ML18139B532: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (One intermediate revision by the same user not shown) | |||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:",:",:.-.. _.,. -.a". <<:JG+Als t+ § ::0 I | {{#Wiki_filter:",:",:.-.. _.,. -.a". | ||
Mr. Stephen A. Varga, Chief Operating Reactors Branch No. l Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555 | <<:JG+Als t+ | ||
§ | |||
::0 I | |||
I | |||
*\\ | |||
e e | |||
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 R.H.LEA.SBUBO VxcB PRBsiD.BNT NuCLBAJ! OPBRATIONS September 14, 1981 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attention: Mr. Stephen A. Varga, Chief Operating Reactors Branch No. l Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. | |||
20555 | |||
==Dear Mr. Denton:== | ==Dear Mr. Denton:== | ||
Serial No. 329A PS E&C/JEW Docket No. 50-280 50-281 License No. DP~-32 DPR-37 RESPONSE TO SAFETY EVALUATION REPORT FOR ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL EQUIPMENT I.E. BULLETIN 79-018 90-DAY REVIEW SURRY POWER STATION UNITS 1 AND 2 As specified in Vepco letter serial number 329, dated August 24, 1981, enclosed are the System Component Evaluation Work Sheets, Section 6 of Revision 4 to the I.E. Bulletin 79-018 90-Day Review for Surry Power Station Units land 2. Also enclosed are errata sheets for Section 5, Master List and Section 7, Conclusions, and an addenda for Section 1, Introduction. | Serial No. 329A PS E&C/JEW Docket No. 50-280 50-281 License No. DP~-32 DPR-37 RESPONSE TO SAFETY EVALUATION REPORT FOR ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL EQUIPMENT I.E. BULLETIN 79-018 90-DAY REVIEW SURRY POWER STATION UNITS 1 AND 2 As specified in Vepco letter serial number 329, dated August 24, 1981, enclosed are the System Component Evaluation Work Sheets, Section 6 of Revision 4 to the I.E. Bulletin 79-018 90-Day Review for Surry Power Station Units land 2. Also enclosed are errata sheets for Section 5, Master List and Section 7, Conclusions, and an addenda for Section 1, Introduction. In addition, errata sheets for Table 3 (Appendix B) of the Surry Power Station Units land 2 Response to Safety Evaluation Report by Office of Nuclear Reactor Regulation are included. | ||
In addition, errata sheets for Table 3 (Appendix B) of the Surry Power Station Units land 2 Response to Safety Evaluation Report by Office of Nuclear Reactor Regulation are included. | Ve~~ | ||
Ve~~ R.H. Leasburg Attachments}} | R.H. Leasburg Attachments}} | ||
Latest revision as of 21:07, 5 January 2025
| ML18139B532 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 09/14/1981 |
| From: | Leasburg R VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | Harold Denton, Varga S Office of Nuclear Reactor Regulation |
| References | |
| 329A, IEB-79-01B, IEB-79-1B, NUDOCS 8109220660 | |
| Download: ML18139B532 (1) | |
Text
",:",:.-.. _.,. -.a".
<<:JG+Als t+
§
- 0 I
I
- \\
e e
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 R.H.LEA.SBUBO VxcB PRBsiD.BNT NuCLBAJ! OPBRATIONS September 14, 1981 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attention: Mr. Stephen A. Varga, Chief Operating Reactors Branch No. l Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Denton:
Serial No. 329A PS E&C/JEW Docket No. 50-280 50-281 License No. DP~-32 DPR-37 RESPONSE TO SAFETY EVALUATION REPORT FOR ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL EQUIPMENT I.E. BULLETIN 79-018 90-DAY REVIEW SURRY POWER STATION UNITS 1 AND 2 As specified in Vepco letter serial number 329, dated August 24, 1981, enclosed are the System Component Evaluation Work Sheets, Section 6 of Revision 4 to the I.E.Bulletin 79-018 90-Day Review for Surry Power Station Units land 2. Also enclosed are errata sheets for Section 5, Master List and Section 7, Conclusions, and an addenda for Section 1, Introduction. In addition, errata sheets for Table 3 (Appendix B) of the Surry Power Station Units land 2 Response to Safety Evaluation Report by Office of Nuclear Reactor Regulation are included.
Ve~~
R.H. Leasburg Attachments