ML17299A475: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:~0 May b~1985 Qg (~~$p,gil/QOM Cc>+L/7Y~F3&3~P~8508080046 850730 PDR ADOCK 05000528 H PDR NUCLEAR MATCH-PALO VERDE COUNTDOWN Ve have gathered today out of conscience to pxotest the impending (May 19)test firing-up of the Palo Verde Nuclear Genexating Station, and to begin a non-violent re-sistance to being turned into guinea pigs for reck1ess and irresponsible economic and poli/ical interests intent upon covering-up their radioactive"mistake." Toward these ends we (1)ea13.upon NRC commissioner Nuncio Palladino, who is visiting the reactor today, to re-turn to Phoenix within the next ten days to participate in a public forum to hear our objections to the PVNGS, and (2)appeal to all concerned parents and ratepayers to con-tact their elected representatives and APS and SRP execu-tives immediately demanding a delay in producing radioac-tive materials at the facilityi Despite mounting, widespread opposition to the reactor as reflected in the e3ection of a State Corporation Com-mission commItted to~but unable to~control it | {{#Wiki_filter:~ 0 May b~ 1985 Qg (~~$ | ||
property and happiness o Xn the absence of public discussion of the-issue, we believe~basic Constitutional rights habe been abrogated and the chances of'nscheduled releases of radioactivity into oux environment have been increased, 0 eO l C E~+pl.1'~E Prof.Mark Reader Arizona Rainbow Coalition 1965 E.Ellis Tempe, AZ 85282}} | p,gil/QOM Cc>+ L /7Y~ | ||
F3& 3~P~ | |||
8508080046 850730 PDR ADOCK 05000528 H | |||
PDR NUCLEAR MATCH - | |||
PALO VERDE COUNTDOWN Ve have gathered today out of conscience to pxotest the impending (May 19) test firing-up of the Palo Verde Nuclear Genexating Station, and to begin a non-violent re-sistance to being turned into guinea pigs for reck1ess and irresponsible economic and poli/ical interests intent upon covering-up their radioactive "mistake." | |||
Toward these ends we (1) ea13. | |||
upon NRC commissioner Nuncio Palladino, who is visiting the reactor today, to re-turn to Phoenix within the next ten days to participate in a public forum to hear our objections to the | |||
: PVNGS, and (2) appeal to all concerned parents and ratepayers to con-tact their elected representatives and APS and SRP execu-tives immediately demanding a delay in producing radioac-tive materials at the facilityi Despite mounting, widespread opposition to the reactor as reflected in the e3ection of a State Corporation Com-mission commItted to~ but unable to~ control it Phoenicians regu3arly have been denied the means necessary to evaluate the impact of the PVNGS on their lives, liberties~ property and happiness o | |||
Xn the absence of public discussion of the -issue, we believe~ basic Constitutional rights habe been abrogated and the chances of'nscheduled releases of radioactivity into oux environment have been increased, | |||
0 eO l | |||
C E | |||
~+ | |||
pl. | |||
1' | |||
~ | |||
E | |||
Prof. | |||
Mark Reader Arizona Rainbow Coalition 1965 E. Ellis | |||
: Tempe, AZ 85282}} | |||
Latest revision as of 03:25, 8 January 2025
| ML17299A475 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 05/06/1985 |
| From: | Reader M ARIZONA RAINBOW COALITION |
| To: | Palladino N NRC COMMISSION (OCM) |
| Shared Package | |
| ML17299A474 | List: |
| References | |
| NUDOCS 8508080046 | |
| Download: ML17299A475 (3) | |
Text
~ 0 May b~ 1985 Qg (~~$
p,gil/QOM Cc>+ L /7Y~
F3& 3~P~
8508080046 850730 PDR ADOCK 05000528 H
PDR NUCLEAR MATCH -
PALO VERDE COUNTDOWN Ve have gathered today out of conscience to pxotest the impending (May 19) test firing-up of the Palo Verde Nuclear Genexating Station, and to begin a non-violent re-sistance to being turned into guinea pigs for reck1ess and irresponsible economic and poli/ical interests intent upon covering-up their radioactive "mistake."
Toward these ends we (1) ea13.
upon NRC commissioner Nuncio Palladino, who is visiting the reactor today, to re-turn to Phoenix within the next ten days to participate in a public forum to hear our objections to the
- PVNGS, and (2) appeal to all concerned parents and ratepayers to con-tact their elected representatives and APS and SRP execu-tives immediately demanding a delay in producing radioac-tive materials at the facilityi Despite mounting, widespread opposition to the reactor as reflected in the e3ection of a State Corporation Com-mission commItted to~ but unable to~ control it Phoenicians regu3arly have been denied the means necessary to evaluate the impact of the PVNGS on their lives, liberties~ property and happiness o
Xn the absence of public discussion of the -issue, we believe~ basic Constitutional rights habe been abrogated and the chances of'nscheduled releases of radioactivity into oux environment have been increased,
0 eO l
C E
~+
pl.
1'
~
E
Prof.
Mark Reader Arizona Rainbow Coalition 1965 E. Ellis
- Tempe, AZ 85282