| issue date = 10/05/2012
| issue date = 10/05/2012
| title = 2011 Quad Cities Nuclear Power Station Initial License Examination Proposed Job Performance Measures Test
| title = 2011 Quad Cities Nuclear Power Station Initial License Examination Proposed Job Performance Measures Test
| author name = Moore C R
| author name = Moore C
| author affiliation = NRC/RGN-III/DRS/OB
| author affiliation = NRC/RGN-III/DRS/OB
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:SRRS: 3D.105 (when utilized for operator initial or continuing training)
{{#Wiki_filter:Exelon Nuclear Job Performance Measure Perform One-Rod-Out Interlock Surveillance JPM Number: RO Admin 1 Revision Number: 0 Date: 04/04/2011 Developed By:
Exelon Nuclear Job Performance Measure Perform One-Rod-Out Interlock Surveillance JPM Number: RO Admin 1 Revision Number:
Instructor       Date Validated By:
0 Date: 0 4/04/2011   Developed By:
SME or Instructor     Date Reviewed By:
Instructor Date Validated By:
Operations Representative   Date Approved By:
SME or Instructor Date Reviewed By:
Training Department     Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
Operations Representative Date Approved By:
 
Training Department Date RO Admin 1
RO Admin 1 - Rev 0 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
- Rev 0  SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 10  JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________     1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________     2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________     3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
________     4. Initial setup conditions are identified.
________ 4. Initial setup conditions are identified.
________     5. Initiating cue (and terminating cue if required) are properly identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     6. Task standards identified and verified by SME review.
________ 6. Task standards identified and verified by SME review.
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________     8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure                               Rev:
Procedure Rev:   Procedure Rev:   Procedure Rev:   ________ 9. Verify cues both verbal and visual are free of conflict.
Procedure                               Rev:
________ 10. Verify performance time is accurate
Procedure                               Rev:
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     9. Verify cues both verbal and visual are free of conflict.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
________     10. Verify performance time is accurate
SME / Instructor Date       SME / Instructor Date       SME / Instructor Date RO Admin 1
________     11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
- Rev 0  SRRS: 3D.105 (when utilized for operator initial or continuing training)
________     12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Page 3 of 10 Revision Record (Summary)
SME / Instructor                             Date SME / Instructor                             Date SME / Instructor                             Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
Revision 00, This JPM was developed new fo r the 2011 ILT NRC Exam.
Page 2 of 10


RO Admin 1
RO Admin 1 - Rev 0 Revision Record (Summary)
- Rev 0 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Revision 00,    This JPM was developed new for the 2011 ILT NRC Exam.
Page 4 of 10 SIMULATOR SETUP INSTRUCTIONS
SRRS: 3D.105 (when utilized for operator initial or continuing training)
: 1. Reset the Simul ator to IC
Page 3 of 10
: 8. (Any Shutdown IC in which the Mode Switch can be placed in REFUEL
 
) NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
RO Admin 1 - Rev 0 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the Simulator to IC 8.
(Any Shutdown IC in which the Mode Switch can be placed in REFUEL)
NOTE:     It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Go to RUN.
: 2. Go to RUN.
: 3. Lock the Mode Switch in REFUEL.
: 3. Lock the Mode Switch in REFUEL.
: 4. Verify the RWM is NOT bypassed.
: 4. Verify the RWM is NOT bypassed.
: 5. Turn Rod Select Power OFF and ON
: 5. Turn Rod Select Power OFF and ON. (Verifies no rod selected at start of JPM)
. (Verifies no rod selected at start of JPM)
: 6. Verify the REFUEL PERMIT light is ON.
: 6. Verify the REFUEL PERMIT light is ON.
: 7. Verify ROD OUT BLOCK annunciator (901-5, C-3) is ON. 8. Acknowledge annunciators as necessary.
: 7. Verify ROD OUT BLOCK annunciator (901-5, C-3) is ON.
: 9. Provide a current revision of the following procedures, signed off as follows
: 8. Acknowledge annunciators as necessary.
QCOS 0300-17 o With applicable Mode
: 9. Provide a current revision of the following procedures, signed off as follows:
-5 Prerequisites signed off.
* QCOS 0300-17 o With applicable Mode-5 Prerequisites signed off.
o With Steps H.4.b and H.11.b marked N/A.
o With Steps H.4.b and H.11.b marked N/A.
QCOP 0207-02 with Prerequisites signed off.
* QCOP 0207-02 with Prerequisites signed off.
: 10. Provide Equipment Status Tag filled out as follows: "Rod Worth Minimizer in Bypass"
: 10. Provide Equipment Status Tag filled out as follows:
: 11. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation
* Rod Worth Minimizer in Bypass
 
: 11. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
Checklist.
: 12. This completes the setup for this JPM.
: 12. This completes the setup for this JPM.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 4 of 10


RO Admin 1
RO Admin 1 - Rev 0 INITIAL CONDITIONS Preparations are being made to begin refueling operations.
- Rev 0 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 10 INITIAL CONDITIONS Preparations are being made to begin refueling operations.
The Mode Switch is locked in REFUEL.
The Mode Switch is locked in REFUEL.
All Prerequisites have been completed for QCOS 0300
All Prerequisites have been completed for QCOS 0300-17, One-Rod-Out Interlock Surveillance.
-17, One-Rod-Out Interlock Surveillance. The Unit Supervisor has reviewed steps of QCOS 0300
The Unit Supervisor has reviewed steps of QCOS 0300-17 and identified the Not-Applicable (N/A) steps.
-17 and identified the Not
All QCOP 0207-02 All Prerequisites have been completed for bypassing the Rod Worth Minimizer (RWM).
-Applicable (N/A) steps.
The necessary Equipment Status Tag has been prepared.
All QCOP 0207
INITIATING CUE Perform the One-Rod-Out Interlock Surveillance, QCOS 0300-17.
-02 All Prerequisites have been completed for bypassing the Rod Worth Minimizer (RWM).
EVALULATOR: Provide the prepared support material:
The necessary Equipment Status Tag has been prepared. INITIATING CUE Perform the One
* QCOS 0300-17
-Rod-Out Interlock Surveillance, QCOS 0300
* QCOP 0207-02
-17.
* Equipment Status Tag Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
EVALULATOR:
Information For Evaluators Use:
Provide the prepared support material
UNSAT requires written comments on respective step.
QCOS 0300-17   QCOP 0207-02   Equipment Status Tag Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use: UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to  
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
 
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 10


RO Admin 1
RO Admin 1 - Rev 0 JPM Start Time:
- Rev 0 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Comment STEP                   ELEMENT                                 STANDARD                 SAT   UNSAT Number H.1       QCOP 0207-02 referenced for             Bypass the RWM per QCOP              ___  ___      ___
Page 6 of 10  JPM Start Time:
bypassing RWM                            0207-02.
STEP ELEMENT STANDARD SAT UNSAT Comment Number H.1 QCOP 0207-02 referenced for bypassing RWM Bypass the RWM per QCOP 0207-02. ___ ___ ___ QCOP 0207-02 F.1 Initials step f. (Performing a  
QCOP 0207-02 Initials step f. (Performing a          Initial the reason that the RWM      ___   ___     ___
Procedure or Test which                  is being bypassed.
F.1      specifically references bypassing the RWM)
QCOP 0207-02 Fills in Procedure/Test # as:            Fill in Procedure/Test number.      ___  ___      ___
QCOS 0300-17 F.1.f (1)
QCOP 0207-02 Fills in Step # as:                      Fill in Step number.                ___  ___      ___
Step H.1 F.1.f (2)
QCOP 0207-02 Attaches the prepared                    Prepare an Equipment Status          ___  ___      ___
Equipment Status Tag to the              Tag to Read Rod Worth F.2.a      ROD MOVEMENT CONT                        Minimizer in Bypass and attach SWITCH                                  it to the ROD MOVEMENT CONT SWITCH.
QCOP 0207-02
            *RWM MODE SELECT switch                  Place the RWM MODE                  ___  ___      ___
selected to BYPASS
* SELECT switch to BYPASS and
*F.2.b    and the date and time is                record the Date and Time.
recorded EVALUATOR NOTE: The ROD OUT BLOCK annunciator will clear when a rod is selected.
  *H.2      *A Control Rod selected,*                Select a peripheral Control Rod.
which should be a peripheral rod H.3      Rod Out Permit light is                Verify Rod Out Permit light is    ___  ___      ___
verified ON                              on.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 6 of 10


Procedure or Test which specifically references bypassing the RWM) Initial the reason that the RWM is being bypassed
RO Admin 1 - Rev 0 Comment STEP                   ELEMENT                                 STANDARD             SAT   UNSAT Number
. ___ ___ ___ QCOP 0207-02 F.1.f (1) Fills in Procedure/Test # as
*H.4.a     *Selected Control Rod                   Withdraw the selected Control    ___  ___      ___
: QCOS 0300-17  Fill in Procedure/Test number. ___ ___ ___ QCOP 0207-02 F.1.f (2) Fills in Step # as
withdrawn* one (1) notch                 Rod one (1) notch.
: Step H.1 Fill in Step number
  *H.5     *ROD SELECT POWER                        Turn ROD SELECT POWER             ___  ___      ___
. ___ ___ ___ QCOP 0207-02 F.2.a Attaches the prepared Equipment Status Tag to the ROD MOVEMENT CONT SWITCH Prepare an Equipment Status Tag to Read "Rod Worth Minimizer in Bypass" and attach it to the ROD MOVEMENT CONT SWITCH.
switch placed in OFF*                    switch to OFF.
___ ___ ___ QCOP 0207-02 *F.2.b RWM MODE SELECT switch selected to BYPASS  and the date and time is recorded  Place the RWM MODE SELECT switch to BYPASS and record the Date and Time.
  *H.6     *ROD SELECT POWER                        Turn ROD SELECT POWER             ___  ___      ___
___ ___ ___ EVALUATOR NOTE:  The ROD OUT BLOCK annunciator will clear when a rod is selected.
switch placed in ON*                    switch to ON.
*H.2 A Control Rod selected
EVALUATOR NOTE: The ROD OUT BLOCK annunciator will alarm when the rod is selected.
, which should be a peripheral rod Select a peripheral Control Rod.
  *H.7     *A second Control Rod is       Select a peripheral Control Rod            ___  ___      ___
H.3 "Rod Out Permit" light is verified ON Verify "Rod Out Permit" light is on. ___ ___ ___
selected*, which should be a   on the opposite side of the core.
RO Admin 1
peripheral Rod on the opposite side of the core H.8       Control Rod Withdrawal Block             Verify the Control Rod            ___  ___      ___
- Rev 0 SRRS: 3D.105 (when utilized for operator initial or continuing training)
verified in effect (Annunciator         withdrawal block cannot be 901-5 A-3 ROD OUT BLOCK                 cleared.
Page 7 of 10 STEP ELEMENT STANDARD SAT UNSAT Comment Number *H.4.a Selected Control Rod withdrawn one (1) notch Withdraw the selected Control Rod one (1) notch. ___ ___ ___ *H.5 ROD SELECT POWER switch placed in OFF Turn ROD SELECT POWER switch to OFF. ___ ___ ___ *H.6 ROD SELECT POWER switch placed in ON Turn ROD SELECT POWER switch to ON
in alarm)
. ___ ___ ___ EVALUATOR NOTE: The ROD OUT BLOCK annunciator will alarm when the rod is selected. *H.7 A second Control Rod is selected, which should be a peripheral Rod on the opposite side of the core Select a peripheral Control Rod on the opposite side of the core
H.9      ROD SELECT POWER switch                  Turn ROD SELECT POWER            ___  ___      ___
. ___ ___ ___ H.8 Control Rod Withdrawal Block verified in effect (Annunciator 901-5 A-3 ROD OUT BLOCK in alarm) Verify the Control Rod  
placed in OFF                            switch to OFF.
H.10      ROD SELECT POWER switch                  Turn ROD SELECT POWER            ___  ___      ___
placed in ON                            switch to ON.
H.11.a      Withdrawn Rod fully inserted            Insert the withdrawn Control     ___  ___      ___
Rod to Position 00.
H.12      QCOP 0207-02 referenced for              Return the RWM to normal          ___  ___      ___
returning RWM to service                operation per QCOP 0207-02.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 7 of 10


withdrawal block cannot be cleared. ___ ___ ___ H.9 ROD SELECT POWER switch placed in OFF Turn ROD SELECT POWER switch to OFF
RO Admin 1 - Rev 0 Comment STEP                   ELEMENT                                 STANDARD                   SAT   UNSAT Number QCOP 0207-02 RWM MODE SELECT switch                  Place the RWM MODE                    ___  ___      ___
. ___ ___ ___ H.10 ROD SELECT POWER switch placed in ON Turn ROD SELECT POWER switch to ON
F.4.a     selected to NORMAL                      SELECT switch to NORMAL and the date and time is                 and record the Date and Time.
. ___ ___ ___ H.11.a Withdrawn Rod fully inserted Insert the withdrawn Control Rod to Position 00. ___ ___ ___ H.12 QCOP 0207-02 referenced for returning RWM to service Return the RWM to normal operation per QCOP 0207
recorded QCOP 0207-02 Equipment Status Tag                    If RWM is determined to be            ___  ___
-02. ___ ___ ___
F.4.b     removed from the ROD                     operable, THEN remove the MOVEMENT CONT SWITCH.                    Equipment Status Tag.
RO Admin 1
H.13.a     NO checked and NONE                 If this surveillance was              ___  ___      ___
- Rev 0 SRRS: 3D.105 (when utilized for operator initial or continuing training)
supplied for COMMENTS.                   satisfactory THEN:
Page 8 of 10 STEP ELEMENT STANDARD SAT UNSAT Comment Number QCOP 0207-02 F.4.a RWM MODE SELECT switch selected to NORMAL and the date and time is recorded  Place the RWM MODE SELECT switch to NORMAL and record the Date and Time.
Identify if test was Satisfactory with discrepancies with corrective actions performed as noted.
___ ___ ___ QCOP 0207-02 F.4.b Equipment Status Tag removed from the ROD MOVEMENT CONT SWITCH.
H.13.b     Surveillance performed by line           If this surveillance was               ___  ___      ___
If RWM is determined to be operable, THEN remove the Equipment Status Tag.
signed and dated                        satisfactory THEN:
___ ___  H.13.a "NO" checked and "NONE" supplied for COMMENTS.
Sign and date the Surveillance performed by line.
If this surveillance was satisfactory THEN: Identify if test was "Satisfactory with discrepancies with corrective actions performed as noted". ___ ___ ___ H.13.b Surveillance performed by line signed and dated If this surveillance was satisfactory THEN: Sign and date the Surveillance performed by line.
H.13.c     Completed Surveillance                   Sign and date the Surveillance         ___  ___      ___
___ ___ ___ H.13.c Completed Surveillance presented to the Unit Supervisor for approval Sign and date the Surveillance approved by line.
presented to the Unit                    approved by line.
___ ___ ___ EVALUATOR ROLE PLAY: As Unit Supervisor when presented with the completed QSOS 0300-17 to approve. You will review the surveillance.
Supervisor for approval EVALUATOR ROLE PLAY: As Unit Supervisor when presented with the completed QSOS 0300-17 to approve. You will review the surveillance.
EVALUATOR NOTE: The candidate should inform you that the task is complete.
EVALUATOR NOTE: The candidate should inform you that the task is complete.
JPM Stop Time:
JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 8 of 10


RO Admin 1
RO Admin 1 - Rev 0 JPM  
- Rev 0 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 9 of 10 JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Job
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title:
 
Perform One
==Title:==
-Rod-Out Interlock Surveillance JPM Number:
EO         RO   SRO       FS STA/IA         SRO Cert JPM
RO Admin 1 Revision Number:
 
0 Task Number and Title:
==Title:==
SR-0280-K20 , Given a Reactor Manual Control System (RMCS)/ Rod Position Information System (RPIS) operating mode and various plant conditions, EVALUATE the following Reactor Manual Control System (RMCS)/Rod Position Information System (RPIS) indications/responses and DETERMINE if the indication/ response is expected and normal: c. Movement control Indicating lights , (1) Rod Out Permissive
Perform One-Rod-Out Interlock Surveillance JPM Number: RO Admin 1                               Revision Number: 0 Task Number and
: e. Refuel Permissive K/A Number and Importance:
 
KA: 2.1.44   Rating: 3.9/3.8 Suggested Testing Environment:
==Title:==
Simulator   Alternate Path:
SR-0280-K20, Given a Reactor Manual Control System (RMCS)/ Rod Position Information System (RPIS) operating mode and various plant conditions, EVALUATE the following Reactor Manual Control System (RMCS)/Rod Position Information System (RPIS) indications/responses and DETERMINE if the indication/ response is expected and normal:
Yes No SRO Only: Yes No Time Critical:
: c. Movement control Indicating lights, (1) Rod Out Permissive
Yes No Reference(s):
: e. Refuel Permissive K/A Number and Importance:           KA: 2.1.44                   Rating: 3.9/3.8 Suggested Testing Environment: Simulator Alternate Path:     Yes       No SRO Only:               Yes         No   Time Critical: Yes       No Reference(s): QCOS 0300-17, Rev. 10, One-Rod-Out Interlock Surveillance QCOP 0207-02, Rev. 11, Rod Worth Minimizer Bypass Control Actual Testing Environment:             Simulator             Control Room           In-Plant     Other Testing Method:           Simulate             Perform Estimated Time to Complete: 15 minutes                         Actual Time Used:             minutes EVALUATION  
QCOS 0300-17, Rev. 10 , "One-Rod-Out Interlock Surveillance" QCOP 0207-02, Rev. 11, "Rod Worth Minimizer Bypass Control" Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
15 minutes Actual Time Used:
minute s EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                     Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory     Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                             (Print)
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Signature:                                                       Date:
Satisfactory Unsatisfactory Comments:               Evaluator's Name
SRRS: 3D.105 (when utilized for operator initial or continuing training)
:   (Print) Evaluator's Signature
Page 9 of 10
:   Date:
 
RO Admin 1
RO Admin 1 - Rev 0 INITIAL CONDITIONS Preparations are being made to begin refueling operations.
- Rev 0  SRRS: 3D.105 (when utilized for operator initial or continuing training)
The Mode Switch is locked in REFUEL.
Page 10 of 10 INITIAL CONDITIONS Preparations are being made to begin refueling operations.
All Prerequisites have been completed for QCOS 0300-17, One-Rod-Out Interlock Surveillance.
The Mode Switch is locked in REFUEL. All Prerequisites have been completed for QCOS 0300
-17, One-Rod-Out Interlock Surveillance.
The Unit Supervisor has reviewed steps of QCOS 0300-17 and identified the Not-Applicable (N/A) steps.
The Unit Supervisor has reviewed steps of QCOS 0300-17 and identified the Not-Applicable (N/A) steps.
All QCOP 0207
All QCOP 0207-02 All Prerequisites have been completed for bypassing the Rod Worth Minimizer (RWM).
-02 All Prerequisites have been completed for bypassing the Rod Worth Minimizer (R WM). The necessary Equipment Status Tag has been prepared.
The necessary Equipment Status Tag has been prepared.
INITIATING CUE Perform the One
INITIATING CUE Perform the One-Rod-Out Interlock Surveillance, QCOS 0300-17.
-Rod-Out Interlock Surveillance, QCOS 0300
SRRS: 3D.105 (when utilized for operator initial or continuing training)
-17.
Page 10 of 10
RO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 1 of 9  Exelon Nuclear Job Performance Measure Evaluate License Maintenance Requirements JPM Number:  RO Admin 2 Revision Number:
01 Date:  04/04/2011 Developed By:
Instructor Date  Validated By:
SME or Instructor Date  Reviewed By:
Operations Representative Date  Approved By:
Training Department Date Rev. 01  G:\DRSIII\License Examinations
\2011\Quad Cities
\Proposed\JPMs\admin\RO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 9  JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE:  All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 through 12 below. ________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure OP-AA-105-102  Rev: 09  ________ Procedure Rev:  Procedure Rev:  9. Verify cues both verbal and visual are free of conflict. ________ 10. Verify performance time is accurate
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date        SME / Instructor Date        SME / Instructor Date Rev. 01  G:\DRSIII\License Examinations
\2011\Quad Cities
\Proposed\JPMs\admin\RO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 3 of 9 Revision Record (Summary)
Revision 00, This JPM was developed from Bank JPM RO A.1.b for ILT Certification Exam 03-1 IAW NUREG 1021, Rev. 9.
Revision 01, This JPM was revised to incorporate procedure changes to OP
-AA-105-102, Rev. 9, and to update format and dates.


Rev. 01 G:\DRSIII\License Examinations
Exelon Nuclear Job Performance Measure Evaluate License Maintenance Requirements JPM Number: RO Admin 2 Revision Number: 01 Date: 04/04/2011 Developed By:
\2011\Quad Cities
Instructor                            Date Validated By:
\Proposed\JPMs\admin\RO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
SME or Instructor                          Date Reviewed By:
Page 4 of 9 INITIAL CONDITIONS Today is March 24 th, 2011. You have been assigned to the cover the Unit
Operations Representative                        Date Approved By:
-2 NSO position for April 4 th , 2011. The Operations department is working a hybrid 8
Training Department                          Date RO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
-hour/12-hour schedule.
Page 1 of 9
 
Rev. 01 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 through 12 below.
________      1. Task description and number, JPM description and number are identified.
________      2. Knowledge and Abilities (K/A) references are included.
________      3. Performance location specified. (in-plant, control room, simulator, or other)
________      4. Initial setup conditions are identified.
________      5. Initiating cue (and terminating cue if required) are properly identified.
________      6. Task standards identified and verified by SME review.
________      7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________      8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure OP-AA-105-102 Rev: 09 Procedure                          Rev:
Procedure                          Rev:
________      9. Verify cues both verbal and visual are free of conflict.
________      10. Verify performance time is accurate
________      11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________      12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                                      Date SME / Instructor                                      Date SME / Instructor                                      Date G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\RO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 9
 
Rev. 01 Revision Record (Summary)
Revision 00,      This JPM was developed from Bank JPM RO A.1.b for ILT Certification Exam 03-1 IAW NUREG 1021, Rev. 9.
Revision 01,      This JPM was revised to incorporate procedure changes to OP-AA-105-102, Rev. 9, and to update format and dates.
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\RO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 3 of 9
 
Rev. 01 INITIAL CONDITIONS Today is March 24th, 2011.
You have been assigned to the cover the Unit-2 NSO position for April 4th, 2011.
The Operations department is working a hybrid 8-hour/12-hour schedule.
Your primary assignment has been as a clearance order writer since the beginning of the 1st quarter 2011, however, during the past quarter you have covered the following shifts:
Your primary assignment has been as a clearance order writer since the beginning of the 1st quarter 2011, however, during the past quarter you have covered the following shifts:
One complete 12
* One complete 12-hour day shift as the Unit 2 Assist NSO on January 9th.
-hour day shift as the Unit 2 Assist NSO on January 9th.
* Five 8-hour afternoon shifts as Unit 1 NSO on February 15th through the 19th.
Five 8-hour afternoon shifts as Unit 1 NSO on February 15 th through the 19 th. Split two 12
* Split two 12-hour midnight shifts, working six hours as the Unit 2 NSO and the other six hours as a clearance writer during a weekend outage on February 26th and 27th.
-hour midnight shifts, working six hours as the Unit 2 NSO and the other six hours as a clearance writer during a weekend outage on February 26 th and 27 th. Split 8-hour day shifts working four hours as the Unit 1 Assist NSO and the other four hours as a clearance writer on March 7 th , 8 th , 9 th, 10 th, 11 th, 14 th, and 15 th. All shifts were logged by the Shift Manager.
* Split 8-hour day shifts working four hours as the Unit 1 Assist NSO and the other four hours as a clearance writer on March 7th, 8th, 9th, 10th, 11th, 14th, and 15th.
The remainder of the time, you have worked 8
* All shifts were logged by the Shift Manager.
-hour shifts on days as clearance writer Monday through Friday.
The remainder of the time, you have worked 8-hour shifts on days as clearance writer Monday through Friday.
INITIATING CUE
INITIATING CUE You are to review shift coverage for the 1st quarter, youre standing as an active licensed RO, and determine eligibility to assume shift for April 4th, 2011. Give an explanation for your determination.
 
Provide examinee with: a copy of OP-AA-105-102, NRC Active License Maintenance.
You are to review shift coverage for the 1st quarter, you're standing as an active licensed RO, and determine eligibility to assume shift for April 4 th, 2011. Give an explanation for your determination.
Provide examinee with:
a copy of OP
-AA-105-102, NRC Active License Maintenance.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use
Information For Evaluators Use:
: UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\RO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 4 of 9


Rev. 01 G:\DRSIII\License Examinations
Rev. 01 Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
\2011\Quad Cities
\Proposed\JPMs\admin\RO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 9 Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\RO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 9


Rev. 01 G:\DRSIII\License Examinations
Rev. 01 JPM Start Time:
\2011\Quad Cities
Comment STEP                       ELEMENT                             STANDARD                      SAT   UNSAT Number EVALUATOR NOTE: Provide the candidate with a completed copy of Attachment 1 Active License Tracking Log from OP-AA-105-102.
\Proposed\JPMs\admin\RO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
EVALUATOR NOTE: ONLY full shifts, either 8 or 12 hours with turnovers count towards shift coverage time allowed.
Page 6 of 9  JPM Start Time:
*OP-AA-105-102       *Reviews requirements to           Recognizes fact that the                ___  ___      ___
STEP ELEMENT SAT STANDARD UNSAT Comment Number EVALUATOR NOTE: Provide the candidate with a completed copy of Attachment 1 "Active License Tracking Log" from OP
maintain active license.*          minimum number of required hours of shift watch to maintain an active license have NOT been completed.
-AA-105-102. EVALUATOR NOTE: ONLY full shifts, either 8 or 12 hours with turnovers *OP-AA-105-102 count towards shift coverage time allowed.
*OP-AA-105-102       *Reviews requirements to           Determines he/she is NOT               ___  ___      ___
Reviews requirements to maintain active license. Recognizes fact that the minimum number of required hours of shift watch to maintain an active license have NOT been completed.
maintain active license.*          eligible to stand shift on April 4th, 2011 due to not having the minimum number of required shifts.
___ ___ ___ *OP-AA-105-102 Reviews requirements to maintain active license. Determines he/she is NOT eligible to stand shift on April 4 th, 2011 due to not having the minimum number of required shifts.
CUE:           When the candidate has determined that they are presently ineligible to assume the shift, ask them what additional requirements are needed to be able to stand the shift on April 4th, 2011.
___ ___ ___ CUE: When the candidate has determined that they are presently ineligible to assume the shift, ask them what additional requirements are needed to be able to stand the shift on April 4 th, 2011. *OP-AA-105-102 Reviews requirements to maintain active license. Determines that a minimum of one more complete eight or twelve-hour shift in March is needed to fulfill the requirements to maintain their license active.
*OP-AA-105-102       *Reviews requirements to           Determines that a minimum              ___  ___      ___
___ ___ ___ EVALUATOR NOTE: When the candidate determines that they cannot assume the shift for April 4 th, 2011, and has determined the correct amount of time needed to maintain their license active, inform them that the JPM is complete.
maintain active license.*          of one more complete eight or twelve-hour shift in March is needed to fulfill the requirements to maintain their license active.
EVALUATOR NOTE: When the candidate determines that they cannot assume the shift for April 4th, 2011, and has determined the correct amount of time needed to maintain their license active, inform them that the JPM is complete.
JPM Stop Time:
JPM Stop Time:
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\RO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 6 of 9


Rev. 01 G:\DRSIII\License Examinations
Rev. 01 JPM  
\2011\Quad Cities
\Proposed\JPMs\admin\RO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 7 of 9 JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                           Job
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title:
 
Evaluate License Maintenance Requirements JPM Number:
==Title:==
RO Admin 2 Revision Number:
EO         RO     SRO       FS STA/IA           SRO Cert JPM
Task Number and Title:
 
NUREG 1021 Licensing Requirements 01  K/A Number and Importance:
==Title:==
K/A: 2.1.4 Rating: 3.3/3.8 Suggested Testing Environment:
Evaluate License Maintenance Requirements JPM Number:         RO Admin 2                                           Revision Number: 01 Task Number and
Simulator Alternate Path:
 
Yes No SRO Only: Yes No Time Critical:
==Title:==
Yes No Reference(s):
NUREG 1021 Licensing Requirements K/A Number and Importance:           K/A:     2.1.4           Rating:           3.3/3.8 Suggested Testing Environment: Simulator Alternate Path:     Yes     No     SRO Only:       Yes         No       Time Critical:     Yes     No Reference(s): OP-AA-105-102, Rev. 9 Actual Testing Environment:           Simulator           Control Room               In-Plant     Other Testing Method:           Simulate       Perform Estimated Time to Complete: 5 minutes                     Actual Time Used:                 minutes EVALUATION  
OP-AA-105-102, Rev. 9 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
5 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                     Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory       Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                             (Print)
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Signature:                                                      Date:
Satisfactory Unsatisfactory Comments:                       Evaluator's Name
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\RO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
:   (Print) Evaluator's Signature
Page 7 of 9
:   Date:
 
INITIAL CONDITIONS Today is March 24th, 2011.
You have been assigned to the cover the Unit-2 NSO position for April 4th, 2011.
The Operations department is working a hybrid 8-hour/12-hour schedule.
Your primary assignment has been as a clearance order writer since the beginning of the 1st quarter 2011, however, during the past quarter you have covered the following shifts:
* One complete 12-hour day shift as the Unit 2 Assist NSO on January 9th.
* Five 8-hour afternoon shifts as Unit 1 NSO on February 15th through the 19th.
* Split two 12-hour midnight shifts, working six hours as the Unit 2 NSO and the other six hours as a clearance writer during a weekend outage on February 26th and 27th.
* Split 8-hour day shifts working four hours as the Unit 1 Assist NSO and the other four hours as a clearance writer on March 7th, 8th, 9th, 10th, 11th, 14th, and 15th.
* All shifts were logged by the Shift Manager.
The remainder of the time, you have worked 8-hour shifts on days as clearance writer Monday through Friday.
INITIATING CUE You are to review shift coverage for the 1st quarter, youre standing as an active licensed RO, and determine eligibility to assume shift for April 4th, 2011. Give an explanation for your determination.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS Today is March 24 th, 2011. You have been assigned to the cover the Unit
-2 NSO position for April 4 th , 2011. The Operations department is working a hybrid 8
-hour/12-hour schedule.
Your primary assignment has been as a clearance order writer since the beginning of the 1st quarter 2011, however, during the past quarter you have covered the following shifts:
One complete 12
-hour day shift as the Unit 2 Assist NSO on January 9th.
Five 8-hour afternoon shifts as Unit 1 NSO on February 15 th through the 19 th. Split two 12
-hour midnight shifts, working six hours as the Unit 2 NSO and the other six hours as a clearance writer during a weekend outage on February 26 th and 27 th. Split 8-hour day shifts working four hours as the Unit 1 Assist NSO and the other four hours as a clearance writer on March 7 th , 8 th , 9 th, 10 th, 11 th, 14 th, and 15 th. All shifts were logged by the Shift Manager.
The remainder of the time, you have worked 8
-hour shifts on days as clearance writer Monday through Friday.
INITIATING CUE You are to review shift coverage for the 1st quarter, you're standing as an active licensed RO, and determine eligibility to assume shift for April 4 th, 2011. Give an explanation for your determination.


Exelon Nuclear Job Performance Measure Review Quarterly SBLC Pump Flow Rate Test RO Admin 3 Revision Number: 00 Date: 04/04/ 2011 Developed By:
Instructor        Date Validated By:
SME or Instructor      Date Reviewed By:
Operations Representative    Date Approved By:
Training Department    Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
RO Admin 3-Rev 00 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________    1. Task description and number, JPM description and number are identified.
________    2. Knowledge and Abilities (K/A) references are included.
________    3. Performance location specified. (in-plant, control room, simulator, or other)
________    4. Initial setup conditions are identified.
________    5. Initiating cue (and terminating cue if required) are properly identified.
________    6. Task standards identified and verified by SME review.
________    7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________    8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure                                Rev:
Procedure                                Rev:
Procedure                                Rev:
________    9. Verify cues both verbal and visual are free of conflict.
________    10. Verify performance time is accurate
________    11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________    12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                              Date SME / Instructor                              Date SME / Instructor                              Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
RO Admin 3-Rev 00 Revision Record (Summary)
Revision 00,    New JPM developed for ILT 09-1 NRC Exam.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Exelon Nuclear Job Performance Measure Review Quarterly SBLC Pump Flow Rate Test RO Admin 3 Revision Number: 00  Date: 0 4/0 4/ 2011 Developed By:
Instructor Date  Validated By:
SME or Instructo r Date  Reviewed By:
Operations Representative Date  Approved By:
Training Department Date RO Admin 3
-Rev 00  SRRS: 3D.105 (when utilized for operator initial or continuing training)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure Rev:  Procedure Rev:  Procedure Rev:  ________ 9. Verify cues both verbal and visual are free of conflict.
________ 10. Verify performance time is accurate
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date        SME / Instructor Date        SME / Instructor Date RO Admin 3
-Rev 00  SRRS: 3D.105 (when utilized for operator initial or continuing training)
Revision Record (Summary)
Revision 00, New JPM developed for ILT 09
-1 NRC Exam.


RO Admin 3
RO Admin 3-Rev 00 SIMULATOR SETUP INSTRUCTIONS
-Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
: 1. NOTE: This JPM may be conducted in any appropriate setting; i.e., simulator, classroom, or Control Room.
SIMULATOR SETUP INSTRUCTIONS
: 2. Prepare a copy of QCOS 1100-07, SBLC Pump Flow Rate Test as follows:
: 1. NOTE: This JPM may be conducted in any appropriate setting; i.e., simulator, classroom, or Control Room
Sign off Prerequisites for a IST Group B Test / Partial for A Pump Initial complete all steps associated with SBLC Pump A IST Group B Test.
. 2. Prepare a copy of QCOS 1100-07, SBLC Pump Flow Rate Test as follows:
N/A all steps associated with SBLC Pump B N/A all steps associated with IST Comprehensive and IST-Pre Service Pump Test.
Sign off Prerequisites for a IST Group B Test / Partial for "A" Pump Initial complete all steps associated with SBLC Pump "A" IST Group B Test.
Step H.6.f. for SBLC Pump A, write in 52 psig and 1300 psig. Sign off the TS PASS and IST PASS blocks.
N/A all steps associated with SBLC Pump "BN/A all steps associated with IST Comprehensive and IST
-Pre Service Pump Test. Step H.6.f. for SBLC Pump "A", write in 52 psig and 1300 psig. Sign off the TS PASS and IST PASS blocks.
Step H.6.i.(3)., write in 49 gpm.
Step H.6.i.(3)., write in 49 gpm.
Step H.6.i.(4). Sign initia l criteria met and enter 50 (H.6.f.)  
Step H.6.i.(4). Sign initial criteria met and enter 50 (H.6.f.) - 49 (H.6.i.(3) for 1 gpm on next line.
- 49 (H.6.i.(3) for 1 gpm on next line.
: 3. Provide a copy of IST Pump Test Acceptance Criteria Sheet for the SBLC Pump A.
: 3. Provide a copy of IST Pump Test Acceptance Criteria Sheet for the SBLC Pump A. 4. This completes the setup for this JPM.
: 4. This completes the setup for this JPM.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


RO Admin 3
RO Admin 3-Rev 00 INITIAL CONDITIONS QCOS 1100-07, SBLC Pump Flow Rate Test, has been completed for the A pump.
-Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
The surveillance is completed up to step H.12.
INITIAL CONDITIONS QCOS 1100-07, SBLC Pump Flow Rate Test, has been completed for the "A" pump. The surveillance is completed up to step H.12.
The Admin NSO has requested you to perform step H.12 by verifying all applicable acceptance criteria and calculations are correct.
The Admin NSO has requested you to perform step H.12 by verifying all applicable acceptance criteria and calculations are correct.
This JPM is NOT time critical.
This JPM is NOT time critical.
INITIATING CUE Complete Step H.12 a.(1) and a.(2) of QCOS 1100-07, SBLC Pump Flow Rate Test
INITIATING CUE Complete Step H.12 a.(1) and a.(2) of QCOS 1100-07, SBLC Pump Flow Rate Test.
. Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cu
The timeclock starts when the candidate acknowledges the initiating cue.
: e.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
RO Admin 3
-Rev 00  SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM Start Time:
STEP ELEMENT STANDARD SAT UNSAT Comment Number Evaluator Note: Step H.12 will require the examinee to review all applicable acceptance criteria and calculations. Acceptance criteria G.3, G.5 , and G.7 do NOT apply since the Group B test was performed for SBLC Pump "A" only. The steps listed below are those which correspond to the acceptance criteria. G.1 Verify SBLC Pump flow rate > 42 gpm at discharge pressure > 1275 psig.
Refers to Step H.6.e. and verifies that SBLC Pump "A" flow of 52 gpm at a discharge pressure of 1300 psig passes TS criteria. ___ ___ ___ G.2 Verify SBLC Pump flow rate within IST Acceptable Range. Refers to IST Pump Acceptance Criteria Sheet and determines that SBLC Pump flow of 52 gpm is in the Required Action Range (> 49 gpm). Step H.6.e (IST PASS) is incorrectly signed off.
___ ___ ___ G.4 Verify stroke open operability of 1
-1101-43A, SBLC PMP DISCH CK VLV. Refers to step H.6.h and determines SBLC Pump flow is


> 4 2 gpm satisfying operability requirement.
RO Admin 3-Rev 00 JPM Start Time:
___ ___ ___ G.6 Verify stroke closed operability of 1
Comment STEP                  ELEMENT                                STANDARD                SAT  UNSAT Number Evaluator      Step H.12 will require the examinee to review all applicable acceptance Note:          criteria and calculations. Acceptance criteria G.3, G.5, and G.7 do NOT apply since the Group B test was performed for SBLC Pump A only. The steps listed below are those which correspond to the acceptance criteria.
-1101-43A, SBLC PMP DISCH CK VLV. Refers to step H.6.i.(4), and identifies SBLC Pump flow of 50 gpm instead of 52 gpm has been entered from step H.6.f.
G.1        Verify SBLC Pump flow                Refers to Step H.6.e. and          ___  ___      ___
rate > 42 gpm at discharge          verifies that SBLC Pump A pressure > 1275 psig.                flow of 52 gpm at a discharge pressure of 1300 psig passes TS criteria.
G.2        *Verify SBLC Pump flow              Refers to IST Pump Acceptance ___         ___     ___
rate within IST Acceptable          Criteria Sheet and determines Range.*                              that SBLC Pump flow of 52 gpm is in the Required Action Range
(> 49 gpm). Step H.6.e (IST PASS) is incorrectly signed off.
G.4        Verify stroke open                  Refers to step H.6.h and            ___  ___      ___
operability of 1-1101-43A,           determines SBLC Pump flow is SBLC PMP DISCH CK                   > 42 gpm satisfying operability VLV.                                 requirement.
G.6        *Verify stroke closed                Refers to step H.6.i.(4), and   ___      ___      ___
operability of 1-1101-43A,          identifies SBLC Pump flow of 50 SBLC PMP DISCH CK                    gpm instead of 52 gpm has VLV.*                                been entered from step H.6.f.
IST flow reduction criteria (< 2 gpm) is NOT met. (Actual flow reduction is 3 gpm).
IST flow reduction criteria (< 2 gpm) is NOT met. (Actual flow reduction is 3 gpm).
___ ___ ___ G.8 Verify 1A SBLC Accumulator 1
G.8         Verify 1A SBLC                       Refers to step H.1.b and notes     ___  ___      ___
-1101-7A charge is > 750 psig.
Accumulator 1-1101-7A                recorded charge of 850 psig charge is > 750 psig.                meets acceptance criteria of 750 psig.
Refers to step H.1.b and notes recorded charge of 850 psig meets acceptance criteria of 750 psig. ___ ___ ___ Evaluator Note: The examinee should inform you that step H.12 is NOT met due to SBLC pump flow being in the Required Action Range AND the stroke closed criteria for the 1
Evaluator       The examinee should inform you that step H.12 is NOT met due to SBLC Note:        pump flow being in the Required Action Range AND the stroke closed criteria for the 1-1101-43A check valve is also NOT met with a reduction flow of 3 gpm.
-1101-43A check valve is also NOT met with a reduction flow of 3 gpm.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


RO Admin 3
RO Admin 3-Rev 00 Comment STEP                   ELEMENT                               STANDARD     SAT   UNSAT Number CUE:         As Unit Supervisor acknowledge report and state that you will determine the compensatory actions.
-Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Evaluator                 The examinee should inform you that the task is complete.
STEP ELEMENT STANDARD SAT UNSAT Comment Number CUE: As Unit Supervisor acknowledge report and state that you will "determine the compensatory actions.
Note:
" Evaluator Note: The examinee should inform you that the task is complete.
JPM Stop Time:
JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training)


RO Admin 3
RO Admin 3-Rev 00 JPM  
-Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Job
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title:
 
Review Quarterly SBLC Pump Flow Rate Test JPM Number:
==Title:==
RO Admin 3 Revision Number:
EO         RO   SRO       FS STA/IA         SRO Cert JPM
00 Task Number and Title:
 
1100.051, Determine if SBLC meets IST requirements
==Title:==
. K/A Number and Importance:
Review Quarterly SBLC Pump Flow Rate Test JPM Number: RO Admin 3                               Revision Number: 00 Task Number and
KA: 2.2.12 Rating: 3.7/4.1 Suggested Testing Environment:
 
Simulator or Classroom Alternate Path:
==Title:==
Yes No SRO Only: Yes No Time Critical:
1100.051, Determine if SBLC meets IST requirements.
Yes No Reference(s):
K/A Number and Importance:             KA: 2.2.12                 Rating: 3.7/4.1 Suggested Testing Environment: Simulator or Classroom Alternate Path:     Yes       No SRO Only:               Yes         No   Time Critical: Yes       No Reference(s): QCOS 1100-07, SBLC Pump Flow Rate Test, Rev. 33 Actual Testing Environment:             Simulator             Control Room           In-Plant     Other Testing Method:           Simulate            Perform Estimated Time to Complete: 15 minutes                         Actual Time Used:             minutes EVALUATION  
QCOS 1100-07, SBLC Pump Flow Rate Test, Rev. 33 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simula te  Perform Estimated Time to Complete:
15 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                     Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory     Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                             (Print)
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Signature:                                                       Date:
Satisfactory Unsatisfactory Comments:                         Evaluator's Name
SRRS: 3D.105 (when utilized for operator initial or continuing training)
:   (Print) Evaluator's Signatu re:   Date:
 
RO Admin 3
RO Admin 3-Rev 00 INITIAL CONDITIONS QCOS 1100-07, SBLC Pump Flow Rate Test, has been completed for the A pump.
-Rev 00  SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS QCOS 1100-07, SBLC Pump Flow Rate Test, has been completed for the "A" pump.
The surveillance is completed up to step H.12.
The surveillance is completed up to step H.12.
The Admin NSO has requested you to perform step H.12 by verifying all applicable acceptance criteria and calculations are correct.
The Admin NSO has requested you to perform step H.12 by verifying all applicable acceptance criteria and calculations are correct.
This JPM is NOT time critical.
This JPM is NOT time critical.
INITIATING CUE Complete Step H.12 a.(1) and a.(2) of QCOS 1100
INITIATING CUE Complete Step H.12 a.(1) and a.(2) of QCOS 1100-07, SBLC Pump Flow Rate Test.
-07, SBLC Pump Flow Rate Test.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


Exelon Nuclear Job Performance Measure Disable NUMAC ARM Channel JPM Number: RO Admin 4 Revision Number: 00 Date: 04/04/2011 Developed By:
Instructor        Date Validated By:
SME or Instructor      Date Reviewed By:
Operations Representative    Date Approved By:
Training Department    Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
RO Admin 4-Rev 00 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________    1. Task description and number, JPM description and number are identified.
________    2. Knowledge and Abilities (K/A) references are included.
________    3. Performance location specified. (in-plant, control room, simulator, or other)
________    4. Initial setup conditions are identified.
________    5. Initiating cue (and terminating cue if required) are properly identified.
________    6. Task standards identified and verified by SME review.
________    7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________    8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure                                Rev:
Procedure                                Rev:
Procedure                                Rev:
________    9. Verify cues both verbal and visual are free of conflict.
________    10. Verify performance time is accurate
________    11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________    12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                              Date SME / Instructor                              Date SME / Instructor                              Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
RO Admin 4-Rev 00 Revision Record (Summary)
Revision 00,    This JPM was developed for the ILT 09-1 NRC Exam.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Exelon Nuclear Job Performance Measure Disable NUMAC ARM Channel JPM Number: RO Admin 4 Revision Number: 00  Date: 0 4/0 4/2011 Developed By:
Instructor Date  Validated By:
SME or Instructor Date  Reviewed By:      Operations Representative Date  Approved By:
Training Department Date RO Admin 4
-Rev 00  SRRS: 3D.105 (when utilized for operator initial or continuing training)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other
) ________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure Rev:  Procedure Rev:  Procedure Rev:  ________ 9. Verify cues both verbal and visual are free of conflict. ________ 10. Verify performance time is accurate
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:        SME / Instructor Date        SME / Instructor Date        SME / Instructor Date RO Admin 4
-Rev 00  SRRS: 3D.105 (when utilized for operator initial or continuing training)
Revision Record (Summary)
Revision 00, This JPM was developed for the ILT 09
-1 NRC Exam.


