ML18088A224: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 9, 2018 MEMORANDUM TO:           Andrea Veil, Executive Director Advisory Committee on Reactor Safeguards FROM:                     Robert M. Taylor, Acting Director /RA - A. Bradford for/
-0001   April 9, 2018 MEMORANDUM TO:
Andrea Veil, Executive Director Advisory Committee on Reactor Safeguards FROM:   Robert M. Taylor , Acting Director   /RA - A. Bradford for/
Division of New Reactor Licensing Office of New Reactors
Division of New Reactor Licensing Office of New Reactors


==SUBJECT:==
==SUBJECT:==
ADVANCED BOILING
ADVANCED BOILING-WATER REACTOR DESIGN CERTIFICATION RENEWAL APPLICATION SAFETY EVALUATION WITH NO OPEN ITEMS FOR SECTION 13.3, EMERGENCY PLANNING By letter dated December 7, 2010, GE-Hitachi Nuclear Energy (GEH) submitted an application to the U.S. Nuclear Regulatory Commission (NRC) requesting renewal of the Advanced Boiling-Water Reactor (ABWR) design certification (DC).
-WATER REACTOR DESIGN CERTIFICATION RENEWAL APPLICATION SAFETY EVALUATION WITH NO OPEN ITEMS FOR SECTION 13.3 , "EMERGENCY PLANNING
Based on our review of the application, the staff is providing the Advisory Committee on Reactor Safeguards (ACRS) its safety evaluation (SE) with no open items associated with Section 12.3, Emergency Planning, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18057A480). This SE supplements the final safety evaluation report for the ABWR DC that was documented in NUREG-1503, Final Safety Evaluation Report Related to the Certification of the Advanced Boiling Water Reactor Design, and NUREG-1503, Supplement 1. Unless otherwise stated in the SE, the staffs review was based on Revision 6 of the ABWR design control document. The SE is being provided to support a future meeting of the subcommittee of the ACRS. The ACRS full committee meeting will be held after the subcommittee meeting.
"    By letter dated December 7, 20 10 , GE-Hitachi Nuclear Energy (GEH) submitted an application to the U.S. Nuclear Regulatory Commission (NRC) requesting renewal of the Advanced Boiling-Water Reactor (ABWR) design certification (DC). Based on our review of the application, the staff is providing the Advisory Committee on Reactor Safeguards (ACRS) its safety evaluation (SE) with no open items associated with Section 12.3 , "Emergency Planning
CONTACT: Adrian Muniz, DNRL/LB3 301-415-4093
," (Agencywide Documents Access and Management System (ADAMS) Accession No.
 
ML18057A480). This SE supplements the final safety evaluation report for the ABWR DC that was documented in NUREG-1503, "Final Safety Evaluation Report Related to the Certification of the Advanced Boiling Water Reactor Design," and NUREG-1503, Supplement 1. Unles s otherwise stated in the SE , the staff's review was based on Revision 6 of the ABWR design control document. The SE is being provided to support a future meeting of the subcommittee of the ACRS. The ACRS full committee meeting will be h eld after the subcommittee meeting.
A. Veil                                       The staff concludes that the SE does not contain any information exempt from public disclosure.
CONTACT: Adrian Muniz, DNRL/LB3 301-415-4093 A. Veil       The staff concludes that the SE does not contain any information exempt from public disclosure. However, the NRC will withhold the SE from public disclosure for 10 business days to allow GEH the opportunity to verify the staff's conclusion that the SE contains no such exempt information. Therefore, the staff requests that the ACRS withhold the SE from public disclosure until the information has been released publicly in ADAMS.
However, the NRC will withhold the SE from public disclosure for 10 business days to allow GEH the opportunity to verify the staffs conclusion that the SE contains no such exempt information. Therefore, the staff requests that the ACRS withhold the SE from public disclosure until the information has been released publicly in ADAMS.
The staff will inform the ACRS immediately if GEH requests that any of the information in the SE be withheld from public disclosure.
The staff will inform the ACRS immediately if GEH requests that any of the information in the SE be withheld from public disclosure.
Docket No.: 52-0 45 
Docket No.: 52-045


