ML17300A036: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML17300A036
| number = ML17300A036
| issue date = 10/31/2017
| issue date = 10/31/2017
| title = 10/23/2017 Summary of Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Potential License Amendment Request Related to Emergency Diesel Generator Technical Specifications
| title = Summary of Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Potential License Amendment Request Related to Emergency Diesel Generator Technical Specifications
| author name = Kuntz R
| author name = Kuntz R
| author affiliation = NRC/NRR/DORL/LPLIII
| author affiliation = NRC/NRR/DORL/LPLIII
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 31, 2017 LICENSEE:
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 31, 2017 LICENSEE:       Northern States Power Company, doing business as Xcel Energy FACILITY:       Monticello Nuclear Generating Plant
Northern States Power Company, doing business as Xcel Energy FACILITY:
Monticello Nuclear Generating Plant  


==SUBJECT:==
==SUBJECT:==
Line 26: Line 24:
==SUMMARY==
==SUMMARY==
OF OCTOBER 23, 2017, MEETING WITH NORTHERN STATES POWER COMPANY, DOING BUSINESS AS XCEL ENERGY, ON POTENTIAL LICENSE AMENDMENT REQUEST RELATED TO EMERGENCY DIESEL GENERATOR TECHNICAL SPECIFICATIONS (EPID L-2017-LRM-0031)
OF OCTOBER 23, 2017, MEETING WITH NORTHERN STATES POWER COMPANY, DOING BUSINESS AS XCEL ENERGY, ON POTENTIAL LICENSE AMENDMENT REQUEST RELATED TO EMERGENCY DIESEL GENERATOR TECHNICAL SPECIFICATIONS (EPID L-2017-LRM-0031)
On October 23, 2017, a Category 1 teleconference was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Northern States Power Company. The purpose of the meeting was to discuss a potential license amendment request to remove technical specification (TS) operating mode restrictions for emergency diesel generator (EOG) surveillance testing for the Monticello Nuclear Generating Plant (Monticello).
On October 23, 2017, a Category 1 teleconference was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Northern States Power Company. The purpose of the meeting was to discuss a potential license amendment request to remove technical specification (TS) operating mode restrictions for emergency diesel generator (EOG) surveillance testing for the Monticello Nuclear Generating Plant (Monticello). The meeting notice and agenda, dated October 27, 2016, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML17283A262. A list of attendees is provided as Enclosure 1.
The meeting notice and agenda, dated October 27, 2016, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML17283A262.
The licensee presented information (ADAMS Accession No. ML17293A429) related to the potential amendment request. The licensee stated that the proposed change would remove the mode restrictions from the notes on surveillance requirements 3.8.1.7 and 3.8.1.9 in the Monticello TSs. Surveillance requirement 3.8.1.7 requires demonstrating that the EOG can reject its single largest load without the EOG output frequency exceeding a specific limit.
A list of attendees is provided as Enclosure 1 . The licensee presented information (ADAMS Accession No. ML17293A429) related to the potential amendment request. The licensee stated that the proposed change would remove the mode restrictions from the notes on surveillance requirements 3.8.1.7 and 3.8.1.9 in the Monticello TSs. Surveillance requirement 3.8.1.7 requires demonstrating that the EOG can reject its single largest load without the EOG output frequency exceeding a specific limit. Surveillance requirement 3.8.1.9 requires starting and then running the EOG continuously at, or near, full-load capability for greater than or equal to 8 hours. The NRC staff provided the licensee comments about the proposed amendment.
Surveillance requirement 3.8.1.9 requires starting and then running the EOG continuously at, or near, full-load capability for greater than or equal to 8 hours.
Specifically, the staff noted that the proposed amendment request should consider past precedents, including any requests for additional information issued by the NRC staff and the responses, and how the precedent applies in this case. The NRC staff also noted that the application should include any mitigative actions that would be done during any testing in Modes 1 or 2, and what is unique about the configuration at Monticello that should be considered for this deviation from the standard TSs. Members of the public were not in attendance.
The NRC staff provided the licensee comments about the proposed amendment. Specifically, the staff noted that the proposed amendment request should consider past precedents, including any requests for additional information issued by the NRC staff and the responses, and how the precedent applies in this case. The NRC staff also noted that the application should include any mitigative actions that would be done during any testing in Modes 1 or 2, and what is unique about the configuration at Monticello that should be considered for this deviation from the standard TSs.
Docket No. 50-263  
Members of the public were not in attendance.
 
Ro ert F. Kuntz, Seni Plant Licensing Branc Division of Operating R ctor Licensing Office of Nuclear Reactor Regulation Docket No. 50-263


==Enclosure:==
==Enclosure:==
List of Attendees cc w/encl: Distribution via Listserv


List of Attendees cc w/encl: Distribution via Listserv Ro ert F. Kuntz, Seni Plant Licensing Branc Division of Operating R ctor Licensing Office of Nuclear Reactor Regulation LIST OF ATTENDEES OCTOBER 23, 2017, MEETING WITH NORTHERN STATES POWER COMPANY, DOING BUSINESS AS XCEL ENERGY Robert Kuntz Peter Syder Prem Sahay Sara Scott Peter Gohdes Bobbi Jo Halvorson Chris Troy POTENTIAL LICENSE AMENDMENT FOR THE MONTICELLO NUCLEAR GENERATING PLANT Nuclear Regulatory Commission (NRC) NRC NRC Xcel Energy Xcel Energy Xcel Energy Xcel Energy Enclosure  
LIST OF ATTENDEES OCTOBER 23, 2017, MEETING WITH NORTHERN STATES POWER COMPANY, DOING BUSINESS AS XCEL ENERGY POTENTIAL LICENSE AMENDMENT FOR THE MONTICELLO NUCLEAR GENERATING PLANT Robert Kuntz      Nuclear Regulatory Commission (NRC)
Peter Syder        NRC Prem Sahay        NRC Sara Scott        Xcel Energy Peter Gohdes      Xcel Energy Bobbi Jo Halvorson Xcel Energy Chris Troy        Xcel Energy Enclosure


