{{#Wiki_filter:Exelon Nuclear Job Performance Measure VERIFY STANDBY LIQUID CONTROL HEATER SURVEILLAN CE  JPM Number:
{{#Wiki_filter:Exelon Nuclear Job Performance Measure VERIFY STANDBY LIQUID CONTROL HEATER SURVEILLANCE JPM Number: A-N-1-R Revision Number: 01 Date: 02/16 Developed By:
A-N-1-R Revision Number: 0 1  Date: 02/16         Developed By:
Instructor Date Approved By:
Instructor Date     Approved By:
Facility Representative Date  
Facility Representative Date Job Performance Measure (JPM)
 
A-N-1-R Page 2 of 7   Revision Record (Summary)
Job Performance Measure (JPM)
Revision 0 0 New JPM developed for 2009 NRC Exam
A-N-1-R Page 2 of 7 Revision Record (Summary)
. Revision 01 Revised for ILT 15-1 (2016-301) NRC Exam
Revision 00 New JPM developed for 2009 NRC Exam.
.
Revision 01 Revised for ILT 15-1 (2016-301) NRC Exam.
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-R Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS
A-N-1-R Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS
: 1. This is a tabletop JPM utilizing simulator procedures
: 1.
. 2. No Simulator setup needed.
This is a tabletop JPM utilizing simulator procedures.
DOCUMENT PREPARATION 1. Markup a copy of DOS 1100-02.  
: 2.
No Simulator setup needed.
DOCUMENT PREPARATION
: 1. Markup a copy of DOS 1100-02.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-R Page 4 of 7 INITIAL CONDITIONS
A-N-1-R Page 4 of 7 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. DOS 1100-02 was performed last shift
: 2. DOS 1100-02 was performed last shift.
. 3. The EO reported all surveillance requirements were within specifications
: 3. The EO reported all surveillance requirements were within specifications.
. INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to verify all requirements are within specifications, and paperwork is correct
: 1. The Unit Supervisor has directed you to verify all requirements are within specifications, and paperwork is correct.
. 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
* Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps.
The timeclock starts when the candidate acknowledges the initiating cue.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-R Page 5 of 7 JPM Start Time
A-N-1-R Page 5 of 7 JPM Start Time: _________
: _________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Provide the examinee with the provided copy of DOS 1100-02.
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
* 1. Student should identify step I.4 should NOT have been initialed.
Provide the examinee with the provided copy of DOS 1100-02.
* 1.
Student should identify step I.4 should NOT have been initialed.
Identifies that step should NOT have been initialed.
Identifies that step should NOT have been initialed.
_____        _____        _____
* 2.
* 2. Student should identify step I.9.g should NOT have been N/A'd. Identifies that step should NOT have been N/A'd. _____        _____        _
Student should identify step I.9.g should NOT have been N/Ad.
____  3. Notify Unit Supervisor of discrepancies
Identifies that step should NOT have been N/Ad.
. Notifies Unit Supervisor, to verify/correct issues
: 3.
. _____        _____        _____
Notify Unit Supervisor of discrepancies.
CUE: Acknowledge report of task completion.
Notifies Unit Supervisor, to verify/correct issues.
END   JPM Stop Time
CUE:
:_________
Acknowledge report of task completion.
END JPM Stop Time:_________  
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-R Page 6 of 7 Operator's Name:
A-N-1-R Page 6 of 7 Operators Name:
Job Title:     RO
Job
 
==Title:==
RO JPM


JPM Title: VERIFY STANDBY LIQUID CONTROL HEATER SURVEILLANCE Revision Number: 0 1 JPM Number: A-N-1-R Task Number and Title:
==Title:==
299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedure
VERIFY STANDBY LIQUID CONTROL HEATER SURVEILLANCE Revision Number: 01 JPM Number: A-N-1-R Task Number and
: s.
 
K/A Number and Importance: Generic.2.
==Title:==
1.18     3.6 / 3.8 Suggested Testing Environment:
299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedures.
Simulator Actual Testing Environment:
K/A Number and Importance: Generic.2.1.18 3.6 / 3.8 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path
Simulate Alternate Path:
Yes No   Perform SRO Only: Yes No Time Critical:
Yes No Perform SRO Only:
Yes No Estimated Time to Complete:
Yes No Time Critical:
20       Actual Time Used:
Yes No Estimated Time to Complete: 20 Actual Time Used:
minutes
minutes  


==References:==
==References:==
 
DOS 1100-02, rev 17 EVALUATION  
DOS 1100-02 , rev 17 EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?
Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:                 Evaluator's Name: ____________________________
Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
(Print)
Evaluator's Signature: ___________________________ Date: _________
Evaluators Signature: ___________________________ Date: _________  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-R Page 7 of 7 INITIAL CONDITIONS
A-N-1-R Page 7 of 7 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. DOS 1100-02 was performed last shift
: 2. DOS 1100-02 was performed last shift.
. 3. The EO reported all surveillance requirements were within specifications
: 3. The EO reported all surveillance requirements were within specifications.
. INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to verify all requirements are within specifications, and paperwork is correct
: 1. The Unit Supervisor has directed you to verify all requirements are within specifications, and paperwork is correct.
. 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.  
 
Exelon Nuclear Job Performance Measure DETERMINE ISOLATION POINTS FOR CLEARANCE ORDER JPM Number: A-N-2-R Revision Number: 00 Date: 02/16 Developed By:
Instructor Date Approved By:
Facility Representative Date


Exelon Nuclear Job Performance Measure DETERMINE ISOLATION POINTS FOR CLEAR A NCE ORDER  JPM Number:
A-N-2-R  Revision Number: 0 0  Date: 02/16        Developed By:
Instructor Date    Approved By:
Facility Representative Date Job Performance Measure (JPM)
A-N-2-R  Page 2 of 10  Revision Record (Summary)
Revision 0 0 New JPM developed for ILT 15-1 (2016-301) NRC Exam
.
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-R Page 3 of 10 SIMULATOR SETUP INSTRUCTIONS
A-N-2-R Page 2 of 10 Revision Record (Summary)
: 1. This is a tabletop JPM utilizing simulator procedures
Revision 00 New JPM developed for ILT 15-1 (2016-301) NRC Exam.
. 2. Pull up prints M
 
-15 Sheet 1, M
Job Performance Measure (JPM)
-16, and M-3658 Sheet 1 on Large TV in simulator.
A-N-2-R Page 3 of 10 SIMULATOR SETUP INSTRUCTIONS
: 3. Turn TV screen off.
: 1.
This is a tabletop JPM utilizing simulator procedures.
: 2.
Pull up prints M-15 Sheet 1, M-16, and M-3658 Sheet 1 on Large TV in simulator.
: 3.
Turn TV screen off.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Copy of M-15 Sheet 1
: 1. Copy of M-15 Sheet 1.
. 2. Copy of M-16. 3. Copy of OP-AA-109-101. 4. Copy of OP
: 2. Copy of M-16.
-DR-109-1001.
: 3. Copy of OP-AA-109-101.
: 4. Copy of OP-DR-109-1001.  
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-R Page 4 of 10 INITIAL CONDITIONS
A-N-2-R Page 4 of 10 INITIAL CONDITIONS
: 1. You are an Extra NSO.
: 1. You are an Extra NSO.
: 2. Unit 2 is at 500 MWe.
: 2. Unit 2 is at 500 MWe.
Line 124: Line 139:
: 5. Condensate/Condensate Booster Pump seal isolation is not required.
: 5. Condensate/Condensate Booster Pump seal isolation is not required.
: 6. Hydrogen Addition injection isolation is not required.
: 6. Hydrogen Addition injection isolation is not required.
: 7. Passport is not available, but is expected to return this shift
: 7. Passport is not available, but is expected to return this shift.
. 8. The Unit NSO has procured controlled copies of the required prints and the revisions have been verified
: 8. The Unit NSO has procured controlled copies of the required prints and the revisions have been verified.
. 9. Authorization for an EXCEPTIONAL clearance order has been given if necessary.
: 9. Authorization for an EXCEPTIONAL clearance order has been given if necessary.
: 10. Other NSOs are tasked with determining electrical and air isolations.
: 10. Other NSOs are tasked with determining electrical and air isolations.
INITIATING CUE 1. The Unit Supervisor has directed you to determine the isolation points necessary to remove ONLY the 2C Condensate and 2C Condensate Booster pump from the condensate header.
INITIATING CUE
: 2. Record recommended Isolation Points and Required Positions on the sheet provided. 3. Inform the Unit Supervisor when the task is complete.
: 1. The Unit Supervisor has directed you to determine the isolation points necessary to remove ONLY the 2C Condensate and 2C Condensate Booster pump from the condensate header.
: 2. Record recommended Isolation Points and Required Positions on the sheet provided.
: 3. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
* Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-R Page 5 of 10 Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
A-N-2-R Page 5 of 10 Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-R Page 6 of 10 JPM Start Time: _________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Provide the examinee with the provided copy of M-15 Sheet 1 and M-16. If the examinee requests Clearance and Tagging procedures, they may be provided.
A-N-2-R Page 6 of 10 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the examinee with the provided copy of M-15 Sheet 1 and M-16.
If the examinee requests Clearance and Tagging procedures, they may be provided.
The following steps may be performed in any order
The following steps may be performed in any order
: 1. Candidate identifies 2C Condensate/Condensate Booster pump on M
: 1.
-15 Sheet 1. Candidate correctly locates and identifies 2C Condensate/Condensate Booster pump on M
Candidate identifies 2C Condensate/Condensate Booster pump on M-15 Sheet
-15 Sheet 1. _____        _____        _____
: 1.
* 2. Candidate determines isolation points and required positions for 2C condensate pump Candidate identifies the following valves are necessary isolation points for 2C Condensate pump:
Candidate correctly locates and identifies 2C Condensate/Condensate Booster pump on M-15 Sheet 1.
(Located on M
* 2.
-15 Sht. 1)
Candidate determines isolation points and required positions for 2C condensate pump Candidate identifies the following valves are necessary isolation points for 2C Condensate pump:
* 2-3301-C-500 (Closed)
(Located on M-15 Sht. 1) 2-3301-C-500 (Closed) 2-3302-C-500 (Closed)
* 2-3302-C-500 (Closed) _____        _____
* 3.
_____
Candidate determines isolation points and required positions for 2C condensate booster pump Candidate identifies the following valves are necessary isolation points for 2C Condensate pump:
* 3. Candidate determines isolation points and required positions for 2C condensate booster pump Candidate identifies the following valves are necessary isolation points for 2C Condensate pump:
2-3305-C-500 (Closed)
* 2-3305-C-500 (Closed) (Located on M
(Located on M-15 Sht. 1) 2-3401-C-500 (Closed)
-15 Sht. 1)
(Located on M-16)  
* 2-34 01-C-500 (Closed) (Located on M
-16)   _____        _____        _____


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-R Page 7 of 10 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
A-N-2-R Page 7 of 10 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
* 4. Completes worksheet with EPN and required hang position. Notifies Unit Supervisor, to verify/correct issues.
: 4.
_____        _____        _____
Completes worksheet with EPN and required hang position.
CUE: Acknowledge report of task completion. END   JPM Stop Time
Notifies Unit Supervisor, to verify/correct issues.
:_________
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________  
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-R Page 8 of 10 Operator's Name:
A-N-2-R Page 8 of 10 Operators Name:
Job Title:    RO   
Job


JPM Title: DETERMINE ISOLATION POINTS FOR CLEARANCE ORDER Revision Number: 0 0 JPM Number:  A-N-2-R  Task Number and Title:
==Title:==
299L012 Determine points of isolation in order to remove a piece of equipment from service.
RO JPM


K/A Number and Importance: Generic.2.2.41    3.5/3.9
==Title:==
DETERMINE ISOLATION POINTS FOR CLEARANCE ORDER Revision Number: 00 JPM Number: A-N-2-R Task Number and


Suggested Testing Environment: Simulator Actual Testing Environment:
==Title:==
Simulator Control Roo m  In-Plant Testing Method:
299L012 Determine points of isolation in order to remove a piece of equipment from service.
Simulate Alternate Path
K/A Number and Importance: Generic.2.2.41 3.5/3.9 Suggested Testing Environment: Simulator Actual Testing Environment:
Yes No   Perform SRO Only: Yes No Time Critical:
Simulator Control Room In-Plant Testing Method:
Yes No Estimated Time to Complete:
Simulate Alternate Path:
15       Actual Time Used:
Yes No Perform SRO Only:
minutes
Yes No Time Critical:
Yes No Estimated Time to Complete: 15 Actual Time Used:
minutes  


==References:==
==References:==
 
OP-AA-109-101 Rev. 10, OP-DR-109-101-1001 Rev. 10, M-15 Sheet 1 Rev. M, M-16 Rev. AP EVALUATION  
OP-AA-109-101 Rev. 10 , OP-DR-109-101-1001 Rev. 10, M-15 Sheet 1 Rev. M, M
-16 Rev. AP EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?
Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory
Satisfactory Unsatisfactory Comments:
 
Evaluators Name: ____________________________
Comments:                 Evaluator's Name: ____________________________
(Print)
(Print)
Evaluator's Signature: ___________________________ Date: _________
Evaluators Signature: ___________________________ Date: _________  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-R Page 9 of 10 INITIAL CONDITIONS
A-N-2-R Page 9 of 10 INITIAL CONDITIONS
: 1. You are an Extra NSO.
: 1. You are an Extra NSO.
: 2. Unit 2 is at 500 MWe.
: 2. Unit 2 is at 500 MWe.
Line 206: Line 226:
: 5. Condensate/Condensate Booster Pump seal isolation is not required.
: 5. Condensate/Condensate Booster Pump seal isolation is not required.
: 6. Hydrogen Addition injection isolation is not required.
: 6. Hydrogen Addition injection isolation is not required.
: 7. Passport is not available, but is expected to return this shift. 8. The Unit NSO has procured controlled copies of the required prints and the revisions have been verified
: 7. Passport is not available, but is expected to return this shift.
. 9. Authorization for an EXCEPTIONAL clearance order has been given if necessary.
: 8. The Unit NSO has procured controlled copies of the required prints and the revisions have been verified.
: 10. Other NSOs are tasked with determining electrical and air isolations
: 9. Authorization for an EXCEPTIONAL clearance order has been given if necessary.
. INITIATING CUE
: 10. Other NSOs are tasked with determining electrical and air isolations.
: 1. The Unit Supervisor has directed you to determine the isolation points necessary to remove ONLY the 2C Condensate and 2C Condensate Booster pump from the condensate header
INITIATING CUE
. 2. Record recommended Isolation Points and Required Positions on the sheet provided. 3. Inform the Unit Supervisor when the task is complete.
: 1. The Unit Supervisor has directed you to determine the isolation points necessary to remove ONLY the 2C Condensate and 2C Condensate Booster pump from the condensate header.
: 2. Record recommended Isolation Points and Required Positions on the sheet provided.
: 3. Inform the Unit Supervisor when the task is complete.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-R Page 10 of 10   EPN Hang Position
A-N-2-R Page 10 of 10 EPN Hang Position  


Exelon Nuclear Job Performance Measure PERFORM CCSW ACTIVITY CALCULATION JPM Number:
Exelon Nuclear Job Performance Measure PERFORM CCSW ACTIVITY CALCULATION JPM Number: A-N-3-R Revision Number: 02 Date: 02/16 Developed By:
A-N-3-R Revision Number: 0 2  Date: 0 2/1 6        Developed By:
Instructor Date Approved By:
Instructor Date     Approved By:
Facility Representative Date  
Facility Representative Date Job Performance Measure (JPM)
A-N-3-R  Page 2 of 7  Revision Record (Summary) Revision 0 0 New JPM. Revision 0 1 Revised for 2010 NRC exam
. Revision 02 Revised for ILT 15-1 (2016-301) NRC Exam.


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-R Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS
A-N-3-R Page 2 of 7 Revision Record (Summary)
: 1. This is a tabletop JPM utilizing simulator procedures.
Revision 00 New JPM.
: 2. No Simulator setup needed.
Revision 01 Revised for 2010 NRC exam.
: 3. Ensure a calculator is available and the memory/display has been cleared.
Revision 02 Revised for ILT 15-1 (2016-301) NRC Exam.
 
Job Performance Measure (JPM)
A-N-3-R Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS
: 1.
This is a tabletop JPM utilizing simulator procedures.
: 2.
No Simulator setup needed.
: 3.
Ensure a calculator is available and the memory/display has been cleared.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Provide a marked up copy of DOS 1500-08.
: 1. Provide a marked up copy of DOS 1500-08.  
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-R Page 4 of 7 INITIAL CONDITIONS
A-N-3-R Page 4 of 7 INITIAL CONDITIONS
: 1. You are an extra NSO. 2. The Unit 2 NSO started DOS 1500
: 1. You are an extra NSO.
-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS then had to leave shift for medical reasons.
: 2. The Unit 2 NSO started DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI)
: 3. Only the "A" CCSW Heat Exchanger is going to be placed in service.
HEAT EXCHANGER DURING CCSW PUMP OPERATIONS then had to leave shift for medical reasons.
: 3. Only the A CCSW Heat Exchanger is going to be placed in service.
INITIATING CUE
INITIATING CUE
: 1. Complete the performance of DOS 1500-08. 2. Inform the Unit Supervisor when the task is complete.
: 1. Complete the performance of DOS 1500-08.
: 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
* Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-R Page 5 of 7 JPM Start Time
A-N-3-R Page 5 of 7 JPM Start Time: _________
: _________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Provide the examinee with the provided copy of DOS 1500-08. The following steps can be performed in any order.
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the examinee with the provided copy of DOS 1500-08.
The following steps can be performed in any order.
If examinee states to stop, due to errors, inform him/her to continue calculations.
If examinee states to stop, due to errors, inform him/her to continue calculations.
* 1. Examinee calculates Dilution flow (1,017,000 gpm).
* 1.
Examinee calculates Dilution flow (1,017,000 gpm).
See attached key.
See attached key.
_____        _____        _____
: 2.
: 2. Examinee enters dilution flow (from above) to calculate CCSW Activity Limit.
Examinee enters dilution flow (from above) to calculate CCSW Activity Limit.
See attached key.
See attached key.
_____        _____        _____
* 3.
* 3. Examinee calculates CCSW Activity Limit (2.91 x 10
Examinee calculates CCSW Activity Limit (2.91 x 10-5).
-5). See attached key.
See attached key.
_____        _____        _____
* 4.
* 4. Examinee verifies CCSW Heat Exchanger A sample activity is less than or equal to the calculated CCSW activity limit Examinee determines CCSW Heat Exchanger A sample activity is greater than or equal to the calculated CCSW activity limit _____        _____        _____
Examinee verifies CCSW Heat Exchanger A sample activity is less than or equal to the calculated CCSW activity limit Examinee determines CCSW Heat Exchanger A sample activity is greater than or equal to the calculated CCSW activity limit
: 5. Recommends to the Unit Supervisor that the calculated sample limit exceeds the allowable discharge.
: 5.
Makes recommendation to Unit Supervisor. _____        _____        _____
Recommends to the Unit Supervisor that the calculated sample limit exceeds the allowable discharge.
: 6. Informs Unit Supervisor task is complete.
Makes recommendation to Unit Supervisor.
: 6.
Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
Examinee notifies the Unit Supervisor.
_____        _____        _____
CUE:
CUE: Acknowledge report of task completion.
Acknowledge report of task completion.
END   JPM Stop Time
END JPM Stop Time:_________  
:_________
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-R Page 6 of 7 Operator's Name:       Job Title:     RO  
A-N-3-R Page 6 of 7 Operators Name:
Job
 
==Title:==
RO JPM


JPM Title: PERFORM CCSW ACTIVITY CALCULATION Revision Number: 0 2 JPM Number: A-N-3-R Task Number and Title:
==Title:==
277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance
PERFORM CCSW ACTIVITY CALCULATION Revision Number: 02 JPM Number: A-N-3-R Task Number and
. K/A Number and Importance: Generic.2.3.11     3.8 / 4.3 Suggested Testing Environment:
 
Simulator Actual Testing Environment:
==Title:==
Simulator Control Room In-Plant Testing Method:
277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance.
Simulate Alternate Path
K/A Number and Importance: Generic.2.3.11 3.8 / 4.3 Suggested Testing Environment: Simulator Actual Testing Environment:
Yes No   Perform SRO Only: Yes No Time Critical:
Simulator Control Room In-Plant Testing Method:
Yes No Estimated Time to Complete:
Simulate Alternate Path:
1 5        Actual Time Used:
Yes No Perform SRO Only:
minutes
Yes No Time Critical:
Yes No Estimated Time to Complete: 15 Actual Time Used:
minutes  


==References:==
==References:==
 
DOS 1500-08, rev 17 EVALUATION  
DOS 1500-08 , rev 17 EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?
Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory
Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________


Comments:                 Evaluator's Name: ____________________________
Job Performance Measure (JPM)
(Print) Evaluator's Signature: __________________________
A-N-3-R Page 7 of 7 INITIAL CONDITIONS
_ Date: _________
: 1. You are an extra NSO.
: 2. The Unit 2 NSO started DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS then had to leave shift for medical reasons.
: 3. Only the A CCSW Heat Exchanger is going to be placed in service.
INITIATING CUE
: 1. Complete the performance of DOS 1500-08.
: 2. Inform the Unit Supervisor when the task is complete.
 
Exelon Nuclear Job Performance Measure DETERMINE ACTIONS FOR A FIRE JPM Number: A-N-4-R Revision Number: 01 Date: 02/16 Developed By:
Instructor Date Approved By:
Facility Representative Date


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-R Page 7 of 7  INITIAL CONDITIONS
A-N-4-R Page 2 of 8 Revision Record (Summary)
: 1. You are an extra NSO. 2. The Unit 2 NSO started DOS 1500
Revision 00 New JPM for ILT 12-1 (2013-301) NRC Exam.
-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS then had to leave shift for medical reasons.
Revision 01 Revised for ILT 15-1 (2016-301) NRC Exam.  
: 3. Only the "A" CCSW Heat Exchanger is going to be placed in service.
INITIATING CUE
: 1. Complete the performance of DOS 1500-08. 2. Inform the Unit Supervisor when the task is complete.


Exelon Nuclear Job Performance Measure DETERMINE ACTIONS FOR A FIRE  JPM Number:
A-N-4-R  Revision Number: 0 1  Date: 02/16        Developed By:
Instructor Date    Approved By:
Facility Representative Date Job Performance Measure (JPM)
A-N-4-R  Page 2 of 8  Revision Record (Summary)
Revision 0 0 New JPM for ILT 12
-1 (2013-301) NRC Exam
. Revision 01 Revised for ILT 15-1 (2016-301) NRC Exam
.
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-R Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
A-N-4-R Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
: 1. This is a tabletop JPM utilizing simulator procedures.
: 1.
: 2. No Simulator setup needed.
This is a tabletop JPM utilizing simulator procedures.
: 2.
No Simulator setup needed.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Provide a copy of DOA 0010-10 and DOA 0010
: 1. Provide a copy of DOA 0010-10 and DOA 0010-S1.  
-S1.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-R Page 4 of 8 INITIAL CONDITIONS
A-N-4-R Page 4 of 8 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. A fire is burning at the Lift Station, no explosion has occurred.
: 2. A fire is burning at the Lift Station, no explosion has occurred.
: 3. The fire has been classified as a major fire.
: 3. The fire has been classified as a major fire.
: 4. Hazmat and rescue response are not required.
: 4. Hazmat and rescue response are not required.
: 5. The Fire brigade has been alerted and is attempting to combat the fir e unsuccessfully.
: 5. The Fire brigade has been alerted and is attempting to combat the fire unsuccessfully.
: 6. A dedicated outside line is not available.
: 6. A dedicated outside line is not available.
INITIATING CUE
INITIATING CUE
: 1. The Unit supervisor has directed you to enter and execute DOA 0010
: 1. The Unit supervisor has directed you to enter and execute DOA 0010-10, FIRE-EXPLOSION through step D.3.
-10, FIRE-EXPLOSION through step D.3
: 2. Inform the Unit Supervisor when the task is complete.
. 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
* Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps.
The timeclock starts when the candidate acknowledges the initiating cue.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-R Page 5 of 8 JPM Start Time
A-N-4-R Page 5 of 8 JPM Start Time: _________
: _________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Provide the examinee with the supplied copy of DOA 0010-10. Provide the examinee with the supplied copy of DOA 0010
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
-S1 when requested.
Provide the examinee with the supplied copy of DOA 0010-10.
* 1. Notify Coal City Fire Protection District. (Refer to DOA 0010-S1, Key Phone Numbers for DOA 0010 Block Procedures.)
Provide the examinee with the supplied copy of DOA 0010-S1 when requested.
From DOA 0010
* 1.
-S1 determines that 815
Notify Coal City Fire Protection District. (Refer to DOA 0010-S1, Key Phone Numbers for DOA 0010 Block Procedures.)
-942-0336 is the number needed to contact the CCFPD. _____        _____        _____
From DOA 0010-S1 determines that 815-942-0336 is the number needed to contact the CCFPD.
* 2. Dial 815-942-0336 and communicate the details of the fire. Dials 815-942-0336 and communicates the details of the fire:
* 2.
* Location of fire
Dial 815-942-0336 and communicate the details of the fire.
* Assistance is required
Dials 815-942-0336 and communicates the details of the fire:
_____        _____        _____
Location of fire Assistance is required CUE:
CUE: If requested by the examinee, the TSO (NORTH and SOUTH) cannot contact the Coal City Fire Department because they are currently dealing with grid instabilities.
If requested by the examinee, the TSO (NORTH and SOUTH) cannot contact the Coal City Fire Department because they are currently dealing with grid instabilities.
: 3. Notifies TSO via direct line for major fire.
: 3.
Notifies TSO via direct line for major fire.
Notifies the TSO from a control room phone using the TSO direct line button and provides call back phone number.
Notifies the TSO from a control room phone using the TSO direct line button and provides call back phone number.
_____        _____        _____
: 4.
: 4. Notify Security Shift Supervisor that outside fire department will be responding AND request assistance in providing access to affected area if necessary.
Notify Security Shift Supervisor that outside fire department will be responding AND request assistance in providing access to affected area if necessary.
Notifies the Security Shift Supervisor that the CCFPD will be responding to the Lift Station.
Notifies the Security Shift Supervisor that the CCFPD will be responding to the Lift Station.
_____        _____
: 5.
_____  5. Informs Unit Supervisor task is complete.
Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
Examinee notifies the Unit Supervisor.
_____        _____        _____
CUE:
CUE: Acknowledge report of task completion.
Acknowledge report of task completion.
END Job Performance Measure (JPM)
END  
A-N-4-R  Page 6 of 8  JPM Stop Time
 
:_________
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-R Page 7 of 8 Operator's Name:
A-N-4-R Page 6 of 8 JPM Stop Time:_________
Job Title:    RO   


JPM Title: DETERMINE ACTIONS FOR A FIRE Revision Number: 01 JPM Number:
Job Performance Measure (JPM)
A-N-4-R Task Number and Title: 295L009, Respond to a fire/explosion K/A Number and Importance: Generic
A-N-4-R Page 7 of 8 Operators Name:
.2.4.27    3.4 / 3.9
Job


Suggested Testing Environment:
==Title:==
Simulator Actual Testing Environment:
RO JPM
Simulator  Control Room In-Plant  Testing Method:
Simulate Alternate Path
:  Yes  No  Perform SRO Onl y:  Yes  No  Time Critical:
Yes  No  Estimated Time to Complete
:      15        minutes  Actual Time Used:
minutes 


==References:==
==Title:==
DETERMINE ACTIONS FOR A FIRE Revision Number: 01 JPM Number: A-N-4-R Task Number and


DOA 0010-10 , rev 20; DOA 0010
==Title:==
-S1, rev 14
295L009, Respond to a fire/explosion K/A Number and Importance: Generic.2.4.27 3.4 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 15 minutes Actual Time Used:
minutes


EVALUATION  
==References:==
DOA 0010-10, rev 20; DOA 0010-S1, rev 14 EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?
Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Satisfactory Unsatisfactory Comments:
Evaluator's Name: ____________________________
Evaluators Name: ____________________________
(Print)
(Print)
Evaluator's Signature: ___________________________ Date: _________
Evaluators Signature: ___________________________ Date: _________  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-R Page 8 of 8 INITIAL CONDITIONS
A-N-4-R Page 8 of 8 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. A fire is burning at the Lift Station, no explosion has occurred.
: 2. A fire is burning at the Lift Station, no explosion has occurred.
: 3. The fire has been classified as a major fire.
: 3. The fire has been classified as a major fire.
: 4. Hazmat and rescue response are not required.
: 4. Hazmat and rescue response are not required.
: 5. The Fire brigade has been alerted and is attempting to combat the fir e unsuccessfully.
: 5. The Fire brigade has been alerted and is attempting to combat the fire unsuccessfully.
: 6. A dedicated outside line is not available.
: 6. A dedicated outside line is not available.
INITIATING CUE
INITIATING CUE
: 1. The Unit supervisor has directed you to enter and execute DOA 0010
: 1. The Unit supervisor has directed you to enter and execute DOA 0010-10, FIRE-EXPLOSION through step D.3.
-10, FIRE-EXPLOSION through step D.3
: 2. Inform the Unit Supervisor when the task is complete.
. 2. Inform the Unit Supervisor when the task is complete.
 
Exelon Nuclear Job Performance Measure REPORTABILITY DETERMINATION JPM Number: A-N-1-S Revision Number: 00 Date: 02/16 Developed By:
Instructor Date Approved By:
Facility Representative Date
 
Job Performance Measure (JPM)
A-N-1-S Page 2 of 7 Revision Record (Summary)
Revision 00 New JPM developed ILT 15-1 (2016-301) NRC Exam.  


Exelon Nuclear Job Performance Measure REPORTABILITY DETERMINATION  JPM Number:
A-N-1-S  Revision Number: 0 0  Date: 02/16        Developed By:
Instructor Date    Approved By:
Facility Representative Date Job Performance Measure (JPM)
A-N-1-S  Page 2 of 7  Revision Record (Summary)
Revision 0 0 New JPM developed ILT 15-1 (2016-301) NRC Exam
.
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-S Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS
A-N-1-S Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS
: 1. This is a tabletop JPM utilizing simulator procedures.
: 1.
: 2. No Simulator setup needed.
This is a tabletop JPM utilizing simulator procedures.
: 2.
No Simulator setup needed.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. None.    
: 1. None.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-S Page 4 of 7 INITIAL CONDITIONS
A-N-1-S Page 4 of 7 INITIAL CONDITIONS
: 1. You are the Unit 3 Unit Supervisor. 2. Unit 2 and Unit 3 are operating at rated power.
: 1. You are the Unit 3 Unit Supervisor.
: 2. Unit 2 and Unit 3 are operating at rated power.
: 3. The following timeline occurred:
: 3. The following timeline occurred:
* 2142 - Reactor Building differential pressure did not meet the required 0.25 inches of vacuum water gauge due to failure of the control system.
* 2142 - Reactor Building differential pressure did not meet the required 0.25 inches of vacuum water gauge due to failure of the control system.
* 2205 - Unit 3 Reactor Building Ventilation was secured and manually isolated.
* 2205 - Unit 3 Reactor Building Ventilation was secured and manually isolated.
* 2207 - Reactor Building differential pressure returned to greater than 0.25 inches of vacuum water gau ge. INITIATING CUE
* 2207 - Reactor Building differential pressure returned to greater than 0.25 inches of vacuum water gauge.
: 1. Utilizing the Reportability Manual, determine the earliest reportability requirement. Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
INITIATING CUE
Information For Evaluator's Use:
: 1. Utilizing the Reportability Manual, determine the earliest reportability requirement.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
* Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-S Page 5 of 7 JPM Start Time
A-N-1-S Page 5 of 7 JPM Start Time: _________
: _________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Candidate locates a copy of Reportability Manual.
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Candidate locates a copy of Reportability Manual.
EXAMINER NOTE:
EXAMINER NOTE:
The candidate will locate the decision trees in Volume 1 of the reportability manual. The candidate will begin in Operations Decision Tree 1 and continue evaluating Reportablity Criteria through Operations Decision Tree 4.
The candidate will locate the decision trees in Volume 1 of the reportability manual. The candidate will begin in Operations Decision Tree 1 and continue evaluating Reportablity Criteria through Operations Decision Tree 4.
* 1. Determines the event is reportable per SAF 1.
* 1.
: 8. Determines the event is reportable per SAF 1.
Determines the event is reportable per SAF 1.8.
8, Event or Condition that could have prevented fulfillment of a Safety Function. _____        _____        _____
Determines the event is reportable per SAF 1.8, Event or Condition that could have prevented fulfillment of a Safety Function.
* 2. Determines the time limit to Notify the NRC Operations Center via the ENS as soon as practical and in all cases, within 8 hours Determines the time limit to Notify the NRC Operations Center via the ENS as soon as practical and in all cases within 8 hours of the occurrence
* 2.
Determines the time limit to Notify the NRC Operations Center via the ENS as soon as practical and in all cases, within 8 hours Determines the time limit to Notify the NRC Operations Center via the ENS as soon as practical and in all cases within 8 hours of the occurrence (Time 0542).
END JPM Stop Time:_________


(Time 0542)
.
_____        _____        _____
END  JPM Stop Time
:_________
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-S Page 6 of 7 Operator's Name:
A-N-1-S Page 6 of 7 Operators Name:
Job Title:
Job
SRO JPM Title: REPORTABILITY DETERMINATION Revision Number: 0 0 JPM Number: A-N-1-S Task Number and Title:
 
==Title:==
SRO JPM
 
==Title:==
REPORTABILITY DETERMINATION Revision Number: 00 JPM Number: A-N-1-S Task Number and
 
==Title:==
299L001, Determine Reportability requirements as outlined in station Reportability manual.
299L001, Determine Reportability requirements as outlined in station Reportability manual.
K/A Number and Importance: Generic.2.1.
K/A Number and Importance: Generic.2.1.2 4.1 / 4.4 Suggested Testing Environment: Simulator Actual Testing Environment:
2     4.1 / 4.4 Suggested Testing Environment
Simulator Control Room In-Plant Testing Method:
: Simulator Actual Testing Environment:
Simulate Alternate Path:
Simulator Control Room In-Plant Testing Method:
Yes No Perform SRO Only:
Simulate Alternate Path
Yes No Time Critical:
Yes No   Perfor m SRO Only: Yes No Time Critical:
Yes No Estimated Time to Complete: 20 Actual Time Used:
Yes No Estimated Time to Complete:
minutes  
20       Actual Time Used:
minutes


==References:==
==References:==
 
Reportability Tables and Decision Trees LS-AA-1020 Rev 23, Safety (SAF) LS-AA-1110 Rev. 22 EVALUATION  
Reportability Tables and Decision Trees LS-AA-1020 Rev 23, Safety (SAF) LS
-AA-1110 Rev. 22
 
EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?
Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory
Satisfactory Unsatisfactory Comments:
 
Evaluators Name: ____________________________
Comments:
Evaluator's Name: ____________________________
(Print)
(Print)
Evaluator's Signature: ___________________________ Date: _________
Evaluators Signature: ___________________________ Date: _________  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-1-S Page 7 of 7 INITIAL CONDITION S 1. You are the Unit 3 Unit Supervisor.
A-N-1-S Page 7 of 7 INITIAL CONDITIONS
: 1. You are the Unit 3 Unit Supervisor.
: 2. Unit 2 and Unit 3 are operating at rated power.
: 2. Unit 2 and Unit 3 are operating at rated power.
: 3. The following timeline occurred:
: 3. The following timeline occurred:
* 2142 - Reactor Building differential pressure did not meet the required 0.25 inches of vacuum water gauge due to failure of the control system.
* 2142 - Reactor Building differential pressure did not meet the required 0.25 inches of vacuum water gauge due to failure of the control system.
* 2205 - Unit 3 Reactor Building Ventilation was secured and manually isolated.
* 2205 - Unit 3 Reactor Building Ventilation was secured and manually isolated.
* 2207 - Reactor Building differential pressure returned to greater than 0.25 inches of vacuum water g a u ge. INITIATING CUE
* 2207 - Reactor Building differential pressure returned to greater than 0.25 inches of vacuum water gauge.
: 1. Utilizing the Reportability Manual, determine the earliest reportability requirement
INITIATING CUE
.
: 1. Utilizing the Reportability Manual, determine the earliest reportability requirement.
Exelon Nuclear Job Performance Measure REACTIVATION OF AN SRO LICENSE JPM Number:
 
A-N-2-S Revision Number: 0 1  Date: 0 2/1 6        Developed By:
Exelon Nuclear Job Performance Measure REACTIVATION OF AN SRO LICENSE JPM Number: A-N-2-S Revision Number: 01 Date: 02/16 Developed By:
Instructor Date     Approved By:
Instructor Date Approved By:
Facility Representative Date Job Performance Measure (JPM)
Facility Representative Date  
A-N-2-S  Page 2 of 8  Revision Record (Summar y) Revision 0 0 Modified for 20 10 Cert Exam. Revision 01 Modified for ILT 15-1 (2016-301) NRC Exam.


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-S Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
A-N-2-S Page 2 of 8 Revision Record (Summary)
: 1. This is a tabletop JPM utilizing simulator procedures
Revision 00 Modified for 2010 Cert Exam.
. 2. No Simulator setup needed.
Revision 01 Modified for ILT 15-1 (2016-301) NRC Exam.
 