RO Admin 4
RO Admin 4-Rev 00 SIMULATOR SETUP INSTRUCTIONS
-Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
: 1. Reset the simulator to IC-21.
SIMULATOR SETUP INSTRUCTIONS
NOTE:     It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 1. Reset the simulator to IC
-21. NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Obtain a NUMAC ARM key from the simulator booth.
: 2. Obtain a NUMAC ARM key from the simulator booth.
: 3. Fail ARM #9 using the command: imf rm0109 1 0 0 4. Prepare a copy of QCOP 1800
: 3. Fail ARM #9 using the command: imf rm0109 100
-03 with the pre
: 4. Prepare a copy of QCOP 1800-03 with the pre-requisites filled as follows:
-requisites filled as follows: C.2.a.(1)   Write "None" for functional testing required following TMOD installation.
C.2.a.(1)   Write None for functional testing required following TMOD installation.
C.2.a.(2) Write "None" for functional testing required following TMOD removal C.2.a.(3)   Enter "10 days" for Duration
C.2.a.(2)   Write None for functional testing required following TMOD removal C.2.a.(3)   Enter 10 days for Duration.
. C.2.a.(4)   Sign off as Unit Supervisor and write in "current" for date.
C.2.a.(4)   Sign off as Unit Supervisor and write in current for date.
: 5. This completes the setup for this JPM.
: 5. This completes the setup for this JPM.
: 6. SIM OP NOTE:
: 6. SIM OP NOTE: The NUMAC must be restored after each simulator reset. Perform QCOP 1800-03, step F.3 to take ARM#9 out of bypass and restore it to the NUMAC display screen.
The NUMAC must be restored after each simulator reset.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Perform QCOP 1800-03, step F.3 to take ARM#9 out of bypass and restore it to the NUMAC display screen.
 
RO Admin 4
RO Admin 4-Rev 00 INITIAL CONDITIONS You are the Unit 1 Admin RO.
-Rev 00  SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS You are the Unit 1 Admin RO.
Unit 1 is in day 15 of a 35 day refuel outage.
Unit 1 is in day 15 of a 35 day refuel outage.
A chemical decontamination of the RWCU system piping is in progress resulting in elevated radiation levels in the Reactor Building.
A chemical decontamination of the RWCU system piping is in progress resulting in elevated radiation levels in the Reactor Building.
Radiation Protection has established access control into the Reactor Building.
Radiation Protection has established access control into the Reactor Building.
Annunciator 901
Annunciator 901-3 A-1, RX BLDG HI RADIATION is in constant alarm due to ARM#9 failing upscale.
-3 A-1, "RX BLDG HI RADIATION" is in constant alarm due to ARM#9 failing upscale. Per OP-AA-103-102, Watch-Standing Practices, the Unit Supervisor, has determined this to be a nuisance alarm and directed you to bypass it. This JPM is NOT time critical.
Per OP-AA-103-102, Watch-Standing Practices, the Unit Supervisor, has determined this to be a nuisance alarm and directed you to bypass it.
INITIATING CUE Bypass ARM #9 per QCOP 1800
This JPM is NOT time critical.
-03, Operation of Area Radiation Monitor 1(2)
INITIATING CUE Bypass ARM #9 per QCOP 1800-03, Operation of Area Radiation Monitor 1(2)-1806-1 (NUMAC Monitor) and reset annunciator 901-3 A-1, RX BLDG HI RADIATION.
-1806-1 (NUMAC Monitor) and reset annunciator 901
Provide the examinee with a marked up copy of QCOP 1800-03.
-3 A-1, RX BLDG HI RADIATION.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Provide the examinee with a marked up copy of QCOP 1800
Information For Evaluators Use:
-03. Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
RO Admin 4
SRRS: 3D.105 (when utilized for operator initial or continuing training)
-Rev 00  SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM Start Time:
STEP ELEMENT STANDARD SAT UNSAT Comment Number F.2.a Notify Unit Supervisor that TMOD is about to be installed.
Notifies Unit Supervisor that Unit 1 ARM Channel 9 is about to be bypassed per QCOP


1800-03. ___ ___ ___ F.2.b Obtains key for 1
RO Admin 4-Rev 00 JPM Start Time:
-1806-1 NUMAC ARM Obtains barrel key for the 1
Comment STEP                  ELEMENT                                STANDARD                SAT  UNSAT Number F.2.a        Notify Unit Supervisor that          Notifies Unit Supervisor that      ___   ___     ___
-
TMOD is about to be                  Unit 1 ARM Channel 9 is about installed.                          to be bypassed per QCOP 1800-03.
1806-1 NUMAC ARM from the Work Execution Center.
F.2.b       Obtains key for 1-1806-1             Obtains barrel key for the 1-NUMAC ARM                            1806-1 NUMAC ARM from the Work Execution Center.
CUE: As Unit Supervisor, provide the key to the examinee and state: "the WEC SRO has brought the key over.
CUE:         As Unit Supervisor, provide the key to the examinee and state: the WEC SRO has brought the key over.
" F.2.c Place the NUMAC ARM into INOP mode
F.2.c       *Place the NUMAC ARM                 At the 901-11 panel, inserts key   ___  ___      ___
. At the 901
into INOP mode.*                    and places the keylock mode switch to the INOP position.
-11 panel, inserts key and places the keylock mode switch to the INOP position.
CUE:         Report to the examinee that, annunciator 901-3 F-1 is in alarm and the Unit NSO has acknowledged it. (Note: the alarm will be acknowledged by the Simulator Operator.)
___ ___ ___ CUE: Report to the examinee that
F.2.c.(1)     Verify the following:               At the 901-3 panel,                ___  ___      ___
, "annunciator 901
acknowledges annunciator 901-Thru            1) Annunciator 901-3 3 F-1, AREA MONITOR F-1, in alarm.
-3 F-1 is in alarm and the Unit NSO has acknowledged it.
F.2.c.(3)                                           DOWNSCALE.
(Note: the alarm will be acknowledged by the Simulator Operator.
: 2) Bar Graph screen is displayed.                   At the 901-11 panel, verifies the following on the NUMAC ARM:
) F.2.c.(1) Thru F.2.c.(3) Verify the following:
: 3) INOP-CAL menu is
: 1) Annunciator 901
-3 F-1, in alarm. 2) Bar Graph screen is displayed.
: 3) INOP-CAL menu is displayed.
At the 901
-3 panel, acknowledge s annunciator 901-3 F-1, AREA MONITOR DOWNSCALE.
At the 901
-11 panel, verifies the following on the NUMAC ARM:
: 1) Bar Graph screen is displayed.
: 1) Bar Graph screen is displayed.
displayed.
: 2) INOP-CAL is displayed at top right corner.
: 2) INOP-CAL is displayed at top right corner.
___ ___ ___ F.2.d. Navigate to the (ENTER INOP-SET/CHECK DISPLAY/CHECK KEYS/ ETC) menu. Depresses ETC softkey until desired menu appears on bottom of screen.
F.2.d.       *Navigate to the (ENTER             Depresses ETC softkey until        ___  ___      ___
___ ___ ___ Evaluator Note: The next step requires entry of the password, (9688). If this is not entered in 10 seconds, then the NUMAC ARM will return to the Bar Graph display
INOP-SET/CHECK                       desired menu appears on DISPLAY/CHECK KEYS/                 bottom of screen.
. Step F.2.e and F.2.f , can be performed again if necessary.
ETC) menu.*
Evaluator       The next step requires entry of the password, (9688). If this is not entered Note:        in 10 seconds, then the NUMAC ARM will return to the Bar Graph display.
Step F.2.e and F.2.f, can be performed again if necessary.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
RO Admin 4-Rev 00 Comment STEP                  ELEMENT                                STANDARD                SAT  UNSAT Number F.2.e      *Select the INOP-SET                Depresses ENTER INOP-SET mode.*                              softkey.
F.2.f      *Enter password.*                    Using DATA keypad softkeys          ___  ___      ___
enters (9688) and then depresses ENT.
F.2.g      *Navigate to CHANNEL 09              Using CURSOR softkeys,              ___  ___      ___
METER DATA.*                        positions inverse video display box to CHANNEL 09 METER DATA.
F.2.h      *Enter SET PARAMETER                Depresses SET PARAMETER            ___  ___      ___
function for CHANNEL 09              softkey and verifies (SET METER DATA.*                        METER PARAMETERS FOR ARM CHANNEL 09 screen is displayed.
F.2.i      *Navigate to the USE?                Positions inverse video display    ___  ___      ___
column.*                            to the USE? column by depressing the right CURSOR softkey.
F.2.j      *Change DESIRED row                  Depresses UPWARD CURSOR            ___  ___      ___
option to NO.*                      softkey and verifies a change in DESIRED row from YES to NO.
F.2.k      *Accept changes to                  Depress ACCEPT softkey and          ___  ___      ___
CHANNEL 09 METER                    verify both PRESENT and DATA*                                DESIRED columns indicate NO.
F.2.l      *Exit SET METER                      Depresses EXIT softkey and          ___  ___      ___
PARAMETERS FOR ARM                  verifies:
CHANNEL 09 screen.*                  (HELP/SET PARAMETER/
EXIT INOP-SET) menu appears on bottom of screen.
F.2.m        Navigate to CHANNEL                  Positions inverse video box to      ___  ___      ___
DESIGNATIONS option.                CHANNEL DESIGNATIONS using CURSOR softkeys.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


RO Admin 4
RO Admin 4-Rev 00 Comment STEP                   ELEMENT                               STANDARD                   SAT   UNSAT Number F.2.n        Select SET PARAMETERS Depresses SET PARAMETER                                ___   ___     ___
-Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
function.             softkey and verifies SET CHANNEL DESIGNATIONS screen is displayed.
STEP ELEMENT STANDARD SAT UNSAT Comment Number F.2.e Select the INOP-SET mode. Depresses ENTER INOP
F.2.o        Navigate to ARM                      Positions inverse video box to         ___   ___     ___
-SET softkey. F.2.f Enter password. Using DATA keypad softkeys enters (9688) and then depresses ENT.
CHANNEL 09.                         ARM CHANNEL 09 using right CURSOR softkey.
___ ___ ___ F.2.g Navigate to CHANNEL 09 METER DATA. Using CURSOR softkeys, positions inverse video display box to CHANNEL 09 METER DATA. ___ ___ ___ F.2.h Enter SET PARAMETER function for CHANNEL 09 METER DATA. Depresses SET PARAMETER softkey and verifies (SET METER PARAMETERS FOR ARM CHANNEL 09 screen is displayed.
F.2.p        Change ARM CHANNEL                   Changes ARM CHANNEL 09                 ___   ___     ___
___ ___ ___ F.2.i Navigate to the USE? column. Positions inverse video display to the USE? column by depressing the right CURSOR softkey. ___ ___ ___ F.2.j Change DESIRED row option to NO
09 digits to 00.                     digits to 00 using left, right, and DOWNWARD CURSOR softkeys.
. Depresses UPWARD CURSOR softkey and verifies a change in DESIRED row from YES to NO.
F.2.q       Accept changes to ARM               Depresses ACCEPT softkey                ___  ___      ___
___ ___ ___ F.2.k Accept changes to CHANNEL 09 METER DATA Depress ACCEPT softkey and verify both PRESENT and DESIRED columns indicate NO.
CHANNEL 09 display.                 and verifies both PRESENT and DESIRED columns indicate 00.
___ ___ ___ F.2.l Exit SET METER PARAMETERS FOR ARM CHANNEL 09 screen. De presses EXIT softkey and verifies: (HELP/SET PARAMETER/ EXIT INOP-SET) menu appears on bottom of screen.
F.2.r       Exit SET CHANNEL                     Depresses EXIT softkey and             ___  ___      ___
___ ___ ___ F.2.m Navigate to CHANNEL DESIGNATIONS option.
DESIGNATIONS screen.                verifies:
Positions inverse video box to CHANNEL DESIGNATIONS using CURSOR softkeys.
(HELP/SET PARAMETER/EXIT INOP-SET) menu appears on bottom of screen.
___ ___ ___
F.2.s       Exit INOP-SET mode.                     1) Depresses EXIT INOP-            ___  ___      ___
RO Admin 4
SET softkey and verifies:
-Rev 00  SRRS: 3D.105 (when utilized for operator initial or continuing training)
(EXIT INOP-SET MODE:
STEP ELEMENT STANDARD SAT UNSAT Comment Number F.2.n Select SET PARAMETERS function. Depresses SET PARAMETER softkey and verifies SET CHANNEL DESIGNATIONS screen is displayed.
F.2.t (1),                                                ARE YOU SURE?)
___ ___ ___ F.2.o Navigate to ARM CHANNEL 09.
(2)                                                    message is displayed.
Positions inverse video box to ARM CHANNEL 09 using right CURSOR softkey.
___ ___ ___ F.2.p Change ARM CHANNEL 09 digits to 00.
Changes ARM CHANNEL 09 digits to 00 using left, right, and DOWNWARD CURSOR softkeys. ___ ___ ___ F.2.q Accept changes to ARM CHANNEL 09 display.
Depresses ACCEPT softkey and verifies both PRESENT and DESIRED columns indicate 00.
___ ___ ___ F.2.r Exit SET CHANNEL DESIGNATIONS screen.
Depresses EXIT softkey and verifies: (HELP/SET PARAMETER/EXIT INOP-SET) menu appears on bottom of screen.
___ ___ ___ F.2.s & F.2.t (1), (2) Exit INOP-SET mode. 1) Depresses EXIT INOP
-SET softkey and verifies:
(EXIT INOP-SET MODE: ARE YOU SURE?) message is displayed.
: 2) Depresses YES softkey
: 2) Depresses YES softkey
: 3) Verifies Bar Graph is displayed and ARM Channel 09 is removed.
: 3) Verifies Bar Graph is displayed and ARM Channel 09 is removed.
___ ___ ___ CUE: As Unit Supervisor, inform the examine e that , "another RO will perform steps F.2.v, F.2.w., and F.2.x.
CUE:         As Unit Supervisor, inform the examinee that, another RO will perform steps F.2.v, F.2.w., and F.2.x.
"
SRRS: 3D.105 (when utilized for operator initial or continuing training)
RO Admin 4
-Rev 00  SRRS: 3D.105 (when utilized for operator initial or continuing training)
STEP ELEMENT STANDARD SAT UNSAT Comment Number F.2.y.(1) Restore NUMAC ARM t o operational status by placing mode switch to OPERATE. At panel 901
-11, places the NUMAC ARM keylock mode switch to OPERATE.
Verifies the following:
: 1) OPERATE is displayed at the top right corner of screen. 2) Bar Graph is displayed.
___ ___ ___ F.y.(2) Select OUTPUT STATU S screen. Depresses OUTPUT STATUS softkey to view all upscale and downscale trips.
___ ___ ___ F.2.y.(3) Reset ARM 09 trip condition. Depresses RESET softkey and verifies trip condition clears.
___ ___ ___ CUE: Inform the examinee that
, "annunciator 901-3 A-1, RX BLDG HI RADIATION has been reset by the Unit NSO. Step F.2.y.(4) is complete.
" F.2.y.(5) Exit OUTPUT STATUS screen. Depresses EXIT softkey and verifies return to Bar Graph display. ___ ___ ___ F.2.y.(6) Remove key from NUMAC ARM. Removes barrel key from NUMAC ARM and returns key to the WEC.
___ ___ ___ CUE: As Unit Supervisor state that you "will have the key returned to the Work Execution Center (WEC)."
Evaluator Note: From Prerequisite step C.2.a.(1), NO functional testing I required, therefore step F.2.z. is N/A.
Evaluator Note: The examinee should inform you that the task is complete
. JPM Stop Time:


RO Admin 4
RO Admin 4-Rev 00 Comment STEP                  ELEMENT                                STANDARD                  SAT  UNSAT Number F.2.y.(1)    *Restore NUMAC ARM to                At panel 901-11, places the          ___  ___      ___
-Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
operational status by                NUMAC ARM keylock mode placing mode switch to              switch to OPERATE.
JPM  
OPERATE.*                            Verifies the following:
: 1) OPERATE is displayed at the top right corner of screen.
: 2) Bar Graph is displayed.
F.y.(2)      *Select OUTPUT STATUS                Depresses OUTPUT STATUS              ___  ___      ___
screen.*                            softkey to view all upscale and downscale trips.
F.2.y.(3)    *Reset ARM 09 trip                  Depresses RESET softkey and          ___  ___      ___
condition.*                          verifies trip condition clears.
CUE:        Inform the examinee that, annunciator 901-3 A-1, RX BLDG HI RADIATION has been reset by the Unit NSO. Step F.2.y.(4) is complete.
F.2.y.(5)      Exit OUTPUT STATUS                  Depresses EXIT softkey and            ___  ___      ___
screen.                              verifies return to Bar Graph display.
F.2.y.(6)      Remove key from NUMAC                Removes barrel key from              ___  ___      ___
ARM.                                NUMAC ARM and returns key to the WEC.
CUE:        As Unit Supervisor state that you will have the key returned to the Work Execution Center (WEC).
Evaluator      From Prerequisite step C.2.a.(1), NO functional testing I required, therefore Note:        step F.2.z. is N/A.
Evaluator      The examinee should inform you that the task is complete.
Note:
JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
RO Admin 4-Rev 00 JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Job
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title:
 
Disable NUMAC ARM Channel JPM Number:
==Title:==
RO Admin 4 Revision Number:
EO         RO   SRO       FS STA/IA         SRO Cert JPM
00 Task Number and Title:
 
SR-1800-P05 (Freq: LIC=I) Given a reactor plant, disable and re
==Title:==
-enable a NUMAC ARM channel to service in accordance with QCOP 1800
Disable NUMAC ARM Channel JPM Number: RO Admin 4                               Revision Number: 00 Task Number and
-03. K/A Number and Importance:
 
KA: 2.3.5 Rating: 2.9/2.9 Suggested Testing Environment:
==Title:==
Simulator Alternate Path:
SR-1800-P05 (Freq: LIC=I) Given a reactor plant, disable and re-enable a NUMAC ARM channel to service in accordance with QCOP 1800-03.
Yes No SRO Only: Yes No Time Critical:
K/A Number and Importance:             KA: 2.3.5                   Rating: 2.9/2.9 Suggested Testing Environment: Simulator Alternate Path:     Yes       No SRO Only:               Yes         No   Time Critical: Yes       No Reference(s): OP-AA-103-102, Watch-Standing Practices, Rev. 8 QCOP 1800-03, Operation of Area Radiation Monitor 1(2)-1806-1 (NUMAC Monitor), Rev. 9 Actual Testing Environment:             Simulator             Control Room           In-Plant     Other Testing Method:           Simulate             Perform Estimated Time to Complete: 15 minutes                         Actual Time Used:             minutes EVALUATION  
Yes No Reference(s):
OP-AA-103-102, Watch
-Standing Practices, Rev. 8 QCOP 1800-03, Operation of Area Radiation Monitor 1(2)
-1806-1 (NUMAC Monitor), Rev. 9 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
15 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                     Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory     Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                             (Print)
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:                         Evaluator's Name
Evaluators Signature:                                                       Date:
:   (Print) Evaluator's Signature
SRRS: 3D.105 (when utilized for operator initial or continuing training)
:   Date:
 
RO Admin 4
RO Admin 4-Rev 00 INITIAL CONDITIONS You are the Unit 1 Admin RO.
-Rev 00  SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS You are the Unit 1 Admin RO.
Unit 1 is in day 15 of a 35 day refuel outage.
Unit 1 is in day 15 of a 35 day refuel outage.
A chemical decontamination of the RWCU system piping is in progress resulting in elevated radiation levels in the Reactor Building.
A chemical decontamination of the RWCU system piping is in progress resulting in elevated radiation levels in the Reactor Building.
Radiation Protection has established access control into the Reactor Building.
Radiation Protection has established access control into the Reactor Building.
Annunciator 901
Annunciator 901-3 A-1, RX BLDG HI RADIATION is in constant alarm due to ARM#9 failing upscale.
-3 A-1, "RX BLDG HI RADIATION" is in constant alarm due to ARM#9 failing upscale. Per OP-AA-103-102, Watch
Per OP-AA-103-102, Watch-Standing Practices, the Unit Supervisor, has determined this to be a nuisance alarm and directed you to bypass it.
-Standing Practices, the Unit Supervisor, has determined this to be a nuisance alarm and directed you to bypass it.
This JPM is NOT time critical.
This JPM is NOT time critical.
INITIATING CUE Bypass ARM #9 per QCOP 1800-03, Operation of Area Radiation Monitor 1(2)-1806-1 (NUMAC Monitor) and reset annunciator 901-3 A-1, RX BLDG HI RADIATION.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


INITIATING CUE Bypass ARM #9 per QCOP 1800
Exelon Nuclear Job Performance Measure Review a Fire Impairment Permit Requiring Compensatory Actions JPM Number: SRO Admin 1 Revision Number: 01 Date: 04/04/2011 Developed By:
-03, Operation of Area Radiation Monitor 1(2)
Instructor                            Date Validated By:
-1806-1 (NUMAC Monitor) and reset annunciator 901
SME or Instructor                          Date Reviewed By:
-3 A-1, RX BLDG HI RADIATION.
Operations Representative                      Date Approved By:
Training Department                          Date SRO Admin 1.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 1 of 10


SRO Admin 1.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
SRO Admin 1- Rev 01 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Page 1 of 10  Exelon Nuclear Job Performance Measure Review a Fire Impairment Permit Requiring Compensatory Actions JPM Number:  SRO Admin 1 Revision Number:
01 Date:  04/04/2011 Developed By:
Instructor Date  Validated By:
SME or Instructor Date  Reviewed By:      Operations Representative Date  Approved By:
Training Department Date SRO Admin 1
- Rev 01 G:\DRSIII\License Examinations
\2011\Quad Cities
\Proposed\JPMs\admin\SRO Admin 1.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 10  JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 through 12 below.
Prior to JPM usage, revalidate JPM using steps 8 through 12 below.
________ 1. Task description and number, JPM description and number are identified.
________       1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________       2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________       3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other) ________ 4. Initial setup conditions are identified.
________       4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________       5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________       6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________       7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________       8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure Rev:   Procedure Rev:   Procedure Rev:   ________ 9. Verify cues both verbal and visual are free of conflict.
Procedure                             Rev:
________ 10. Verify performance time is accurate
Procedure                             Rev:
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
Procedure                             Rev:
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
________       9. Verify cues both verbal and visual are free of conflict.
SME / Instructor Date       SME / Instructor Date       SME / Instructor Date SRO Admin 1
________       10. Verify performance time is accurate
- Rev 01  G:\DRSIII\License Examinations
________       11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
\2011\Quad Cities
________       12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
\Proposed\JPMs\admin\SRO Admin 1.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
SME / Instructor                             Date SME / Instructor                             Date SME / Instructor                             Date G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 1.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 3 of 10 Revision Record (Summary)
Page 2 of 10
Revision 00,  This is a LORT Bank JPM (AD
-SRO-6) that was used on the 2011 ILT NRC      License Exam. Updated Fire Permit information.


SRO Admin 1
SRO Admin 1- Rev 01 Revision Record (Summary)
- Rev 01 G:\DRSIII\License Examinations
Revision 00, This is a LORT Bank JPM (AD-SRO-6) that was used on the 2011 ILT NRC License Exam. Updated Fire Permit information.
\2011\Quad Cities
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 1.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
\Proposed\JPMs\admin\SRO Admin 1.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 3 of 10
Page 4 of 10 SIMULATOR SETUP INSTRUCTIONS
 
: 1. NOTE: This JPM may be conducted in any appropriate setting; i.e., simulator, classroom, Control Room, provided that the following procedures are available to the candidate:
SRO Admin 1- Rev 01 SIMULATOR SETUP INSTRUCTIONS
OP-MW-201-007, FIRE PROTECTION SYSTEM IMPAIRMENT CONTROL QCAP 1500-01, ADMINISTRATIVE REQUIREMENTS FOR FIRE PROTECTION
: 1. NOTE: This JPM may be conducted in any appropriate setting; i.e., simulator, classroom, Control Room, provided that the following procedures are available to the candidate:
* OP-MW-201-007, FIRE PROTECTION SYSTEM IMPAIRMENT CONTROL
* QCAP 1500-01, ADMINISTRATIVE REQUIREMENTS FOR FIRE PROTECTION
: 2. Verify the following for this JPM setup:
: 2. Verify the following for this JPM setup:
A current revision of OP
* A current revision of OP-MW-201-007 Attachment 1 Fire Protection Impairment Permit is filled out as follows:
-MW-201-007 Attachment 1 "Fire Protection Impairment Permit" is filled out as follows 1) One detector, (1
: 1) One detector, (1-4141-109), that makes a detection system inoperable (ref. QCAP 1500-01 Attachment A) and the detection system in turn makes the suppression system inoperable (ref. QCAP 1500-01 Attachment C).
-4141-109), that makes a detection system inoperable (ref. QCAP 1500-01 Attachment A) and the detection system in turn makes the suppression system inoperable (ref. QCAP 1500
: 2) Fill out Section I Initiator: of the Fire Protection Permit as follows:
-01 Attachment C).
Initiator: IMD Supervisor                   Station: Quad             Unit: 01 Name: K. Arney                               Phone: X 2667             Dept/Co: IMD/Exelon Sch. Start Date: current                     Bldg: TB                 EPN#: 1-4141-109 Sch. End Date: current + 1                   Elev: 611                 Door #: N/A AR/WR/OOS#: 108111-01                                                   Det. Zone: N/A Pent #: N/A Do NOT check the Structural fireproofing OR Wall Penetration boxes.
: 2) Fill out Section I   Initiator:" of the Fire Protection Permit as follows: Initiator: "IMD Supervisor" Station: "Quad" Unit: "01" Name:   "K. Arney" Phone: "X 2667" Dept/Co: "IMD/Exelon" Sch. Start Date: "current" Bldg: "TB" EPN#: "1-4141-109Sch. End Date: "current + 1" Elev: "611" Door #: "N/A" AR/WR/OOS#: "108111
-01Det. Zone: "N/A" Pent #: "N/A" Do NOT check the Structural fireproofing OR Wall Penetration boxes.
Impairment
Impairment


== Description:==
== Description:==
  "Disconnect and test Turbine Oil Reservoir smoke detector 1
Disconnect and test Turbine Oil Reservoir smoke detector 1-4141-109 per surveillance per surveillance procedure and reconnect.
-4141-109 per surveillance per surveillance procedure and reconnect."
: 3) Fill out section II. FIRE MARSHAL REVIEW of the Fire Protection Impairment Permit as follows:
: 3) Fill out section II. "FIRE MARSHAL REVIEW" of the Fire Protection Impairment Permit as follows:
: a.           Fire Zone(s): 8.2.7.c   / For Barriers: Check the Functional box.
: a. Fire Zone(s): 8.2.7.c   / For Barriers: Check the "Functional" box.
: b.           Technical Requirement Manual? Check the Yes box.
: b. Technical Requirement Manual? Check the "Yes" box.
: c.           Mark None in the Fire Watch Required: block and N/A below.
: c. Mark "None" in the Fire Watch Required: block and "N/A" below.
: d.           Check the NO box for Additional Compensatory Measures.
: d. Check the "NO" box for Additional Compensatory Measures.
: e.           Fire Detector Operability Check Required? Check the Yes box.
: e. Fire Detector Operability Check Required? Check the "Yes" box.
: f.           NEIL Notification Required? Check the NO box.
: f. NEIL Notification Required? Check the "NO" box.
: g.           Fire Marshal Instructions: Return to operable status in 14 days
: g. Fire Marshal Instructions: "Return to operable status in 14 days"
: h.           Restoration/Testing Requirements: Completion of Work Package.
: h. Restoration/Testing Requirements: "Completion of Work Package".
: i.           Sign and date as Fire Marshal for Authorization Block.
: i. Sign and date as Fire Marshal for Authorization Block.
: 3. This completes the setup for this JPM.
: 3. This completes the setup for this JPM.
SRO Admin 1
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 1.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
- Rev 01  G:\DRSIII\License Examinations
Page 4 of 10
\2011\Quad Cities
 
\Proposed\JPMs\admin\SRO Admin 1.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
SRO Admin 1- Rev 01 INITIAL CONDITIONS
Page 5 of 10 INITIAL CONDITIONS
- You are the Work Execution Center Senior Reactor Operator.
- You are the Work Execution Center Senior Reactor Operator.
- An Instrument Maintenance Supervisor has requested a permit to allow testing of smoke detectors in the Turbine Oil Reservoir area. The work will continue into the next shift.
- An Instrument Maintenance Supervisor has requested a permit to allow testing of smoke detectors in the Turbine Oil Reservoir area. The work will continue into the next shift.
INITIATING CUE Review Fire Protection Impairment Permit 11-21. Approve the permit OR explain the reason(s) why you cannot.
INITIATING CUE Review Fire Protection Impairment Permit 11-21. Approve the permit OR explain the reason(s) why you cannot.
EVALUATOR:
EVALUATOR: Provide candidate with a copy of fire permit 11-21, OP-MW-201-007, .
Provide candidate with a copy of fire permit 11
-21, OP-MW-201-007, Attachment 1.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 1.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 10


SRO Admin 1
SRO Admin 1- Rev 01 JPM Start Time:
- Rev 01 G:\DRSIII\License Examinations
Comment STEP                  ELEMENT                           STANDARD                  SAT   UNSAT Number Obtains Procedures.             Obtains a copy of OP-MW-201-         ___    ___      ___
\2011\Quad Cities
007, QCAP 1500-01, QCOA 4100-11 as necessary.
\Proposed\JPMs\admin\SRO Admin 1.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
EVALUATOR: When the candidate locates the procedures listed above, provide the candidate with a copy of each procedure.
Page 6 of 10  JPM Start Time:
EVALUATOR: The candidate may perform the following steps in any order.
STE P ELEMENT SAT STANDARD UNSAT Comment Number Obtains Procedures.
Reviews Fire Permit.             Reviews Fire Permit to               ___    ___      ___
Obtains a copy of OP
determine what is being impaired. Determines that one detector will be disconnected.
-MW-201-007, QCAP 1500
CUE:
-01, QCOA 4100-11 as necessary.
Att. A     Determines effect of             Reviews QCAP 1500-01 Att. A         ___    ___      ___
___ ___ ___ EVALUATOR: When the candidate locates the procedures listed above, provide the candidate with a copy of each procedure.
page 3      disconnecting detectors.        page 3 and determines that one detector, if removed, will make the detection system inoperable (all 6 are required).
EVALUATOR: The candidate may perform the following steps in any order.
EVALUATOR: If the candidate states he cannot approve the permit because of errors, prompt him to explain all of the errors on the permit for you.
Reviews Fire Permit.
Reviews Fire Permit to determine what is being impaired. Determines that one detector will be disconnected.
___ ___ ___ CUE: Att. A page 3 Determines effect of disconnecting detectors.
Reviews QCAP 1500
-01 Att. A page 3 and determines that one detector, if removed, will make the detection system inoperable (all 6 are required).
___ ___ ___ EVALUATOR: If the candidate states he cannot approve the permit because of errors, prompt him to explain all of the errors on the permit for you.
The following errors are built into the permit:
The following errors are built into the permit:
The Fire Protection Permit was filled out improperly in section II. "FIRE MARSHAL REVIEW" as follows: None is marked in the "Fire Watch Required:" block (should be marked "hourly" with performed by marked as "IMD").
The Fire Protection Permit was filled out improperly in section II. FIRE MARSHAL REVIEW as follows:
NO is checked in the box for "Additional Compensatory Measures" (should be marked "YES" and a Description of the additional Compensatory Measures should be included i.e., "backup suppression established or verified.")
* None is marked in the Fire Watch Required: block (should be marked hourly with performed by marked as IMD).
The one detector that was chosen to make a detection system inoperable (ref. QCAP 1500
* NO is checked in the box for Additional Compensatory Measures (should be marked YES and a Description of the additional Compensatory Measures should be included i.e., backup suppression established or verified.)
-01 Attachment A page 3), and the detection system in turn makes the preaction suppression system inoperable (ref. QCAP 1500
The one detector that was chosen to make a detection system inoperable (ref. QCAP 1500-01 Attachment A page 3), and the detection system in turn makes the preaction suppression system inoperable (ref. QCAP 1500-01 Attachment C page 2).
-01 Attachment C page 2).
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 1.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 6 of 10


SRO Admin 1
SRO Admin 1- Rev 01 Comment STEP                  ELEMENT                           STANDARD                  SAT   UNSAT Number Att. C     Determines consequence of       Reviews QCAP 1500-01 Att. C         ___    ___      ___
- Rev 01 G:\DRSIII\License Examinations
page 2      making the detection system      page 2 (or determines info from inoperable.                      QCAP 1500-01 Att. A page 3) and determines that making the detection system inoperable makes the suppression system inoperable.
\2011\Quad Cities
*D.1.c.(2)   *Determines hourly fire         Reviews QCAP 1500-01 step           ___    ___      ___
\Proposed\JPMs\admin\SRO Admin 1.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
watch required.
Page 7 of 10 STE P ELEMENT SAT STANDARD UNSAT Comment Number Att. C page 2 Determines consequence of making the detection system inoperable.
* D.1.c.(2) and D.2.c.(2) and
Reviews QCAP 1500
*D.2.c.(2) determines an hourly fire watch must be conducted if this permit is approved.
-01 Att. C page 2 (or determines info from QCAP 1500-01 Att. A page 3) and determines that making the detecti on system inoperable makes the suppression system inoperable.
*D.2.c.(4)   *Determines backup               Reviews step D.2.c.(4) and           ___    ___      ___
___ ___ ___ *D.1.c.(2)
suppression required.
*D.2.c.(2)
* determines backup suppression will also be required.
Determines hourly fire watch required. Reviews QCAP 1500
Attach. 1   Determines that the Fire         Recognizes the N/A is not          ___    ___      ___
-01 step D.1.c.(2) and D.2.c.(2) and determines an hourly fire watch must be conducted if this permi t is approved.
Watch Performed By field         correct for this field.
___ ___ ___ *D.2.c.(4)
must be filled in IMD or other appropriate department.
Determines backup suppression required. Reviews step D.2.c.(4) and determines backup suppression will also be required.
NOTE: The candidate may choose to correct the provided impairment. This is acceptable.
___ ___ ___ Attach. 1 Determines that the Fire Watch Performed By field must be filled in "IMD" or other appropriate department.
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 1.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Recognizes the "N/A" is not correct for this field.
Page 7 of 10
___ ___ ___ NOTE: The candidate may choose to correct the provided impairment. This is acceptable.


