{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 13, 2016 Richard Michael Glover Site Vice President H. B. Robinson Steam Electric Plant  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 13, 2016 Richard Michael Glover Site Vice President H. B. Robinson Steam Electric Plant Duke Energy 3581 West Entrance Road, RNPA01 Hartsville, SC 29550  
 
Duke Energy 3581 West Entrance Road, RNPA01 Hartsville, SC 29550  


==SUBJECT:==
==SUBJECT:==
Line 23: Line 21:


==SUMMARY==
==SUMMARY==
, OFFICE OF INVESTIGATIONS CASE NUMBER 2-2016-022F  
OFFICE OF INVESTIGATIONS CASE NUMBER 2-2016-022F  


==Dear Mr. Glover:==
==Dear Mr. Glover:==
The Nuclear Regulatory Commission (NRC) Office of Investigations has closed the subject case regarding post-maintenance testing of the motor-driven auxiliary feedwater system at H. B.
The Nuclear Regulatory Commission (NRC) Office of Investigations has closed the subject case regarding post-maintenance testing of the motor-driven auxiliary feedwater system at H. B.
Robinson Steam Electric Plant.
Robinson Steam Electric Plant.
The NRC determined that there was no information to indicate that management refused to collect relevant data so that the site would not have to enter a 24-hour limiting condition for operation action statement if the proposed test revealed a common cause. We plan no further action with regard to this specific matter. However, a finding was documented in Inspection Report 05000261/2016001, regarding the event related to this matter. Should you have any questions concerning this letter, please contact us.  
The NRC determined that there was no information to indicate that management refused to collect relevant data so that the site would not have to enter a 24-hour limiting condition for operation action statement if the proposed test revealed a common cause. We plan no further action with regard to this specific matter. However, a finding was documented in Inspection Report 05000261/2016001, regarding the event related to this matter. Should you have any questions concerning this letter, please contact us.
 
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs document system (ADAMS).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its  
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).
 
Sincerely,  
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Record s component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).
/RA/
Sincerely,       /RA/
George T. Hopper, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No.:
George T. Hopper, Chief       Reactor Projects Branch 4 Division of Reactor Projects  
50-261 License No.: DPR-23 CERTIFIED MAIL 7012 1010 0002 6821 1772 RETURN RECEIPT REQUESTED


Docket No.: 50-261 License No.: DPR-23
ML16134A263 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:EICS SIGNATURE DXW4 JSD GTH MXM3 NAME DJackson JDodson GHopper MCheckle DATE 5/12/2016 5/12/2016 5/13/2016 5/11/2016 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO


CERTIFIED MAIL 7012 1010 0002 6821 1772 RETURN RECEIPT REQUESTED
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 13, 2016 Richard Michael Glover Site Vice President H. B. Robinson Steam Electric Plant Duke Energy 3581 West Entrance Road, RNPA01 Hartsville, SC 29550  
 
ML16134A263      SUNSI REVIEW COMPLETE  FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:EICS  SIGNATURE DXW4 JSD GTH MXM3  NAME DJackson JDodson GHopper MCheckle  DATE 5/12/2016 5/12/2016 5/13/2016 5/11/2016  E-MAIL COPY?    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 13, 2016 Richard Michael Glover Site Vice President H. B. Robinson Steam Electric Plant  
 
Duke Energy 3581 West Entrance Road, RNPA01 Hartsville, SC 29550  


==SUBJECT:==
==SUBJECT:==
Line 49: Line 43:


==SUMMARY==
==SUMMARY==
, OFFICE OF INVESTIGATIONS CASE NUMBER 2-2016-022F  
OFFICE OF INVESTIGATIONS CASE NUMBER 2-2016-022F  


==Dear Mr. Glover:==
==Dear Mr. Glover:==
The Nuclear Regulatory Commission (NRC) Office of Investigations has closed the subject case regarding post-maintenance testing of the motor-driven auxiliary feedwater system at H. B.
The Nuclear Regulatory Commission (NRC) Office of Investigations has closed the subject case regarding post-maintenance testing of the motor-driven auxiliary feedwater system at H. B.
Robinson Steam Electric Plant.
Robinson Steam Electric Plant.
The NRC determined that there was no information to indicate that management refused to collect relevant data so that the site would not have to enter a 24-hour limiting condition for operation action statement if the proposed test revealed a common cause. We plan no further action with regard to this specific matter. However, a finding was documented in Inspection Report 05000261/2016001, regarding the event related to this matter. Should you have any questions concerning this letter, please contact us.  
The NRC determined that there was no information to indicate that management refused to collect relevant data so that the site would not have to enter a 24-hour limiting condition for operation action statement if the proposed test revealed a common cause. We plan no further action with regard to this specific matter. However, a finding was documented in Inspection Report 05000261/2016001, regarding the event related to this matter. Should you have any questions concerning this letter, please contact us.
 