Job Performance Measure (JPM)
A-N-2-S Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
: 1.
This is a tabletop JPM utilizing simulator procedures.
: 2.
No Simulator setup needed.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Marked up copy of OP
: 1. Marked up copy of OP-AA-105-102.  
-AA-105-102.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-S Page 4 of 8 INITIAL CONDITIONS
A-N-2-S Page 4 of 8 INITIAL CONDITIONS
: 1. You are the Shift Manager
: 1.
. 2. An SRO is in the process of license reactivation
You are the Shift Manager.
. 3. OP-AA-105-102, Attachment 2, Reactivation of License Log, is filled out up to the point of Shift Manager review for the licensee
: 2.
. INITIATING C UE  1. The Shift Operation Superintendent directs you to "perform the Shift Manager review of OP-AA-105-102, Attachment 2 for the licensee and report any errors or omissions". Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
An SRO is in the process of license reactivation.
Information For Evaluator's Use:
: 3.
OP-AA-105-102, Attachment 2, Reactivation of License Log, is filled out up to the point of Shift Manager review for the licensee.
INITIATING CUE
: 1. The Shift Operation Superintendent directs you to perform the Shift Manager review of OP-AA-105-102, Attachment 2 for the licensee and report any errors or omissions.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
* Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps.
The timeclock starts when the candidate acknowledges the initiating cue.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-S Page 5 of 8 JPM Start Time
A-N-2-S Page 5 of 8 JPM Start Time: _________
: _________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Provide the Examinee the provided marked up copy of OP
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comm ent NOTE:
-AA-105-102. 1. Review OP-AA-105-102, Attachment 2.
Provide the Examinee the provided marked up copy of OP-AA-105-102.
Reviews OP
: 1.
-AA-105-102, Attachment 2.
Review OP-AA-105-102,.
_____        _____        _____
Reviews OP-AA-105-102,.
: 2. Check that Hours on Shift are in the same calendar quarter.
: 2.
Notes 12.0 hours listed on 6/2 6/16 are performed during the 2nd calendar quarter and cannot be counted towards license re
Check that Hours on Shift are in the same calendar quarter.
-activation.
Notes 12.0 hours listed on 6/26/16 are performed during the 2nd calendar quarter and cannot be counted towards license re-activation.
_____        _____        _____
: 3.
: 3. Check that Hours on Shift are applicable for license reactivation.
Check that Hours on Shift are applicable for license reactivation.
Determines 12.0 hours as WEC listed on 07/3/16 cannot be credited towards license re
Determines 12.0 hours as WEC listed on 07/3/16 cannot be credited towards license re-activation.
-activation.
_____        _____        _____
EXAMINER NOTE:
EXAMINER NOTE:
Steps 2 and 3 lead to the determination in step 4
Steps 2 and 3 lead to the determination in step 4
* 4. Check that licensee has the required 40 hours.
: 4.
Check that licensee has the required 40 hours.
Determines that licensee does NOT have adequate hours to meet the 40 hour requirement.
Determines that licensee does NOT have adequate hours to meet the 40 hour requirement.
_____        _____        _____
: 5.
* 5. Verifies Plant Tour completed per step 4.b Determines that Plant Tour date and signature are not completed.
Verifies Plant Tour completed per step 4.b Determines that Plant Tour date and signature are not completed.
_____        _____        _____
: 6.
: 6. Report the results of the review to the Shift Operations Superintendent (SOS).
Report the results of the review to the Shift Operations Superintendent (SOS).
Returns without signing OP
Returns without signing OP-AA-105-102, Attachment 2 to the SOS.
-AA-105-102, Attachment 2 to the SOS.
Informs the SOS that the licensees license CANNOT be reactivated due to insufficient hours on shift and plant tour incomplete.
Informs the SOS that the licensee's license CANNOT be reactivated due to insufficient hours on shift and plant tour incomplete.
CUE:
_____        _____        _____
As the SOS, acknowledge the report.
CUE: As the SOS, acknowledge the report. END Job Performance Measure (JPM)
END  
A-N-2-S  Page 6 of 8  JPM Stop Time
 
:_________
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-S Page 7 of 8 Operator's Name:
A-N-2-S Page 6 of 8 JPM Stop Time:_________
Job Title:
 
SRO JPM Title:
Job Performance Measure (JPM)
REACTIVATION OF AN SRO LICENSE Revision Number: 0 1 JPM Number: A-N-2-S Task Number and Title:
A-N-2-S Page 7 of 8 Operators Name:
Title: 299L024, Maintain an Active Licens e  K/A Number and Importance: Generic.2.1.
Job
4     3.3 / 3.8 Suggested Testing Environment:
 
Simulator Actual Testing Environment:
==Title:==
Simulator Control Room In-Plant Testing Method:
SRO JPM
Simulate Alternate Path
 
Yes No   Perform SRO Only: Yes No Time Critical:
==Title:==
Yes No Estimated Time to Complete:
REACTIVATION OF AN SRO LICENSE Revision Number: 01 JPM Number: A-N-2-S Task Number and
12       Actual Time Used:     minutes
 
==Title:==
Title: 299L024, Maintain an Active License K/A Number and Importance: Generic.2.1.4 3.3 / 3.8 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 12 Actual Time Used:
minutes  


==References:==
==References:==
 
OP-AA-105-102, Rev. 11 EVALUATION  
OP-AA-105-102 , Rev. 11 EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?
Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:                 Evaluator's Name: ____________________________
Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
(Print)
Evaluator's Signature: ___________________________ Date: _________
Evaluators Signature: ___________________________ Date: _________  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-2-S Page 8 of 8 INITIAL CONDITIONS
A-N-2-S Page 8 of 8 INITIAL CONDITIONS
: 1. You are the Shift Manager
: 1.
. 2. An SRO is in the process of license reactivation
You are the Shift Manager.
. 3. OP-AA-105-102, Attachment 2, Reactivation of License Log, is filled out up to the point of Shift Manager review for the licensee
: 2.
. INITIATING CUE
An SRO is in the process of license reactivation.
: 1. The Shift Operation Superintendent directs you to "perform the Shift Manager review of OP
: 3.
-AA-105-102, Attachment 2 for the licensee and report any errors or omissions
OP-AA-105-102, Attachment 2, Reactivation of License Log, is filled out up to the point of Shift Manager review for the licensee.
INITIATING CUE
: 1.
The Shift Operation Superintendent directs you to perform the Shift Manager review of OP-AA-105-102, Attachment 2 for the licensee and report any errors or omissions  


Exelon Nuclear Job Performance Measure VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE JPM Number:
Exelon Nuclear Job Performance Measure VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE JPM Number: A-N-3-S Revision Number: 04 Date: 02/16 Developed By:
A-N-3-S Revision Number: 0 4  Date: 0 2/1 6        Developed By:
Instructor Date Approved By:
Instructor Date     Approved By:
Facility Representative Date  
Facility Representative Date Job Performance Measure (JPM)
A-N-3-R  Page 2 of 7  Revision Record (Summary)
Revision 0 1 Bank JPM. Revision 0 2 Revised for 2010 NRC exam.
Revision 03 Revised for 2015 NRC exam Revision 04 Revised for ILT 15-1 (2016-301) NRC Exam.


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-R Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS
A-N-3-R Page 2 of 7 Revision Record (Summary)
: 1. This is a tabletop JPM utilizing simulator procedures.
Revision 01 Bank JPM.
: 2. No Simulator setup needed.
Revision 02 Revised for 2010 NRC exam.
Revision 03 Revised for 2015 NRC exam Revision 04 Revised for ILT 15-1 (2016-301) NRC Exam.
 
Job Performance Measure (JPM)
A-N-3-R Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS
: 1.
This is a tabletop JPM utilizing simulator procedures.
: 2.
No Simulator setup needed.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Provide a marked up copy of DOS 6600-02.  
: 1. Provide a marked up copy of DOS 6600-02.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-R Page 4 of 7 INITIAL CONDITIONS
A-N-3-R Page 4 of 7 INITIAL CONDITIONS
: 1. You are the Unit 2 Unit Supervisor
: 1. You are the Unit 2 Unit Supervisor.
. 2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal. 3. The off-going Unit Supervisor was unable to verify the paperwork, and has turned it over to you. 4. The Equipment Operator reported all surveillance requirements were within specifications
: 2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal.
. INITIATING CUE
: 3. The off-going Unit Supervisor was unable to verify the paperwork, and has turned it over to you.
: 1. Perform calculation verification and ensure paperwork is correct
: 4. The Equipment Operator reported all surveillance requirements were within specifications.
. 2. Inform me when the task is complete.
INITIATING CUE
: 1. Perform calculation verification and ensure paperwork is correct.
: 2. Inform me when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
* Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-R Page 5 of 7 JPM Start Time
A-N-3-R Page 5 of 7 JPM Start Time: _________
: _________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Provide the examinee with the provided copy of DOS 6600-02.
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
* 1. Candidate should identify step I.1.e has a mathematical error. Identifies differential pressure should read 4. _____
Provide the examinee with the provided copy of DOS 6600-02.
_____        _____
* 1.
* 2. Candidate should identify step I.1.w OR step I.1.v is signed off as verified dP of <6 (actual is 7).
Candidate should identify step I.1.e has a mathematical error.
Identifies differential pressure should read 4.
* 2.
Candidate should identify step I.1.w OR step I.1.v is signed off as verified dP of <6 (actual is 7).
Identifies incorrect verification of dP <6.
Identifies incorrect verification of dP <6.
_____        _____        _____
* 3.
* 3. Candidate should identify that steps I.1.ab have been initialed by the same person performing the surveillance and were NOT independently verified. Identifies step NOT independently verified.
Candidate should identify that steps I.1.ab have been initialed by the same person performing the surveillance and were NOT independently verified.
_____        _____        _____
Identifies step NOT independently verified.
: 4. Notify Unit Supervisor of discrepancies.
: 4.
Notify Unit Supervisor of discrepancies.
Notifies Unit Supervisor, may dispatch Operators to verify/correct issues, also may initiate IR.
Notifies Unit Supervisor, may dispatch Operators to verify/correct issues, also may initiate IR.
_____        _____        _____
CUE:
CUE: Acknowledge report of task completion.
Acknowledge report of task completion.
END   JPM Stop Time
END JPM Stop Time:_________  
:_________
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-R Page 6 of 7 Operator's Name:
A-N-3-R Page 6 of 7 Operators Name:
Job Title:
Job
SRO JPM Title: VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE Revision Number: 0 4 JPM Number: A-N-3-S Task Number and Title:
 
299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedures K/A Number and Importance: Generic.2.2.12     3.
==Title:==
7 / 4.1 Suggested Testing Environment:
SRO JPM
Simulator Actual Testing Environment:
 
Simulator Control Room In-Plant Testing Method
==Title:==
Simulate Alternate Path
VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE Revision Number: 04 JPM Number: A-N-3-S Task Number and
Yes No   Perform SRO Only: Yes No Time Critical:
 
Yes No Estimated Time to Complete:
==Title:==
12       Actual Time Used:
299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedures K/A Number and Importance: Generic.2.2.12 3.7 / 4.1 Suggested Testing Environment: Simulator Actual Testing Environment:
minutes
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 12 Actual Time Used:
minutes  


==References:==
==References:==
 
DOS 6600-02, rev 20 EVALUATION  
DOS 6600-02 , rev 20 EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?
Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory
Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________


Comments:
Job Performance Measure (JPM)
Evaluator's Name: ____________________________
A-N-3-R Page 7 of 7 INITIAL CONDITIONS
(Print)
: 1. You are the Unit 2 Unit Supervisor.
Evaluator's Signature: _____________________
: 2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal.
______ Date: _________
: 3. The off-going Unit Supervisor was unable to verify the paperwork, and has turned it over to you.
: 4. The Equipment Operator reported all surveillance requirements were within specifications.
INITIATING CUE
: 1. Perform calculation verification and ensure paperwork is correct.
: 2. Inform me when the task is complete.
 
Exelon Nuclear Job Performance Measure REVIEW CCSW ACTIVITY CALCULATION JPM Number: A-N-4-S Revision Number: 02 Date: 02/16 Developed By:
Instructor Date Approved By:
Facility Representative Date


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-3-Page 7 of 7  INITIAL CONDITIONS
A-N-4-S Page 2 of 8 Revision Record (Summary)
: 1. You are the Unit 2 Unit Supervisor
Revision 00 New JPM.
. 2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal
Revision 01 Revised for 2010 NRC exam.
. 3. The off-going Unit Supervisor was unable to verify the paperwork, and has turned it over to you
Revision 02 Modified for ILT 15-1 (2016-301) NRC Exam.  
. 4. The Equipment Operator reported all surveillance requirements were within specifications
. INITIATING CUE
: 1. Perform calculation verification and ensure paperwork is correct
. 2. Inform me when the task is complete.


Exelon Nuclear Job Performance Measure REVIEW CCSW ACTIVITY CALCULATION  JPM Number:
A-N-4-S  Revision Number: 0 2  Date: 0 2/1 6        Developed By:
Instructor Date    Approved By:
Facility Representative Date Job Performance Measure (JPM)
A-N-4-S  Page 2 of 8  Revision Record (Summary) Revision 0 0 New JPM. Revision 01 Revised for 2010 NRC exam.
Revision 02 Modified for ILT 15
-1 (2016-301) NRC Exam
.
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-S Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
A-N-4-S Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
: 1. This is a tabletop JPM utilizing simulator procedures.
: 1.
: 2. No Simulator setup needed.
This is a tabletop JPM utilizing simulator procedures.
: 3. Ensure a calculator is available and the memory/display has been cleared.
: 2.
No Simulator setup needed.
: 3.
Ensure a calculator is available and the memory/display has been cleared.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. Provide a marked up copy of DOS 1500-08.
: 1. Provide a marked up copy of DOS 1500-08.  
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-S Page 4 of 8 INITIAL CONDITIONS
A-N-4-S Page 4 of 8 INITIAL CONDITIONS
: 1. You are the U2 US. 2. The Unit 2 NSO has completed DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS
: 1. You are the U2 US.
. 3. Only the "A" CCSW Heat Exchanger is going to be placed in service.
: 2. The Unit 2 NSO has completed DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS.
: 3. Only the A CCSW Heat Exchanger is going to be placed in service.
INITIATING CUE
INITIATING CUE
: 1. Review and Verify DOS 1500
: 1. Review and Verify DOS 1500-08.
-08. Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
* Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps.
The timeclock starts when the candidate acknowledges the initiating cue.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-S Page 5 of 8 JPM Start Time
A-N-4-S Page 5 of 8 JPM Start Time: _________
: _________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Provide the examinee with the provided copy of DOS 1500-08. The following steps can be performed in any order.
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
* 1. Verifies Dilution flow calculation (1,017,000 gpm).
Provide the examinee with the provided copy of DOS 1500-08.
Determines Dilution flow was incorrectly determined. Correct Dilution flow is 1,017,000 gpm. _____        _____        _____
The following steps can be performed in any order.
* 2. Enters dilution flow (1,017,000 gpm) to calculate CCSW Activity Limit.
* 1.
Determines 2.91 x 10
Verifies Dilution flow calculation (1,017,000 gpm).
-5 is the correct CCSW sample activity limit.
Determines Dilution flow was incorrectly determined. Correct Dilution flow is 1,017,000 gpm.
_____        _____        _____
* 2.
NOTE: If the candidate attempts to terminate the review based on incorrect dilution flow previously calculated:
Enters dilution flow (1,017,000 gpm) to calculate CCSW Activity Limit.
Direct the candidate to complete the review and make any necessary adjustments as necessary     and another SRO will review.
Determines 2.91 x 10-5 is the correct CCSW sample activity limit.
: 3. Verifies CCSW Heat Exchanger A sample activity is less than or equal to the calculated CCSW activity limit Determines 2.01 x 10-5 is less than 2.91 x 10-5. _____        _____        _____
NOTE:
* 4. Re-Performs Canal Activity Calculation.
If the candidate attempts to terminate the review based on incorrect dilution flow previously calculated:
Uses 1,017,000 gpm as Dilution Flow. Determines incorrect activity level used for "A" Activity level of CCSW Heat Exchanger. Correct value is 2.01 x10-5. _____        _____        _____
Direct the candidate to complete the review and make any necessary adjustments as necessary and another SRO will review.
* 5. Determines Canal Activity Concentration.
: 3.
Determines Canal Activity Concentration is 6.9 x10-8   _____        _____        _____
Verifies CCSW Heat Exchanger A sample activity is less than or equal to the calculated CCSW activity limit Determines 2.01 x 10-5 is less than 2.91 x 10-5.
: 4.
Re-Performs Canal Activity Calculation.
Uses 1,017,000 gpm as Dilution Flow. Determines incorrect activity level used for A Activity level of CCSW Heat Exchanger.
Correct value is 2.01 x10-5.
: 5.
Determines Canal Activity Concentration.
Determines Canal Activity Concentration is 6.9 x10-8  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-S Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment 6. Determines need for NSO to re-perform calculations.
A-N-4-S Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
Examinee directs NSO to re-perform calculations
: 6.
_____        _____        _____
Determines need for NSO to re-perform calculations.
CUE: Acknowledge report of task completion.
Examinee directs NSO to re-perform calculations CUE:
END   JPM Stop Time
Acknowledge report of task completion.
:_________
END JPM Stop Time:_________  
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-S Page 7 of 8 Operator's Name:
A-N-4-S Page 7 of 8 Operators Name:
Job Title:
Job
SRO JPM Title: PERFORM CCSW ACTIVITY CALCULATION Revision Number: 0 2 JPM Number: A-N-4-S Task Number and Title:
 
277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance
==Title:==
. K/A Number and Importance: Generic.2.3.11     3.8
SRO JPM
/ 4.3 Suggested Testing Environment:
 
Simulator Actual Testing Environment:
==Title:==
Simulator Control Room In-Plant Testing Method:
PERFORM CCSW ACTIVITY CALCULATION Revision Number: 02 JPM Number: A-N-4-S Task Number and
Simulate Alternate Path
 
Yes No   Perform SRO Only: Yes No Time Critical:
==Title:==
Yes No Estimated Time to Complete:
277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance.
1 5        Actual Time Used:
K/A Number and Importance: Generic.2.3.11 3.8 / 4.3 Suggested Testing Environment: Simulator Actual Testing Environment:
minutes
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 15 Actual Time Used:
minutes  


==References:==
==References:==
 
DOS 1500-08, rev 17 EVALUATION  
DOS 1500-08 , rev 17 EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?
Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory
Satisfactory Unsatisfactory Comments:
 
Evaluators Name: ____________________________
Comments:                 Evaluator's Name: ____________________________
(Print)
(Print) Evaluator's Signature: ___________________________ Date: _________
Evaluators Signature: ___________________________ Date: _________  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-4-S Page 8 of 8 INITIAL CONDITIONS
A-N-4-S Page 8 of 8 INITIAL CONDITIONS
: 1. You are the U2 US. 2. The Unit 2 NSO has completed DOS 1500
: 1. You are the U2 US.
-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS.
: 2. The Unit 2 NSO has completed DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS.
: 3. Only the "A" CCSW Heat Exchanger is going to be placed in service.
: 3. Only the A CCSW Heat Exchanger is going to be placed in service.
INITIATING CUE
INITIATING CUE
: 1. Review and Verify DOS 1500
: 1. Review and Verify DOS 1500-08.
-08. 2. Inform the Unit 2 Supervisor when the task is complete.
: 2. Inform the Unit 2 Supervisor when the task is complete.  


SRRS: 3D.105 (when utilized for operator initial or continuing training)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Exelon Nuclear Job Performance Measure DETERMINE AN EP PROTECTIVE ACTION RECOMMENDATION JPM Number:
Exelon Nuclear Job Performance Measure DETERMINE AN EP PROTECTIVE ACTION RECOMMENDATION JPM Number: A-N-5-S Revision Number: 00 Date: 02/16 Developed By:
A-N-5-S Revision Number:
Instructor Date Approved By:
00 Date: 02/16         Developed By:
Facility Representative Date  
Instructor Date     Approved By:
Facility Representative Date Job Performance Measure (JPM)
A-N-5-S  Page 2 of 8  Revision Record (Summary)
Revision 00 New JPM developed for ILT 15-1 (2016-301) NRC Exam.


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-5-S Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
A-N-5-S Page 2 of 8 Revision Record (Summary)
: 1. This is a tabletop JPM utilizing simulator procedures.
Revision 00 New JPM developed for ILT 15-1 (2016-301) NRC Exam.
: 2. No Simulator setup needed.
 
Job Performance Measure (JPM)
A-N-5-S Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
: 1.
This is a tabletop JPM utilizing simulator procedures.
: 2.
No Simulator setup needed.
DOCUMENT PREPARATION
DOCUMENT PREPARATION
: 1. For exam purposes/exam security provide a colored copy of a blank NARS form
: 1. For exam purposes/exam security provide a colored copy of a blank NARS form.
.
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-5-S Page 4 of 8 INITIAL CONDITIONS
A-N-5-S Page 4 of 8 INITIAL CONDITIONS
: 1. This is a time critical JPM.
: 1. This is a time critical JPM.
: 2. You are the Shift Emergency Director
: 2. You are the Shift Emergency Director.
. 3. Unit 2 was operating at near rated conditions
: 3. Unit 2 was operating at near rated conditions.
. 4. Security reported a HOSTILE ACTION is occurring and terrorists gained access to the reactor building
: 4. Security reported a HOSTILE ACTION is occurring and terrorists gained access to the reactor building.
. 5. An explosive device was detonated in the spent fuel pool resulting in a loss of fuel pool level. 6. Visible damage to spent fuel has occurred
: 5. An explosive device was detonated in the spent fuel pool resulting in a loss of fuel pool level.
. 7. Fuel pool level is lowering at 1 foot per minute
: 6. Visible damage to spent fuel has occurred.
. 8. Refuel floor CAM is alarming due to high airborne particulate contamination.
: 7. Fuel pool level is lowering at 1 foot per minute.
: 9. A large hole is present in the Reactor Building wall
: 8. Refuel floor CAM is alarming due to high airborne particulate contamination.
. 10. There is NO verifier available.
: 9. A large hole is present in the Reactor Building wall.
: 10. There is NO verifier available.
INITIATING CUES
INITIATING CUES
: 1. Determine EAL(s) (ignore discretionary EALs) and complete a NARS form. Give the NARS form to the WEC Supervisor, who will make the state notification.
: 1. Determine EAL(s) (ignore discretionary EALs) and complete a NARS form. Give the NARS form to the WEC Supervisor, who will make the state notification.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
* Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-5-S Page 5 of 8 Some operations that are performed from outside of the C/R may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
A-N-5-S Page 5 of 8 Some operations that are performed from outside of the C/R may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-5-S Page 6 of 8 JPM Start Time
A-N-5-S Page 6 of 8 JPM Start Time: _________
: _________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Examinee locates a copy of Radiological Emergency Plan Annex for Dresden EP
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
-AA-1004 charts
Examinee locates a copy of Radiological Emergency Plan Annex for Dresden EP-AA-1004 charts.
. Provide the supplied NARS Form.
Provide the supplied NARS Form.
Provide the supplied screen shot of the meteorological data.
Provide the supplied screen shot of the meteorological data.
* 1. Determines a classification of GENERAL EMERGENCY, due to notification from the Security Force that a HOSTILE ACTION is occurring within the protected area AND Damage to spent fuel pool has occurred.
* 1.
Determines a classification of GENERAL EMERGENCY, due to notification from the Security Force that a HOSTILE ACTION is occurring within the protected area AND Damage to spent fuel pool has occurred.
Determines highest classification is a GENERAL EMERGENCY per EAL HG1 (15 minute requirement).
Determines highest classification is a GENERAL EMERGENCY per EAL HG1 (15 minute requirement).
_____        _____        _____
NOTE:
NOTE: Determines classification start time _______ and stop time _______ .
Determines classification start time _______ and stop time _______.
(15 minute limit)
(15 minute limit)
* 2. Properly fills out NARS form.
* 2.
See attached key for the areas that must be filled out correctly (1 2 minute requirement)
Properly fills out NARS form.
See attached key for the areas that must be filled out correctly (12 minute requirement)
NARS form Block 8 either meters/sec or miles/hr may be annotated. Only one is required. Ground level parameters must be used.
NARS form Block 8 either meters/sec or miles/hr may be annotated. Only one is required. Ground level parameters must be used.
_____        _____        _____
NOTE:
NOTE: Fill out NARS form start time (when declaration completed) _______ and stop time _______ .                 (12 minute limit)
Fill out NARS form start time (when declaration completed) _______ and stop time _______.
END   JPM Stop Time
(12 minute limit)
:_________
END JPM Stop Time:_________
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-5-S Page 7 of 8 Operator's Name:
A-N-5-S Page 7 of 8 Operators Name:
Job Title:    SRO   
Job


JPM Title: DETERMINE EP PROTECTIVE ACTION RECOMMENDATION Revision Number: 00 JPM Number:  A-N-5-S  Task Number and Title: 295L160, Given a plant in an off normal condition, determine the EP classification K/A Number and Importance: Generic.2.4.
==Title:==
44    2.4 / 4.4  Suggested Testing Environment:
SRO JPM
Simulator Actual Testing Environment:
Simulator  Control Room In-Plant  Testing Method:
Simulate Alternate Path
:  Yes  No  Perform SRO Only:  Yes  No  Time Critical:
Yes  No  Estimated Time to Complete:
1 5        Actual Time Used:
minutes 


==References:==
==Title:==
DETERMINE EP PROTECTIVE ACTION RECOMMENDATION Revision Number: 00 JPM Number: A-N-5-S Task Number and


EP-AA-1004 Addendum 3 Rev. 002
==Title:==
295L160, Given a plant in an off normal condition, determine the EP classification K/A Number and Importance: Generic.2.4.44 2.4 / 4.4 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 15 Actual Time Used:
minutes


EVALUATION  
==References:==
EP-AA-1004 Addendum 3 Rev. 002 EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?
Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Satisfactory Unsatisfactory Comments:
Evaluator's Name: ____________________________
Evaluators Name: ____________________________
(Print)
(Print)
Evaluator's Signature: ___________________________ Date: _________
Evaluators Signature: ___________________________ Date: _________  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
A-N-5-S Pag e 8 of 8 INITIAL CONDITIONS
A-N-5-S Page 8 of 8 INITIAL CONDITIONS
: 1. This is a time critical JPM. 2. You are the Shift Emergency Director.
: 1. This is a time critical JPM.
: 3. Unit 2 was operating at near rated conditions
: 2. You are the Shift Emergency Director.
. 4. Security reported a HOSTILE ACTION is occurring and terrorists gained access to the reactor building
: 3. Unit 2 was operating at near rated conditions.
. 5. An explosive device was detonated in the spent fuel pool resulting in a loss of fuel pool level.
: 4. Security reported a HOSTILE ACTION is occurring and terrorists gained access to the reactor building.
: 5. An explosive device was detonated in the spent fuel pool resulting in a loss of fuel pool level.
: 6. Visible damage to spent fuel has occurred.
: 6. Visible damage to spent fuel has occurred.
: 7. Fuel pool level is lowering at 1 foot per minute.
: 7. Fuel pool level is lowering at 1 foot per minute.
: 8. Refuel floor CAM is alarming due to high airborne particulate contamination.
: 8. Refuel floor CAM is alarming due to high airborne particulate contamination.
: 9. A large hole is present in the Reactor Building wall. 10. There is NO verifier available.
: 9. A large hole is present in the Reactor Building wall.
: 10. There is NO verifier available.
INITIATING CUES
INITIATING CUES
: 1. Determine EAL(s) (ignore discretionary EALs) and complete a NARS form. Give the NARS form to the WEC Supervisor, who will make the state notification.
: 1. Determine EAL(s) (ignore discretionary EALs) and complete a NARS form.
Give the NARS form to the WEC Supervisor, who will make the state notification.  
 
TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST Job Performance Measure SBLC - INJECTION WITH PUMP AND RWCU FAILURES JPM Number: S-N-a Revision Number: 03 Date: 02/16 EXAM MATERIAL Developed By:
Instructor Date Approved By:
Facility Representative Date
 
TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
: 1.
Task description and number, JPM description and number are identified.
: 2.
Knowledge and Abilities (K/A) references are included.
: 3.
Performance location specified. (in-plant, control room, simulator, or other)
: 4.
Initial setup conditions are identified.
: 5.
Initiating cue (and terminating cue if required) are properly identified.
: 6.
Task standards identified and verified by SME review.
: 7.
Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8.
If an alternate path is used, the task standard contains criteria for successful completion.
: 9.
Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOP 1100-02 Rev: 19 Procedure Rev:
Procedure Rev:
: 10. Verify cues both verbal and visual are free of conflict.
: 11. Verify performance time is accurate
: 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date


TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 Revision Record (Summary)
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST Job Performance Measure SBLC - INJECTION WITH PUMP AND RWCU FAILURES JPM Number: S
Revision 02 Revised for 2013 NRC exam.
-N-a  Revision Number: 03 Date: 02/16 EXAM MATERIAL Developed By:
Revision 03 Revised for ILT 15-1 (2016-301) NRC Exam  
Instructor Date  Approved By:
Facility Representative Date TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03  NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure    DOP 1100-02  Rev:    19  Procedure Rev:  Procedure Rev:  ________ 10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date        SME / Instructor Date TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 Revision Record (Summary)
Revision 0 2 Revised for 201 3 NRC exam. Revision 03 Revised for ILT 15
-1 (2016-301) NRC Exam


TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 SIMULATOR SETUP INSTRUCTIONS
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to IC _51_.
: 1. Reset the simulator to IC _
NOTE:
51_. NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Run CAEP file S-N-a.cae. 3. If the CAEP file cannot be run then insert the following Expert Commands:
: 2. Run CAEP file S-N-a.cae.
: 3. If the CAEP file cannot be run then insert the following Expert Commands:
: a. Insert following Malfunctions and/or Remotes:
: a. Insert following Malfunctions and/or Remotes:
* IMF CIRWCUAP (2
IMF CIRWCUAP (2-1201-1 valve failure to close - and allows manual closure).
-1201-1 valve failure to close  
IMF CIRWCUBP (2-1201-2 valve failure to close - and allows manual closure).
- and allows manual closure).
IMF SCRLFVAD 0.0 (Inserts BOTH SBLC Pump relief valve setpoint drift to 0.0 so #
* IMF CIRWCUBP (2
whichever pump is started first will not develop flow)
-1201-2 valve failure to close - and allows manual closure).
IMF SCRLFVBD 0.0 (Inserts BOTH SBLC Pump relief valve setpoint drift to 0.0 so #
* IMF SCRLFVAD 0.0 (Inserts BOTH SBLC Pump relief valve setpoint drift to 0.0 so
whichever pump is started first will not develop flow)
# whichever pump is started first will not develop flow
IOR SCD3013 OFF (Overrides SBLC SYS1&2 and SYS2&1 positions OFF)
)
: b. Setup the following Triggers:
* IMF SCRLFVBD 0.0 (Inserts BOTH SBLC Pump relief valve setpoint drift to 0.0 so
TRGSET 1 "SCD301_DRW(1)" (Trigger 1 Activates when SBLC control switch is placed to SYS1 position)
# whichever pump is started first will not develop flow
TRG 1 "DMF SCRLFVBD" (Deletes 2B SBLC relief valve setpoint drift malfunction)
)
TRGSET 2 "SCD301_DRW(2)" (Trigger 2 Activates when SBLC control switch is placed to SYS2 position)
* IOR SCD3013 OFF (Overrides SBLC SYS1&2 and SYS2&1 positions OFF
TRG 2 "DMF SCRLFVAD" (Deletes 2A SBLC relief valve setpoint drift malfunction)
) b. Setup the following Triggers:
DOCUMENT PREPARATION Clean copy of DOP 1100-02 hardcard.  
* TRGSET 1 "SCD301_DRW(1)" (Trigger 1 Activates when SBLC control switch is placed to SYS1 position
)
* TRG 1 "DMF SCRLFVBD" (Deletes 2B SBLC relief valve setpoint drift malfunction
)
* TRGSET 2 "SCD301_DRW(2)" (Trigger 2 Activates when SBLC control switch is placed to SYS2 position
)
* TRG 2 "DMF SCRLFVAD" (Deletes 2A SBLC relief valve setpoint drift malfunction
)
DOCUMENT PREPARATION Clean copy of DOP 1100
-02 hardcard.


TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 INITIAL CONDITIONS
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 INITIAL CONDITIONS
: 1. You are the Unit 2 NSO.
: 1. You are the Unit 2 NSO.
: 2. A transient has occurred, resulting in an ATWS.
: 2. A transient has occurred, resulting in an ATWS.
Line 939: Line 1,041:
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  


TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-a Rev 03 JPM Start Time:
S-N-a Rev 03 JPM Start Time:
STEP ELEMENT STANDARD SAT UNSAT Comment Number Note Examinee should locate the hard card, then provide the included copy.
STEP ELEMENT STANDARD SAT UNSAT Comment Number Note Examinee should locate the hard card, then provide the included copy.
: 1. Selects the correct procedure step.
: 1.
Determines correct procedure step is per DOP 1100
Selects the correct procedure step. Determines correct procedure step is per DOP 1100-02 Page 6, Initiate SBLC for Boron Injection or Level Control (ATWS)
-02 Page 6, Initiate SBLC for Boron Injection or Level Control (ATWS)
: 2.
 
Place the SBLC INJECTION CONTROL keylock switch to the SYS 1 OR SYS 2 position.
___ 
 
___ 
 
___ 2. Place the SBLC INJECTION CONTROL keylock switch to the SYS 1 OR SYS 2 position.
Turns the SBLC INJECTION CONTROL keylock switch to either the intermediate right OR intermediate left position.
Turns the SBLC INJECTION CONTROL keylock switch to either the intermediate right OR intermediate left position.
___    ___    ___ 3. Verifies applicable SQUIB pilot light NOT lit. SQUIB "A" or "B" light off.
: 3.
___  ___  ___ Note The selected pump starts but does not develop flow (relief valve failure in the JPM setup).
Verifies applicable SQUIB pilot light NOT lit.
: 4. Verifies applicable PUMP pilot light lit.
SQUIB A or B light off.
Note The selected pump starts but does not develop flow (relief valve failure in the JPM setup).
: 4.
Verifies applicable PUMP pilot light lit.
PUMP light on.
PUMP light on.
___  ___  ___ BEGIN ALTERNATE PATH
BEGIN ALTERNATE PATH
: 5. Verifies FLOW pilot light lit.
: 5.
Verifies FLOW pilot light lit.
FLOW light off (SBLC is NOT injecting).
FLOW light off (SBLC is NOT injecting).
___  ___  ___ 6. SBLC SQUIB VLV CKT FAILURE annunciator alarms (902
: 6.
-5 H-6). Annunciator 902
SBLC SQUIB VLV CKT FAILURE annunciator alarms (902-5 H-6).
-5 H-6 illuminated.
Annunciator 902-5 H-6 illuminated.  
___  ___  ___ *7. Places SBLC INJECTION CONTROL keylock switch to opposite position taken to in step
*7.
: 1. Turns the SBLC INJECTION CONTROL keylock switch to the opposite direction turned in step 1.
Places SBLC INJECTION CONTROL keylock switch to opposite position taken to in step
: 1.
Turns the SBLC INJECTION CONTROL keylock switch to the opposite direction turned in step 1.
: 8.
Verifies opposite PUMP pilot light lit.
Opposite PUMP light on.
Note Flow light will illuminate when SBLC INJECTION CONTROL keylock switch is re-positioned.
: 9.
Verifies RWCU valve 2-1201-1 closed.
Examinee recognizes that valve 2-1201-1 valve did NOT close.  


___ 
TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-a Rev 03 STEP ELEMENT STANDARD SAT UNSAT Comment Number
*10.
Closes RWCU valve 2-1201-1.
Takes manual action for a failed automatic action and closes 2-1201-1 valve, by placing c/s in the CLOSED position.
: 11.
Verifies RWCU valve 2-1201-1A closed.
GREEN light illuminated.
: 12.
Verifies RWCU valve 2-1201-2 closed.
Examinee recognizes that valve 2-1201-2 valve did NOT close.
*13.
Closes RWCU valve 2-1201-2.
Takes manual action for a failed automatic action and closes 2-1201-2 valve, by placing c/s in the CLOSED position.
: 14.
Verifies RWCU valve 2-1201-3 closed.
GREEN light illuminated.
: 15.
Verifies RWCU valve 2-1201-7 closed.
RED light illuminated.
: 16.
Informs Unit Supervisor task is complete.
Reports SBLC is injecting but the first pump did not inject and valves 2-1201-1 and 2-1201-2 failed to close automatically.
Cue Acknowledge report of task completion.
END JPM Stop Time:


___ 
TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-a Rev 03 JPM


___ 8. Verifies opposite PUMP pilot light lit. Opposite PUMP light on.
==SUMMARY==
___  ___  ___ Note Flow light will illuminate when SBLC INJECTION CONTROL keylock switch is re
Operators Name:
-positioned.
Emp. ID#: ____________
: 9. Verifies RWCU valve 2-1201-1 closed. Examinee recognizes that valve 2
Job
-1201-1 valve did NOT close. ___  ___  ___
TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ
-JA-150-02  SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-a Rev 03 STEP ELEMENT STANDARD SAT UNSAT Comment Number *10. Closes RWCU valve 2
-1201-1. Takes manual action for a failed automatic action and closes 2
-1201-1 valve, by placing c/s in the CLOSED position.
___    ___    ___ 11. Verifies RWCU valve 2
-1201-1A closed. GREEN light illuminated.
___  ___  ___ 12. Verifies RWCU valve 2
-1201-2 closed. Examinee recognizes that valve 2
-1201-2 valve did NOT close. ___  ___  ___ *13. Closes RWCU valve 2
-1201-2. Takes manual action for a failed automatic action and closes 2
-
1201-2 valve, by placing c/s in the CLOSED position.
 
___ 
 
___ 
 
___ 14. Verifies RWCU valve 2
-1201-3 closed. GREEN light illuminated.
___  ___  ___ 15. Verifies RWCU valve 2-1201-7 closed. RED light illuminated.
___  ___  ___ 16. Informs Unit Supervisor task is complete. Reports SBLC is injecting but the first pump did not inject and valves 2-1201-1 and 2-1201-2 failed to close automatically.
 
___ 
 
___ 


___ Cue Acknowledge report of task completion.
==Title:==
END  JPM Stop Time:
RO SRO SRO Cert JPM


TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ
==Title:==
-JA-150-02  SRRS: 3D.105 (when utilized for operator initial or continuing training)
SBLC - Injection with Pump and RWCU Failures JPM Number: S-N-a Revision Number: 03 Task Number and
S-N-a Rev 03 JPM


==SUMMARY==
==Title:==
 
211L002, Injection of Standby Liquid Control System K/A Number and Importance: 211000.A4.08 4.2 / 4.2 Suggested Testing Environment: Simulator Alternate Path:
Operator's Name
Yes No SRO Only:
:  Emp. ID#: ____________
Yes No Time Critical:
Job Title:  RO    SRO      SRO Cert JPM Title:  SBLC - Injection with Pump and RWCU Failures JPM Number
Yes No Reference(s): DOP 1100-02, Rev 19 Actual Testing Environment:
: S-N-a Revision Number
Simulator Control Room In-Plant Other Testing Method:
: 03 Task Number and Title
Simulate Perform Estimated Time to Complete: 9 minutes Actual Time Used:
211L002, Injection of Standby Liquid Control System K/A Number and Importance
:   211000.A4.08     4.2 / 4.2 Suggested Testing Environment
:   Simulator Alternate Path
Yes No SRO Only: Yes No Time Critical
Yes No Reference(s)
: DO P 1100-02, Rev 19 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
9 minutes Actual Time Used:
minutes EVALUATION  
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:
Satisfactory Unsatisfactory Comments:                     Evaluator's Name (Print):   Evaluator's Signature
Satisfactory Unsatisfactory Comments:
Date:
Evaluators Name (Print):
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ
Evaluators Signature:
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03   INITIAL CONDITIONS
Date:  
 
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 INITIAL CONDITIONS
: 1. You are the Unit 2 NSO.
: 1. You are the Unit 2 NSO.
: 2. A transient has occurred, resulting in an ATWS.
: 2. A transient has occurred, resulting in an ATWS.
Line 1,047: Line 1,146:
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has ordered you to inject SBLC per the Hard Card.
: 1. The Unit Supervisor has ordered you to inject SBLC per the Hard Card.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.  
 
TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04 Job Performance Measure PLACE A FRV IN SERVICE IN AUTO DURING UNIT STARTUP JPM Number: S-N-b Revision Number: 04 Date: 02/16 EXAM MATERIAL Developed By:
Instructor Date Approved By:
Facility Representative Date
 
TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
: 1.
Task description and number, JPM description and number are identified.
: 2.
Knowledge and Abilities (K/A) references are included.
: 3.
Performance location specified. (in-plant, control room, simulator, or other)
: 4.
Initial setup conditions are identified.
: 5.
Initiating cue (and terminating cue if required) are properly identified.
: 6.
Task standards identified and verified by SME review.
: 7.
Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8.
If an alternate path is used, the task standard contains criteria for successful completion.
: 9.
Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOP 0600-06 Rev: 44 Procedure Rev:
Procedure Rev:
: 10. Verify cues both verbal and visual are free of conflict.
: 11. Verify performance time is accurate
: 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date


TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04 Revision Record (Summary)
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 0 4  Job Performance Measure PLACE A FRV IN SERVICE IN AUTO DURING UNIT STARTUP JPM Number: S
Revision 02 Bank JPM.
-N-b  Revision Number: 04 Date: 02/16 EXAM MATERIAL Developed By:
Revision 03 Revised for 2009 NRC Exam.
Instructor Date  Approved By:
Revision 04 Revised for ILT 15-1 (2016-301) NRC Exam  
Facility Representative Date TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 0 4 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure    DOP 0600-06  Rev:    44  Procedure Rev:  Procedure Rev:  ________ 10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date        SME / Instructor Date TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 0 4 Revision Record (Summary)
Revision 02 Bank JPM. Revision 03 Revised for 2009 NRC Exam.
Revision 04 Revised for ILT 15
-1 (2016-301) NRC Exam


TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04 SIMULATOR SETUP INSTRUCTIONS
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 0 4 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to IC _52_.
: 1. Reset the simulator to IC _
NOTE:
52_. NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Verify BOTH FW REG ISOL VALVES are OPEN:
: 2. Verify BOTH FW REG ISOL VALVES are OPEN:
* MO 2-3206A
* MO 2-3206A
* MO 2-3206B 3. Verify 2A & 2B REG VLV CONTROL STATIONS in MAN and CLOSED.
* MO 2-3206B
: 3. Verify 2A & 2B REG VLV CONTROL STATIONS in MAN and CLOSED.
: 4. Verify MASTER CONTROL STATION is in MAN.
: 4. Verify MASTER CONTROL STATION is in MAN.
: 5. Low Flow Reg Valve is controlling level at 30" in AUTO.
: 5. Low Flow Reg Valve is controlling level at 30 in AUTO.
: 6. Insert following Malfunctions and/or Remotes:
: 6. Insert following Malfunctions and/or Remotes:
* None. 7. Setup the following Triggers:
* None.
* None. DOCUMENT PREPARATION
: 7. Setup the following Triggers:
: 1. Copy of DOP 0600-06 marked up through limitations and actions.
* None.
DOCUMENT PREPARATION
: 1.
Copy of DOP 0600-06 marked up through limitations and actions.  


TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04 INITIAL CONDITIONS
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 0 4 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. Unit Startup is in progress.
: 2. Unit Startup is in progress.
: 3. The FWLCS is controlling level with the Low Flow Reg Valve.
: 3. The FWLCS is controlling level with the Low Flow Reg Valve.
: 4. 2A & 2B REG VLV CONTROL STATIONS are closed in manual mode.
: 4. 2A & 2B REG VLV CONTROL STATIONS are closed in manual mode.
: 5. 2A & 2B FRVs have been pre
: 5. 2A & 2B FRVs have been pre-operationally tested.
-operationally tested.
: 6. Another NSO will acknowledge annunciators not associated with this task.
: 6. Another NSO will acknowledge annunciators not associated with this tas
INITIATING CUE
: k. INITIATING CUE
: 1. The Unit Supervisor has directed you to place 2B FRV in service (Unit Startup) in the Master Automatic mode in accordance with DOP 0600-06 per step G.2.
: 1. The Unit Supervisor has directed you to place 2B FRV in service (Unit Startup) in the Master Automatic mode in accordance with DOP 0600
: 2. Inform the Unit Supervisor when the task is complete.
-06 per step G.2
. 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  


TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-b Rev 04 JPM Start Time:
S-N-b Rev 04 JPM Start Time:
STEP ELEMENT STANDARD SAT UNSAT Comment Number Note Provide the examinee with the provided copy of DOP 0600-06.
STEP ELEMENT STANDARD SAT UNSAT Comment Number Note Provide the examinee with the provided copy of DOP 0600
: 1.
-06. 1. Verify 2A and 2B FWRVs have been pre-operationally tested per Step G.1. Condition met in initial conditions.
Verify 2A and 2B FWRVs have been pre-operationally tested per Step G.1.
___
Condition met in initial conditions.
___
: 2.
___ 2. Verify the following valves are open:
Verify the following valves are open:
* MO 2-3205A, FW LINE STOP.
MO 2-3205A, FW LINE STOP.
* MO 2-3205B, FW LINE STOP.
MO 2-3205B, FW LINE STOP.
* MO 2-3206A, 2A FW REG ISOL.
MO 2-3206A, 2A FW REG ISOL.
* MO 2-3206B, 2B FW REG ISOL. GREEN lights illuminated on the following:
MO 2-3206B, 2B FW REG ISOL.
GREEN lights illuminated on the following:
* MO 2-3205A
* MO 2-3205A
* MO 2-3205B
* MO 2-3205B
* MO 2-3206A
* MO 2-3206A
* MO 2-3206B    
* MO 2-3206B
 
: 3.
___ 
Adjust MASTER CONTROL STATION OR RX LO FLOW CONTROL STATION, setpoint to match actual RPV level.
 
Depresses appropriate pushbutton to verify setpoint to match actual RPV level on MASTER CONTROL STATION OR RX LO FLOW CONTROL STATION.
___ 
: 4.
 
Select appropriate FWLCS RPV level signal per Section G.17.
___ 3. Adjust MASTER CONTROL STATION OR RX LO FLOW CONTROL STATION, setpoint to match actual RPV level.
Depresses appropriate pushbutton to verify setpoint to match actual RPV level on MASTER CONTROL STATION OR RX LO FLOW CONTROL STATION.
___ 
 
___ 
 
___ 4. Select appropriate FWLCS RPV level signal per Section G.17.
Depresses appropriate FWLCS RPV level signal pushbutton.
Depresses appropriate FWLCS RPV level signal pushbutton.
___  ___  ___ 5. Place RX LO FLOW CONTROL STATION to AUTO.
: 5.
Verifies AUTO light illuminated on RX LO FLOW CONTROL STATION. ___  ___  ___ *6. Place one REG VLV CONTROL STATION in AUTO.
Place RX LO FLOW CONTROL STATION to AUTO.
Depresses AUTO pushbutton on 2B REG VLV CONTROL STATION. ___
Verifies AUTO light illuminated on RX LO FLOW CONTROL STATION.  
___
*6.
___ 7. Verify other REG VLV CONTROL STATION in MAN.
Place one REG VLV CONTROL STATION in AUTO.
Verifies MAN light illuminated on 2A REG VLV CONTROL STATION.
Depresses AUTO pushbutton on 2B REG VLV CONTROL STATION.
___ 
: 7.
Verify other REG VLV CONTROL STATION in MAN.
Verifies MAN light illuminated on 2A REG VLV CONTROL STATION.  


___ 
TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
S-N-b Rev 04 STEP ELEMENT STANDARD SAT UNSAT Comment Number  
___
*8.
TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ
Place MASTER CONTROL STATION in AUTO.
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Depresses AUTO pushbutton on FWLC MASTER CONTROL STATION.
S-N-b Rev 04 STEP ELEMENT STANDARD SAT UNSAT Comment Number *8. Place MASTER CONTROL STATION in AUTO.
Note The LOW FLOW FWRV will automatically transfer to the 2B FWRV when the LOW FLOW FWRV position is 85% feedwater flow.
Depresses AUTO pushbutton on FWLC MASTER CONTROL STATION. ___
: 9.
___
Informs Unit Supervisor task is complete.
___ Note The LOW FLOW FWRV will automatically transfer to the 2B FWRV                                                         when the LOW FLOW FWRV position is 85% feedwater flow.
Examinee notifies the Unit Supervisor.
: 9. Informs Unit Supervisor task is complete. Examinee notifies the Unit Supervisor.
Cue Acknowledge report of task completion.
___  ___  ___ Cue Acknowledge report of task completion.
END JPM Stop Time:  
END   JPM Stop Time:


TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-b Rev 04 JPM  
S-N-b Rev 04 JPM  


==SUMMARY==
==SUMMARY==
Operators Name:
Emp. ID#: ____________
Job


Operator's Name
==Title:==
:   Emp. ID#: ____________
RO SRO SRO Cert JPM
Job Title:  RO     SRO     SRO Cert JPM Tit le:   Place a FRV in Service in Auto During Unit Startup JPM Number
 
: S-N-b Revision Number
==Title:==
: 0 4 Task Number and Title
Place a FRV in Service in Auto During Unit Startup JPM Number: S-N-b Revision Number: 04 Task Number and
259L021, Place FRV in service in AUTO (unit startup).
 
K/A Number and Importance
==Title:==
259002.A4.03     3.8 / 3.6 Suggested Testing Environment
259L021, Place FRV in service in AUTO (unit startup).
:   Simulator Alternate Path
K/A Number and Importance:
Yes No SRO Only: Yes No Time Critical
259002.A4.03 3.8 / 3.6 Suggested Testing Environment: Simulator Alternate Path:
Yes No Reference(s)
Yes No SRO Only:
: DOP 0600-06, Rev 44 Actual Testing Environment:
Yes No Time Critical:
Simulator Control Room In-Plant Other Testing Method:
Yes No Reference(s): DOP 0600-06, Rev 44 Actual Testing Environment:
Simulate Perform Estimated Time to Complete:
Simulator Control Room In-Plant Other Testing Method:
9 minutes Actual Time Used:
Simulate Perform Estimated Time to Complete: 9 minutes Actual Time Used:
minutes EVALUATION  
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:
Satisfactory Unsatisfactory Comments:                     Evaluator's Name (Print):   Evaluator's Signature
Satisfactory Unsatisfactory Comments:
Date:
Evaluators Name (Print):
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ
Evaluators Signature:
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04   INITIAL CONDITIONS
Date:  
 
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. Unit Startup is in progress.
: 2. Unit Startup is in progress.
Line 1,198: Line 1,308:
: 6. Another NSO will acknowledge annunciators not associated with this task.
: 6. Another NSO will acknowledge annunciators not associated with this task.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to place 2B FRV in service (Unit Startup) in the Master Automatic mode in accordance with DOP 0600
: 1. The Unit Supervisor has directed you to place 2B FRV in service (Unit Startup) in the Master Automatic mode in accordance with DOP 0600-06 per step G.2.
-06 per step G.2
: 2. Inform the Unit Supervisor when the task is complete.  
. 2. Inform the Unit Supervisor when the task is complete.


TQ-AA-150-J020 Revision 00 Page 1 of 13 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 1 of 13 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 Job Performance Measure LPCI - MITIGATE HIGH SUCTION PRESSURE WHILE LINING UP TO CST SUCTION FOR INJECTION JPM Number: S-N-d Revision Number: 09 Date: 2/16 EXAM MATERIAL Developed By:
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09   Job Performance Measure LPCI - MITIGATE HIGH SUCTION PRESSURE        
Instructor Date Approved By:
Facility Representative Date


WHILE LINING UP TO CST SUCTION FOR INJECTION  JPM Number: S
TQ-AA-150-J020 Revision 00 Page 2 of 13 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
-N-d  Revision Number: 09 Date: 2/16 EXAM MATERIAL Developed By:
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
Instructor Date Approved By:
: 1.
Facility Representative Date TQ-AA-150-J020 Revision 00 Page 2 of 13 This replaced TQ
Task description and number, JPM description and number are identified.
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
: 2.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
Knowledge and Abilities (K/A) references are included.
________ 2. Knowledge and Abilities (K/A) references are included.
: 3.
________ 3. Performance location specified. (in
Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
: 4.
________ 4. Initial setup conditions are identified.
Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
: 5.
________ 6. Task standards identified and verified by SME review.
Initiating cue (and terminating cue if required) are properly identified.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 6.
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
Task standards identified and verified by SME review.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
: 7.
Procedure   DEOP 0500-03 Rev:   23 Procedure Rev:   Procedure Rev:   ________ 10. Verify cues both verbal and visual are free of conflict.
Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 11. Verify performance time is accurate
: 8.
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
If an alternate path is used, the task standard contains criteria for successful completion.
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
: 9.
SME / Instructor Date SME / Instructor Date       SME / Instructor Date TQ-AA-150-J020 Revision 00 Page 3 of 13 This replaced TQ
Verify the procedure(s) referenced by this JPM reflects the current revision:
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 Revision Record (Summary)
Procedure DEOP 0500-03 Rev: 23 Procedure Rev:
Revision 06 Bank JPM. Revision 07 Revised for ILT 12
Procedure Rev:
-1 Cert Exam.
: 10. Verify cues both verbal and visual are free of conflict.
Revision 08 Revised for ILT 14
: 11. Verify performance time is accurate
-1 NRC Exam.
: 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
Revision 09 Revised for ILT 15
: 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
-1 (2016-301) NRC Exam.
SME / Instructor Date SME / Instructor Date SME / Instructor Date  
 
TQ-AA-150-J020 Revision 00 Page 3 of 13 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 Revision Record (Summary)
Revision 06 Bank JPM.
Revision 07 Revised for ILT 12-1 Cert Exam.
Revision 08 Revised for ILT 14-1 NRC Exam.
Revision 09 Revised for ILT 15-1 (2016-301) NRC Exam.  


TQ-AA-150-J020 Revision 00 Page 4 of 13 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 4 of 13 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 SIMULATOR SETUP INSTRUCTIONS
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to any IC (IC _53__ used for validation).
: 1. Reset the simulator to any IC (IC _53__ used for validation).
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
NOTE:
: 2. Verify ALL LP ECCS Pumps are in PTL
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
. 3. Run the following CAEP file: S
: 2. Verify ALL LP ECCS Pumps are in PTL.
-N-d.cae 4. If the CAEP cannot be ran, insert the following Expert Commands:
: 3. Run the following CAEP file: S-N-d.cae
* Insert the following Malfunctions, Remotes, and/or Overrides:
: 4. If the CAEP cannot be ran, insert the following Expert Commands:
o imf ser0016 on o imf ser0155 on o ior lpdvlvcl25 close o ior lpdvlvop16 open o ior rrd5bcls close
Insert the following Malfunctions, Remotes, and/or Overrides:
* Assign the following trigger assignment:
o imf ser0016 on o imf ser0155 on o ior lpdvlvcl25 close o ior lpdvlvop16 open o ior rrd5bcls close Assign the following trigger assignment:
o irf lpcstppc (15) true DOCUMENT PREPARATION Markup a copy of DEOP 0500
o irf lpcstppc (15) true DOCUMENT PREPARATION Markup a copy of DEOP 0500-03, Alternate Water Injection Systems.
-03, Alternate Water Injection Systems
 
.
TQ-AA-150-J020 Revision 00 Page 5 of 13 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 INITIAL CONDITIONS
TQ-AA-150-J020 Revision 00 Page 5 of 13 This replaced TQ
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. A transient has occurred requiring Alternate Water Injection
: 2. A transient has occurred requiring Alternate Water Injection.
. Examiner Note: The following parameters do not match the simulator indications.
Examiner Note: The following parameters do not match the simulator indications.
: 3. RPV level is  
: 3. RPV level is -65 inches and slowly dropping.
-65 inches and slowly dropping.
: 4. RPV pressure is 140 psig and slowly dropping.
: 4. RPV pressure is 140 psig and slowly dropping.
: 5. All LP ECCS Pumps are in PTL due to the Ring Header being plugged.
: 5. All LP ECCS Pumps are in PTL due to the Ring Header being plugged.
: 6. 'B' Loop is selected for injection.
: 6. B Loop is selected for injection.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to line up the 2A LPCI pump with CST suction and inject to raise RPV water level per DEOP 0500
: 1. The Unit Supervisor has directed you to line up the 2A LPCI pump with CST suction and inject to raise RPV water level per DEOP 0500-03.
-03. 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  


TQ-AA-150-J020 Revision 00 Page 6 of 13 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 6 of 13 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-d Rev 09 JPM Start Time:
S-N-d Rev 09 JPM Start Time:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: Provide the Examinee with the provided copy of DEOP 0500
Provide the Examinee with the provided copy of DEOP 0500-03.
-03. 1. Verifies 2A LPCI PP control switch in Pull
: 1.
-to-Lock. ALL lights extinguished.
Verifies 2A LPCI PP control switch in Pull-to-Lock.
_____        _____        _____
ALL lights extinguished.
: 2. Place PP SUCT VLV MO 2
: 2.
-1501-5A control switch in Manual Bypass and verify closed. RED light illuminated
Place PP SUCT VLV MO 2-1501-5A control switch in Manual Bypass and verify closed.
. _____        _____        _____
RED light illuminated.
: 3. Verify MIN FLOW VLV 2
: 3.
-1501-13A closed if not needed. RED light illuminated.
Verify MIN FLOW VLV 2-1501-13A closed if not needed.
_____        _____        _____
RED light illuminated.
CUE: 2-1501-13A is not required for 2B LPCI pump.
CUE:
NOTE: The following valves may be verified in any order
2-1501-13A is not required for 2B LPCI pump.
: 4. Verify TORUS CLG/TEST valves 2-1501-20A and 2-1501-38A closed.
NOTE:
The following valves may be verified in any order
: 4.
Verify TORUS CLG/TEST valves 2-1501-20A and 2-1501-38A closed.
GREEN lights illuminated.
GREEN lights illuminated.
_____        _____        _____
: 5.
: 5. Verify TORUS SPRAY VLVs 2-1501-19A and 2-1501-18A closed. GREEN lights illuminated.
Verify TORUS SPRAY VLVs 2-1501-19A and 2-1501-18A closed.
_____        _____        _____
: 6. Verify DW SPRAY VLVs 2
-1501-28A and 2-1501-27A closed. GREEN lights illuminated.
_____        _____        _____
: 7. Verify TORUS CLG/TEST valves 2-1501-20B and 2-1501-38B closed.
GREEN lights illuminated.
GREEN lights illuminated.
_____        _____        _____
: 6.
: 8. Verify TORUS SPRAY VLVs  
Verify DW SPRAY VLVs 2-1501-28A and 2-1501-27A closed.
GREEN lights illuminated.
: 7.
Verify TORUS CLG/TEST valves 2-1501-20B and 2-1501-38B closed.
GREEN lights illuminated.
: 8.
Verify TORUS SPRAY VLVs 2-1501-19B and 2-1501-18B closed.
GREEN lights illuminated.


2-1501-19B and 2-1501-18B closed. GREEN lights illuminated.
TQ-AA-150-J020 Revision 00 Page 7 of 13 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
_____        _____        _____
S-N-d Rev 09 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
 
: 9.
TQ-AA-150-J020 Revision 00 Page 7 of 13 This replaced TQ
Verify DW SPRAY VLVs 2-1501-28B and 2-1501-27B closed.
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
GREEN lights illuminated.
S-N-d Rev 09 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment 9. Verify DW SPRAY VLVs 2-1501-28B and 2-1501-27B closed. GREEN lights illuminated.
NOTE:
_____        _____        _____
For bleeding off the pressure in the suction piping, the examinee may communicate each of the following steps individually OR instruct the EO to complete actions of DEOP 0500-03 step G.12.c.(5 thru 8).
NOTE: For bleeding off the pressure in the suction piping,                                                                                   the examinee may communicate each of the following steps individually OR                                           instruct the EO to complete actions of DEOP 0500
CUE:
-03 step G.12.c.(5 thru 8).
When directed, as the EO in the field, communicate that the steps (either individually of as a whole) have been completed.
CUE: When directed, as the EO in the field, communicate that the steps                                                       (either individually of as a whole) have been completed.
: 10. Unlock AND open 2-1501-74A, U2 LPCI A PMP VENT VLV.
: 10. Unlock AND open 2
Instructs EO to complete step G.12.c.(5).(a).
-1501-74A, U2 LPCI A PMP VENT VLV. Instructs EO to complete step G.12.c.(5).(a).
_____        _____        _____
: 11. Crack open 2-1501-15A, U2 LPCI A PMP VENT VLV until flow is observed from pipe.
: 11. Crack open 2-1501-15A, U2 LPCI A PMP VENT VLV until flow is observed from pipe.
Instructs EO to complete step G.12.c.(5).(b).
Instructs EO to complete step G.12.c.(5).(b).
_____        _____        _____
: 12. Close 2(3)-1501-15A, U2 LPCI A PMP VENT VLV.
: 12. Close 2(3)
-1501-15A, U2 LPCI A PMP VENT VLV.
Instructs EO to complete step G.12.c.(5).(c).
Instructs EO to complete step G.12.c.(5).(c).
_____
: 13. Close AND lock 2-1501-74A, U2(3) LPCI A PMP VENT VLV.
_____        _____
Instructs EO to complete step G.12.c.(5).(d).
: 13. Close AND lock 2
: 14. Open 2-1501-47A-R, U2 LPCI A PUMP SUCT PI 2-1501-47A ROOT VLV (at pump) and verify PI 2-1501-47A indicates less than 15 psig.
-1501-74A, U2(3) LPCI A PMP VENT VLV. Instructs EO to complete step G.12.c.(5).(d).
Instructs EO to obtain PI 2-1501-47A reading per step G.12.c.(6). & G.12.c.(7).
_____        _____        _____
CUE:
: 14. Open 2-1501-47A-R, U2 LPCI A PUMP SUCT PI 2-1501-47A ROOT VLV (at pump) and verify PI 2-1501-47A indicates less than 15 psig. Instructs EO to obtain PI 2
PI 2-1501-47A indicates 15.5 psig.
-1501-47A reading per step G.12.c.(6). & G.12.c.(7).
_____        _____        _____
CUE: PI 2-1501-47A indicates 15.5 psig.
: 15. Recognizes reading is NOT less than 15 psig.
: 15. Recognizes reading is NOT less than 15 psig.
Determines reading is greater than 15 psig.
Determines reading is greater than 15 psig.  
_____        _____        _____


TQ-AA-150-J020 Revision 00 Page 8 of 13 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 8 of 13 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-d Rev 09 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
S-N-d Rev 09 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment 16. Close 2-1501-47A-R, U2 LPCI A PUMP SUCT PI 2-1501-47A ROOT VLV.
: 16. Close 2-1501-47A-R, U2 LPCI A PUMP SUCT PI 2-1501-47A ROOT VLV.
Instructs EO to close 2
Instructs EO to close 2-1501-47A per step G.12.c.(8).
-1501-47A per step G.12.c.(8).
CUE:
_____        _____        _____
2-1501-47A-R is Closed.
CUE: 2-1501-47A-R is Closed.
: 17. Open PP SUCT VLV MO 2-1501-5A.
: 17. Open PP SUCT VLV MO 2
GREEN light illuminated.
-
1501-5A. GREEN light illuminated.
_____        _____        _____
: 18. Notify Unit Supervisor that 2A LPCI pump cannot be used with suction from the CST.
: 18. Notify Unit Supervisor that 2A LPCI pump cannot be used with suction from the CST.
Examinee notifies Unit Supervisor of 2A LPCI pump suction pressure problem when aligned to CST. May recommend using another LPCI pump.
Examinee notifies Unit Supervisor of 2A LPCI pump suction pressure problem when aligned to CST. May recommend using another LPCI pump.
_____        _____        _____
CUE:
CUE: Notify the examinee that injection is still needed and to line up 2C LPCI pump suction to the CST.
Notify the examinee that injection is still needed and to line up 2C LPCI pump suction to the CST.
Maintain the 2A LPCI pump in PTL.
Maintain the 2A LPCI pump in PTL.
BEGIN ALTERNATE PATH
BEGIN ALTERNATE PATH
: 19. Verifies 2C LPCI PP control switch in Pull
: 19. Verifies 2C LPCI PP control switch in Pull-to-Lock.
-to-Lock. ALL lights extinguished.
ALL lights extinguished.
_____        _____        _____
* 20. Place PP SUCT VLV MO 2-1501-5C control switch in Manual Bypass and verify closed.
* 20. Place PP SUCT VLV MO 2
RED light illuminated.
-1501-5C control switch in Manual Bypass and verify closed. RED light illuminated
: 21. Verify MIN FLOW VLV 2-1501-13B closed if not needed.
. _____        _____
RED light illuminated.
_____  21. Verify MIN FLOW VLV 2
CUE:
-1501-13B closed if not needed. RED light illuminated.
2-1501-13B is not required for 2D LPCI pump.
_____        _____        _____
CUE: 2-1501-13B is not required for 2D LPCI pump.
: 22. Verify TORUS CLG/TEST valves 2-1501-20A and 2-1501-38A closed.
: 22. Verify TORUS CLG/TEST valves 2-1501-20A and 2-1501-38A closed.
GREEN lights illuminated.
TQ-AA-150-J020 Revision 00 Page 9 of 13 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-d Rev 09 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
: 23. Verify TORUS SPRAY VLVs 2-1501-19A and 2-1501-18A closed.
GREEN lights illuminated.
: 24. Verify DW SPRAY VLVs 2-1501-28A and 2-1501-27A closed.
GREEN lights illuminated.
GREEN lights illuminated.
_____        _____        _____
TQ-AA-150-J020 Revision 00 Page 9 of 13 This replaced TQ
-JA-150-02  SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-d Rev 09 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment  23. Verify TORUS SPRAY VLVs 2-1501-19A and 2-1501-18A closed. GREEN lights illuminated.
_____        _____        _____
: 24. Verify DW SPRAY VLVs 2
-1501-28A and 2-1501-27A closed. GREEN lights illuminated.
_____        _____        _____
: 25. Verify TORUS CLG/TEST valves 2-1501-20B and 2-1501-38B closed.
: 25. Verify TORUS CLG/TEST valves 2-1501-20B and 2-1501-38B closed.
GREEN lights illuminated.
GREEN lights illuminated.
_____        _____        _____
: 26. Verify TORUS SPRAY VLVs 2-1501-19B and 2-1501-18B closed.
: 26. Verify TORUS SPRAY VLVs  
GREEN lights illuminated.
 
: 27. Verify DW SPRAY VLVs 2-1501-28B and 2-1501-27B closed.
2-1501-19B and 2-1501-18B closed. GREEN lights illuminated.
GREEN lights illuminated.
_____        _____        _____
: 28. Unlock AND open 2-1501-74C, U2 LPCI C PMP VENT VLV.
: 27. Verify DW SPRAY VLVs 2
Instructs EO to complete step G.12.e.(5).(a).
-1501-28B and 2-1501-27B closed. GREEN lights illuminated.
: 29. Crack open 2-1501-15C, U2 LPCI C PMP VENT VLV until flow is observed from pipe.
_____        _____        _____
: 28. Unlock AND open 2
-1501-74C, U2 LPCI C PMP VENT VLV. Instructs EO to complete step G.12.e.(5).(a).
_____        _____        _____
: 29. Crack open 2
-1501-15C, U2 LPCI C PMP VENT VLV until flow is observed from pipe.
Instructs EO to complete step G.12.e.(5).(b).
Instructs EO to complete step G.12.e.(5).(b).
_____        _____        _____
: 30. Close 2(3)-1501-15C, U2 LPCI C PMP VENT VLV.
: 30. Close 2(3)
Instructs EO to complete step G.12.e.(5).(c).
-1501-15C, U2 LPCI C PMP VENT VLV. Instructs EO to complete step G.12.e.(5).(c).
: 31. Close AND lock 2-1501-74C, U2 LPCI C PMP VENT VLV.
_____        _____        _____
Instructs EO to complete step G.12.e.(5).(d).
: 31. Close AND lock 2
: 32. Open 2-1501-47C-R, U2 LPCI C PUMP SUCT PI 2-1501-47C ROOT VLV (at pump) and verify PI 2-1501-47C indicates less than 15 psig.
-1501-74C, U2 LPCI C PMP VENT VLV. Instructs EO to complete step G.12.e.(5).(d).
Instructs EO to obtain PI 2-1501-47C reading per step G.12.e.(6).
_____        _____        _____
CUE:
: 32. Open 2-1501-47C-R, U2 LPCI C PUMP SUCT PI       2
Pressure is 10 psig..  
-1501-47C ROOT VLV (at pump) and verify PI 2
-1501-47C indicates less than 15 psig. Instructs EO to obtain PI 2
-
1501-47C reading per step G.12.e.(6).
_____        _____        _____
CUE: Pressure is 10 psig. .


TQ-AA-150-J020 Revision 00 Page 10 of 13 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 10 of 13 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-d Rev 09 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
S-N-d Rev 09 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment 33. Recognizes reading is less than 15 psig.
: 33. Recognizes reading is less than 15 psig.
Determines reading is LESS than 15 psig.
Determines reading is LESS than 15 psig.
_____        _____        _____
: 34. Close 2-1501-47C-R, U2 LPCI C PUMP SUCT PI 2-1501-47C ROOT VLV.
: 34. Close 2-1501-47C-R, U2 LPCI C PUMP SUCT PI 2-1501-47C ROOT VLV.
Instructs EO to close 2
Instructs EO to close 2-1501-47C per step G.12.e.(8).
-1501-47C per step G.12.e.(8).
_____        _____        _____
* 35. Unlock AND open 2-1501-31C, U2 LPCI C PMP SUCT VLV FROM CST [at 2 C LPCI Pump]
* 35. Unlock AND open 2-1501-31C, U2 LPCI C PMP SUCT VLV FROM CST [at 2 C LPCI Pump]
Directs EO to perform step G.12.e.(10)(a)
Directs EO to perform step G.12.e.(10)(a)
_____        _____        _____
CUE:
CUE: 2-1501-31C is open
2-1501-31C is open.
.
* 36. Unlock AND open 2-1501-37, U2 LPCI & CS SUCT FROM 2/3A CST SV (located at 2/3A CST)
* 36. Unlock AND open 2-1501-37, U2 LPCI &
CS SUCT FROM 2/3A CST SV (located at 2/3A CST)
Directs EO to perform step G.12.e.(10)(b)
Directs EO to perform step G.12.e.(10)(b)
_____        _____        _____
Simulator Operator / Evaluator:
Simulator Operator / Evaluator:
Activate Trigger 15 to lineup 2C LPCI pump suction to the CST.
Activate Trigger 15 to lineup 2C LPCI pump suction to the CST.
CUE: 2-1501-37 is open
CUE:
. Examiner Note: If a RPV level band is requested: Direct the candidate to maintain RPV level between +8" and +48" (NOTE: RPV level is  
2-1501-37 is open.
-65" and dropping per the cue)
Examiner Note:
* 37. Start 2C LPCI PP Places control switch to start. RED light illuminated.
If a RPV level band is requested: Direct the candidate to maintain RPV level between +8 and +48 (NOTE: RPV level is -65 and dropping per the cue)
_____        _____
* 37. Start 2C LPCI PP Places control switch to start. RED light illuminated.  
_____
TQ-AA-150-J020 Revision 00 Page 11 of 13 This replaced TQ
-JA-150-02  SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-d Rev 09 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment  38. Inform Unit Supervisor that 2C LPCI pump is lined up to the CST and the task is complete. Informs Unit Supervisor that 2C LPCI pump is lined up to the CST and injecting; the task is complete. _____        _____        _____
CUE: Acknowledge report of task completion.
END  JPM Stop Time:


TQ-AA-150-J020 Revision 00 Page 12 of 13 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 11 of 13 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-d Rev 09 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
: 38. Inform Unit Supervisor that 2C LPCI pump is lined up to the CST and the task is complete.
Informs Unit Supervisor that 2C LPCI pump is lined up to the CST and injecting; the task is complete.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:
 
TQ-AA-150-J020 Revision 00 Page 12 of 13 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-d Rev 09 JPM  
S-N-d Rev 09 JPM  


==SUMMARY==
==SUMMARY==
Operators Name:
Emp. ID#: ____________
Job


Operator's Name
==Title:==
:   Emp. ID#: ____________
RO SRO SRO Cert JPM
Job Title:  RO     SRO     SRO Cert JPM Title:   LPCI - Mitigate High Suction Pressure While Lining up to CST suction for Injection JPM Number
 
: S-N-d Revision Number
==Title:==
: 0 9 Task Number and Title
LPCI - Mitigate High Suction Pressure While Lining up to CST suction for Injection JPM Number: S-N-d Revision Number: 09 Task Number and
29502LK061, Lineup LPCI to the CST K/A Number and Importance
 
:  203 000.A1.0 4 3.6 / 3.6 Suggested Testing Environment
==Title:==
:   Simulator Alternate Path
29502LK061, Lineup LPCI to the CST K/A Number and Importance:
Yes No SRO Only: Yes No Time Critical
203000.A1.04 3.6 / 3.6 Suggested Testing Environment: Simulator Alternate Path:
Yes No Reference(s)
Yes No SRO Only:
: DEOP 0500-03, Rev 23 Actual Testing Environment:
Yes No Time Critical:
Simulator Control Room In-Plant Other Testing Method:
Yes No Reference(s): DEOP 0500-03, Rev 23 Actual Testing Environment:
Simulate Perform Estimated Time to Complete:
Simulator Control Room In-Plant Other Testing Method:
38 minutes Actual Time Used:
Simulate Perform Estimated Time to Complete: 38 minutes Actual Time Used:
minutes EVALUATION  
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:
Satisfactory Unsatisfactory Comments:                     Evaluator's Name (Print):   Evaluator's Signature
Satisfactory Unsatisfactory Comments:
Date:
Evaluators Name (Print):
TQ-AA-150-J020 Revision 00 Page 13 of 13 This replaced TQ
Evaluators Signature:
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 INITIAL CONDITIONS
Date:  
 
TQ-AA-150-J020 Revision 00 Page 13 of 13 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. A transient has occurred requiring Alternate Water Injection
: 2. A transient has occurred requiring Alternate Water Injection.
. 3. RPV level is  
: 3. RPV level is -65 inches and slowly dropping.
-65 inches and slowly dropping.
: 4. RPV pressure is 140 psig and slowly dropping.
: 4. RPV pressure is 140 psig and slowly dropping.
: 5. All LP ECCS Pumps are in PTL due to the Ring Header being plugged.
: 5. All LP ECCS Pumps are in PTL due to the Ring Header being plugged.
: 6. 'B' Loop is selected for injection.
: 6. B Loop is selected for injection.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to line up the 2A LPCI pump with CST suction and inject to raise RPV water level per DEOP 0500
: 1. The Unit Supervisor has directed you to line up the 2A LPCI pump with CST suction and inject to raise RPV water level per DEOP 0500-03.
-03. 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.  


TQ-AA-150-J020 Revision 00 Page 1 of 10 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 1 of 10 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00 Job Performance Measure CONTAINMENT - VENT CONTAINMENT WITH APCV - (A)
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 0 0  Job Performance Measure CONTAINMENT  
JPM Number: S-N-e Revision Number: 00 Date: 2/16 EXAM MATERIAL Developed By:
- VENT CONTAINMENT WITH APCV - (A) JPM Number: S
Instructor Date Approved By:
-N-e Revision Number: 00 Date: 2/16 EXAM MATERIAL Developed By:
Facility Representative Date  
Instructor Date Approved By:
Facility Representative Date TQ-AA-150-J020 Revision 00 Page 2 of 10 This replaced TQ
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 0 0 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure    DEOP 0500-0 4  Rev:  16  Procedure Rev:  Procedure Rev:  ________ 10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date        SME / Instructor Date TQ-AA-150-J020 Revision 00 Page 3 of 10 This replaced TQ
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 0 0 Revision Record (Summary)
Revision 00 Created for ILT 15
-1 (2016-301) NRC Exam.


TQ-AA-150-J020 Revision 00 Page 4 of 10 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 2 of 10 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 0 0 SIMULATOR SETUP INSTRUCTIONS
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
: 1. Reset the simulator to an IC with the mode switch NOT in run, so that the proper alarms and interlocks will work
: 1.
. (IC _51__ used for validation).
Task description and number, JPM description and number are identified.
: 2.
Knowledge and Abilities (K/A) references are included.
: 3.
Performance location specified. (in-plant, control room, simulator, or other)
: 4.
Initial setup conditions are identified.
: 5.
Initiating cue (and terminating cue if required) are properly identified.
: 6.
Task standards identified and verified by SME review.
: 7.
Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8.
If an alternate path is used, the task standard contains criteria for successful completion.
: 9.
Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DEOP 0500-04 Rev: 16 Procedure Rev:
Procedure Rev:
: 10. Verify cues both verbal and visual are free of conflict.
: 11. Verify performance time is accurate
: 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date
 
TQ-AA-150-J020 Revision 00 Page 3 of 10 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00 Revision Record (Summary)
Revision 00 Created for ILT 15-1 (2016-301) NRC Exam.
 
TQ-AA-150-J020 Revision 00 Page 4 of 10 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to an IC with the mode switch NOT in run, so that the proper alarms and interlocks will work. (IC _51__ used for validation).
NOTE:It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
NOTE:It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Ensure Torus water level is <30 feet.
: 2. Ensure Torus water level is <30 feet.
: 3. Run the following CAEP file: S
: 3. Run the following CAEP file: S-N-e.cae
-N-e.cae 4. If the CAEP file cannot be ran insert the following Expert Commands: a. Insert following Malfunctions, Remotes, and/or Overrides:
: 4. If the CAEP file cannot be ran insert the following Expert Commands:
* IMF CIGP2I (Spurious Group II Isolation)
: a. Insert following Malfunctions, Remotes, and/or Overrides:
* Adjusts Torus Level indications to ~20 feet.
IMF CIGP2I (Spurious Group II Isolation)
v ior atl10 25.0 v ior pcltr10a 20 v ior pcltr10b 20
Adjusts Torus Level indications to ~20 feet.
* Adjusts Torus Bottom Pressure to 58.0 psig v ior pcptr103 58.0
v ior atl10 25.0 v ior pcltr10a 20 v ior pcltr10b 20 Adjusts Torus Bottom Pressure to 58.0 psig v ior pcptr103 58.0 Prevents the 2-1601-61 from opening v ior pcdcl61 close v ior pcdop61 off Pulls ECCS Initiation Logic fuses so when Drywell pressure is forced high, NO ECCS starts.
* Prevents the 2
v irf lp1aaf1f pulled v irf lp701af pulled v irf lp1aaf2f pulled v irf lp701bf pulled v irf csalgoff pulled v irf csblgoff pulled v irf hp2a1f1 pulled v irf hp2b1f1 pulled Adjusts Drywell & Torus pressures to 50.0 psig.
-1601-61 from opening v ior pcdcl61 close v ior pcdop61 off
* Pulls ECCS Initiation Logic fuses so when Drywell pressure is forced high, NO ECCS starts.
v irf lp1aaf1f pulled v irf lp701af pulled v irf lp1aaf2f pulled v irf lp701bf pulled v irf csalgoff pulled v irf csblgoff pulled v irf hp2a1f1 pulled v irf hp2b1f1 pulled
* Adjusts Drywell & Torus pressures to 50.0 psig.
v ior pcp8524 50.0 v ior pcpdw102 50.0 v ior pcp85401 5.0 v ior pcptr1 5.0
v ior pcp8524 50.0 v ior pcpdw102 50.0 v ior pcp85401 5.0 v ior pcptr1 5.0
: 5. Verify the SBGT system operating and verify flow ~4000 scfm.
: 5. Verify the SBGT system operating and verify flow ~4000 scfm.
: 6. Start ALL available ventilation exhaust fans as directed in DEOP 0500
: 6. Start ALL available ventilation exhaust fans as directed in DEOP 0500-04.
-04. 7. Place CRM ISOL switch to ISOLATE  
: 7. Place CRM ISOL switch to ISOLATE - wait 10 seconds then verify a C/R Booster Fan is running.
- wait 10 seconds then verify a C/R Booster Fan is running.
DOCUMENT PREPARATION Markup a copy of DEOP 0500-04, Containment Venting.
DOCUMENT PREPARATION Markup a copy of DEOP 0 500-04 , Containment Venting
 
.
TQ-AA-150-J020 Revision 00 Page 5 of 10 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00 INITIAL CONDITIONS
TQ-AA-150-J020 Revision 00 Page 5 of 10 This replaced TQ
: 1. You are the Aux 2 NSO.
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 0 0 INITIAL CONDITIONS
: 2. A break inside the Unit 2 Primary Containment has occurred.
: 1. You are the Aux 2 NSO. 2. A break inside the Unit 2 Primary Containment has occurred.
: 3. Torus bottom pressure is about to exceed the PCP limit in DEOP 0200-01.
: 3. Torus bottom pressure is about to exceed the P CP limit in DEOP 0 200-01. 4. Torus water level is 20 feet. 5. Control Room ventilation has been isolated.
: 4. Torus water level is 20 feet.
: 5. Control Room ventilation has been isolated.
: 6. Reactor Building and Turbine Building have been evacuated.
: 6. Reactor Building and Turbine Building have been evacuated.
: 7. The Instrument Bus and ESS Bus are energized.
: 7. The Instrument Bus and ESS Bus are energized.
Line 1,529: Line 1,622:
: 9. The N2 System is in its normal lineup.
: 9. The N2 System is in its normal lineup.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to vent the Unit 2 Primary Containment in accordance with DEOP 0 500-04 , to control Primary Containment pressure.
: 1. The Unit Supervisor has directed you to vent the Unit 2 Primary Containment in accordance with DEOP 0500-04, to control Primary Containment pressure.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use: UNSAT requires written comments on respective step.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  


TQ-AA-150-J020 Revision 00 Page 6 of 10 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 6 of 10 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-e Rev 00 JPM Start Time:
S-N-e Rev 00 JPM Start Time:
STEP ELEMENT STANDARD SAT UNSAT Comment Number Note Provide examinee the marked up copy of DEOP 0500-04.
STEP ELEMENT STANDARD SAT UNSAT Comment Number Note Provide examinee the marked up copy of DEOP 0500
Annunciator 902-3 A-15, Pri Cnmt Vent/Sample Isol Bypass, will be received during this JPM.
-04. Annunciator 902
: 1.
-3 A-15, Pri Cnmt Vent/Sample Isol Bypass, will be received during this JPM.
Verify SBGT is operating and flow is ~ 4000 scfm.
: 1. Verify SBGT is operating and flow is ~ 4000 scfm.
Verifies 2/3A SBGT train FI 7540-13 is reading ~4000 scfm.
Verifies 2/3A SBGT train FI 7540-13 is reading ~4000 scfm.
___  ___  ___ 2. Verify Reactor Mode switch NOT in RUN. Verifies Reactor Mode switch NOT in RUN. ___  ___  ___ 3. Place VENT ISOL SIGNAL BYPASS switch on 902
: 2.
-5 panel to TORUS. Momentarily places Bypass switch to Torus Position.
Verify Reactor Mode switch NOT in RUN.
___  ___
Verifies Reactor Mode switch NOT in RUN.
___ 4. Open AO 2-1601-61, TORUS 2
: 3.
-INCH VENT VLV.
Place VENT ISOL SIGNAL BYPASS switch on 902-5 panel to TORUS.
Places AO 2
Momentarily places Bypass switch to Torus Position.
-1601-61 control switch to OPEN position and determines that the valve will not open.
: 4.
___ 
Open AO 2-1601-61, TORUS 2-INCH VENT VLV.
 
Places AO 2-1601-61 control switch to OPEN position and determines that the valve will not open.  
___ 
*5.
 
Place the VENT ISOL SIGNAL BYPASS Switch on 902-5 to DRYWELL.
___ *5. Place the VENT ISOL SIGNAL BYPASS Switch on 902
Places the VENT ISOL SIGNAL BYPASS Switch on 902-5 to DRYWELL  
-5 to DRYWELL. Places the VENT ISOL SIGNAL BYPASS Switch on 902
*6.
-5 to DRYWELL   ___
Open AO 2-1601-62, DW 2-INCH VENT VLV.
___
Places AO 2-1601-62 control switch to OPEN.
___ *6. Open AO 2-1601-62, DW 2-INCH VENT VLV. Places AO 2
Green light extinguishes and Red light illuminates.
-1601-62 control switch to OPEN.
*7.
Open AO 2-1601-63, VENT TO SBGT.
Places AO 2-1601-63 control switch to OPEN.
Green light extinguishes and Red light illuminates.
Green light extinguishes and Red light illuminates.
: 8.
Determine if SBGT flow is adequate to control and maintain Torus Bottom pressure below the Primary Containment Pressure Limit.
Determines Containment pressure trend.
Examiner Note:
DW pressure as indicated on PR/FR 2-8540-2/4 is as read and no change is expected with the small diameter vent path in service.