SRO Admin 1
SRO Admin 1- Rev 01 Comment STEP                  ELEMENT                           STANDARD                  SAT   UNSAT Number Reviews the permit for           The candidate reviews the            ___    ___      ___
- Rev 01 G:\DRSIII\License Examinations
accuracy and Notifies the       permit for accuracy in Evaluator of his conclusions. accordance with OP-MW-201-007 FIRE PROTECTION SYSTEM IMPAIRMENT CONTROL step 4.4 and determines the fire impairment permit cannot be approved as written because the Fire Protection Permit was filled out improperly in section II. FIRE MARSHAL REVIEW None is marked in the Fire Watch Performed By: block (should be marked YES and a Description of the additional Compensatory Measures should be included i.e.,
\2011\Quad Cities
backup suppression required).
\Proposed\JPMs\admin\SRO Admin 1.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
EVALUATOR: After the candidate explains why he cannot approve the fire permit as written, as the IM Supervisor requesting the permit that you will rewrite the permit and bring it back for approval on the next shift.
Page 8 of 10 STE P ELEMENT SAT STANDARD UNSAT Comment Number Reviews the permit for accuracy and Notifies the Evaluator of his conclusions.
NOTE: The JPM is complete.
The candidate reviews the permit for accuracy in accordance with OP
JPM Stop Time:
-MW-201-007 "FIRE PROTECTION SYSTEM IMPAIRMENT CONTROL" step 4.4 and determines the fire impairment permit cannot be approved as written because the Fire Protection Permit was filled out improperly in section II. "FIRE MARSHAL REVIEW" None is marked in the "Fire Watch Performed By:" block (should be marked "YES" and a Description of the additional Compensatory Measures should be included i.e.,  
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 1.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
"backup suppression required").
Page 8 of 10
___ ___ ___ EVALUATOR: After the candidate explains why he cannot approve the fire permit as written, as the IM Supervisor requesting the permit that you will rewrite the permit and bring it back for approval on the next shift.
NOTE: The JPM is complet
: e. JPM Stop Time:


SRO Admin 1
SRO Admin 1- Rev 01 JPM  
- Rev 01 G:\DRSIII\License Examinations
\2011\Quad Cities
\Proposed\JPMs\admin\SRO Admin 1.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 9 of 10 JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Job
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title:
 
Review a Fire Impairment Permit Requiring Compensatory Actions JPM Number:
==Title:==
SRO Admin 1 Revision Number:
EO         RO     SRO       FS STA/IA           SRO Cert JPM
Task Number and Title:
 
01 4100.016 Complete / review / approve Fire Protection Impairment Permits and Fire Watch Waivers K/A Number and Importance:
==Title:==
K/A: 2.1.25 Rating: 3.9/4.2 Suggested Testing Environment:
Review a Fire Impairment Permit Requiring Compensatory Actions JPM Number:           SRO Admin 1                                         Revision Number: 01 Task Number and
Simulator Alternate Path:
 
Yes No SRO Only: Yes No Time Critical:
==Title:==
Yes No Reference(s):
4100.016 Complete / review / approve Fire Protection Impairment Permits and Fire Watch Waivers K/A Number and Importance:                 K/A:     2.1.25       Rating:     3.9/4.2 Suggested Testing Environment: Simulator Alternate Path:       Yes         No     SRO Only:       Yes     No     Time Critical:     Yes     No Reference(s): QCAP 1500-01, Administrative Requirements For Fire Protection, Rev. 29 OP-MW-201-007, Fire Protection System Impairment Control, Rev. 7 Actual Testing Environment:                   Simulator         Control Room         In-Plant     Other Testing Method:               Simulate             Perform Estimated Time to Complete: 12.5 minutes                        Actual Time Used:            minutes EVALUATION
QCAP 1500-01, Administrative Requirements For Fire Protection, Rev. 29 OP
-MW-201-007, Fire Protection System Impairment Control, Rev. 7 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
12.5EVALUATION


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                     Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory       Unsatisfactory Comments:
minutes Actual Time Used:
Evaluators Name:                                                             (Print)
minutes Were all the Critical Elements performed satisfactorily?
Evaluators Signature:                                                      Date:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 1.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Satisfactory Unsatisfactory Comments:                     Evaluator's Name
Page 9 of 10
:   (Print) Evaluator's Signature
 
:   Date:
INITIAL CONDITIONS
- You are the Work Execution Center Senior Reactor Operator.
- An Instrument Maintenance Supervisor has requested a permit to allow testing of smoke detectors in the Turbine Oil Reservoir area. The work will continue into the next shift.
INITIATING CUE Review Fire Protection Impairment Permit 11-21. Approve the permit OR explain the reason(s) why you cannot.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS
-  You are the Work Execution Center Senior Reactor Operator.
-  An Instrument Maintenance Supervisor has requested a permit to allow testing of smoke detectors in the Turbine Oil Reservoir area. The work will continue into the next shift.
INITIATING CUE Review Fire Protection Impairment Permit 11
-21. Approve the permit OR explain the reason(s) why you cannot.


SRO Admin 2.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Exelon Nuclear Job Performance Measure Use Procedures Related to Shift Staffing JPM Number: SRO Admin 2 Revision Number: 01 Date: __04/04/2011__
Page 1 of 9  Exelon Nuclear Job Performance Measure Use Procedures Related to Shift Staffing JPM Number: SRO Admin 2 Revision Number:
01 Date: __04/04/2011__
Developed By:
Developed By:
Instructor Date Validated By:
Instructor                             Date Validated By:
SME or Instructor Date Reviewed By:
SME or Instructor                           Date Reviewed By:
Operations Representative Date Approved By:
Operations Representative                       Date Approved By:
Training Department Date SRO Admin 2
Training Department                         Date SRO Admin 2.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
- Rev 01  G:\DRSIII\License Examinations
Page 1 of 9
\2011\Quad Cities
 
\Proposed\JPMs\admin\SRO Admin 2.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
SRO Admin 2- Rev 01 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Page 2 of 9 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 through 12 below.
Prior to JPM usage, revalidate JPM using steps 8 through 12 below.
________ 1. Task description and number, JPM description and number are identified.
________       1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________       2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________       3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
________       4. Initial setup conditions are identified.
________ 4. Initial setup conditions are identified.
________       5. Initiating cue (and terminating cue if required) are properly identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________       6. Task standards identified and verified by SME review.
________ 6. Task standards identified and verified by SME review.
________       7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________       8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure                             Rev:
Procedure Rev:   Procedure Rev:   Procedure Rev:   ________ 9. Verify cues both verbal and visual are free of conflict.
Procedure                             Rev:
________ 10. Verify performance time is accurate
Procedure                             Rev:
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________       9. Verify cues both verbal and visual are free of conflict.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
________       10. Verify performance time is accurate
SME / Instructor Date       SME / Instructor Date       SME / Instructor Date SRO Admin 2
________       11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
- Rev 01  G:\DRSIII\License Examinations
________       12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
\2011\Quad Cities
SME / Instructor                             Date SME / Instructor                             Date SME / Instructor                             Date G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 2.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
\Proposed\JPMs\admin\SRO Admin 2.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 9
Page 3 of 9 Revision Record (Summary)
 
Revision 00, This JPM was developed IAW guidelines established in NUREG 1021 Rev. 9 Supplement 1, ES
SRO Admin 2- Rev 01 Revision Record (Summary)
-301 and Appendix C. This JPM meets the criteria of ES-301 D.3 for "Administrative Topics."
Revision 00,         This JPM was developed IAW guidelines established in NUREG 1021 Rev. 9 Supplement 1, ES-301 and Appendix C. This JPM meets the criteria of ES-301 D.3 for Administrative Topics.
This JPM was developed NEW for the 2009 ILT NRC Exam.
This JPM was developed NEW for the 2009 ILT NRC Exam.
Revision 01.
Revision 01.         Revised to incorporate procedure changes.
Revised to incorporate procedure changes.
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 2.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 3 of 9


SRO Admin 2
SRO Admin 2- Rev 01 JPM SETUP INSTRUCTIONS
- Rev 01 G:\DRSIII\License Examinations
\2011\Quad Cities
\Proposed\JPMs\admin\SRO Admin 2.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 4 of 9 JPM SETUP INSTRUCTIONS
: 1. This is an Administrative JPM that may be performed in any setting where the necessary procedures and support information can be provided.
: 1. This is an Administrative JPM that may be performed in any setting where the necessary procedures and support information can be provided.
: 2. Verify the following information is available for the Initiating Cue:
: 2. Verify the following information is available for the Initiating Cue:
The current shift schedule
* The current shift schedule
: 3. Verify the following information is available for JPM performance:
: 3. Verify the following information is available for JPM performance:
QAP 0300-03, Rev. 39, Operations Shift Staffing Tech Spec 5.2, Organization OP-AA-112-101, Rev.7, Shift Turnover and Relief SY-AA-102-201, Rev.8, "Call
* QAP 0300-03, Rev. 39, Operations Shift Staffing
-Outs for Unscheduled Work"
* Tech Spec 5.2, Organization
: 4. Fill out SY
* OP-AA-112-101, Rev.7, Shift Turnover and Relief
-AA-102-201, with all "fit for duty" and STA 1,2, and 3 arrival times as 0700, 0630, and 0530 respectively.
* SY-AA-102-201, Rev.8, Call-Outs for Unscheduled Work
: 4. Fill out SY-AA-102-201, with all fit for duty and STA 1,2, and 3 arrival times as 0700, 0630, and 0530 respectively.
: 5. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
: 5. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
: 6. This completes the setup for this JPM.
: 6. This completes the setup for this JPM.
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 2.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 4 of 9


SRO Admin 2
SRO Admin 2- Rev 01 (Evaluator Note: Provide the shift staffing information per the JPM Setup Instructions)
- Rev 01 G:\DRSIII\License Examinations
\2011\Quad Cities
\Proposed\JPMs\admin\SRO Admin 2.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 9 (Evaluator Note: Provide the shift staffing information per the JPM Setup Instructions)
INITIAL CONDITIONS You are the Shift Manager.
INITIAL CONDITIONS You are the Shift Manager.
Unit 1 and Unit 2 are at full power.
Unit 1 and Unit 2 are at full power.
The STA's wife is expecting a baby. He has permission from the Operations Director to leave if necessary to join his wife.
The STAs wife is expecting a baby. He has permission from the Operations Director to leave if necessary to join his wife.
At 0400 the STA departs the site when his wife calls him home because she has gone into labor. There are no other STA qualified supervisors on shift.
At 0400 the STA departs the site when his wife calls him home because she has gone into labor.
There are no other STA qualified supervisors on shift.
INITIATING CUE Identify the staffing adjustments that need to be made and the time constraints involved.
INITIATING CUE Identify the staffing adjustments that need to be made and the time constraints involved.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 2.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 9


SRO Admin 2
SRO Admin 2- Rev 01
- Rev 01 G:\DRSIII\License Examinations
*JPM Start Time:
\2011\Quad Cities
Comment STEP                   ELEMENT                           STANDARD              SAT   UNSAT Number
\Proposed\JPMs\admin\SRO Admin 2.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
  *QAP       *Determine that the STA           The requirement for STA          ___    ___      ___
Page 6 of 9 JPM Start Time:
0300-03      position must be staffed for       staff position manning is both Units in Mode 1, 2, or 3.
STEP ELEMENT SAT STANDARD UNSAT Comment Number *QAP 0300-03  C.1.d Determine that the STA position must be staffed for both Units in Mode 1, 2, or 3. The requirement for STA staff position manning is identified.
* identified.
___ ___ ___ *T. S. 5.2.2.b. Determine that the STA position must be staffed in a time not to exceed 2 hours. The requirement to fill the STA staff position withi n 2 hours is identified.
C.1.d
___ ___ ___ CUE: Role Play as Shift Supervisor who will make the call
  *T. S.     *Determine that the STA            The requirement to fill the      ___    ___      ___
-outs and provide the completed SY
5.2.2.b. position must be staffed in a     STA staff position within 2 time not to exceed 2 hours.
-AA-102-101 form to the examinee.
* hours is identified.
  *T.S. 5.2.2.b Directs STA # 3 to report to work. The STA position can be vacant for 2 hours per T. S.
CUE:       Role Play as Shift Supervisor who will make the call-outs and provide the completed SY-AA-102-101 form to the examinee.
5.2.2.b. ___ ___ ___ CUE: As Shift Supervisor tell the candidate you will contact the "selected" STA to drive in and fill the position.
  *T.S.     Directs STA # 3 to report to       The STA position can be         ___    ___      ___
5.2.2.b    work.                              vacant for 2 hours per T. S.
5.2.2.b.
CUE:       As Shift Supervisor tell the candidate you will contact the selected STA to drive in and fill the position.
JPM Stop Time:
JPM Stop Time:
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 2.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 6 of 9


SRO Admin 2
SRO Admin 2- Rev 01 JPM  
- Rev 01 G:\DRSIII\License Examinations
\2011\Quad Cities
\Proposed\JPMs\admin\SRO Admin 2.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 7 of 9 JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Job
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title: Use Procedures Related to Shift Staffing JPM Number:
 
SRO Admin 2 Revision Number:
==Title:==
Task Number and Title:
EO         RO     SRO       FS STA/IA           SRO Cert JPM
(Discussion requirement) SS
 
-S-08 Operations Shift Staffing 01 K/A Number and Importance:
==Title:==
K/A: 2.1.5 Rating: 2.9*/3.9 Ability to use procedures related to shift staffing, such as minimum crew compliment, overtime limitations, etc.
Use Procedures Related to Shift Staffing JPM Number:           SRO Admin 2                                         Revision Number: 01 Task Number and
Suggested Testing Environment:
 
Classroom Alternate Path:
==Title:==
Yes No SRO Only: Yes No Time Critical:
(Discussion requirement) SS-S-08 Operations Shift Staffing K/A Number and Importance:                 K/A: 2.1.5 Rating:           2.9*/3.9 Ability to use procedures related to shift staffing, such as minimum crew compliment, overtime limitations, etc.
Yes No Reference(s):
Suggested Testing Environment: Classroom Alternate Path:       Yes         No     SRO Only:       Yes     No     Time Critical:     Yes     No Reference(s): QAP 0300-03 Rev. 39, Operations Shift Staffing Tech Spec 5.2, Organization OP-AA-112-101 Rev. 7, Shift Turnover and Relief SY-AA-102-201 Rev. 8, Call-Outs for Unscheduled Work Actual Testing Environment:                   Simulator         Control Room         In-Plant     Other Testing Method:               Simulate             Perform Estimated Time to Complete: 05 minutes                          Actual Time Used:            minutes EVALUATION
QAP 0300-03 Rev. 39, Operations Shift Staffing Tech Spec 5.2, Organization OP-AA-112-101 Rev. 7, Shift Turnover and Relief SY-AA-102-201 Rev. 8, "Call
-Outs for Unscheduled Work" Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
05EVALUATION


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                     Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory       Unsatisfactory Comments:
minutes Actual Time Used:
Evaluators Name:                                                             (Print)
minutes Were all the Critical Elements performed satisfactorily?
Evaluators Signature:                                                       Date:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 2.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Satisfactory Unsatisfactory Comments:               Evaluator's Name
Page 7 of 9
:   (Print) Evaluator's Signature
 
:   Date:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS You are the Shift Manager.
INITIAL CONDITIONS You are the Shift Manager.
Unit 1 and Unit 2 are at full power.
Unit 1 and Unit 2 are at full power.
The STA's wife is expecting a baby. He has permission from the Operations Director to leave if necessary to join his wife.
The STAs wife is expecting a baby. He has permission from the Operations Director to leave if necessary to join his wife.
At 0400 the STA departs the site when his wife calls him home because she has gone into labor. There are no other STA qualified supervisors on shift.
At 0400 the STA departs the site when his wife calls him home because she has gone into labor.
INITIATING CUE Identify the staffing adjustments that need to be made and the time constraints involved.  
There are no other STA qualified supervisors on shift.
INITIATING CUE Identify the staffing adjustments that need to be made and the time constraints involved.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


SRO Admin 3.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Exelon Nuclear Job Performance Measure Verify Reactor Mode Change Requirements JPM Number: SRO Admin 3 Revision Number: 03 Date: 04/04/2011 Developed By:
Page 1 of 8  Exelon Nuclear Job Performance Measure Verify Reactor Mode Change Requirements JPM Number: SRO Admin 3 Revision Number:
Instructor                             Date Validated By:
03 Date: 04/04/2011 Developed By:
SME or Instructor                           Date Reviewed By:
Instructor Date Validated By:
Operations Representative                       Date Approved By:
SME or Instructor Date Reviewed By:
Training Department                         Date SRO Admin 3.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Operations Representative Date Approved By:
Page 1 of 8
Training Department Date SRO Admin 3 Rev 03 G:\DRSIII\License Examinations
 
\2011\Quad Cities
SRO Admin 3 Rev 03 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
\Proposed\JPMs\admin\SRO Admin 3.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Prior to JPM usage, revalidate JPM using steps 8 through 12 below.
Page 2 of 8 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
________       1. Task description and number, JPM description and number are identified.
Prior to JPM usage, revalidate JPM using steps 8 through 12 below. ________ 1. Task description and number, JPM description and number are identified.
________       2. Knowledge and Abilities (K/A) references are included.
________ 2. Knowledge and Abilities (K/A) references are included.
________       3. Performance location specified. (in-plant, control room, simulator, or other)
________ 3. Performance location specified. (in
________       4. Initial setup conditions are identified.
-plant, control room, simulator, or other)
________       5. Initiating cue (and terminating cue if required) are properly identified.
________ 4. Initial setup conditions are identified.
________       6. Task standards identified and verified by SME review.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________       7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 6. Task standards identified and verified by SME review.
________       8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
Procedure                             Rev:
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure                             Rev:
Procedure Rev:   Procedure Rev:   Procedure Rev:   ________ 9. Verify cues both verbal and visual are free of conflict.
Procedure                             Rev:
________ 10. Verify performance time is accurate
________       9. Verify cues both verbal and visual are free of conflict.
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________       10. Verify performance time is accurate
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
________       11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
SME / Instructor Date       SME / Instructor Date       SME / Instructor Date SRO Admin 3 Rev 03 G:\DRSIII\License Examinations
________       12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
\2011\Quad Cities
SME / Instructor                             Date SME / Instructor                             Date SME / Instructor                             Date G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 3.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
\Proposed\JPMs\admin\SRO Admin 3.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 8
Page 3 of 8 Revision Record (Summary)
 
Revision 00, This JPM was modified from JPM ADM
SRO Admin 3 Rev 03 Revision Record (Summary)
-A.1.1-SRO, Quad Cities NRC Exam March, 2000, IAW ILT NRC Exam 03
Revision 00, This JPM was modified from JPM ADM-A.1.1-SRO, Quad Cities NRC Exam March, 2000, IAW ILT NRC Exam 03-01, IAW NUREG 1021, Rev 9.
-01, IAW NUREG 1021, Rev
Revision 01, Changed estimated completion time to 18 minutes based on performance data.
: 9. Revision 01, Changed estimated completion time to 18 minutes based on performance data.
Revision 02, Modified dates to current year, updated based on procedure revision.
Revision 02, Modified dates to current year, updated based on procedure revision.
Revision 03, Updated to current procedure revision and adjusted dates.
Revision 03, Updated to current procedure revision and adjusted dates.
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 3.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 3 of 8


SRO Admin 3 Rev 03 G:\DRSIII\License Examinations
SRO Admin 3 Rev 03 SIMULATOR SETUP INSTRUCTIONS
\2011\Quad Cities
: 1. None. This JPM may be completed at any location, provided that the appropriate reference material is available.
\Proposed\JPMs\admin\SRO Admin 3.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
: 2. Ensure the following references are available
Page 4 of 8 SIMULATOR SETUP INSTRUCTIONS 1. None. This JPM may be completed at any location, provided that the appropriate reference material is available.
* QCGP 1-1, page 69-70. Do not sign off step F.6.hh.
: 2. Ensure the following references are available QCGP 1-1, page 69
* QCGP 1-1 Attachment E completed as follows:
-70. Do not sign off step F.6.hh.
o Unit 1 Recirculation System Drive Flow Calibration (N/A for Unit 2) is incorrectly marked N/A (page 1 of 6) o MSIV Closure Monthly Scram Sensor Channel Functional Test is performed on 2/01/2011 (page 5 of 6) o All Unit 2 surveillances marked N/A The following dates include the 25% extension.
QCGP 1-1 Attachment E completed as follows: o Unit 1 Recirculation System Drive Flow Calibration (N/A for Unit 2) is incorrectly marked "N/A" (page 1 of 6) o MSIV Closure Monthly Scram Sensor Channel Functional Test is performed on 2/01/2011 (page 5 of 6) o All Unit 2 surveillances marked "N/A" The following dates include the 25% extension.
o All Unit 1 24 month surveillances dated AFTER 11/30/2009.
o All Unit 1 24 month surveillances dated AFTER 11/30/2009.
o All 184 day (6 month) surveillances dated AFTER 10/13/2010.
o All 184 day (6 month) surveillances dated AFTER 10/13/2010.
o All Unit 1 92 day surveillances dated AFTER 2/05/2011, except as noted above o The Unit 1 7
o All Unit 1 92 day surveillances dated AFTER 2/05/2011, except as noted above o The Unit 1 7-day surveillance dated AFTER 05/23/2011, (page 165) o All steps NOT marked N/A are initialed and dated 06/01/2011.
-day surveillance dated AFTER 05/23/2011, (page 165) o All steps NOT marked N/A are initialed and dated 06/01/2011.
* A Calendar for 2011
A Calendar for 2011
: 3. This completes the setup for this JPM.
: 3. This completes the setup for this JPM.
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 3.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 4 of 8


SRO Admin 3 Rev 03 G:\DRSIII\License Examinations
SRO Admin 3 Rev 03 INITIAL CONDITIONS Today is June 1st, 2011.
\2011\Quad Cities
You are the Unit 1 Supervisor. Unit 1 is in Mode 2 at 10% reactor power, starting up following a 30 day Refuel Outage. QCGP 1-1 is in progress. All procedure steps up to, and including F.6.gg. have been completed.
\Proposed\JPMs\admin\SRO Admin 3.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIATING CUE The Shift Manager has directed you to perform QCGP 1-1 step F.6.hh. to VERIFY MODE 1 surveillance requirements met, and report to the Shift Manager when complete.
Page 5 of 8 INITIAL CONDITIONS Today is June 1st, 2011 You are the Unit 1 Supervisor.
Unit 1 is in Mode 2 at 10% reactor power, starting up following a 30 day Refuel Outage. QCGP 1
-1 is in progress. All procedure steps up to, and including F.6.gg. have been completed.
. INITIATING CUE The Shift Manager has directed you to perform QCGP 1
-1 step F.6.hh. to VERIFY MODE 1 surveillance requirements met, and report to the Shift Manager when complete.
If MODE 1 surveillance requirements are not met, report to the Shift Manager, any action(s) required, to meet the requirements.
If MODE 1 surveillance requirements are not met, report to the Shift Manager, any action(s) required, to meet the requirements.
Provide the candidate with page 69
Provide the candidate with page 69-70 of QCGP 1-1 completed up to step F.6.hh, AND a copy of Attachment E with dates filled in as described in setup.
-70 of QCGP 1
-1 completed up to step F.6.hh, AND a copy of Attachment E with dates filled in as described in setup.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 3.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 8


SRO Admin 3 Rev 03 G:\DRSIII\License Examinations
SRO Admin 3 Rev 03 JPM Start Time:
\2011\Quad Cities
Comment STEP               ELEMENT                           STANDARD                  SAT   UNSAT Number F.6.hh. Reviews Attachment E to                                                 ___    ___      ___
\Proposed\JPMs\admin\SRO Admin 3.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
ensure all Mode 2 to Mode 1 surveillance requirements are met NOTE: There are TWO ERRORS on Attachment E that the candidate must identify. The ORDER which the candidate identifies the errors will affect the role-play required of the Evaluator.
Page 6 of 8  JPM Start Time:
*ATT E   *Verifies ALL surveillances       Recognizes that the Unit 1          ___    ___      ___
STEP ELEMENT SAT STANDARD UNSAT Commen t Number F.6.hh. Reviews Attachment E to ensure all Mode 2 to Mode 1 surveillance requirements are met ___ ___ ___ NOTE: There are TWO ERRORS on Attachment E that the candidate must identify. The ORDER which the candidate identifies the errors will affect the role
applicable to Unit One have       Recirculation System Drive been completed.*                  Flow Calibration (N/A for Unit 2) is incorrectly marked N/A CUE:     Report, as the Operations Predefine Coordinator, that the surveillance was last performed on May 15, 2011. Change the N/A to 05/15/11 then initial and date the change, and initial the right column.
-play required of the Evaluator.
*ATT E   *Verifies ALL applicable           Recognizes that the MSIV             ___    ___      ___
*ATT E Verifies ALL surveillances applicable to Unit One have been completed. Recognizes that the Unit 1 Recirculation System Drive Flow Calibration (N/A for Unit 2) is incorrectly marked "N/A"
surveillances completed within    Closure Monthly Scram Sensor the proper timeframe.*            Channel Functional Test should have been completed no earlier than Feb 05, 2011.
___ ___ ___ CUE: Report, as the Operations Predefine Coordinator, that the surveillance was last performed on May 15, 2011. Change the "N/A" to 05/15/11 then initial and date the change, and initial the right column.
CUE:     Report, as the Operations Predefine Coordinator, that the surveillance was last performed on March 02, 2011. Change the date to 03/02/11, initial and date the change, and initial the right column.
*ATT E Verifies ALL applicable surveillances completed within the proper timeframe. Recognizes that the MSIV Closure Monthly Scram Sensor Channel Functional Test should have been completed no earlier than Feb 05, 2011.
Candidate reports task                                                 ___   ___     ___
___ ___ ___ CUE: Report, as the Operations Predefine Coordinator, that the surveillance was last performed on March 02, 2011. Change the date to 03/02/11, initial and date the change, and initial the right column.
complete:
Candidate reports task complete:  ___ ___ ___   JPM Stop Time:
JPM Stop Time:
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 3.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 6 of 8


SRO Admin 3 Rev 03 G:\DRSIII\License Examinations
SRO Admin 3 Rev 03 JPM  
\2011\Quad Cities
\Proposed\JPMs\admin\SRO Admin 3.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 7 of 8 JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Job
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title:
 
Verify Reactor Mode Change Requirements JPM Number:
==Title:==
SRO Admin 3 Revision Number:
EO         RO     SRO       FS STA/IA           SRO Cert JPM
Task Number and Title: SR
 
-0002-P10   (Freq: LIC=I), Given a shutdown reactor plant, perform a reactor plant startup in accordance with QCGP 1
==Title:==
-1. 03  K/A Number and Importance:
Verify Reactor Mode Change Requirements JPM Number:           SRO Admin 3                                         Revision Number: 03 Task Number and
K/A: 2.2.12   Rating:   3.7/4.1 Suggested Testing Environment:
 
Simulator Alternate Path:
==Title:==
Yes No SRO Only: Yes No Time Critical:
SR-0002-P10 (Freq: LIC=I), Given a shutdown reactor plant, perform a reactor plant startup in accordance with QCGP 1-1.
Yes No Reference(s):
K/A Number and Importance:                   K/A: 2.2.12                 Rating: 3.7/4.1 Suggested Testing Environment: Simulator Alternate Path:       Yes         No     SRO Only:       Yes     No     Time Critical:     Yes     No Reference(s): QCGP 1-1, Rev. 84, Normal Unit Startup Actual Testing Environment:                   Simulator         Control Room         In-Plant     Other Testing Method:               Simulate             Perform Estimated Time to Complete: 18 minutes                          Actual Time Used:            minutes EVALUATION
QCGP 1-1, Rev. 84, Normal Unit Startup Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
18EVALUATION


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                     Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory       Unsatisfactory Comments:
minutes Actual Time Used:
Evaluators Name:                                                             (Print)
minutes Were all the Critical Elements performed satisfactorily?
Evaluators Signature:                                                      Date:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 3.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Satisfactory Unsatisfactory Comments:                   Evaluator's Name
Page 7 of 8
:   (Print) Evaluator's Signature
 
:   Date:
INITIAL CONDITIONS Today is June 1st, 2011.
You are the Unit 1 Supervisor. Unit 1 is in Mode 2 at 10% reactor power, starting up following a 30 day Refuel Outage. QCGP 1-1 is in progress. All procedure steps up to, and including F.6.gg. have been completed.
INITIATING CUE The Shift Manager has directed you to perform QCGP 1-1 step F.6.hh. to VERIFY MODE 1 surveillance requirements met, and report to the Shift Manager when complete.
If MODE 1 surveillance requirements are not met, report to the Shift Manager, any action(s) required, to meet the requirements.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS Today is June 1st, 2011
. You are the Unit 1 Supervisor.
Unit 1 is in Mode 2 at 10% reactor power, starting up following a 30 day Refuel Outage. QCGP 1
-1 is in progress. All procedure steps up to, and including F.6.gg. have been completed.
INITIATING CUE The Shift Manager has directed you to perform QCGP 1
-1 step F.6.hh. to VERIFY MODE 1 surveillance requirements met, and report to the Shift Manager when complete. If MODE 1 surveillance requirements are not met, report to the Shift Manager, any action(s) required, to meet the requirements.


SRO Admin 4.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Exelon Nuclear Job Performance Measure Verify a Liquid Radwaste River Discharge Permit JPM Number: SRO Admin 4 Revision Number: 04 Date: 04/04/2011 Developed By:
Page 1 of 8  Exelon Nuclear Job Performance Measure Verify a Liquid Radwaste River Discharge Permit JPM Number:
Instructor                             Date Validated By:
SRO Admin 4 Revision Number:
SME or Instructor                           Date Reviewed By:
04 Date: 04/04/2011 Developed By:
Operations Representative                       Date Approved By:
Instructor Date Validated By:
Training Department                         Date SRO Admin 4.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
SME or Instructor Date Reviewed By:
Page 1 of 8
Operations Representative Date Approved By:
 
Training Department Date SRO Admin 4
SRO Admin 4-Rev 04 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
-Rev 04  SRO Admin 4.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 8 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 through 12 below.
Prior to JPM usage, revalidate JPM using steps 8 through 12 below.
________ 1. Task description and number, JPM description and number are identified.
________     1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________     2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________     3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
________     4. Initial setup conditions are identified.
________ 4. Initial setup conditions are identified.
________     5. Initiating cue (and terminating cue if required) are properly identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     6. Task standards identified and verified by SME review.
________ 6. Task standards identified and verified by SME review.
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________     8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure                           Rev:
Procedure Rev:   Procedure Rev:   Procedure Rev:   ________ 9. Verify cues both verbal and visual are free of conflict.
Procedure                           Rev:
________ 10. Verify performance time is accurate
Procedure                           Rev:
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     9. Verify cues both verbal and visual are free of conflict.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below
________     10. Verify performance time is accurate
:
________     11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
SME/Instructor Date       SME/Instructor Date       SME/Instructor Date  
________     12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME/Instructor                                               Date SME/Instructor                                               Date SME/Instructor                                               Date SRO Admin 4.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 8


SRO Admin 4
SRO Admin 4-Rev 04 Revision Record (Summary)
-Rev 04   G:\DRSIII\License Examinations
: 1. Revision 00,       This JPM is being developed for SRO testing during the Annual License Operator Requal cycle.
\2011\Quad Cities
: 2. Revision 01,       This JPM revised to reflect changing times.
\Proposed\JPMs\admin\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
: 3. Revision 02,       This JPM revised to reflect procedure changes.
Page 3 of 8 Revision Record (Summary)
: 4. Revision 03,       Changed Shift Supervisor to Field Supervisor and updated JPM to new procedure revision.
: 1. Revision 00, This JPM is being developed for SRO testing during the Annual License Operator Requal cycle.
: 5. Revision 04,       This JPM revised to reflect procedure changes.
: 2. Revision 01, This JPM revised to reflect changing times.
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
: 3. Revision 02, This JPM revised to reflect procedure changes.
Page 3 of 8
: 4. Revision 03, Changed Shift Supervisor to Field Supervisor and updated JPM to new procedure revision.
: 5. Revision 04, This JPM revised to reflect procedure changes.


SRO Admin 4
SRO Admin 4-Rev 04 INITIAL CONDITIONS You are the Shift Supervisor with the current plant conditions as follows:
-Rev 04   G:\DRSIII\License Examinations
\2011\Quad Cities
\Proposed\JPMs\admin\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 4 of 8 INITIAL CONDITIONS You are the Shift Supervisor with the current plant conditions as follows:
The River Discharge Tank (RDT) is 94% and needs to be discharged into the river using the river discharge pump.
The River Discharge Tank (RDT) is 94% and needs to be discharged into the river using the river discharge pump.
The Chemistry Department has sampled the contents of the river discharge tank and forwarded the sample analysis and discharge calculations.
The Chemistry Department has sampled the contents of the river discharge tank and forwarded the sample analysis and discharge calculations.
NO other tanks are being discharged to the river.
NO other tanks are being discharged to the river.
NO Valve lineup has been completed per Attachment B.
NO other tanks are being pumped to the River Discharge Tank.
other tanks are being pumped to the River Discharge Tank.
Valve lineup has been completed per Attachment B.
South Diffuser gate - 100% open Ice melt line  
South Diffuser gate - 100% open Ice melt line - Closed
- Closed   INITIATING CUE


The Shift Manager has asked you, as Shift Supervisor, to independently calculate the maximum River Discharge Tank (RDT) discharge rate per QOP 2000-25. The following information was provided on the envelope:
INITIATING CUE The Shift Manager has asked you, as Shift Supervisor, to independently calculate the maximum River Discharge Tank (RDT) discharge rate per QOP 2000-25. The following information was provided on the envelope:
RIVER DISCHARGE TANK Batch #
Total Percent of 10EC Minimum # Circ Water Pumps = 2 Minimum # Service Wtr Pumps = 1 Ice Melt Line OPEN or CLOSED? (Circle)
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 4 of 8


RIVER DISCHARGE TANK Batch #    Total Percent of 10EC    Minimum # Circ Water Pumps = 2 Minimum # Service Wtr Pumps = 1 Ice Melt Line OPEN or CLOSED? (Circle)
SRO Admin 4-Rev 04 Set Up Instructions:
 
SRO Admin 4
-Rev 04   G:\DRSIII\License Examinations
\2011\Quad Cities
\Proposed\JPMs\admin\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 8 Set Up Instructions:
On the Chemistry Batch sticker which is part of the Initiating Cue, fill in the following:
On the Chemistry Batch sticker which is part of the Initiating Cue, fill in the following:
Batch #: "7371" Total Percent of 10EC: "63" Circle "Closed" for the Ice Melt Line.
Batch #: 7371 Total Percent of 10EC: 63 Circle Closed for the Ice Melt Line.
*********************************************************************************************************
Provide examinee with:
Provide examinee with:
Calculator Fill in the JPM Start Time when the student acknowledges the Initiating Cue Information For Evaluator's Use:
Calculator Fill in the JPM Start Time when the student acknowledges the Initiating Cue Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 8


SRO Admin 4
SRO Admin 4-Rev 04 JPM Start Time:
-Rev 04   G:\DRSIII\License Examinations
Comment SAT  UNSAT  Number STEP                   ELEMENT                                 STANDARD
\2011\Quad Cities
*F.7.b. Determines NET DILUTION                Determines NET DILUTION                      ___  ___      ___
\Proposed\JPMs\admin\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
FLOW by determining the                 FLOW.
Page 6 of 8  JPM Start Time:
number of circulating water             2 circ wtr pmp x 157,000 gpm =
STEP ELEMENT SAT STANDARD UNSAT Comment Number *F.7.b. FLOW by determining the number of circulating water pumps operating x 157,000gpm  
pumps operating x 157,000gpm             314,000 gpm
+ number of service water pumps operating x 13,800gpm and subtracting 0 gpm for ice melt line being closed. Determines NET DILUTION FLOW. 2 circ wtr pmp x 157,000 gpm =
            + number of service water
314,000 gpm
                                                    +
+ 1 service wtr pmps x 13,800 gpm = 13,800 gpm  
pumps operating x 13,800gpm and subtracting 0 gpm for ice           1 service wtr pmps x 13,800 melt line being closed.                gpm = 13,800 gpm - 0 gpm (due to ice melt line being closed.)
- 0 gpm (due to ice melt line being closed.) Determines total net dilution flow 327,800 gpm  
Determines total net dilution flow 327,800 gpm - 0 =327,800 gpm.
- 0 =327,800 gpm. ___ ___ ___ *F.7.c. flow by dividing net dilution flow by 2. Divides NET DILUTION FLOW by 2. Determines effective dilution flow to be 327,800 gpm/2=163,900 gpm.
*F.7.c. Determines effective dilution          Divides NET DILUTION FLOW                    ___  ___      ___
___ ___ ___ *F.7.d. allowable discharge rate by multiplying the effective dilution flow by 10, and dividing by the total percent of 10*EC (from sample analysis). Multiplies NET DILUTION FLOW by 10, and divides by Total % of 10*EC. Determines Max Allowable Discharge Rate to be (163,900 x 10)/63=26,016 gpm ___ ___ ___ EVALUATORS NOTE: JPM is complete when calculation is finished by candidate.
flow by dividing net dilution flow       by 2. Determines effective by 2.                                   dilution flow to be 327,800 gpm/2=163,900 gpm.
*F.7.d. Determines maximum                      Multiplies NET DILUTION                      ___  ___      ___
allowable discharge rate by              FLOW by 10, and divides by multiplying the effective dilution       Total % of 10*EC. Determines flow by 10, and dividing by the         Max Allowable Discharge Rate total percent of 10*EC (from             to be (163,900 x 10)/63=26,016 sample analysis).                      gpm EVALUATORS NOTE: JPM is complete when calculation is finished by candidate.
JPM Stop Time:
JPM Stop Time:
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 6 of 8


SRO Admin 4
SRO Admin 4-Rev 04 JPM  
-Rev 04   G:\DRSIII\License Examinations
\2011\Quad Cities
\Proposed\JPMs\admin\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 7 of 8 JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                             Job
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title:
 
Verify a Liquid Radwaste River Discharge Permit JPM Number:
==Title:==
SRO Admin 4 Revision Number:
EO         RO     SRO       FS STA/IA           SRO Cert JPM
Task Number and Title:
 
04 SN-2000-P09 (Freq: LIC=I NF=I) Given Rad Waste systems in a normal lineup, discharge from the River Discharge Tank to the river using the Waste Surge Pump or the River Discharge Pump in accordance with QOP 2000
==Title:==
-24 or QOP 2000
Verify a Liquid Radwaste River Discharge Permit JPM Number:         SRO Admin 4                                           Revision Number: 04 Task Number and
-25. (Use pictures, rad maps, remote cameras etc.. to discuss actions in high dose areas)
 
K/A Number and Importance:
==Title:==
K/A: 2.3.6 Rating: 2.0/3.8 Suggested Testing Environment:
SN-2000-P09 (Freq: LIC=I NF=I) Given Rad Waste systems in a normal lineup, discharge from the River Discharge Tank to the river using the Waste Surge Pump or the River Discharge Pump in accordance with QOP 2000-24 or QOP 2000-25. (Use pictures, rad maps, remote cameras etc.. to discuss actions in high dose areas)
Simulator Alternate Path:
K/A Number and Importance:           K/A:     2.3.6 Rating:             2.0/3.8 Suggested Testing Environment: Simulator Alternate Path:       Yes     No     SRO Only:         Yes         No       Time Critical:     Yes     No Reference(s): QOP 2000-25, Rev. 43, DISCHARGING TO THE RIVER FROM THE RIVER DISCHARGE TANK USING THE RIVER DISCHARGING PUMP Actual Testing Environment:           Simulator           Control Room               In-Plant     Other Testing Method:           Simulate         Perform Estimated Time to Complete: 10 minutes                      Actual Time Used:                  minutes EVALUATION
Yes No SRO Only: Yes No Time Critical:
Yes No Reference(s):
QOP 2000-25, Rev. 43, DISCHARGING TO THE RIVER FROM THE RIVER DISCHARGE TANK USING THE RIVER DISCHARGING PUMP Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
10EVALUATION


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                       Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                       Satisfactory       Unsatisfactory Comments:
minutes Actual Time Used:
Evaluators Name:                                                               (Print)
minutes Were all the Critical Elements performed satisfactorily?
Evaluators Signature:                                                                 Date:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Satisfactory Unsatisfactory Comments:               Evaluator's Na me:   (Print) Evaluator's Signature
Page 7 of 8
:   Date:
 
SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS You are the Shift Supervisor with the current plant conditions as follows:
INITIAL CONDITIONS You are the Shift Supervisor with the current plant conditions as follows:
The River Discharge Tank (RDT) is 94% and needs to be discharged into the river using the river discharge pump.
The River Discharge Tank (RDT) is 94% and needs to be discharged into the river using the river discharge pump.
Line 1,141: Line 1,073:
NO other tanks are being pumped to the River Discharge Tank.
NO other tanks are being pumped to the River Discharge Tank.
Valve lineup has been completed per Attachment B.
Valve lineup has been completed per Attachment B.
South diffuser gate  
South diffuser gate - 100% open Ice melt line - Closed INITIATING CUE The Shift Manager has asked you, as Shift Supervisor, to independently calculate the maximum River Discharge Tank (RDT) discharge rate per QOP 2000-25. The following information was provided on the envelope:
- 100% open Ice melt line  
RIVER DISCHARGE TANK Batch #
- Closed   INITIATING CUE The Shift Manager has asked you, as Shift Supervisor, to independently calculate the maximum River Discharge Tank (RDT) discharge rate per QOP 2000-25. The following information was provided on the envelope:
Total Percent of 10EC Minimum # Circ Water Pumps = 2 Minimum # Service Wtr Pumps = 1 Ice Melt Line OPEN or CLOSED? (Circle)
SRRS: 3D.105 (when utilized for operator initial or continuing training)


RIVER DISCHARGE TANK Batch #    Total Percent of 10EC    Minimum # Circ Water Pumps = 2 Minimum # Service Wtr Pumps = 1 Ice Melt Line OPEN or CLOSED? (Circl e)
Exelon Nuclear Job Performance Measure Classify a Security Event JPM Number: SRO Admin 5 Revision Number: 00 Date: 04/04/2011 Developed By:
SRO Admin 5.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Instructor                             Date Validated By:
Page 1 of 12  Exelon Nuclear Job Performance Measure Classify a Security Event JPM Number: SRO Admin 5 Revision Number:
SME or Instructor                           Date Reviewed By:
00 Date: 04/04/2011 Developed By:
Operations Representative                      Date Approved By:
Instructor Date Validated By:
Training Department                         Date SRO Admin 5.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
SME or Instructor Date Reviewed By:
Page 1 of 12
Operations Representati ve Date Approved By:
 
Training Department Date SRO Admin 5
SRO Admin 5-Rev 00 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
-Rev 00  G:\DRSIII\License Examinations
\2011\Quad Cities
\Proposed\JPMs\admin\SRO Admin 5.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 12 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 through 12 below.
Prior to JPM usage, revalidate JPM using steps 8 through 12 below.
________ 1. Task description and number, JPM description and number are identified.
________       1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________       2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________       3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
________       4. Initial setup conditions are identified.
________ 4. Initial setup conditions are identified.
________       5. Initiating cue (and terminating cue if required) are properly identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________       6. Task standards identified and verified by SME review.
________ 6. Task standards identified and verified by SME review.
________       7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 7. Critical steps meet the criteria for critical steps and are identified wit h an asterisk (*).
________       8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure                             Rev:
Procedure Rev:   Procedure Rev:   Procedure Rev:   ________ 9. Verify cues both verbal and visual are free of conflict.
Procedure                             Rev:
________ 10. Verify performance time is accurate
Procedure                             Rev:
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________       9. Verify cues both verbal and visual are free of conflict.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
________       10. Verify performance time is accurate
SME / Instructor Date       SME / Instructor Date       SME / Instructor Date SRO Admin 5
________       11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
-Rev 00  G:\DRSIII\License Examinations
________       12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
\2011\Quad Cities
SME / Instructor                             Date SME / Instructor                             Date SME / Instructor                             Date G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 5.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
\Proposed\JPMs\admin\SRO Admin 5.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 12
Page 3 of 12 Revision Record (Summary)
Revision 00, This JPM was developed for the ILT 09
-1 NRC Exam.


