pages 51-113, PSC Equipment lists and calibration certifications.
Pages 114- 184, Misc. personnel information and certifications.
Pages 114- 184, Misc. personnel information and certifications.
File: 7TH TENDON SURVEL TEST REPT.pdf: General Contents:
File: 7TH TENDON SURVEL TEST REPT.pdf:
Pages 1-56, PSC 25th Year Surveillance of the Post-Tensioning System at the Crystal River Nuclear Plant Unit 3 -Final Report. (Pages 27-30 relate to the tendon lift-off and detensioning, pages 33, 35-39 relate to the tendon retensioning.)
General Contents:     Pages 1-56, PSC 25th Year Surveillance of the Post-Tensioning System at the Crystal River Nuclear Plant Unit 3 - Final Report. (Pages 27-30 relate to the tendon lift-off and detensioning, pages 33, 35-39 relate to the tendon retensioning.)
Page 56-End, Calculation S01-0019, Preparation of Tendon Force Curves for the 7 th Tendon Surveillance at CR3.8th Surveillance:
Page 56-End, Calculation S01-0019, Preparation of Tendon Force Curves for the 7 th Tendon Surveillance at CR3.
8th Surveillance:
File: 8TH TENDON SURVEL TEST REPT- Original.pdf:
File: 8TH TENDON SURVEL TEST REPT- Original.pdf:
General Contents:
General Contents:     Pages 2-4, PEF Evaluation and acceptance of PSC Tendon Surveillance Results.
Pages 2-4, PEF Evaluation and acceptance of PSC Tendon Surveillance Results.Pages 5-61, PSC Final Report for the 30th Year Containment IWL Inspection, 30th Year Tendon Surveillance (pages 45-49, Section 8.0 relates to tendon lift-off and re-stressing, pages 52-53, Section 10.0 relates to tendon re-stressing, pages 68-69, testing conclusions)
Pages 5-61, PSC Final Report for the 30th Year Containment IWL Inspection, 30th Year Tendon Surveillance (pages 45-49, Section 8.0 relates to tendon lift-off and re-stressing, pages 52-53, Section 10.0 relates to tendon re-stressing, pages 68-69, testing conclusions)
Pages 61-463, Final Report App. A -PSC field data sheets.Pages 464-475, Final Report App. B -Testing Laboratory results.Pages 476-489, Final Report App. C -PSC Nonconformance reports.Pages 490-491, Final Report App. D -Field Changes Pages 492-523, Final Report App. E -PSC Calibration records.Pages 524-770, Final Report App. F -PSC Inservice Inspection Manual (procedures)
Pages 61-463, Final Report App. A - PSC field data sheets.
Pages 771-End, Final Report App. G -PSC Calibration verification reports.  
Pages 464-475, Final Report App. B -Testing Laboratory results.
.-.~ 4.Request #9, NRC SIT Question#3 Information
Pages 476-489, Final Report App. C - PSC Nonconformance reports.
: 3. Was there any analysis of why re-tensioning was required in past tendon surveillance activities (done at that time of surveillance testing)?Response:
Pages 490-491, Final Report App. D - Field Changes Pages 492-523, Final Report App. E - PSC Calibration records.
There was no analysis performed during past surveillance testing years in which tendons were re-tensioned.
Pages 524-770, Final Report App. F - PSC Inservice Inspection Manual (procedures)
Additional information in response to the above question:
Pages 771-End, Final Report App. G - PSC Calibration verification reports.
See License Request No. 24- NRC SIT Question#
 
18 folder, under sub-folder: "IWL -Tendon Surveillance History" for information, discussions and actions taken related to tendon lift-off testing and re-tensioning.
.-. ~ 4.
Below shows the breakdown of the information contained in that folder and highlights specific areas related to the tendon lift-off testing and re-tensioning.
Request #9, NRC SIT Question#3 Information
Breakdown of the "IWL -Tendon Surveillance History" Folder: 6th Surveillance:
: 3. Was there any analysis of why re-tensioning was required in past tendon surveillance activities (done at that time of surveillance testing)?
Response: There was no analysis performed during past surveillance testing years in which tendons were re-tensioned.
Additional information in response to the above question: See License Request No. 24- NRC SIT Question# 18 folder, under sub-folder: "IWL - Tendon Surveillance History" for information, discussions and actions taken related to tendon lift-off testing and re-tensioning. Below shows the breakdown of the information contained in that folder and highlights specific areas related to the tendon lift-off testing and re-tensioning.
Breakdown of the "IWL     -Tendon Surveillance History" Folder:
6th Surveillance:
File: WR 341602 6th-Surv.pdf:
File: WR 341602 6th-Surv.pdf:
General Contents: Pages 1-57, Work Request, general documents, parts lists.Pages 58-59, Surveillance Plan Pages 60-82, PSC Equipment lists and calibration certifications Pages 83-114, FPC Evaluation of the 6 th Surveillance (Section 5.0 relates to evaluation of the tendon lift-off testing and potential cause discussions)
General Contents:       Pages 1-57, Work Request, general documents, parts lists.
Pages 115 -end, FPC Surveillance Procedure SP-182, Rev. 13 File: 6TH TENDON SURVEL TEST REPT.pdf: General Contents: Pages (All), PSC 20th Year Surveillance of the Post-Tensioning System at the Crystal River Nuclear Plant Unit 3 -Final Report. (Pages 34-39 relate to the tendon lift-off and detensioning, pages 42-45 relate to the tendon retensioning.)
Pages 58-59, Surveillance Plan Pages 60-82, PSC Equipment lists and calibration certifications Pages 83-114, FPC Evaluation of the   6 th Surveillance (Section 5.0 relates to evaluation of the tendon lift-off testing and potential cause discussions)
Pages 115 - end, FPC Surveillance Procedure SP-182, Rev. 13 File: 6TH TENDON SURVEL TEST REPT.pdf:
General Contents:       Pages (All), PSC 20th Year Surveillance of the Post-Tensioning System at the Crystal River Nuclear Plant Unit 3 - Final Report. (Pages 34-39 relate to the tendon lift-off and detensioning, pages 42-45 relate to the tendon retensioning.)
7th Surveillance:
7th Surveillance:
File: WR 368426-1_7th-Surv.pdf:
File: WR 368426-1_7th-Surv.pdf:
General Contents: Pages 1-47, Work Request, general documents, parts lists.}}
General Contents:       Pages 1-47, Work Request, general documents, parts lists.}}