==SUBJECT:==
Meeting Notice ML17283A262 Meeting Summary ML17300A036 Handouts ML17293A429 OFFICE   NRR/DORL/LPL3/PM   NRR/DORL/LPL3/LA NRR/DORL/LPL3/BC NRR/DORL/LPL3/PM NAME     RKuntz             SRohrer         DWrona          RKuntz DATE     10/30/2017         10/30/2017       10/30/2017       10/31/2017}}
 
==SUMMARY==
OF OCTOBER 23, 2017, MEETING WITH NORTHERN STATES POWER COMPANY, DOING BUSINESS AS XCEL ENERGY, ON POTENTIAL LICENSE AMENDMENT REQUEST RELATED TO EMERGENCY DIESEL GENERATOR TECHNICAL SPECIFICATIONS (EPID L-2017-LRM-0031)
DATED OCTOBER 31, 2017 DISTRIBUTION:
PUBLIC LPL3 r/f RidsACRS_MailCTR Resource RidsNrrDorlLpl3 Resource RidsNrrPMMonticello Resource RidsNrrLASRohrerResource RidsRgnlllMailCenter Resource PSahay, NRR PSnyder, NRR ADAMS Accession Nos. Meeting Notice ML17283A262 Meeting Summary ML17300A036 Handouts ML17293A429 OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NAME RKuntz SRohrer DATE 10/30/2017 10/30/2017 NRR/DORL/LPL3/BC DWrona 10/30/2017 OFFICIAL RECORD COPY NRR/DORL/LPL3/PM RKuntz 10/31/2017}}

Latest revision as of 20:53, 2 December 2019

Summary of Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Potential License Amendment Request Related to Emergency Diesel Generator Technical Specifications
ML17300A036
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 10/31/2017
From: Robert Kuntz
Plant Licensing Branch III
To:
Northern States Power Co
Kuntz R
References
EPID L-2017-LRM-0031
Download: ML17300A036 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 31, 2017 LICENSEE: Northern States Power Company, doing business as Xcel Energy FACILITY: Monticello Nuclear Generating Plant

SUBJECT:

SUMMARY

OF OCTOBER 23, 2017, MEETING WITH NORTHERN STATES POWER COMPANY, DOING BUSINESS AS XCEL ENERGY, ON POTENTIAL LICENSE AMENDMENT REQUEST RELATED TO EMERGENCY DIESEL GENERATOR TECHNICAL SPECIFICATIONS (EPID L-2017-LRM-0031)

On October 23, 2017, a Category 1 teleconference was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Northern States Power Company. The purpose of the meeting was to discuss a potential license amendment request to remove technical specification (TS) operating mode restrictions for emergency diesel generator (EOG) surveillance testing for the Monticello Nuclear Generating Plant (Monticello). The meeting notice and agenda, dated October 27, 2016, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML17283A262. A list of attendees is provided as Enclosure 1.

The licensee presented information (ADAMS Accession No. ML17293A429) related to the potential amendment request. The licensee stated that the proposed change would remove the mode restrictions from the notes on surveillance requirements 3.8.1.7 and 3.8.1.9 in the Monticello TSs. Surveillance requirement 3.8.1.7 requires demonstrating that the EOG can reject its single largest load without the EOG output frequency exceeding a specific limit.

Surveillance requirement 3.8.1.9 requires starting and then running the EOG continuously at, or near, full-load capability for greater than or equal to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

The NRC staff provided the licensee comments about the proposed amendment. Specifically, the staff noted that the proposed amendment request should consider past precedents, including any requests for additional information issued by the NRC staff and the responses, and how the precedent applies in this case. The NRC staff also noted that the application should include any mitigative actions that would be done during any testing in Modes 1 or 2, and what is unique about the configuration at Monticello that should be considered for this deviation from the standard TSs.

Members of the public were not in attendance.

Ro ert F. Kuntz, Seni Plant Licensing Branc Division of Operating R ctor Licensing Office of Nuclear Reactor Regulation Docket No. 50-263

Enclosure:

List of Attendees cc w/encl: Distribution via Listserv

LIST OF ATTENDEES OCTOBER 23, 2017, MEETING WITH NORTHERN STATES POWER COMPANY, DOING BUSINESS AS XCEL ENERGY POTENTIAL LICENSE AMENDMENT FOR THE MONTICELLO NUCLEAR GENERATING PLANT Robert Kuntz Nuclear Regulatory Commission (NRC)

Peter Syder NRC Prem Sahay NRC Sara Scott Xcel Energy Peter Gohdes Xcel Energy Bobbi Jo Halvorson Xcel Energy Chris Troy Xcel Energy Enclosure

Meeting Notice ML17283A262 Meeting Summary ML17300A036 Handouts ML17293A429 OFFICE NRR/DORL/LPL3/PM NRR/DORL/LPL3/LA NRR/DORL/LPL3/BC NRR/DORL/LPL3/PM NAME RKuntz SRohrer DWrona RKuntz DATE 10/30/2017 10/30/2017 10/30/2017 10/31/2017