SRO Admin 5
SRO Admin 5-Rev 00 Revision Record (Summary)
-Rev 00 G:\DRSIII\License Examinations
Revision 00, This JPM was developed for the ILT 09-1 NRC Exam.
\2011\Quad Cities
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 5.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
\Proposed\JPMs\admin\SRO Admin 5.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 3 of 12
Page 4 of 12 SIMULATOR SETUP INSTRUCTIONS Verify the following reference material is available:
 
SRO Admin 5-Rev 00 SIMULATOR SETUP INSTRUCTIONS Verify the following reference material is available:
: 1) EP-MW-114-100, Rev. 9, MIDWEST REGION OFFSITE NOTIFICATIONS
: 1) EP-MW-114-100, Rev. 9, MIDWEST REGION OFFSITE NOTIFICATIONS
: 2) EP-AA-1006, Rev. 29, RADIOLOGICAL EMERGENCY PLAN ANNEX FOR QUAD CITIES STATION
: 2) EP-AA-1006, Rev. 29, RADIOLOGICAL EMERGENCY PLAN ANNEX FOR QUAD CITIES STATION G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 5.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 4 of 12


SRO Admin 5
SRO Admin 5-Rev 00 INITIAL CONDITIONS Both Units are operating at rated power.
-Rev 00 G:\DRSIII\License Examinations
\2011\Quad Cities
\Proposed\JPMs\admin\SRO Admin 5.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 12 INITIAL CONDITIONS Both Units are operating at rated power.
You are the Shift Manager when the following events occur:
You are the Shift Manager when the following events occur:
: 1) A Fork Truck carrying a load of scaffold has tipped over in the Reactor Building near the half-track. No equipment damage or personnel injuries resulted.
: 1) A Fork Truck carrying a load of scaffold has tipped over in the Reactor Building near the half-track. No equipment damage or personnel injuries resulted.
: 2) The Unit Supervisor has received the following authenticated message from the NRC:
: 2) The Unit Supervisor has received the following authenticated message from the NRC:
"A large commercial airliner has been hijacked and is on a flight path for the Quad Cities Nuclear Station. Estimated time of arrival is approximately 20 minutes."
A large commercial airliner has been hijacked and is on a flight path for the Quad Cities Nuclear Station. Estimated time of arrival is approximately 20 minutes.
: 3) During the placement of a Clearance Order on the Halon system, an inadvertent actuation occurred in the Main Computer Room located on the 1st floor of Service Building. The meteorological conditions are as follows:
: 3) During the placement of a Clearance Order on the Halon system, an inadvertent actuation occurred in the Main Computer Room located on the 1st floor of Service Building.
Wind direction 233 deg. Wind speed 2.74 m/sec OR 6.09 miles/hr  
The meteorological conditions are as follows:
 
Wind direction         233 deg.
THIS JPM IS TIME CRITICAL.
Wind speed             2.74 m/sec OR 6.09 miles/hr THIS JPM IS TIME CRITICAL.
INITIATING CUE Determine the highest Emergency Action Level (EAL) classification and prepare a NARS form for transmittal.
INITIATING CUE Determine the highest Emergency Action Level (EAL) classification and prepare a NARS form for transmittal.
Provide examinee with: Candidate needs to have access to all Emergency Plan procedures as found in the simulator.
Provide examinee with: Candidate needs to have access to all Emergency Plan procedures as found in the simulator.
Fill in the JPM Start Time when the student acknowledges the Initiating C ue. Information For Evaluator's Use:
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to SRO Admin 5
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 5.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
-Rev 00  G:\DRSIII\License Examinations
Page 5 of 12
\2011\Quad Cities
 
\Proposed\JPMs\admin\SRO Admin 5.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
SRO Admin 5-Rev 00 management expectations, or problems the examinee had while performing the JPM.
Page 6 of 12 management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 5.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 6 of 12
SRO Admin 5-Rev 00 JPM Start Time:
Comment STEP                ELEMENT                          STANDARD                  SAT    UNSAT Number EVALUATOR: The following step (Classification) must be completed within 15 minutes from the JPM start time.
    *      *Declares an ALERT < 15          Recognizes that the conditions      ___    ___      ___
minutes of JPM start time.*      for HA1 are met due to validated notification from NRC of an airliner attack threat < 30 minutes from site.
Refers to EP-MW-114-100          Time ALERT declared. ____          ___  ___      ___
Midwest Region OFFSITE NOTIFICATIONS as                  JPM start time.
necessary to fill out NARS        Difference < 15 min.
form.
EVALUATOR: The following step (NARs completion ) must be completed within 15 minutes from the time of Classification.
NARS        Fills out Utility Message        Records Utility Message #1.        ___    ___      ___
form        Number.
NARS        Fills out State Message          Records N/A for State Message      ___    ___      ___
form        Number.                          Number.
Block #1    Fills out block #1 information    Checks box [B] Drill/Exercise in    ___    ___      ___
regarding Status.                block #1.
Block #2    Fills out block #2 information    Checks box [F] Quad Cities in      ___    ___      ___
regarding Station.                block #2.
*Block      *Fills out block #3              Checks box [B] ALERT.              ___    ___      ___
#3          information regarding onsite condition.*
*Block      *Fills out block #4              Records Accident Classification    ___    ___      ___
#4          information regarding            as Accident Classified &            Time= time ALERT declared Accident Terminated.*            Date= todays date EAL=HA1 Records N/A for Accident Terminated in Time and Date space.
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 5.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 7 of 12


SRO Admin 5
SRO Admin 5-Rev 00 Comment STEP               ELEMENT                           STANDARD                  SAT   UNSAT Number
-Rev 00 G:\DRSIII\License Examinations
*Block     *Fills out block #5              Checks box [A] None.               ___   ___     ___
\2011\Quad Cities
#5          information regarding Release Status.*
\Proposed\JPMs\admin\SRO Admin 5.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Block #6    Fills out block #6 information   Checks box [A] NOT                  ___   ___     ___
Page 7 of 12  JPM Start Time:
regarding Type of Release.       APPLICABLE Block #7   Fills out block #7 information   Records 233 degrees.               ___   ___     ___
STEP ELEMENT SAT STANDARD UNSAT Comment Number EVALUATOR:  The following step (Classification) must be completed within 15 minutes from the JPM start time.
regarding Wind Direction.
* Declares an ALERT
CUE: Examinee should derive the meteorological data from the Initial Conditions If asked about present conditions or the examinee starts to access the information from PPDS, state: the meteorological conditions have NOT changed from the Initial Conditions.
< Recognizes that the conditions for HA1 are met due to validated notification from NRC of an airliner attack threat < 30 minutes from site.
Block #8   Fills out block #8 information   Checks both boxes and records       ___    ___      ___
15 minutes of JPM start time. ___ ___ ___  Refers to EP
regarding Wind Speed.            values for [A] Meters/Sec =
-MW-114-100 Midwest Region OFFSITE NOTIFICATIONS as necessary to fill out NARS form. Time ALERT declared. ____
2.74 and [B] Miles/Hr = 6.09.
JPM start time.
Block #9   Fills out block #9 information   Checks box [A] NONE (               ___   ___     ___
Difference
regarding Recommended Actions.
< 15 min. ___ ___ ___ EVALUATOR:  The following step (NARs completion ) must be completed within 15 minutes from the time of Classification.
Block       Fills out block #10               Records NONE.                      ___    ___      ___
NARS form Fills out Utility Message Number. Records Utility Message
#10        information regarding Additional Information.
#1. ___ ___ ___ NARS form Fills out State Message Number. Records N/A for State Message Number. ___ ___ ___ Block #1  Fills out block #1 information regarding Status.
NARS      *Submits NARS form for            Submits NARS form for               ___    ___      ___
Checks box [B] Drill/Exercise in block #1. ___ ___ ___ Block #2 Fills out block #2 information regarding Station. Checks box [F] Quad Cities in block #2. ___ ___ ___ *Block
form        transmittal < 14 minutes after   transmittal.
#3 Fills out block #3 information regarding onsite condition. Checks box [B] ALERT. ___ ___ ___ *Block #4 Fills out block #4 information regarding Accident Classified & Accident Terminated. Records Accident Classification as Time= time ALERT declared Date= today's date EAL=HA1 Records N/A for Accident Terminated in Time and Date space. ___ ___ ___
classification.*                  Record time: ________
SRO Admin 5
CUE:     When candidate submits the NARS form for verification, state that the JPM is complete.
-Rev 00  G:\DRSIII\License Examinations
\2011\Quad Cities
\Proposed\JPMs\admin\SRO Admin 5.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 8 of 12 STEP ELEMENT SAT STANDARD UNSAT Comment Number *Block #5 Fills out block #5 information regarding Release Status. Checks box [A] Non e. ___ ___ ___ Block #6 Fills out block #6 information regarding Type of Release.
Checks box [A] NOT APPLICABLE
___ ___ ___ Block #7 Fills out block #7 information regarding Wind Direction.
Records 233 degrees
. ___ ___ ___ CUE: Examinee should derive the meteorological data from the Initial Conditions If asked about present conditions or the examinee starts to access the information from PPDS, state: "the meteorological conditions have NOT changed from the Initial Conditions."
Block #8 Fills out block #8 information regarding Wind Speed.
Checks both boxes and records values for [A] Meters/Sec = 2.74 and [B] Miles/Hr = 6.09. ___ ___ ___ Block #9 Fills out block #9 information regarding Recommended Actions. Checks box
[A] NONE ( ___ ___ ___ Block #10  Fills out block #10 information regarding Additional Information.
Records NONE. ___ ___ ___ NARS form Submits NARS form for transmittal  
< 14 minutes after classification. Submits NARS form for transmittal.
Record time: ________
___ ___ ___ CUE: When candidate submits the NARS form for verification, state that the JPM is complete.
JPM Stop Time:
JPM Stop Time:
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 5.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 8 of 12


SRO Admin 5
SRO Admin 5-Rev 00 JPM  
-Rev 00 G:\DRSIII\License Examinations
\2011\Quad Cities
\Proposed\JPMs\admin\SRO Admin 5.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 9 of 12 JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Job
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title:
 
Classify a Security Event JPM Number:
==Title:==
SRO-Admin 5 Revision Number:
EO       RO   SRO       FS STA/IA         SRO Cert JPM
Task Number and Title:
 
00 S-EP-P01 (Freq: LIC=A) (ILT
==Title:==
-MP) Given an event, classify the event and activate the Emergency Response organization in accordance with EP
Classify a Security Event JPM Number:           SRO-Admin 5                   Revision Number:   00 Task Number and
-AA-111 and EP
 
-AA-112. K/A Number and Importance:
==Title:==
K/A: 2.4.41 Rating: 2.9/4.6 Suggested Testing Environment:
S-EP-P01 (Freq: LIC=A) (ILT-MP) Given an event, classify the event and activate the Emergency Response organization in accordance with EP-AA-111 and EP-AA-112.
Simulator Alternate Path:
K/A Number and Importance:                 K/A:     2.4.41       Rating:     2.9/4.6 Suggested Testing Environment: Simulator Alternate Path:       Yes         No     SRO Only:       Yes     No     Time Critical: Yes     No Reference(s): EP-MW-114-100, Rev. 10, MIDWEST REGION OFFSITE NOTIFICATIONS EP-AA-1006, Rev. 30, RADIOLOGICAL EMERGENCY PLAN ANNEX FOR QUAD CITIES STATION Actual Testing Environment:               Simulator     Control Room       In-Plant Other Testing Method:               Simulate             Perform Estimated Time to Complete: 15 minutes                         Actual Time Used:         minutes 14 minutes               Actual Time Used:         minutes G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 5.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):
Page 9 of 12
EP-MW-114-100, Rev. 10, MIDWEST REGION OFFSITE NOTIFICATIONS EP-AA-1006, Rev. 30, RADIOLOGICAL EMERGENCY PLAN ANNEX FOR QUAD CITIES STATION Actual Testing Environment:
 
Simulator Control Room In-Plant Other Testing Method:
SRO Admin 5-Rev 00 EVALUATION  
Simulate Perform Estimated Time to Complete:
15 minutes Actual Time Used:
minutes 14 minutes Actual Time Used:
minutes SRO Admin 5
-Rev 00  G:\DRSIII\License Examinations
\2011\Quad Cities
\Proposed\JPMs\admin\SRO Admin 5.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 10 of 12 EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?             Yes             No The operators performance was evaluated against standards contained within this JPM and has been determined to be:             Satisfactory   Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                     (Print)
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Signature:                                               Date:
Satisfactory Unsatisfactory Comments:                         Evaluator's Name
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 5.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
:   (Print) Evaluator's Signature
Page 10 of 12
:   Date:
 
SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS Both Units are operating at rated power.
INITIAL CONDITIONS Both Units are operating at rated power.
You are the Shift Manager when the following events occur:
You are the Shift Manager when the following events occur:
: 1) A Fork Truck carrying a load of scaffold has tipped over in the Reactor Building near the half-track. No equipment damage or personnel injuries resulted.
: 1) A Fork Truck carrying a load of scaffold has tipped over in the Reactor Building near the half-track. No equipment damage or personnel injuries resulted.
: 2) The Unit Supervisor has received the following authenticated message from the NRC:
: 2) The Unit Supervisor has received the following authenticated message from the NRC:
"A large commercial airliner has been hijacked and is on a flight path for the Quad Cities Nuclear Station. Estimated time of arrival is approximately 20 minutes."
A large commercial airliner has been hijacked and is on a flight path for the Quad Cities Nuclear Station. Estimated time of arrival is approximately 20 minutes.
: 3) During the placement of a Clearance Order on the Halon system, an inadvertent actuation occurred in the Main Computer Room located on the 1st floor of Service Building. The meteorological conditions are as follows:
: 3) During the placement of a Clearance Order on the Halon system, an inadvertent actuation occurred in the Main Computer Room located on the 1st floor of Service Building.
Wind direction 233 deg. Wind speed 2.74 m/sec OR 6.09 miles/hr  
The meteorological conditions are as follows:
Wind direction       233 deg.
Wind speed           2.74 m/sec OR 6.09 miles/hr THIS JPM IS TIME CRITICAL.
INITIATING CUE Determine the highest Emergency Action Level (EAL) classification and prepare a NARS form for transmittal.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


THIS JPM IS TIME CRITICAL.
Exelon Nuclear Job Performance Measure Locally Start-Up a Diesel Generator With a Failure of the Vent Fan to Start RO/SRO JPM i Revision Number: 19 Date: 04/04/2011 Developed By:
INITIATING CUE Determine the highes t Emergency Action Level (EAL) classification and prepare a NARS form for transmittal.
Instructor                          Date Validated By:
SME or Instructor                        Date Reviewed By:
Operations Representative                    Date Approved By:
Training Department                        Date RO-SRO JPM i.doc              SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 1 of 11


RO-SRO JPM i.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
RO/SRO JPM i - Rev 19 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Page 1 of 11  Exelon Nuclear Job Performance Measure Locally Start
-Up a Diesel Generator With a Failure of the Vent Fan to Start RO/SRO JPM i Revision Number:
19 Date:  04/04/2011 Developed By:
Instructor Date  Validated By:
SME or Instructor Date  Reviewed By:      Operations Representative Date  Approved By:
Training Department Date RO/SRO JPM i
- Rev 19 G:\DRSIII\License Examinations
\2011\Quad Cities
\Proposed\JPMs\inplant\RO-SRO JPM i.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 11  JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 through 12 below.
Prior to JPM usage, revalidate JPM using steps 8 through 12 below.
________ 1. Task description and number, JPM description and number are identified.
________       1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________       2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________       3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other) ________ 4. Initial setup conditions are identified.
________       4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________       5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________       6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________       7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________       8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure Rev:   Procedure Rev:   Procedure Rev:   ________ 9. Verify cues both verbal and visual are free of conflict.
Procedure                               Rev:
________ 10. Verify performance time is accurate
Procedure                               Rev:
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
Procedure                               Rev:
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
________       9. Verify cues both verbal and visual are free of conflict.
SME / Instructor Date       SME / Instructor Date       SME / Instructor Date RO/SRO JPM i
________       10. Verify performance time is accurate
- Rev 19  G:\DRSIII\License Examinations
________       11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
\2011\Quad Cities
________       12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
\Proposed\JPMs\inplant\RO-SRO JPM i.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
SME / Instructor                               Date SME / Instructor                               Date SME / Instructor                               Date G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM i.doc           SRRS:
Page 3 of 11 Revision Record (Summary)
3D.105 (when utilized for operator initial or continuing training)
Revision 10, This JPM is developed IAW guidelines established in NUREG 1021 Rev 8 ES
Page 2 of 11
-301 and Appendix C. This JPM meets the criteria of Category B.2 "In
 
-Plant Systems," for RO/SRO candidates.
RO/SRO JPM i - Rev 19 Revision Record (Summary)
Revision 10, This JPM is developed IAW guidelines established in NUREG 1021 Rev 8 ES-301 and Appendix C. This JPM meets the criteria of Category B.2 "In-Plant Systems," for RO/SRO candidates.
JPM revised to match procedure revision.
JPM revised to match procedure revision.
Revision 11, JPM revised to match procedure revision.
Revision 11, JPM revised to match procedure revision.
Line 1,338: Line 1,262:
Revision 15, JPM revised to match procedure revision.
Revision 15, JPM revised to match procedure revision.
Revision 16, JPM revised to match procedure revision.
Revision 16, JPM revised to match procedure revision.
Revision 17, JPM revised objective to allow flexibility to perform task on more than one diesel. Added note to instructor to verify the operator dons double hearing protection.
Revision 17, JPM revised objective to allow flexibility to perform task on more than one diesel.
Added note to instructor to verify the operator dons double hearing protection.
Revision 18, JPM revised to match procedure revision.
Revision 18, JPM revised to match procedure revision.
Revision 19, Revised Evaluator cues and notes.
Revision 19, Revised Evaluator cues and notes.
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM i.doc      SRRS:
3D.105 (when utilized for operator initial or continuing training)
Page 3 of 11


RO/SRO JPM i  
RO/SRO JPM i - Rev 19 INITIAL CONDITIONS A loss of off-site power has occurred on Unit 1. The U-1(U1/2) Diesel failed to start.
- Rev 19 G:\DRSIII\License Examinations
\2011\Quad Cities
\Proposed\JPMs\inplant\RO-SRO JPM i.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 4 of 11 INITIAL CONDITIONS A loss of off-site power has occurred on Unit 1. The U
-1(U1/2) Diesel failed to start.
A fire in the plant has damaged fire detection cabling associated with the U1(U1/2) Diesel Room as indicated by control room alarms.
A fire in the plant has damaged fire detection cabling associated with the U1(U1/2) Diesel Room as indicated by control room alarms.
A manual start from the Control Room was attempted but was not successful due to a faulty control switch.
A manual start from the Control Room was attempted but was not successful due to a faulty control switch.
Annunciator 901
Annunciator 901-8 G-8, DIESEL GEN 1 RELAY TRIP (901-5 G-5, DIESEL GEN 1/2 RELAY TRIP), is NOT alarming.
-8 G-8, DIESEL GEN 1 RELAY TRIP (901
QCOA 6600-01 has been entered and other operators are taking action directed by that procedure.
-5 G-5, DIESEL GEN 1/2 RELAY TRIP), is NOT QCOA 6600-01 has been entered and other operators are taking action directed by that procedure. alarming. The Unit Supervisor (US) has directed that the U1(U1/2) Diesel be started locally.
The Unit Supervisor (US) has directed that the U1(U1/2) Diesel be started locally.
The U1(U1/2) Diesel is in its normal standby line
The U1(U1/2) Diesel is in its normal standby line-up with the output breaker open as verified by the Control Room and an EO, locally.
-up with the output breaker open as verified by the Control Room and an EO, locally.
The EO will standby to verify that the output breaker closes after the U1(U1/2) Diesel is up to speed and locally load the diesel as directed by the Control Room.
The EO will standby to verify that the output breaker closes after the U1(U1/2) Diesel is up to speed and locally load the diesel as directed by the Control Room.
U1(U1/2) Diesel Day Tank level is 90% and the storage tank level is 95%.
U1(U1/2) Diesel Day Tank level is 90% and the storage tank level is 95%.
This JPM is not time critical.
This JPM is not time critical.
INITIATING CUE The Unit Supervisor directs you to locally start the U
INITIATING CUE The Unit Supervisor directs you to locally start the U-1(U1/2) Diesel Generator in accordance with QCOP 6600-11, to energize Bus 14-1(13-1) and ensure the U1(U1/2) Diesel is operating properly. Report to the US when Diesel Generator is ready to be loaded.
-1(U1/2) Diesel Generator in accordance with QCOP 6600
Provide the examinee with a blank copy of QCOP 6600-11.
-11, to energize Bus 14
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
-1(13-1) and ensure the U1(U1/2) Diesel is operating properly. Report to the US when Diesel Generator is ready to be loaded.
Information For Evaluators Use:
Provide the examinee with a blank copy of QCOP 6600
-11. Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM i.doc      SRRS:
3D.105 (when utilized for operator initial or continuing training)
Page 4 of 11


RO/SRO JPM i  
RO/SRO JPM i - Rev 19 JPM Start Time:
- Rev 19 G:\DRSIII\License Examinations
Comment STEP               ELEMENT                           STANDARD                  SAT   UNSAT Number F.2.           Verify maint. switch in             Verifies maint. switch in "up"   ___    ___      ___
\2011\Quad Cities
                "REMOTE AUTO START"                  position. (Engine Mounted position.                            Control Panel)
\Proposed\JPMs\inplant\RO-SRO JPM i.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
CUE:     Point to the maintenance switch up position and state, This switch is here.
Page 5 of 11  JPM Start Time:
F.5.           Verify SPEED DROOP set to         At governor, ensures             ___    ___      ___
STEP ELEMENT SAT STANDARD UNSAT Comment Number F.2. Verify maint. switch in "REMOTE AUTO START" position. Verifies maint. switch in "up" position. (Engine Mounted Control Panel)
: 0.                                SPEED DROOP knob set on 0 (upper left knob).
___ ___ ___ CUE: Point to the maintenance switch up position and state, "This switch is here." F.5. Verify "SPEED DROOP" set to "0". At governor, ensures "SPEED DROOP" knob set on "0" (upper left knob).
CUE:     Point to 0 position on the speed droop knob and state, This knob is here.
___ ___ ___ CUE: Point to "0" position on the speed droop knob and state, "This knob is here." *F.6. Isolate Diesel Generator controls. Positions "Transfer switch" to "LOCAL" at the 2251
*F.6.           *Isolate Diesel Generator           Positions Transfer switch     ___    ___      ___
-10 (2212-45) panel.
controls.*                          to LOCAL at the 2251-10 (2212-45) panel.
___ ___ ___ CUE: Point to the local position on the transfer switch and state, "This switch is in this position.Point to annunciator C
CUE:     Point to the local position on the transfer switch and state, This switch is in this position. Point to annunciator C-1 on the 2251-10(2212-45) panel and state, This annunciator is alarming.
-1 on the 2251
F.7.           Notify plant personnel of           Notifies the CR to announce     ___    ___      ___
-10(2212-45) panel and state, "This annunciator is alarming."
starting the engine.                the impending engine start, or uses page to announce it to the plant.
F.7. Notify plant personnel of starting the engine.
CUE:     As appropriate state, I understand you are about to start the U1(U1/2)
Notifies the CR to announce the impending engine start, or uses page to announce it to the plant.
EDG, I will make an announcement. Or the announcement has been delivered to the plant via the page.
___ ___ ___ CUE: As appropriate state, "I understand you are about to start the U1(U1/2) EDG, I will make an announcement.Or the announcement has been delivered to the plant via the page.
NOTE: The candidate should indicate that they are wearing double hearing protection.
NOTE: The candidate should indicate that they are wearing double hearing protection.
*F.8.           *Start the EDG.*                    Depresses DG START             ___    ___      ___
*F.8. Start the EDG. Depresses "DG START" pushbutton. (Engine Mounted Control Panel)
pushbutton. (Engine Mounted Control Panel)
___ ___ ___ CUE: State the following to the candidate, "The diesel has started and the EO at the Bus reports that the output breaker has closed."
CUE:     State the following to the candidate, The diesel has started and the EO at the Bus reports that the output breaker has closed.
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM i.doc            SRRS:
3D.105 (when utilized for operator initial or continuing training)
Page 5 of 11


RO/SRO JPM i  
RO/SRO JPM i - Rev 19 Comment STEP               ELEMENT                           STANDARD                SAT   UNSAT Number F.9.           Determines DG Room Vent             Observes fan red run light      ___    ___      ___
- Rev 19 G:\DRSIII\License Examinations
Fan has failed to autostart.         on 2251-37 (2212-50) panel is NOT lit OR flow of air has not changed.
\2011\Quad Cities
CUE:     As appropriate state, Red light is out, green light is lit. OR Air flow has NOT changed.
\Proposed\JPMs\inplant\RO-SRO JPM i.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
CUE:     IF the candidate chooses to align the alternate power source to the Vent Fan by placing the VENT FAN SELECTOR SWITCH to ALT, then give the following cues: The alternate power yellow light is LIT, the Vent Fan red light is OUT and green light is LIT. Air Flow has NOT changed.
Page 6 of 11 STEP ELEMENT SAT STANDARD UNSAT Comment Number F.9. Determines DG Room Vent Fan has failed to autostart.
EVALUATOR NOTE: Per the Initial Conditions, the operator should identify that the Vent Fan is locked out due to cable damage. The Fire Protection Bypass SW may be moved to Bypass per step E.3, OR QCOA 6600-08 (QCOA 6600-06). 4E-1350B sh 3 indicates that the fan will start after the selector switch is taken to Bypass.
Observes fan red run light on 2251-37 (2212-50) panel is NOT OR lit flow of air has not changed.
EVALUATOR NOTE: Alternate path starts here.
___ ___ ___ CUE: As appropriate state, "Red light is out, green light is lit.OR "Air flow has NOT changed."
D.2.b.(1)       Unlock and open Diesel               Diesel Generator Room            ___    ___      ___
CUE: IF the candidate chooses to align the alternate power source to the Vent Fan by placing the VENT FAN SELECTOR SWITCH to ALT, then give the following cues:
Generator Room Vent fan key         Vent fan box opened and locked box.                          unlocked.
"The alternate power yellow light is LIT, the Vent Fan red light is OUT and green light is LIT. Air Flow has NOT changed."
CUE:     The examinee may either break the glass or go to the WEC and obtain the key from the Shift Manage Key Cabinet. If the latter is chosen, state you have the key.
EVALUATOR NOTE: Per the Initial Conditions, the operator should identify that the Vent Fan is locked out due to cable damage. The Fire Protection Bypass SW may be moved to Bypass per step E.3, OR QCOA 6600
Point to the EDG vent fan key lock box and state, Box is open or the glass is broken as appropriate.
-08 (QCOA 6600
*D.2.b.(2)     Start DG Room Vent Fan               Position the D.G. 1 (1/2)       ___    ___      ___
-06). 4E-1350B sh 3 indicates that the fan will start after the selector switch is taken to "Bypass".
OR      by::*placing the D.G. 1 (1/2)       Vent Fan Fire Prot. Bypass VENT FAN FIRE                        switch to Bypass (QCOA
EVALUATOR NOTE: Alternate path starts here.
* Step E.3.. PROTECTION BYPASS                    6600-08, D.2.b., QCOA SWITCH to BYPASS.*                  6600-06, D.2.b., or QCOP 6600-11, E.3.)
D.2.b.(1) Unlock and open Diesel Generator Room Vent fan key locked box.
CUE:     Point to bypass switch and state, Switch is in Bypass position and you feel increased air flow.
Diesel Generator Room Vent fan box opened and unlocked. ___ ___ ___ CUE: The examinee may either break the glass or go to the WEC and obtain the key from the Shift Manage Key Cabinet. If the latter is chosen, state "you have the key".
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM i.doc            SRRS:
Point to the EDG vent fan key lock box and state, "Box is open" or "the glass is broken" as appropriate.
3D.105 (when utilized for operator initial or continuing training)
*D.2.b.(2)
Page 6 of 11
OR
 
* Step E.3..
RO/SRO JPM i - Rev 19 Comment STEP                  ELEMENT                          STANDARD                  SAT  UNSAT Number D.2.b.(3)      Close and lock Diesel                Diesel Generator Room            ___    ___      ___
Start DG Room Vent Fan by::placing the D.G. 1 (1/2) VENT FAN FIRE PROTECTION BYPASS SWITCH to BYPASS. Position the D.G. 1 (1/2) Vent Fan Fire Prot. Bypass switch to Bypass (QCOA 6600-08, D.2.b., QCOA 6600-06, D.2.b., or QCOP 6600-11, E.3.) ___ ___ ___ CUE: Point to bypass switch and state, "Switch is in Bypass position and you feel increased air flow."
Generator Room Vent fan box.        Vent Fan box closed and locked.
CUE:        State, EDG vent fan lock box is closed and locked.
D.4.            Verify proper operation of          Observes louvers are open.      ___    ___      ___
associated dampers.
CUE:        Point to dampers and state, These are open.
F.10.          Verify DGCWP automatically          Verifies DGCWP red run          ___    ___      ___
starts.                              light lit (2251-37/2212-50 panel)
OR Verifies pressure on DG HX SW gauges.
OR Observes flow meter outside DG room > 900 gpm (FI 1-3941-26/FI 1/2-3941-27).
CUE:        As appropriate state, The DGCWP red light is lit" OR point to 50 psig on the Diesel heat exchanger pressure gauge and state, Pressure is here OR pointing at 950 gpm on flowmeter, Gauge indicates here.
CUE:        At the 2251-10 (2212-45) panel, POINT to the following indications when the information is requested by the candidate.
F.11.          Verify DG Frequency at 60hz.        Checks DG frequency              ___    ___      ___
meter CUE:        Point to 60HZ on the gauge and state, Frequency is here.
F.12.          Verify DG Voltage at 4160.          Checks DG Voltage meter.        ___    ___      ___
CUE:        Point to 4160 on the gauge and state, Voltage is here.
Report DG status to CR.              Reports to CR to provide        ___    ___      ___
them with the current status of the DG.
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM i.doc            SRRS:
3D.105 (when utilized for operator initial or continuing training)
Page 7 of 11


RO/SRO JPM i  
RO/SRO JPM i - Rev 19 Comment STEP                   ELEMENT                           STANDARD                 SAT   UNSAT Number CUE:         As Unit Supervisor state: Bus 14-1(13-1) is energized and another operator will be dispatched to monitor voltage, frequency, and load.
- Rev 19 G:\DRSIII\License Examinations
EVALUATOR: The candidate should inform you that the task is complete.
\2011\Quad Cities
\Proposed\JPMs\inplant\RO-SRO JPM i.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 7 of 11 STEP ELEMENT SAT STANDARD UNSAT Comment Number D.2.b.(3) Close and lock Diesel Generator Room Vent fan box.
Diesel Generator Room Vent Fan box closed and locked. ___ ___ ___ CUE: State, "EDG vent fan lock box is closed and locked."
D.4. Verify proper operation of associated dampers.
Observes louvers are open.
___ ___ ___ CUE: Point to dampers and state, "These are open."
F.10. Verify DGCWP automatically starts. Verifies DGCWP red run light lit (2251
-37/2212-50 panel) OR Verifies pressure on DG HX SW gauges.
OR Observes flow meter outside DG room > 900 gpm (FI 1-3941-26/FI 1/2-3941-27). ___ ___ ___ CUE: As appropriate state, "The DGCWP red light is lit" OR point to 50 psig on the Diesel heat exchanger pressure gauge and state, "Pressure is here" OR pointing at 950 gpm on flowmeter, "Gauge indicates here."
CUE: At the 2251
-10 (2212-45) panel, POINT to the following indications when the information is requested by the candidate.
F.11. Verify DG Frequency at 60hz.
Checks DG frequency meter ___ ___ ___ CUE: Point to 60HZ on the gauge and state, "Frequency is here."
F.12. Verify DG Voltage at 4160.
Checks DG Voltage meter.
___ ___ ___ CUE: Point to 4160 on the gauge and state, "Voltage is here."
Report DG status to CR.
Reports to CR to provide them with the current status of the DG.
___ ___ ___
RO/SRO JPM i
- Rev 19  G:\DRSIII\License Examinations
\2011\Quad Cities
\Proposed\JPMs\inplant\RO-SRO JPM i.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 8 of 11 STEP ELEMENT SAT STANDARD UNSAT Comment Number CUE: As Unit Supervisor state: Bus 14
-1(13-1) is energized and another operator will be dispatched to monitor voltage, frequency, and load.
EVALUATOR: The candidate should inform you that the task is complete.
JPM Stop Time:
JPM Stop Time:
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM i.doc            SRRS:
3D.105 (when utilized for operator initial or continuing training)
Page 8 of 11


RO/SRO JPM i  
RO/SRO JPM i - Rev 19 JPM  
- Rev 19 G:\DRSIII\License Examinations
\2011\Quad Cities
\Proposed\JPMs\inplant\RO-SRO JPM i.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 9 of 11 JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                   Job
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title:
 
Locally Start
==Title:==
-Up a Diesel Generator With a Failure of the Vent Fan to Start JPM Number:
EO       RO     SRO   FS STA/IA         SRO Cert JPM
RO/SRO JPM i Revision Number:
 
Task Number and Title:
==Title:==
19 SRN-6600-P04   (Freq: LIC=B NF=B) Given a condition where the 1/2 (U1) Emergency DG has failed to auto start, Bus 18 (19) is de
Locally Start-Up a Diesel Generator With a Failure of the Vent Fan to Start JPM Number:         RO/SRO JPM i                                           Revision Number: 19 Task Number and
-energized, and fire detection cable damage has locked out the 1/2 (U1) DG vent fan, locally start the 1/2 (U1) Emergency DG and energize Bus 13
 
-1(14-1) in accordance with QCOP 6600-11, QCOA 6600
==Title:==
-06 (QCOA 6600
SRN-6600-P04 (Freq: LIC=B NF=B) Given a condition where the 1/2 (U1)
-08) and QOP 6500
Emergency DG has failed to auto start, Bus 18 (19) is de-energized, and fire detection cable damage has locked out the 1/2 (U1) DG vent fan, locally start the 1/2 (U1) Emergency DG and energize Bus 13-1(14-1) in accordance with QCOP 6600-11, QCOA 6600-06 (QCOA 6600-08) and QOP 6500-10.
-10. K/A Number and Importance:
K/A Number and Importance:                 K/A:     264000 A2.08           Rating:       3.3/3.7 Suggested Testing Environment: Plant Alternate Path:       Yes       No       SRO Only:         Yes     No     Time Critical:   Yes   No Reference(s): QCOP 6600-11, Rev. 25, DIESEL GENERATOR LOCAL OPERATION QCOA 6600-08, Rev. 10, UNIT 1(2) DIESEL GENERATOR ROOM VENT FAN FAILURE QCOA 6600-06, Rev. 10, 1/2 DIESEL GENERATOR ROOM VENT FAN FAILURE Actual Testing Environment:                 Simulator           Control Room         In-Plant     Other Testing Method:             Simulate             Perform Estimated Time to Complete: 15 minutes                           Actual Time Used:           minutes G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM i.doc               SRRS:
K/A: 264000 A2.08 Rating: 3.3/3.7 Suggested Testing Environment: Plant Alternate Path:
3D.105 (when utilized for operator initial or continuing training)
Yes No SRO Only: Yes No Time Critical:
Page 9 of 11
Yes No Reference(s):
 