___ 
TQ-AA-150-J020 Revision 00 Page 7 of 10 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
S-N-e Rev 00 STEP ELEMENT STANDARD SAT UNSAT Comment Number Cue If examinee reads TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter displays 58 psig and is trending UP slowly.
___ 
 
___ *7. Open AO 2-1601-63, VENT TO SBGT. Places AO 2
-1601-63 control switch to OPEN.
Green light extinguishes and Red light illuminates.
 
___ 
 
___ 
 
___ 8. Determine if SBGT flow is adequate to control and maintain Torus Bottom pressure below the Primary Containment Pressure Limit. Determines Containment pressure trend. ___
___ 
 
___ Examiner Note:
DW pressure as indicated on PR/FR 2
-8540-2/4 is as read and no change is expected with the small diameter vent path in service.
 
TQ-AA-150-J020 Revision 00 Page 7 of 10 This replaced TQ
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-e Rev 00 STEP ELEMENT STANDARD SAT UNSAT Comment Number Cue If examinee reads TORUS BOTTOM PRESS PI 2
-1640-103, inform him/her that the meter displays 58 psig and is trending UP slowly.
BEGIN ALTERNATE PATH
BEGIN ALTERNATE PATH
: 9. Determines use of AUGMENTED PRI CNMT VENT (APCV) System is required
: 9.
. Proceeds to Attachment 1 step 6.
Determines use of AUGMENTED PRI CNMT VENT (APCV) System is required.
___
Proceeds to Attachment 1 step 6.  
___
*10.
___ *10. Place AUGMENTED PRI CNMT VENT MODE SWITCH to APCV on Panel 902
Place AUGMENTED PRI CNMT VENT MODE SWITCH to APCV on Panel 902-3 Rotates control switch clockwise to APCV position
-3 Rotates control switch clockwise to APCV position
: 11.
___
Verify closed AO 2-1601-63, VENT TO SBGT Verifies AO-2-1601-63 in closed.
___
GREEN light lit, RED light extinguished.
___ 11. Verify closed AO 2
: 12.
-1601-63, VENT TO SBGT Verifies AO-2-1601-63 in closed. GREEN light lit, RED light extinguished.
Verify closed AO 2-1601-91, VENT TO RX BLDG EXH SYS Verifies AO-2-1601-91 in closed.
___
RED light lit, GREEN light extinguished.  
___
*13.
___ 12. Verify closed AO 2
Place TORUS ISOLATION GROUP 2 OVERRIDE 2-1601-60 switch to OVERRIDE and hold on 902-3 Panel Rotates TORUS ISOLATION GROUP 2 OVERRIDE 2-1601-60 keylock switch clockwise and holds  
-1601-91, VENT TO RX BLDG EXH SYS Verifies AO 1601-91 in closed. RED light lit, GREEN light extinguished.
*14.
___
Place DRYWELL ISOLATION GROUP 2 OVERRIDE 2-1601-23 switch to OVERRIDE and release on 902-3 Panel Rotates DRYWELL ISOLATION GROUP 2 OVERRIDE 2-1601-23 keylock switch clockwise and releases  
___
*15.
___ *13. Place TORUS ISOLATION GROUP 2 OVERRIDE 2
Release TORUS ISOLATION GROUP 2 OVERRIDE 2-1601-60 on 902-3 Panel Releases TORUS ISOLATION GROUP 2 OVERRIDE 2-1601-60 keylock switch
-1601-60 switch to OVERRIDE and hold on 902-3 Panel Rotates TORUS ISOLATION GROUP 2 OVERRIDE 2
*16.
-1601-60 keylock switch clockwise and holds
Place CMNT ISOLATION GROUP 2 OVERRIDE 2-1601-24 switch to OVERRIDE and release on 902-3 Panel Rotates CMNT ISOLATION GROUP 2 OVERRIDE 2-1601-24 keylock switch clockwise and releases
___    ___    ___ *14. Place DRYWELL ISOLATION GROUP 2 OVERRIDE 2
-1601-23 switch to OVERRIDE and release on 902-3 Panel Rotates DRYWELL ISOLATION GROUP 2 OVERRIDE 2
-1601-23 keylock switch clockwise and releases
___ 


___ 
TQ-AA-150-J020 Revision 00 Page 8 of 10 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-e Rev 00 STEP ELEMENT STANDARD SAT UNSAT Comment Number
*17.
Open AO 2-1601-60, TORUS VENT VLV.
Determines Torus Water Level is less than 30 feet and opens AO 2-1601-60, TORUS VENT VLV.
*18.
Open AO 2-1601-24, VENT TO RX BLDG EXH SYS.
Rotates AO 2-1601-24, VENT TO RX BLDG EXH SYS control switch clockwise and verifies GREEN light extinguishes and RED light illuminates
*19.
Open AO 2-1601-92 VENT TO MAIN CHIMNEY to control and maintain Primary Containment pressure below limit.
Rotates AO 2-1601-92 VENT TO MAIN CHIMNEY control switch clockwise and verifies GREEN light extinguishes and RED light illuminates Cue:
DW pressure is being controlled and maintained below the Primary Containment Pressure Limit.
If examinee asks, DW pressure recorder PR/FR 2-8540-2/4 is slowly lowering.
If examinee asks reading on TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter has decreased to 53 psig (5 psig less than original report).
: 20.
Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
Cue Acknowledge report of task completion.
END JPM Stop Time:


___ *15. Release TORUS ISOLATION GROUP 2 OVERRIDE 2-1601-60 on 902-3 Panel Releases TORUS ISOLATION GROUP 2 OVERRIDE 2
TQ-AA-150-J020 Revision 00 Page 9 of 10 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
-1601-60 keylock switch
S-N-e Rev 00 JPM
___
___
___ *16. Place CMNT ISOLATION GROUP 2 OVERRIDE 2
-1601-24 switch to OVERRIDE and release on 902
-3 Panel Rotates CMNT ISOLATION GROUP 2 OVERRIDE 2
-1601-24 keylock switch clockwise and releases
___ 


___ 
==SUMMARY==
Operators Name:
Emp. ID#: ____________
Job


___
==Title:==
TQ-AA-150-J020 Revision 00 Page 8 of 10 This replaced TQ
RO SRO SRO Cert JPM
-JA-150-02  SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-e Rev 00 STEP ELEMENT STANDARD SAT UNSAT Comment Number *17. Open AO 2-1601-60, TORUS VENT VLV. Determines Torus Water Level is less than 30 feet and opens AO 2
-1601-60, TORUS VENT VLV.
___
___
___ *18. Open AO 2-1601-24, VENT TO RX BLDG EXH SYS.
Rotates AO 2
-1601-24, VENT TO RX BLDG EXH SYS control switch clockwise and verifies GREEN light extinguishes and RED light illuminates


___ 
==Title:==
Containment - Vent Containment with APCV - (A)
JPM Number: S-N-e Revision Number: 00 Task Number and


___ 
==Title:==
 
295L101, Vent the primary containment through the augmented primary containment vent (APCV) to stay below the Primary Containment Pressure Limit.
___ *19. Open AO 2-1601-92 VENT TO MAIN CHIMNEY to control and maintain Primary Containment pressure below limit.
K/A Number and Importance:
Rotates AO 2
223001.A4.07 4.2*/4.1 Suggested Testing Environment: Simulator Alternate Path:
-1601-92 VENT TO MAIN CHIMNEY control switch clockwise and verifies GREEN light extinguishes and RED light illuminates
Yes No SRO Only:
 
Yes No Time Critical:
___ 
Yes No Reference(s): DEOP 0500-04, Rev 16 Actual Testing Environment:
 
Simulator Control Room In-Plant Other Testing Method:
___ 
Simulate Perform Estimated Time to Complete: 9 minutes Actual Time Used:
 
___ Cue: DW pressure is being controlled and maintained below the Primary Containment Pressure Limit.
If examinee asks, DW pressure recorder PR/FR 2
-8540-2/4 is slowly lowering.
If examinee asks reading on TORUS BOTTOM PRESS PI 2
-1640-103,                                                      inform him/her that the meter has decreased to 53 psig (5 psig less than original report).
: 20. Informs Unit Supervisor task is complete. Examinee notifies the Unit Supervisor.
___  ___  ___ Cue Acknowledge report of task completion.
END  JPM Stop Time:
 
TQ-AA-150-J020 Revision 00 Page 9 of 10 This replaced TQ
-JA-150-02  SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-e Rev 00 JPM
 
==SUMMARY==
 
Operator's Name
:  Emp. ID#: ____________
Job Title:  RO    SRO      SRO Cert JPM Title:  Containment
- Vent Containment with APCV
- (A) JPM Number
: S-N-e Revision Number
: 0 0 Task Number and Title
295L101, Vent the primary containment through the augmented primary containment vent (APCV) to stay below the Primary Containment Pressure Limit. K/A Number and Importance
223001.A4.07     4.2*/4.1 Suggested Testing Environment
:   Simulator Alternate Path
Yes No SRO Only: Yes No Time Critical
Yes No Reference(s)
: DEOP 0500-04, Rev 16 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
9 minutes Actual Time Used:
minutes EVALUATION  
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:
Satisfactory Unsatisfactory Comments:                     Evaluator's Name (Print):   Evaluator's Signature
Satisfactory Unsatisfactory Comments:
Date:
Evaluators Name (Print):
TQ-AA-150-J020 Revision 00 Page 10 of 10 This replaced TQ
Evaluators Signature:
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00   INITIAL CONDITIONS
Date:  
: 1. You are the Aux 2 NSO. 2. A break inside the Unit 2 Primary Containment has occurred.
 
: 3. Torus bottom pressure is about to exceed the P CP limit in DEOP 0 200-01. 4. Torus water level is 20 feet. 5. Control Room ventilation has been isolated.
TQ-AA-150-J020 Revision 00 Page 10 of 10 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00 INITIAL CONDITIONS
: 1. You are the Aux 2 NSO.
: 2. A break inside the Unit 2 Primary Containment has occurred.
: 3. Torus bottom pressure is about to exceed the PCP limit in DEOP 0200-01.
: 4. Torus water level is 20 feet.
: 5. Control Room ventilation has been isolated.
: 6. Reactor Building and Turbine Building have been evacuated.
: 6. Reactor Building and Turbine Building have been evacuated.
: 7. The Instrument Bus and ESS Bus are energized.
: 7. The Instrument Bus and ESS Bus are energized.
Line 1,698: Line 1,754:
: 9. The N2 System is in its normal lineup.
: 9. The N2 System is in its normal lineup.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to vent the Unit 2 Primary Containment in accordance with DEOP 0 500-04 , to control Primary Containment pressure.
: 1. The Unit Supervisor has directed you to vent the Unit 2 Primary Containment in accordance with DEOP 0500-04, to control Primary Containment pressure.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.  
 
TQ-AA-150-J020 Revision 00 Page 1 of 8 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 Job Performance Measure Restore Normal Feed to 28-7/29-7 from Bus 29 JPM Number: S-N-f Revision Number: 03 Date: 2/16 EXAM MATERIAL Developed By:
Instructor Date Approved By:
Facility Representative Date
 
TQ-AA-150-J020 Revision 00 Page 2 of 8 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
: 1.
Task description and number, JPM description and number are identified.
: 2.
Knowledge and Abilities (K/A) references are included.
: 3.
Performance location specified. (in-plant, control room, simulator, or other)
: 4.
Initial setup conditions are identified.
: 5.
Initiating cue (and terminating cue if required) are properly identified.
: 6.
Task standards identified and verified by SME review.
: 7.
Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8.
If an alternate path is used, the task standard contains criteria for successful completion.
: 9.
Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOP 6700-18 Rev: 13 Procedure Rev:
Procedure Rev:
: 10. Verify cues both verbal and visual are free of conflict.
: 11. Verify performance time is accurate
: 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date
 
TQ-AA-150-J020 Revision 00 Page 3 of 8 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 Revision Record (Summary)
Revision 02 Updated to comply with rev 4 of DOP 6500-10 Revision 03 Revised for ILT 15-1 (2016-301) NRC Exam


TQ-AA-150-J020 Revision 00 Page 1 of 8 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 4 of 8 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 SIMULATOR SETUP INSTRUCTIONS
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03  Job Performance Measure Restore Normal Feed to 28
: 1. Reset the simulator to any IC (IC _51__ used for validation).
-7/29-7 from Bus 29 JPM Number: S
NOTE:
-N-f  Revision Number: 03 Date: 2/16 EXAM MATERIAL Developed By:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
Instructor Date  Approved By:
: 2. Hold MCC 29-7/28-7 Feed from Bus 29 in TRIP until MCC 29-7/28-7 Feed from Bus 28 CLOSES.
Facility Representative Date TQ-AA-150-J020 Revision 00 Page 2 of 8 This replaced TQ
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure    DOP 6700-18  Rev:  1 3  Procedure Rev:  Procedure Rev:  ________ 10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date        SME / Instructor Date TQ-AA-150-J020 Revision 00 Page 3 of 8 This replaced TQ
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 Revision Record (Summary)
Revision 02 Updated to comply with rev 4 of DOP 6500
-10 Revision 03 Revised for ILT 15
-1 (2016-301) NRC Exam TQ-AA-150-J020 Revision 00 Page 4 of 8 This replaced TQ
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to any IC (IC _5 1__ used for validation).
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Hold MCC 29
-7/28-7 Feed from Bus 29 in TRIP until MCC 29
-7/28-7 Feed from Bus 28 CLOSES.
: 3. This completes the setup for this JPM.
: 3. This completes the setup for this JPM.
DOCUMENT PREPARATION Mark up copy of DOP 6700
DOCUMENT PREPARATION Mark up copy of DOP 6700-18, Bus 28 Outage.
-18, Bus 28 Outage.
 
TQ-AA-150-J020 Revision 00 Page 5 of 8 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 5 of 8 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 INITIAL CONDITIONS
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 INITIAL CONDITIONS
: 1. MCC 28-7/29-7 is powered from Bus 28.
: 1. MCC 28-7/29-7 is powered from Bus 28.
: 2. Power has been restored to Bus 29.
: 2. Power has been restored to Bus 29.
Line 1,743: Line 1,806:
: 4. DOP 6700-18 Attachment F loads are in the desired position as specified by Unit Supervisor.
: 4. DOP 6700-18 Attachment F loads are in the desired position as specified by Unit Supervisor.
INITIATING CUE
INITIATING CUE
: 1. You have been directed by the Unit Supervisor to restore the normal feed to MCC 28
: 1. You have been directed by the Unit Supervisor to restore the normal feed to MCC 28-7/29-7 per DOP 6700-18 Step G.5
-7/29-7 per DOP 6700
-18 Step G.5
: 2. Notify the Unit 2 Supervisor when the task is complete Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
: 2. Notify the Unit 2 Supervisor when the task is complete Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  


TQ-AA-150-J020 Revision 00 Page 6 of 8 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 6 of 8 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-f Rev 03 JPM Start Time:
S-N-f Rev 03 JPM Start Time:
STEP ELEMENT STANDARD SAT UNSAT Comment Number
STEP ELEMENT STANDARD SAT UNSAT Comment Number 1. Declare BOTH LPCI subsystems inoperable Informs the Unit Supervisor BOTH LPCI subsystems must be declared inoperable.
: 1.
Reference TS 3.5.2
Declare BOTH LPCI subsystems inoperable Informs the Unit Supervisor BOTH LPCI subsystems must be declared inoperable.
Reference TS 3.5.2 Cue Respond: Division 1 and 2 LPCI subsystems are inoperable.
*2.
Open the feed breaker from Bus 28, MCC 29-7/28-7 FEED FROM BUS 28, by placing control switch in TRIP AND maintain switch in TRIP.
Opens the feed breaker AND maintains the switch in TRIP.
*3.
Close feed breaker from Bus 29, MCC 29-7/28-7 FEED FROM BUS
: 29.
Closes the feed breaker
*4.
Release feed breaker from Bus 28, MCC 29-7/28-7 FEED FROM BUS 28, control switch.
Releases feed breaker control switch
: 5.
Notify the Unit 2 Supervisor that normal feed has been restored to MCC 28-7/29-7.
Unit 2 Supervisor notified.
Cue Acknowledge report of task completion.
END JPM Stop Time:


___ 
TQ-AA-150-J020 Revision 00 Page 7 of 8 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-f Rev 03 JPM


___ 
==SUMMARY==
 
Operators Name:
___ Cue Respond: Division 1 and 2 LPCI subsystems are inoperable.
Emp. ID#: ____________
*2. Open the feed breaker from Bus 28, MCC 29
Job
-7/28-7 FEED FROM BUS 28, by placing control switch in TRIP AND maintain switch in TRIP. Opens the feed breaker AND maintains the switch in TRIP.


___
==Title:==
___
RO SRO SRO Cert JPM
___ *3. Close feed breaker from Bus 29, MCC 29-7/28-7 FEED FROM BUS
: 29. Closes the feed breaker
___  ___
___ *4. Release feed breaker from Bus 28, MCC 29-7/28-7 FEED FROM BUS 28, control switch.
Releases feed breaker control switch  ___
___
___ 5. Notify the Unit 2 Supervisor that normal feed has been restored to MCC 28-7/29-7. Unit 2 Supervisor notified.
___
___
___ Cue Acknowledge report of task completion.
END  JPM Stop Time:


TQ-AA-150-J020 Revision 00 Page 7 of 8 This replaced TQ
==Title:==
-JA-150-02  SRRS: 3D.105 (when utilized for operator initial or continuing training)
Restore Normal Feed to 28-7/29-7 from Bus 29 JPM Number: S-N-f Revision Number: 03 Task Number and
S-N-f Rev 03 JPM


==SUMMARY==
==Title:==
 
262L026, Restore Normal Feed to 28-7/29-7 from Bus 29 K/A Number and Importance:
Operator's Name
262001.A4.01 3.4 / 3.7 Suggested Testing Environment: Simulator Alternate Path:
:  Emp. ID#: ____________
Yes No SRO Only:
Job Title:  RO    SRO      SRO Cert JPM Title:  Restore Normal Feed to 28
Yes No Time Critical:
-7/29-7 from Bus 29 JPM Number
Yes No Reference(s): DOP 6700-18, Rev 13 Actual Testing Environment:
: S-N-f Revision Number
Simulator Control Room In-Plant Other Testing Method:
: 0 3 Task Number and Title
Simulate Perform Estimated Time to Complete: 12 minutes Actual Time Used:
262L026, Restore Normal Feed to 28
-7/29-7 from Bus 29 K/A Number and Importance
262001.A4.01 3.4 / 3.7 Suggested Testing Environment
:   Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical
Yes No Reference(s)
: DOP 6700-18, Rev 13 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
12 minutes Actual Time Used:
minutes EVALUATION  
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:
Satisfactory Unsatisfactory Comments:                     Evaluator's Name (Print):   Evaluator's Signature
Satisfactory Unsatisfactory Comments:
Date:
Evaluators Name (Print):
TQ-AA-150-J020 Revision 00 Page 8 of 8 This replaced TQ
Evaluators Signature:
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 0 3  INITIAL CONDITIONS
Date:  
 
TQ-AA-150-J020 Revision 00 Page 8 of 8 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 INITIAL CONDITIONS
: 1. MCC 28-7/29-7 is powered from Bus 28.
: 1. MCC 28-7/29-7 is powered from Bus 28.
: 2. Power has been restored to Bus 29.
: 2. Power has been restored to Bus 29.
Line 1,819: Line 1,876:
: 4. DOP 6700-18 Attachment F loads are in the desired position as specified by Unit Supervisor.
: 4. DOP 6700-18 Attachment F loads are in the desired position as specified by Unit Supervisor.
INITIATING CUE
INITIATING CUE
: 1. You have been directed by the Unit Supervisor to restore the normal feed to MCC 28-7/29-7 per DOP 6700
: 1. You have been directed by the Unit Supervisor to restore the normal feed to MCC 28-7/29-7 per DOP 6700-18 Step G.5
-18 Step G.5
: 2. Notify the Unit 2 Supervisor when the task is complete  
: 2. Notify the Unit 2 Supervisor when the task is complete
 
TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 Job Performance Measure Withdraw SRM Detectors with a Stuck SRM Detector (AP)
S-N-g Revision Number: 02 Date: 2/16 EXAM MATERIAL Developed By:
Instructor Date Approved By:
Facility Representative Date
 
TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
: 1.
Task description and number, JPM description and number are identified.
: 2.
Knowledge and Abilities (K/A) references are included.
: 3.
Performance location specified. (in-plant, control room, simulator, or other)
: 4.
Initial setup conditions are identified.
: 5.
Initiating cue (and terminating cue if required) are properly identified.
: 6.
Task standards identified and verified by SME review.
: 7.
Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8.
If an alternate path is used, the task standard contains criteria for successful completion.
: 9.
Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOP 0700-01 Rev: 15 Procedure DOA 0700-02 Rev: 13 Procedure Rev:
: 10. Verify cues both verbal and visual are free of conflict.
: 11. Verify performance time is accurate
: 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date


TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 Revision Record (Summary)
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02  Job Performance Measure Withdraw SRM Detectors with a Stuck SRM Detector (AP)
S-N-g  Revision Number: 02 Date: 2/16 EXAM MATERIAL Developed By:
Instructor Date  Approved By:
Facility Representative Date TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure    DOP 0700-01  Rev:  1 5  Procedure    DOA 0700-02  Rev:  13  Procedure Rev:  ________ 10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 13. When JPM is initially validated, sign and date JPM cover page.
Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date        SME / Instructor Date TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 Revision Record (Summary)
Revision 00 New JPM for the 2010 LORT exam.
Revision 00 New JPM for the 2010 LORT exam.
Revision 01 Updated for the 2012 LORT exam.
Revision 01 Updated for the 2012 LORT exam.
Revision 02 Revised for ILT 15
Revision 02 Revised for ILT 15-1 (2016-301) NRC Exam  
-1 (2016-301) NRC Exam


TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 SIMULATOR SETUP INSTRUCTIONS
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to a 2-3% power IC (IC _53__ used for validation).
: 1. Reset the simulator to a 2
NOTE:
-3% power IC (IC _53__ used for validation).
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Position SRM detectors for a 104 to 105 count rate. (Should not be in the fully withdrawn position)
: 2. Position SRM detectors for a 10 4 to 105 count rate. (Should not be in the fully withdrawn position)
: 3. Run CAEP file: S-N-f.cae
: 3. Run CAEP file: S
: 4. If CAEP file cannot be ran, insert the following Expert Commands:
-N-f.cae 4. If CAEP file cannot be ran, insert the following Expert Commands:
: a. Malfunctions required:
: a. Malfunctions required:
: 1) imf nis22det (Inserts SRM 22 stuck malfunction)
: 1) imf nis22det (Inserts SRM 22 stuck malfunction)
: b. Triggers required:
: b. Triggers required:
: 1) trgset 1 "nilsdet(2) .and. nil104do"
: 1) trgset 1 nilsdet(2).and. nil104do
: 2) trgset 2 "et_array(1) .and. nilsdet(2) .and. nil101di"
: 2) trgset 2 et_array(1).and. nilsdet(2).and. nil101di
: 3) trg 2 "dmf nis22det" DOCUMENT PREPARATION Clean copies of the following procedures:
: 3) trg 2 dmf nis22det DOCUMENT PREPARATION Clean copies of the following procedures:
* DOP 0700-01, Source Range monitor Operation (SRM)
DOP 0700-01, Source Range monitor Operation (SRM)
* DOA 0700-02, SRM or IRM Detector Stuck
DOA 0700-02, SRM or IRM Detector Stuck  


TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 INITIAL CONDITIONS
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 INITIAL CONDITIONS
: 1. Unit 2 startup is in progress.
: 1. Unit 2 startup is in progress.
: 2. You are an extra NSO assisting the startup.
: 2. You are an extra NSO assisting the startup.
: 3. Primary Containment has been established.
: 3. Primary Containment has been established.
INITIATING CUE
INITIATING CUE
: 1. The Unit 2 Supervisor directs you to fully withdraw SRM detectors per DOP 0700
: 1. The Unit 2 Supervisor directs you to fully withdraw SRM detectors per DOP 0700-01, Source Range Monitor Operation (SRM).
-01, Source Range Monitor Operation (SRM).
: 2. Your Pre-Job Brief has been completed.
: 2. Your Pre-Job Brief has been completed.
: 3. Notify the Unit supervisor upon completion of the task.
: 3. Notify the Unit supervisor upon completion of the task.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  


TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-g Rev 02 JPM Start Time:
S-N-g Rev 02 JPM Start Time:
STEP ELEMENT STANDARD SAT UNSAT Comment Number Note Provide the Examinee a copy of DOP 0700-01.
STEP ELEMENT STANDARD SAT UNSAT Comment Number Note Provide the Examinee a copy of DOP 0700
: 1.
-01. 1. WHEN IRM down scale alarms have cleared, THEN start SRM withdrawal and maintain SRM count rate 290 cps to 8.85x10 4 cps. IRM down scales are cleared by initial conditions.
WHEN IRM down scale alarms have cleared, THEN start SRM withdrawal and maintain SRM count rate 290 cps to 8.85x104 cps.
Monitors count rate when withdrawing SRMs.
IRM down scales are cleared by initial conditions.
 
Monitors count rate when withdrawing SRMs.  
___ 
*2.
 
Depress the applicable SELECT switch (LIT when selected).
___ 
Depresses each SRMs SELECT switch.
 
Verifies SELECT light lit.  
___ *2. Depress the applicable SELECT switch (LIT when selected).
*3.
Depresses each SRM's SELECT switch. Verifies SELECT light lit.
Depress and hold the DRIVE OUT switch to withdraw SRMs to maintain SRM count rate of 290 cps to 8.85x104 cps.
 
Depress and hold the DRIVE OUT switch to withdraw SRMs BEGIN ALTERNATE PATH
___ 
: 4.
 
Verify that SRMs indication is changing as expected.
___ 
 
___ *3. Depress and hold the DRIVE OUT switch to withdraw SRMs to maintain SRM count rate of 290 cps to 8.85x10 4 cps. Depress and hold the DRIVE OUT switch to withdraw SRMs
___    ___    ___ BEGIN ALTERNATE PATH
: 4. Verify that SRMs indication is changing as expected.
For SRMs 21, 23 & 24:
For SRMs 21, 23 & 24:
* Count rate drops.
Count rate drops.
* Period indicates negative.
Period indicates negative.
* OUT light is lit when detector reaches full out position.
OUT light is lit when detector reaches full out position.
For SRM 22 indications remain unchanged.
For SRM 22 indications remain unchanged.
 
: 5.
___ 
Report SRM 22 detector did not move and/or appears to be stuck.
 
___ 
 
___ 5. Report SRM 22 detector did not move and/or appears to be stuck.
Reports SRM 22 detector did not move and/or appears to be stuck.
Reports SRM 22 detector did not move and/or appears to be stuck.
___  ___  ___ Note The Examinee should allow SRMs 21, 23, 24 to fully withdraw. Cue Acknowledge report. Announce "entering DOA 0700
Note The Examinee should allow SRMs 21, 23, 24 to fully withdraw.
-02, SRM or IRM Detector Stuck". Direct the Examinee to "perform DOA 0700
Cue Acknowledge report. Announce entering DOA 0700-02, SRM or IRM Detector Stuck. Direct the Examinee to perform DOA 0700-02. When the Examinee locates DOA 0700-02, give him the provided copy of DOA 0700-02.
-02". When the Examinee locates DOA 0700
Note The Examinee may have already deselected SRMs earlier.  
-02, give him the provided copy of DOA 0700
-02. Note The Examinee may have already deselected SRMs earlier.
 
TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ
-JA-150-02  SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-g Rev 02 STEP ELEMENT STANDARD SAT UNSAT Comment Number *6. Depress SRM SELECT switches to establish ONLY SRM 22 selected Depresses SRM SELECT switches to establish ONLY SRM 22 SELECT light lit.
___
___  ___ Note An automatic Trigger is setup to delete the SRM stuck detector malfunction when it is inserted. *7. Use DRIVE IN AND DRIVE OUT switches to move stuck SRM detector in both directions to free it. Depress es DRIVE IN switch to move SRM 22.
 
___ 
 
___ 
 
___ 8. Verify indication that SRM 22 is moving. Observes SRM 22:
* Count rate rises.
* Period indicates positive.


___ 
TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
S-N-g Rev 02 STEP ELEMENT STANDARD SAT UNSAT Comment Number
___ 
*6.
 
Depress SRM SELECT switches to establish ONLY SRM 22 selected Depresses SRM SELECT switches to establish ONLY SRM 22 SELECT light lit.
___ *9. Depress DRIVE IN switch to stop SRM 22. Depresses DRIVE IN switch to stop SRM 22.
Note An automatic Trigger is setup to delete the SRM stuck detector malfunction when it is inserted.
___
*7.
___
Use DRIVE IN AND DRIVE OUT switches to move stuck SRM detector in both directions to free it.
___ *10. Use DRIVE IN AND DRIVE OUT switches to move stuck SRM detector in both directions to free it. Depresses and holds DRIVE OUT switch to move SRM
Depresses DRIVE IN switch to move SRM 22.
: 22. Drives SRM 22 fully out.
: 8.
___    ___    ___ 11. Verify that SRM 22 indication is changing as expected.
Verify indication that SRM 22 is moving.
Observes SRM 22:
Count rate rises.
Period indicates positive.
*9.
Depress DRIVE IN switch to stop SRM 22.
Depresses DRIVE IN switch to stop SRM 22.  
*10.
Use DRIVE IN AND DRIVE OUT switches to move stuck SRM detector in both directions to free it.
Depresses and holds DRIVE OUT switch to move SRM 22.
Drives SRM 22 fully out.
: 11.
Verify that SRM 22 indication is changing as expected.
Observes SRMs 22:
Observes SRMs 22:
* Count rate drops.
Count rate drops.
* Period indicates negative.
Period indicates negative.
* OUT light is lit when detector reaches full out position.
OUT light is lit when detector reaches full out position.
 
: 12.
___
Report SRM 22 detector is fully withdrawn.
___
___ 12. Report SRM 22 detector is fully withdrawn.
Reports SRM 22 detector is fully withdrawn.
Reports SRM 22 detector is fully withdrawn.
___  ___  ___ Cue Acknowledge report. END JPM Stop Time:
Cue Acknowledge report.
END JPM Stop Time:  


TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-g Rev 02 JPM  
S-N-g Rev 02 JPM  


==SUMMARY==
==SUMMARY==
Operators Name:
Emp. ID#: ____________
Job


Operator's Name
==Title:==
:   Emp. ID#: ____________
RO SRO SRO Cert JPM
Job Title:  RO     SRO     SRO Cert JPM Title:   Withdraw SRM Detectors with a Stuck SRM Detector (AP)
 
JPM Number
==Title:==
: S-N-g Revision Number
Withdraw SRM Detectors with a Stuck SRM Detector (AP)
: 0 2 Task Number and Title
JPM Number: S-N-g Revision Number: 02 Task Number and
215L022   Respond to an SRM or IRM stuck detector.
 
K/A Number and Importance
==Title:==
215004A4.04 3.2 / 3.2 Suggested Testing Environment
215L022 Respond to an SRM or IRM stuck detector.
:   Simulator Alternate Path
K/A Number and Importance:
Yes No SRO Only: Yes No Time Critical
215004A4.04 3.2 / 3.2 Suggested Testing Environment: Simulator Alternate Path:
Yes No Reference(s)
Yes No SRO Only:
: DOP 0700-01, Rev 15 DOA 0700-02, Rev 13 Actual Testing Environment:
Yes No Time Critical:
Simulator Control Room In-Plant Other Testing Method:
Yes No Reference(s): DOP 0700-01, Rev 15 DOA 0700-02, Rev 13 Actual Testing Environment:
Simulate Perform Estimated Time to Complete:
Simulator Control Room In-Plant Other Testing Method:
18 minutes Actual Time Used:
Simulate Perform Estimated Time to Complete: 18 minutes Actual Time Used:
minutes EVALUATION  
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:
Satisfactory Unsatisfactory Comments:                     Evaluator's Name (Print):   Evaluator's Signature
Satisfactory Unsatisfactory Comments:
Date:
Evaluators Name (Print):
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ
Evaluators Signature:
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02   INITIAL CONDITIONS
Date:  
 
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 INITIAL CONDITIONS
: 1. Unit 2 startup is in progress.
: 1. Unit 2 startup is in progress.
: 2. You are an extra NSO assisting the startup.
: 2. You are an extra NSO assisting the startup.
: 3. Primary Containment has been established.
: 3. Primary Containment has been established.
INITIATING CUE
INITIATING CUE
: 1. The Unit 2 Supervisor directs you to fully withdraw SRM detectors per DOP 0700
: 1. The Unit 2 Supervisor directs you to fully withdraw SRM detectors per DOP 0700-01, Source Range Monitor Operation (SRM).
-01, Source Range Monitor Operation (SRM).
: 2. Your Pre-Job Brief has been completed.
: 2. Your Pre-Job Brief has been completed. 3. Notify the Unit supervisor upon completion of the task.
: 3. Notify the Unit supervisor upon completion of the task.  


TQ-AA-150-J020 Revision 00 Page 1 of 12 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 1 of 12 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 Job Performance Measure SBGT - START SBGT WITH A FAILURE OF RX BLDG VENT TO ISOLATE JPM Number: S-N-h Revision Number: 03 Date: 2/16 EXAM MATERIAL Developed By:
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03   Job Performance Measure SBGT - START SBGT WITH A FAILURE OF RX BLDG VENT TO ISOLATE JPM Number: S
Instructor Date Approved By:
-N-h Revision Number: 03 Date: 2/16 EXAM MATERIAL Developed By:
Facility Representative Date  
Instructor Date Approved By:
Facility Representative Date TQ-AA-150-J020 Revision 00 Page 2 of 12 This replaced TQ
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. If an alternate path is used, the task standard contains criteria for successful completion.
________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure    DOP 7500-01  Rev:  36  Procedure DAN 902(3)
-3 F-14 Rev:  20  Procedure Rev:  ________ 10. Verify cues both verbal and visual are free of conflict.
________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date        SME / Instructor Date TQ-AA-150-J020 Revision 00 Page 3 of 12 This replaced TQ
-JA-150-02  SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 Revision Record (Summary)
Revision 01 Bank JPM. Revision 02 Revised for 2010 Cert Exam.
Revision 03 Modified for ILT 15
-1 (2016-301) NRC Exam


TQ-AA-150-J020 Revision 00 Page 4 of 12 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 2 of 12 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 SIMULATOR SETUP INSTRUCTIONS
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
: 1.
Task description and number, JPM description and number are identified.
: 2.
Knowledge and Abilities (K/A) references are included.
: 3.
Performance location specified. (in-plant, control room, simulator, or other)
: 4.
Initial setup conditions are identified.
: 5.
Initiating cue (and terminating cue if required) are properly identified.
: 6.
Task standards identified and verified by SME review.
: 7.
Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 8.
If an alternate path is used, the task standard contains criteria for successful completion.
: 9.
Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOP 7500-01 Rev: 36 Procedure DAN 902(3)-3 F-14 Rev: 20 Procedure Rev:
: 10. Verify cues both verbal and visual are free of conflict.
: 11. Verify performance time is accurate
: 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date
 
TQ-AA-150-J020 Revision 00 Page 3 of 12 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 Revision Record (Summary)
Revision 01 Bank JPM.
Revision 02 Revised for 2010 Cert Exam.
Revision 03 Modified for ILT 15-1 (2016-301) NRC Exam
 
TQ-AA-150-J020 Revision 00 Page 4 of 12 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to any IC with Rx Bldg Vent operating normally (IC _53_ used for validation).
: 1. Reset the simulator to any IC with Rx Bldg Vent operating normally (IC _53_ used for validation).
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Place the 2/3A SBGT train control switch in STBY.
: 2. Place the 2/3A SBGT train control switch in STBY.
: 3. Place the 2/3B SBGT train control switch in PRI.
: 3. Place the 2/3B SBGT train control switch in PRI.
Line 2,042: Line 2,103:
* 3A RX BLDG EXH FAN
* 3A RX BLDG EXH FAN
* 3B RX BLDG EXH FAN
* 3B RX BLDG EXH FAN
: 5. Run CAEP file S
: 5. Run CAEP file S-N-h.cae
-N-h.cae 6. If the CAEP file cannot be ran, insert the following Expert Commands:
: 6. If the CAEP file cannot be ran, insert the following Expert Commands:
: a. ior vrdtp3c trip (Prevents autostart of 2C RB vent fan)
: a. ior vrdtp3c trip (Prevents autostart of 2C RB vent fan)
: b. ior vrdtp4c trip (Prevents autostart of 2C RB exhaust fan)
: b. ior vrdtp4c trip (Prevents autostart of 2C RB exhaust fan)
: c. irf cirbvall lifted (Prevents Secondary Containment Isolation on U2)
: c. irf cirbvall lifted (Prevents Secondary Containment Isolation on U2)
: d. trgset 16 "vgdstrta_drw" (Trigger 16 automatically activates when 2/3A SBGT is placed to START) e. imf radrbvah (16 30) (After 30 sec, inserts RX Bldg Rad Mon failed high to cause a Secondary Containment Isolation signal)
: d. trgset 16 "vgdstrta_drw" (Trigger 16 automatically activates when 2/3A SBGT is placed to START)
: e. imf radrbvah (16 30) (After 30 sec, inserts RX Bldg Rad Mon failed high to cause a Secondary Containment Isolation signal)
: f. imf x04 (16 30) (After 30 sec, trips 2A RBV Supply Fan).
: f. imf x04 (16 30) (After 30 sec, trips 2A RBV Supply Fan).
: g. imf x05 (16 30) (After 30 sec, trips 2B RBV Supply Fan).
: g. imf x05 (16 30) (After 30 sec, trips 2B RBV Supply Fan).
: h. imf x07 (16 30) (After 30 sec, trips 2A RBV Exhaust Fan).
: h. imf x07 (16 30) (After 30 sec, trips 2A RBV Exhaust Fan).
: i. imf x08 (16 30) (After 30 sec, trips 2B RBV Exhaust Fan).
: i.
DOCUMENT PREPARATION Clean copy of DOP 7500-01. Clean copy of DAN 902(3)
imf x08 (16 30) (After 30 sec, trips 2B RBV Exhaust Fan).
-3 F-14 TQ-AA-150-J020 Revision 00 Page 5 of 12 This replaced TQ
DOCUMENT PREPARATION Clean copy of DOP 7500-01.
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 INITIAL CONDITIONS
Clean copy of DAN 902(3)-3 F-14  
 
TQ-AA-150-J020 Revision 00 Page 5 of 12 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. U2 HPCI surveillance is in progress and is at the point of starting a SBGT train
: 2. U2 HPCI surveillance is in progress and is at the point of starting a SBGT train.
. 3. DOP 7500-M1/E1 is not required per the Unit Supervisor.
: 3. DOP 7500-M1/E1 is not required per the Unit Supervisor.
: 4. The 2/3A SBGT Initial Cumulative Run Time has been recorded
: 4. The 2/3A SBGT Initial Cumulative Run Time has been recorded.
. 5. There has been NO painting or operation of propane powered equipment in the power block in the last 72 hours.
: 5. There has been NO painting or operation of propane powered equipment in the power block in the last 72 hours.
INITIATING CUE
INITIATING CUE
: 1. The Unit 2 Supervisor has directed you to start the 2/3A SBGT train per DOP 7500
: 1. The Unit 2 Supervisor has directed you to start the 2/3A SBGT train per DOP 7500-01.
-01. 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  


TQ-AA-150-J020 Revision 00 Page 6 of 12 This replaced TQ
TQ-AA-150-J020 Revision 00 Page 6 of 12 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-h Rev 03 JPM Start Time:
S-N-h Rev 03 JPM Start Time:
STEP ELEMENT STANDARD SAT UNSAT Comment Number Note Provide the Examinee a copy of DOP 7500-01.  
STEP ELEMENT STANDARD SAT UNSAT Comment Number Note Provide the Examinee a copy of DOP 7500-01. *1. Place the 2/3A SBGT SELECT switch to A PRI position.
*1.
Places the 2/3A SBGT SELECT switch to the A PRI position. ___  ___  ___ *2. Place the 2/3B SBGT SELECT switch to B STBY position.
Place the 2/3A SBGT SELECT switch to A PRI position.
Places the 2/3A SBGT SELECT switch to the A PRI position.  
*2.
Place the 2/3B SBGT SELECT switch to B STBY position.
Places the 2/3B SBGT SELECT switch to the B STBY position.
Places the 2/3B SBGT SELECT switch to the B STBY position.
___  ___  ___ 3. Verify the 2/3A and B AIR HEATERs are OFF.
: 3.
Verify the 2/3A and B AIR HEATERs are OFF.
Both GREEN lights illuminated.
Both GREEN lights illuminated.
___  ___  ___ 4. Verify the 2/3A and B Fans are OFF. Both GREEN lights illuminated.
: 4.
___  ___  ___ 5. Verify annunciators 923
Verify the 2/3A and B Fans are OFF.
-5 A-6 and 923-5 B-6 are NOT in alarm.
Both GREEN lights illuminated.
: 5.
Verify annunciators 923-5 A-6 and 923-5 B-6 are NOT in alarm.
Both annunciator tiles extinguished.
Both annunciator tiles extinguished.
___  ___  ___ 6. Verify 2/3B SBGT SELECT SWITCH in B STBY position.
: 6.
Verify 2/3B SBGT SELECT SWITCH in B STBY position.
Verifies 2/3 B SBGT Select switch in B STBY.
Verifies 2/3 B SBGT Select switch in B STBY.
___  ___  ___ Note When 2/3A SBGT train starts, a Trigger auto activates which inserts a RBV Rad Mon Hi Hi condition after 30 seconds. The resulting Secondary Containment Isolation fails and the operator should complete the isolation.
Note When 2/3A SBGT train starts, a Trigger auto activates which inserts a RBV Rad Mon Hi Hi condition after 30 seconds. The resulting Secondary Containment Isolation fails and the operator should complete the isolation.  
*7. Starts 2/3A SBGT train.
*7.
Starts 2/3A SBGT train.
Places 2/3 A SBGT Select switch to START A position.
Places 2/3 A SBGT Select switch to START A position.
___  ___  ___ 8. Verifies the 2/3A SBGT train initiated properly.
: 8.
Verifies the 2/3A SBGT train initiated properly.
Begins verifying the 2/3A SBGT train operating properly.
Begins verifying the 2/3A SBGT train operating properly.
___  ___  ___ 9. Records the Start Time on Operator Aid.
: 9.
Records the Start Time on Operator Aid ___  ___  ___ BEGIN ALTERNATE PATH Note The examinee should recognize the Secondary Containment Isolation did NOT occur,                     and perform the Limitations and Actions.
Records the Start Time on Operator Aid.
Cue If examinee does not react to the alarm on the 902
Records the Start Time on Operator Aid BEGIN ALTERNATE PATH Note The examinee should recognize the Secondary Containment Isolation did NOT occur, and perform the Limitations and Actions.
-3 panel, make the following update:
Cue If examinee does not react to the alarm on the 902-3 panel, make the following update:
"Attention for an Update. RX BLDG VENT CH A RAD HI
Attention for an Update. RX BLDG VENT CH A RAD HI-HI is in. End of Update.  
-HI is in. End of Update."
 
