{{#Wiki_filter:February 20, 2013 MEMORANDUM TO: Meena Khanna, Chief   Plant Licensing Branch I-2   Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation  
{{#Wiki_filter:February 20, 2013 MEMORANDUM TO: Meena Khanna, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:
 
Peter Bamford, Project Manager /RA/
FROM:   Peter Bamford, Project Manager /RA/
Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation  
Plant Licensing Branch I-2   Division of Operating Reactor Licensing     Office of Nuclear Reactor Regulation  


==SUBJECT:==
==SUBJECT:==
THREE MILE ISLAND, UNIT NO. 1 - ELECTRONIC TRANSMISSION, DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING END-OF-INTERVAL RELIEF REQUEST RR-12-01, PRESSURIZER NOZZLE-TO-HEAD WELD EXAMS (TAC NO. ME9788)  
THREE MILE ISLAND, UNIT NO. 1 - ELECTRONIC TRANSMISSION, DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING END-OF-INTERVAL RELIEF REQUEST RR-12-01, PRESSURIZER NOZZLE-TO-HEAD WELD EXAMS (TAC NO. ME9788)
 
The attached draft request for additional information (RAI) was transmitted by electronic transmission on February 19, 2013, to Mr. Thomas Loomis, at Exelon Generation Company, LLC (Exelon, the licensee). This draft RAI was transmitted to facilitate the technical review being conducted by the Nuclear Regulatory Commission (NRC) staff and to support a conference call (if needed) with Exelon in order to clarify the licensees end-of-interval relief request regarding the limited examination coverage of three pressurizer relief nozzle welds at Three Mile Island Nuclear Station, Unit 1. The draft RAI is related to the licensees submittal dated October 5, 2012. The draft question was sent to ensure that it was understandable, the regulatory basis was clear, and to determine if the information was previously docketed.
The attached draft request for additional information (RAI) was transmitted by electronic transmission on February 19, 2013, to Mr. Thomas Loomis, at Exelon Generation Company, LLC (Exelon, the licensee). This draft RAI was transmitted to facilitate the technical review  
 
being conducted by the Nuclear Regulatory Commission (NRC) staff and to support a conference call (if needed) with Exelon in order to clarify the licensee's end-of-interval relief request regarding the limited examination coverage of three pressurizer relief nozzle welds at Three Mile Island Nuclear Station, Unit 1. The draft RAI is related to the licensee's submittal dated October 5, 2012. The draft question was sent to ensure that it was understandable, the regulatory basis was clear, and to determine if the information was previously docketed.
Additionally, review of the draft RAI would allow Exelon to evaluate and agree upon a schedule to respond to the RAI. This memorandum and the attachment do not represent an NRC staff position.
Additionally, review of the draft RAI would allow Exelon to evaluate and agree upon a schedule to respond to the RAI. This memorandum and the attachment do not represent an NRC staff position.
Docket No. 50-289  
Docket No. 50-289  


==Enclosure:==
==Enclosure:==
As stated February 20, 2013 MEMORANDUM TO: Meena Khanna, Chief Plant Licensing Branch I-2    Division of Operating Reactor Licensing    Office of Nuclear Reactor Regulation
As stated


FROM:   Peter Bamford, Project Manager /RA/
February 20, 2013 MEMORANDUM TO: Meena Khanna, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:
Plant Licensing Branch I-2 Division of Operating Reactor Licensing     Office of Nuclear Reactor Regulation  
Peter Bamford, Project Manager /RA/
Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation  


==SUBJECT:==
==SUBJECT:==
THREE MILE ISLAND, UNIT NO. 1 - ELECTRONIC TRANSMISSION, DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING END-OF-INTERVAL RELIEF REQUEST RR-12-01, PRESSURIZER NOZZLE-TO-HEAD WELD EXAMS (TAC NO. ME9788)  
THREE MILE ISLAND, UNIT NO. 1 - ELECTRONIC TRANSMISSION, DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING END-OF-INTERVAL RELIEF REQUEST RR-12-01, PRESSURIZER NOZZLE-TO-HEAD WELD EXAMS (TAC NO. ME9788)
 
The attached draft request for additional information (RAI) was transmitted by electronic transmission on February 19, 2013, to Mr. Thomas Loomis, at Exelon Generation Company, LLC (Exelon, the licensee). This draft RAI was transmitted to facilitate the technical review being conducted by the Nuclear Regulatory Commission (NRC) staff and to support a conference call (if needed) with Exelon in order to clarify the licensees end-of-interval relief request regarding the limited examination coverage of three pressurizer relief nozzle welds at Three Mile Island Nuclear Station, Unit 1. The draft RAI is related to the licensees submittal dated October 5, 2012. The draft question was sent to ensure that it was understandable, the regulatory basis was clear, and to determine if the information was previously docketed.
The attached draft request for additional information (RAI) was transmitted by electronic transmission on February 19, 2013, to Mr. Thomas Loomis, at Exelon Generation Company, LLC (Exelon, the licensee). This draft RAI was transmitted to facilitate the technical review  
 
being conducted by the Nuclear Regulatory Commission (NRC) staff and to support a conference call (if needed) with Exelon in order to clarify the licensee's end-of-interval relief request regarding the limited examination coverage of three pressurizer relief nozzle welds at Three Mile Island Nuclear Station, Unit 1. The draft RAI is related to the licensee's submittal dated October 5, 2012. The draft question was sent to ensure that it was understandable, the regulatory basis was clear, and to determine if the information was previously docketed.
 
Additionally, review of the draft RAI would allow Exelon to evaluate and agree upon a schedule to respond to the RAI. This memorandum and the attachment do not represent an NRC staff position.
Additionally, review of the draft RAI would allow Exelon to evaluate and agree upon a schedule to respond to the RAI. This memorandum and the attachment do not represent an NRC staff position.
Docket No. 50-289  
Docket No. 50-289  


==Enclosure:==
==Enclosure:==
As stated DISTRIBUTION
As stated DISTRIBUTION:
: Public   RidsNrrPMThreeMileIsland Resource LPL1-2 R/F Accession No.: ML13050A636* via email OFFICE LPL1-2/PM EVIB/BC NAME PBamford SRosenberg*
Public RidsNrrPMThreeMileIsland Resource LPL1-2 R/F Accession No.: ML13050A636* via email OFFICE LPL1-2/PM EVIB/BC NAME PBamford SRosenberg*
DATE 2/20/13 02/15/13 OFFICIAL RECORD COPY Enclosure REQUEST FOR ADDITIONAL INFORMATION THREE MILE ISLAND NUCLEAR STATION, UNIT 1 END-OF-INTERVAL RELIEF REQUEST RR-12-01 PRESSURIZER NOZZLE-TO-HEAD WELD EXAMS DOCKET NO. 50-289
DATE 2/20/13 02/15/13 OFFICIAL RECORD COPY  
 
By letter dated October 5, 2012 (Agencywide Documents Access and Management System Accession No. ML12283A252), Exelon Generation Company, LLC (Exelon, the licensee) submitted a relief request for U.S. Nuclear Regulatory Commission (NRC) approval. In the relief request, Exelon identifies the limited examination of three pressurizer relief nozzle welds at Three Mile Island Nuclear Station (TMI-1) for the third inservice inspection interval, which ended on April 19, 2012. According to the licensee, the coverage for each of the welds in question
 
was approximately 40%, as compared to a specification of 90%, in accordance with American Society of Mechanical Engineers Code Case N-460, "Alternative Examination Requirements for Class 1 and Class 2 Welds, Section XI, Division 1."  The U.S. Nuclear Regulatory Commission (NRC) staff has been reviewing the submittal and has determined that additional information is needed to complete its review. 


1.) The submittal does not include any statement regarding past inspection results, including preservice. The NRC staff is concerned that there could be a weld repair done during fabrication. If the repair used a Nickel-based alloy filler metal, the joint could be susceptible to primary water stress corrosion cracking.
Enclosure REQUEST FOR ADDITIONAL INFORMATION THREE MILE ISLAND NUCLEAR STATION, UNIT 1 END-OF-INTERVAL RELIEF REQUEST RR-12-01 PRESSURIZER NOZZLE-TO-HEAD WELD EXAMS DOCKET NO. 50-289 By {{letter dated|date=October 5, 2012|text=letter dated October 5, 2012}} (Agencywide Documents Access and Management System Accession No. ML12283A252), Exelon Generation Company, LLC (Exelon, the licensee) submitted a relief request for U.S. Nuclear Regulatory Commission (NRC) approval. In the relief request, Exelon identifies the limited examination of three pressurizer relief nozzle welds at Three Mile Island Nuclear Station (TMI-1) for the third inservice inspection interval, which ended on April 19, 2012. According to the licensee, the coverage for each of the welds in question was approximately 40%, as compared to a specification of 90%, in accordance with American Society of Mechanical Engineers Code Case N-460, Alternative Examination Requirements for Class 1 and Class 2 Welds, Section XI, Division 1. The U.S. Nuclear Regulatory Commission (NRC) staff has been reviewing the submittal and has determined that additional information is needed to complete its review.
1.)
The submittal does not include any statement regarding past inspection results, including preservice. The NRC staff is concerned that there could be a weld repair done during fabrication. If the repair used a Nickel-based alloy filler metal, the joint could be susceptible to primary water stress corrosion cracking.
Therefore, describe the results of all past inspections, including preservice, as well as any repairs that have been done to the subject pressurizer relief nozzle-to-vessel welds.}}
Therefore, describe the results of all past inspections, including preservice, as well as any repairs that have been done to the subject pressurizer relief nozzle-to-vessel welds.}}