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs document system (ADAMS).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its  
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).
 
Sincerely,  
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Record s component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).
/RA/
Sincerely,       /RA/
George T. Hopper, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No.:
George T. Hopper, Chief       Reactor Projects Branch 4 Division of Reactor Projects  
50-261 License No.: DPR-23 CERTIFIED MAIL 7012 1010 0002 6821 1772 RETURN RECEIPT REQUESTED  
 
Docket No.: 50-261 License No.: DPR-23  
 
CERTIFIED MAIL 7012 1010 0002 6821 1772 RETURN RECEIPT REQUESTED


ML16134A263     SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:EICS   SIGNATURE DXW4 JSD GTH MXM3   NAME DJackson JDodson GHopper MCheckle   DATE 5/12/2016 5/12/2016 5/13/2016 5/11/2016   E-MAIL COPY?     YES NO       YES NO       YES NO       YES NO       YES NO       YES NO}}
ML16134A263 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:EICS SIGNATURE DXW4 JSD GTH MXM3 NAME DJackson JDodson GHopper MCheckle DATE 5/12/2016 5/12/2016 5/13/2016 5/11/2016 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO}}

Latest revision as of 23:47, 9 January 2025

OI Synopsis Release
ML16134A263
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 05/13/2016
From: Hopper G
NRC/RGN-II/DRP/RPB4
To: Glover R
Duke Energy Corp
References
Download: ML16134A263 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 13, 2016 Richard Michael Glover Site Vice President H. B. Robinson Steam Electric Plant Duke Energy 3581 West Entrance Road, RNPA01 Hartsville, SC 29550

SUBJECT:

H. B. ROBINSON STEAM ELECTRIC PLANT - INVESTIGATIVE

SUMMARY

OFFICE OF INVESTIGATIONS CASE NUMBER 2-2016-022F

Dear Mr. Glover:

The Nuclear Regulatory Commission (NRC) Office of Investigations has closed the subject case regarding post-maintenance testing of the motor-driven auxiliary feedwater system at H. B.

Robinson Steam Electric Plant.

The NRC determined that there was no information to indicate that management refused to collect relevant data so that the site would not have to enter a 24-hour limiting condition for operation action statement if the proposed test revealed a common cause. We plan no further action with regard to this specific matter. However, a finding was documented in Inspection Report 05000261/2016001, regarding the event related to this matter. Should you have any questions concerning this letter, please contact us.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).

Sincerely,

/RA/

George T. Hopper, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No.:

50-261 License No.: DPR-23 CERTIFIED MAIL 7012 1010 0002 6821 1772 RETURN RECEIPT REQUESTED

ML16134A263 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:EICS SIGNATURE DXW4 JSD GTH MXM3 NAME DJackson JDodson GHopper MCheckle DATE 5/12/2016 5/12/2016 5/13/2016 5/11/2016 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 13, 2016 Richard Michael Glover Site Vice President H. B. Robinson Steam Electric Plant Duke Energy 3581 West Entrance Road, RNPA01 Hartsville, SC 29550

SUBJECT:

H. B. ROBINSON STEAM ELECTRIC PLANT - INVESTIGATIVE

SUMMARY

OFFICE OF INVESTIGATIONS CASE NUMBER 2-2016-022F

Dear Mr. Glover:

The Nuclear Regulatory Commission (NRC) Office of Investigations has closed the subject case regarding post-maintenance testing of the motor-driven auxiliary feedwater system at H. B.

Robinson Steam Electric Plant.

The NRC determined that there was no information to indicate that management refused to collect relevant data so that the site would not have to enter a 24-hour limiting condition for operation action statement if the proposed test revealed a common cause. We plan no further action with regard to this specific matter. However, a finding was documented in Inspection Report 05000261/2016001, regarding the event related to this matter. Should you have any questions concerning this letter, please contact us.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).

Sincerely,

/RA/

George T. Hopper, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No.:

50-261 License No.: DPR-23 CERTIFIED MAIL 7012 1010 0002 6821 1772 RETURN RECEIPT REQUESTED

ML16134A263 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:EICS SIGNATURE DXW4 JSD GTH MXM3 NAME DJackson JDodson GHopper MCheckle DATE 5/12/2016 5/12/2016 5/13/2016 5/11/2016 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO