ML14279A147: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(One intermediate revision by the same user not shown) | |||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:BOARD OF SUPERVISORS 1055 MONTEREY, ROOM D430 | ||
* SAN LUIS 0BlSPO, CALIFORNIA 93408-1003 | * SAN LUIS 0BlSPO, CALIFORNIA 93408-1003 | ||
* 805.781.5450 September 19, 20.14 U.S. Nuclear Regulatory Commission Mail Stop 0-16G4 Washington, DC 20555-0001 RE: Diablo Canyon Power Plant Hazard Analyses | * 805.781.5450 II II September 19, 20.14 DEBBIE ARNOLD SUPERVISOR DISTRICT FIVE II I. | ||
!II U.S. Nuclear Regulatory Commission Mail Stop 0-16G4 I Washington, DC 20555-0001 | |||
.I RE: Diablo Canyon Power Plant Hazard Analyses II i! | |||
==Dear Dr. Macfarlane:== | ==Dear Dr. Macfarlane:== | ||
I. In recent weeks, we have been informed of reports regarding the natural hazards that might affect I | |||
the safe operation of the Diablo Canyon Power Plant {DCCP) located in San Luis Obispo County. | |||
Specifically, it has come to my attention that a tsunami hazard analysis by Dr. Robert Sewell was I recently reviewed by NRC staff. I have heard from various constituents representing local advocacy groups during the public comment period of our recent County Board of Supervisors meetings that the NRC has refused to publicly disclose the findings of this report. | |||
I I would like to respectfully request that the tsunami hazard study by Dr. Sewell be made available to the public for their review as soon as possible. | |||
Thank you for your time and consideration. | Thank you for your time and consideration. | ||
Sincerely, Debbie Arnold Supervisor, 5th District}} | Sincerely, | ||
~ ~,p_ | |||
Debbie Arnold Supervisor, 5th District}} |
Latest revision as of 11:26, 25 February 2020
ML14279A147 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 09/19/2014 |
From: | Arnold D City of San Luis Obispo, CA, Board of Supervisors |
To: | Macfarlane A NRC/Chairman, NRC/OIS/CSD/FPIB |
References | |
FOIA/PA-2015-0013 | |
Download: ML14279A147 (1) | |
Text
BOARD OF SUPERVISORS 1055 MONTEREY, ROOM D430
- SAN LUIS 0BlSPO, CALIFORNIA 93408-1003
- 805.781.5450 II II September 19, 20.14 DEBBIE ARNOLD SUPERVISOR DISTRICT FIVE II I.
!II U.S. Nuclear Regulatory Commission Mail Stop 0-16G4 I Washington, DC 20555-0001
.I RE: Diablo Canyon Power Plant Hazard Analyses II i!
Dear Dr. Macfarlane:
I. In recent weeks, we have been informed of reports regarding the natural hazards that might affect I
the safe operation of the Diablo Canyon Power Plant {DCCP) located in San Luis Obispo County.
Specifically, it has come to my attention that a tsunami hazard analysis by Dr. Robert Sewell was I recently reviewed by NRC staff. I have heard from various constituents representing local advocacy groups during the public comment period of our recent County Board of Supervisors meetings that the NRC has refused to publicly disclose the findings of this report.
I I would like to respectfully request that the tsunami hazard study by Dr. Sewell be made available to the public for their review as soon as possible.
Thank you for your time and consideration.
Sincerely,
~ ~,p_
Debbie Arnold Supervisor, 5th District