Latest revision as of 10:59, 11 January 2025

Draft RAI Memo
ML13050A636
Person / Time
Site: Crane Constellation icon.png
Issue date: 02/20/2013
From: Peter Bamford
Plant Licensing Branch 1
To: Meena Khanna
Plant Licensing Branch 1
Bamford P
References
TAC ME9788
Download: ML13050A636 (3)


Text

February 20, 2013 MEMORANDUM TO: Meena Khanna, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:

Peter Bamford, Project Manager /RA/

Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

SUBJECT:

THREE MILE ISLAND, UNIT NO. 1 - ELECTRONIC TRANSMISSION, DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING END-OF-INTERVAL RELIEF REQUEST RR-12-01, PRESSURIZER NOZZLE-TO-HEAD WELD EXAMS (TAC NO. ME9788)

The attached draft request for additional information (RAI) was transmitted by electronic transmission on February 19, 2013, to Mr. Thomas Loomis, at Exelon Generation Company, LLC (Exelon, the licensee). This draft RAI was transmitted to facilitate the technical review being conducted by the Nuclear Regulatory Commission (NRC) staff and to support a conference call (if needed) with Exelon in order to clarify the licensees end-of-interval relief request regarding the limited examination coverage of three pressurizer relief nozzle welds at Three Mile Island Nuclear Station, Unit 1. The draft RAI is related to the licensees submittal dated October 5, 2012. The draft question was sent to ensure that it was understandable, the regulatory basis was clear, and to determine if the information was previously docketed.

Additionally, review of the draft RAI would allow Exelon to evaluate and agree upon a schedule to respond to the RAI. This memorandum and the attachment do not represent an NRC staff position.

Docket No. 50-289

Enclosure:

As stated

February 20, 2013 MEMORANDUM TO: Meena Khanna, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:

Peter Bamford, Project Manager /RA/

Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

SUBJECT:

THREE MILE ISLAND, UNIT NO. 1 - ELECTRONIC TRANSMISSION, DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING END-OF-INTERVAL RELIEF REQUEST RR-12-01, PRESSURIZER NOZZLE-TO-HEAD WELD EXAMS (TAC NO. ME9788)

The attached draft request for additional information (RAI) was transmitted by electronic transmission on February 19, 2013, to Mr. Thomas Loomis, at Exelon Generation Company, LLC (Exelon, the licensee). This draft RAI was transmitted to facilitate the technical review being conducted by the Nuclear Regulatory Commission (NRC) staff and to support a conference call (if needed) with Exelon in order to clarify the licensees end-of-interval relief request regarding the limited examination coverage of three pressurizer relief nozzle welds at Three Mile Island Nuclear Station, Unit 1. The draft RAI is related to the licensees submittal dated October 5, 2012. The draft question was sent to ensure that it was understandable, the regulatory basis was clear, and to determine if the information was previously docketed.

Additionally, review of the draft RAI would allow Exelon to evaluate and agree upon a schedule to respond to the RAI. This memorandum and the attachment do not represent an NRC staff position.

Docket No. 50-289

Enclosure:

As stated DISTRIBUTION:

Public RidsNrrPMThreeMileIsland Resource LPL1-2 R/F Accession No.: ML13050A636* via email OFFICE LPL1-2/PM EVIB/BC NAME PBamford SRosenberg*

DATE 2/20/13 02/15/13 OFFICIAL RECORD COPY

Enclosure REQUEST FOR ADDITIONAL INFORMATION THREE MILE ISLAND NUCLEAR STATION, UNIT 1 END-OF-INTERVAL RELIEF REQUEST RR-12-01 PRESSURIZER NOZZLE-TO-HEAD WELD EXAMS DOCKET NO. 50-289 By letter dated October 5, 2012 (Agencywide Documents Access and Management System Accession No. ML12283A252), Exelon Generation Company, LLC (Exelon, the licensee) submitted a relief request for U.S. Nuclear Regulatory Commission (NRC) approval. In the relief request, Exelon identifies the limited examination of three pressurizer relief nozzle welds at Three Mile Island Nuclear Station (TMI-1) for the third inservice inspection interval, which ended on April 19, 2012. According to the licensee, the coverage for each of the welds in question was approximately 40%, as compared to a specification of 90%, in accordance with American Society of Mechanical Engineers Code Case N-460, Alternative Examination Requirements for Class 1 and Class 2 Welds,Section XI, Division 1. The U.S. Nuclear Regulatory Commission (NRC) staff has been reviewing the submittal and has determined that additional information is needed to complete its review.

1.)

The submittal does not include any statement regarding past inspection results, including preservice. The NRC staff is concerned that there could be a weld repair done during fabrication. If the repair used a Nickel-based alloy filler metal, the joint could be susceptible to primary water stress corrosion cracking.

Therefore, describe the results of all past inspections, including preservice, as well as any repairs that have been done to the subject pressurizer relief nozzle-to-vessel welds.