.: Package: ML18057A450   Memorandum
Package: ML18057A450 Memorandum: ML18088A224 SE - ML18057A480                       NRO-002 OFFICE DNRL:LB3:PM       DNRL:LA       DNRL:BWR:BC     DNRL: D NAME     AMuniz         SGreen       AFetter (Acting) RTaylor (Acting) (ABradford for)
:   ML18088A224 SE - ML18057A480 NRO-002 OFFICE DNRL:LB3:PM DNRL:LA DNRL:BWR:BC DNRL: D NAME AMuniz SGreen AFetter (Acting)
DATE     3/30/2018       03/29/2018   04/02/2018       4/9/2018}}
RTaylor (Acting)
(ABradford for)
DATE 3/30/2018 03/29/2018 04/02/2018 4/9/2018}}

Latest revision as of 12:55, 21 October 2019

Memo - Safety Evaluation with No Open Items GEH Advanced Boiling Water Reactor Section 13.3, Emergency Planning
ML18088A224
Person / Time
Site: 05200045
Issue date: 04/09/2018
From: Renee Taylor
NRC/NRO/DNRL
To: Andrea Veil
Advisory Committee on Reactor Safeguards
Muniz A
Shared Package
ML18057A450 List:
References
Download: ML18088A224 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 9, 2018 MEMORANDUM TO: Andrea Veil, Executive Director Advisory Committee on Reactor Safeguards FROM: Robert M. Taylor, Acting Director /RA - A. Bradford for/

Division of New Reactor Licensing Office of New Reactors

SUBJECT:

ADVANCED BOILING-WATER REACTOR DESIGN CERTIFICATION RENEWAL APPLICATION SAFETY EVALUATION WITH NO OPEN ITEMS FOR SECTION 13.3, EMERGENCY PLANNING By letter dated December 7, 2010, GE-Hitachi Nuclear Energy (GEH) submitted an application to the U.S. Nuclear Regulatory Commission (NRC) requesting renewal of the Advanced Boiling-Water Reactor (ABWR) design certification (DC).

Based on our review of the application, the staff is providing the Advisory Committee on Reactor Safeguards (ACRS) its safety evaluation (SE) with no open items associated with Section 12.3, Emergency Planning, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18057A480). This SE supplements the final safety evaluation report for the ABWR DC that was documented in NUREG-1503, Final Safety Evaluation Report Related to the Certification of the Advanced Boiling Water Reactor Design, and NUREG-1503, Supplement 1. Unless otherwise stated in the SE, the staffs review was based on Revision 6 of the ABWR design control document. The SE is being provided to support a future meeting of the subcommittee of the ACRS. The ACRS full committee meeting will be held after the subcommittee meeting.

CONTACT: Adrian Muniz, DNRL/LB3 301-415-4093

A. Veil The staff concludes that the SE does not contain any information exempt from public disclosure.

However, the NRC will withhold the SE from public disclosure for 10 business days to allow GEH the opportunity to verify the staffs conclusion that the SE contains no such exempt information. Therefore, the staff requests that the ACRS withhold the SE from public disclosure until the information has been released publicly in ADAMS.

The staff will inform the ACRS immediately if GEH requests that any of the information in the SE be withheld from public disclosure.

Docket No.: 52-045

Package: ML18057A450 Memorandum: ML18088A224 SE - ML18057A480 NRO-002 OFFICE DNRL:LB3:PM DNRL:LA DNRL:BWR:BC DNRL: D NAME AMuniz SGreen AFetter (Acting) RTaylor (Acting) (ABradford for)

DATE 3/30/2018 03/29/2018 04/02/2018 4/9/2018