Latest revision as of 07:45, 13 November 2019

Subject: Emailing: !Request #9_NRC SIT Question#3 Information.Docx Attachments: !Request #24_NRC SIT Question#18 Information.Docx; !Request #9 NRC SIT Question#3 Information.Docx
ML102920103
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/10/2009
From: Lake L
NRC/RGN-II/DRS/EB3
To: Naus D
- No Known Affiliation
References
FOIA/PA-2010-0116
Download: ML102920103 (6)


Text

Lake, Louis From: Lake, Louis 1_ýý Sent: Thursday, December 10, 2009 8:42 AM To: Dan naus

Subject:

Emailing: !Request #9_NRC SIT Question#3 Information.docx Attachments: !Request #24_NRC SIT Question#18 Information.docx; !Request #9_NRC SIT Question#3 Information.docx t_ /L2

  • .-* .71 Attached is a re sponse to Question #9 for your review.

Lou The message is ready to be sent with the following file or link attachments:

!Request #9_NRC SIT Question#3 Information.docx Note: To protect against computer viruses, e-mail programs may prevent sending or receiving certain types of file attachments. Check your e-mail security settings to determine how attachments are handled.

1 911(90

License Request# 24, NRC SIT Question#18 Information 18 What were results of the last three IWE/IWL surveillance reports (provide actual complete reports)? Provide inspection procedures and including qualification of personnel information?

Enclosed in this folder in response to the above question [Note: Since the IWL rules went into effect in 2001 there have only been 2 IWL examinations performed (5 year requirement)]:

Breakdown of the "IWE/IWL - Examination History" Folder:

Folder: RF011 - IWE Sub Folder: RFO11 Examination Files: RFO-11 IWE Examination.pdf Sub Folder: RFO11 Personnel Sub Folder: RFO11 Procedures Folder: RF012 - IWE-IWL Sub Folder: RF012 IWE-IWL Examination Files: CR3_2001_IWEIWLEXAMVol 1.pdf Files: CR3_2001_IWEIWLEXAMVol 2.pdf Sub Folder: RF012 Personnel Sub Folder: RF012 Procedures Folder: RF014- IWE Sub Folder: RF014 IWE Examination Files: 2005 Containment Inspection Program Summary.doc Files: wo 702983-16 for IWE prior to ILRT 2005.pdf Sub Folder: RF014 Personnel Sub Folder: RF014 Procedures Folder: RF015 - IWE-IWL Sub Folder: R15 IWE-IWL Examination Files: R15 IWE-IWL Results.xls

4-Files: R15 WO 681043 Liner-Containment Inspection.pdf Files: R15 WO 681043 Liner Inspection (supplement 1).pdf Files: R15 WO 681043 Liner UT lnspection.pdf Sub Folder: RF015 Personnel Sub Folder: RF015 Procedures Breakdown of the "IWL - Tendon Surveillance History" Folder:

6th Surveillance:

File: WR 341602 6th-Surv.pdf:

General Contents: Pages 1-57, Work Request, general documents, parts lists.

Pages 58-59, Surveillance Plan Pages 60-82, PSC Equipment lists and calibration certifications Pages83-114, FPC Evaluation of the 6 th Surveillance (Section 5.0 relates to evaluation of the tendon lift-off testing and potential cause discussions)

Pages 115 - end, FPC Surveillance Procedure SP-182, Rev. 13 File: 6TH TENDON SURVEL TEST REPT.pdf:

General Contents: Pages (All), PSC 2 0 th Year Surveillance of the Post-Tensioning System at the Crystal River Nuclear Plant Unit 3 - Final Report. (Pages 34-39 relate to the tendon lift-off and detensioning, pages 42-45 relate to the tendon retensioning.)

7th Surveillance:

File: WR 368426-1_7th-Surv.pdf:

General Contents: Pages 1-47, Work Request, general documents, parts lists.

