Forwards Sys Component Evaluation Work Sheets for Section 6 of Revision 4 to IE Bulletin 79-01B 90-day Review,Errata Sheets for Section 5 of Master List & Section 7 of Conclusions & Addenda for Section 1 of Introduction
ML18139B532
Person / Time
Site: Surry  Dominion icon.png
Issue date: 09/14/1981
From: Leasburg R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Varga S
Office of Nuclear Reactor Regulation
References
329A, IEB-79-01B, IEB-79-1B, NUDOCS 8109220660
Download: ML18139B532 (1)


Text

",:",:.-.. _.,. -.a".

<<:JG+Als t+

§

0 I

I

  • \\

e e

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 R.H.LEA.SBUBO VxcB PRBsiD.BNT NuCLBAJ! OPBRATIONS September 14, 1981 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attention: Mr. Stephen A. Varga, Chief Operating Reactors Branch No. l Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Denton:

Serial No. 329A PS E&C/JEW Docket No. 50-280 50-281 License No. DP~-32 DPR-37 RESPONSE TO SAFETY EVALUATION REPORT FOR ENVIRONMENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL EQUIPMENT I.E. BULLETIN 79-018 90-DAY REVIEW SURRY POWER STATION UNITS 1 AND 2 As specified in Vepco letter serial number 329, dated August 24, 1981, enclosed are the System Component Evaluation Work Sheets, Section 6 of Revision 4 to the I.E.Bulletin 79-018 90-Day Review for Surry Power Station Units land 2. Also enclosed are errata sheets for Section 5, Master List and Section 7, Conclusions, and an addenda for Section 1, Introduction. In addition, errata sheets for Table 3 (Appendix B) of the Surry Power Station Units land 2 Response to Safety Evaluation Report by Office of Nuclear Reactor Regulation are included.

Ve~~

R.H. Leasburg Attachments