TQ-AA-150-J020 Revision 00 Page 7 of 12 This replaced TQ
-JA-150-02  SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-h Rev 03 STEP ELEMENT STANDARD SAT UNSAT Comment Number Note If the examinee starts to head to the 902
-3 panel to respond to the 902
-3 F-14 annunciator stop them and hand them the provided copy of the DAN.
*10. Verifies trip of 3A RX BLDG VENT FAN. Determines 3A RX BLDG VENT FAN is NOT tripped. (BLUE lights illuminated).
Places control switch 3A RX BLDG VENT FAN to the Trip position. Determines 3A RX BLDG VENT FAN tripped (GREEN light illuminated).
 
___ 
 
___ 
 
___ *11. Verifies trip of 3B RX BLDG VENT FAN. Determines 3B RX BLDG VENT FAN is NOT tripped. (BLUE lights illuminated).
Places control switch 3B RX BLDG VENT FAN to the Trip position. Determines 3B RX BLDG VENT FAN tripped (GREEN light illuminated).
 
___ 
 
___ 
 
___ 12. Verifies trip of 3C RX BLDG VENT FAN. GREEN light illuminated.
___  ___  ___ *13. Verifies trip of 3A RX BLDG EXH FAN. Determines 3A RX EXH VENT FAN is NOT tripped. (BLUE lights illuminated).
Places control switch 3A RX BLDG EXH FAN to the Trip position. Determines 3A RX BLDG EXH FAN tripped (GREEN light illuminated).
 
___ 
 
___ 
 
___ *14. Verifies trip of 3B RX BLDG EXH FAN. Determines 3B RX EXH VENT FAN is NOT tripped. (BLUE lights illuminated).
Places control switch 3B RX BLDG EXH FAN to the Trip position. Determines 3B RX BLDG EXH FAN tripped (GREEN light illuminated).
 
___ 


___ 
TQ-AA-150-J020 Revision 00 Page 7 of 12 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-h Rev 03 STEP ELEMENT STANDARD SAT UNSAT Comment Number Note If the examinee starts to head to the 902-3 panel to respond to the 902-3 F-14 annunciator stop them and hand them the provided copy of the DAN.
*10.
Verifies trip of 3A RX BLDG VENT FAN.
Determines 3A RX BLDG VENT FAN is NOT tripped. (BLUE lights illuminated).
Places control switch 3A RX BLDG VENT FAN to the Trip position.
Determines 3A RX BLDG VENT FAN tripped (GREEN light illuminated).
*11.
Verifies trip of 3B RX BLDG VENT FAN.
Determines 3B RX BLDG VENT FAN is NOT tripped. (BLUE lights illuminated).
Places control switch 3B RX BLDG VENT FAN to the Trip position.
Determines 3B RX BLDG VENT FAN tripped (GREEN light illuminated).
: 12.
Verifies trip of 3C RX BLDG VENT FAN.
GREEN light illuminated.
*13.
Verifies trip of 3A RX BLDG EXH FAN.
Determines 3A RX EXH VENT FAN is NOT tripped. (BLUE lights illuminated).
Places control switch 3A RX BLDG EXH FAN to the Trip position.
Determines 3A RX BLDG EXH FAN tripped (GREEN light illuminated).
*14.
Verifies trip of 3B RX BLDG EXH FAN.
Determines 3B RX EXH VENT FAN is NOT tripped. (BLUE lights illuminated).
Places control switch 3B RX BLDG EXH FAN to the Trip position.
Determines 3B RX BLDG EXH FAN tripped (GREEN light illuminated).


___
TQ-AA-150-J020 Revision 00 Page 8 of 12 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
TQ-AA-150-J020 Revision 00 Page 8 of 12 This replaced TQ
S-N-h Rev 03 STEP ELEMENT STANDARD SAT UNSAT Comment Number
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
: 15.
S-N-h Rev 03 STEP ELEMENT STANDARD SAT UNSAT Comment Number 15. Verifies trip of 3C RX BLDG EXH FAN. GREEN light illuminated.
Verifies trip of 3C RX BLDG EXH FAN.
___  ___  ___ 16. Verifies trip of 2A RX BLDG VENT FAN. GREEN and AMBER lights illuminated.
GREEN light illuminated.
___  ___  ___ 17. Verifies trip of 2B RX BLDG VENT FAN. GREEN and AMBER lights illuminated.
: 16.
___  ___  ___ 18. Verifies trip of 2C RX BLDG VENT FAN. GREEN light illuminated.
Verifies trip of 2A RX BLDG VENT FAN.
___  ___  ___ 19. Verifies trip of 2A RX BLDG EXH FAN. GREEN and AMBER lights illuminated.
GREEN and AMBER lights illuminated.
___  ___  ___ 20. Verifies trip of 2B RX BLDG EXH FAN. GREEN and AMBER lights illuminated.
: 17.
___  ___  ___ 21. Verifies trip of 2C RX BLDG EXH FAN. GREEN light illuminated.
Verifies trip of 2B RX BLDG VENT FAN.
___  ___  ___ *22. Verifies 3A INLET DAMPER AO 3-5741A closed.
GREEN and AMBER lights illuminated.
: 18.
Verifies trip of 2C RX BLDG VENT FAN.
GREEN light illuminated.
: 19.
Verifies trip of 2A RX BLDG EXH FAN.
GREEN and AMBER lights illuminated.
: 20.
Verifies trip of 2B RX BLDG EXH FAN.
GREEN and AMBER lights illuminated.
: 21.
Verifies trip of 2C RX BLDG EXH FAN.
GREEN light illuminated.  
*22.
Verifies 3A INLET DAMPER AO 3-5741A closed.
Verifies 3B INLET DAMPER AO 3-5741B closed.
Verifies 3B INLET DAMPER AO 3-5741B closed.
Determines 3A & 3B INLET DAMPERs AO 3-5741A & B are NOT closed (GREEN lights illuminated).
Determines 3A & 3B INLET DAMPERs AO 3-5741A & B are NOT closed (GREEN lights illuminated).
Places control switch 3A & 3B RX BLDG VENT INLET ISOL DAM 3
Places control switch 3A & 3B RX BLDG VENT INLET ISOL DAM 3-5741A & 3-5741B to the CLOSE position.
-5741A & 3-5741B to the CLOSE position. Determines 3A & 3B INLET DAMPERs AO 3-5741A & B did not close (GREEN lights illuminated).
Determines 3A & 3B INLET DAMPERs AO 3-5741A & B did not close (GREEN lights illuminated).  
 
___ 


___ 
TQ-AA-150-J020 Revision 00 Page 9 of 12 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
S-N-h Rev 03 STEP ELEMENT STANDARD SAT UNSAT Comment Number  
___
*23.
TQ-AA-150-J020 Revision 00 Page 9 of 12 This replaced TQ
Verifies 3A OUTLET DAMPER AO 3-5742A closed.
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-h Rev 03 STEP ELEMENT STANDARD SAT UNSAT Comment Number *23. Verifies 3A OUTLET DAMPER AO 3-5742A closed.
Verifies 3B OUTLET DAMPER AO 3-5742B closed.
Verifies 3B OUTLET DAMPER AO 3-5742B closed.
Determines 3A & 2B OUTLET DAMPERs AO 3-5742A & B are NOT closed (GREEN lights illuminated).
Determines 3A & 2B OUTLET DAMPERs AO 3-5742A & B are NOT closed (GREEN lights illuminated).
Places control switch 3A & 3B RX BLDG VENT OTLT ISOL DAM 3-5742A & 3-5742B to the CLOSE position. Determines 3A & 3B OUTLET DAMPERs AO 3
Places control switch 3A & 3B RX BLDG VENT OTLT ISOL DAM 3-5742A & 3-5742B to the CLOSE position.
-5742A & B did not clos e (GREEN lights illuminated).
Determines 3A & 3B OUTLET DAMPERs AO 3-5742A & B did not close (GREEN lights illuminated).  
 
*24.
___   
Verifies 2A INLET DAMPER AO 2-5741A closed.
 
___   
 
___ *24. Verifies 2A INLET DAMPER AO 2-5741A closed.
Verifies 2B INLET DAMPER AO 2-5741B closed.
Verifies 2B INLET DAMPER AO 2-5741B closed.
Determines 3A & 3B INLET DAMPERs AO 2-5741A & B are NOT closed (GREEN lights illuminated).
Determines 3A & 3B INLET DAMPERs AO 2-5741A & B are NOT closed (GREEN lights illuminated).
Places control switch 2A & 2B RX BLDG VENT INLET ISOL DAM 2
Places control switch 2A & 2B RX BLDG VENT INLET ISOL DAM 2-5741A & 2-5741B to the CLOSE position.
-5741A & 2-5741B to the CLOSE position. Determines 2A & 2B INLET DAMPERs AO 2-5741A & B did not close (GREEN lights illuminated).
Determines 2A & 2B INLET DAMPERs AO 2-5741A & B did not close (GREEN lights illuminated).  


___ 
TQ-AA-150-J020 Revision 00 Page 10 of 12 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
S-N-h Rev 03 STEP ELEMENT STANDARD SAT UNSAT Comment Number  
___ 
*25.
 
Verifies 2A OUTLET DAMPER AO 2-5742A closed.
___
TQ-AA-150-J020 Revision 00 Page 10 of 12 This replaced TQ
-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-h Rev 03 STEP ELEMENT STANDARD SAT UNSAT Comment Number *25. Verifies 2A OUTLET DAMPER AO 2-5742A closed.
Verifies 2B OUTLET DAMPER AO 2-5742B closed.
Verifies 2B OUTLET DAMPER AO 2-5742B closed.
Determines 2A & 2B OUTLET DAMPERs AO 2-5742A & B are NOT closed (GREEN lights illuminated).
Determines 2A & 2B OUTLET DAMPERs AO 2-5742A & B are NOT closed (GREEN lights illuminated).
Places control switch 2A & 2B RX BLDG VENT OTLT ISOL DAM 2-5742A & 2-5742B to the CLOSE position. Determines 2A & 3B OUTLET DAMPERs AO 2-5742A & B did not clos e (GREEN lights illuminated).
Places control switch 2A & 2B RX BLDG VENT OTLT ISOL DAM 2-5742A & 2-5742B to the CLOSE position.
 
Determines 2A & 3B OUTLET DAMPERs AO 2-5742A & B did not close (GREEN lights illuminated).
___   
: 26.
 
Verifies trip of 2A D/W & Torus Purge Fan.
___   
 
___ 26. Verifies trip of 2A D/W & Torus Purge Fan.
Condition met from previous steps in the procedure.
Condition met from previous steps in the procedure.
___  ___  ___ 27. Verifies trip of 2B D/W & Torus Purge Fan.
: 27.
Verifies trip of 2B D/W & Torus Purge Fan.
Condition met from previous steps in the procedure.
Condition met from previous steps in the procedure.
___  ___  ___ 28. Verifies trip of 3A D/W & Torus Purge Fan.
: 28.
Verifies trip of 3A D/W & Torus Purge Fan.
Condition met from previous steps in the procedure.
Condition met from previous steps in the procedure.
___  ___  ___ 29. Verifies trip of 3B D/W & Torus Purge Fan.
: 29.
Verifies trip of 3B D/W & Torus Purge Fan.
Condition met from previous steps in the procedure.
Condition met from previous steps in the procedure.
___  ___  ___ 30. Notifies US of Secondary Containment Isolation Failure and successful manual completion of the isolation.
: 30.
Notifies US of Secondary Containment Isolation Failure and successful manual completion of the isolation.
Examinee notifies the Unit Supervisor.
Examinee notifies the Unit Supervisor.
Cue Acknowledge report.
END JPM Stop Time:


___ 
TQ-AA-150-J020 Revision 00 Page 11 of 12 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-h Rev 03 JPM


___ 
==SUMMARY==
Operators Name:
Emp. ID#: ____________
Job


___ Cue Acknowledge report.
==Title:==
END  JPM Stop Time:
RO SRO SRO Cert JPM


TQ-AA-150-J020 Revision 00 Page 11 of 12 This replaced TQ
==Title:==
-JA-150-02  SRRS: 3D.105 (when utilized for operator initial or continuing training)
SBGT - Start SBGT with a Failure of RX BLDG VENT to Isolate (AP)
S-N-h Rev 03 JPM
JPM Number: S-N-h Revision Number: 03 Task Number and


==SUMMARY==
==Title:==
 
261L002, Start the SBGT system.
Operator's Name
K/A Number and Importance:
:  Emp. ID#: ____________
261000.A4.09 2.7 / 2.7 Suggested Testing Environment: Simulator Alternate Path:
Job Title:  RO    SRO      SRO Cert JPM Title:  SBGT - Start SBGT with a Failure of RX BLDG VENT to Isolate (AP) JPM Number
Yes No SRO Only:
: S-N-h Revision Number
Yes No Time Critical:
: 0 3 Task Number and Title
Yes No Reference(s): DOP 7500-01, Rev 36 Actual Testing Environment:
261L002, Start the SBGT system.
Simulator Control Room In-Plant Other Testing Method:
K/A Number and Importance
Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used:
261000.A4.09     2.7
/ 2.7 Suggested Testing Environment
:   Simulator Alternate Path
Yes No SRO Only: Yes No Time Critical
Yes No Reference(s)
: DOP 7500-01, Rev 36 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
15 minutes Actual Time Used:
minutes EVALUATION  
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:
Satisfactory Unsatisfactory Comments:                     Evaluator's Name (Print):   Evaluator's Signature
Satisfactory Unsatisfactory Comments:
Date:
Evaluators Name (Print):
TQ-AA-150-J020 Revision 00 Page 12 of 12 This replaced TQ
Evaluators Signature:
-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03   INITIAL CONDITIONS
Date:  
 
TQ-AA-150-J020 Revision 00 Page 12 of 12 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 INITIAL CONDITIONS
: 1. You are the Unit 2 Aux NSO.
: 1. You are the Unit 2 Aux NSO.
: 2. U2 HPCI surveillance is in progress and is at the point of starting a SBGT train
: 2. U2 HPCI surveillance is in progress and is at the point of starting a SBGT train.
. 3. DOP 7500-M1/E1 is not required per the Unit Supervisor.
: 3. DOP 7500-M1/E1 is not required per the Unit Supervisor.
: 4. The 2/3A SBGT Initial Cumulative Run Time has been recorded
: 4. The 2/3A SBGT Initial Cumulative Run Time has been recorded.
. 5. There has been NO painting or operation of propane powered equipment in the power block in the last 72 hours.
: 5. There has been NO painting or operation of propane powered equipment in the power block in the last 72 hours.
INITIATING CUE
INITIATING CUE
: 1. The Unit 2 Supervisor has directed you to start the 2/3A SBGT train per DOP 7500
: 1. The Unit 2 Supervisor has directed you to start the 2/3A SBGT train per DOP 7500-01.
-01. 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.  


Page 1 of 10 Exelon Nuclear Job Performance Measure Lineup IAC to Unit 2 Instrument Air Header JPM Number:
Page 1 of 10 Exelon Nuclear Job Performance Measure Lineup IAC to Unit 2 Instrument Air Header JPM Number: S-N-i Revision Number: 00 Date: 02/16 Developed By:
S-N-i Revision Number:
Exam Author Date Approved By:
00 Date: 0 2/1 6          Developed By:
Facility Representative Date  
Exam Author Date   Approved By:
 
Facility Representative Date Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 2 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Page 2 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified. ________ 2. Knowledge and Abilities (K/A) references are included.
: 1.
________ 3. Performance location specified. (in
Task description and number, JPM description and number are identified.
-plant, control room, simulator, or other)
: 2.
________ 4. Initial setup conditions are identified.
Knowledge and Abilities (K/A) references are included.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
: 3.
________ 6. Task standards identified and verified by SME review.
Performance location specified. (in-plant, control room, simulator, or other)
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). ________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
: 4.
Procedure DOP 4700-03 Rev: 22 Procedure Rev:   Procedure Rev:   ________ 9. Verify cues both verbal and visual are free of conflict.
Initial setup conditions are identified.
________ 10. Verify performance time is accurate
: 5.
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. ________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Initiating cue (and terminating cue if required) are properly identified.
: 6.
Task standards identified and verified by SME review.
: 7.
Critical steps meet the criteria for critical steps and are identified with an asterisk
(*).
: 8.
Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOP 4700-03 Rev: 22 Procedure Rev:
Procedure Rev:
: 9.
Verify cues both verbal and visual are free of conflict.
: 10. Verify performance time is accurate
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date


SME / Instructor Date SME / Instructor Date SME / Instructor Date Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 3 of 10 Revision Record (Summary)
Page 3 of 10 Revision Record (Summary)
Revision 00 Created for ILT 15-1 (2016-301) NRC Exam
Revision 00 Created for ILT 15-1 (2016-301) NRC Exam.
.
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 4 of 10 SIMULATOR SETUP INSTRUCTIONS N/A: In-Plant JPM. DOCUMENT PREPARATION Provide a copy of DOP 4700-03, Unit 2/3 Instrument Air Cross
Page 4 of 10 SIMULATOR SETUP INSTRUCTIONS N/A: In-Plant JPM.
-Connect Operation to examinee
DOCUMENT PREPARATION Provide a copy of DOP 4700-03, Unit 2/3 Instrument Air Cross-Connect Operation to examinee.
.
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 5 of 10 INITIAL CONDITIONS
Page 5 of 10 INITIAL CONDITIONS
: 1. Unit 3 is shutdown for a refuel outage.
: 1. Unit 3 is shutdown for a refuel outage.
: 2. 2A IAC is unavailable due to an oil leak.
: 2. 2A IAC is unavailable due to an oil leak.
: 3. 2B, 3A, 3B, and 3C IACs are supplying their own unit
: 3. 2B, 3A, 3B, and 3C IACs are supplying their own unit.
. 4. Unit 2 is at 100% power and is experiencing an Instrument Air transient that is causing the Unit 2 Instrument Air header pressure to drop slowly.
: 4. Unit 2 is at 100% power and is experiencing an Instrument Air transient that is causing the Unit 2 Instrument Air header pressure to drop slowly.
: 5. The Unit Supervisor has determined a Unit 3 Instrument air compressor must be aligned to Unit 2
: 5. The Unit Supervisor has determined a Unit 3 Instrument air compressor must be aligned to Unit 2.
. 6. Unit 2 SAC is running.
: 6. Unit 2 SAC is running.
: 7. Main Control Room is monitoring IA parameters.
: 7. Main Control Room is monitoring IA parameters.
INITIATING CUE
INITIATING CUE
: 1. The Unit 2 Unit Supervisor has directed you to Cross-connect 3C Instrument Air Compressor to Unit 2 ONLY
: 1. The Unit 2 Unit Supervisor has directed you to Cross-connect 3C Instrument Air Compressor to Unit 2 ONLY.
. 2. All applicable prerequisites of DOP 4700
: 2. All applicable prerequisites of DOP 4700-03 have been met.
-03 have been met.
: 3. Your Pre Job Brief has been completed.
: 3. Your Pre Job Brief has been completed.
: 4. Notify the Unit Supervisor when you are complete with the task.
: 4. Notify the Unit Supervisor when you are complete with the task.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 6 of 10 The timeclock starts when the candidate acknowledges the initiating cue.
Page 6 of 10 The timeclock starts when the candidate acknowledges the initiating cue.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 7 of 10 JPM Start Time
Page 7 of 10 JPM Start Time: _________
: _________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment # Provide examinee a current copy of DOP 4700-03. 1. Identifies Step G.
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
9 as the correct step in DOP 4700
Provide examinee a current copy of DOP 4700-03.
-03. Proceeds to Step G.
: 1. Identifies Step G.9 as the correct step in DOP 4700-
: 9. _____        _____
: 03.
_____ 2. Verify closed 3
Proceeds to Step G.9.
-4799-501A, 3C IAC DISCH TO U
: 2. Verify closed 3-4799-501A, 3C IAC DISCH TO U-3 INST AIR HEADER ISOL VLV.
-3 INST AIR HEADER ISOL VLV. Verifies 3
Verifies 3-4799-501A, 3C IAC DISCH TO U-3 INST AIR HEADER ISOL VLV stem is in.
-4799-501A, 3C IAC DISCH TO U
(Valve is located above 3B IAC)
-3 INST AIR HEADER ISOL VLV stem is in.
CUE The component is in the position you described.  
(Valve is located above  
*3. Close 2/3-4799-424, U2/U3 X-TIE SV.
 
Rotates 2/3-4799-424, U2/U3 X-TIE SV clockwise until stem is in.
3B IAC)
(Valve is located North of 3A IAC)
_____        _____        _____
CUE The component is in the position you described.  
CUE The component is in the position you described.
*4. Open 2/3-4799-425, 3C IAC TO U2 AIR SYS X-TIE SV.
*3. Close 2/3-4799-424, U2/U3 X-TIE SV. Rotates 2/3-4799-424, U2/U3 X-TIE SV clockwise until stem is in. (Valve is located North of 3A IAC)
Rotates 2/3-4799-425, 3C IAC TO U2 AIR SYS X-TIE SV counter clockwise until stem is out.
 
(Valve is located North of 3A IAC)
_____        _____        _____
CUE The component is in the position you described.  
CUE The component is in the position you described. *4. Open 2/3-4799-425, 3C IAC TO U2 AIR SYS X
-TIE SV. Rotates 2/3
-4799-425, 3C IAC TO U2 AIR SYS X
-TIE SV counter clockwise until stem is out. (Valve is located North of 3A IAC)
_____        _____        _____
CUE The component is in the position you described.


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 8 of 10 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment # *5. Open 2-47350-500, U2 INST AIR SYS XTIE FROM THE U3 INST AIR SYS
Page 8 of 10 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #  
. Rotates 47350-500, U2 INST AIR SYS XTIE FROM THE U3 INST AIR SYS counter clockwise until stem is out. (Valve is located North of Cardox tank
*5. Open 2-47350-500, U2 INST AIR SYS XTIE FROM THE U3 INST AIR SYS.
)    _____        _____        _____ CUE The component is in the position you described.
Rotates 47350-500, U2 INST AIR SYS XTIE FROM THE U3 INST AIR SYS counter clockwise until stem is out.
*6. Open 2-47350-329, U2 INST AIR HDR ISOL VLV
(Valve is located North of Cardox tank)
. Rotates 2-47350-329, U2 INST AIR HDR ISOL VLV  
CUE The component is in the position you described.  
 
*6. Open 2-47350-329, U2 INST AIR HDR ISOL VLV.
counter clockwise until stem is out. (Valve is located North of 2B IAC)     _____        _____        _____
Rotates 2-47350-329, U2 INST AIR HDR ISOL VLV counter clockwise until stem is out.
(Valve is located North of 2B IAC)
CUE The component is in the position you described.
CUE The component is in the position you described.
: 7. Report completion of task to Unit Supervisor.
: 7. Report completion of task to Unit Supervisor.
Reports completion of task to Unit Supervisor.
Reports completion of task to Unit Supervisor.
_____        _____        _____
END JPM Stop Time:_________  
END JPM Stop Time
 
:_________
Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 9 of 10 Operator's Name:
Page 9 of 10 Operators Name:
Job Title:
Job
q RO q SRO JPM Title:
 
Align IACs to Unit 2 Instrument Air header Revision Number: 00 JPM Number:
==Title:==
S-N-i Task Number and Title: 278N 01 3 Lineup Unit 3 C Instrument Air Compressor to Unit 2 K/A Number and Importance: 295019.A1.02     3.3 / 3.1 Suggested Testing Environment:
q RO q SRO JPM
In-Plant Suggested Testing Environment:
 
q Simulator     Plant q Control Room Testing Method:
==Title:==
Simulate Alternate Path
Align IACs to Unit 2 Instrument Air header Revision Number: 00 JPM Number: S-N-i Task Number and
Yes No   Perform SRO Only: Yes No Time Critical:
 
Yes No Estimated Time to Complete:
==Title:==
_ 2 0__minutes  Actual Time Used:
278N013 Lineup Unit 3 C Instrument Air Compressor to Unit 2 K/A Number and Importance: 295019.A1.02 3.3 / 3.1 Suggested Testing Environment: In-Plant Suggested Testing Environment:
_______ minutes
q Simulator Plant q Control Room Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete:_ 20__minutes Actual Time Used: _______ minutes  


==References:==
==References:==
DOP 4700-03, Rev. 22 EVALUATION  
DOP 4700-03, Rev. 22 EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?
Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:               Evaluator's Name: ____________________________
Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
(Print)
Evaluator's Signature: ___________________________ Date: _________
Evaluators Signature: ___________________________ Date: _________  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 10 of 10 INITIAL CONDITIONS
Page 10 of 10 INITIAL CONDITIONS
: 1. Unit 3 is shutdown for a refuel outage.
: 1. Unit 3 is shutdown for a refuel outage.
: 2. 2A IAC is unavailable due to an oil leak. 3. 2B, 3A, 3B, and 3C IACs are supplying their own unit.
: 2. 2A IAC is unavailable due to an oil leak.
: 3. 2B, 3A, 3B, and 3C IACs are supplying their own unit.
: 4. Unit 2 is at 100% power and is experiencing an Instrument Air transient that is causing the Unit 2 Instrument Air header pressure to drop slowly.
: 4. Unit 2 is at 100% power and is experiencing an Instrument Air transient that is causing the Unit 2 Instrument Air header pressure to drop slowly.
: 5. The Unit Supervisor has determined a Unit 3 Instrument air compressor must be aligned to Unit 2.
: 5. The Unit Supervisor has determined a Unit 3 Instrument air compressor must be aligned to Unit 2.
Line 2,372: Line 2,450:
: 7. Main Control Room is monitoring IA parameters.
: 7. Main Control Room is monitoring IA parameters.
INITIATING CUE
INITIATING CUE
: 1. The Unit 2 Unit Supervisor has directed you to Cross
: 1. The Unit 2 Unit Supervisor has directed you to Cross-connect 3C Instrument Air Compressor to Unit 2 ONLY.
-connect 3C Instrument Air Compressor to Unit 2 ONLY .
: 2. All applicable prerequisites of DOP 4700-03 have been met.
: 2. All applicable prerequisites of DOP 4700
-03 have been met.
: 3. Your Pre Job Brief has been completed.
: 3. Your Pre Job Brief has been completed.
: 4. Notify the Unit Supervisor when you are complete with the task.
: 4. Notify the Unit Supervisor when you are complete with the task.  
 
Job Performance Measure (JPM)
Exelon Nuclear Job Performance Measure Bypass the Trip of Drywell Coolers JPM Number: S-N-j Revision Number: 10 Date: 02/16 Developed By:
Exam Author Date Approved By:
Facility Representative Date


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Exelon Nuclear Job Performance Measure Bypass the Trip of Drywell Coolers JPM Number:
S-N-j  Revision Number:
10  Date: 02/16        Developed By:
Exam Author Date  Approved By:
Facility Representative Date Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
: 1.
________ 2. Knowledge and Abilities (K/A) references are included.
Task description and number, JPM description and number are identified.
________ 3. Performance location specified. (in
: 2.
-plant, control room, simulator, or other)
Knowledge and Abilities (K/A) references are included.
________ 4. Initial setup conditions are identified.
: 3.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
Performance location specified. (in-plant, control room, simulator, or other)
________ 6. Task standards identified and verified by SME review.
: 4.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). ________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Initial setup conditions are identified.
Procedure DEOP 500-02 Rev: 16 Procedure Rev:   Procedure Rev:   ________ 9. Verify cues both verbal and visual are free of conflict.
: 5.
________ 10. Verify performance time is accurate
Initiating cue (and terminating cue if required) are properly identified.
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. ________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
: 6.
Task standards identified and verified by SME review.
: 7.
Critical steps meet the criteria for critical steps and are identified with an asterisk
(*).
: 8.
Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DEOP 500-02 Rev: 16 Procedure Rev:
Procedure Rev:
: 9.
Verify cues both verbal and visual are free of conflict.
: 10. Verify performance time is accurate
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date


SME / Instructor Date SME / Instructor Date        SME / Instructor Date Job Performance Measure (JPM)
Job Performance Measure (JPM)
Revision Record (Summary)
Revision Record (Summary)
Rev 08: Updated for the 2007 LORT exam Rev 09: Updated for the 2010 LORT exam Revision 10 Revised for ILT 15-1 (2016-301) NRC Exam.
Rev 08:
Updated for the 2007 LORT exam Rev 09:
Updated for the 2010 LORT exam Revision 10 Revised for ILT 15-1 (2016-301) NRC Exam.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
SIMULATOR SETUP INSTRUCTIONS N/A: In-Plant JPM. DOCUMENT PREPARATION Provide a clean copy of current revision of DEOP 0500
SIMULATOR SETUP INSTRUCTIONS N/A: In-Plant JPM.
-02, Bypassing Interlocks and Isolations to provide to examinee.
DOCUMENT PREPARATION Provide a clean copy of current revision of DEOP 0500-02, Bypassing Interlocks and Isolations to provide to examinee.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. A fire has occurred resulting in a loss of the feeder breakers to Busses 33
: 1. A fire has occurred resulting in a loss of the feeder breakers to Busses 33-1 AND 34-1 from Busses 33 AND 34.
-1 AND 34-1 from Busses 33 AND 34. 2. The Unit 3 and 2/3 Diesel Generators have started AND are powering Busses 33
: 2. The Unit 3 and 2/3 Diesel Generators have started AND are powering Busses 33-1 and 34-1.
-1 and 34-1. 3. The loss of Busses 33
: 3. The loss of Busses 33-1 AND 34-1 caused a spurious trip of the Unit 3 Drywell Coolers.
-1 AND 34-1 caused a spurious trip of the Unit 3 Drywell Coolers.
: 4. RBCCW pressure is normal with the 2/3 RBCCW pump in operation.
: 4. RBCCW pressure is normal with the 2/3 RBCCW pump in operation.
: 5. Drywell temperature and pressure are rising.
: 5. Drywell temperature and pressure are rising.
INITIATING CUE
INITIATING CUE
: 1. Unit Supervisor has directed you to perform the in
: 1. Unit Supervisor has directed you to perform the in-plant actions to bypass the Drywell Cooler trip signals to allow the restart of the Unit 3 Drywell Coolers for Drywell temperature control in accordance with DEOP 500-02.
-plant actions to bypass the Drywell Cooler trip signals to allow the restart of the Unit 3 Drywell Coolers for Drywell temperature control in accordance with DEOP 500
: 2. Your Pre Job Brief has been completed.
-02. 2. Your Pre Job Brief has been completed.
: 3. Notify the Unit Supervisor when the in-plant actions are complete.
: 3. Notify the Unit Supervisor when the in
-plant actions are complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
JPM Start Time
JPM Start Time: _________
: _________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment # Provide examinee a current copy of DEOP 500
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
-02. 1 Proceed to Step G.3 of procedure.
Provide examinee a current copy of DEOP 500-02.
Locates Step G.3
1 Proceed to Step G.3 of procedure.
_____        _____        _____
Locates Step G.3 NOTE The DEOP Equipment Storage Cabinet key must be obtained from the Unit Supervisor.
NOTE The DEOP Equipment Storage Cabinet key must be obtained from the Unit Supervisor.
NOTE Examinee should locate the proper Equipment Box in the cabinet. Tools required are:
NOTE Examinee should locate the proper Equipment Box in the cabinet. Tools required are:
Electrical Tape, Standard Straight Screwdriver, Split Blade Screwdriver, and Insulated Gloves NOTE Do NOT allow examinee to remove the Equipment Box from the DEOP Equipment Storage Cabinet.
Electrical Tape, Standard Straight Screwdriver, Split Blade Screwdriver, and Insulated Gloves NOTE Do NOT allow examinee to remove the Equipment Box from the DEOP Equipment Storage Cabinet.
Lock cabinet and return DEOP key to Unit Supervisor PRIOR to leaving the Control Room.
Lock cabinet and return DEOP key to Unit Supervisor PRIOR to leaving the Control Room.
2 Obtain appropriate Equipment Box from the Control Room DEOP Equipment Storage Cabinet. OBTAINS appropriate EQUIPMENT BOX from the Control Room DEOP Equipment Storage Cabinet.
2 Obtain appropriate Equipment Box from the Control Room DEOP Equipment Storage Cabinet.
_____        _____        _____
OBTAINS appropriate EQUIPMENT BOX from the Control Room DEOP Equipment Storage Cabinet.
CUE DEOP Equipment Box you have identified is in your hand.
CUE DEOP Equipment Box you have identified is in your hand.
NOTE DS key is required for entry into the AEER 3 Proceed to the AEER and panel 903-32. Locates Panel 903
NOTE DS key is required for entry into the AEER 3 Proceed to the AEER and panel 903-32.
-32. _____        _____        _____
Locates Panel 903-32.
NOTE Simulated JPM  
NOTE Simulated JPM - Examinee must explain the task.  
- Examinee must explain the task.


Job Performance Measure (JPM)
Job Performance Measure (JPM)
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment # *4 Lift AND tape lead on 903-32 panel terminal block AA terminal point 6 OR terminal point 7.
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #  
On 903-32 panel terminal block AA terminal point 6 OR terminal point 7
*4 Lift AND tape lead on 903-32 panel terminal block AA terminal point 6 OR terminal point 7.
* Puts on insulated gloves.
On 903-32 panel terminal block AA terminal point 6 OR terminal point 7 Puts on insulated gloves.
* Loosens screw with standard screwdriver
Loosens screw with standard screwdriver.
.
Uses split blade screwdriver to grasp screw and remove it.
* Uses split blade screwdriver to grasp screw and remove it
Tapes the loose wire with electricians tape.
.
CUE 903-32 panel terminal block AA terminal point 6 OR terminal point 7 screw is removed and the loose wire is taped.  
* Tapes the loose wire with electricians tape
*5 Lift AND tape lead on 903-33 panel terminal block AA terminal point 6 OR terminal point 7.
.
On 903-33 panel terminal block AA terminal point 6 OR terminal point 7 Puts on insulated gloves.
_____        _____        _____
Loosens screw with standard screwdriver.
CUE 903-32 panel terminal block AA terminal point 6 OR terminal point 7 screw is removed and the loose wire is taped.
Uses split blade screwdriver to grasp screw and remove it.
*5 Lift AND tape lead on 903-33 panel terminal block AA terminal point 6 OR terminal point 7.
Tapes the loose wire with electricians tape.
On 903-33 panel terminal block AA terminal point 6 OR terminal point 7
CUE 903-33 panel terminal block AA terminal point 6 OR terminal point 7 screw is removed and the loose wire is taped.
* Puts on insulated gloves.
6 Notify Unit Supervisor upon completion of task.
* Loosens screw with standard screwdriver
.
* Uses split blade screwdriver to grasp screw and remove it
.
* Tapes the loose wire with electricians tape
.
_____        _____        _____
CUE 903-33 panel terminal block AA terminal point 6 OR terminal point 7 screw is removed and the loose wire is taped. 6 Notify Unit Supervisor upon completion of task.
Notifies Unit Supervisor upon completion of task.
Notifies Unit Supervisor upon completion of task.
_____        _____        _____
CUE Acknowledge report of task completion.
CUE Acknowledge report of task completion.
END   JPM Stop Time
END JPM Stop Time:_________  
:_________
 
Job Performance Measure (JPM)
Job Performance Measure (JPM)
Operator's Name:
Operators Name: ___________________________________
________________
Job
___________________
Job Title:
q RO q SRO JPM Title:
Bypass the Trip of Drywell Coolers Revision Number:
10 JPM Number:
S-N-j  Task Number and Title: 295L074, Bypass the Trip of Drywell Coolers.
K/A Number and Importance: 295028
.A1.03    3.9 / 3.9  Suggested Testing Environment:
q Simulator    Plant q Control Room


Testing Method:
==Title:==
Simulate Alternate Path
q RO q SRO JPM
:  Yes  No  Perform SRO Only:  Yes  No Time Critical:
Yes  No Estimated Time to Complete:
15      minutes    Actual Time Used: _______
minutes 


==References:==
==Title:==
Bypass the Trip of Drywell Coolers Revision Number: 10 JPM Number: S-N-j Task Number and


DEOP 500-02, Rev 16
==Title:==
295L074, Bypass the Trip of Drywell Coolers.
K/A Number and Importance: 295028.A1.03 3.9 / 3.9 Suggested Testing Environment:
q Simulator Plant q Control Room Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 15 minutes Actual Time Used: _______ minutes


EVALUATION  
==References:==
DEOP 500-02, Rev 16 EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily? Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be:
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Satisfactory Unsatisfactory Comments:
Evaluator's Name: ____________________________
Evaluators Name: ____________________________
(Print) Evaluator's Signature: ___________________________ Date: _________
(Print)
Evaluators Signature: ___________________________ Date: _________  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 9 of 9 INITIAL CONDITIONS
Page 9 of 9 INITIAL CONDITIONS
: 1. A fire has occurred resulting in a loss of the feeder breakers to Busses 33
: 1. A fire has occurred resulting in a loss of the feeder breakers to Busses 33-1 AND 34-1 from Busses 33 AND 34.
-1 AND 34-1 from Busses 33 AND 34. 2. The Unit 3 and 2/3 Diesel Generators have started AND are powering Busses 33
: 2. The Unit 3 and 2/3 Diesel Generators have started AND are powering Busses 33-1 and 34-1.
-1 and 34-1. 3. The loss of Busses 33
: 3. The loss of Busses 33-1 AND 34-1 caused a spurious trip of the Unit 3 Drywell Coolers.
-1 AND 34-1 caused a spurious trip of the Unit 3 Drywell Coolers. 4. RBCCW pressure is normal with the 2/3 RBCCW pump in operation.
: 4. RBCCW pressure is normal with the 2/3 RBCCW pump in operation.
: 5. Drywell temperature and pressure are rising.
: 5. Drywell temperature and pressure are rising.
INITIATING CUE
INITIATING CUE
: 1. Unit Supervisor has directed you to perform the in
: 1. Unit Supervisor has directed you to perform the in-plant actions to bypass the Drywell Cooler trip signals to allow the restart of the Unit 3 Drywell Coolers for Drywell temperature control in accordance with DEOP 500-02.
-plant actions to bypass the Drywell Cooler trip signals to allow the restart of the Unit 3 Drywell Coolers for Drywell temperature control in accordance with DEOP 500
: 2. Your Pre-Job Brief has been completed.
-02. 2. Your Pre-Job Brief has been completed.
: 3. Notify the Unit Supervisor when the in-plant actions are complete  
: 3. Notify the Unit Supervisor when the in
-plant actions are complete


Page 1 of 11 Exelon Nuclear Job Performance Measure Swap CRD Flow Control Valves JPM Number:
Page 1 of 11 Exelon Nuclear Job Performance Measure Swap CRD Flow Control Valves JPM Number: S-N-k Revision Number: 15 Date: 02/16 Developed By:
S-N-k Revision Number: 15 Date: 02/16           Developed By:
Exam Author Date Approved By:
Exam Author Date   Approved By:
Facility Representative Date  
Facility Representative Date Job Performance Measure (JPM)
 
Page 2 of 11 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Job Performance Measure (JPM)
Page 2 of 11 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
: 1.
________ 2. Knowledge and Abilities (K/A) references are included.
Task description and number, JPM description and number are identified.
________ 3. Performance location specified. (in
: 2.
-plant, control room, simulator, or other)
Knowledge and Abilities (K/A) references are included.
________ 4. Initial setup conditions are identified.
: 3.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
Performance location specified. (in-plant, control room, simulator, or other)
________ 6. Task standards identified and verified by SME review.
: 4.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). ________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Initial setup conditions are identified.
Procedure DOP 0300-03 Rev: 25 Procedure Rev:   Procedure Rev:   ________ 9. Verify cues both verbal and visual are free of conflict.
: 5.
________ 10. Verify performance time is accurate
Initiating cue (and terminating cue if required) are properly identified.
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. ________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
: 6.
Task standards identified and verified by SME review.
: 7.
Critical steps meet the criteria for critical steps and are identified with an asterisk
(*).
: 8.
Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOP 0300-03 Rev: 25 Procedure Rev:
Procedure Rev:
: 9.
Verify cues both verbal and visual are free of conflict.
: 10. Verify performance time is accurate
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date


SME / Instructor Date SME / Instructor Date SME / Instructor Date Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 3 of 11   Revision Record (Summary)
Page 3 of 11 Revision Record (Summary)
Revision 14 Updated for the 2007 LORT exam.
Revision 14 Updated for the 2007 LORT exam.
Revision 15 Revised for ILT 15
Revision 15 Revised for ILT 15-1 (2016-301) NRC Exam.  
-1 (2016-301) NRC Exam.