QCOP 6600-11, Rev. 25, DIESEL GENERATOR LOCAL OPERATION QCOA 6600-08, Rev. 10, UNIT 1(2) DIESEL GENERATOR ROOM VENT FAN FAILURE QCOA 6600-06, Rev. 10, 1/2 DIESEL GENERATOR ROOM VENT FAN FAILURE Actual Testing Environment:
RO/SRO JPM i - Rev 19 EVALUATION  
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
15 minutes Actual Time Used:
minutes RO/SRO JPM i
- Rev 19  G:\DRSIII\License Examinations
\2011\Quad Cities
\Proposed\JPMs\inplant\RO-SRO JPM i.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 10 of 11 EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?               Yes             No The operators performance was evaluated against standards contained within this JPM and has been determined to be:               Satisfactory   Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                       (Print)
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Signature:                                                 Date:
Satisfactory Unsatisfactory Comments:                         Evaluator's Name
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM i.doc        SRRS:
:   (Print) Evaluator's Signature
3D.105 (when utilized for operator initial or continuing training)
:   Date:
Page 10 of 11
SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
INITIAL CONDITIONS A loss of off
INITIAL CONDITIONS A loss of off-site power has occurred on Unit 1. The U-1(U1/2) Diesel failed to start.
-site power has occurred on Unit 1. The U
-1(U1/2) Diesel failed to start.
A fire in the plant has damaged fire detection cabling associated with the U1(U1/2) Diesel Room as indicated by control room alarms.
A fire in the plant has damaged fire detection cabling associated with the U1(U1/2) Diesel Room as indicated by control room alarms.
A manual start from the Control Room was attempted but was not successful due to a faulty control switch.
A manual start from the Control Room was attempted but was not successful due to a faulty control switch.
Annunciator 901
Annunciator 901-8 G-8, DIESEL GEN 1 RELAY TRIP (901-5 G-5, DIESEL GEN 1/2 RELAY TRIP), is NOT alarming.
-8 G-8, DIESEL GEN 1 RELAY TRIP (901
QCOA 6600-01 has been entered and other operators are taking action directed by that procedure.
-5 G-5, DIESEL GEN 1/2 RELAY TRIP), is NOT alarming. QCOA 6600-01 has been entered and other operators are taking action directed by that procedure.
The Unit Supervisor (US) has directed that the U1(U1/2) Diesel be started locally.
The Unit Supervisor (US) has directed that the U1(U1/2) Diesel be started locally.
The U1(U1/2) Diesel is in its normal standby line
The U1(U1/2) Diesel is in its normal standby line-up with the output breaker open as verified by the Control Room and an EO, locally.
-up with the output breaker open as verified by the Control Room and an EO, locally.
The EO will standby to verify that the output breaker closes after the U1(U1/2) Diesel is up to speed and locally load the diesel as directed by the Control Room.
The EO will standby to verify that the output breaker closes after the U1(U1/2) Diesel is up to speed and locally load the diesel as directed by the Control Room.
U1(U1/2) Diesel Day Tank level is 90% and the storage tank level is 95%.
U1(U1/2) Diesel Day Tank level is 90% and the storage tank level is 95%.
This JPM is not time critical.
This JPM is not time critical.
INITIATING CUE The Unit Supervisor directs you to locally start the U
INITIATING CUE The Unit Supervisor directs you to locally start the U-1(U1/2) Diesel Generator in accordance with QCOP 6600-11, to energize Bus 14-1(13-1) and ensure the U1(U1/2) Diesel is operating properly. Report to the US when Diesel Generator is ready to be loaded.
-1(U1/2) Diesel Generator in accordance with QCOP 6600
SRRS: 3D.105 (when utilized for operator initial or continuing training)
-11, to energize Bus 14
 
-1(13-1) and ensure the U1(U1/2) Diesel is operating properly. Report to the US when Diesel Generator is ready to be loaded.
Exelon Nuclear Job Performance Measure Inject Water Into the RPV Using the Condensate System Crosstie RO/SRO JPM j Revision Number: 07 Date: 04/04/2011 Developed By:
Instructor                              Date Validated By:
SME or Instructor                          Date Reviewed By:
Operations Representative                        Date Approved By:
Training Department                          Date RO-SRO JPM j.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 1 of 8


RO-SRO JPM j.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
RO/SRO JPM j - Rev 07 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Page 1 of 8  Exelon Nuclear Job Performance Measure Inject Water Into the RPV Using the Condensate System Crosstie RO/SRO JPM j Revision Number:
07 Date:  04/04/2011 Developed By:
Instructor Date  Validated By:
SME or Instructor Date  Reviewed By:
Operations Representative Date  Approved By:
Training Department Date RO/SRO JPM j
- Rev 07 G:\DRSIII\License Examinations
\2011\Quad Cities
\Proposed\JPMs\inplant\RO-SRO JPM j.doc Page 2 of 8  JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 through 12 below.
Prior to JPM usage, revalidate JPM using steps 8 through 12 below.
________ 1. Task description and number, JPM description and number are identified.
________       1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________       2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________       3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
________       4. Initial setup conditions are identified.
________ 4. Initial setup conditions are identified.
________       5. Initiating cue (and terminating cue if required) are properly identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________       6. Task standards identified and verified by SME review.
________ 6. Task standards identified and verified by SME review.
________       7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________       8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure                         Rev:
Procedure Rev:   Procedure Rev:   Procedure Rev:   ________ 9. Verify cues both verbal and visual are free of conflict
Procedure                         Rev:
. ________ 10. Verify performance time is accurate
Procedure                         Rev:
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________       9. Verify cues both verbal and visual are free of conflict.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:       SME / Instructor Date       SME / Instructor Date       SME / Instructor Date RO/SRO JPM j
________       10. Verify performance time is accurate
- Rev 07  G:\DRSIII\License Examinations
________       11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
\2011\Quad Cities
________       12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
\Proposed\JPMs\inplant\RO-SRO JPM j.doc Page 3 of 8 Revision Record (Summary)
SME / Instructor                               Date SME / Instructor                               Date SME / Instructor                               Date G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM j.doc Page 2 of 8
Revision 00, This JPM is developed IAW guidelines established in NUREG 1021 Rev 8 ES
 
-301 and Appendix C. This JPM meets the criteria of Category B.2 "In
RO/SRO JPM j - Rev 07 Revision Record (Summary)
-Plant Systems," for RO/SRO candidates.
Revision 00, This JPM is developed IAW guidelines established in NUREG 1021 Rev 8 ES-301 and Appendix C. This JPM meets the criteria of Category B.2 "In-Plant Systems," for RO/SRO candidates.
JPM revised to match procedure changes.
JPM revised to match procedure changes.
Revision 01, JPM revised to match procedure changes.
Revision 01, JPM revised to match procedure changes.
Line 1,542: Line 1,442:
Revision 06, JPM revised to update procedure reference.
Revision 06, JPM revised to update procedure reference.
Revision 07, Revised steps by adding valve names and cues. Also added two critical steps.
Revision 07, Revised steps by adding valve names and cues. Also added two critical steps.
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM j.doc Page 3 of 8


RO/SRO JPM j  
RO/SRO JPM j - Rev 07 INITIAL CONDITIONS
- Rev 07 G:\DRSIII\License Examinations
-   Problems have developed on Unit 2(1) which require the Alternate Injection Systems to be lined-up in order to restore reactor water level.
\2011\Quad Cities
-    The Unit Supervisor has directed you to inject water from the Unit 1(2) Condensate system into the Unit 2(1) reactor using the Condensate system crosstie in accordance with QCOP 3300-12 as directed by QGA 100.
\Proposed\JPMs\inplant\RO-SRO JPM j.doc Page 4 of 8 INITIAL CONDITIONS
-    The Unit 1(2) Condensate pumps are operating normally.
- Problems have developed on Unit 2(1)- The Unit Supervisor has directed you to inject water from the which require the Alternate Injection Systems to be lined-up in order to restore reactor water level.
-   The Unit 1 and 2 NSOs are aware of the situation and are standing by to monitor parameters in the Control Room.
Unit 1(2) Condensate system into the Unit 2(1)- The  reactor using the Condensate system crosstie in accordance with QCOP 3300-12 as directed by QGA 100.
-   There are no Condensate Demin backwashes in progress on either unit.
Unit 1(2)- The Unit 1 and 2 NSOs are aware of the situation and are standing by to monitor parameters in the Control Room.
-   You have obtained an S-key and are ready to perform the task.
Condensate pumps are operating normally.
-   This JPM is not time critical.
- There are no Condensate Demin backwashes in progress on either unit.
INITIATING CUE Line-up the Condensate System crosstie and begin restoring Unit 2(1) reactor level IAW QCOP 3300-12.
- You have obtained an S
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
-key and are ready to perform the task.
Information For Evaluators Use:
- This JPM is not time critical.
INITIATING CUE Line-up the Condensate System crosstie and begin restoring Unit 2(1) reactor level IAW QCOP 3300-12. Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of callin g for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM j.doc Page 4 of 8
RO/SRO JPM j - Rev 07 JPM Start Time:
Comment STEP                ELEMENT                            STANDARD                    SAT  UNSAT Number EVALUATOR NOTE/CUE: Per OP-AA-103-105, if the candidate elects to manually close the outlet valves, the breakers should first be opened. Given the importance of restoring vessel level it is not considered vital that this is done (however, it should be discussed with the candidate at the conclusion of the walkthroughs). If the candidate does locally open the breakers, cue him that the outlet valve breaker is open, after each handle is taken to the trip position.
*F.2.a.(1)  *Remotely close all U-2(1)      At U-2(1) Condensate Demin            ___    ___      ___
or      Demin Outlet E Valves.
* Panels (2252(1)-11 & 16)
*F.2.a.(2)                                    depresses A through H OR DEMIN OUTLET E VALVE
            *Locally manually close all      close pushbuttons.
COND DEMIN DSCH VLVS            OR MO 2(1)-3302A-H*
Locates all COND DEMIN VESSEL DSCH VLVS (MO 2(1)-3302A through H),
depresses declutch lever and rotates handwheel clockwise.
CUE:      Point to the indicating lights for each and state, Green light is lit, Red light is out OR, The handwheel will not rotate any further. If asked state threads are visible on the stem.
F.2.b. Verify closed 2(1)-3303,        At U-2(1) Cond Demin Panel            ___    ___      ___
COND DEMIN BYPASS                verifies green light lit for MO VALVE.                          2(1)-3303.
OR Locally, at MO 2(1)-3303 verifies green light lit.
OR Contacts Control Room to verify closed.
CUE:      Point to indicating lights and state, Red light is out, Green light is lit or Control Room reports, U-2(1) Condemin Bypass Valve is closed.
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM j.doc Page 5 of 8


RO/SRO JPM j  
RO/SRO JPM j - Rev 07 Comment STEP                 ELEMENT                           STANDARD                    SAT   UNSAT Number
- Rev 07 G:\DRSIII\License Examinations
  *F.2.c.    *Open 1-5599-68 U-1 COND          Locates and rotates the 1-5599-      ___    ___      ___
\2011\Quad Cities
HDR TO 1/2 BACKWASH                68 vlv handwheel counter-HDR SV.*                          clockwise. (South of U-1 Condensate Demin Precoat Tank)
\Proposed\JPMs\inplant\RO-SRO JPM j.doc Page 5 of 8  JPM Start Time:
CUE:      Point to the handwheel and state, The valve handwheel will not rotate any further.
STEP ELEMENT SAT STANDARD UNSAT Comment Number EVALUATOR NOTE/CUE: Per OP
F.2.d. Verify open MO 2(1)-3205A        Contacts Control Room to verify      ___    ___      ___
-AA-103-105, if the candidate elects to manually close the outlet valves, the breakers should first be opened. Given the importance of restoring vessel level it is not considered vital that this is done (however, it should be discussed with the candidate at the conclusion of the walkthroughs). If the candidate does locally open the breakers, cue him that "the outlet valve breaker is open", after each handle is taken to the trip position.
AND B, RX FW INLT VLV.           MO 2(1)-3205A AND B are open.
*F.2.a.(1) or *F.2.a.(2)
CUE:      Report as NSO that, The MO 2(1)-3205A and MO 2(1)-3205B valves are open.
Remotely close all U-2(1) Demin Outlet "E" Valves. OR Locally manually close all COND DEMIN DSCH VLVS MO 2(1)-3302A-H At U-2(1) Condensate Demin Panels (2252(1)
F.2.e. Verify open MO 2(1)-3201A,        Contacts Control Room to verify      ___    ___      ___
-11 & 16) depresses "A" through "H" DEMIN OUTLET "E" VALVE close pushbuttons.
B, OR C, RFP DISCH VLVs.          open:
OR Locates all COND DEMIN VESSEL DSCH VLVS (MO 2(1)-3302A through H), depresses declutch lever and rotates handwheel clockwise.
MO 2(1)-3201A OR MO 2(1)-3201B, OR MO 2(1)-3201C CUE:       Report back as NSO that, The A & B RFP Discharge valves are open.
___ ___ ___ CUE: Point to the indicating lights for each and state, "Green light is lit, Red light is out"  OR, "The handwheel will not rotate any further." If asked state "threads are visible on the stem."
F.2.f. Verify Feedwater Regulator        Contacts Control Room to verify      ___    ___      ___
F.2.b. Verify closed 2(1)
valves(s) in manual AND          all 3 FWRVs are in manual and closed:                          closed.
-3303, COND DEMIN BYPASS VALVE. At U-2(1) Cond Demin Panel verifies green light lit for MO 2(1)-3303. OR Locally, at MO 2(1)
2(1)-640-19A, 2(1)A FEEDWATER MAN/AUTO CONT STA 2(1)-640-19B, 2(1)B FEEDWATER MAN/AUTO CONT STA 2(1)-640-20, FEEDWATER LO FLOW CONTLR G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM j.doc Page 6 of 8
-3303 verifies green light lit.
OR Contacts Control Room to verify closed. ___ ___ ___ CUE: Point to indicating lights and state, "Red light is out, Green light is lit" or Control Room reports, "U
-2(1) Condemin Bypass Valve is closed."


RO/SRO JPM j  
RO/SRO JPM j - Rev 07 Comment STEP                 ELEMENT                           STANDARD                   SAT   UNSAT Number CUE:     Report back as NSO that, All Feedwater Regulating Valves are in manual and closed.
- Rev 07 G:\DRSIII\License Examinations
  *F.2.g.   *Unlock 2-5599-68 U-2             Unlocks the 2-5599-68, U-2           ___    ___      ___
\2011\Quad Cities
COND HDR TO 1/2                  COND HDR TO 1/2 BACKWASH HDR SV.*                BACKWASH HDR SV, (located 20 East of U-1 Cond Demin Control Panel).
\Proposed\JPMs\inplant\RO-SRO JPM j.doc Page 6 of 8 STEP ELEMENT SAT STANDARD UNSAT Comment Number *F.2.c. Open 1-5599-68 U-1 COND HDR TO 1/2 BACKWASH HDR SV. Locates and rotates the 1
CUE:     The valve is unlocked
-5599-68 vlv handwheel counter
  *F.2.h. Slowly *open the 2-5599-68       Rotates the 2-5599-68 valve.*                          handwheel counterclockwise.
-clockwise.  (South of U
CUE:     Point to the 2-5599-68 handwheel and state, The valve handwheel will not rotate any further.
-1 Condensate Demin Precoat Tank) ___ ___ ___ CUE: Point to the handwheel and state, "The valve handwheel will not rotate any further." F.2.d. Verify open MO 2(1)
  *F.3.     *Open one Feedwater               Contacts the Control Room and Regulator Valve.
-3205A ANDContacts Control Room to verify MO 2(1)-3205A AND B are open. B, RX FW INLT VLV.
* requests performance of QCOP 3300-12 step F.3.
___ ___ ___ CUE: Report as NSO that, "The MO 2(1)
CUE:     After contacting the Control Room, as the NSO report the low flow feedwater reg valve is open and U-2(1) Reactor water level is rising.
-3205A and MO 2(1)
EVALUATOR NOTE: The candidate should inform you that the task is complete.
-3205B valves are open." F.2.e. Verify open MO 2(1)
-3201A, B, ORContacts Control Room to verify open:  C, RFP DISCH VLVs.
MO 2(1)-3201A OR MO 2(1)-3201B,  OR MO 2(1)-3201C ___ ___ ___ CUE: Report back as NSO that, "The A & B RFP Discharge valves are open."
F.2.f. Verify Feedwater Regulator valves(s) in manual AND closed2(1)-640-19A, 2(1)A FEEDWATER MAN/AUTO CONT STA :  2(1)-640-19B, 2(1)B FEEDWATER MAN/AUTO CONT STA 2(1)-640-20, FEEDWATER LO FLOW CONTLR Contacts Control Room to verify all 3 FWRV's are in manual and closed. ___ ___ ___
RO/SRO JPM j
- Rev 07  G:\DRSIII\License Examinations
\2011\Quad Cities
\Proposed\JPMs\inplant\RO-SRO JPM j.doc Page 7 of 8 STEP ELEMENT SAT STANDARD UNSAT Comment Number CUE: Report back as NSO that, "All Feedwater Regulating Valves are in manual and closed."
  *F.2.g. Unlock 2-5599-68 U-2 COND HDR TO 1/2 BACKWASH HDR SV. Unlocks the 2
-5599-68, U-2 COND HDR TO 1/2 BACKWASH HDR SV, (located 20' East of U
-1 Cond Demin Control Panel).
___ ___ ___ CUE: "The valve is unlocked"
  *F.2.h. Slowly open the 2
-5599-68 valve. Rotates the 2
-5599-68 handwheel counterclockwise.
CUE: Point to the 2
-5599-68 handwheel and state, "The valve handwheel will not rotate any further."
*F.3. Open one Feedwater Regulator Valve. Contacts the Control Room and requests performance of QCOP 3300-12 step F.3.
CUE: After contacting the Control Room, as the NSO report "the low flow feedwater reg valve is open and U
-2(1) Reactor water level is rising."
EVALUATOR NOTE: The candidate should inform you that the task is complete.
JPM Stop Time:
JPM Stop Time:
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM j.doc Page 7 of 8


RO/SRO JPM j  
RO/SRO JPM j - Rev 07 JPM  
- Rev 07 G:\DRSIII\License Examinations
\2011\Quad Cities
\Proposed\JPMs\inplant\RO-SRO JPM j.doc Page 8 of 8 JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                         Job
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title:
 
Inject Water Into the RPV Using the Condensate System Crosstie JPM Number:
==Title:==
RO/SRO JPM j Revision Number:
EO         RO     SRO       FS STA/IA           SRO Cert JPM
Task Number and Title:
 
07 SRN-3300-P07 (Freq: LIC=B NF=B) Given a reactor plant in a QGA condition, locally crosstie the unit condensate systems to inject into the RPV in accordance with QCOP 3300
==Title:==
-12. K/A Number and Importance:
Inject Water Into the RPV Using the Condensate System Crosstie JPM Number:         RO/SRO JPM j                                     Revision Number: 07 Task Number and
K/A: 295031 EA1.11 Rating: 4.1/4.1 Suggested Testing Environment:
 
Plant Alternate Path:
==Title:==
Yes No SRO Only: Yes No Time Critical:
SRN-3300-P07 (Freq: LIC=B NF=B) Given a reactor plant in a QGA condition, locally crosstie the unit condensate systems to inject into the RPV in accordance with QCOP 3300-12.
Yes No Reference(s):
K/A Number and Importance:           K/A:     295031 EA1.11         Rating:         4.1/4.1 Suggested Testing Environment: Plant Alternate Path:     Yes     No     SRO Only:       Yes     No       Time Critical:     Yes     No Reference(s): QCOP 3300-12, Rev. 11, Injection Into the Reactor Using the Condensate System Crosstie OP-AA-103-105, Rev. 01, Limitorque Motor Operated Valve Operations Actual Testing Environment:           Simulator         Control Room           In-Plant     Other Testing Method:           Simulate       Perform Estimated Time to Complete: 17        minutes          Actual Time Used:              minutes EVALUATION
QCOP 3300-12, Rev. 11, Injection Into the Reactor Using the Condensate System Crosstie OP-AA-103-105, Rev. 01, Limitorque Motor Operated Valve Operations Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
17EVALUATION


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?               Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:               Satisfactory       Unsatisfactory Comments:
minutes Actual Time Used:
Evaluators Name:                                                       (Print)
minutes Were all the Critical Elements performed satisfactorily?
Evaluators Signature:                                                 Date:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM j.doc Page 8 of 8
Satisfactory Unsatisfactory Comments:               Evaluator's Name
 
:   (Print) Evaluator's Signature:   Date:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS
INITIAL CONDITIONS
  - Problems have developed on Unit 2(1) which require the Alternate Injection Systems to be lined-up in order to restore reactor water level.
- Problems have developed on Unit 2(1) which require the Alternate Injection Systems to be lined-up in order to restore reactor water level.
  - The Shift Manager has directed you to inject water from the Unit 1(2) Condensate system into the Unit 2(1) reactor using the Condensate system crosstie in accordance with QCOP 3300-12 as directed by QGA 100.
- The Shift Manager has directed you to inject water from the Unit 1(2) Condensate system into the Unit 2(1) reactor using the Condensate system crosstie in accordance with QCOP 3300-12 as directed by QGA 100.
  - The Unit 1(2) Condensate pumps are operating normally.
- The Unit 1(2) Condensate pumps are operating normally.
  - The Unit 1 and 2 NSOs are aware of the situation and are standing by to monitor parameters in the Control Room.
- The Unit 1 and 2 NSOs are aware of the situation and are standing by to monitor parameters in the Control Room.
  - There are no Condensate Demin backwashes in progress on either unit.
- There are no Condensate Demin backwashes in progress on either unit.
  - You have obtained an S
- You have obtained an S-key and are ready to perform the task.
-key and are ready to perform the task.
- This JPM is not time critical.
  - This JPM is not time critical.
INITIATING CUE Line-up the Condensate System crosstie and begin restoring Unit 2(1) reactor level IAW QCOP 3300-12.
INITIATING CUE Line-up the Condensate System crosstie and begin restoring Unit 2(1) reactor level IAW QCOP 3300-12.
RO-SRO JPM k.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 1 of 8  Exelon Nuclear Job Performance Measure Aligning Fire Protection Water to SSMP Room Cooler RO/SRO JPM k Revision Number:
 
06 Date: 04/04/2011 Developed By:
Exelon Nuclear Job Performance Measure Aligning Fire Protection Water to SSMP Room Cooler RO/SRO JPM k Revision Number: 06 Date: 04/04/2011 Developed By:
Instructor Date Validated By:
Instructor                           Date Validated By:
SME or Instructor Date Reviewed By:
SME or Instructor                       Date Reviewed By:
Operations Representative Date Approved By:
Operations Representative                   Date Approved By:
Training Department Date RO/SRO JPM k  
Training Department                       Date RO-SRO JPM k.doc              SRRS: 3D.105 (when utilized for operator initial or continuing training)
- Rev 06  G:\DRSIII\License Examinations
Page 1 of 8
\2011\Quad Cities
 
\Proposed\JPMs\inplant\RO-SRO JPM k.doc
RO/SRO JPM k - Rev 06 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
  ) Page 2 of 8  JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 through 12 below.
Prior to JPM usage, revalidate JPM using steps 8 through 12 below. ________ 1. Task description and number, JPM description and number are identified.
________       1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________       2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________       3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
________       4. Initial setup conditions are identified.
________ 4. Initial setup conditions are identified.
________       5. Initiating cue (and terminating cue if required) are properly identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________       6. Task standards identified and verified by SME review.
________ 6. Task standards identified and verified by SME review.
________       7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________       8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure                         Rev:
Procedure Rev:   Procedure Rev:   Procedure Rev:   ________ 9. Verify cues both verbal and visual are free of conflict.
Procedure                         Rev:
________ 10. Verify performance time is accurate.
Procedure                         Rev:
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________       9. Verify cues both verbal and visual are free of conflict.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
________       10. Verify performance time is accurate.
SME / Instructor Date       SME / Instructor Date       SME / Instructor Date RO/SRO JPM k
________       11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
- Rev 06  G:\DRSIII\License Examinations
________       12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
\2011\Quad Cities
SME / Instructor                               Date SME / Instructor                               Date SME / Instructor                               Date G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM k.doc           )
\Proposed\JPMs\inplant\RO-SRO JPM k.doc
Page 2 of 8
  ) Page 3 of 8 Revision Record (Summary)
 
RO/SRO JPM k - Rev 06 Revision Record (Summary)
Revision 01, The reason for this JPM is to demonstrate the ability to terminate one of the twenty most probable Core Damage Sequences.
Revision 01, The reason for this JPM is to demonstrate the ability to terminate one of the twenty most probable Core Damage Sequences.
This JPM is developed IAW guidelines established in NUREG 1021 Rev 9 ES
This JPM is developed IAW guidelines established in NUREG 1021 Rev 9 ES-301 and Appendix C. This JPM meets the criteria of Category B.2 "In-Plant Systems," for RO/SRO candidates.
-301 and Appendix C. This JPM meets the criteria of Category B.2 "In
-Plant Systems," for RO/SRO candidates.
JPM revised to match procedure changes.
JPM revised to match procedure changes.
Revision 02, JPM revised to match procedure changes. Revision 03, JPM verified to match procedure changes.
Revision 02, JPM revised to match procedure changes.
Revision 03, JPM verified to match procedure changes.
Revision 04, JPM revised to match objective changes.
Revision 04, JPM revised to match objective changes.
Revision 05, JPM revised to match objective and procedure changes.
Revision 05, JPM revised to match objective and procedure changes.
Revision 06, JPM cues revised.
Revision 06, JPM cues revised.
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM k.doc    )
Page 3 of 8


RO/SRO JPM k  
RO/SRO JPM k - Rev 06 INITIAL CONDITIONS
- Rev 06 G:\DRSIII\License Examinations
-   There is a severe fire in the South end of the Reactor Building 1st Floor (RB 1S).
\2011\Quad Cities
-   The US has entered QCARP 0010-01.
\Proposed\JPMs\inplant\RO-SRO JPM k.doc
-   SSMP is injecting into U-1.
  ) Page 4 of 8 INITIAL CONDITIONS
-   Service Water is no longer available to the SSMP Room Cooler.
- There is a severe fire in the South end of the Reactor Building 1st Floor (RB 1S).
-   You have obtained an S Key.
- The US has entered QCARP 0010
-   This JPM is NOT time critical.
-01. - SSMP is injecting into U
INITIATING CUE Align Fire Protection Water to SSMP Room Cooler in accordance with QCARP 0010-01 Attachment D and notify the Unit Supervisor when complete.
-1. - Service Water is no longer available to the SSMP Room Cooler.
- You have obtained an "S" Key.
- This JPM is NOT time critical.
INITIATING C UE  Align Fire Protection Water to SSMP Room Cooler in accordance with QCARP 0010
-01 Attachment D and notify the Unit Supervisor when complete.
Provide examinee with:
Provide examinee with:
Copy of QCARP 0010
Copy of QCARP 0010-01 Attachment D, Rev. 9 Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
-01 Attachment D, Rev. 9 Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
Information For Evaluator's Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM k.doc    )
Page 4 of 8


RO/SRO JPM k  
RO/SRO JPM k - Rev 06 JPM Start Time:
- Rev 06 G:\DRSIII\License Examinations
Comment STEP                 ELEMENT                           STANDARD                  SAT   UNSAT Number
\2011\Quad Cities
*Attachment D, *Close 1/2-2901-25, SERV         Turns valve handwheel                ___  ___          ___
\Proposed\JPMs\inplant\RO-SRO JPM k.doc
Step 1    WTR TO SAFE                       clockwise until valve no longer SHUTDOWN PMP RM                   moves.
  ) Page 5 of 8  JPM Start Time:
HVAC CLR SV.*
STEP ELEMENT SAT STANDARD UNSAT Comment Number *Attachment D, Step 1 Close 1/2-2901-25, SERV WTR TO SAFE SHUTDOWN PMP RM HVAC CLR SV. Turns valve handwheel clockwise until valve no longer moves. ___ ___ ___ CUE: Point to the valve and state, "The handwheel cannot be turned anymore ."
CUE:         Point to the valve and state, The handwheel cannot be turned anymore .
*Attachment D, Step 2 Unlock 1/2
*Attachment D, *Unlock 1/2-2901-9, FIRE         Unlocks or breaks lock.              ___  ___          ___
-2901-9, FIRE PROTECTION WTR TO SAFE SHUTDOWN PMP RM HVAC CLR SV. Unlocks or breaks lock.
Step 2    PROTECTION WTR TO SAFE SHUTDOWN PMP RM HVAC CLR SV.*
___ ___ ___ *Attachment D, Step 3 Open 1/2-2901-9. Turns valve handwheel counterclockwise until valve no longer moves.
*Attachment D, *Open 1/2-2901-9.*                Turns valve handwheel                 ___  ___          ___
___ ___ ___ CUE: Point to the valve and state, "The lock is unlocked and the handwheel cannot be turned anymore."
Step 3                                      counterclockwise until valve no longer moves.
*Attachment D, Step 4 Close 1/2-2999-9 SERVICE WATER TO SSMP ROOM COOLER BYPASS VALVE. Turns valve handwheel clockwise until valve no longer moves. ___ ___ ___ CUE: Point to the valve and state, "The handwheel cannot be turned anymore "
CUE:         Point to the valve and state, The lock is unlocked and the handwheel cannot be turned anymore.
Attachment D, Step 5 Verify Room Cooler Operation.
*Attachment D, *Close 1/2-2999-9                 Turns valve handwheel                ___  ___          ___
Checks Room Cooler operation by verifying discharge air flow and/or motor operation.
Step 4    SERVICE WATER TO                 clockwise until valve no longer SSMP ROOM COOLER                  moves.
___ ___ ___ CUE: After proper checks are made for Cooler operation (Proper checks should include that the candidate listens or feels for air flow discharging from the cooler), indicate to the candidate that the "room is becoming cooler."
BYPASS VALVE.*
Attachment D, Step 6 Notify U1 US that the steps are complete.
CUE:         Point to the valve and state, The handwheel cannot be turned anymore Attachment D,   Verify Room Cooler             Checks Room Cooler operation         ___  ___          ___
Uses phone or radio to contact the U-1 US in the Control Room and reports QCARP 0010
Step 5      Operation.                      by verifying discharge air flow and/or motor operation.
-1 Attachment D is complete.
CUE:         After proper checks are made for Cooler operation (Proper checks should include that the candidate listens or feels for air flow discharging from the cooler), indicate to the candidate that the room is becoming cooler.
___ ___ ___ CUE: When informed, acknowledge as Unit One Unit Supervisor that you understand that "the SSMP Room Cooler is lined up to the fire header."
Attachment D,   Notify U1 US that the steps     Uses phone or radio to contact       ___  ___          ___
Step 6      are complete.                  the U-1 US in the Control Room and reports QCARP 0010-1 Attachment D is complete.
CUE:         When informed, acknowledge as Unit One Unit Supervisor that you understand that the SSMP Room Cooler is lined up to the fire header.
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM k.doc            )
Page 5 of 8


RO/SRO JPM k  
RO/SRO JPM k - Rev 06 JPM Stop Time:
- Rev 06 G:\DRSIII\License Examinations
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM k.doc     )
\2011\Quad Cities
Page 6 of 8
\Proposed\JPMs\inplant\RO-SRO JPM k.doc
  ) Page 6 of 8   JPM Stop Time:


RO/SRO JPM k  
RO/SRO JPM k - Rev 06 JPM  
- Rev 06 G:\DRSIII\License Examinations
\2011\Quad Cities
\Proposed\JPMs\inplant\RO-SRO JPM k.doc
  ) Page 7 of 8 JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                         Job
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title:
 
Aligning Fire Protection Water to SSMP Room Cooler JPM Number:
==Title:==
RO/SRO JPM k Revision Number:
EO         RO     SRO       FS STA/IA           SRO Cert JPM
Task Number and Title:
 
06 SN-2900-P08 (Freq: LIC=A NF=A) Given Unit 1 in an QCARP condition, transfer SSMP HVAC cooling water supply to the fire header and verify SSMP room cooler operation in accordance with QCARP 0010
==Title:==
-01 Attachment D. (Important PRA Operator Action  
Aligning Fire Protection Water to SSMP Room Cooler JPM Number:         RO/SRO JPM k                                     Revision Number: 06 Task Number and
- transferring SSMP cooling water supply to fire header in combination with starting the SSMP has a RAW of 1600)
 
K/A Number and Importance:
==Title:==
K/A: 286000 K1.01 Rating: 2.7/2.8 Suggested Testing Environment:
SN-2900-P08 (Freq: LIC=A NF=A) Given Unit 1 in an QCARP condition, transfer SSMP HVAC cooling water supply to the fire header and verify SSMP room cooler operation in accordance with QCARP 0010-01 Attachment D. (Important PRA Operator Action - transferring SSMP cooling water supply to fire header in combination with starting the SSMP has a RAW of 1600)
Plant Alternate Path:
K/A Number and Importance:             K/A: 286000 K1.01           Rating:         2.7/2.8 Suggested Testing Environment:         Plant Alternate Path:       Yes     No     SRO Only:       Yes     No       Time Critical:     Yes     No Reference(s): QCARP 0010-01 Attachment D, Rev. 9 Actual Testing Environment:           Simulator         Control Room           In-Plant     Other Testing Method:           Simulate       Perform Estimated Time to Complete: 10 minutes                  Actual Time Used:              minutes EVALUATION
Yes No SRO Only: Yes No Time Critical:
Yes No Reference(s):
QCARP 0010
-01 Attachment D, Rev. 9 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
10EVALUATION


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?               Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:               Satisfactory       Unsatisfactory Comments:
minutes Actual Time Used:
Evaluators Name:                                                       (Print)
minutes Were all the Critical Elements performed satisfactorily?
Evaluators Signature:                                                  Date:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM k.doc            )
Satisfactory Unsatisfactory Comments:                 Evaluator's Name
Page 7 of 8
:   (Print) Evaluator's Signature
 
Date:
INITIAL CONDITIONS
-  There is a severe fire in the South end of the Reactor Building 1st Floor (RB 1S).
-  The US has entered QCARP 0010-01.
-  SSMP is injecting into U-1.
-  Service Water is no longer available to the SSMP Room Cooler.
-  You have obtained an S Key.
-   This JPM is NOT time critical.
INITIATING CUE Align Fire Protection Water to SSMP Room Cooler in accordance with QCARP 0010-01 Attachment D and notify the Unit Supervisor when complete.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS - There is a severe fire in the South end of the Reactor Building 1st Floor (RB 1S).
- The US has entered QCARP 0010
-01. - SSMP is injecting into U
-1. - Service Water is no longer available to the SSMP Room Cooler.
- You have obtained an "S" Key.
- This JPM is NOT time critical.
INITIATING CUE Align Fire Protection Water to SSMP Room Cooler in accordance with QCARP 0010
-01 Attachment D and notify the Unit Supervisor when complete.


SRRS: 3D.105 (when utilized for operator initial or continuing training)
Exelon Nuclear Job Performance Measure Post Accident Pumping of the DWFDS to the WCT RO JPM h Revision Number: 00 Date: 04/04/2011 Developed By:
Exelon Nuclear Job Performance Measure Post Accident Pumping of the DWFDS to the WCT RO JPM h Revision Number: 00 Date: 04/04/2011
Instructor        Date Validated By:
SME or Instructor      Date Reviewed By:
Operations Representative    Date Approved By:
Training Department    Date SRRS: 3D.105 (when utilized for operator initial or continuing training)


Developed By:
RO JPM h-Rev 00 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Instructor Date  Validated By:
SME or Instructor Date  Reviewed By:
Operations Representative Date  Approved By:
Training Department Date RO JPM h-Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 11  JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________     1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________     2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________     3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
________     4. Initial setup conditions are identified.
________ 4. Initial setup conditions are identified.
________     5. Initiating cue (and terminating cue if required) are properly identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________     6. Task standards identified and verified by SME review.
________ 6. Task standards identified and verified by SME review.
________     7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________     8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure                               Rev:
Procedure Rev:   Procedure Rev:   Procedure Rev:   ________ 9. Verify cues both verbal and visual are free of conflict.
Procedure                               Rev:
________ 10. Verify performance time is accurate
Procedure                               Rev:
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________     9. Verify cues both verbal and visual are free of conflict.
________ 12. When JPM is initially validated, sign and date JPM cover page.
________     10. Verify performance time is accurate
Subsequent validations, sign and date below:
________     11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
SME / Instructor Date       SME / Instructor Date       SME / Instructor Date RO JPM h-Rev 00  SRRS: 3D.105 (when utilized for operator initial or continuing training)
________     12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Page 3 of 11 Revision Record (Summary)
SME / Instructor                             Date SME / Instructor                             Date SME / Instructor                             Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
Revision 00, New JPM for the ILT 09
Page 2 of 11
-1 NRC Exam.
 