Pages 48-50, FPC Evaluation of the 7 th Surveillance (page 49 relates to evaluation of the tendon force measurements)

Pages51-113, PSC Equipment lists and calibration certifications.

Pages 114- 184, Misc. personnel information and certifications.

File: 7TH TENDON SURVEL TEST REPT.pdf:

General Contents: Pages 1-56, PSC 251h Year Surveillance of the Post-Tensioning System at the Crystal River Nuclear Plant Unit 3 - Final Report. (Pages 27-30 relate to the tendon lift-off and detensioning, pages 33, 35-39 relate to the tendon retensioning.)

Page 56-End, Calculation S01-0019, Preparation of Tendon Force Curves for the 7 th Tendon Surveillance at CR3.

8th Surveillance:

File: 8TH TENDON SURVEL TEST REPT- Original.pdf:

General Contents: Pages 2-4, PEF Evaluation and acceptance of PSC Tendon Surveillance Results.

Pages 5-61, PSC Final Report for the 3 0 th Year Containment IWL Inspection, 301h Year Tendon Surveillance (pages 45-49, Section 8.0 relates to tendon lift-off and re-stressing, pages 52-53, Section 10.0 relates to tendon re-stressing, pages 68-69, testing conclusions)

Pages61-463, Final Report App. A - PSC field data sheets.

Pages 464-475, Final Report App. B - Testing Laboratory results.

Pages 476-489, Final Report App. C - PSC Nonconformance reports.

Pages 490-491, Final Report App. D - Field Changes Pages 492-523, Final Report App. E - PSC Calibration records.

Pages 524-770, Final Report App. F - PSC Inservice Inspection Manual (procedures)

Pages 771-End, Final Report App. G - PSC Calibration verification reports.

Pages 48-50, FPC Evaluation of the 7 th Surveillance (page 49 relates to evaluation of the tendon force measurements)

Pages51-113, PSC Equipment lists and calibration certifications.

Pages 114- 184, Misc. personnel information and certifications.

File: 7TH TENDON SURVEL TEST REPT.pdf:

General Contents: Pages 1-56, PSC 25th Year Surveillance of the Post-Tensioning System at the Crystal River Nuclear Plant Unit 3 - Final Report. (Pages 27-30 relate to the tendon lift-off and detensioning, pages 33, 35-39 relate to the tendon retensioning.)

Page 56-End, Calculation S01-0019, Preparation of Tendon Force Curves for the 7 th Tendon Surveillance at CR3.

8th Surveillance:

File: 8TH TENDON SURVEL TEST REPT- Original.pdf:

General Contents: Pages 2-4, PEF Evaluation and acceptance of PSC Tendon Surveillance Results.

Pages 5-61, PSC Final Report for the 30th Year Containment IWL Inspection, 30th Year Tendon Surveillance (pages 45-49, Section 8.0 relates to tendon lift-off and re-stressing, pages 52-53, Section 10.0 relates to tendon re-stressing, pages 68-69, testing conclusions)

Pages61-463, Final Report App. A - PSC field data sheets.

Pages 464-475, Final Report App. B -Testing Laboratory results.

Pages 476-489, Final Report App. C - PSC Nonconformance reports.

Pages 490-491, Final Report App. D - Field Changes Pages 492-523, Final Report App. E - PSC Calibration records.

Pages 524-770, Final Report App. F - PSC Inservice Inspection Manual (procedures)

Pages 771-End, Final Report App. G - PSC Calibration verification reports.

.-. ~ 4.

Request #9, NRC SIT Question#3 Information

3. Was there any analysis of why re-tensioning was required in past tendon surveillance activities (done at that time of surveillance testing)?

Response: There was no analysis performed during past surveillance testing years in which tendons were re-tensioned.

Additional information in response to the above question: See License Request No. 24- NRC SIT Question# 18 folder, under sub-folder: "IWL - Tendon Surveillance History" for information, discussions and actions taken related to tendon lift-off testing and re-tensioning. Below shows the breakdown of the information contained in that folder and highlights specific areas related to the tendon lift-off testing and re-tensioning.

Breakdown of the "IWL -Tendon Surveillance History" Folder:

6th Surveillance:

File: WR 341602 6th-Surv.pdf:

General Contents: Pages 1-57, Work Request, general documents, parts lists.

Pages 58-59, Surveillance Plan Pages 60-82, PSC Equipment lists and calibration certifications Pages83-114, FPC Evaluation of the 6 th Surveillance (Section 5.0 relates to evaluation of the tendon lift-off testing and potential cause discussions)

Pages 115 - end, FPC Surveillance Procedure SP-182, Rev. 13 File: 6TH TENDON SURVEL TEST REPT.pdf:

General Contents: Pages (All), PSC 20th Year Surveillance of the Post-Tensioning System at the Crystal River Nuclear Plant Unit 3 - Final Report. (Pages 34-39 relate to the tendon lift-off and detensioning, pages 42-45 relate to the tendon retensioning.)

7th Surveillance:

File: WR 368426-1_7th-Surv.pdf:

General Contents: Pages 1-47, Work Request, general documents, parts lists.