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 4 of 11 SIMULATOR SETUP INSTRUCTIONS:
Page 4 of 11 SIMULATOR SETUP INSTRUCTIONS:
N/A: In-Plant JPM. DOCUMENT PREPARATION Provide a copy of DOP 0300-03, CRD System Flow Control Valve Transfer, to provide to examinee.
N/A: In-Plant JPM.
DOCUMENT PREPARATION Provide a copy of DOP 0300-03, CRD System Flow Control Valve Transfer, to provide to examinee.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Line 2,557: Line 2,645:
: 3. The Unit Supervisor has reviewed the TRM and has taken required actions.
: 3. The Unit Supervisor has reviewed the TRM and has taken required actions.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to perform the in
: 1. The Unit Supervisor has directed you to perform the in-plant actions to transfer Unit 2 CRD FCVs, placing the 2B CRD FCV in service in "Automatic" per DOP 0300-03.
-plant actions to transfer Unit 2 CRD FCVs, placing the 2B CRD FCV in service in "Automatic" per DOP 0300
: 2. Prerequisites have been met.
-03. 2. Prerequisites have been met.
: 3. Your Pre-Job Brief is complete.
: 3. Your Pre-Job Brief is complete.
: 4. Notify the Unit Supervisor upon completion of in
: 4. Notify the Unit Supervisor upon completion of in-plant actions.
-plant actions.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information for Evaluator's Use:
Information for Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
* Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The time clock starts when the candidate acknowledges the initiating cue.
The time clock starts when the candidate acknowledges the initiating cue.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 6 of 11 JPM Start Time
Page 6 of 11 JPM Start Time: _________
: _________ PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment # 1. Proceed to Unit 2 CRD Flow Control Valves (FCVs) and establish communications with the control room.
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
: 1. Proceed to Unit 2 CRD Flow Control Valves (FCVs) and establish communications with the control room.
CRD FCVs located and communications established with control room.
CRD FCVs located and communications established with control room.
_______        ______      _____
NOTE Step G.2 is N/A.
NOTE Step G.2 is N/A.
: 2. Verify OPEN 2
: 2. Verify OPEN 2-0301-30, U2 CRD SYS FCV CONT AIR PRV ISOL VLV.
-0301-30, U2 CRD SYS FCV CON T AIR PRV ISOL VLV.
Verifies 2-0301-30 stem/handwheel backed out.
Verifies 2
-0301-30 stem/handwheel backed out.
_______        ______      _____
CUE Valve 2-0301-30 stem/ handwheel is backed out.
CUE Valve 2-0301-30 stem/ handwheel is backed out.
: 3. Verify OPEN 2
: 3. Verify OPEN 2-0301-144B, U2 CRD SYS FCV 2-0302-6B AIR ISOL VLV.
-0301-144B, U2 CRD SYS FCV 2
Verifies 2-0301-144B valve stem/handwheel backed out.
-0302-6B AIR ISOL VLV.
Verifies 2
-0301-144B valve stem/handwheel backed out.
_______        ______      _____
CUE Valve 2-0301-144B stem/handwheel is backed out.
CUE Valve 2-0301-144B stem/handwheel is backed out.
: 4. Verify OPEN 2
: 4. Verify OPEN 2-0301-40B, U2 CRD SYS B FCV INLET VLV.
-0301-40B, U2 CRD SYS B FCV INLET VLV.
Verifies 2-0301-40B valve stem/handwheel backed out.
Verifies 2
-0301-40B valve stem/handwheel backed out.
_______        ______      _____
CUE Valve 2-0301-40B stem/handwheel is backed out.
CUE Valve 2-0301-40B stem/handwheel is backed out.
: 5. Cycle the 2B FCV full open and full closed by adjusting PRV 2-0301-34 locally.
: 5. Cycle the 2B FCV full open and full closed by adjusting PRV 2-0301-34 locally.
Adjusts PRV 2
Adjusts PRV 2-0301-34 locally to cycle 2B FCV.
-0301-34 locally to cycle 2B FCV.
Verifies cycling by observing stem position and/or light indication on the CRD FCV electrical transfer station.
Verifies cycling by observing stem position and/or light indication on the CRD FCV electrical transfer station.
 
CUE 2B FCV cycles full open and then full closed.  
_______        ______      _____
CUE 2B FCV cycles full open and then full closed.


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 7 of 11 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment # NOTE The Unit Supervisor has addressed the TRM per the Initial Conditions (addresses note preceding G.5 of DOP).
Page 7 of 11 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
: 6. Verify PRV 2
NOTE The Unit Supervisor has addressed the TRM per the Initial Conditions (addresses note preceding G.5 of DOP).
-0301-34 closed. Verifies PRV 2
: 6. Verify PRV 2-0301-34 closed.
-0301-34 valve stem backed out and turning freely. _______        ______      _____
Verifies PRV 2-0301-34 valve stem backed out and turning freely.
CUE PRV 2-0301-34 valve stem is backed out and turning freely.
CUE PRV 2-0301-34 valve stem is backed out and turning freely.
: 7. Verify Pressure gauge PI 2-0302-60 indicates 0 psig.
: 7. Verify Pressure gauge PI 2-0302-60 indicates 0 psig.
Verifies pressure gauge PI 2
Verifies pressure gauge PI 2-0302-60 reading 0 psig.
-
0302-60 reading 0 psig.
_______        ______      _____
CUE After examinee locates and observes the indicator, then cue:
CUE After examinee locates and observes the indicator, then cue:
PI 2-0302-60 is reading 0 psig.
PI 2-0302-60 is reading 0 psig.
: 8. Verify via U2 NSO that CRD FCV Controller in MANUAL and demand is set to minimum.
: 8. Verify via U2 NSO that CRD FCV Controller in MANUAL and demand is set to minimum.
Calls U2 NSO to verify CRD FCV Controller configuration
Calls U2 NSO to verify CRD FCV Controller configuration CUE The Unit 2 CRD Flow Controller is in MANUAL and demand is set to minimum.  
_______        ______      _____
*9. At CRD Electrical Transfer, place the transfer switch TS160 to the "Valve B" position to place FCV 2-0302-6B in service.
CUE The Unit 2 CRD Flow Controller is in MANUAL and demand is set to minimum.
At CRD Electrical Transfer Station, places the transfer switch to the "Valve B" position to place FCV 2-0302-6B in service CUE The transfer switch is in the "Valve B" position.  
*9. At CRD Electrical Transfer, place the transfer switch TS160 to the "Valve B" position to place FCV 2-0302-6B in service.
*10. Select the 2B E/P converter by placing U2 CRD SYS FCV A/B SELECTOR VLV 2-0301-29 to B.
At CRD Electrical Transfer Station, places the transfer switch to the "Valve B" position to place FCV 2
Selects the 2B E/P converter by placing 2-0301-29 to B.  
-0302-6B in service
_______        ______      _____
CUE The transfer switch is in the "Valve B" position.
*10. Select the 2B E/P converter by placing U2 CRD SYS FCV A/B SELECTOR VLV 2
-0301-29 to 'B".
Selects the 2B E/P converter by placing 2
-0301-29 to "B".
 
_______        ______      _____


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 8 of 11 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment # CUE The 2-0301-29 Unit 2 CRD MANUAL E/P SELECTOR VALVE is in the 'B' position.
Page 8 of 11 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
CUE The 2-0301-29 Unit 2 CRD MANUAL E/P SELECTOR VALVE is in the B position.
Examiner Note:
Examiner Note:
On valves 2
On valves 2-0301-37 and 2-0301-38 an arrow is embossed on the handle. The shorter end of the handle and arrow point to the in service position of the valve.  
-0301-37 and 2-0301-38 an arrow is embossed on the handle. The shorter end of the handle and arrow point to the in service position of the valve.
*11. Place U2 CRD SYS FCV 2-0302-6B MAN/AUTO SELECTOR VLV, 2-0301-38, switch to the automatic position.
*11. Place U2 CRD SYS FCV 2-0302-6B MAN/AUTO SELECTOR VLV, 2
Places 2-0302-6B selector switch to the automatic position.
-0301-38, switch to the automatic position. Places 2-0302-6B selector switch to the automatic position. _______        ______      _____
CUE 2-0302-6B selector switch is in automatic.  
CUE 2-0302-6B selector switch is in automatic.
*12. Place the U2 CRD SYS FCV 2-0302-6A MAN/AUTO SELECTOR VLV, 2-0301-37, to the manual position.
*12. Place the U2 CRD SYS FCV 2-0302-6A MAN/AUTO SELECTOR VLV, 2-0301-37, to the manual position. Places the 2
Places the 2-0302-6A selector switch to the manual position.
-0302-6A selector switch to the manual position.
CUE The 2-0302-6A selector switch is in manual.  
 
*13. Open 2-0301-41B, U2 CRD SYS A/B FCV OUTLET VLV.
_______        ______      _____
CUE The 2-0302-6A selector switch is in manual.
*13. Open 2-0301-41B, U2 CRD SYS A/B FCV OUTLET VLV.
Opens 2-0301-41B valve.
Opens 2-0301-41B valve.
Full CCW, stem/handwhee l
Full CCW, stem/handwheel backed out.
backed out.
_______        ______      _____
CUE The 2-0301-41B valve is full CCW, stem/handwheel backed out.
CUE The 2-0301-41B valve is full CCW, stem/handwheel backed out.
: 14. Notify Unit NSO that the 2B CRD FCV can now be controlled from the 902
: 14. Notify Unit NSO that the 2B CRD FCV can now be controlled from the 902-5 Panel AND that system flow should be adjusted to maintain stable flow rate.
-5 Panel AND that system flow should be adjusted to maintain stable flow rate.
Notifies Unit NSO of 2B CRD FCV status and directs Unit NSO to adjust system flow rate to maintain stable flow.
Notifies Unit NSO of 2B CRD FCV status and directs Unit NSO to adjust system flow rate to maintain stable flow.
_______        ______      _____
CUE Acknowledge report of CRD FCV Status and report that system flow has been adjusted to maintain stable flow rate.  
CUE Acknowledge report of CRD FCV Status and report that system flow has been adjusted to maintain stable flow rate.


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 9 of 11 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment # *15. Slowly close 2
Page 9 of 11 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #  
-0301-41A, U2 CRD SYS A/B FCV OUTLET VLV.
*15. Slowly close 2-0301-41A, U2 CRD SYS A/B FCV OUTLET VLV.
Closes 2-0301-41A valve slowly (full CW or stem/
Closes 2-0301-41A valve slowly (full CW or stem/
handwheel in).
handwheel in).
_______        ______      _____
CUE The 2-0301-41A valve stem/handwheel is full CW or in.
CUE The 2-0301-41A valve stem/handwheel is full CW or in.
: 16. Notifies Unit Supervisor of completion of in
: 16. Notifies Unit Supervisor of completion of in-plant actions per DOP and that the remaining steps are from the 902-5 panel.
-plant actions per DOP and that the remaining steps are from the 902
Unit Supervisor notified of completion of in-plant actions.
-5 panel. Unit Supervisor notified of completion of in
CUE Acknowledge report of task completion.
-plant actions.
END JPM Stop Time:_________


_______        ______      _____
CUE Acknowledge report of task completion.
EN D  JPM Stop Time
:_________
Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 10 of 11 Operator's Name:
Page 10 of 11 Operators Name: ___________________________________
___________________________________
Job
Job Title:
 
r RO  rSRO JPM Title:
==Title:==
Swap CRD Flow Control Valves Revision Number: 15 JPM Number:
rRO rSRO JPM
S-N-k Task Number and Title: 201L011, Respond to a CRD Flow Control Valve Failure K/A Number and Importance: 201001
 
.A4.03     2.9/2.8 Suggested Testing Environment:
==Title:==
In-Plant Suggested Testing Environment:
Swap CRD Flow Control Valves Revision Number: 15 JPM Number: S-N-k Task Number and
q Simulator     Plant q Control Room Testing Method:
 
Simulate Alternate Path
==Title:==
Yes No   Perform SRO Only: Yes No Time Critical:
201L011, Respond to a CRD Flow Control Valve Failure K/A Number and Importance: 201001.A4.03 2.9/2.8 Suggested Testing Environment: In-Plant Suggested Testing Environment:
Yes No Estimated Time to Complete:
q Simulator Plant q Control Room Testing Method:
_ 2 3__ minutes   Actual Time Used: _______
Simulate Alternate Path:
minutes
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: _ 23__ minutes Actual Time Used: _______ minutes  


==References:==
==References:==
DOP 0300-03, Rev. 25 EVALUATION  
DOP 0300-03, Rev. 25 EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?
Yes No The operator's performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
 
Satisfactory Unsatisfactory Comments:
Comments:                 Evaluator's Name: ____________________________
Evaluators Name: ____________________________
(Print)
(Print)
Evaluator's Signature: ___________________________ Date: _________
Evaluators Signature: ___________________________ Date: _________  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Line 2,710: Line 2,760:
: 4. The Unit Supervisor has reviewed the TRM and has taken required actions.
: 4. The Unit Supervisor has reviewed the TRM and has taken required actions.
INITIATING CUE
INITIATING CUE
: 1. The Unit Supervisor has directed you to perform the in
: 1. The Unit Supervisor has directed you to perform the in-plant actions to transfer Unit 2 CRD FCVs, placing the 2B CRD FCV in service in "Automatic" per DOP 0300-03.
-plant actions to transfer Unit 2 CRD FCVs, placing the 2B CRD FCV in service in "Automatic" per DOP 0300
: 2. Prerequisites have been met.
-03. 2. Prerequisites have been met.
: 3. Your Pre-Job Brief is complete.
: 3. Your Pre-Job Brief is complete.
: 4. Notify the Unit Supervisor upon completion of in
: 4. Notify the Unit Supervisor upon completion of in-plant actions.}}
-plant actions.}}

Latest revision as of 08:41, 9 January 2025

2016 Dresden Nuclear Station Initial License Examination As-Administered JPMs
ML17128A181
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 09/01/2016
From: Chuck Zoia
Exelon Generation Co
To:
NRC/RGN-III/DRS/OLB
Shared Package
ML16257A680 List:
References
Download: ML17128A181 (170)


Text

Exelon Nuclear Job Performance Measure VERIFY STANDBY LIQUID CONTROL HEATER SURVEILLANCE JPM Number: A-N-1-R Revision Number: 01 Date: 02/16 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

A-N-1-R Page 2 of 7 Revision Record (Summary)

Revision 00 New JPM developed for 2009 NRC Exam.

Revision 01 Revised for ILT 15-1 (2016-301) NRC Exam.

Job Performance Measure (JPM)

A-N-1-R Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS

1.

This is a tabletop JPM utilizing simulator procedures.

2.

No Simulator setup needed.

DOCUMENT PREPARATION

1. Markup a copy of DOS 1100-02.

Job Performance Measure (JPM)

A-N-1-R Page 4 of 7 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. DOS 1100-02 was performed last shift.
3. The EO reported all surveillance requirements were within specifications.

INITIATING CUE

1. The Unit Supervisor has directed you to verify all requirements are within specifications, and paperwork is correct.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

A-N-1-R Page 5 of 7 JPM Start Time: _________

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:

Provide the examinee with the provided copy of DOS 1100-02.

  • 1.

Student should identify step I.4 should NOT have been initialed.

Identifies that step should NOT have been initialed.

  • 2.

Student should identify step I.9.g should NOT have been N/Ad.

Identifies that step should NOT have been N/Ad.

3.

Notify Unit Supervisor of discrepancies.

Notifies Unit Supervisor, to verify/correct issues.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

Job Performance Measure (JPM)

A-N-1-R Page 6 of 7 Operators Name:

Job

Title:

RO JPM

Title:

VERIFY STANDBY LIQUID CONTROL HEATER SURVEILLANCE Revision Number: 01 JPM Number: A-N-1-R Task Number and

Title:

299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedures.

K/A Number and Importance: Generic.2.1.18 3.6 / 3.8 Suggested Testing Environment: Simulator Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path:

Yes No Perform SRO Only:

Yes No Time Critical:

Yes No Estimated Time to Complete: 20 Actual Time Used:

minutes

References:

DOS 1100-02, rev 17 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

Job Performance Measure (JPM)

A-N-1-R Page 7 of 7 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. DOS 1100-02 was performed last shift.
3. The EO reported all surveillance requirements were within specifications.

INITIATING CUE

1. The Unit Supervisor has directed you to verify all requirements are within specifications, and paperwork is correct.
2. Inform the Unit Supervisor when the task is complete.

Exelon Nuclear Job Performance Measure DETERMINE ISOLATION POINTS FOR CLEARANCE ORDER JPM Number: A-N-2-R Revision Number: 00 Date: 02/16 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

A-N-2-R Page 2 of 10 Revision Record (Summary)

Revision 00 New JPM developed for ILT 15-1 (2016-301) NRC Exam.

Job Performance Measure (JPM)

A-N-2-R Page 3 of 10 SIMULATOR SETUP INSTRUCTIONS

1.

This is a tabletop JPM utilizing simulator procedures.

2.

Pull up prints M-15 Sheet 1, M-16, and M-3658 Sheet 1 on Large TV in simulator.

3.

Turn TV screen off.

DOCUMENT PREPARATION

1. Copy of M-15 Sheet 1.
2. Copy of M-16.
3. Copy of OP-AA-109-101.
4. Copy of OP-DR-109-1001.

Job Performance Measure (JPM)

A-N-2-R Page 4 of 10 INITIAL CONDITIONS

1. You are an Extra NSO.
2. Unit 2 is at 500 MWe.
3. 2C Condensate/Condensate Booster pump requires removal from service due to a leak.
4. Vent and Drain paths do NOT require manipulation.
5. Condensate/Condensate Booster Pump seal isolation is not required.
6. Hydrogen Addition injection isolation is not required.
7. Passport is not available, but is expected to return this shift.
8. The Unit NSO has procured controlled copies of the required prints and the revisions have been verified.
9. Authorization for an EXCEPTIONAL clearance order has been given if necessary.
10. Other NSOs are tasked with determining electrical and air isolations.

INITIATING CUE

1. The Unit Supervisor has directed you to determine the isolation points necessary to remove ONLY the 2C Condensate and 2C Condensate Booster pump from the condensate header.
2. Record recommended Isolation Points and Required Positions on the sheet provided.
3. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Job Performance Measure (JPM)

A-N-2-R Page 5 of 10 Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

A-N-2-R Page 6 of 10 JPM Start Time: _________

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:

Provide the examinee with the provided copy of M-15 Sheet 1 and M-16.

If the examinee requests Clearance and Tagging procedures, they may be provided.

The following steps may be performed in any order

1.

Candidate identifies 2C Condensate/Condensate Booster pump on M-15 Sheet

1.

Candidate correctly locates and identifies 2C Condensate/Condensate Booster pump on M-15 Sheet 1.

  • 2.

Candidate determines isolation points and required positions for 2C condensate pump Candidate identifies the following valves are necessary isolation points for 2C Condensate pump:

(Located on M-15 Sht. 1) 2-3301-C-500 (Closed) 2-3302-C-500 (Closed)

  • 3.

Candidate determines isolation points and required positions for 2C condensate booster pump Candidate identifies the following valves are necessary isolation points for 2C Condensate pump:

2-3305-C-500 (Closed)

(Located on M-15 Sht. 1) 2-3401-C-500 (Closed)

(Located on M-16)

Job Performance Measure (JPM)

A-N-2-R Page 7 of 10 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment

4.

Completes worksheet with EPN and required hang position.

Notifies Unit Supervisor, to verify/correct issues.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

Job Performance Measure (JPM)

A-N-2-R Page 8 of 10 Operators Name:

Job

Title:

RO JPM

Title:

DETERMINE ISOLATION POINTS FOR CLEARANCE ORDER Revision Number: 00 JPM Number: A-N-2-R Task Number and

Title:

299L012 Determine points of isolation in order to remove a piece of equipment from service.

K/A Number and Importance: Generic.2.2.41 3.5/3.9 Suggested Testing Environment: Simulator Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path:

Yes No Perform SRO Only:

Yes No Time Critical:

Yes No Estimated Time to Complete: 15 Actual Time Used:

minutes

References:

OP-AA-109-101 Rev. 10, OP-DR-109-101-1001 Rev. 10, M-15 Sheet 1 Rev. M, M-16 Rev. AP EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

Job Performance Measure (JPM)

A-N-2-R Page 9 of 10 INITIAL CONDITIONS

1. You are an Extra NSO.
2. Unit 2 is at 500 MWe.
3. 2C Condensate/Condensate Booster pump requires removal from service due to a leak.
4. Vent and Drain paths do NOT require manipulation.
5. Condensate/Condensate Booster Pump seal isolation is not required.
6. Hydrogen Addition injection isolation is not required.
7. Passport is not available, but is expected to return this shift.
8. The Unit NSO has procured controlled copies of the required prints and the revisions have been verified.
9. Authorization for an EXCEPTIONAL clearance order has been given if necessary.
10. Other NSOs are tasked with determining electrical and air isolations.

INITIATING CUE

1. The Unit Supervisor has directed you to determine the isolation points necessary to remove ONLY the 2C Condensate and 2C Condensate Booster pump from the condensate header.
2. Record recommended Isolation Points and Required Positions on the sheet provided.
3. Inform the Unit Supervisor when the task is complete.

Job Performance Measure (JPM)

A-N-2-R Page 10 of 10 EPN Hang Position

Exelon Nuclear Job Performance Measure PERFORM CCSW ACTIVITY CALCULATION JPM Number: A-N-3-R Revision Number: 02 Date: 02/16 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

A-N-3-R Page 2 of 7 Revision Record (Summary)

Revision 00 New JPM.

Revision 01 Revised for 2010 NRC exam.

Revision 02 Revised for ILT 15-1 (2016-301) NRC Exam.

Job Performance Measure (JPM)

A-N-3-R Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS

1.

This is a tabletop JPM utilizing simulator procedures.

2.

No Simulator setup needed.

3.

Ensure a calculator is available and the memory/display has been cleared.

DOCUMENT PREPARATION

1. Provide a marked up copy of DOS 1500-08.

Job Performance Measure (JPM)

A-N-3-R Page 4 of 7 INITIAL CONDITIONS

1. You are an extra NSO.
2. The Unit 2 NSO started DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI)

HEAT EXCHANGER DURING CCSW PUMP OPERATIONS then had to leave shift for medical reasons.

3. Only the A CCSW Heat Exchanger is going to be placed in service.

INITIATING CUE

1. Complete the performance of DOS 1500-08.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

A-N-3-R Page 5 of 7 JPM Start Time: _________

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:

Provide the examinee with the provided copy of DOS 1500-08.

The following steps can be performed in any order.

If examinee states to stop, due to errors, inform him/her to continue calculations.

  • 1.

Examinee calculates Dilution flow (1,017,000 gpm).

See attached key.

2.

Examinee enters dilution flow (from above) to calculate CCSW Activity Limit.

See attached key.

  • 3.

Examinee calculates CCSW Activity Limit (2.91 x 10-5).

See attached key.

  • 4.

Examinee verifies CCSW Heat Exchanger A sample activity is less than or equal to the calculated CCSW activity limit Examinee determines CCSW Heat Exchanger A sample activity is greater than or equal to the calculated CCSW activity limit

5.

Recommends to the Unit Supervisor that the calculated sample limit exceeds the allowable discharge.

Makes recommendation to Unit Supervisor.

6.

Informs Unit Supervisor task is complete.

Examinee notifies the Unit Supervisor.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

Job Performance Measure (JPM)

A-N-3-R Page 6 of 7 Operators Name:

Job

Title:

RO JPM

Title:

PERFORM CCSW ACTIVITY CALCULATION Revision Number: 02 JPM Number: A-N-3-R Task Number and

Title:

277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance.

K/A Number and Importance: Generic.2.3.11 3.8 / 4.3 Suggested Testing Environment: Simulator Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path:

Yes No Perform SRO Only:

Yes No Time Critical:

Yes No Estimated Time to Complete: 15 Actual Time Used:

minutes

References:

DOS 1500-08, rev 17 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

Job Performance Measure (JPM)

A-N-3-R Page 7 of 7 INITIAL CONDITIONS

1. You are an extra NSO.
2. The Unit 2 NSO started DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS then had to leave shift for medical reasons.
3. Only the A CCSW Heat Exchanger is going to be placed in service.

INITIATING CUE

1. Complete the performance of DOS 1500-08.
2. Inform the Unit Supervisor when the task is complete.

Exelon Nuclear Job Performance Measure DETERMINE ACTIONS FOR A FIRE JPM Number: A-N-4-R Revision Number: 01 Date: 02/16 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

A-N-4-R Page 2 of 8 Revision Record (Summary)

Revision 00 New JPM for ILT 12-1 (2013-301) NRC Exam.

Revision 01 Revised for ILT 15-1 (2016-301) NRC Exam.

Job Performance Measure (JPM)

A-N-4-R Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS

1.

This is a tabletop JPM utilizing simulator procedures.

2.

No Simulator setup needed.

DOCUMENT PREPARATION

1. Provide a copy of DOA 0010-10 and DOA 0010-S1.

Job Performance Measure (JPM)

A-N-4-R Page 4 of 8 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A fire is burning at the Lift Station, no explosion has occurred.
3. The fire has been classified as a major fire.
4. Hazmat and rescue response are not required.
5. The Fire brigade has been alerted and is attempting to combat the fire unsuccessfully.
6. A dedicated outside line is not available.

INITIATING CUE

1. The Unit supervisor has directed you to enter and execute DOA 0010-10, FIRE-EXPLOSION through step D.3.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

A-N-4-R Page 5 of 8 JPM Start Time: _________

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:

Provide the examinee with the supplied copy of DOA 0010-10.

Provide the examinee with the supplied copy of DOA 0010-S1 when requested.

  • 1.

Notify Coal City Fire Protection District. (Refer to DOA 0010-S1, Key Phone Numbers for DOA 0010 Block Procedures.)

From DOA 0010-S1 determines that 815-942-0336 is the number needed to contact the CCFPD.

  • 2.

Dial 815-942-0336 and communicate the details of the fire.

Dials 815-942-0336 and communicates the details of the fire:

Location of fire Assistance is required CUE:

If requested by the examinee, the TSO (NORTH and SOUTH) cannot contact the Coal City Fire Department because they are currently dealing with grid instabilities.

3.

Notifies TSO via direct line for major fire.

Notifies the TSO from a control room phone using the TSO direct line button and provides call back phone number.

4.

Notify Security Shift Supervisor that outside fire department will be responding AND request assistance in providing access to affected area if necessary.

Notifies the Security Shift Supervisor that the CCFPD will be responding to the Lift Station.

5.

Informs Unit Supervisor task is complete.

Examinee notifies the Unit Supervisor.

CUE:

Acknowledge report of task completion.

END

Job Performance Measure (JPM)

A-N-4-R Page 6 of 8 JPM Stop Time:_________

Job Performance Measure (JPM)

A-N-4-R Page 7 of 8 Operators Name:

Job

Title:

RO JPM

Title:

DETERMINE ACTIONS FOR A FIRE Revision Number: 01 JPM Number: A-N-4-R Task Number and

Title:

295L009, Respond to a fire/explosion K/A Number and Importance: Generic.2.4.27 3.4 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path:

Yes No Perform SRO Only:

Yes No Time Critical:

Yes No Estimated Time to Complete: 15 minutes Actual Time Used:

minutes

References:

DOA 0010-10, rev 20; DOA 0010-S1, rev 14 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

Job Performance Measure (JPM)

A-N-4-R Page 8 of 8 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A fire is burning at the Lift Station, no explosion has occurred.
3. The fire has been classified as a major fire.
4. Hazmat and rescue response are not required.
5. The Fire brigade has been alerted and is attempting to combat the fire unsuccessfully.
6. A dedicated outside line is not available.

INITIATING CUE

1. The Unit supervisor has directed you to enter and execute DOA 0010-10, FIRE-EXPLOSION through step D.3.
2. Inform the Unit Supervisor when the task is complete.

Exelon Nuclear Job Performance Measure REPORTABILITY DETERMINATION JPM Number: A-N-1-S Revision Number: 00 Date: 02/16 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

A-N-1-S Page 2 of 7 Revision Record (Summary)

Revision 00 New JPM developed ILT 15-1 (2016-301) NRC Exam.

Job Performance Measure (JPM)

A-N-1-S Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS

1.

This is a tabletop JPM utilizing simulator procedures.

2.

No Simulator setup needed.

DOCUMENT PREPARATION

1. None.

Job Performance Measure (JPM)

A-N-1-S Page 4 of 7 INITIAL CONDITIONS

1. You are the Unit 3 Unit Supervisor.
2. Unit 2 and Unit 3 are operating at rated power.
3. The following timeline occurred:
  • 2142 - Reactor Building differential pressure did not meet the required 0.25 inches of vacuum water gauge due to failure of the control system.
  • 2207 - Reactor Building differential pressure returned to greater than 0.25 inches of vacuum water gauge.

INITIATING CUE

1. Utilizing the Reportability Manual, determine the earliest reportability requirement.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

A-N-1-S Page 5 of 7 JPM Start Time: _________

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:

Candidate locates a copy of Reportability Manual.

EXAMINER NOTE:

The candidate will locate the decision trees in Volume 1 of the reportability manual. The candidate will begin in Operations Decision Tree 1 and continue evaluating Reportablity Criteria through Operations Decision Tree 4.

  • 1.

Determines the event is reportable per SAF 1.8.

Determines the event is reportable per SAF 1.8, Event or Condition that could have prevented fulfillment of a Safety Function.

  • 2.

Determines the time limit to Notify the NRC Operations Center via the ENS as soon as practical and in all cases, within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Determines the time limit to Notify the NRC Operations Center via the ENS as soon as practical and in all cases within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of the occurrence (Time 0542).

END JPM Stop Time:_________

Job Performance Measure (JPM)

A-N-1-S Page 6 of 7 Operators Name:

Job

Title:

SRO JPM

Title:

REPORTABILITY DETERMINATION Revision Number: 00 JPM Number: A-N-1-S Task Number and

Title:

299L001, Determine Reportability requirements as outlined in station Reportability manual.

K/A Number and Importance: Generic.2.1.2 4.1 / 4.4 Suggested Testing Environment: Simulator Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path:

Yes No Perform SRO Only:

Yes No Time Critical:

Yes No Estimated Time to Complete: 20 Actual Time Used:

minutes

References:

Reportability Tables and Decision Trees LS-AA-1020 Rev 23, Safety (SAF) LS-AA-1110 Rev. 22 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

Job Performance Measure (JPM)

A-N-1-S Page 7 of 7 INITIAL CONDITIONS

1. You are the Unit 3 Unit Supervisor.
2. Unit 2 and Unit 3 are operating at rated power.
3. The following timeline occurred:
  • 2142 - Reactor Building differential pressure did not meet the required 0.25 inches of vacuum water gauge due to failure of the control system.
  • 2207 - Reactor Building differential pressure returned to greater than 0.25 inches of vacuum water gauge.

INITIATING CUE

1. Utilizing the Reportability Manual, determine the earliest reportability requirement.

Exelon Nuclear Job Performance Measure REACTIVATION OF AN SRO LICENSE JPM Number: A-N-2-S Revision Number: 01 Date: 02/16 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

A-N-2-S Page 2 of 8 Revision Record (Summary)

Revision 00 Modified for 2010 Cert Exam.

Revision 01 Modified for ILT 15-1 (2016-301) NRC Exam.

Job Performance Measure (JPM)

A-N-2-S Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS

1.

This is a tabletop JPM utilizing simulator procedures.

2.

No Simulator setup needed.

DOCUMENT PREPARATION

1. Marked up copy of OP-AA-105-102.

Job Performance Measure (JPM)

A-N-2-S Page 4 of 8 INITIAL CONDITIONS

1.

You are the Shift Manager.

2.

An SRO is in the process of license reactivation.

3.

OP-AA-105-102, Attachment 2, Reactivation of License Log, is filled out up to the point of Shift Manager review for the licensee.

INITIATING CUE

1. The Shift Operation Superintendent directs you to perform the Shift Manager review of OP-AA-105-102, Attachment 2 for the licensee and report any errors or omissions.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

A-N-2-S Page 5 of 8 JPM Start Time: _________

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comm ent NOTE:

Provide the Examinee the provided marked up copy of OP-AA-105-102.

1.

Review OP-AA-105-102,.

Reviews OP-AA-105-102,.

2.

Check that Hours on Shift are in the same calendar quarter.

Notes 12.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> listed on 6/26/16 are performed during the 2nd calendar quarter and cannot be counted towards license re-activation.

3.

Check that Hours on Shift are applicable for license reactivation.

Determines 12.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> as WEC listed on 07/3/16 cannot be credited towards license re-activation.

EXAMINER NOTE:

Steps 2 and 3 lead to the determination in step 4

4.

Check that licensee has the required 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />.

Determines that licensee does NOT have adequate hours to meet the 40 hour4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> requirement.

5.

Verifies Plant Tour completed per step 4.b Determines that Plant Tour date and signature are not completed.

6.

Report the results of the review to the Shift Operations Superintendent (SOS).

Returns without signing OP-AA-105-102, Attachment 2 to the SOS.

Informs the SOS that the licensees license CANNOT be reactivated due to insufficient hours on shift and plant tour incomplete.

CUE:

As the SOS, acknowledge the report.

END

Job Performance Measure (JPM)

A-N-2-S Page 6 of 8 JPM Stop Time:_________

Job Performance Measure (JPM)

A-N-2-S Page 7 of 8 Operators Name:

Job

Title:

SRO JPM

Title:

REACTIVATION OF AN SRO LICENSE Revision Number: 01 JPM Number: A-N-2-S Task Number and

Title:

Title: 299L024, Maintain an Active License K/A Number and Importance: Generic.2.1.4 3.3 / 3.8 Suggested Testing Environment: Simulator Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path:

Yes No Perform SRO Only:

Yes No Time Critical:

Yes No Estimated Time to Complete: 12 Actual Time Used:

minutes

References:

OP-AA-105-102, Rev. 11 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

Job Performance Measure (JPM)

A-N-2-S Page 8 of 8 INITIAL CONDITIONS

1.

You are the Shift Manager.

2.

An SRO is in the process of license reactivation.

3.

OP-AA-105-102, Attachment 2, Reactivation of License Log, is filled out up to the point of Shift Manager review for the licensee.

INITIATING CUE

1.

The Shift Operation Superintendent directs you to perform the Shift Manager review of OP-AA-105-102, Attachment 2 for the licensee and report any errors or omissions

Exelon Nuclear Job Performance Measure VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE JPM Number: A-N-3-S Revision Number: 04 Date: 02/16 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

A-N-3-R Page 2 of 7 Revision Record (Summary)

Revision 01 Bank JPM.

Revision 02 Revised for 2010 NRC exam.

Revision 03 Revised for 2015 NRC exam Revision 04 Revised for ILT 15-1 (2016-301) NRC Exam.

Job Performance Measure (JPM)

A-N-3-R Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS

1.

This is a tabletop JPM utilizing simulator procedures.

2.

No Simulator setup needed.

DOCUMENT PREPARATION

1. Provide a marked up copy of DOS 6600-02.

Job Performance Measure (JPM)

A-N-3-R Page 4 of 7 INITIAL CONDITIONS

1. You are the Unit 2 Unit Supervisor.
2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal.
3. The off-going Unit Supervisor was unable to verify the paperwork, and has turned it over to you.
4. The Equipment Operator reported all surveillance requirements were within specifications.

INITIATING CUE

1. Perform calculation verification and ensure paperwork is correct.
2. Inform me when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

A-N-3-R Page 5 of 7 JPM Start Time: _________

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:

Provide the examinee with the provided copy of DOS 6600-02.

  • 1.

Candidate should identify step I.1.e has a mathematical error.

Identifies differential pressure should read 4.

  • 2.

Candidate should identify step I.1.w OR step I.1.v is signed off as verified dP of <6 (actual is 7).

Identifies incorrect verification of dP <6.

  • 3.

Candidate should identify that steps I.1.ab have been initialed by the same person performing the surveillance and were NOT independently verified.

Identifies step NOT independently verified.

4.

Notify Unit Supervisor of discrepancies.

Notifies Unit Supervisor, may dispatch Operators to verify/correct issues, also may initiate IR.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

Job Performance Measure (JPM)

A-N-3-R Page 6 of 7 Operators Name:

Job

Title:

SRO JPM

Title:

VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE Revision Number: 04 JPM Number: A-N-3-S Task Number and

Title:

299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedures K/A Number and Importance: Generic.2.2.12 3.7 / 4.1 Suggested Testing Environment: Simulator Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path:

Yes No Perform SRO Only:

Yes No Time Critical:

Yes No Estimated Time to Complete: 12 Actual Time Used:

minutes

References:

DOS 6600-02, rev 20 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

Job Performance Measure (JPM)

A-N-3-R Page 7 of 7 INITIAL CONDITIONS

1. You are the Unit 2 Unit Supervisor.
2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal.
3. The off-going Unit Supervisor was unable to verify the paperwork, and has turned it over to you.
4. The Equipment Operator reported all surveillance requirements were within specifications.

INITIATING CUE

1. Perform calculation verification and ensure paperwork is correct.
2. Inform me when the task is complete.

Exelon Nuclear Job Performance Measure REVIEW CCSW ACTIVITY CALCULATION JPM Number: A-N-4-S Revision Number: 02 Date: 02/16 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

A-N-4-S Page 2 of 8 Revision Record (Summary)

Revision 00 New JPM.

Revision 01 Revised for 2010 NRC exam.

Revision 02 Modified for ILT 15-1 (2016-301) NRC Exam.

Job Performance Measure (JPM)

A-N-4-S Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS

1.

This is a tabletop JPM utilizing simulator procedures.

2.

No Simulator setup needed.

3.

Ensure a calculator is available and the memory/display has been cleared.

DOCUMENT PREPARATION

1. Provide a marked up copy of DOS 1500-08.

Job Performance Measure (JPM)

A-N-4-S Page 4 of 8 INITIAL CONDITIONS

1. You are the U2 US.
2. The Unit 2 NSO has completed DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS.
3. Only the A CCSW Heat Exchanger is going to be placed in service.

INITIATING CUE

1. Review and Verify DOS 1500-08.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps.

These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

A-N-4-S Page 5 of 8 JPM Start Time: _________

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:

Provide the examinee with the provided copy of DOS 1500-08.

The following steps can be performed in any order.

  • 1.

Verifies Dilution flow calculation (1,017,000 gpm).