RO JPM h-Rev 00 Revision Record (Summary)
Revision 00,     New JPM for the ILT 09-1 NRC Exam.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 3 of 11


RO JPM h-Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
RO JPM h-Rev 00 SIMULATOR SETUP INSTRUCTIONS
Page 4 of 11 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the Simulator to IC-21.
: 1. Reset the Simulator to IC
NOTE:     It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
-21. NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Insert a Group II Isolation with the following commands:
: 2. Insert a Group II Isolation with the following commands:
imf rp07a   imf rp07b After the automatic actions have occurred, acknowledge annunciators, then clear Group II Isolation signal using: dmf rp07a dmf rp07b Do NOT reset the Group II isolation.
imf rp07a imf rp07b After the automatic actions have occurred, acknowledge annunciators, then clear Group II Isolation signal using:
: 3. Fill the Drywell Equipment Floor Drain Sump by inserting a 50% RBCCW line break for 2 1/2 minutes and then deleting it. imf pc05 50 dmf pc05 4. Secure SBGTS and restore Reactor Building Ventilation to its normal lineup.
dmf rp07a dmf rp07b Do NOT reset the Group II isolation.
: 3. Fill the Drywell Equipment Floor Drain Sump by inserting a 50% RBCCW line break for 2 1/2 minutes and then deleting it.
imf pc05 50 dmf pc05
: 4. Secure SBGTS and restore Reactor Building Ventilation to its normal lineup.
: 5. Acknowledge annunciators.
: 5. Acknowledge annunciators.
: 6. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
: 6. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
: 7. This completes the setup for this JPM.
: 7. This completes the setup for this JPM.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 4 of 11


RO JPM h-Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
RO JPM h-Rev 00 INITIAL CONDITIONS A manual reactor scram was inserted due to high Drywell pressure resulting from a small break on the A Recirc loop.
Page 5 of 11 INITIAL CONDITIONS A manual reactor scram was inserted due to high Drywell pressure resulting from a small break on the "A" Recirc loop.
QGAs 100, 200, and 300 have been entered.
QGAs 100, 200, and 300 have been entered.
Group II and Group III isolation s occurred. RPV water level is at 30 inches and being maintained by the Low Flow Feed Reg Valve (LFFRV). The reactor is depressurized.
Group II and Group III isolations occurred.
RPV water level is at 30 inches and being maintained by the Low Flow Feed Reg Valve (LFFRV).
The reactor is depressurized.
The Unit Supervisor has directed pumping of the Drywell Floor Drain Sump, (DWFDS), to the Waste Collector Tank.
The Unit Supervisor has directed pumping of the Drywell Floor Drain Sump, (DWFDS), to the Waste Collector Tank.
"B" SBGTS is operating and Reactor Building ventilation is isolated.
B SBGTS is operating and Reactor Building ventilation is isolated.
No Radwaste discharges are in progress.
No Radwaste discharges are in progress.
Radwaste Ventilation system is in operation.
Radwaste Ventilation system is in operation.
Radwaste has been informed and is ready to process the water.
Radwaste has been informed and is ready to process the water.
Chemistry has obtained a Reactor Coolant sample and has concurred with pumping the DWFDS to the Waste Collector Tank per QOP 2040
Chemistry has obtained a Reactor Coolant sample and has concurred with pumping the DWFDS to the Waste Collector Tank per QOP 2040-11.
-11. This JPM is NOT time critical.
This JPM is NOT time critical.
INITIATING CUE Pump the Drywell Floor Drain Sump to the Waste Collector Tank per QOP 2040
INITIATING CUE Pump the Drywell Floor Drain Sump to the Waste Collector Tank per QOP 2040-11. Inform the Unit Supervisor when flow to the Waste Collector Tank is established.
-11. Inform the Unit Supervisor when flow to the Waste Collector Tank is established.
Provide the examinee with a blank copy of QOP 2040-11.
Provide the examinee with a blank copy of QOP 2040
Information For Evaluators Use:
-11. Information For Evaluator's Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 11


RO JPM h-Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
RO JPM h-Rev 00 JPM Start Time:
Page 6 of 11  JPM Start Time:
Comment STEP                   ELEMENT                               STANDARD                 SAT   UNSAT Number C.1       Reset Group I and *Group             At the 901-5 panel:                 ___    ___      ___
STEP ELEMENT STANDARD SAT UNSAT Comment Number C.1 Reset Group I and Group II isolation signals. At the 901
II isolation signals.*                  1) Resets the Group I isolation by: placing the MN STM ISOL RESET switch to the INBD and OTBD positions.
-5 panel: 1) Resets the Group I isolation by: placing the MN STM ISOL RESET switch to the INBD and OTBD positions.
: 2) Resets the Group II isolation by: placing the ISOL VLV RESET switch to the INBD and OTBD positions.
: 2) Resets the Group II isolation by: placing the ISOL VLV RESET switch to the INBD and OTBD positions.
___ ___ ___ C.2 Verify closed the DWFDS and DWEDS isolation valves. At the 901
C.2         Verify closed the DWFDS             At the 901-4 panel verifies         ___    ___      ___
-4 panel verifies CLOSED lights are lit for: 1) AO 1- 2001-3 2) AO 1-2001-4 3) AO 1-2001-15 4) AO 1-2001-16 ___ ___ ___ C.3 Verify RBEDT is in recirculation mode.
and DWEDS isolation                  CLOSED lights are lit for:
Contacts Radwaste operator to verify at the 2212
valves.                                  1) AO 1- 2001-3
-4 panel: 1) RBET DISCH OR RECIRC switch is in the RECIRC position
: 2) AO 1-2001-4
. 2) Red RECIRC light is lit.
: 3) AO 1-2001-15
___ ___ ___ CUE: As Radwaste Operator state:  
: 4) AO 1-2001-16 C.3         Verify RBEDT is in                   Contacts Radwaste operator to       ___    ___      ___
"The RBET DISCH OR RECIRC switch is in the RECIRC position and the red RECIRC light is lit.
recirculation mode.                  verify at the 2212-4 panel:
" C.4 Verify a SBGTS is operating AND Reactor Building Vent system is isolated. Verifies SBGTS operation and Rx. Bldg.
: 1) RBET DISCH OR RECIRC switch is in the RECIRC position.
ventilation status from the "Initial Conditions.
: 2) Red RECIRC light is lit.
" ___ ___ ___
CUE:         As Radwaste Operator state: The RBET DISCH OR RECIRC switch is in the RECIRC position and the red RECIRC light is lit.
RO JPM h-Rev 00  SRRS: 3D.105 (when utilized for operator initial or continuing training)
C.4         Verify a SBGTS is                   Verifies SBGTS operation and       ___    ___      ___
Page 7 of 11 STEP ELEMENT STANDARD SAT UNSAT Comment Number C.5 Place control switches for DWFD and DWED sump pumps in PTL.
operating AND Reactor                Rx. Bldg. ventilation status from Building Vent system is              the Initial Conditions.
At the 901
isolated.
-4 panel, places the following control switches in PTL: 1) 1-2001-241A 2) 1-2001-241B 3) 1-2001-245A 4) 1-2001-245B ___ ___ ___ C.6 Radwaste ventilation system in operation
SRRS: 3D.105 (when utilized for operator initial or continuing training)
. Verifies Radwaste ventilation system status from the "Initial Conditions."
Page 6 of 11
___ ___ ___ F.1 Terminate any Radwaste discharges.
From "Initial Conditions",
verifies NO Radwaste discharges are in progress.
___ ___ ___ F.2 Verify Radwaste is ready to receive and process highly contaminated water.
Contacts Radwaste Operator and verifies Radwaste is ready to receive and process highly contaminated water.
___ ___ ___ CUE: As Radwaste Operator state that you "are ready to receive and process water to the Waste Collector Tank
." F.3 Verify open the 1/2-2001-826, EQIP DRN HDR STOP TO WASTE COLLECTOR TK SV.
Contacts Radwaste Operator to verify the 1/2-2001-826 valve is open. ___ ___ ___ F.4 Verify closed 1/2-2001-825,FLR DRN/EQUIP DRN TO COLLECTOR TK XTIE VLV. Contacts Radwaste Operator to verify the 1/2-2001-825, FLR DRN/EQUIP DRN TO COLLECTOR TK XTIE VLV is closed. ___ ___ ___ CUE: When contacted, as Radwaste Operator state that "the 1/2-2001-826 valve is OPEN and the 1/2-2001-825 valve is CLOSED."


RO JPM h-Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
RO JPM h-Rev 00 Comment STEP                  ELEMENT                                STANDARD                SAT  UNSAT Number C.5        Place control switches for          At the 901-4 panel, places the    ___    ___      ___
Page 8 of 11 STEP ELEMENT STANDARD SAT UNSAT Comment Number F.5a./b. Process the D WFDS by directing Chemistry to: 1) Obtain a Reactor coolant sample AND 2) Determine which tank the DWFDS will be pumped to and the flow path.
DWFD and DWED sump                  following control switches in pumps in PTL.                        PTL:
From the "Initial Conditions",
: 1) 1-2001-241A
verifies that a reac tor coolant sample has been obtained and Chemistry recommends pumping to the WCT per QOP 2040-11 flow path
: 2) 1-2001-241B
. ___ ___ ___ F.5.d.(1), (2), & (3).
: 3) 1-2001-245A
Establish valve lineup:
: 4) 1-2001-245B C.6        Radwaste ventilation                Verifies Radwaste ventilation      ___    ___      ___
: 1) Close 1-2001-837, U1 DW FLR DRN SUMP PMP RW DSCH VLV TO FDCT. 2) Open 1-2001-836, U1 DW FLR DRN SUMP PMP DSCH VLV TO WCT.
system in operation.                system status from the Initial Conditions.
: 3) Verify closed AO 1-8941-728, DW EQUIP DRN SUMP AND RX BLDG EQUIP DRN TK TO WCT. Contacts Radwaste Operator to establish the following valve lineup to the WCT:
F.1        Terminate any Radwaste              From Initial Conditions,        ___    ___      ___
: 1) Close the 1-2001-837 2) Open the 1
discharges.                          verifies NO Radwaste discharges are in progress.
-2001-836 At the 901
F.2        Verify Radwaste is ready to Contacts Radwaste Operator                  ___    ___      ___
-4 panel: 3) Places the AO 1
receive and process highly and verifies Radwaste is ready contaminated water.        to receive and process highly contaminated water.
-8941-728 vlv control switch to CLOSE and verifies CLOSED light lit.
CUE:        As Radwaste Operator state that you are ready to receive and process water to the Waste Collector Tank.
___ ___ ___ F.5.e Open AO 1-2001-3 and AO 1-2001-4. At the 901
F.3        Verify open the 1/2-2001-            Contacts Radwaste Operator to      ___    ___      ___
-4 panel:  Places the SUMP ISOL VLVS AO 1-2001-3 AND 4 control switch to OPEN and verifies the OPEN light is lit.
826, EQIP DRN HDR                    verify the 1/2-2001-826 valve is STOP TO WASTE                        open.
___ ___ ___ CUE: As Unit Supervisor, inform the examinee that another NSO will log all the information required in step F.5.f.
COLLECTOR TK SV.
F.4        Verify closed 1/2-2001-              Contacts Radwaste Operator to      ___    ___      ___
825,FLR DRN/EQUIP DRN                verify the 1/2-2001-825, FLR TO COLLECTOR TK XTIE                DRN/EQUIP DRN TO VLV.                                COLLECTOR TK XTIE VLV is closed.
CUE:        When contacted, as Radwaste Operator state that the 1/2-2001-826 valve is OPEN and the 1/2-2001-825 valve is CLOSED.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 7 of 11
 
RO JPM h-Rev 00 Comment STEP                   ELEMENT                               STANDARD               SAT   UNSAT Number F.5a./b.     Process the DWFDS by                 From the Initial Conditions,     ___    ___      ___
directing Chemistry to:              verifies that a reactor coolant sample has been obtained and
: 1) Obtain a Reactor Chemistry recommends coolant sample pumping to the WCT per QOP AND                                  2040-11 flow path.
: 2) Determine which tank the DWFDS will be pumped to and the flow path.
F.5.d.(1),     Establish valve lineup:              Contacts Radwaste Operator to      ___    ___      ___
(2), & (3).       1) Close 1-2001-837,             establish the following valve U1 DW FLR DRN                 lineup to the WCT:
SUMP PMP RW                       1) Close the 1-2001-837 DSCH VLV TO
: 2) Open the 1-2001-836 FDCT.
At the 901-4 panel:
: 2) Open 1-2001-836, U1 DW FLR DRN                     3) Places the AO 1-8941-SUMP PMP DSCH                       728 vlv control switch to VLV TO WCT.                          CLOSE and verifies CLOSED light lit.
: 3) Verify closed AO 1-8941-728, DW EQUIP DRN SUMP AND RX BLDG EQUIP DRN TK TO WCT.
F.5.e      *Open AO 1-2001-3 and                At the 901-4 panel:               ___   ___     ___
AO 1-2001-4.*                        Places the SUMP ISOL VLVS AO 1-2001-3 AND 4 control switch to OPEN and verifies the OPEN light is lit.
CUE:         As Unit Supervisor, inform the examinee that another NSO will log all the information required in step F.5.f.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 8 of 11


RO JPM h-Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
RO JPM h-Rev 00 Comment STEP                   ELEMENT                               STANDARD             SAT   UNSAT Number F.5.g       *Start one or both DWFDS             At the 901-4 panel:
Page 9 of 11 STEP ELEMENT STANDARD SAT UNSAT Comment Number F.5.g Start one or both DWFDS pump(s). At the 901
pump(s).*                            Takes one or both control switches for 1-2001-241A and/or 1-2001-241B sump pumps out of PTL and verifies RUN light(s) lit.
-4 panel: Takes one or both control switches for 1-2001-241A and/or 1-2001-241B sump pumps out of PTL and verifies RUN light(s) lit.
CUE:         As Unit Supervisor inform the examinee that another NSO will monitor the transfer and secure the sump pumps.
CUE: As Unit Supervisor inform the examinee that another NSO will monitor the transfer and secure the sump pumps.
Evaluator       The examinee should inform you that the task is complete.
Evaluator Note: The examinee should inform you that the task is complete.
Note:
JPM Stop Time:
JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 9 of 11


RO JPM h-Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
RO JPM h-Rev 00 JPM  
Page 10 of 11 JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Job
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title:
 
Post Accident Pumping of the DWFDS to the WCT JPM Number:
==Title:==
RO JPM h Revision Number:
EO         RO   SRO       FS STA/IA         SRO Cert JPM
00 Task Number and Title:
 
SR-2000-P37, (Freq: LIC
==Title:==
-I) Given a reactor plant in a post accident condition, pump the DW floor drain sump to the WCT in accordance with QOP 2040-11. K/A Number and Importance:
Post Accident Pumping of the DWFDS to the WCT JPM Number: RO JPM h                                 Revision Number: 00 Task Number and
KA: 268000 2.1.30 Rating: 4.4/4.0 Suggested Testing Environment:
 
Simulator Alternate Path:
==Title:==
Yes No SRO Only: Yes No Time Critical:
SR-2000-P37, (Freq: LIC-I) Given a reactor plant in a post accident condition, pump the DW floor drain sump to the WCT in accordance with QOP 2040-11.
Yes No Reference(s
K/A Number and Importance: KA: 268000 2.1.30                               Rating: 4.4/4.0 Suggested Testing Environment: Simulator Alternate Path:     Yes       No SRO Only:               Yes         No   Time Critical: Yes       No Reference(s): QOP 2040-11, Post-Accident Sump Pumping Operations, Rev. 6 Actual Testing Environment:             Simulator             Control Room           In-Plant     Other Testing Method:           Simulate             Perform Estimated Time to Complete: 10 minutes                         Actual Time Used:             minutes EVALUATION  
): QOP 2040-11, Post-Accident Sump Pumping Operations, Rev. 6 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
10 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                     Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory     Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                             (Print)
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Signature:                                                       Date:
Satisfactory Unsatisfactory Comments:                         Evaluator's Name
SRRS: 3D.105 (when utilized for operator initial or continuing training)
:   (Print) Evaluator's Signature
Page 10 of 11
:   Date:
 
RO JPM h-Rev 00  SRRS: 3D.105 (when utilized for operator initial or continuing training)
RO JPM h-Rev 00 INITIAL CONDITIONS A manual reactor scram was inserted due to high Drywell pressure resulting from a small break on the A Recirc loop.
Page 11 of 11 INITIAL CONDITIONS A manual reactor scram was inserted due to high Drywell pressure resulting from a small break on the "A" Recirc loop.
QGAs 100, 200, and 300 have been entered.
QGAs 100, 200, and 300 have been entered.
Group II and Group III isolations occurred.
Group II and Group III isolations occurred.
RPV water level is at 30 inches and being maintained by the Low Flow Feed Reg Valve (LFFRV). The reactor is depressurized. The Unit Supervisor has directed pumping of the Drywell Floor Drain Sump, (DWFDS), to the Waste Collector Tank.
RPV water level is at 30 inches and being maintained by the Low Flow Feed Reg Valve (LFFRV).
"B" SBGTS is operating and Reactor Building ventilation is isolated.
The reactor is depressurized.
The Unit Supervisor has directed pumping of the Drywell Floor Drain Sump, (DWFDS), to the Waste Collector Tank.
B SBGTS is operating and Reactor Building ventilation is isolated.
No Radwaste discharges are in progress.
No Radwaste discharges are in progress.
Radwaste Ventilation system is in operation.
Radwaste Ventilation system is in operation.
Radwaste has been informed and is ready to process the water.
Radwaste has been informed and is ready to process the water.
Chemistry has obtained a Reactor Coolant sample and has concurred with pumping the DWFDS to the Waste Collector Tank per QOP 2040
Chemistry has obtained a Reactor Coolant sample and has concurred with pumping the DWFDS to the Waste Collector Tank per QOP 2040-11.
-11. This JPM is NOT time critical.
This JPM is NOT time critical.
INITIATING C UE  Pump the Drywell Floor Drain Sump to the Waste Collector Tank per QOP 2040
INITIATING CUE Pump the Drywell Floor Drain Sump to the Waste Collector Tank per QOP 2040-11. Inform the Unit Supervisor when flow to the Waste Collector Tank is established.
-11. Inform the Unit Supervisor when flow to the Waste Collector Tank is established.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 11 of 11


RO-SRO JPM a.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Exelon Nuclear Job Performance Measure Initiate Standby Liquid Control With RWCU Failure to Isolate RO/SRO JPM a Revision Number: 04 Date: 04/04/2011 Developed By:
Page 1 of 9 Exelon Nuclear Job Performance Measure Initiate Standby Liquid Control With RWCU Failure to Isolate
Instructor                            Date Validated By:
SME or Instructor                          Date Reviewed By:
Operations Representative                        Date Approved By:
Training Department                          Date RO-SRO JPM a.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 1 of 9


RO/SRO JPM a Revision Number:
RO/SRO JPM a-Rev. 04 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
04 Date:  04/04/2011 Developed By:
Instructor Date  Validated By:
SME or Instructor Date  Reviewed By:
Operations Representative Date  Approved By:
Training Department Date RO/SRO JPM a
-Rev. 04   RO-SRO JPM a.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 9  JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 through 12 below.
Prior to JPM usage, revalidate JPM using steps 8 through 12 below.
________ 1. Task description and number, JPM description and number are identified.
________   1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________   2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________   3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
________   4. Initial setup conditions are identified.
________ 4. Initial setup conditions are identified.
________   5. Initiating cue (and terminating cue if required) are properly identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________   6. Task standards identified and verified by SME review.
________ 6. Task standards identified and verified by SME review.
________   7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________   8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure QCOP 1100-02             Rev: 12 Procedure                         Rev:
Procedure QCOP 1100-02 Rev: 12 ________ Procedure Rev:   Procedure Rev:   9. Verify cues both verbal and visual are free of conflict.
Procedure                         Rev:
________ 10. Verify performance time is accurate
________    9. Verify cues both verbal and visual are free of conflict.
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________   10. Verify performance time is accurate
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
________   11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
SME/Instructor Date       SME/Instructor Date       SME/Instructor Date RO/SRO JPM a
________   12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
-Rev. 04  G:\DRSIII\License Examinations
SME/Instructor                                               Date SME/Instructor                                               Date SME/Instructor                                               Date RO-SRO JPM a.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
\2011\Quad Cities
Page 2 of 9
\Proposed\JPMs\simulator\RO-SRO JPM a.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
Page 3 of 9 Revision Record (Summary)
RO/SRO JPM a-Rev. 04 Revision Record (Summary)
Revision 00, This JPM is developed IAW guidelines established in NUREG 1021 Rev 9.
Revision 00, This JPM is developed IAW guidelines established in NUREG 1021 Rev 9.
Revision 01, JPM revised for procedure revision. Revision 02, Deleted instruction to run Computer Aided Exercise. Revised JPM to match procedure revision. Major changes account for >5% Reactor power entry to QGA 100 and ATWS rule requiring only one SBLC pump.
Revision 01, JPM revised for procedure revision.
Revision 02, Deleted instruction to run Computer Aided Exercise. Revised JPM to match procedure revision. Major changes account for >5% Reactor power entry to QGA 100 and ATWS rule requiring only one SBLC pump.
Revision 03, This JPM revised to update the format and for procedure revisions.
Revision 03, This JPM revised to update the format and for procedure revisions.
Revision 04, Revised Initial Conditions to include more detail in QGA 101 actions taken.
Revision 04, Revised Initial Conditions to include more detail in QGA 101 actions taken.
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM a.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 3 of 9


RO/SRO JPM a
RO/SRO JPM a-Rev. 04 SIMULATOR SETUP INSTRUCTIONS
-Rev. 04   G:\DRSIII\License Examinations
\2011\Quad Cities
\Proposed\JPMs\simulator\RO-SRO JPM a.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 4 of 9 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to any IC at power > 20%
: 1. Reset the simulator to any IC at power > 20%
: 2. Manual Actuation:
: 2. Manual Actuation:
Ensure the SBLC key is in the Control switch.
Ensure the SBLC key is in the Control switch.
: 3. Malfunctions Fail RWCU to isolate by failing the Group 3 Division 1 logic; imf rp10a Fail RWCU to isolate by failing the Group 3 Division 2 logic; imf rp10b 4. Remotes: NONE 5. Overrides: NONE 6. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
: 3. Malfunctions Fail RWCU to isolate by failing the Group 3 Division 1 logic; imf rp10a Fail RWCU to isolate by failing the Group 3 Division 2 logic; imf rp10b
: 4. Remotes:
NONE
: 5. Overrides:
NONE
: 6. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
: 7. This completes the setup for this JPM.
: 7. This completes the setup for this JPM.
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM a.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 4 of 9


RO/SRO JPM a
RO/SRO JPM a-Rev. 04 INITIAL CONDITIONS
-Rev. 04   G:\DRSIII\License Examinations
-   U-1 has experienced a Hydraulic ATWS. The following conditions and QGA 101 actions taken are:
\2011\Quad Cities
o Reactor power > 20%.
\Proposed\JPMs\simulator\RO-SRO JPM a.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 9 INITIAL CONDITIONS
- U-1 has experienced a Hydraulic ATWS. The following conditions and QGA 101 actions taken are: o Reactor power > 20%.
o Mode Switch is in Shutdown.
o Mode Switch is in Shutdown.
o Both Recirc pumps were tripped o Control rods are being inserted using Emergency Rod In.
o Both Recirc pumps were tripped o Control rods are being inserted using Emergency Rod In.
o The Unit Supervisor anticipates reaching 110F in the Torus.
o The Unit Supervisor anticipates reaching 110&deg;F in the Torus.
- The SBLC system is in standby lineup.
-   The SBLC system is in standby lineup.
- The Unit Supervisor has directed SBLC system injected per QGA 101.
-   The Unit Supervisor has directed SBLC system injected per QGA 101.
- This JPM is NOT time critical.
-   This JPM is NOT time critical.
INITIATING CUE Inject with the Standby Liquid Control System.
INITIATING CUE Inject with the Standby Liquid Control System.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use
Information For Evaluators Use:
: UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. The timeclock starts when the candidate acknowledges the initiating cue.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM a.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 9


RO/SRO JPM a
RO/SRO JPM a-Rev. 04 JPM Start Time:
-Rev. 04   G:\DRSIII\License Examinations
Comment SAT    UNSAT  Number STEP                   ELEMENT                             STANDARD Obtain procedure to be used.         Obtains procedure QCOP 1100- ___              ___      ___
\2011\Quad Cities
02 or the ATWS portion of the Standby Liquid Control Hard Card.
\Proposed\JPMs\simulator\RO-SRO JPM a.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
  *F.1.       *Select system 1 OR 2 using          Positions SBLC keylock switch         ___    ___      ___
Page 6 of 9  JPM Start Time:
or          keylock switch A AND B               SYS 1 OR SYS 2.
STEP ELEMENT SAT STANDARD UNSAT Comment Number  Obtain procedure to be used.
Hard Card      PUMP SELECT.*
Obtains procedure QCOP 1100
Step 1 F.3.a       Verify applicable squib A & B       Verifies A OR B continuity lights     ___    ___     ___
-02 or the ATWS portion of the Standby Liquid Control Hard Card. ___ ___ ___ *F.1. or  Hard Card Step 1 Select system 1 ORPositions SBLC keylock switch SYS 1  2 using keylock switch A AND B PUMP SELECT. OR___  SYS 2. ___ ___ F.3.a or Hard Card Step 2.a Verify applicable squib A & B continuity.
or        continuity.                         out.
Verifies A OR___  B continuity lights out. ___ ___ F.3.b or Hard Card Step 2.b Verify SBLC Flow light lit.
Hard Card Step 2.a F.3.b       Verify SBLC Flow light lit.         Observes Flow light lit.               ___     ___     ___
Observes Flow light lit.
or Hard Card Step 2.b EVALUATOR NOTE: The examinee may report to the Unit Supervisor that the RWCU system failed to isolate. If this occurs, as Unit Supervisor acknowledge the report. If prompted by examinee for direction, state Verify auto actions.
___ ___ ___ EVALUATOR NOTE: The examinee may report to the Unit Supervisor that the RWCU system failed to isolate. If this occurs, as Unit Supervisor acknowledge the report. If prompted by examinee for direction, state "Verify auto actions."
EVALUATOR NOTE: Start of alternate path.
EVALUATOR NOTE: Start of alternate path.
  *F.3.c.     Verify RWCU System                   Closes the MO 1-1201-2,                ___    ___      ___
*F.3.c. or Hard Card Step 2.c Verify RWCU System isolates:  MO-1-1201-2 vlv closed MO 1-1201- 5 vlv closed  MO 1-1201-80 vlv closed Both RWCU pumps tripped Closes the MO 1
or        isolates:                            MO 1-1201-5, and MO 1-1201-Hard Card                                          80 vlvs with the respective Step 2.c      *MO-1-1201-2 vlv closed*            control switches and verifies both RWCU pumps trip.
-1201-2, MO 1-1201-5, and MO 1
              *MO 1-1201- 5 vlv closed*
-1201-80 vlvs with the respective control switches and verifies both RWCU pumps trip.
MO 1-1201-80 vlv closed Both RWCU pumps tripped G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM a.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
___ ___ ___
Page 6 of 9
RO/SRO JPM a
 
-Rev. 04  G:\DRSIII\License Examinations
RO/SRO JPM a-Rev. 04 Comment SAT    UNSAT  Number STEP                   ELEMENT                             STANDARD F.3.d.     Verify SLBC tank level               Verifies SBLC tank level               ___    ___      ___
\2011\Quad Cities
or        decreasing.                          decreasing on LI 1-1140-2.
\Proposed\JPMs\simulator\RO-SRO JPM a.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Hard Card Step 2.d F.3.e.     Verify SBLC pump discharge           Determines SBLC Pump                  ___    ___      ___
Page 7 of 9 STEP ELEMENT SAT STANDARD UNSAT Comment Number F.3.d. or Hard Card Step 2.d Verify SLBC tank level decreasing.
or        pressure > Reactor pressure.         discharge pressure > Reactor Hard Card                                          pressure on PI 1-1140-1.
Verifies SBLC tank level decreasing on LI 1
Step 2.e F.3.f.     Verify alarm 901-5 H-6               Annunciator 901-5 H-6                 ___    ___      ___
-1140-2. ___ ___ ___ F.3.e. or Hard Card Step 2.e Verify SBLC pump discharge pressure > Reactor pressure.
or        STANDBY LIQ SQUIB VLV              STANDBY LIQ SQUIB VALVE Hard Card    CIRCUIT FAILURE.                    CIRCUIT FAIL is lit.
Determines SBLC Pump discharge pressure >
Step 2.f F.3.g.     Verify neutron flux level           Verifies neutron flux level           ___    ___      ___
Reactor pressure on PI 1-1140-1. ___ ___ ___ F.3.f. or Hard Card Step 2.f Verify alarm 901
or        decreasing                          decreasing on APRM recorders.
-5 H-6 "STANDBY LIQ SQUIB VL V CIRCUIT FAILURE".
Hard Card Step 2.g EVALUATOR: The candidate should inform you that the task is complete.
Annunciator 901
-5 H-6 "STANDBY LIQ SQUIB VALVE CIRCUIT FAIL" is lit. ___ ___ ___ F.3.g. or Hard Card Step 2.g Verify neutron flux level decreasing Verifies neutron flux level decreasing on APRM recorders.
___ ___ ___ EVALUATOR: The candidate should inform you that the task is complete.
JPM Stop Time:
JPM Stop Time:
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM a.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 7 of 9


RO/SRO JPM a
RO/SRO JPM a-Rev. 04 JPM  
-Rev. 04   G:\DRSIII\License Examinations
\2011\Quad Cities
\Proposed\JPMs\simulator\RO-SRO JPM a.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 8 of 9 JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                           Job
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title:
 
Initiate Standby Liquid Control with RWCU Failure to Isolate JPM Number:
==Title:==
RO/SRO JPM a Revision Number:
EO         RO     SRO     FS STA/IA           SRO Cert JPM
Task Number and Title:
 
04 SR-1100-P02 (Freq: LIC=A) (ILT
==Title:==
-MP) Given a reactor plant with an ATWS, inject boron prior to exceeding 110 degrees torus water temperature OR if core instability is observed in accordance with QGA 101 and QCOP 1100
Initiate Standby Liquid Control with RWCU Failure to Isolate JPM Number:         RO/SRO JPM a                                         Revision Number: 04 Task Number and
-02. (Important PRA Operator Action  
 
- starting SBLC terminates 1 of the top 100 most probable Core Damage Sequences and has a RAW of 17.3)
==Title:==
K/A Number and Importance:
SR-1100-P02 (Freq: LIC=A) (ILT-MP) Given a reactor plant with an ATWS, inject boron prior to exceeding 110 degrees torus water temperature OR if core instability is observed in accordance with QGA 101 and QCOP 1100-02.
K/A: 211000 A4.06 Rating: 3.9/3.9 Suggested Testing Environment:
(Important PRA Operator Action - starting SBLC terminates 1 of the top 100 most probable Core Damage Sequences and has a RAW of 17.3)
Simulator Alternate Path:
K/A Number and Importance:           K/A:   211000 A4.06               Rating:           3.9/3.9 Suggested Testing Environment: Simulator Alternate Path:     Yes       No     SRO Only:       Yes         No       Time Critical:     Yes     No Reference(s): QCOP 1100-02, Rev. 12 Actual Testing Environment:             Simulator         Control Room               In-Plant     Other Testing Method:             Simulate       Perform Estimated Time to Complete: 4 minutes                     Actual Time Used:                   minutes EVALUATION  
Yes No SRO Only: Yes No Time Critical:
Yes No Reference(s):
QCOP 1100-02, Rev. 12 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete:
4 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                     Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory       Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                             (Print)
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Signature:                                                      Date:
Satisfactory Unsatisfactory Comments:               Evaluator's Name
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM a.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
:   (Print) Evaluator's Signature
Page 8 of 9
:   Date:
 
INITIAL CONDITIONS
INITIAL CONDITIONS
- U-1 has experienced a Hydraulic ATWS. The following conditions and QGA 101 actions taken are:
-   U-1 has experienced a Hydraulic ATWS. The following conditions and QGA 101 actions taken are:
o Reactor power > 20%.
o Reactor power > 20%.
o Mode Switch is in Shutdown.
o Mode Switch is in Shutdown.
o Both Recirc pumps were tripped o Control rods are being inserted using Emergency Rod In.
o Both Recirc pumps were tripped o Control rods are being inserted using Emergency Rod In.
o The Unit Supervisor anticipates reaching 110F in the Torus.
o The Unit Supervisor anticipates reaching 110&deg;F in the Torus.
- The SBLC system is in standby lineup.
-   The SBLC system is in standby lineup.
- The Unit Supervisor has directed SBLC system injected per QGA 101.
-   The Unit Supervisor has directed SBLC system injected per QGA 101.
- This JPM is NOT time critical.
-   This JPM is NOT time critical.
INITIATING CUE Inject with the Standby Liquid Control System
INITIATING CUE Inject with the Standby Liquid Control System.
.
RO-SRO JPM b.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 1 of 9  Exelon Nuclear Job Performance Measure Manual Initiation of RCIC


RO/SRO JPM b Revision Number:
Exelon Nuclear Job Performance Measure Manual Initiation of RCIC RO/SRO JPM b Revision Number: 03 Date: 04/04/2011 Developed By:
03 Date: 04/04/2011 Developed By:
Instructor                             Date Validated By:
Instructor Date Validated By:
SME or Instructor                           Date Reviewed By:
SME or Instructor Date Reviewed By:
Operations Representative                         Date Approved By:
Operations Representative Date Approved By:
Training Department                           Date RO-SRO JPM b.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Training Department Date RO/SRO JPM b
Page 1 of 9
-Rev 03  G:\DRSIII\License Examinations
 
\2011\Quad Cities
RO/SRO JPM b-Rev 03 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
\Proposed\JPMs\simulator\RO-SRO JPM b.doc Page 2 of 9  JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 through 12 below.
Prior to JPM usage, revalidate JPM using steps 8 through 12 below.
________ 1. Task description and number, JPM description and number are identified.
________       1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________       2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________       3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
________       4. Initial setup conditions are identified.
________ 4. Initial setup conditions are identified.
________       5. Initiating cue (and terminating cue if required) are properly identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________       6. Task standards identified and verified by SME review.
________ 6. Task standards identified and verified by SME review.
________       7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). ________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________       8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure Rev:   Procedure Rev:   Procedure Rev:   ________ 9. Verify cues both verbal and visual are free of conflict.
Procedure                         Rev:
________ 10. Verify performance time is accurate ________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
Procedure                         Rev:
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Procedure                         Rev:
SME / Instructor Date       SME / Instructor Date       SME / Instructor Date RO/SRO JPM b
________       9. Verify cues both verbal and visual are free of conflict.
-Rev 03  G:\DRSIII\License Examinations
________       10. Verify performance time is accurate
\2011\Quad Cities
________       11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
\Proposed\JPMs\simulator\RO-SRO JPM b.doc Page 3 of 9 Revision Record (Summary) 1.Revision 00, Developed JPM.
________       12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Revision 01, Procedure revision required revision.
SME / Instructor                               Date SME / Instructor                               Date SME / Instructor                               Date G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM b.doc Page 2 of 9
 
RO/SRO JPM b-Rev 03 Revision Record (Summary) 1.Revision 00,       Developed JPM.                                                             Formatted: Bullets and Numbering Revision 01, Procedure revision required revision.
Revision 02, Grammatical corrections.
Revision 02, Grammatical corrections.
Revision 03, Modified description of Standards column actions. Formatted:
Revision 03, Modified description of Standards column actions.
Bullets and Numbering RO/SRO JPM b
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM b.doc Page 3 of 9
-Rev 03  G:\DRSIII\License Examinations
 
\2011\Quad Cities
RO/SRO JPM b-Rev 03 SIMULATOR SETUP INSTRUCTIONS
\Proposed\JPMs\simulator\RO-SRO JPM b.doc Page 4 of 9 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to IC 19.
: 1. Reset the simulator to IC 19.
NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
NOTE:       It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
3.2. Insert the following: ior dihs11300rmi default Malfunction will prevent injection using the RCIC pushbutton.
3.2.               Insert the following: ior dihs11300rmi default Malfunction will prevent         Formatted: Bullets and Numbering injection using the RCIC pushbutton.
4.3. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
4.3.               When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
: 4. This completes the setup for this JPM.
: 4. This completes the setup for this JPM.
Formatted:
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM b.doc Page 4 of 9
Bullets and Numbering RO/SRO JPM b
 
-Rev 03  G:\DRSIII\License Examinations
RO/SRO JPM b-Rev 03 INITIAL CONDITIONS Unit One is in a LOCA condition.
\2011\Quad Cities
\Proposed\JPMs\simulator\RO-SRO JPM b.doc Page 5 of 9 INITIAL CONDITIONS Unit One is in a LOCA condition.
Drywell pressure is at 4 psig and holding steady.
Drywell pressure is at 4 psig and holding steady.
Reactor level is at  
Reactor level is at -40 and slowly lowering.
-40" and slowly lowering.
The Unit Supervisor has ordered RCIC for injection.
The Unit Supervisor has ordered RCIC for injection.
All appropriate QGA's have been entered.
All appropriate QGAs have been entered.
This JPM is NOT time critical.
This JPM is NOT time critical.
INITIATING CUE Start the Unit One RCIC system for injection using the manual initiation pushbutton. Notify the Unit Supervisor when RCIC is injection.
INITIATING CUE Start the Unit One RCIC system for injection using the manual initiation pushbutton. Notify the Unit Supervisor when RCIC is injection.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM b.doc Page 5 of 9


RO/SRO JPM b
RO/SRO JPM b-Rev 03 JPM Start Time:
-Rev 03 G:\DRSIII\License Examinations
Comment STEP               ELEMENT                           STANDARD                  SAT   UNSAT Number Hard Card Depress and hold RCIC           Depress and hold RCIC MAN           ___    ___      ___
\2011\Quad Cities
Step 1 MAN INITIATION                  INITIATION pushbutton for at OR pushbutton for at least 30      least 30 sec.
\Proposed\JPMs\simulator\RO-SRO JPM b.doc Page 6 of 9  JPM Start Time:
QCOP sec.
STEP ELEMENT SAT STANDARD UNSAT Comment Number Hard Card Step 1  OR  QCOP 1300-02, F.4.a Depress and hold RCIC MAN INITIATION pushbutton for at least 30 sec. Depress and hold RCIC MAN INITIATION pushbutton for at least 30 sec.
1300-02, F.4.a CUE:         IF told RCIC failed to initiate with pushbutton, acknowledge. If asked for direction, respond with continue with efforts to inject with RCIC.
___ ___ ___ CUE:   IF told RCIC failed to initiate with pushbutton, acknowledge. If asked for direction, respond with "continue with efforts to inject with RCIC".
EVALUATOR NOTE: Alternate Path starts here.
EVALUATOR NOTE: Alternate Path starts here.
EVALUATOR NOTE: RCIC will fail using the pushbutton. Operator must proceed with manual startup actions on Hard Card or per QCOP 1300-02 step F.5.
EVALUATOR NOTE: RCIC will fail using the pushbutton. Operator must proceed with manual startup actions on Hard Card or per QCOP 1300
Hard Card     Start TURB VACU PMP.           Places the TURB VACU PMP Step 1                                      control switch to Start and OR                                        verifies the RUN light is lit.
-02 step F.5.
F.5.a
Hard Card Step 1  OR F.5.a Start TURB VACU PMP.
  *Hard      *Open MO 1-1301-62,             Places the MO 1-1301-62,             ___    ___      ___
Places the TURB VACU PMP control switch to "Start" and verifies the "RUN" light is lit.
Card      TURB CLG WTR VLV.
___ ___ ___ *Hard Card  Step 2  OR F.5.b Open MO 1-1301-62, TURB CLG WTR VLV.
* TURB CLG WTR VLV control Step 2                                      switch to OPEN and verifies OR                                        the OPEN light is lit.
Places the MO 1-1301-62, TURB CLG WTR VLV control switch to "OPEN" and verifies the "OPEN" light is lit.
F.5.b Hard Card    Verify open MO 1-1301-         Verifies the OPEN light for the Step 3      48, PMP DISCH VLV.             MO 1-1301-48, PMP DISCH OR                                        VLV is lit.
___ ___ ___ Hard Card Step 3  OR F.5.c Verify open MO 1-1301-48, PMP DISCH VLV.
F.5.c
Verifies the "OPEN" light for the MO 1-1301-48, PMP DISCH VLV is lit.
  *Hard      *Open MO 1-1301-49,             Places the MO 1-1301-49, PMP Card      PMP DISCH VLV.
___ ___ ___ *Hard Card  Step 4 OR F.5.d Open MO 1-1301-49, PMP DISCH VLV.
* DISCH VLV control switch to Step 4                                      OPEN and verifies the OR                                        OPEN light is lit.
Places the MO 1
F.5.d G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM b.doc Page 6 of 9
-1301-49, PMP DISCH VLV control switch to "OPEN" and verifies the "OPEN" light is lit.
___ ___ ___
RO/SRO JPM b
-Rev 03  G:\DRSIII\License Examinations
\2011\Quad Cities
\Proposed\JPMs\simulator\RO-SRO JPM b.doc Page 7 of 9 STEP ELEMENT SAT STANDARD UNSAT Comment Number Hard Card Step 5 OR F.5.e Open MO 1-1301-60, MIN FLOW VLV. Places the MO 1
-1301-60, MIN FLOW VLV control switch to "OPEN" and verifies the "OPEN" light is lit.
___ ___ ___ *Hard Card  Step 6 OR F.5.f Open M O 1-1301-61, STM TO TURB VLV.
Places the MO 1
-1301-61, STM TO TURB VLV control switch to "OPEN" and verifies the "OPEN" light is lit.
Also verifies:
RCIC discharge flow increases to 400 gpm.
MO 1-1301-60, MIN FLOW VLV fully closes.
___ ___ ___ 7  (Har d Card) or F.5.i If necessary, adjusts discharge flow in MANUAL OR AUTO mode.
Adjusts flow in MANUAL OR AUTO mode using the manual adjustment lever or the setpoint pushbutton respectively on FIC


1-1340-1, RCIC FLOW CONTROLLER.
RO/SRO JPM b-Rev 03 Comment STEP                ELEMENT                          STANDARD                  SAT    UNSAT Number Hard Card    Open MO 1-1301-60, MIN          Places the MO 1-1301-60, MIN Step 5      FLOW VLV.                      FLOW VLV control switch to OR                                        OPEN and verifies the F.5.e                                      OPEN light is lit.
___ ___ ___ CUE:   If candidate reports that RCIC is injecting, acknowledge the report "I understand that RCIC is injecting into the vessel."
  *Hard      *Open MO 1-1301-61,            Places the MO 1-1301-61, STM        ___    ___      ___
EVALUATOR NOTE
Card      STM TO TURB VLV.
: Operator will inform you that the task is complete.
* TO TURB VLV control switch to Step 6                                      OPEN and verifies the OR                                        OPEN light is lit.
F.5.f                                      Also verifies:
* RCIC discharge flow increases to 400 gpm.
* MO 1-1301-60, MIN FLOW VLV fully closes.
7        If necessary, adjusts          Adjusts flow in MANUAL OR            ___     ___     ___
(Hard      discharge flow in MANUAL        AUTO mode using the manual Card)      OR AUTO mode.
adjustment lever or the setpoint or                                      pushbutton respectively on FIC F.5.i                                    1-1340-1, RCIC FLOW CONTROLLER.
CUE:         If candidate reports that RCIC is injecting, acknowledge the report I understand that RCIC is injecting into the vessel.
EVALUATOR NOTE: Operator will inform you that the task is complete.
JPM Stop Time:
JPM Stop Time:
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM b.doc Page 7 of 9


RO/SRO JPM b
RO/SRO JPM b-Rev 03 JPM  
-Rev 03 G:\DRSIII\License Examinations
\2011\Quad Cities
\Proposed\JPMs\simulator\RO-SRO JPM b.doc Page 8 of 9 JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                         Job
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title:
 