Determines Dilution flow was incorrectly determined. Correct Dilution flow is 1,017,000 gpm.

  • 2.

Enters dilution flow (1,017,000 gpm) to calculate CCSW Activity Limit.

Determines 2.91 x 10-5 is the correct CCSW sample activity limit.

NOTE:

If the candidate attempts to terminate the review based on incorrect dilution flow previously calculated:

Direct the candidate to complete the review and make any necessary adjustments as necessary and another SRO will review.

3.

Verifies CCSW Heat Exchanger A sample activity is less than or equal to the calculated CCSW activity limit Determines 2.01 x 10-5 is less than 2.91 x 10-5.

4.

Re-Performs Canal Activity Calculation.

Uses 1,017,000 gpm as Dilution Flow. Determines incorrect activity level used for A Activity level of CCSW Heat Exchanger.

Correct value is 2.01 x10-5.

5.

Determines Canal Activity Concentration.

Determines Canal Activity Concentration is 6.9 x10-8

Job Performance Measure (JPM)

A-N-4-S Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment

6.

Determines need for NSO to re-perform calculations.

Examinee directs NSO to re-perform calculations CUE:

Acknowledge report of task completion.

END JPM Stop Time:_________

Job Performance Measure (JPM)

A-N-4-S Page 7 of 8 Operators Name:

Job

Title:

SRO JPM

Title:

PERFORM CCSW ACTIVITY CALCULATION Revision Number: 02 JPM Number: A-N-4-S Task Number and

Title:

277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance.

K/A Number and Importance: Generic.2.3.11 3.8 / 4.3 Suggested Testing Environment: Simulator Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path:

Yes No Perform SRO Only:

Yes No Time Critical:

Yes No Estimated Time to Complete: 15 Actual Time Used:

minutes

References:

DOS 1500-08, rev 17 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

Job Performance Measure (JPM)

A-N-4-S Page 8 of 8 INITIAL CONDITIONS

1. You are the U2 US.
2. The Unit 2 NSO has completed DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS.
3. Only the A CCSW Heat Exchanger is going to be placed in service.

INITIATING CUE

1. Review and Verify DOS 1500-08.
2. Inform the Unit 2 Supervisor when the task is complete.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure DETERMINE AN EP PROTECTIVE ACTION RECOMMENDATION JPM Number: A-N-5-S Revision Number: 00 Date: 02/16 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

A-N-5-S Page 2 of 8 Revision Record (Summary)

Revision 00 New JPM developed for ILT 15-1 (2016-301) NRC Exam.

Job Performance Measure (JPM)

A-N-5-S Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS

1.

This is a tabletop JPM utilizing simulator procedures.

2.

No Simulator setup needed.

DOCUMENT PREPARATION

1. For exam purposes/exam security provide a colored copy of a blank NARS form.

Job Performance Measure (JPM)

A-N-5-S Page 4 of 8 INITIAL CONDITIONS

1. This is a time critical JPM.
2. You are the Shift Emergency Director.
3. Unit 2 was operating at near rated conditions.
4. Security reported a HOSTILE ACTION is occurring and terrorists gained access to the reactor building.
5. An explosive device was detonated in the spent fuel pool resulting in a loss of fuel pool level.
6. Visible damage to spent fuel has occurred.
7. Fuel pool level is lowering at 1 foot per minute.
8. Refuel floor CAM is alarming due to high airborne particulate contamination.
9. A large hole is present in the Reactor Building wall.
10. There is NO verifier available.

INITIATING CUES

1. Determine EAL(s) (ignore discretionary EALs) and complete a NARS form. Give the NARS form to the WEC Supervisor, who will make the state notification.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Job Performance Measure (JPM)

A-N-5-S Page 5 of 8 Some operations that are performed from outside of the C/R may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

A-N-5-S Page 6 of 8 JPM Start Time: _________

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:

Examinee locates a copy of Radiological Emergency Plan Annex for Dresden EP-AA-1004 charts.

Provide the supplied NARS Form.

Provide the supplied screen shot of the meteorological data.

  • 1.

Determines a classification of GENERAL EMERGENCY, due to notification from the Security Force that a HOSTILE ACTION is occurring within the protected area AND Damage to spent fuel pool has occurred.

Determines highest classification is a GENERAL EMERGENCY per EAL HG1 (15 minute requirement).

NOTE:

Determines classification start time _______ and stop time _______.

(15 minute limit)

  • 2.

Properly fills out NARS form.

See attached key for the areas that must be filled out correctly (12 minute requirement)

NARS form Block 8 either meters/sec or miles/hr may be annotated. Only one is required. Ground level parameters must be used.

NOTE:

Fill out NARS form start time (when declaration completed) _______ and stop time _______.

(12 minute limit)

END JPM Stop Time:_________

Job Performance Measure (JPM)

A-N-5-S Page 7 of 8 Operators Name:

Job

Title:

SRO JPM

Title:

DETERMINE EP PROTECTIVE ACTION RECOMMENDATION Revision Number: 00 JPM Number: A-N-5-S Task Number and

Title:

295L160, Given a plant in an off normal condition, determine the EP classification K/A Number and Importance: Generic.2.4.44 2.4 / 4.4 Suggested Testing Environment: Simulator Actual Testing Environment:

Simulator Control Room In-Plant Testing Method:

Simulate Alternate Path:

Yes No Perform SRO Only:

Yes No Time Critical:

Yes No Estimated Time to Complete: 15 Actual Time Used:

minutes

References:

EP-AA-1004 Addendum 3 Rev. 002 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

Job Performance Measure (JPM)

A-N-5-S Page 8 of 8 INITIAL CONDITIONS

1. This is a time critical JPM.
2. You are the Shift Emergency Director.
3. Unit 2 was operating at near rated conditions.
4. Security reported a HOSTILE ACTION is occurring and terrorists gained access to the reactor building.
5. An explosive device was detonated in the spent fuel pool resulting in a loss of fuel pool level.
6. Visible damage to spent fuel has occurred.
7. Fuel pool level is lowering at 1 foot per minute.
8. Refuel floor CAM is alarming due to high airborne particulate contamination.
9. A large hole is present in the Reactor Building wall.
10. There is NO verifier available.

INITIATING CUES

1. Determine EAL(s) (ignore discretionary EALs) and complete a NARS form.

Give the NARS form to the WEC Supervisor, who will make the state notification.

TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST Job Performance Measure SBLC - INJECTION WITH PUMP AND RWCU FAILURES JPM Number: S-N-a Revision Number: 03 Date: 02/16 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date

TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

1.

Task description and number, JPM description and number are identified.

2.

Knowledge and Abilities (K/A) references are included.

3.

Performance location specified. (in-plant, control room, simulator, or other)

4.

Initial setup conditions are identified.

5.

Initiating cue (and terminating cue if required) are properly identified.

6.

Task standards identified and verified by SME review.

7.

Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

8.

If an alternate path is used, the task standard contains criteria for successful completion.

9.

Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DOP 1100-02 Rev: 19 Procedure Rev:

Procedure Rev:

10. Verify cues both verbal and visual are free of conflict.
11. Verify performance time is accurate
12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date

TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 Revision Record (Summary)

Revision 02 Revised for 2013 NRC exam.

Revision 03 Revised for ILT 15-1 (2016-301) NRC Exam

TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC _51_.

NOTE:

It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Run CAEP file S-N-a.cae.
3. If the CAEP file cannot be run then insert the following Expert Commands:
a. Insert following Malfunctions and/or Remotes:

IMF CIRWCUAP (2-1201-1 valve failure to close - and allows manual closure).

IMF CIRWCUBP (2-1201-2 valve failure to close - and allows manual closure).

IMF SCRLFVAD 0.0 (Inserts BOTH SBLC Pump relief valve setpoint drift to 0.0 so #

whichever pump is started first will not develop flow)

IMF SCRLFVBD 0.0 (Inserts BOTH SBLC Pump relief valve setpoint drift to 0.0 so #

whichever pump is started first will not develop flow)

IOR SCD3013 OFF (Overrides SBLC SYS1&2 and SYS2&1 positions OFF)

b. Setup the following Triggers:

TRGSET 1 "SCD301_DRW(1)" (Trigger 1 Activates when SBLC control switch is placed to SYS1 position)

TRG 1 "DMF SCRLFVBD" (Deletes 2B SBLC relief valve setpoint drift malfunction)

TRGSET 2 "SCD301_DRW(2)" (Trigger 2 Activates when SBLC control switch is placed to SYS2 position)

TRG 2 "DMF SCRLFVAD" (Deletes 2A SBLC relief valve setpoint drift malfunction)

DOCUMENT PREPARATION Clean copy of DOP 1100-02 hardcard.

TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 INITIAL CONDITIONS

1. You are the Unit 2 NSO.
2. A transient has occurred, resulting in an ATWS.
3. The Unit Supervisor has authorized the use of Hard Cards.

INITIATING CUE

1. The Unit Supervisor has ordered you to inject SBLC per the Hard Card.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-N-a Rev 03 JPM Start Time:

STEP ELEMENT STANDARD SAT UNSAT Comment Number Note Examinee should locate the hard card, then provide the included copy.

1.

Selects the correct procedure step. Determines correct procedure step is per DOP 1100-02 Page 6, Initiate SBLC for Boron Injection or Level Control (ATWS)

2.

Place the SBLC INJECTION CONTROL keylock switch to the SYS 1 OR SYS 2 position.

Turns the SBLC INJECTION CONTROL keylock switch to either the intermediate right OR intermediate left position.

3.

Verifies applicable SQUIB pilot light NOT lit.

SQUIB A or B light off.

Note The selected pump starts but does not develop flow (relief valve failure in the JPM setup).

4.

Verifies applicable PUMP pilot light lit.

PUMP light on.

BEGIN ALTERNATE PATH

5.

Verifies FLOW pilot light lit.

FLOW light off (SBLC is NOT injecting).

6.

SBLC SQUIB VLV CKT FAILURE annunciator alarms (902-5 H-6).

Annunciator 902-5 H-6 illuminated.

  • 7.

Places SBLC INJECTION CONTROL keylock switch to opposite position taken to in step

1.

Turns the SBLC INJECTION CONTROL keylock switch to the opposite direction turned in step 1.

8.

Verifies opposite PUMP pilot light lit.

Opposite PUMP light on.

Note Flow light will illuminate when SBLC INJECTION CONTROL keylock switch is re-positioned.

9.

Verifies RWCU valve 2-1201-1 closed.

Examinee recognizes that valve 2-1201-1 valve did NOT close.

TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-N-a Rev 03 STEP ELEMENT STANDARD SAT UNSAT Comment Number

  • 10.

Closes RWCU valve 2-1201-1.

Takes manual action for a failed automatic action and closes 2-1201-1 valve, by placing c/s in the CLOSED position.

11.

Verifies RWCU valve 2-1201-1A closed.

GREEN light illuminated.

12.

Verifies RWCU valve 2-1201-2 closed.

Examinee recognizes that valve 2-1201-2 valve did NOT close.

  • 13.

Closes RWCU valve 2-1201-2.

Takes manual action for a failed automatic action and closes 2-1201-2 valve, by placing c/s in the CLOSED position.

14.

Verifies RWCU valve 2-1201-3 closed.

GREEN light illuminated.

15.

Verifies RWCU valve 2-1201-7 closed.

RED light illuminated.

16.

Informs Unit Supervisor task is complete.

Reports SBLC is injecting but the first pump did not inject and valves 2-1201-1 and 2-1201-2 failed to close automatically.

Cue Acknowledge report of task completion.

END JPM Stop Time:

TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-N-a Rev 03 JPM

SUMMARY

Operators Name:

Emp. ID#: ____________

Job

Title:

RO SRO SRO Cert JPM

Title:

SBLC - Injection with Pump and RWCU Failures JPM Number: S-N-a Revision Number: 03 Task Number and

Title:

211L002, Injection of Standby Liquid Control System K/A Number and Importance: 211000.A4.08 4.2 / 4.2 Suggested Testing Environment: Simulator Alternate Path:

Yes No SRO Only:

Yes No Time Critical:

Yes No Reference(s): DOP 1100-02, Rev 19 Actual Testing Environment:

Simulator Control Room In-Plant Other Testing Method:

Simulate Perform Estimated Time to Complete: 9 minutes Actual Time Used:

minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature:

Date:

TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 INITIAL CONDITIONS

1. You are the Unit 2 NSO.
2. A transient has occurred, resulting in an ATWS.
3. The Unit Supervisor has authorized the use of Hard Cards.

INITIATING CUE

1. The Unit Supervisor has ordered you to inject SBLC per the Hard Card.
2. Inform the Unit Supervisor when the task is complete.

TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04 Job Performance Measure PLACE A FRV IN SERVICE IN AUTO DURING UNIT STARTUP JPM Number: S-N-b Revision Number: 04 Date: 02/16 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date

TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

1.

Task description and number, JPM description and number are identified.

2.

Knowledge and Abilities (K/A) references are included.

3.

Performance location specified. (in-plant, control room, simulator, or other)

4.

Initial setup conditions are identified.

5.

Initiating cue (and terminating cue if required) are properly identified.

6.

Task standards identified and verified by SME review.

7.

Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

8.

If an alternate path is used, the task standard contains criteria for successful completion.

9.

Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DOP 0600-06 Rev: 44 Procedure Rev:

Procedure Rev:

10. Verify cues both verbal and visual are free of conflict.
11. Verify performance time is accurate
12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date

TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04 Revision Record (Summary)

Revision 02 Bank JPM.

Revision 03 Revised for 2009 NRC Exam.

Revision 04 Revised for ILT 15-1 (2016-301) NRC Exam

TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC _52_.

NOTE:

It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Verify BOTH FW REG ISOL VALVES are OPEN:
  • MO 2-3206A
  • MO 2-3206B
3. Verify 2A & 2B REG VLV CONTROL STATIONS in MAN and CLOSED.
4. Verify MASTER CONTROL STATION is in MAN.
5. Low Flow Reg Valve is controlling level at 30 in AUTO.
6. Insert following Malfunctions and/or Remotes:
  • None.
7. Setup the following Triggers:
  • None.

DOCUMENT PREPARATION

1.

Copy of DOP 0600-06 marked up through limitations and actions.

TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Unit Startup is in progress.
3. The FWLCS is controlling level with the Low Flow Reg Valve.
4. 2A & 2B REG VLV CONTROL STATIONS are closed in manual mode.
5. 2A & 2B FRVs have been pre-operationally tested.
6. Another NSO will acknowledge annunciators not associated with this task.

INITIATING CUE

1. The Unit Supervisor has directed you to place 2B FRV in service (Unit Startup) in the Master Automatic mode in accordance with DOP 0600-06 per step G.2.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-N-b Rev 04 JPM Start Time:

STEP ELEMENT STANDARD SAT UNSAT Comment Number Note Provide the examinee with the provided copy of DOP 0600-06.

1.

Verify 2A and 2B FWRVs have been pre-operationally tested per Step G.1.

Condition met in initial conditions.

2.

Verify the following valves are open:

MO 2-3205A, FW LINE STOP.

MO 2-3205B, FW LINE STOP.

MO 2-3206A, 2A FW REG ISOL.

MO 2-3206B, 2B FW REG ISOL.

GREEN lights illuminated on the following:

  • MO 2-3205A
  • MO 2-3205B
  • MO 2-3206A
  • MO 2-3206B
3.

Adjust MASTER CONTROL STATION OR RX LO FLOW CONTROL STATION, setpoint to match actual RPV level.

Depresses appropriate pushbutton to verify setpoint to match actual RPV level on MASTER CONTROL STATION OR RX LO FLOW CONTROL STATION.

4.

Select appropriate FWLCS RPV level signal per Section G.17.

Depresses appropriate FWLCS RPV level signal pushbutton.

5.

Place RX LO FLOW CONTROL STATION to AUTO.

Verifies AUTO light illuminated on RX LO FLOW CONTROL STATION.

  • 6.

Place one REG VLV CONTROL STATION in AUTO.

Depresses AUTO pushbutton on 2B REG VLV CONTROL STATION.

7.

Verify other REG VLV CONTROL STATION in MAN.

Verifies MAN light illuminated on 2A REG VLV CONTROL STATION.

TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-N-b Rev 04 STEP ELEMENT STANDARD SAT UNSAT Comment Number

  • 8.

Place MASTER CONTROL STATION in AUTO.

Depresses AUTO pushbutton on FWLC MASTER CONTROL STATION.

Note The LOW FLOW FWRV will automatically transfer to the 2B FWRV when the LOW FLOW FWRV position is 85% feedwater flow.

9.

Informs Unit Supervisor task is complete.

Examinee notifies the Unit Supervisor.

Cue Acknowledge report of task completion.

END JPM Stop Time:

TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-N-b Rev 04 JPM

SUMMARY

Operators Name:

Emp. ID#: ____________

Job

Title:

RO SRO SRO Cert JPM

Title:

Place a FRV in Service in Auto During Unit Startup JPM Number: S-N-b Revision Number: 04 Task Number and

Title:

259L021, Place FRV in service in AUTO (unit startup).

K/A Number and Importance:

259002.A4.03 3.8 / 3.6 Suggested Testing Environment: Simulator Alternate Path:

Yes No SRO Only:

Yes No Time Critical:

Yes No Reference(s): DOP 0600-06, Rev 44 Actual Testing Environment:

Simulator Control Room In-Plant Other Testing Method:

Simulate Perform Estimated Time to Complete: 9 minutes Actual Time Used:

minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature:

Date:

TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. Unit Startup is in progress.
3. The FWLCS is controlling level with the Low Flow Reg Valve.
4. 2A & 2B REG VLV CONTROL STATIONS are closed in manual mode.
5. 2A & 2B FRVs have been pre-operationally tested.
6. Another NSO will acknowledge annunciators not associated with this task.

INITIATING CUE

1. The Unit Supervisor has directed you to place 2B FRV in service (Unit Startup) in the Master Automatic mode in accordance with DOP 0600-06 per step G.2.
2. Inform the Unit Supervisor when the task is complete.

TQ-AA-150-J020 Revision 00 Page 1 of 13 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 Job Performance Measure LPCI - MITIGATE HIGH SUCTION PRESSURE WHILE LINING UP TO CST SUCTION FOR INJECTION JPM Number: S-N-d Revision Number: 09 Date: 2/16 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date

TQ-AA-150-J020 Revision 00 Page 2 of 13 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

1.

Task description and number, JPM description and number are identified.

2.

Knowledge and Abilities (K/A) references are included.

3.

Performance location specified. (in-plant, control room, simulator, or other)

4.

Initial setup conditions are identified.

5.

Initiating cue (and terminating cue if required) are properly identified.

6.

Task standards identified and verified by SME review.

7.

Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

8.

If an alternate path is used, the task standard contains criteria for successful completion.

9.

Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DEOP 0500-03 Rev: 23 Procedure Rev:

Procedure Rev:

10. Verify cues both verbal and visual are free of conflict.
11. Verify performance time is accurate
12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date

TQ-AA-150-J020 Revision 00 Page 3 of 13 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 Revision Record (Summary)

Revision 06 Bank JPM.

Revision 07 Revised for ILT 12-1 Cert Exam.

Revision 08 Revised for ILT 14-1 NRC Exam.

Revision 09 Revised for ILT 15-1 (2016-301) NRC Exam.

TQ-AA-150-J020 Revision 00 Page 4 of 13 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to any IC (IC _53__ used for validation).

NOTE:

It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Verify ALL LP ECCS Pumps are in PTL.
3. Run the following CAEP file: S-N-d.cae
4. If the CAEP cannot be ran, insert the following Expert Commands:

Insert the following Malfunctions, Remotes, and/or Overrides:

o imf ser0016 on o imf ser0155 on o ior lpdvlvcl25 close o ior lpdvlvop16 open o ior rrd5bcls close Assign the following trigger assignment:

o irf lpcstppc (15) true DOCUMENT PREPARATION Markup a copy of DEOP 0500-03, Alternate Water Injection Systems.

TQ-AA-150-J020 Revision 00 Page 5 of 13 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A transient has occurred requiring Alternate Water Injection.

Examiner Note: The following parameters do not match the simulator indications.

3. RPV level is -65 inches and slowly dropping.
4. RPV pressure is 140 psig and slowly dropping.
5. All LP ECCS Pumps are in PTL due to the Ring Header being plugged.
6. B Loop is selected for injection.

INITIATING CUE

1. The Unit Supervisor has directed you to line up the 2A LPCI pump with CST suction and inject to raise RPV water level per DEOP 0500-03.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

TQ-AA-150-J020 Revision 00 Page 6 of 13 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-N-d Rev 09 JPM Start Time:

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:

Provide the Examinee with the provided copy of DEOP 0500-03.

1.

Verifies 2A LPCI PP control switch in Pull-to-Lock.

ALL lights extinguished.

2.

Place PP SUCT VLV MO 2-1501-5A control switch in Manual Bypass and verify closed.

RED light illuminated.

3.

Verify MIN FLOW VLV 2-1501-13A closed if not needed.

RED light illuminated.

CUE:

2-1501-13A is not required for 2B LPCI pump.

NOTE:

The following valves may be verified in any order

4.

Verify TORUS CLG/TEST valves 2-1501-20A and 2-1501-38A closed.

GREEN lights illuminated.

5.

Verify TORUS SPRAY VLVs 2-1501-19A and 2-1501-18A closed.

GREEN lights illuminated.

6.

Verify DW SPRAY VLVs 2-1501-28A and 2-1501-27A closed.

GREEN lights illuminated.

7.

Verify TORUS CLG/TEST valves 2-1501-20B and 2-1501-38B closed.

GREEN lights illuminated.

8.

Verify TORUS SPRAY VLVs 2-1501-19B and 2-1501-18B closed.

GREEN lights illuminated.

TQ-AA-150-J020 Revision 00 Page 7 of 13 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-N-d Rev 09 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment

9.

Verify DW SPRAY VLVs 2-1501-28B and 2-1501-27B closed.

GREEN lights illuminated.

NOTE:

For bleeding off the pressure in the suction piping, the examinee may communicate each of the following steps individually OR instruct the EO to complete actions of DEOP 0500-03 step G.12.c.(5 thru 8).

CUE:

When directed, as the EO in the field, communicate that the steps (either individually of as a whole) have been completed.

10. Unlock AND open 2-1501-74A, U2 LPCI A PMP VENT VLV.

Instructs EO to complete step G.12.c.(5).(a).

11. Crack open 2-1501-15A, U2 LPCI A PMP VENT VLV until flow is observed from pipe.

Instructs EO to complete step G.12.c.(5).(b).

12. Close 2(3)-1501-15A, U2 LPCI A PMP VENT VLV.

Instructs EO to complete step G.12.c.(5).(c).

13. Close AND lock 2-1501-74A, U2(3) LPCI A PMP VENT VLV.

Instructs EO to complete step G.12.c.(5).(d).

14. Open 2-1501-47A-R, U2 LPCI A PUMP SUCT PI 2-1501-47A ROOT VLV (at pump) and verify PI 2-1501-47A indicates less than 15 psig.

Instructs EO to obtain PI 2-1501-47A reading per step G.12.c.(6). & G.12.c.(7).

CUE:

PI 2-1501-47A indicates 15.5 psig.

15. Recognizes reading is NOT less than 15 psig.

Determines reading is greater than 15 psig.

TQ-AA-150-J020 Revision 00 Page 8 of 13 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-N-d Rev 09 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment

16. Close 2-1501-47A-R, U2 LPCI A PUMP SUCT PI 2-1501-47A ROOT VLV.

Instructs EO to close 2-1501-47A per step G.12.c.(8).

CUE:

2-1501-47A-R is Closed.

17. Open PP SUCT VLV MO 2-1501-5A.

GREEN light illuminated.

18. Notify Unit Supervisor that 2A LPCI pump cannot be used with suction from the CST.

Examinee notifies Unit Supervisor of 2A LPCI pump suction pressure problem when aligned to CST. May recommend using another LPCI pump.

CUE:

Notify the examinee that injection is still needed and to line up 2C LPCI pump suction to the CST.

Maintain the 2A LPCI pump in PTL.

BEGIN ALTERNATE PATH

19. Verifies 2C LPCI PP control switch in Pull-to-Lock.

ALL lights extinguished.

  • 20. Place PP SUCT VLV MO 2-1501-5C control switch in Manual Bypass and verify closed.

RED light illuminated.

21. Verify MIN FLOW VLV 2-1501-13B closed if not needed.

RED light illuminated.

CUE:

2-1501-13B is not required for 2D LPCI pump.

22. Verify TORUS CLG/TEST valves 2-1501-20A and 2-1501-38A closed.

GREEN lights illuminated.

TQ-AA-150-J020 Revision 00 Page 9 of 13 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-N-d Rev 09 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment

23. Verify TORUS SPRAY VLVs 2-1501-19A and 2-1501-18A closed.

GREEN lights illuminated.

24. Verify DW SPRAY VLVs 2-1501-28A and 2-1501-27A closed.

GREEN lights illuminated.

25. Verify TORUS CLG/TEST valves 2-1501-20B and 2-1501-38B closed.

GREEN lights illuminated.

26. Verify TORUS SPRAY VLVs 2-1501-19B and 2-1501-18B closed.

GREEN lights illuminated.

27. Verify DW SPRAY VLVs 2-1501-28B and 2-1501-27B closed.

GREEN lights illuminated.

28. Unlock AND open 2-1501-74C, U2 LPCI C PMP VENT VLV.

Instructs EO to complete step G.12.e.(5).(a).

29. Crack open 2-1501-15C, U2 LPCI C PMP VENT VLV until flow is observed from pipe.

Instructs EO to complete step G.12.e.(5).(b).

30. Close 2(3)-1501-15C, U2 LPCI C PMP VENT VLV.

Instructs EO to complete step G.12.e.(5).(c).

31. Close AND lock 2-1501-74C, U2 LPCI C PMP VENT VLV.

Instructs EO to complete step G.12.e.(5).(d).

32. Open 2-1501-47C-R, U2 LPCI C PUMP SUCT PI 2-1501-47C ROOT VLV (at pump) and verify PI 2-1501-47C indicates less than 15 psig.

Instructs EO to obtain PI 2-1501-47C reading per step G.12.e.(6).

CUE:

Pressure is 10 psig..

TQ-AA-150-J020 Revision 00 Page 10 of 13 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-N-d Rev 09 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment

33. Recognizes reading is less than 15 psig.

Determines reading is LESS than 15 psig.

34. Close 2-1501-47C-R, U2 LPCI C PUMP SUCT PI 2-1501-47C ROOT VLV.

Instructs EO to close 2-1501-47C per step G.12.e.(8).

Directs EO to perform step G.12.e.(10)(a)

CUE:

2-1501-31C is open.

  • 36. Unlock AND open 2-1501-37, U2 LPCI & CS SUCT FROM 2/3A CST SV (located at 2/3A CST)

Directs EO to perform step G.12.e.(10)(b)

Simulator Operator / Evaluator:

Activate Trigger 15 to lineup 2C LPCI pump suction to the CST.

CUE:

2-1501-37 is open.

Examiner Note:

If a RPV level band is requested: Direct the candidate to maintain RPV level between +8 and +48 (NOTE: RPV level is -65 and dropping per the cue)

  • 37. Start 2C LPCI PP Places control switch to start. RED light illuminated.

TQ-AA-150-J020 Revision 00 Page 11 of 13 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-N-d Rev 09 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment

38. Inform Unit Supervisor that 2C LPCI pump is lined up to the CST and the task is complete.

Informs Unit Supervisor that 2C LPCI pump is lined up to the CST and injecting; the task is complete.

CUE:

Acknowledge report of task completion.

END JPM Stop Time:

TQ-AA-150-J020 Revision 00 Page 12 of 13 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-N-d Rev 09 JPM

SUMMARY

Operators Name:

Emp. ID#: ____________

Job

Title:

RO SRO SRO Cert JPM

Title:

LPCI - Mitigate High Suction Pressure While Lining up to CST suction for Injection JPM Number: S-N-d Revision Number: 09 Task Number and

Title:

29502LK061, Lineup LPCI to the CST K/A Number and Importance:

203000.A1.04 3.6 / 3.6 Suggested Testing Environment: Simulator Alternate Path:

Yes No SRO Only:

Yes No Time Critical:

Yes No Reference(s): DEOP 0500-03, Rev 23 Actual Testing Environment:

Simulator Control Room In-Plant Other Testing Method:

Simulate Perform Estimated Time to Complete: 38 minutes Actual Time Used:

minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature:

Date:

TQ-AA-150-J020 Revision 00 Page 13 of 13 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. A transient has occurred requiring Alternate Water Injection.
3. RPV level is -65 inches and slowly dropping.
4. RPV pressure is 140 psig and slowly dropping.
5. All LP ECCS Pumps are in PTL due to the Ring Header being plugged.
6. B Loop is selected for injection.

INITIATING CUE

1. The Unit Supervisor has directed you to line up the 2A LPCI pump with CST suction and inject to raise RPV water level per DEOP 0500-03.
2. Inform the Unit Supervisor when the task is complete.

TQ-AA-150-J020 Revision 00 Page 1 of 10 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00 Job Performance Measure CONTAINMENT - VENT CONTAINMENT WITH APCV - (A)

JPM Number: S-N-e Revision Number: 00 Date: 2/16 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date

TQ-AA-150-J020 Revision 00 Page 2 of 10 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

1.

Task description and number, JPM description and number are identified.

2.

Knowledge and Abilities (K/A) references are included.

3.

Performance location specified. (in-plant, control room, simulator, or other)

4.

Initial setup conditions are identified.

5.

Initiating cue (and terminating cue if required) are properly identified.

6.

Task standards identified and verified by SME review.

7.

Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

8.

If an alternate path is used, the task standard contains criteria for successful completion.

9.

Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DEOP 0500-04 Rev: 16 Procedure Rev:

Procedure Rev:

10. Verify cues both verbal and visual are free of conflict.
11. Verify performance time is accurate
12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date

TQ-AA-150-J020 Revision 00 Page 3 of 10 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00 Revision Record (Summary)

Revision 00 Created for ILT 15-1 (2016-301) NRC Exam.

TQ-AA-150-J020 Revision 00 Page 4 of 10 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to an IC with the mode switch NOT in run, so that the proper alarms and interlocks will work. (IC _51__ used for validation).

NOTE:It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Ensure Torus water level is <30 feet.
3. Run the following CAEP file: S-N-e.cae
4. If the CAEP file cannot be ran insert the following Expert Commands:
a. Insert following Malfunctions, Remotes, and/or Overrides:

IMF CIGP2I (Spurious Group II Isolation)

Adjusts Torus Level indications to ~20 feet.

v ior atl10 25.0 v ior pcltr10a 20 v ior pcltr10b 20 Adjusts Torus Bottom Pressure to 58.0 psig v ior pcptr103 58.0 Prevents the 2-1601-61 from opening v ior pcdcl61 close v ior pcdop61 off Pulls ECCS Initiation Logic fuses so when Drywell pressure is forced high, NO ECCS starts.

v irf lp1aaf1f pulled v irf lp701af pulled v irf lp1aaf2f pulled v irf lp701bf pulled v irf csalgoff pulled v irf csblgoff pulled v irf hp2a1f1 pulled v irf hp2b1f1 pulled Adjusts Drywell & Torus pressures to 50.0 psig.

v ior pcp8524 50.0 v ior pcpdw102 50.0 v ior pcp85401 5.0 v ior pcptr1 5.0

5. Verify the SBGT system operating and verify flow ~4000 scfm.
6. Start ALL available ventilation exhaust fans as directed in DEOP 0500-04.
7. Place CRM ISOL switch to ISOLATE - wait 10 seconds then verify a C/R Booster Fan is running.

DOCUMENT PREPARATION Markup a copy of DEOP 0500-04, Containment Venting.

TQ-AA-150-J020 Revision 00 Page 5 of 10 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00 INITIAL CONDITIONS

1. You are the Aux 2 NSO.
2. A break inside the Unit 2 Primary Containment has occurred.
3. Torus bottom pressure is about to exceed the PCP limit in DEOP 0200-01.
4. Torus water level is 20 feet.
5. Control Room ventilation has been isolated.
6. Reactor Building and Turbine Building have been evacuated.
7. The Instrument Bus and ESS Bus are energized.
8. The Instrument Air System is available.
9. The N2 System is in its normal lineup.

INITIATING CUE

1. The Unit Supervisor has directed you to vent the Unit 2 Primary Containment in accordance with DEOP 0500-04, to control Primary Containment pressure.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

TQ-AA-150-J020 Revision 00 Page 6 of 10 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-N-e Rev 00 JPM Start Time:

STEP ELEMENT STANDARD SAT UNSAT Comment Number Note Provide examinee the marked up copy of DEOP 0500-04.

Annunciator 902-3 A-15, Pri Cnmt Vent/Sample Isol Bypass, will be received during this JPM.

1.

Verify SBGT is operating and flow is ~ 4000 scfm.

Verifies 2/3A SBGT train FI 7540-13 is reading ~4000 scfm.

2.

Verify Reactor Mode switch NOT in RUN.

Verifies Reactor Mode switch NOT in RUN.

3.

Place VENT ISOL SIGNAL BYPASS switch on 902-5 panel to TORUS.

Momentarily places Bypass switch to Torus Position.

4.

Open AO 2-1601-61, TORUS 2-INCH VENT VLV.

Places AO 2-1601-61 control switch to OPEN position and determines that the valve will not open.

  • 5.

Place the VENT ISOL SIGNAL BYPASS Switch on 902-5 to DRYWELL.

Places the VENT ISOL SIGNAL BYPASS Switch on 902-5 to DRYWELL

  • 6.

Open AO 2-1601-62, DW 2-INCH VENT VLV.

Places AO 2-1601-62 control switch to OPEN.

Green light extinguishes and Red light illuminates.

  • 7.

Open AO 2-1601-63, VENT TO SBGT.

Places AO 2-1601-63 control switch to OPEN.

Green light extinguishes and Red light illuminates.

8.

Determine if SBGT flow is adequate to control and maintain Torus Bottom pressure below the Primary Containment Pressure Limit.

Determines Containment pressure trend.

Examiner Note:

DW pressure as indicated on PR/FR 2-8540-2/4 is as read and no change is expected with the small diameter vent path in service.

TQ-AA-150-J020 Revision 00 Page 7 of 10 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-N-e Rev 00 STEP ELEMENT STANDARD SAT UNSAT Comment Number Cue If examinee reads TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter displays 58 psig and is trending UP slowly.

BEGIN ALTERNATE PATH

9.

Determines use of AUGMENTED PRI CNMT VENT (APCV) System is required.

Proceeds to Attachment 1 step 6.

  • 10.

Place AUGMENTED PRI CNMT VENT MODE SWITCH to APCV on Panel 902-3 Rotates control switch clockwise to APCV position

11.

Verify closed AO 2-1601-63, VENT TO SBGT Verifies AO-2-1601-63 in closed.

GREEN light lit, RED light extinguished.

12.

Verify closed AO 2-1601-91, VENT TO RX BLDG EXH SYS Verifies AO-2-1601-91 in closed.

RED light lit, GREEN light extinguished.

  • 13.

Place TORUS ISOLATION GROUP 2 OVERRIDE 2-1601-60 switch to OVERRIDE and hold on 902-3 Panel Rotates TORUS ISOLATION GROUP 2 OVERRIDE 2-1601-60 keylock switch clockwise and holds

  • 14.

Place DRYWELL ISOLATION GROUP 2 OVERRIDE 2-1601-23 switch to OVERRIDE and release on 902-3 Panel Rotates DRYWELL ISOLATION GROUP 2 OVERRIDE 2-1601-23 keylock switch clockwise and releases

  • 15.

Release TORUS ISOLATION GROUP 2 OVERRIDE 2-1601-60 on 902-3 Panel Releases TORUS ISOLATION GROUP 2 OVERRIDE 2-1601-60 keylock switch

  • 16.

Place CMNT ISOLATION GROUP 2 OVERRIDE 2-1601-24 switch to OVERRIDE and release on 902-3 Panel Rotates CMNT ISOLATION GROUP 2 OVERRIDE 2-1601-24 keylock switch clockwise and releases

TQ-AA-150-J020 Revision 00 Page 8 of 10 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-N-e Rev 00 STEP ELEMENT STANDARD SAT UNSAT Comment Number

  • 17.

Open AO 2-1601-60, TORUS VENT VLV.

Determines Torus Water Level is less than 30 feet and opens AO 2-1601-60, TORUS VENT VLV.

  • 18.

Open AO 2-1601-24, VENT TO RX BLDG EXH SYS.

Rotates AO 2-1601-24, VENT TO RX BLDG EXH SYS control switch clockwise and verifies GREEN light extinguishes and RED light illuminates

  • 19.

Open AO 2-1601-92 VENT TO MAIN CHIMNEY to control and maintain Primary Containment pressure below limit.

Rotates AO 2-1601-92 VENT TO MAIN CHIMNEY control switch clockwise and verifies GREEN light extinguishes and RED light illuminates Cue:

DW pressure is being controlled and maintained below the Primary Containment Pressure Limit.

If examinee asks, DW pressure recorder PR/FR 2-8540-2/4 is slowly lowering.

If examinee asks reading on TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter has decreased to 53 psig (5 psig less than original report).

20.

Informs Unit Supervisor task is complete.

Examinee notifies the Unit Supervisor.

Cue Acknowledge report of task completion.

END JPM Stop Time:

TQ-AA-150-J020 Revision 00 Page 9 of 10 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-N-e Rev 00 JPM

SUMMARY

Operators Name:

Emp. ID#: ____________

Job

Title:

RO SRO SRO Cert JPM

Title:

Containment - Vent Containment with APCV - (A)

JPM Number: S-N-e Revision Number: 00 Task Number and

Title:

295L101, Vent the primary containment through the augmented primary containment vent (APCV) to stay below the Primary Containment Pressure Limit.

K/A Number and Importance:

223001.A4.07 4.2*/4.1 Suggested Testing Environment: Simulator Alternate Path:

Yes No SRO Only:

Yes No Time Critical:

Yes No Reference(s): DEOP 0500-04, Rev 16 Actual Testing Environment:

Simulator Control Room In-Plant Other Testing Method:

Simulate Perform Estimated Time to Complete: 9 minutes Actual Time Used:

minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature:

Date:

TQ-AA-150-J020 Revision 00 Page 10 of 10 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00 INITIAL CONDITIONS

1. You are the Aux 2 NSO.
2. A break inside the Unit 2 Primary Containment has occurred.
3. Torus bottom pressure is about to exceed the PCP limit in DEOP 0200-01.
4. Torus water level is 20 feet.
5. Control Room ventilation has been isolated.
6. Reactor Building and Turbine Building have been evacuated.
7. The Instrument Bus and ESS Bus are energized.
8. The Instrument Air System is available.
9. The N2 System is in its normal lineup.

INITIATING CUE

1. The Unit Supervisor has directed you to vent the Unit 2 Primary Containment in accordance with DEOP 0500-04, to control Primary Containment pressure.
2. Inform the Unit Supervisor when the task is complete.

TQ-AA-150-J020 Revision 00 Page 1 of 8 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 Job Performance Measure Restore Normal Feed to 28-7/29-7 from Bus 29 JPM Number: S-N-f Revision Number: 03 Date: 2/16 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date

TQ-AA-150-J020 Revision 00 Page 2 of 8 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

1.

Task description and number, JPM description and number are identified.

2.

Knowledge and Abilities (K/A) references are included.

3.

Performance location specified. (in-plant, control room, simulator, or other)

4.

Initial setup conditions are identified.

5.

Initiating cue (and terminating cue if required) are properly identified.

6.

Task standards identified and verified by SME review.

7.

Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

8.

If an alternate path is used, the task standard contains criteria for successful completion.

9.

Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DOP 6700-18 Rev: 13 Procedure Rev:

Procedure Rev:

10. Verify cues both verbal and visual are free of conflict.
11. Verify performance time is accurate
12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date

TQ-AA-150-J020 Revision 00 Page 3 of 8 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 Revision Record (Summary)

Revision 02 Updated to comply with rev 4 of DOP 6500-10 Revision 03 Revised for ILT 15-1 (2016-301) NRC Exam

TQ-AA-150-J020 Revision 00 Page 4 of 8 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to any IC (IC _51__ used for validation).

NOTE:

It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Hold MCC 29-7/28-7 Feed from Bus 29 in TRIP until MCC 29-7/28-7 Feed from Bus 28 CLOSES.
3. This completes the setup for this JPM.

DOCUMENT PREPARATION Mark up copy of DOP 6700-18, Bus 28 Outage.

TQ-AA-150-J020 Revision 00 Page 5 of 8 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 INITIAL CONDITIONS

1. MCC 28-7/29-7 is powered from Bus 28.
2. Power has been restored to Bus 29.
3. You are the Unit 2 Assistant NSO.
4. DOP 6700-18 Attachment F loads are in the desired position as specified by Unit Supervisor.