Manual Initiation of RCIC JPM Number:
==Title:==
RO/SRO JPM b Revision Number:
EO         RO     SRO       FS STA/IA           SRO Cert JPM
Task Number and Title:
 
03 SR-1300-P01 (Freq: LIC=B) (ILT
==Title:==
-MP) Given a reactor plant in an accident condition where RCIC fails to autostart and/or fails to start with auto pushbutton, start RCIC for injection in accordance with QCOP 1300
Manual Initiation of RCIC JPM Number:         RO/SRO JPM b                                   Revision Number: 03 Task Number and
-02. K/A Number and Importance:
 
K/A: 217000.A4.04 Rating: 3.6/3.6 Suggested Testing Environment:
==Title:==
Simulator Alternate Path:
SR-1300-P01 (Freq: LIC=B) (ILT-MP) Given a reactor plant in an accident condition where RCIC fails to autostart and/or fails to start with auto pushbutton, start RCIC for injection in accordance with QCOP 1300-02.
Yes No SRO Only: Yes No Time Critical:
K/A Number and Importance:           K/A:     217000.A4.04         Rating:         3.6/3.6 Suggested Testing Environment: Simulator Alternate Path:     Yes     No     SRO Only:       Yes     No       Time Critical:     Yes     No Reference(s): QCOP 1300-02, Rev 27, RCIC SYSTEM MANUAL STARTUP, (INJECTION/PRESSURE CONTROL)
Yes No Reference(s):
Actual Testing Environment:           Simulator         Control Room           In-Plant     Other Testing Method:           Simulate       Perform Estimated Time to Complete: 5 minutes                   Actual Time Used:             minutes EVALUATION  
QCOP 1300-02, Rev 27, RCIC SYSTEM MANUAL STARTUP, (INJECTION/PRESSURE CONTROL)
Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
5 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?               Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:               Satisfactory       Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                       (Print)
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Signature:                                                 Date:
Satisfactory Unsatisfactory Comments:                 Evaluator's Name
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM b.doc Page 8 of 9
:   (Print) Evaluator's Signature
 
:   Date:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS Unit One is in a LOCA condition.
INITIAL CONDITIONS Unit One is in a LOCA condition.
Drywell pressure is at 4 psig and holding steady.
Drywell pressure is at 4 psig and holding steady.
Reactor level is at  
Reactor level is at -40 and slowly lowering.
-40" and slowly lowering.
The Unit Supervisor has ordered RCIC for injection.
The Unit Supervisor has ordered RCIC for injection.
All appropriate QGA's have been entered.
All appropriate QGAs have been entered.
This JPM is NOT time critical.
This JPM is NOT time critical.
INITIATING CUE Start the Unit One RCIC system for injection using the manual initiation pushbutton. Notify the Unit Supervisor when RCIC is injection.
INITIATING CUE Start the Unit One RCIC system for injection using the manual initiation pushbutton. Notify the Unit Supervisor when RCIC is injection.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


Exelon Nuclear Job Performance Measure Adjust Turbine/Generator System Load Set RO/SRO JPM c Revision Number: 00 Date: 04/04/2011 Developed By:
Instructor        Date Validated By:
SME or Instructor      Date Reviewed By:
Operations Representative    Date Approved By:
Training Department    Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
RO/SRO JPM c-Rev 00 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________    1. Task description and number, JPM description and number are identified.
________    2. Knowledge and Abilities (K/A) references are included.
________    3. Performance location specified. (in-plant, control room, simulator, or other)
________    4. Initial setup conditions are identified.
________    5. Initiating cue (and terminating cue if required) are properly identified.
________    6. Task standards identified and verified by SME review.
________    7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________    8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure                                Rev:
Procedure                                Rev:
Procedure                                Rev:
________    9. Verify cues both verbal and visual are free of conflict.
________    10. Verify performance time is accurate
________    11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________    12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                              Date SME / Instructor                              Date SME / Instructor                              Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
RO/SRO JPM c-Rev 00 Revision Record (Summary)
Revision 00,    New JPM created from Task Training Matrix for the 09-1 ILT NRC Exam.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Exelon Nuclear Job Performance Measure Adjust Turbine/Generator System Load Set RO/SRO JPM c Revision Number: 00  Date: 0 4/0 4/2011 Developed By:
 
Instructor Date  Validated By:
RO/SRO JPM c-Rev 00 SIMULATOR SETUP INSTRUCTIONS
SME or Instruct or Date  Reviewed By:
: 1. Reset the simulator to IC-20.
Operations Representative Date  Approved By:
NOTE:     It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
Training Department Date RO/SRO JPM c
: 2. On the Speed Load Screen, change the Load Set Setpoint to 80%.
-Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
: 3. Select the <Status> and <Steam Pressure> Screens for the Digital EHC Monitors.
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure Rev:  Procedure Rev:  Procedure Rev:  ________ 9. Verify cues both verbal and visual are free of conflict.
________ 10. Verify performance time is accurate
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date        SME / Instructor Date        SME / Instructor Date RO/SRO JPM c
-Rev 00  SRRS: 3D.105 (when utilized for operator initial or continuing training)
Revision Record (Summary)
Revision 00, New JPM created from Task Training Matrix for the 09
-1 ILT NRC Exam.
RO/SRO JPM c
-Rev 00  SRRS: 3D.105 (when utilized for operator initial or continuing training)
SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to IC
-20. NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. On the Speed Load Screen, change the Load Set Setpoint to 80%. 3. Select the <Status> and <Steam Pressure> Screens for the Digital EHC Monitors.
: 4. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
: 4. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
: 5. This completes the setup for this JPM.
: 5. This completes the setup for this JPM.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


RO/SRO JPM c
RO/SRO JPM c-Rev 00 INITIAL CONDITIONS Unit-1 is presently at 74% power with a load increase in progress per QCGP 3-1 step F.3.
-Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS Unit-1 is presently at 7 4% power with a load increase in progress per QCGP 3
-1 step F.3.
The Unit Supervisor has directed you to maintain Load Set approximately 10% above Reactor power until the Unit is at 100% power.
The Unit Supervisor has directed you to maintain Load Set approximately 10% above Reactor power until the Unit is at 100% power.
This JPM is NOT time critical.
This JPM is NOT time critical.
INITIATING CUE Raise the Load Set Setpoin t to 85% at a ramp rate of 10% per minute in accordance with QCGP 3-1 Attachment D.
INITIATING CUE Raise the Load Set Setpoint to 85% at a ramp rate of 10% per minute in accordance with QCGP 3-1 Attachment D.
Provide a copy of QCGP 3
Provide a copy of QCGP 3-1 Attachment D.
-1 Attachment D. Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


RO/SRO JPM c
RO/SRO JPM c-Rev 00 JPM Start Time:
-Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Comment STEP                   ELEMENT                           STANDARD               SAT   UNSAT Number Attachment D         *Navigate to the             From the <Status> OR <Steam       ___  ___      ___
JPM Start Time:
                      <Speed-Load>                  Pressure> screens:
STEP ELEMENT STANDARD SAT UNSAT Comment Number Attachment D Step 2.a. Navigate to the  
Step 2.a.
<Speed-Load> screen. From the <Status> OR <Steam Pressure> screens:
screen.*
Select <Control> to display the Control Screen Group Select <Speed
* Select <Control> to display the Control Screen Group
-Load> to display the Speed
* Select <Speed-Load> to display the Speed-Load screen.
-Load screen. ___ ___ ___ *Attachment D Step 2.a.(1)
*Attachment D        *Select STPT/RAMP*            In the Load Set box:            ___   ___     ___
Select STPT/RAMP In the "Load Set" box:  Select s STPT/RAMP.
Step 2.a.(1)
___ ___ ___ *Attachment D Step 2.a.(2)
* Selects STPT/RAMP.
Enter a value for SETPOINT and select OK Enter the value for RAMP and select OK.
*Attachment D        *Enter a value for  In the Load Setpoint and                    ___   ___     ___
In the "Load Setpoint and RAMP" box:
Step 2.a.(2)       SETPOINT and select RAMP box:
Enter s 85 for Load Set Setpoint  Enter s 10 for the RAMP value. Select s OK. ___ ___ ___ Evaluator Note: If no change is entered for the RAMP value
OK*
, the default ramp rate is 5%. *Attachment D Step 2.a.(3)
* Enters 85 for Load Set Enter the value for         Setpoint RAMP and select OK.
Select OK to confirm setpoint changes. In the "Confirm Setpoint
* Enters 10 for the RAMP value.
" b ox:  Select s OK AND In the "Load Set" box:
* Selects OK.
Verifies both "Load Ref Cmd" and "Load Reference" indicate 85%
Evaluator         If no change is entered for the RAMP value, the default ramp rate is Note:            5%.
*Attachment D         *Select OK to confirm        In the Confirm Setpoint box:    ___  ___      ___
Step 2.a.(3)       setpoint changes.*
* Selects OK AND In the Load Set box:
* Verifies both Load Ref Cmd and Load Reference indicate 85%
after approx. 1 minute.
after approx. 1 minute.
___ ___ ___ Evaluator Note: If a value of 85% was entered for Step 2.a.(2), then the next step is NOT required.
Evaluator         If a value of 85% was entered for Step 2.a.(2), then the next step is Note:            NOT required.
RO/SRO JPM c
SRRS: 3D.105 (when utilized for operator initial or continuing training)
-Rev 00  SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
STEP ELEMENT STANDARD SAT UNSAT Comment Number Attachment D Step 2.a.(4)
RO/SRO JPM c-Rev 00 Comment STEP                   ELEMENT                           STANDARD             SAT   UNSAT Number Attachment D         Selects RAISE or              In the Load Set box:          ___  ___      ___
Selects RAISE or LOWER to manually bump final auto setpoint. In the "Load Set" box:  Select RAISE or LOWER until "Load Reference" indicates 85%
LOWER to manually Step 2.a.(4)
. ___ ___ ___ Evaluator Note: The candidate should inform you that the task is complete JPM Stop Time:
* Select RAISE or LOWER bump final auto until Load Reference setpoint.
indicates 85%.
Evaluator         The candidate should inform you that the task is complete Note:
JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training)


RO/SRO JPM c
RO/SRO JPM c-Rev 00 JPM  
-Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Job
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title:
 
Adjust Turbine/Generator System Load Set JPM Number:
==Title:==
RO/SRO JPM c Revision Number:
EO         RO   SRO       FS STA/IA         SRO Cert JPM
00 Task Number and Title:
 
==Title:==
Adjust Turbine/Generator System Load Set JPM Number: RO/SRO JPM c                             Revision Number: 00 Task Number and
 
==Title:==
SR-5600-P15, Perform the following DEHC operations on the Operator Work Station (OWS): Adjust Load Set.
SR-5600-P15, Perform the following DEHC operations on the Operator Work Station (OWS): Adjust Load Set.
K/A Number and Importance:
K/A Number and Importance: Reactor/Turbine Pressure Regulating System, 241000 A4.15, 3.2/3.2 Suggested Testing Environment: Simulator Alternate Path:     Yes       No SRO Only:               Yes         No   Time Critical: Yes       No Reference(s): QCGP 3-1, Reactor Power Operations, Rev.63 Actual Testing Environment:             Simulator             Control Room           In-Plant     Other Testing Method:           Simulate             Perform Estimated Time to Complete: 5 minutes                         Actual Time Used:             minutes EVALUATION  
Reactor/Turbine Pressure Regulating System, 241000 A4.15, 3.2/3.2 Suggested Testing Environment:
Simulator Alternate Path:
Yes No SRO Only: Yes No Time Critical:
Yes No Reference(s):
QCGP 3-1, Reactor Power Operations, Rev.63 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
5 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                     Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory     Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                             (Print)
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:                         Evaluator's Name
Evaluators Signature:                                                       Date:
:   (Print) Evaluator's Signature
SRRS: 3D.105 (when utilized for operator initial or continuing training)
:   Date:
 
RO/SRO JPM c
RO/SRO JPM c-Rev 00 INITIAL CONDITIONS Unit-1 is presently at 74% power with a load increase in progress per QCGP 3-1 step F.3.
-Rev 00  SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS Unit-1 is presently at 74% power with a load increase in progress per QCGP 3
-1 step F.3.
The Unit Supervisor has directed you to maintain Load Set approximately 10% above Reactor power until the Unit is at 100% power.
The Unit Supervisor has directed you to maintain Load Set approximately 10% above Reactor power until the Unit is at 100% power.
This JPM is NOT time critical.
This JPM is NOT time critical.
INITIATING CUE Raise the Load Set Setpoint to 85% at a ramp rate of 10% per minute in accordance with QCGP 3-1 Attachment D.
INITIATING CUE Raise the Load Set Setpoint to 85% at a ramp rate of 10% per minute in accordance with QCGP 3-1 Attachment D.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


RO-SRO JPM d.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Exelon Nuclear Job Performance Measure Place Shutdown Cooling In Operation with Spurious Group II RO/SRO JPM d Revision Number: 02 Date: 04/04/2011 Developed By:
Page 1 of 11 Exelon Nuclear Job Performance Measure
Instructor                            Date Validated By:
SME or Instructor                          Date Reviewed By:
Operations Representative                      Date Approved By:
Training Department                          Date RO-SRO JPM d.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 1 of 11


Place Shutdown Cooling In Operation with Spurious Group II RO/SRO JPM d Revision Number:
RO/SRO JPM d-Rev. 02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
02 Date:  04/04/2011 Developed By:
Instructor Date  Validated By:
SME or Instructor Date  Reviewed By:
Operations Representative Date  Approved By:
Training Department Date RO/SRO JPM d
-Rev. 02 RO-SRO JPM d.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 11  JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 through 12 below.
Prior to JPM usage, revalidate JPM using steps 8 through 12 below.
________ 1. Task description and number, JPM description and number are identified.
________   1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________   2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________   3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
________   4. Initial setup conditions are identified.
________ 4. Initial setup conditions are identified.
________   5. Initiating cue (and terminating cue if required) are properly identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________   6. Task standards identified and verified by SME review.
________ 6. Task standards identified and verified by SME review.
________   7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________   8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure QCOP 1000-05             Rev: 43 Procedure QCOA 1000-02             Rev: 16 Procedure                         Rev:
Procedure QCOP 1000-05 Rev: 43 Procedure QCOA 1000-02 Rev: 16 ________ Procedure Rev:   9. Verify cues both verbal and visual are free of conflict.
________    9. Verify cues both verbal and visual are free of conflict.
________ 10. Verify performance time is accurate
________   10. Verify performance time is accurate
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________   11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
________   12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date       SME / Instructor Date       SME / Instructor Date RO/SRO JPM d
SME / Instructor                                     Date SME / Instructor                                     Date SME / Instructor                                     Date RO-SRO JPM d.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
-Rev. 02  RO-SRO JPM d.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 11
Page 3 of 11 Revision Record (Summary)
 
Revision 00, This JPM was developed for ILT NRC exam 03
RO/SRO JPM d-Rev. 02 Revision Record (Summary)
-01 IAW NUREG 1021, rev. 9.
Revision 00, This JPM was developed for ILT NRC exam 03-01 IAW NUREG 1021, rev. 9.
Revision 01, This JPM was revised to update format and for procedure revisions. This JPM was also revised to delete the Reactor Recirc Pump Trip and add a spurious Group II.
Revision 01, This JPM was revised to update format and for procedure revisions. This JPM was also revised to delete the Reactor Recirc Pump Trip and add a spurious Group II.
Revision 02, Modified Initial Conditions and role
Revision 02, Modified Initial Conditions and role-plays, deleted procedure steps C.1 through C.4 and reformatted steps.
-plays, deleted procedure steps C.1 through C.4 and reformatted steps.
RO-SRO JPM d.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 3 of 11


RO/SRO JPM d
RO/SRO JPM d-Rev. 02 SIMULATOR SETUP INSTRUCTIONS
-Rev. 02 RO-SRO JPM d.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
: 1) Reset simulator to IC 5, shutdown cooling on service and go to RUN
Page 4 of 11 SIMULATOR SETUP INSTRUCTIONS
: 2) Manual Actuations :
: 1) Reset simulator to IC 5, shutdown cooling on service and go to RUN 2) Manual Actuations :
* Shutdown SDC per QCOP 1000-05 step F.5, SDC Lineup for Subsequent Restart.
Shutdown SDC per QCOP 1000
* Verify MO 1-1001-16A shows dual position indication.
-05 step F.5, SDC Lineup for Subsequent Restart.
* Acknowledge all annunciators
Verify MO 1
* Fill out a copy of QCOP 1000-05. Sign off the prerequisites, all of step F.1 and F.5.
-1001-16A shows dual position indication
except step F.5.c. (N/A). N/A steps F.3 and F.4.
. Acknowledge all annunciators Fill out a copy of QCOP 1000
: 3) Run setup CAEP file           (if available)
-05. Sign off the prerequisites, all of step F.1 and F.5. except step F.5.c. (N/A). N/A steps F.3 and F.4.
: 4) Malfunctions VERIFY the following commands are in the Instructor Summary: (enter in expert mode as necessary) a) Trigger 1 is set to cause a spurious Group II 30 seconds after the 1A RHR pump is started.
: 3) Run setup CAEP file (if available)
* trgset 1 zdihs110021A(5)
: 4) Malfunctions VERIFY the following commands are in the Instructor Summary: (enter in expert mode as necessary) a) Trigger 1 is set to cause a spurious Group II 30 seconds after the 1A RHR pump is started. trgset 1 "zdihs110021A(5)"
* imf rp07a(1 :30)
imf rp07a(1 :30) imf rp07b(1 :30) b) PLACE an Equipment Status Tag c) PLACE an  on the MO 1-1001-16A valve control switch stating:  
* imf rp07b(1 :30) b) PLACE an Equipment Status Tag on the MO 1-1001-16A valve control switch stating:
"1-1001-17A RHR HX OUTLET VLV, is throttled 28.5 turns closed from full open".
1-1001-17A RHR HX OUTLET VLV, is throttled 28.5 turns closed from full open.
Equipment Status Tag
c) PLACE an Equipment Status Tag on the MO 1-1001-18A valve control switch stating:
MO 1-1001-18A, RHR LOOP MIN FLOW VLV, is closed with the breaker open.
: 5) When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
: 5) When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
on the MO 1
-1001-18A valve control switch stating: "MO 1-1001-18A, RHR LOOP MIN FLOW VLV, is closed with the breaker open".
: 6) This completes the setup for this JPM.
: 6) This completes the setup for this JPM.
RO-SRO JPM d.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 4 of 11


RO/SRO JPM d
RO/SRO JPM d-Rev. 02 INITIAL CONDITIONS
-Rev. 02 RO-SRO JPM d.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
-   Unit 1 is in Mode 4 and has been shut down for 2 days.
Page 5 of 11 INITIAL CONDITIONS
-   Both reactor recirc pumps are running at minimum speed.
- Unit 1 is in Mode 4 and has been shut down for 2 days.
-   RHR is lined up for a subsequent restart of Shutdown Cooling (SDC) on A loop per QCOP 1000-05 step F.5.
- Both reactor recirc pumps are running at minimum speed.
-   RHRSW is still in operation.
- RHR is lined up for a subsequent restart of Shutdown Cooling (SDC) on A loop per QCOP 1000-05 step F.5.
-   Rad Protection has been notified that SDC will be restarted.
- RHRSW is still in operation.
-   Reactor water temperature is 153 degrees F in a band of 150 - 160 degrees F.
- Rad Protection has been notified that SDC will be restarted.
-   The Unit Supervisor has directed you to establish a new Reactor water temperature band of 130 -150 degrees F.
- Reactor water temperature is 153 degrees F in a band of 150  
INITIATING CUE Place the "A" loop of RHR in Shutdown Cooling using the "A" RHR pump per QCOP 1000-05 step F.2.
- 160 degrees F.  
Cool down to the new temperature band slowly, (25-30 degrees F per hour.)
- The Unit Supervisor has directed you to establish a new Reactor water temperature band of 130 -150 degrees F.
INITIATING CUE Place the "A" loop of RHR in Shutdown Cooling using the "A" RHR pump per QCOP 1000
-05 step F.2. Cool down to the new temperature band slowly, (25
-30 degrees F per hour.)
 
Notify the Unit Supervisor when Reactor cooldown has begun.
Notify the Unit Supervisor when Reactor cooldown has begun.
Provide the candidate with a copy of QCOP 10 00-05 marked up IAW the setup instructions.
Provide the candidate with a copy of QCOP 1000-05 marked up IAW the setup instructions.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
RO-SRO JPM d.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 11


RO/SRO JPM d
RO/SRO JPM d-Rev. 02 JPM Start Time:
-Rev. 02 RO-SRO JPM d.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Comment SAT  UNSAT  Number STEP                 ELEMENT                               STANDARD F.2.a       Verify RHRSW Loop A in                   Verifies "A" RHRSW pump on                ___  ___      ___
Page 6 of 11  JPM Start Time:
operation per QCOP 1000-04.               per QCOP 1000-05 from Initial Conditions.
STEP ELEMENT SAT STANDARD UNSAT Comment Number F.2.a Verify RHRSW Loop A in operation per QCOP 1000
F.2.b.(1)   Verify closed:                           Verifies the following valve              ___  ___      ___
-04. Verifies "A" RHRSW pump on per QCOP 1000
indications on RHR Loop A:
-05 from Initial Conditions.
thru        MO 1-1001-19A, A RHR LOOP X-TIE TO B RHR LOOP SV.
___ ___ ___ F.2.b.(1) thru b(4). Verify closed: MO 1-1001-19A, A RHR LOOP X-TIE TO B RHR LOOP SV.
* MO 1-1001-19A closed b(4).
light lit.
MO 1-1001-7A, A RHR PMP TORUS SUCT VLV.
MO 1-1001-7A, A RHR PMP TORUS SUCT VLV.
MO 1-1001-7B, B RHR PMP TORUS SUCT VLV.
* MO 1-1001-7A closed MO 1-1001-7B, B RHR PMP                           light lit.
MO 1-1001-29A, LPCI LOOP DOWNSTREAM SV .
TORUS SUCT VLV.
Verifies the following valve indications on RHR Loop A:
* MO 1-1001-7B closed MO 1-1001-29A, LPCI LOOP                          light lit.
MO 1-1001-19A closed light lit.
DOWNSTREAM SV .
MO 1-1001-7A closed light lit.
* MO 1-1001-29A closed light lit.
MO 1-1001-7B closed light lit.
F.2.c.(1)   Verify open:                             Verifies the following valve              ___  ___      ___
MO 1-1001-29A closed light lit.
indications on RHR Loop A:
___ ___ ___ F.2.c.(1) thru c(3). Verify open: MO 1-100 1-43A, RHR PMP SDC SUCT VLV.
thru        MO 1-1001-43A, RHR PMP SDC SUCT VLV.
* MO 1-1001 43A open c(3).
light lit.
MO 1-1001-47, SDC SUCT HDR DOWNSTREAM SV.
MO 1-1001-47, SDC SUCT HDR DOWNSTREAM SV.
MO 1-1001-50, SDC SUCT HDR UPSTREAM SV.
* MO 1-1001-47 open MO 1-1001-50, SDC SUCT                           light lit.
Verifies the following valve indications on RHR Loop A:
HDR UPSTREAM SV.
MO 1-1001 43A open light lit.
* MO 1-1001-50 open light lit.
MO 1-1001-47 open light lit.
F.2.d.(1)   Verify throttled open:                    Verifies both open and closed            ___  ___      ___
MO 1-1001-50 open light lit.
thru                                                  lights are lit for:
___ ___ ___ F.2.d.(1) thru    d(2). Verify throttled open:
MO 1-1001-28A, A LPCI LOOP d(2).
MO 1-1001-28A, A LPCI LOOP UPSTREAM SV.
UPSTREAM SV.
MO 1-1001-16A, RHR HX BYP VLV. Verifies both open and closed lights are lit for:
* MO 1-1001-28A MO 1-1001-16A, RHR HX BYP
MO 1-1001-28A  MO 1-1001-16A ___ ___ ___ F.2.e. If Reactor Recirc Pump A is off, THEN close MO 1-202-5A, RECIRC PMP DISCH VLV, ORDetermines 1A Recirc pump is running by observing ASD A Run Status ON light is lit.
* MO 1-1001-16A VLV.
N/A's step F.2.e.
F.2.e.     If Reactor Recirc Pump A is off,         Determines 1A Recirc pump                ___  ___      ___
MO 1-202-4A, RECIRC PMP SUCTION VLV.
THEN close MO 1-202-5A,                   is running by observing ASD RECIRC PMP DISCH VLV, OR                  A Run Status ON light is lit.
___ ___ ___
MO 1-202-4A, RECIRC PMP                  N/As step F.2.e.
RO/SRO JPM d
SUCTION VLV.
-Rev. 02  RO-SRO JPM d.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
RO-SRO JPM d.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 7 of 11 STEP ELEMENT SAT STANDARD UNSAT Comment Number F.2.f. Verify a slow cooldown rate of 25-30&deg;F per hour is desired and thenDetermines from Initial Conditions that a slow cooldown rate is desired and verifies 1
Page 6 of 11
-1001-17A is throttled closed 28.5 turns as indicated on the Equipment Status Tag.
verify the 1-1001-17A throttled (approx 28.5 turns closed) to maintain a slow cooldown rate.
___ ___ ___ F.2.f.(1) Verify Equipment Status Tag on MO 1-1001-16A., RHR HX BYP VLV control switch Verifies Equipment Status Tag is placed on the MO 1
-
1001-16A control switch stating,  "1
-1001-17A RHR HX OUTLET VLV, is


throttled".
RO/SRO JPM d-Rev. 02 Comment SAT  UNSAT  Number STEP                  ELEMENT                                STANDARD F.2.f.      Verify a slow cooldown rate of          Determines from Initial                  ___  ___      ___
___ ___ ___ F.2.g. Push RESET FOR GRP 2 ISOL VLV 1
25-30&deg;F per hour is desired              Conditions that a slow and then verify the 1-1001-              cooldown rate is desired and 17A throttled (approx 28.5 turns        verifies 1-1001-17A is closed) to maintain a slow              throttled closed 28.5 turns as cooldown rate.                          indicated on the Equipment Status Tag.
-1001-29, pushbutton at panel 901(2)
F.2.f.(1)    Verify Equipment Status Tag              Verifies Equipment Status                ___   ___     ___
-3. Depresses the RESET FOR GRP 2 ISOL VLV 1
on MO 1-1001-16A., RHR HX                Tag is placed on the MO 1-BYP VLV control switch                  1001-16A control switch stating, 1-1001-17A RHR HX OUTLET VLV, is throttled.
-1001-29, pushbutton for RHR Loop A on the 901
F.2.g.       Push RESET FOR GRP 2                    Depresses the RESET FOR                  ___  ___      ___
-3 Panel. ___ ___ ___ EVALUATOR NOTE: The next two steps will be done in rapid succession. Placekeeping is not required between steps but should be done at the completion of both.
ISOL VLV 1-1001-29,                      GRP 2 ISOL VLV 1-1001-29, pushbutton at panel 901(2)-3.           pushbutton for RHR Loop A on the 901-3 Panel.
*F.2.h.(1)
EVALUATOR NOTE: The next two steps will be done in rapid succession. Placekeeping is not required between steps but should be done at the completion of both.
Initiate opening MO 1-1001-29A, A LPCI LOOP DOWNSTREAM SV. Places the MO 1
*F.2.h.(1)   *Initiate opening MO 1-1001-             Places the MO 1-1001-29A                 ___  ___      ___
-1001-29A control switch to OPEN.
29A, A LPCI LOOP                        control switch to OPEN.
___ ___ ___ *F.2.h.(2) After MO 1
DOWNSTREAM SV.*
-1001-29A opens for approx. 2 seconds, start the 1A RHR Pump. 2 seconds after placing the MO 1-1001-29A c/s to open, places the A RHR pump CS to START. ___ ___ ___
*F.2.h.(2)   After MO 1-1001-29A opens for           2 seconds after placing the              ___  ___      ___
RO/SRO JPM d
approx. 2 seconds, *start the           MO 1-1001-29A c/s to open, 1A RHR Pump.*                            places the A RHR pump CS to START.
-Rev. 02  RO-SRO JPM d.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
RO-SRO JPM d.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 8 of 11 STEP ELEMENT SAT STANDARD UNSAT Comment Number SIMOP: Approximately 30 seconds after the start of the 1A RHR pump, verify trigger 1 goes true. If not then insert the following commands for a Group II isolation:
Page 7 of 11
imf rp07a, imf rp07c Wait approximately 1 minute then delete both malfunctions with the commands:
 
dmf rp07a,   dmf rp07b Alternate Path Starts Here E.9 On a Group 2 isolation, the following RHR valves close:
RO/SRO JPM d-Rev. 02 Comment SAT  UNSAT  Number STEP                   ELEMENT                               STANDARD SIMOP: Approximately 30 seconds after the start of the 1A RHR pump, verify trigger 1 goes true. If not then insert the following commands for a Group II isolation:
MO 1-1001-20 RHR SYS to RW UPSTREAM SV.
* imf rp07a,
MO 1-1001-21, RHR SYS TO RW DOWNSTREAM SV.
* imf rp07c Wait approximately 1 minute then delete both malfunctions with the commands:
MO 1-1001-47, SDC SUCT HDR DOWNSTREAM SV.
* dmf rp07a,
MO 1-1001-50, RHR SDC SUCT HDR UPSTREAM SV Verifies the following valve indications on RHR Loop A:
* dmf rp07b Alternate Path Starts Here E.9         On a Group 2 isolation, the              Verifies the following valve              ___  ___      ___
MO 1-1001-20 closed light lit.
following RHR valves close:              indications on RHR Loop A:
MO 1-1001-21 closed light lit.
MO 1-1001-20 RHR SYS to
MO 1-1001-47 closed light lit.
* MO 1-1001-20 closed RW UPSTREAM SV.                                  light lit.
MO 1-1001-50 closed light lit.
MO 1-1001-21, RHR SYS TO
___ ___ ___ EVALUATOR ROLE PLAY: As the Shift Supervisor just calling in from the Aux Electric Room, report that Electrical Maintenance was assisting an EO by placing jumpers in the 901-40 and 901
* MO 1-1001-21 closed RW DOWNSTREAM SV.                                light lit.
-41 panels for a Clearance Order when they heard a couple of relays change state. You have directed the EMs to remove all jumpers and return to the WEC with the Clearance Order. EVALUATOR ROLE PLAY: As Unit Supervisor, acknowledge the call in from the Aux Electric Room and direct SDC to be placed back in service.
MO 1-1001-47, SDC SUCT
* MO 1-1001-47 closed HDR DOWNSTREAM SV.                               light lit.
MO 1-1001-50, RHR SDC
* MO 1-1001-50 closed SUCT HDR UPSTREAM SV                            light lit.
EVALUATOR ROLE PLAY: As the Shift Supervisor just calling in from the Aux Electric Room, report that Electrical Maintenance was assisting an EO by placing jumpers in the 901-40 and 901-41 panels for a Clearance Order when they heard a couple of relays change state. You have directed the EMs to remove all jumpers and return to the WEC with the Clearance Order.
EVALUATOR ROLE PLAY: As Unit Supervisor, acknowledge the call in from the Aux Electric Room and direct SDC to be placed back in service.
RO-SRO JPM d.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 8 of 11
 
RO/SRO JPM d-Rev. 02 Comment SAT  UNSAT  Number STEP                  ELEMENT                                STANDARD EVALUATOR NOTE: Per QCOP 1000-05, Limitations and Actions step E.3, the candidate should refer to QCOA 1000-02, Loss of Shutdown Cooling. Only applicable steps are shown. All others are N/Ad. However the candidate may also accomplish the task by referring directly to QCOP 1000-05 steps F.1.i. through F.1.r.
D.2.a.      Verify closed:                          Verifies the following valve              ___  ___      ___
indications on RHR Loop A:
thru        MO 1-1001-18A, RHR MIN FLOW BYP.
* MO 1-1001-18A closed D.2.d light lit.
MO 1-1001-34A, TORUS TEST OR SPRAY VALVE.
* MO 1-1001-34A closed MO 1-1001-36A, TORUS H2O                        light lit.
TEST VALVE.
* MO 1-1001-36A closed MO 1-1001-37A, TORUS                            light lit.
SPRAY SHUTOFF
* MO 1-1001-37A closed light lit.
EVALUATOR NOTE: Student may ask if the Shift Manager has been notified, reply that the Shift Manager has been notified and that another NSO will monitor Reactor Water/Metal temps per step D.5.
D.8.c.(1)(a) Alarm 901-3 E-15, SDC low                Verifies 901-3 E-15 alarm                ___  ___      ___
pressure permissive is clear.            clear.
D.8.c.(1)(b) Alarm 901-5 A-8, Group 2 ISOL Verifies 901-5 A-8 is in alarm.                      ___  ___      ___
CH TRIP, in alarm.
*D.8.c.(4)  If a spurious Group 2 Isolation          At 901-5 panel, takes Group              ___  ___      ___
(a)          signal has caused a loss of              isolation reset switch to both Shutdown Cooling, THEN:                  INBD and OTBD.
OR
            *Reset Group II at 901-5 QCOP 1000-05      panel.*
F.1.i.(1)
RO-SRO JPM d.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 9 of 11
 
RO/SRO JPM d-Rev. 02 Comment SAT  UNSAT  Number STEP                  ELEMENT                                STANDARD
*D.8.c.(4)    Depress both RESET FOR                  Depresses both RESET FOR                  ___  ___      ___
(b).          GRP ISOL VLV 1-1001-29A/B              GRP ISOL VLV 1-1001-29A/B pushbuttons:                            pushbuttons.
OR
              *Reset 1-1001-29A isolation.*
QCOP 1000-05      Reset 1-1001-29B isolation.
F.1.i.(2).
D.8.c.(4)(c) Restart Shutdown Cooling per            Refers to QCOP 1000-05 to                ___  ___      ___
QCOP 1000-05.                            restart Shutdown Cooling.
EVALUATOR CUE: Inform candidate that QCOP 1000-05, Shutdown Cooling Operations, prerequisites are met.
Time Compression: Procedural steps have been verified through step F.1.i.
*F.1.j.      *Open MO 1-1001-47, SDC                Places C/S for MO 1-1001-47              ___  ___      ___
HDR DOWNSTREAM SV.*                    to OPEN and verifies valve open light is lit.
*F.1.k.      *Open MO 1-1001-50, SDC                Places C/S for MO 1-1001-50              ___  ___      ___
HDR UPSTREAM SV.*                      to OPEN and verifies valve open light is lit.
F.1.l.        Verify open MO 1-1001-16A, A            Verifies MO 1-1001-16A valve              ___  ___      ___
RHR HX BYP VLV.                        open light is lit.
*F.1.m.      *Close MO 1-1001-28A, A                Places the C/S for MO 1-                  ___  ___      ___
LPCI LOOP UPSTREAM SV.*                1001-28A to CLOSE and holds until valve closed light is lit and open light is out.
*F.1.n.      *Open MO 1-1001-29A, A LPCI Places C/S for MO 1-1001-                            ___  ___      ___
LOOP DOWNSTREAM SV.*        29A to OPEN and verifies valve opens light is lit.
EVALUATOR NOTE: Step F.1.o. is N/Ad. Steps F.1.p.(1), (2), and (3) are all Condition Met (CM).
*F.1.q.(1),  *Throttle open MO 1-1001-28A            Places the C/S for MO 1-                  ___  ___      ___
(2)          for ~2 seconds and start the 1A        1001-28A to OPEN for ~2 RHR pump.
* seconds and then takes the C/S for the 1A RHR pump to START.
RO-SRO JPM d.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 10 of 11


RO/SRO JPM d
RO/SRO JPM d-Rev. 02 Comment SAT   UNSAT   Number STEP                 ELEMENT                               STANDARD
-Rev. 02 RO-SRO JPM d.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
*F.1.r.     *Throttle open MO 1-1001-28A             Moves C/S for MO 1-1001-                 ___   ___     ___
Page 9 of 11 STEP ELEMENT SAT STANDARD UNSAT Comment Number EVALUATOR NOTE:  Per QCOP 1000
to maintain >2500 gpm flow.*              28A to adjust flow to >2500 gpm.
-05, Limitations and Actions step E.3, the candidate should refer to QCOA 1000
EVALUATOR NOTE: The candidate should inform you that the RPV cooldown has begun.
-02, Loss of Shutdown Cooling. Only applicable steps are shown. All others are N/A'd. However the candidate may also accomplish the task by referring directlyD.2.a. to QCOP 1000
CUE: Inform candidate that another NSO will monitor and adjust RPV cooldown rate, water temperature and level as needed.
-05 steps F.1.i. through F.1.r.
EVALUATOR NOTE: The candidate should inform you that the task is complete.
thru  D.2.d Verify closed: MO 1-1001-18A, RHR MIN FLOW BYP. MO 1-1001-34A, TORUS TEST OR SPRAY VALVE.
MO 1-1001-36A, TORUS H2O TEST VALVE.
MO 1-1001-37A, TORUS SPRAY SHUTOFF Verifies the following valve indications on RHR Loop A:
MO 1-1001-18A closed light lit.
MO 1-1001-34A closed light lit.
MO 1-1001-36A closed light lit.
MO 1-1001-37A closed light lit.
___ ___ ___ EVALUATOR NOTE:  Student may ask if the Shift Manager has been notified, reply that "the Shift Manager has been notified and that another NSO will monitor Reactor Water/Metal temps per step D.5."
D.8.c.(1)(a)
Alarm 901-3 E-15, SDC low pressure permissive is clear.
Verifies 901
-3 E-15 alarm clear. ___ ___ ___ D.8.c.(1)(b)
Alarm 901-5 A-8, Group 2 ISOL CH TRIP, in alarm.
Verifies 901
-5 A-8 is in alarm.
___ ___ ___ *D.8.c.(4)
(a) OR QCOP 1000-05 F.1.i.(1) If a spurious Group 2 Isolation signal has caused a loss of Shutdown Cooling, Reset Group II at 901
-5 panel. THEN: At 901-5 panel, takes Group isolation reset switch to both INBD and OTBD.
___ ___ ___
RO/SRO JPM d
-Rev. 02  RO-SRO JPM d.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 10 of 11 STEP ELEMENT SAT STANDARD UNSAT Comment Number *D.8.c.(4)
(b). OR QCOP 1000-05 F.1.i.(2).
Depress both Reset 1-1001-29A isolation. RESET FOR GRP ISOL VLV 1
-1001-29A/B pushbuttons:
Reset 1-1001-29B isolation.
Depresses both RESET FOR GRP ISOL VLV 1
-1001-29A/B pushbuttons.
___ ___ ___ D.8.c.(4)(c)
Restart Shutdown Cooling per QCOP 1000-05. Refers to QCOP 1000
-05 to restart Shutdown Cooling.
___ ___ ___ EVALUATOR CUE:  Inform candidate that QCOP 1000
-05, Shutdown Cooling Operations, prerequisites are met.
Time Compression*F.1.j. :  Procedural steps have been verified through step F.1.i.
Open MO 1-1001-47, SDC HDR DOWNSTREAM SV. Places C/S for MO 1
-1001-47 to OPEN and verifies valve open light is lit.
___ ___ ___ *F.1.k. Open MO 1-1001-50, SDC HDR UPSTREAM SV. Places C/S for MO 1
-1001-50 to OPEN and verifies valve open light is lit. ___ ___ ___ F.1.l. Verify open MO 1
-1001-16A, A RHR HX BYP VLV.
Verifies MO 1
-1001-16A valve open light is lit.
___ ___ ___ *F.1.m. Close MO 1
-1001-28A, A LPCI LOOP UPSTREAM SV. Places the C/S for MO 1
-
1001-28A to CLOSE and holds until valve closed light is lit and open light is out.
___ ___ ___ *F.1.n. Open MO 1-1001-29A, A LPCI LOOP DOWNSTREAM SV. Places C/S for MO 1
-1001-29A to OPEN and verifies valve opens light is lit.
___ ___ ___ EVALUATOR NOTE:  Step F.1.o. is N/A'd. Steps F.1.p.(1), (2), and (3) are all Condition Met (CM). *F.1.q.(1), (2) Throttle open MO 1
-1001-28A for ~2 seconds and start the 1A RHR pump. Places the C/S for MO 1
-1001-28A to OPEN for ~2 seconds and then takes the C/S for the 1A RHR pump to START. ___ ___ ___
RO/SRO JPM d
-Rev. 02  RO-SRO JPM d.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 11 of 11 STEP ELEMENT SAT STANDARD UNSAT Comment Number *F.1.r. Throttle open MO 1
-1001-28A to maintain  
>2500 gpm flow. Moves C/S for MO 1
-1001-28A to adjust flow to  
>2500 gpm. ___ ___ ___ EVALUATOR NOTE: The candidate should inform you that "the RPV cooldown has begun." CUE: Inform candidate that "another NSO will monitor and adjust RPV cooldown rate, water temperature and level as needed."
EVALUATOR NOTE: The candidate should inform you that the task is complete.
JPM Stop Time:
JPM Stop Time:
RO-SRO JPM d.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 11 of 11


RO/SRO JPM d
RO/SRO JPM d-Rev. 02 JPM  
-Rev. 02 RO-SRO JPM d.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 12 of 11 JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                           Job
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title:
 
Place Shutdown Cooling In Operation with Spurious Group II JPM Number:
==Title:==
RO/SRO JPM d Revision Number:
EO         RO     SRO       FS STA/IA           SRO Cert JPM
Task Number and Title:
 
02 SR-1000-P07 (Freq: LIC=B) (ILT  
==Title:==
- Must Perform or Must Supervise) Given a shutdown reactor plant, start RHR in shutdown cooling mode in accordance with QCOP 1000
Place Shutdown Cooling In Operation with Spurious Group II JPM Number:       RO/SRO JPM d                                         Revision Number: 02 Task Number and
-5.   (Important PRA task. Starting SDC has a Risk Achievement Worth (RAW) of 2.35)
 
K/A Number and Importance: K/A: 205000.A2.06 Rating: 3.4 / 3.5 Suggested Testing Environment:
==Title:==
Simulator Alternate Path:
SR-1000-P07 (Freq: LIC=B) (ILT - Must Perform or Must Supervise)
Yes No SRO Only: Yes No Time Critical:
Given a shutdown reactor plant, start RHR in shutdown cooling mode in accordance with QCOP 1000-5. (Important PRA task. Starting SDC has a Risk Achievement Worth (RAW) of 2.35)
Yes No Reference(s):
K/A Number and Importance:         K/A: 205000.A2.06                             Rating:         3.4 / 3.5 Suggested Testing Environment: Simulator Alternate Path:     Yes     No   SRO Only:         Yes         No       Time Critical:     Yes       No Reference(s):   QCOP 1000-05, Rev. 43, Shutdown Cooling Start-Up and Operation QCOA 1000-02, Rev. 16, Loss of Shutdown Cooling Actual Testing Environment:         Simulator           Control Room               In-Plant       Other Testing Method:         Simulate         Perform Estimated Time to Complete: 20 minutes                    Actual Time Used:                  minutes EVALUATION
QCOP 1000-05, Rev. 43, Shutdown Cooling Start
-Up and Operation QCOA 1000-02, Rev. 16, Loss of Shutdown Cooling Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
20EVALUATION


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                     Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory       Unsatisfactory Comments:
minutes Actual Time Used:
Evaluators Name:                                                             (Print)
minutes Were all the Critical Elements performed satisfactorily?
Evaluators Signature:                                                     Date:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
RO-SRO JPM d.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Satisfactory Unsatisfactory Comments:                 Evaluator's Name
Page 12 of 11
:   (Print) Evaluator's Signature:   Date:
 
INITIAL CONDITIONS
-  Unit 1 is in Mode 4 and has been shut down for 2 days.
-  Both reactor recirc pumps are running at minimum speed.
-  RHR is lined up for a subsequent restart of Shutdown Cooling (SDC) on A loop per QCOP 1000-05 step F.5.
-  RHRSW is still in operation.
-  Rad Protection has been notified that SDC will be restarted.
-  Reactor water temperature is 153 degrees F in a band of 150 - 160 degrees F.
-  The Unit Supervisor has directed you to establish a new Reactor water temperature band of 130 -150 degrees F.
INITIATING CUE Place the "A" loop of RHR in Shutdown Cooling using the "A" RHR pump.
Cool down to the new temperature band slowly, (25-30 degrees F per hour.)
Notify the Unit Supervisor when Reactor cooldown has begun.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS
- Unit 1 is in Mode 4 and has been shut down for 2 days.
- Both reactor recirc pumps are running at minimum speed.
- RHR is lined up for a subsequent restart of Shutdown Cooling (SDC) on A loop per QCOP 1000-05 step F.5.
- RHRSW is still in operation.
- Rad Protection has been notified that SDC will be restarted.
- Reactor water temperature is 153 degrees F in a band of 150
- 160 degrees F.
- The Unit Supervisor has directed you to establish a new Reactor water temperature band of 130 -150 degrees F.