INITIATING CUE

1. You have been directed by the Unit Supervisor to restore the normal feed to MCC 28-7/29-7 per DOP 6700-18 Step G.5
2. Notify the Unit 2 Supervisor when the task is complete Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

TQ-AA-150-J020 Revision 00 Page 6 of 8 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-N-f Rev 03 JPM Start Time:

STEP ELEMENT STANDARD SAT UNSAT Comment Number

1.

Declare BOTH LPCI subsystems inoperable Informs the Unit Supervisor BOTH LPCI subsystems must be declared inoperable.

Reference TS 3.5.2 Cue Respond: Division 1 and 2 LPCI subsystems are inoperable.

  • 2.

Open the feed breaker from Bus 28, MCC 29-7/28-7 FEED FROM BUS 28, by placing control switch in TRIP AND maintain switch in TRIP.

Opens the feed breaker AND maintains the switch in TRIP.

  • 3.

Close feed breaker from Bus 29, MCC 29-7/28-7 FEED FROM BUS

29.

Closes the feed breaker

  • 4.

Release feed breaker from Bus 28, MCC 29-7/28-7 FEED FROM BUS 28, control switch.

Releases feed breaker control switch

5.

Notify the Unit 2 Supervisor that normal feed has been restored to MCC 28-7/29-7.

Unit 2 Supervisor notified.

Cue Acknowledge report of task completion.

END JPM Stop Time:

TQ-AA-150-J020 Revision 00 Page 7 of 8 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-N-f Rev 03 JPM

SUMMARY

Operators Name:

Emp. ID#: ____________

Job

Title:

RO SRO SRO Cert JPM

Title:

Restore Normal Feed to 28-7/29-7 from Bus 29 JPM Number: S-N-f Revision Number: 03 Task Number and

Title:

262L026, Restore Normal Feed to 28-7/29-7 from Bus 29 K/A Number and Importance:

262001.A4.01 3.4 / 3.7 Suggested Testing Environment: Simulator Alternate Path:

Yes No SRO Only:

Yes No Time Critical:

Yes No Reference(s): DOP 6700-18, Rev 13 Actual Testing Environment:

Simulator Control Room In-Plant Other Testing Method:

Simulate Perform Estimated Time to Complete: 12 minutes Actual Time Used:

minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature:

Date:

TQ-AA-150-J020 Revision 00 Page 8 of 8 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 INITIAL CONDITIONS

1. MCC 28-7/29-7 is powered from Bus 28.
2. Power has been restored to Bus 29.
3. You are the Unit 2 Assistant NSO.
4. DOP 6700-18 Attachment F loads are in the desired position as specified by Unit Supervisor.

INITIATING CUE

1. You have been directed by the Unit Supervisor to restore the normal feed to MCC 28-7/29-7 per DOP 6700-18 Step G.5
2. Notify the Unit 2 Supervisor when the task is complete

TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 Job Performance Measure Withdraw SRM Detectors with a Stuck SRM Detector (AP)

S-N-g Revision Number: 02 Date: 2/16 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date

TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

1.

Task description and number, JPM description and number are identified.

2.

Knowledge and Abilities (K/A) references are included.

3.

Performance location specified. (in-plant, control room, simulator, or other)

4.

Initial setup conditions are identified.

5.

Initiating cue (and terminating cue if required) are properly identified.

6.

Task standards identified and verified by SME review.

7.

Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

8.

If an alternate path is used, the task standard contains criteria for successful completion.

9.

Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DOP 0700-01 Rev: 15 Procedure DOA 0700-02 Rev: 13 Procedure Rev:

10. Verify cues both verbal and visual are free of conflict.
11. Verify performance time is accurate
12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date

TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 Revision Record (Summary)

Revision 00 New JPM for the 2010 LORT exam.

Revision 01 Updated for the 2012 LORT exam.

Revision 02 Revised for ILT 15-1 (2016-301) NRC Exam

TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to a 2-3% power IC (IC _53__ used for validation).

NOTE:

It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Position SRM detectors for a 104 to 105 count rate. (Should not be in the fully withdrawn position)
3. Run CAEP file: S-N-f.cae
4. If CAEP file cannot be ran, insert the following Expert Commands:
a. Malfunctions required:
1) imf nis22det (Inserts SRM 22 stuck malfunction)
b. Triggers required:
1) trgset 1 nilsdet(2).and. nil104do
2) trgset 2 et_array(1).and. nilsdet(2).and. nil101di
3) trg 2 dmf nis22det DOCUMENT PREPARATION Clean copies of the following procedures:

DOP 0700-01, Source Range monitor Operation (SRM)

DOA 0700-02, SRM or IRM Detector Stuck

TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 INITIAL CONDITIONS

1. Unit 2 startup is in progress.
2. You are an extra NSO assisting the startup.
3. Primary Containment has been established.

INITIATING CUE

1. The Unit 2 Supervisor directs you to fully withdraw SRM detectors per DOP 0700-01, Source Range Monitor Operation (SRM).
2. Your Pre-Job Brief has been completed.
3. Notify the Unit supervisor upon completion of the task.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-N-g Rev 02 JPM Start Time:

STEP ELEMENT STANDARD SAT UNSAT Comment Number Note Provide the Examinee a copy of DOP 0700-01.

1.

WHEN IRM down scale alarms have cleared, THEN start SRM withdrawal and maintain SRM count rate 290 cps to 8.85x104 cps.

IRM down scales are cleared by initial conditions.

Monitors count rate when withdrawing SRMs.

  • 2.

Depress the applicable SELECT switch (LIT when selected).

Depresses each SRMs SELECT switch.

Verifies SELECT light lit.

  • 3.

Depress and hold the DRIVE OUT switch to withdraw SRMs to maintain SRM count rate of 290 cps to 8.85x104 cps.

Depress and hold the DRIVE OUT switch to withdraw SRMs BEGIN ALTERNATE PATH

4.

Verify that SRMs indication is changing as expected.

For SRMs 21, 23 & 24:

Count rate drops.

Period indicates negative.

OUT light is lit when detector reaches full out position.

For SRM 22 indications remain unchanged.

5.

Report SRM 22 detector did not move and/or appears to be stuck.

Reports SRM 22 detector did not move and/or appears to be stuck.

Note The Examinee should allow SRMs 21, 23, 24 to fully withdraw.

Cue Acknowledge report. Announce entering DOA 0700-02, SRM or IRM Detector Stuck. Direct the Examinee to perform DOA 0700-02. When the Examinee locates DOA 0700-02, give him the provided copy of DOA 0700-02.

Note The Examinee may have already deselected SRMs earlier.

TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-N-g Rev 02 STEP ELEMENT STANDARD SAT UNSAT Comment Number

  • 6.

Depress SRM SELECT switches to establish ONLY SRM 22 selected Depresses SRM SELECT switches to establish ONLY SRM 22 SELECT light lit.

Note An automatic Trigger is setup to delete the SRM stuck detector malfunction when it is inserted.

  • 7.

Use DRIVE IN AND DRIVE OUT switches to move stuck SRM detector in both directions to free it.

Depresses DRIVE IN switch to move SRM 22.

8.

Verify indication that SRM 22 is moving.

Observes SRM 22:

Count rate rises.

Period indicates positive.

  • 9.

Depress DRIVE IN switch to stop SRM 22.

Depresses DRIVE IN switch to stop SRM 22.

  • 10.

Use DRIVE IN AND DRIVE OUT switches to move stuck SRM detector in both directions to free it.

Depresses and holds DRIVE OUT switch to move SRM 22.

Drives SRM 22 fully out.

11.

Verify that SRM 22 indication is changing as expected.

Observes SRMs 22:

Count rate drops.

Period indicates negative.

OUT light is lit when detector reaches full out position.

12.

Report SRM 22 detector is fully withdrawn.

Reports SRM 22 detector is fully withdrawn.

Cue Acknowledge report.

END JPM Stop Time:

TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-N-g Rev 02 JPM

SUMMARY

Operators Name:

Emp. ID#: ____________

Job

Title:

RO SRO SRO Cert JPM

Title:

Withdraw SRM Detectors with a Stuck SRM Detector (AP)

JPM Number: S-N-g Revision Number: 02 Task Number and

Title:

215L022 Respond to an SRM or IRM stuck detector.

K/A Number and Importance:

215004A4.04 3.2 / 3.2 Suggested Testing Environment: Simulator Alternate Path:

Yes No SRO Only:

Yes No Time Critical:

Yes No Reference(s): DOP 0700-01, Rev 15 DOA 0700-02, Rev 13 Actual Testing Environment:

Simulator Control Room In-Plant Other Testing Method:

Simulate Perform Estimated Time to Complete: 18 minutes Actual Time Used:

minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature:

Date:

TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 INITIAL CONDITIONS

1. Unit 2 startup is in progress.
2. You are an extra NSO assisting the startup.
3. Primary Containment has been established.

INITIATING CUE

1. The Unit 2 Supervisor directs you to fully withdraw SRM detectors per DOP 0700-01, Source Range Monitor Operation (SRM).
2. Your Pre-Job Brief has been completed.
3. Notify the Unit supervisor upon completion of the task.

TQ-AA-150-J020 Revision 00 Page 1 of 12 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 Job Performance Measure SBGT - START SBGT WITH A FAILURE OF RX BLDG VENT TO ISOLATE JPM Number: S-N-h Revision Number: 03 Date: 2/16 EXAM MATERIAL Developed By:

Instructor Date Approved By:

Facility Representative Date

TQ-AA-150-J020 Revision 00 Page 2 of 12 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

1.

Task description and number, JPM description and number are identified.

2.

Knowledge and Abilities (K/A) references are included.

3.

Performance location specified. (in-plant, control room, simulator, or other)

4.

Initial setup conditions are identified.

5.

Initiating cue (and terminating cue if required) are properly identified.

6.

Task standards identified and verified by SME review.

7.

Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

8.

If an alternate path is used, the task standard contains criteria for successful completion.

9.

Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DOP 7500-01 Rev: 36 Procedure DAN 902(3)-3 F-14 Rev: 20 Procedure Rev:

10. Verify cues both verbal and visual are free of conflict.
11. Verify performance time is accurate
12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date

TQ-AA-150-J020 Revision 00 Page 3 of 12 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 Revision Record (Summary)

Revision 01 Bank JPM.

Revision 02 Revised for 2010 Cert Exam.

Revision 03 Modified for ILT 15-1 (2016-301) NRC Exam

TQ-AA-150-J020 Revision 00 Page 4 of 12 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to any IC with Rx Bldg Vent operating normally (IC _53_ used for validation).

NOTE:

It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Place the 2/3A SBGT train control switch in STBY.
3. Place the 2/3B SBGT train control switch in PRI.
4. Verify the following fans operating:
  • 2A RX BLDG VENT FAN
  • 2B RX BLDG VENT FAN
  • 2A RX BLDG EXH FAN
  • 2B RX BLDG EXH FAN
  • 3A RX BLDG VENT FAN
  • 3B RX BLDG VENT FAN
  • 3A RX BLDG EXH FAN
  • 3B RX BLDG EXH FAN
5. Run CAEP file S-N-h.cae
6. If the CAEP file cannot be ran, insert the following Expert Commands:
a. ior vrdtp3c trip (Prevents autostart of 2C RB vent fan)
b. ior vrdtp4c trip (Prevents autostart of 2C RB exhaust fan)
c. irf cirbvall lifted (Prevents Secondary Containment Isolation on U2)
d. trgset 16 "vgdstrta_drw" (Trigger 16 automatically activates when 2/3A SBGT is placed to START)
e. imf radrbvah (16 30) (After 30 sec, inserts RX Bldg Rad Mon failed high to cause a Secondary Containment Isolation signal)
f. imf x04 (16 30) (After 30 sec, trips 2A RBV Supply Fan).
g. imf x05 (16 30) (After 30 sec, trips 2B RBV Supply Fan).
h. imf x07 (16 30) (After 30 sec, trips 2A RBV Exhaust Fan).
i.

imf x08 (16 30) (After 30 sec, trips 2B RBV Exhaust Fan).

DOCUMENT PREPARATION Clean copy of DOP 7500-01.

Clean copy of DAN 902(3)-3 F-14

TQ-AA-150-J020 Revision 00 Page 5 of 12 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. U2 HPCI surveillance is in progress and is at the point of starting a SBGT train.
3. DOP 7500-M1/E1 is not required per the Unit Supervisor.
4. The 2/3A SBGT Initial Cumulative Run Time has been recorded.
5. There has been NO painting or operation of propane powered equipment in the power block in the last 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

INITIATING CUE

1. The Unit 2 Supervisor has directed you to start the 2/3A SBGT train per DOP 7500-01.
2. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

TQ-AA-150-J020 Revision 00 Page 6 of 12 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-N-h Rev 03 JPM Start Time:

STEP ELEMENT STANDARD SAT UNSAT Comment Number Note Provide the Examinee a copy of DOP 7500-01.

  • 1.

Place the 2/3A SBGT SELECT switch to A PRI position.

Places the 2/3A SBGT SELECT switch to the A PRI position.

  • 2.

Place the 2/3B SBGT SELECT switch to B STBY position.

Places the 2/3B SBGT SELECT switch to the B STBY position.

3.

Verify the 2/3A and B AIR HEATERs are OFF.

Both GREEN lights illuminated.

4.

Verify the 2/3A and B Fans are OFF.

Both GREEN lights illuminated.

5.

Verify annunciators 923-5 A-6 and 923-5 B-6 are NOT in alarm.

Both annunciator tiles extinguished.

6.

Verify 2/3B SBGT SELECT SWITCH in B STBY position.

Verifies 2/3 B SBGT Select switch in B STBY.

Note When 2/3A SBGT train starts, a Trigger auto activates which inserts a RBV Rad Mon Hi Hi condition after 30 seconds. The resulting Secondary Containment Isolation fails and the operator should complete the isolation.

  • 7.

Starts 2/3A SBGT train.

Places 2/3 A SBGT Select switch to START A position.

8.

Verifies the 2/3A SBGT train initiated properly.

Begins verifying the 2/3A SBGT train operating properly.

9.

Records the Start Time on Operator Aid.

Records the Start Time on Operator Aid BEGIN ALTERNATE PATH Note The examinee should recognize the Secondary Containment Isolation did NOT occur, and perform the Limitations and Actions.

Cue If examinee does not react to the alarm on the 902-3 panel, make the following update:

Attention for an Update. RX BLDG VENT CH A RAD HI-HI is in. End of Update.

TQ-AA-150-J020 Revision 00 Page 7 of 12 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-N-h Rev 03 STEP ELEMENT STANDARD SAT UNSAT Comment Number Note If the examinee starts to head to the 902-3 panel to respond to the 902-3 F-14 annunciator stop them and hand them the provided copy of the DAN.

  • 10.

Verifies trip of 3A RX BLDG VENT FAN.

Determines 3A RX BLDG VENT FAN is NOT tripped. (BLUE lights illuminated).

Places control switch 3A RX BLDG VENT FAN to the Trip position.

Determines 3A RX BLDG VENT FAN tripped (GREEN light illuminated).

  • 11.

Verifies trip of 3B RX BLDG VENT FAN.

Determines 3B RX BLDG VENT FAN is NOT tripped. (BLUE lights illuminated).

Places control switch 3B RX BLDG VENT FAN to the Trip position.

Determines 3B RX BLDG VENT FAN tripped (GREEN light illuminated).

12.

Verifies trip of 3C RX BLDG VENT FAN.

GREEN light illuminated.

  • 13.

Verifies trip of 3A RX BLDG EXH FAN.

Determines 3A RX EXH VENT FAN is NOT tripped. (BLUE lights illuminated).

Places control switch 3A RX BLDG EXH FAN to the Trip position.

Determines 3A RX BLDG EXH FAN tripped (GREEN light illuminated).

  • 14.

Verifies trip of 3B RX BLDG EXH FAN.

Determines 3B RX EXH VENT FAN is NOT tripped. (BLUE lights illuminated).

Places control switch 3B RX BLDG EXH FAN to the Trip position.

Determines 3B RX BLDG EXH FAN tripped (GREEN light illuminated).

TQ-AA-150-J020 Revision 00 Page 8 of 12 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-N-h Rev 03 STEP ELEMENT STANDARD SAT UNSAT Comment Number

15.

Verifies trip of 3C RX BLDG EXH FAN.

GREEN light illuminated.

16.

Verifies trip of 2A RX BLDG VENT FAN.

GREEN and AMBER lights illuminated.

17.

Verifies trip of 2B RX BLDG VENT FAN.

GREEN and AMBER lights illuminated.

18.

Verifies trip of 2C RX BLDG VENT FAN.

GREEN light illuminated.

19.

Verifies trip of 2A RX BLDG EXH FAN.

GREEN and AMBER lights illuminated.

20.

Verifies trip of 2B RX BLDG EXH FAN.

GREEN and AMBER lights illuminated.

21.

Verifies trip of 2C RX BLDG EXH FAN.

GREEN light illuminated.

  • 22.

Verifies 3A INLET DAMPER AO 3-5741A closed.

Verifies 3B INLET DAMPER AO 3-5741B closed.

Determines 3A & 3B INLET DAMPERs AO 3-5741A & B are NOT closed (GREEN lights illuminated).

Places control switch 3A & 3B RX BLDG VENT INLET ISOL DAM 3-5741A & 3-5741B to the CLOSE position.

Determines 3A & 3B INLET DAMPERs AO 3-5741A & B did not close (GREEN lights illuminated).

TQ-AA-150-J020 Revision 00 Page 9 of 12 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-N-h Rev 03 STEP ELEMENT STANDARD SAT UNSAT Comment Number

  • 23.

Verifies 3A OUTLET DAMPER AO 3-5742A closed.

Verifies 3B OUTLET DAMPER AO 3-5742B closed.

Determines 3A & 2B OUTLET DAMPERs AO 3-5742A & B are NOT closed (GREEN lights illuminated).

Places control switch 3A & 3B RX BLDG VENT OTLT ISOL DAM 3-5742A & 3-5742B to the CLOSE position.

Determines 3A & 3B OUTLET DAMPERs AO 3-5742A & B did not close (GREEN lights illuminated).

  • 24.

Verifies 2A INLET DAMPER AO 2-5741A closed.

Verifies 2B INLET DAMPER AO 2-5741B closed.

Determines 3A & 3B INLET DAMPERs AO 2-5741A & B are NOT closed (GREEN lights illuminated).

Places control switch 2A & 2B RX BLDG VENT INLET ISOL DAM 2-5741A & 2-5741B to the CLOSE position.

Determines 2A & 2B INLET DAMPERs AO 2-5741A & B did not close (GREEN lights illuminated).

TQ-AA-150-J020 Revision 00 Page 10 of 12 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-N-h Rev 03 STEP ELEMENT STANDARD SAT UNSAT Comment Number

  • 25.

Verifies 2A OUTLET DAMPER AO 2-5742A closed.

Verifies 2B OUTLET DAMPER AO 2-5742B closed.

Determines 2A & 2B OUTLET DAMPERs AO 2-5742A & B are NOT closed (GREEN lights illuminated).

Places control switch 2A & 2B RX BLDG VENT OTLT ISOL DAM 2-5742A & 2-5742B to the CLOSE position.

Determines 2A & 3B OUTLET DAMPERs AO 2-5742A & B did not close (GREEN lights illuminated).

26.

Verifies trip of 2A D/W & Torus Purge Fan.

Condition met from previous steps in the procedure.

27.

Verifies trip of 2B D/W & Torus Purge Fan.

Condition met from previous steps in the procedure.

28.

Verifies trip of 3A D/W & Torus Purge Fan.

Condition met from previous steps in the procedure.

29.

Verifies trip of 3B D/W & Torus Purge Fan.

Condition met from previous steps in the procedure.

30.

Notifies US of Secondary Containment Isolation Failure and successful manual completion of the isolation.

Examinee notifies the Unit Supervisor.

Cue Acknowledge report.

END JPM Stop Time:

TQ-AA-150-J020 Revision 00 Page 11 of 12 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)

S-N-h Rev 03 JPM

SUMMARY

Operators Name:

Emp. ID#: ____________

Job

Title:

RO SRO SRO Cert JPM

Title:

SBGT - Start SBGT with a Failure of RX BLDG VENT to Isolate (AP)

JPM Number: S-N-h Revision Number: 03 Task Number and

Title:

261L002, Start the SBGT system.

K/A Number and Importance:

261000.A4.09 2.7 / 2.7 Suggested Testing Environment: Simulator Alternate Path:

Yes No SRO Only:

Yes No Time Critical:

Yes No Reference(s): DOP 7500-01, Rev 36 Actual Testing Environment:

Simulator Control Room In-Plant Other Testing Method:

Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used:

minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature:

Date:

TQ-AA-150-J020 Revision 00 Page 12 of 12 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 INITIAL CONDITIONS

1. You are the Unit 2 Aux NSO.
2. U2 HPCI surveillance is in progress and is at the point of starting a SBGT train.
3. DOP 7500-M1/E1 is not required per the Unit Supervisor.
4. The 2/3A SBGT Initial Cumulative Run Time has been recorded.
5. There has been NO painting or operation of propane powered equipment in the power block in the last 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

INITIATING CUE

1. The Unit 2 Supervisor has directed you to start the 2/3A SBGT train per DOP 7500-01.
2. Inform the Unit Supervisor when the task is complete.

Page 1 of 10 Exelon Nuclear Job Performance Measure Lineup IAC to Unit 2 Instrument Air Header JPM Number: S-N-i Revision Number: 00 Date: 02/16 Developed By:

Exam Author Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Page 2 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1.

Task description and number, JPM description and number are identified.

2.

Knowledge and Abilities (K/A) references are included.

3.

Performance location specified. (in-plant, control room, simulator, or other)

4.

Initial setup conditions are identified.

5.

Initiating cue (and terminating cue if required) are properly identified.

6.

Task standards identified and verified by SME review.

7.

Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

8.

Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DOP 4700-03 Rev: 22 Procedure Rev:

Procedure Rev:

9.

Verify cues both verbal and visual are free of conflict.

10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date

Job Performance Measure (JPM)

Page 3 of 10 Revision Record (Summary)

Revision 00 Created for ILT 15-1 (2016-301) NRC Exam.

Job Performance Measure (JPM)

Page 4 of 10 SIMULATOR SETUP INSTRUCTIONS N/A: In-Plant JPM.

DOCUMENT PREPARATION Provide a copy of DOP 4700-03, Unit 2/3 Instrument Air Cross-Connect Operation to examinee.

Job Performance Measure (JPM)

Page 5 of 10 INITIAL CONDITIONS

1. Unit 3 is shutdown for a refuel outage.
2. 2A IAC is unavailable due to an oil leak.
3. 2B, 3A, 3B, and 3C IACs are supplying their own unit.
4. Unit 2 is at 100% power and is experiencing an Instrument Air transient that is causing the Unit 2 Instrument Air header pressure to drop slowly.
5. The Unit Supervisor has determined a Unit 3 Instrument air compressor must be aligned to Unit 2.
6. Unit 2 SAC is running.
7. Main Control Room is monitoring IA parameters.

INITIATING CUE

1. The Unit 2 Unit Supervisor has directed you to Cross-connect 3C Instrument Air Compressor to Unit 2 ONLY.
2. All applicable prerequisites of DOP 4700-03 have been met.
3. Your Pre Job Brief has been completed.
4. Notify the Unit Supervisor when you are complete with the task.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

Job Performance Measure (JPM)

Page 6 of 10 The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

Page 7 of 10 JPM Start Time: _________

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #

Provide examinee a current copy of DOP 4700-03.

1. Identifies Step G.9 as the correct step in DOP 4700-
03.

Proceeds to Step G.9.

2. Verify closed 3-4799-501A, 3C IAC DISCH TO U-3 INST AIR HEADER ISOL VLV.

Verifies 3-4799-501A, 3C IAC DISCH TO U-3 INST AIR HEADER ISOL VLV stem is in.

(Valve is located above 3B IAC)

CUE The component is in the position you described.

  • 3. Close 2/3-4799-424, U2/U3 X-TIE SV.

Rotates 2/3-4799-424, U2/U3 X-TIE SV clockwise until stem is in.

(Valve is located North of 3A IAC)

CUE The component is in the position you described.

  • 4. Open 2/3-4799-425, 3C IAC TO U2 AIR SYS X-TIE SV.

Rotates 2/3-4799-425, 3C IAC TO U2 AIR SYS X-TIE SV counter clockwise until stem is out.

(Valve is located North of 3A IAC)

CUE The component is in the position you described.

Job Performance Measure (JPM)

Page 8 of 10 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #

  • 5. Open 2-47350-500, U2 INST AIR SYS XTIE FROM THE U3 INST AIR SYS.

Rotates 47350-500, U2 INST AIR SYS XTIE FROM THE U3 INST AIR SYS counter clockwise until stem is out.

(Valve is located North of Cardox tank)

CUE The component is in the position you described.

  • 6. Open 2-47350-329, U2 INST AIR HDR ISOL VLV.

Rotates 2-47350-329, U2 INST AIR HDR ISOL VLV counter clockwise until stem is out.

(Valve is located North of 2B IAC)

CUE The component is in the position you described.

7. Report completion of task to Unit Supervisor.

Reports completion of task to Unit Supervisor.

END JPM Stop Time:_________

Job Performance Measure (JPM)

Page 9 of 10 Operators Name:

Job

Title:

q RO q SRO JPM

Title:

Align IACs to Unit 2 Instrument Air header Revision Number: 00 JPM Number: S-N-i Task Number and

Title:

278N013 Lineup Unit 3 C Instrument Air Compressor to Unit 2 K/A Number and Importance: 295019.A1.02 3.3 / 3.1 Suggested Testing Environment: In-Plant Suggested Testing Environment:

q Simulator Plant q Control Room Testing Method:

Simulate Alternate Path:

Yes No Perform SRO Only:

Yes No Time Critical:

Yes No Estimated Time to Complete:_ 20__minutes Actual Time Used: _______ minutes

References:

DOP 4700-03, Rev. 22 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

Job Performance Measure (JPM)

Page 10 of 10 INITIAL CONDITIONS

1. Unit 3 is shutdown for a refuel outage.
2. 2A IAC is unavailable due to an oil leak.
3. 2B, 3A, 3B, and 3C IACs are supplying their own unit.
4. Unit 2 is at 100% power and is experiencing an Instrument Air transient that is causing the Unit 2 Instrument Air header pressure to drop slowly.
5. The Unit Supervisor has determined a Unit 3 Instrument air compressor must be aligned to Unit 2.
6. Unit 2 SAC is running.
7. Main Control Room is monitoring IA parameters.

INITIATING CUE

1. The Unit 2 Unit Supervisor has directed you to Cross-connect 3C Instrument Air Compressor to Unit 2 ONLY.
2. All applicable prerequisites of DOP 4700-03 have been met.
3. Your Pre Job Brief has been completed.
4. Notify the Unit Supervisor when you are complete with the task.

Job Performance Measure (JPM)

Exelon Nuclear Job Performance Measure Bypass the Trip of Drywell Coolers JPM Number: S-N-j Revision Number: 10 Date: 02/16 Developed By:

Exam Author Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1.

Task description and number, JPM description and number are identified.

2.

Knowledge and Abilities (K/A) references are included.

3.

Performance location specified. (in-plant, control room, simulator, or other)

4.

Initial setup conditions are identified.

5.

Initiating cue (and terminating cue if required) are properly identified.

6.

Task standards identified and verified by SME review.

7.

Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

8.

Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DEOP 500-02 Rev: 16 Procedure Rev:

Procedure Rev:

9.

Verify cues both verbal and visual are free of conflict.

10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date

Job Performance Measure (JPM)

Revision Record (Summary)

Rev 08:

Updated for the 2007 LORT exam Rev 09:

Updated for the 2010 LORT exam Revision 10 Revised for ILT 15-1 (2016-301) NRC Exam.

Job Performance Measure (JPM)

SIMULATOR SETUP INSTRUCTIONS N/A: In-Plant JPM.

DOCUMENT PREPARATION Provide a clean copy of current revision of DEOP 0500-02, Bypassing Interlocks and Isolations to provide to examinee.

Job Performance Measure (JPM)

INITIAL CONDITIONS

1. A fire has occurred resulting in a loss of the feeder breakers to Busses 33-1 AND 34-1 from Busses 33 AND 34.
2. The Unit 3 and 2/3 Diesel Generators have started AND are powering Busses 33-1 and 34-1.
3. The loss of Busses 33-1 AND 34-1 caused a spurious trip of the Unit 3 Drywell Coolers.
4. RBCCW pressure is normal with the 2/3 RBCCW pump in operation.
5. Drywell temperature and pressure are rising.

INITIATING CUE

1. Unit Supervisor has directed you to perform the in-plant actions to bypass the Drywell Cooler trip signals to allow the restart of the Unit 3 Drywell Coolers for Drywell temperature control in accordance with DEOP 500-02.
2. Your Pre Job Brief has been completed.
3. Notify the Unit Supervisor when the in-plant actions are complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

JPM Start Time: _________

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #

Provide examinee a current copy of DEOP 500-02.

1 Proceed to Step G.3 of procedure.

Locates Step G.3 NOTE The DEOP Equipment Storage Cabinet key must be obtained from the Unit Supervisor.

NOTE Examinee should locate the proper Equipment Box in the cabinet. Tools required are:

Electrical Tape, Standard Straight Screwdriver, Split Blade Screwdriver, and Insulated Gloves NOTE Do NOT allow examinee to remove the Equipment Box from the DEOP Equipment Storage Cabinet.

Lock cabinet and return DEOP key to Unit Supervisor PRIOR to leaving the Control Room.

2 Obtain appropriate Equipment Box from the Control Room DEOP Equipment Storage Cabinet.

OBTAINS appropriate EQUIPMENT BOX from the Control Room DEOP Equipment Storage Cabinet.

CUE DEOP Equipment Box you have identified is in your hand.

NOTE DS key is required for entry into the AEER 3 Proceed to the AEER and panel 903-32.

Locates Panel 903-32.

NOTE Simulated JPM - Examinee must explain the task.

Job Performance Measure (JPM)

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #

  • 4 Lift AND tape lead on 903-32 panel terminal block AA terminal point 6 OR terminal point 7.

On 903-32 panel terminal block AA terminal point 6 OR terminal point 7 Puts on insulated gloves.

Loosens screw with standard screwdriver.

Uses split blade screwdriver to grasp screw and remove it.

Tapes the loose wire with electricians tape.

CUE 903-32 panel terminal block AA terminal point 6 OR terminal point 7 screw is removed and the loose wire is taped.

  • 5 Lift AND tape lead on 903-33 panel terminal block AA terminal point 6 OR terminal point 7.

On 903-33 panel terminal block AA terminal point 6 OR terminal point 7 Puts on insulated gloves.

Loosens screw with standard screwdriver.

Uses split blade screwdriver to grasp screw and remove it.

Tapes the loose wire with electricians tape.

CUE 903-33 panel terminal block AA terminal point 6 OR terminal point 7 screw is removed and the loose wire is taped.

6 Notify Unit Supervisor upon completion of task.

Notifies Unit Supervisor upon completion of task.

CUE Acknowledge report of task completion.

END JPM Stop Time:_________

Job Performance Measure (JPM)

Operators Name: ___________________________________

Job

Title:

q RO q SRO JPM

Title:

Bypass the Trip of Drywell Coolers Revision Number: 10 JPM Number: S-N-j Task Number and

Title:

295L074, Bypass the Trip of Drywell Coolers.

K/A Number and Importance: 295028.A1.03 3.9 / 3.9 Suggested Testing Environment:

q Simulator Plant q Control Room Testing Method:

Simulate Alternate Path:

Yes No Perform SRO Only:

Yes No Time Critical:

Yes No Estimated Time to Complete: 15 minutes Actual Time Used: _______ minutes

References:

DEOP 500-02, Rev 16 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

Job Performance Measure (JPM)

Page 9 of 9 INITIAL CONDITIONS

1. A fire has occurred resulting in a loss of the feeder breakers to Busses 33-1 AND 34-1 from Busses 33 AND 34.
2. The Unit 3 and 2/3 Diesel Generators have started AND are powering Busses 33-1 and 34-1.
3. The loss of Busses 33-1 AND 34-1 caused a spurious trip of the Unit 3 Drywell Coolers.
4. RBCCW pressure is normal with the 2/3 RBCCW pump in operation.
5. Drywell temperature and pressure are rising.

INITIATING CUE

1. Unit Supervisor has directed you to perform the in-plant actions to bypass the Drywell Cooler trip signals to allow the restart of the Unit 3 Drywell Coolers for Drywell temperature control in accordance with DEOP 500-02.
2. Your Pre-Job Brief has been completed.
3. Notify the Unit Supervisor when the in-plant actions are complete

Page 1 of 11 Exelon Nuclear Job Performance Measure Swap CRD Flow Control Valves JPM Number: S-N-k Revision Number: 15 Date: 02/16 Developed By:

Exam Author Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

Page 2 of 11 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1.

Task description and number, JPM description and number are identified.

2.

Knowledge and Abilities (K/A) references are included.

3.

Performance location specified. (in-plant, control room, simulator, or other)

4.

Initial setup conditions are identified.

5.

Initiating cue (and terminating cue if required) are properly identified.

6.

Task standards identified and verified by SME review.

7.

Critical steps meet the criteria for critical steps and are identified with an asterisk

(*).

8.

Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DOP 0300-03 Rev: 25 Procedure Rev:

Procedure Rev:

9.

Verify cues both verbal and visual are free of conflict.

10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date

Job Performance Measure (JPM)

Page 3 of 11 Revision Record (Summary)

Revision 14 Updated for the 2007 LORT exam.

Revision 15 Revised for ILT 15-1 (2016-301) NRC Exam.

Job Performance Measure (JPM)

Page 4 of 11 SIMULATOR SETUP INSTRUCTIONS:

N/A: In-Plant JPM.

DOCUMENT PREPARATION Provide a copy of DOP 0300-03, CRD System Flow Control Valve Transfer, to provide to examinee.

Job Performance Measure (JPM)

Page 5 of 11 INITIAL CONDITIONS

1. Unit 2 is at 100% power when 2A CRD FCV developed a small air leak that requires the FCV to be taken OOS for maintenance, but NOT big enough to immediately affect valve operation.
2. The Unit 2 NSO has already performed all control room procedure actions in preparation for the CRD FCV transfer.
3. The Unit Supervisor has reviewed the TRM and has taken required actions.

INITIATING CUE

1. The Unit Supervisor has directed you to perform the in-plant actions to transfer Unit 2 CRD FCVs, placing the 2B CRD FCV in service in "Automatic" per DOP 0300-03.
2. Prerequisites have been met.
3. Your Pre-Job Brief is complete.
4. Notify the Unit Supervisor upon completion of in-plant actions.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information for Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The time clock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

Page 6 of 11 JPM Start Time: _________

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #

1. Proceed to Unit 2 CRD Flow Control Valves (FCVs) and establish communications with the control room.

CRD FCVs located and communications established with control room.

NOTE Step G.2 is N/A.

2. Verify OPEN 2-0301-30, U2 CRD SYS FCV CONT AIR PRV ISOL VLV.

Verifies 2-0301-30 stem/handwheel backed out.

CUE Valve 2-0301-30 stem/ handwheel is backed out.

3. Verify OPEN 2-0301-144B, U2 CRD SYS FCV 2-0302-6B AIR ISOL VLV.

Verifies 2-0301-144B valve stem/handwheel backed out.

CUE Valve 2-0301-144B stem/handwheel is backed out.

4. Verify OPEN 2-0301-40B, U2 CRD SYS B FCV INLET VLV.

Verifies 2-0301-40B valve stem/handwheel backed out.

CUE Valve 2-0301-40B stem/handwheel is backed out.

5. Cycle the 2B FCV full open and full closed by adjusting PRV 2-0301-34 locally.

Adjusts PRV 2-0301-34 locally to cycle 2B FCV.

Verifies cycling by observing stem position and/or light indication on the CRD FCV electrical transfer station.

CUE 2B FCV cycles full open and then full closed.

Job Performance Measure (JPM)

Page 7 of 11 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #

NOTE The Unit Supervisor has addressed the TRM per the Initial Conditions (addresses note preceding G.5 of DOP).

6. Verify PRV 2-0301-34 closed.

Verifies PRV 2-0301-34 valve stem backed out and turning freely.

CUE PRV 2-0301-34 valve stem is backed out and turning freely.

7. Verify Pressure gauge PI 2-0302-60 indicates 0 psig.

Verifies pressure gauge PI 2-0302-60 reading 0 psig.

CUE After examinee locates and observes the indicator, then cue:

PI 2-0302-60 is reading 0 psig.

8. Verify via U2 NSO that CRD FCV Controller in MANUAL and demand is set to minimum.

Calls U2 NSO to verify CRD FCV Controller configuration CUE The Unit 2 CRD Flow Controller is in MANUAL and demand is set to minimum.

  • 9. At CRD Electrical Transfer, place the transfer switch TS160 to the "Valve B" position to place FCV 2-0302-6B in service.

At CRD Electrical Transfer Station, places the transfer switch to the "Valve B" position to place FCV 2-0302-6B in service CUE The transfer switch is in the "Valve B" position.

  • 10. Select the 2B E/P converter by placing U2 CRD SYS FCV A/B SELECTOR VLV 2-0301-29 to B.

Selects the 2B E/P converter by placing 2-0301-29 to B.

Job Performance Measure (JPM)

Page 8 of 11 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #

CUE The 2-0301-29 Unit 2 CRD MANUAL E/P SELECTOR VALVE is in the B position.

Examiner Note:

On valves 2-0301-37 and 2-0301-38 an arrow is embossed on the handle. The shorter end of the handle and arrow point to the in service position of the valve.

  • 11. Place U2 CRD SYS FCV 2-0302-6B MAN/AUTO SELECTOR VLV, 2-0301-38, switch to the automatic position.

Places 2-0302-6B selector switch to the automatic position.

CUE 2-0302-6B selector switch is in automatic.

  • 12. Place the U2 CRD SYS FCV 2-0302-6A MAN/AUTO SELECTOR VLV, 2-0301-37, to the manual position.

Places the 2-0302-6A selector switch to the manual position.

CUE The 2-0302-6A selector switch is in manual.

  • 13. Open 2-0301-41B, U2 CRD SYS A/B FCV OUTLET VLV.

Opens 2-0301-41B valve.

Full CCW, stem/handwheel backed out.

CUE The 2-0301-41B valve is full CCW, stem/handwheel backed out.

14. Notify Unit NSO that the 2B CRD FCV can now be controlled from the 902-5 Panel AND that system flow should be adjusted to maintain stable flow rate.

Notifies Unit NSO of 2B CRD FCV status and directs Unit NSO to adjust system flow rate to maintain stable flow.

CUE Acknowledge report of CRD FCV Status and report that system flow has been adjusted to maintain stable flow rate.

Job Performance Measure (JPM)

Page 9 of 11 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #

  • 15. Slowly close 2-0301-41A, U2 CRD SYS A/B FCV OUTLET VLV.

Closes 2-0301-41A valve slowly (full CW or stem/

handwheel in).

CUE The 2-0301-41A valve stem/handwheel is full CW or in.

16. Notifies Unit Supervisor of completion of in-plant actions per DOP and that the remaining steps are from the 902-5 panel.

Unit Supervisor notified of completion of in-plant actions.

CUE Acknowledge report of task completion.

END JPM Stop Time:_________

Job Performance Measure (JPM)

Page 10 of 11 Operators Name: ___________________________________

Job

Title:

rRO rSRO JPM

Title:

Swap CRD Flow Control Valves Revision Number: 15 JPM Number: S-N-k Task Number and

Title:

201L011, Respond to a CRD Flow Control Valve Failure K/A Number and Importance: 201001.A4.03 2.9/2.8 Suggested Testing Environment: In-Plant Suggested Testing Environment:

q Simulator Plant q Control Room Testing Method:

Simulate Alternate Path:

Yes No Perform SRO Only:

Yes No Time Critical:

Yes No Estimated Time to Complete: _ 23__ minutes Actual Time Used: _______ minutes

References:

DOP 0300-03, Rev. 25 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

Job Performance Measure (JPM)

Page 11 of 11 INITIAL CONDITIONS

1. Unit 2 is at 100% power when 2A CRD FCV developed a small air leak that requires the FCV to be taken OOS for maintenance, but NOT big enough to immediately affect valve operation.
2. The Unit 2 NSO has already performed all control room procedure actions in preparation for the CRD FCV transfer.
4. The Unit Supervisor has reviewed the TRM and has taken required actions.

INITIATING CUE

1. The Unit Supervisor has directed you to perform the in-plant actions to transfer Unit 2 CRD FCVs, placing the 2B CRD FCV in service in "Automatic" per DOP 0300-03.
2. Prerequisites have been met.
3. Your Pre-Job Brief is complete.
4. Notify the Unit Supervisor upon completion of in-plant actions.