INITIATING CUE Place the "A" loop of RHR in Shutdown Cooling using the "A" RHR pump.
Exelon Nuclear Job Performance Measure Energize 480 VAC Bus 15 With a Failure of the Normal Feed RO/SRO JPM e Revision Number: 00 Date: 04/04/2011 Developed By:
Cool down to the new temperature band slowly, (25
Instructor        Date Validated By:
-30 degrees F per hour.)
SME or Instructor      Date Reviewed By:
Operations Representative    Date Approved By:
Training Department    Date SRRS: 3D.105 (when utilized for operator initial or continuing training)


Notify the Unit Supervisor when Reactor cooldown has begun.
RO/SRO JPM e-Rev 00 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________    1. Task description and number, JPM description and number are identified.
________    2. Knowledge and Abilities (K/A) references are included.
________    3. Performance location specified. (in-plant, control room, simulator, or other)
________    4. Initial setup conditions are identified.
________    5. Initiating cue (and terminating cue if required) are properly identified.
________    6. Task standards identified and verified by SME review.
________    7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________    8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure                                Rev:
Procedure                                Rev:
Procedure                                Rev:
________    9. Verify cues both verbal and visual are free of conflict.
________    10. Verify performance time is accurate
________    11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________    12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                              Date SME / Instructor                              Date SME / Instructor                              Date SRRS: 3D.105 (when utilized for operator initial or continuing training)


RO/SRO JPM e-Rev 00 Revision Record (Summary)
Revision 00,    New JPM developed for ILT 09-1 NRC Exam.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Exelon Nuclear Job Performance Measure Energize 480 VAC Bus 15 With a Failure of the Normal Feed RO/SRO JPM e  Revision Number: 00  Date: 0 4/0 4/2011 Developed By:
Instructor Date  Validated By:
SME or Instructor Date  Reviewed By:
Operations Representative Date  Approved By:
Training Department Date RO/SRO JPM e
-Rev 00  SRRS: 3D.105 (when utilized for operator initial or continuing training)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure Rev:  Procedure Rev:  Procedure Rev:  ________ 9. Verify cues both verbal and visual are free of conflict.
________ 10. Verify performance time is accurate
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date        SME / Instructor Date        SME / Instructor Date RO/SRO JPM e
-Rev 00  SRRS: 3D.105 (when utilized for operator initial or continuing training)
Revision Record (Summary)
Revision 00, New JPM developed for ILT 09
-1 NRC Exam.


RO/SRO JPM e
RO/SRO JPM e-Rev 00 SIMULATOR SETUP INSTRUCTIONS
-Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
: 1. Reset the simulator to IC-18 NOTE:     It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to IC
-18 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Take the following actions:
: 2. Take the following actions:
Prevent reclosure of the Bus 15 Main Feed Breaker: imf ed06a Trip T-12 using the command: imf ed02 Insert a manual reactor scram and place the Mode Switch in Shutdown.
* Prevent reclosure of the Bus 15 Main Feed Breaker: imf ed06a
Verify the U
* Trip T-12 using the command: imf ed02
-1 and U1/2 EDG are supplying the ECCS Busses.
* Insert a manual reactor scram and place the Mode Switch in Shutdown.
Restore RPS A and B from the normal feeds
* Verify the U-1 and U1/2 EDG are supplying the ECCS Busses.
: irf rp28r reset, irf rp29r reset Backfeed Bus 13 and Bus 14
* Restore RPS A and B from the normal feeds: irf rp28r reset, irf rp29r reset
. Allow the simulator to stabilize, i.e. RPV water level 30 inches (use RCIC if necessary), and RPV pressure stable at <
* Backfeed Bus 13 and Bus 14.
1060 psig.
* Allow the simulator to stabilize, i.e. RPV water level 30 inches (use RCIC if necessary),
Perform the following steps of QCOA 6100
and RPV pressure stable at < 1060 psig.
-03, D.3, D.15, D.18, D.23, D.24, and D.28. Acknowledge annunciators initially and throughout the JPM.
* Perform the following steps of QCOA 6100-03, D.3, D.15, D.18, D.23, D.24, and D.28.
Snap the setup to IC
* Acknowledge annunciators initially and throughout the JPM.
-0 or any other available IC.
* Snap the setup to IC-0 or any other available IC.
: 3. Prepare a copy of QCOA 6100
: 3. Prepare a copy of QCOA 6100-03 with the following steps signed of as complete, N/A , or in progress (circled), up step D.29.
-03 with the following steps signed of as complete, N/A , or in progress (circled), up step D.29.
: 4. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
: 4. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
: 5. This completes the setup for this JPM.
: 5. This completes the setup for this JPM.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


RO/SRO JPM e
RO/SRO JPM e-Rev 00 INITIAL CONDITIONS A loss of offsite power has occurred on Unit 1.
-Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
The Unit Supervisor has entered QGA 100 and directed actions to control RPV water level and pressure.
INITIAL CONDITIONS A loss of offsite power has occurred on Unit 1.
Actions taken per QCOA 6100-03, Loss of Offsite Power actions up to step D.29 have been completed.
The Unit Supervisor has entered QGA 100 and directed actions to control RPV water level and pressure. Actions taken per QCOA 6100
-03, Loss of Offsite Power actions up to step D.29 have been completed.
Hard Cards are authorized.
Hard Cards are authorized.
The Unit Supervisor has directed you to assume Electric Plant restoration activities. This JPM is NOT time critical.
The Unit Supervisor has directed you to assume Electric Plant restoration activities.
INITIATING CUE Re-energize Bus 15 and Bus 17 from t he i r Normal Feed s per QCOA 6100-03, step D.29.
This JPM is NOT time critical.
INITIATING CUE Re-energize Bus 15 and Bus 17 from their Normal Feeds per QCOA 6100-03, step D.29.
Do NOT energize Bus 16.
Do NOT energize Bus 16.
Notify the Unit Supervisor when Bus 15 and Bus 17 are energized.
Notify the Unit Supervisor when Bus 15 and Bus 17 are energized.
Provide the examinee with a copy of QCOA 6100
Provide the examinee with a copy of QCOA 6100-03.
-03.
Information For Evaluators Use:
Information For Evaluator's Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


RO/SRO JPM e
RO/SRO JPM e-Rev 00 JPM Start Time:
-Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Comment STEP                   ELEMENT                             STANDARD                 SAT   UNSAT Number QCOA 6100-         Close Bus 15 Main
JPM Start Time:
* Places the Bus 15         ___  ___      ___
STEP ELEMENT STANDARD SAT UNSAT Comment Number QCOA 6100-03 Step 29 a. Close Bus 15 Main F eed breaker  Places the Bus 15 control switch to NAT to clear the Auto Trip.
03              Feed breaker                                control switch to NAT Step 29 a.                                                    to clear the Auto Trip.
Places the Bus 15 control switch to NAC to close the breaker.
* Places the Bus 15 control switch to NAC to close the breaker.
___ ___ ___ CUE: If the examinee reports the trip of the Bus 15 Main Feed breaker and asks for direction, as Unit Supervisor acknowledge the report and state: "Continue efforts to energize Bus 15.
CUE:           If the examinee reports the trip of the Bus 15 Main Feed breaker and asks for direction, as Unit Supervisor acknowledge the report and state: Continue efforts to energize Bus 15..
". CUE: If an EO is dispatched to investigate the Bus 15 Main Feed breaker, then report back as the EO from Bus 1 5 cubicle 2B that "EM's are here and they have identified a problem with the closing spring and are unable to charge it.
CUE:           If an EO is dispatched to investigate the Bus 15 Main Feed breaker, then report back as the EO from Bus 15 cubicle 2B that EMs are here and they have identified a problem with the closing spring and are unable to charge it. There are no other problems preventing Bus 15 from being energized.
There are no other problems preventing Bus 15 from being energized.
QCOA 6100-         *Close Bus 17 Main
" QCOA 6100-03 Step 29 c.
* Places the Bus 17 03              Feed Breaker*                            control switch to NAT to clear the Auto Trip lights.
Close Bus 17 Main Feed Breaker  Places the Bus 17 control switch to NAT to clear the Auto Trip lights.
Step 29 c.
Places the Bus 17 control switch to NAC and verifies breaker CLOSE D and Bus 17 LIVE lights are lit.
* Places the Bus 17 control switch to NAC and verifies breaker CLOSED and Bus 17 LIVE lights are lit.
Alternate Path Starts Here Evaluator Note: The task may be accomplished by using the QOA 6700
Alternate Path Starts Here Evaluator         The task may be accomplished by using the QOA 6700-01 Hard Card Note:          OR QOP 6700-02. The step below is critical if Bus 17 was NOT energized using QCOA 6100-03.
-01 Hard Card OR QOP 6700-02. The step belo w is critical if Bus 17 was NOT energized using QCOA 6100
Hard Card         Verify closed the Bus
-03. Hard Card Step 1 OR QOP 6700-02 Step F.1.d.(1). Verify closed the Bus 1 7 Main Feed Breaker If necessary, places the Bus 17 control switch to NAC. Verifies breaker CLOSE D and Bus 17 LIVE lights are lit.
* If necessary, places the     ___  ___      ___
___ ___ ___
Step 1          17 Main Feed Breaker                    Bus 17 control switch to OR                                                    NAC.
RO/SRO JPM e
QOP 6700-02
-Rev 00  SRRS: 3D.105 (when utilized for operator initial or continuing training)
* Verifies breaker CLOSED and Bus 17 Step F.1.d.(1).                                              LIVE lights are lit.
STEP ELEMENT STANDARD SAT UNSAT Comment Number Hard Card Step 2.a OR QOP 67 00-02 Step F.1.d.(2)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Verify open Bus 15 Main Feed Breaker
 
. Verifies Bus 15 breaker OPEN and AUTO TRIP lights are lit
RO/SRO JPM e-Rev 00 Comment STEP                   ELEMENT                             STANDARD             SAT   UNSAT Number Hard Card         Verify open Bus 15               Verifies Bus 15 breaker OPEN Main Feed Breaker.              and AUTO TRIP lights are lit.
. OR Places Bus 15 control switch to NAT and verifies Breaker OPEN lights are lit.
Step 2.a OR OR Places Bus 15 control switch to QOP 6700-02 NAT and verifies Breaker OPEN Step F.1.d.(2)                                       lights are lit.
Hard Card Step 2.c OR QOP 6700-02  Step F.1.d.(3)
Hard Card        Verify open Bus 15 to            Verifies Bus 15 to Bus 16 tie-   ___  ___      ___
Verify open Bus 15 to Bus 16 T ie-Breaker. Verifies Bus 15 to Bus 16 t ie- breaker OPEN light is lit.
Step 2.c        Bus 16 Tie-Breaker.              breaker OPEN light is lit.
___ ___ ___ Hard Card Step 2.d OR QOP 6700-02 Step F.1.d.(4)
OR QOP 6700-02 Step F.1.d.(3)
Close Bus 1 5 to Bus 17 Tie-Breaker. Places Bus 15 to Bus 17 tie
Hard Card        *Close Bus 15 to Bus             Places Bus 15 to Bus 17 tie-      ___  ___      ___
-
Step 2.d        17 Tie-Breaker.*                breaker control switch to NAC and verifies CLOSED light and OR BUS 15 LIVE lights are lit.
breaker control switch to NAC and verifies CLOSED light and BUS 15 LIVE lights are lit.
QOP 6700-02 Step F.1.d.(4)
___ ___ ___ Evaluator Note: The examinee should inform you that the task is complete.
Evaluator         The examinee should inform you that the task is complete.
Note:
JPM Stop Time:
JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training)


RO/SRO JPM e
RO/SRO JPM e-Rev 00 JPM  
-Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Job
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title:
 
Energize 480 VAC Bus 15 With a Failure of the Normal Feed JPM Number:
==Title:==
RO/SRO JPM e Revision Number:
EO         RO   SRO       FS STA/IA         SRO Cert JPM
00 Task Number and Title:
 
SR 6500-P04, K/A Number and Importance:
==Title:==
Electrical, 262001 A4.01, 3.4/3.7 Suggested Testing Environment:
Energize 480 VAC Bus 15 With a Failure of the Normal Feed JPM Number: RO/SRO JPM e                             Revision Number: 00 Task Number and
Simulator Alternate Path:
 
Yes No SRO Only: Yes No Time Critical:
==Title:==
Yes No Reference(s):
SR 6500-P04, K/A Number and Importance:             Electrical, 262001 A4.01, 3.4/3.7 Suggested Testing Environment: Simulator Alternate Path:     Yes       No SRO Only:               Yes         No   Time Critical: Yes       No Reference(s): QCOA 6100-03, Loss of Offsite Power, Rev. 26 QOA 6700-01, Attachment B, Crosstie Busses 15,16, and 17, Rev. 11 QOP 6700-02, 480 Bus Volt Tie Circuit Breakers, Rev. 30 Actual Testing Environment:             Simulator             Control Room           In-Plant     Other Testing Method:           Simulate             Perform Estimated Time to Complete: 10 minutes                         Actual Time Used:             minutes EVALUATION  
QCOA 6100-03, Loss of Offsite Power, Rev. 26 QOA 6 7 00-0 1, Attachment B, Crosstie Busses 15,16, and 17, Rev. 11 QOP 6700-02, 480 Bus Volt Tie Circuit Breakers, Rev. 30 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
10 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                     Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory     Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily? Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Name:                                                             (Print)
Satisfactory Unsatisfactory Comments:                       Evaluator's Name
Evaluators Signature:                                                       Date:
:   (Print) Evaluator's Signature
SRRS: 3D.105 (when utilized for operator initial or continuing training)
:   Date:
 
RO/SRO JPM e
RO/SRO JPM e-Rev 00 INITIAL CONDITIONS A loss of offsite power has occurred on Unit 1.
-Rev 00  SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS A loss of offsite power has occurred on Unit 1.
The Unit Supervisor has entered QGA 100 and directed actions to control RPV water level and pressure.
The Unit Supervisor has entered QGA 100 and directed actions to control RPV water level and pressure.
Actions taken per QCOA 61 00-03, Loss of Offsite Power actions up to step D.29 have been completed.
Actions taken per QCOA 6100-03, Loss of Offsite Power actions up to step D.29 have been completed.
Hard Cards are authorized.
Hard Cards are authorized.
The Unit Supervisor has directed you to assume Electric Plant restoration activities.
The Unit Supervisor has directed you to assume Electric Plant restoration activities.
This JPM is NOT time critical.
This JPM is NOT time critical.
INITIATING CUE Re-energize Bus 15 and Bus 17 from their Normal Feeds per QCOA 6100
INITIATING CUE Re-energize Bus 15 and Bus 17 from their Normal Feeds per QCOA 6100-03, step D.29.
-03, step D.29.
Do NOT energize Bus 16.
Do NOT energize Bus 16.
Notify the Unit Supervisor when Bus 15 and Bus 17 are energized.
Notify the Unit Supervisor when Bus 15 and Bus 17 are energized.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


Exelon Nuclear Job Performance Measure Bypass A Channel of the Reactor Mode Switch to Shutdown Scram RO/SRO JPM f Revision Number: 00 Date: 04/04/2011 Developed By:
Instructor        Date Validated By:
SME or Instructor      Date Reviewed By:
Operations Representative    Date Approved By:
Training Department    Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
RO/SRO JPM f-Rev 00 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________    1. Task description and number, JPM description and number are identified.
________    2. Knowledge and Abilities (K/A) references are included.
________    3. Performance location specified. (in-plant, control room, simulator, or other)
________    4. Initial setup conditions are identified.
________    5. Initiating cue (and terminating cue if required) are properly identified.
________    6. Task standards identified and verified by SME review.
________    7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________    8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure                                Rev:
Procedure                                Rev:
Procedure                                Rev:
________    9. Verify cues both verbal and visual are free of conflict.
________    10. Verify performance time is accurate
________    11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________    12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                              Date SME / Instructor                              Date SME / Instructor                              Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
RO/SRO JPM f-Rev 00 Revision Record (Summary)
Revision 00,    New JPM developed for the 09-1 ILT NRC Exam.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Exelon Nuclear Job Performance Measure Bypass "A" Channel of the Reactor Mode Switch to Shutdown Scram RO/SRO JPM f Revision Number: 00  Date: 0 4/04/2011 Developed By:
Instructor Date  Validated B y:      SME or Instructor Date  Reviewed By:
Operations Representative Date  Approved By:
Training Department Date RO/SRO JPM f
-Rev 00  SRRS: 3D.105 (when utilized for operator initial or continuing training)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure Rev:  Procedure Rev:  Procedure Rev:  ________ 9. Verify cues both verbal and visual are free of conflict.
________ 10. Verify performance time is accurate
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date        SME / Instructor Date        SME / Instructor Date RO/SRO JPM f
-Rev 00  SRRS: 3D.105 (when utilized for operator initial or continuing training)
Revision Record (Summary)
Revision 00, New JPM developed for the 09
-1 ILT NRC Exam.


RO/SRO JPM f
RO/SRO JPM f-Rev 00 SIMULATOR SETUP INSTRUCTIONS
-Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to any IC.
: 1. Reset the simulator to any IC.
: 2. Obtain a switchable jumper with banana type connectors.
: 2. Obtain a switchable jumper with banana type connectors.
: 3. Provide a copy of QCOP 0500
: 3. Provide a copy of QCOP 0500-07 with the prerequisites signed.
-07 with the prerequisit es signed. 4. Fill out an EST per QCOP 0500
: 4. Fill out an EST per QCOP 0500-07, step F.2.
-07, step F.2.
: 5. This completes the setup for this JPM.
: 5. This completes the setup for this JPM.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


RO/SRO JPM f
RO/SRO JPM f-Rev 00 INITIAL CONDITIONS A Reactor shutdown is in progress per QCGP 2-1.
-Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
All control rods have been inserted to position 00.
INITIAL CONDITIONS A Reactor shutdown is in progress per QCGP 2
-1. All control rods have been inserted to position 00.
NO half scrams are present on either RPS channel.
NO half scrams are present on either RPS channel.
NO half scram testing is in progress.
NO half scram testing is in progress.
The Reactor Mode Switch is ready to be placed to the Shutdown position per QCGP 2-1 step F.12.l. This JPM is NOT time critical.
The Reactor Mode Switch is ready to be placed to the Shutdown position per QCGP 2-1 step F.12.l.
INITIATING CUE Bypass the RPS Channel A Reactor Mode Switch to Shutdown scram per QCOP 0500
This JPM is NOT time critical.
-07. Notify the Unit Supervisor when the task is complete.
INITIATING CUE Bypass the RPS Channel A Reactor Mode Switch to Shutdown scram per QCOP 0500-07.
Provide the examinee with a copy of QCOP 0500
Notify the Unit Supervisor when the task is complete.
-07, a completed Equipment Status Tag (EST), and a switchable jumper with banana type connectors. (Note: Verify the switch is in the OFF position.)
Provide the examinee with a copy of QCOP 0500-07, a completed Equipment Status Tag (EST), and a switchable jumper with banana type connectors. (Note: Verify the switch is in the OFF position.)
Information For Evaluator's Use:
Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


RO/SRO JPM f
RO/SRO JPM f-Rev 00 JPM Start Time:
-Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Comment STEP                   ELEMENT                                 STANDARD               SAT   UNSAT Number F.1     Notify US of TMOD installation.           Informs Unit Supervisor of         ___  ___      ___
JPM Start Time
installation of jumper per QCOP 0500-07.
STEP ELEMENT STANDARD SAT UNSAT Comment Number F.1 Notify US of TMOD i nstallation.
CUE:     As Unit Supervisor, acknowledge installation of TMOD.
Informs Unit Supervisor of installation of jumper per QCOP 0500-07. ___ ___ ___ CUE: As Unit Supervisor, acknowledge installation of TMOD
F.2     Place EST on Reactor Mode                  Verifies EST states:                ___  ___      ___
. F.2 Place EST on Reactor Mo de Switch. Verifies EST states
Switch.                                    Reactor Mode Switch to Shutdown Scram is bypassed for A channel per QCOP 0500-07.
: "Reactor Mode Switch to Shutdown Scram is bypassed for "A" channel per QCOP 0500-07.AND Places EST on the Reactor Mode Switch.
AND Places EST on the Reactor Mode Switch.
___ ___ ___ CUE: After the examinee verifies the EST, as Unit Supervisor state: "another NSO will place the EST on the Reactor Mode Switch.
CUE:     After the examinee verifies the EST, as Unit Supervisor state: another NSO will place the EST on the Reactor Mode Switch. (Note: Do NOT allow actual placement of the EST as it may cue other examinees in the simulator.)
(Note: Do NOT allow actual placement of the EST as it may cue other examinees in the simulator
F.3     *Install the switchable jumper.*          Verifies the switch is in the OFF   ___  ___      ___
.) F.3 Install the switchable jumper
position At the 901-15 panel, Terminal Board C:
. Verifies the switch is in the OFF position At the 901
* Places the jumper between terminals C-54 and C-55.
-15 panel, Terminal Board "C": Places the jumper between terminals C
F.3.a *Turn ON switchable jumper.*                  Places the jumper toggle switch     ___  ___      ___
-54 and C-55. ___ ___ ___ F.3.a Turn ON switchable jumper. Places the jumper toggle switch to the ON position.
to the ON position.
___ ___ ___ F.4 Notify Unit Supervisor of jumper placement.
F.4     Notify Unit Supervisor of jumper           Notifies Unit Supervisor jumper placement.                                is placed per QCOP 0500-07.
Notifies Unit Supervisor jumper is placed per QCOP 0500
CUE     As Unit Supervisor, acknowledge jumper placement and inform the examinee that another NSO will perform the remaining steps of the procedure.
-07. CUE As Unit Supervisor, acknowledge jumper placement and inform the examinee that "another NSO will perform the remaining steps of the procedure."
JPM Stop Time:
JPM Stop Time:
SRRS: 3D.105 (when utilized for operator initial or continuing training)


RO/SRO JPM f
RO/SRO JPM f-Rev 00 JPM  
-Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Job
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title:
 
Bypass "A" Channel of the Reactor Mode Switch to Shutdown Scram JPM Number:
==Title:==
RO/SRO JPM f Revision Number:
EO         RO   SRO       FS STA/IA         SRO Cert JPM
00 Task Number and Title:
 
SRN-TMOD-P3, Install/Remove Jumper From Correct Terminals K/A Number and Importance:
==Title:==
Reactor Protection System, 212000 2.1.23, 4.3/4.4 Suggested Testing Environment:
Bypass A Channel of the Reactor Mode Switch to Shutdown Scram JPM Number: RO/SRO JPM f                             Revision Number: 00 Task Number and
Simulator Alternate Path
 
: Yes No SRO Only: Yes No Time Critical:
==Title:==
Yes No Reference(s):
SRN-TMOD-P3, Install/Remove Jumper From Correct Terminals K/A Number and Importance: Reactor Protection System, 212000 2.1.23, 4.3/4.4 Suggested Testing Environment: Simulator Alternate Path:     Yes       No SRO Only:               Yes         No   Time Critical: Yes       No Reference(s): QCOP 0500-07, Rev. 10 Actual Testing Environment:             Simulator             Control Room           In-Plant     Other Testing Method:           Simulate             Perform Estimated Time to Complete: 05 minutes                         Actual Time Used:             minutes EVALUATION  
QCOP 0500-07, Rev. 10 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
05 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                     Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory     Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                             (Print)
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Signature:                                                       Date:
Satisfactory Unsatisfactory Comments:                         Evaluator's Name
SRRS: 3D.105 (when utilized for operator initial or continuing training)
:   (Print) Evaluator's Signature
 
:   Date:
RO/SRO JPM f-Rev 00 INITIAL CONDITIONS A Reactor shutdown is in progress per QCGP 2-1.
RO/SRO JPM f
All control rods have been inserted to position 00.
-Rev 00  SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS A Reactor shutdown is in progress per QCGP 2
-1. All control rods have been inserted to position 00.
NO half scrams are present on either RPS channel.
NO half scrams are present on either RPS channel.
NO half scram testing is in progress.
NO half scram testing is in progress.
The Reactor Mode Switch is ready to be placed to the Shutdown position per QCGP 2
The Reactor Mode Switch is ready to be placed to the Shutdown position per QCGP 2-1 step F.12.l.
-1 step F.12.l. This JPM is NOT time critical.
This JPM is NOT time critical.
INITIATING CUE
INITIATING CUE Bypass the RPS Channel A Reactor Mode Switch to Shutdown scram per QCOP 0500-07.
Notify the Unit Supervisor when the task is complete.
SRRS: 3D.105 (when utilized for operator initial or continuing training)


Bypass the RPS Channel A Reactor Mode Switch to Shutdown scram per QCOP 0500
Exelon Nuclear Job Performance Measure Shutdown Torus Cooling RO/SRO JPM g Revision Number: 12 Date: 04/04/2011___
-07. Notify the Unit Supervisor when the task is complete.
Developed By:
Instructor                            Date Validated By:
SME or Instructor                          Date Reviewed By:
Operations Representative                        Date Approved By:
Training Department                          Date RO-SRO JPM g.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 1 of 8


RO-SRO JPM g.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
RO/SRO JPM g-Rev 12 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Page 1 of 8  Exelon Nuclear Job Performance Measure Shutdown Torus Cooling RO/SRO JPM g Revision Number:
12 Date: 04/04/2011
___  Developed By:
Instructor Date  Validated By:
SME or Instructor Date  Reviewed By:
Operations Representative Date  Approved By:
Training Department Date RO/SRO JPM g-Rev 12 G:\DRSIII\License Examinations
\2011\Quad Cities
\Proposed\JPMs\simulator\RO-SRO JPM g.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 8  JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 through 12 below.
Prior to JPM usage, revalidate JPM using steps 8 through 12 below.
________ 1. Task description and number, JPM description and number are identified.
________       1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________       2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in
________       3. Performance location specified. (in-plant, control room, simulator, or other)
-plant, control room, simulator, or other)
________       4. Initial setup conditions are identified.
________ 4. Initial setup conditions are identified.
________       5. Initiating cue (and terminating cue if required) are properly identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________       6. Task standards identified and verified by SME review.
________ 6. Task standards identified and verified by SME review.
________       7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). ________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
________       8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure Rev:   Procedure Rev:   Procedure Rev:   ________ 9. Verify cues both verbal and visual are free of conflict.
Procedure                             Rev:
________ 10. Verify performance time is accurate ________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
Procedure                             Rev:
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
Procedure                             Rev:
SME / Instructor Date       SME / Instructor Date       SME / Instructor Date RO/SRO JPM g-Rev 12  G:\DRSIII\License Examinations
________       9. Verify cues both verbal and visual are free of conflict.
\2011\Quad Cities
________       10. Verify performance time is accurate
\Proposed\JPMs\simulator\RO-SRO JPM g.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
________       11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
Page 3 of 8 Revision Record (Summary)
________       12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                             Date SME / Instructor                             Date SME / Instructor                             Date G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM g.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 8
 
RO/SRO JPM g-Rev 12 Revision Record (Summary)
Revision 09, This JPM is being revised to reflect procedures changes and new format.
Revision 09, This JPM is being revised to reflect procedures changes and new format.
Revision 10, This JPM is being revised to reflect procedure changes.
Revision 10, This JPM is being revised to reflect procedure changes.
Revision 11, This JPM was revised to reflect procedure changes.
Revision 11, This JPM was revised to reflect procedure changes.
Revision 12, This JPM was revised to reflect procedure changes.
Revision 12, This JPM was revised to reflect procedure changes.
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM g.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 3 of 8


RO/SRO JPM g-Rev 12 G:\DRSIII\License Examinations
RO/SRO JPM g-Rev 12 SIMULATOR SETUP INSTRUCTIONS
\2011\Quad Cities
: 1. Reset the simulator to IC 21 (rst 21).
\Proposed\JPMs\simulator\RO-SRO JPM g.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
NOTE:       It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
Page 4 of 8 SIMULATOR SETUP INSTRUCTIONS
: 2. Run the setup Computer Aided Exercise _____-__ (jcae! _____-__)
: 1. Reset the simulator to IC 21 (rst 21NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 3. Manual Actuation:
). 2. Run the setup Computer Aided Exercise _____
Start one RHRSW pump per loop per QCOP 1000-04.
-__ (jcae! _____
Start-up Torus Cooling on either Loop of RHR with one RHR pump on IAW QCOP 1000-
-__) 3. Manual Actuation
: 09. Fully close the MO 1-1001-16A/B, Heat Exchanger Bypass valve.
Start one RHRSW pump per loop per QCOP 1000
Prepare a copy of QCOP 1000-09 with the Prerequisites and either step F.1 or F.2 signed off. (depending on which loop of Torus Cooling is running).
-04. Start-up Torus Cooling on either Loop of RHR with one RHR pump on IAW QCOP 1000
Malfunctions:
-09. Fully close the MO 1
NONE Remotes:
-1001-16A/B, Heat Exchanger Bypass valve.
NONE Overrides:
Prepare a copy of QCOP 1000
NONE
-09 with the Prerequisites and either step F.1 or F.2 signed off. (depending on which loop of Torus Cooling is running).
: 4. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
Malfunctions
: NONE Remotes: NONE Overrides: NONE 4. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
: 5. This completes the setup for this JPM.
: 5. This completes the setup for this JPM.
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM g.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 4 of 8


RO/SRO JPM g-Rev 12 G:\DRSIII\License Examinations
RO/SRO JPM g-Rev 12 INITIAL CONDITIONS
\2011\Quad Cities
- The Unit is operating at _________% power.
\Proposed\JPMs\simulator\RO-SRO JPM g.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
- The Periodic HPCI surveillance requiring Torus cooling has been completed.
Page 5 of 8 INITIAL CONDITIONS
- The RHR system is in Torus Cooling with one RHR pump running IAW QCOP 1000-09.
- The Unit is operating at _________% power.
- Two RHR Service Water pumps are running (one per loop) IAW QCOP 1000-04.
- The Periodic HPCI surveillance requiring Torus cooling has been completed.
- This JPM is not time critical.
- The RHR system is in Torus Cooling with one RHR pump running IAW QCOP 1000
INITIATING CUE Shutdown Torus Cooling per QCOP 1000-09.
-09. - Two RHR Service Water pumps are running (one per loop) IAW QCOP 1000
Provide examinee with: Copy of QCOP 1000-09.
-04. - This JPM is not time critical.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
INITIATING CUE Shutdown Torus Cooling per QCOP 1000
Information For Evaluators Use:
-09. Provide examinee with: Copy of QCOP 1000
-09. Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Denotes critical elements of a critical step.
* Denotes critical elements of a critical step.
Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the site's appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM g.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 8


RO/SRO JPM g-Rev 12 G:\DRSIII\License Examinations
RO/SRO JPM g-Rev 12 JPM Start Time:
\2011\Quad Cities
Comment STEP                 ELEMENT                           STANDARD                  SAT   UNSAT Number
\Proposed\JPMs\simulator\RO-SRO JPM g.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
*F.5/6.a   Throttle closed MO 1-1001-         Positions and holds the MO 1-        ___  ___      ___
Page 6 of 8  JPM Start Time:
36A/B.                              1001-36A/B CS to CLOSED.
STEP ELEMENT SAT STANDARD UNSAT Comment Number *F.5/6.a -1001-36A/B. Positions and holds the MO 1
*F.5/6.b   Stop running RHR pump and          When RHR pump discharge              ___  ___      ___
-1001-36A/B CS to CLOSED.
fully close MO 1-1001-36A/B.       pressure increases to within 25 psig of RHRSW pressure, positions RHR pump CS to STOP 1A/1B/1C/1D -OFF light lit AND positions MO 1-1001-36A/B CS to CLOSE. -
___ ___ ___ *F.5/6.b fully close MO 1
CLOSED light lit.
-1001-36A/B. When RHR pump discharge pressure increases to within 25 psig of RHRSW pressure, positions RHR pump CS to STOP 1A/1B/1C/1D  
F.5/6.c. Close MO 1-1001-34A/B.               Positions MO 1-1001-34A/B CS         ___  ___      ___
-OFF light lit AND positions MO 1
to CLOSE. - CLOSED light lit.
-1001-36A/B CS to CLOSE.
F.5/6.d. Open MO 1-1001-16A/B.               Positions MO 1-1001-16A/B CS         ___  ___      ___
- CLOSED light lit.
to OPEN. - OPEN light lit.
___ ___ ___ F.5/6.c. Close MO 1
*F.5./   OPEN MO 1-1001-18A/B.             Position MO 1-1001-18A/B CS         ___  ___      ___
-1001-34A/B. Positions MO 1
6.e.                                          to open. - OPEN light lit.
-1001-34A/B CS to CLOSE.
CUE:     Inform the candidate that you will have another operator secure RHRSW and verify RHR Loop A/B is in standby lineup per QCOP 1000-02.
- CLOSED light lit.
EVALUATOR: The candidate should inform you that the task is complete.
___ ___ ___ F.5/6.d. Open MO 1-1001-16A/B. Positions MO 1
-1001-16A/B CS to OPEN.
- OPEN light lit.
___ ___ ___ *F.5./ 6.e. -1001-18A/B. Position MO 1
-1001-18A/B CS to open.
- OPEN light lit.
___ ___ ___ CUE: Inform the candidate that you will have another operator secure RHRSW and verify RHR Loop A/B is in standby lineup per QCOP 1000
-02. EVALUATOR: The candidate should inform you that the task is complete.
JPM Stop Time:
JPM Stop Time:
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM g.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 6 of 8


RO/SRO JPM g-Rev 12 G:\DRSIII\License Examinations
RO/SRO JPM g-Rev 12 JPM  
\2011\Quad Cities
\Proposed\JPMs\simulator\RO-SRO JPM g.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 7 of 8 JPM  


==SUMMARY==
==SUMMARY==


Operator's Name
Operators Name:                                                 Job
:   Job Title: EO RO SRO FS   STA/IA SRO Cert JPM Title: Shutdown Torus Cooling JPM Number:
 
RO/SRO JPM g Revision Number:
==Title:==
Task Number and Title:
EO         RO     SRO       FS STA/IA           SRO Cert JPM
12 SR-1000-P39 (Freq: LIC=I) Given a reactor plant with RHR torus cooling in operation, stop the RHRSW system and RHR system in accordance with QCOP 1000-04 and QCOP 1000-09 or QCOP 1000
 
-30. K/A Number and Importance:
==Title:==
K/A: 219000 A4.01 Rating: 3.8/3.7 Suggested Testing Environment:
Shutdown Torus Cooling JPM Number:           RO/SRO JPM g                                       Revision Number: 12 Task Number and
Simulator Alternate Path:
 
Yes No SRO Only: Yes No Time Critical
==Title:==
: Yes No Reference(s):
SR-1000-P39 (Freq: LIC=I) Given a reactor plant with RHR torus cooling in operation, stop the RHRSW system and RHR system in accordance with QCOP 1000-04 and QCOP 1000-09 or QCOP 1000-30.
QCOP 1000-09, Rev. 22, TORUS COOLING STARTUP AND OPERATION Actual Testing Environment:
K/A Number and Importance:                 K/A:     219000 A4.01       Rating:         3.8/3.7 Suggested Testing Environment: Simulator Alternate Path:       Yes         No     SRO Only:       Yes     No     Time Critical:     Yes     No Reference(s): QCOP 1000-09, Rev. 22, TORUS COOLING STARTUP AND OPERATION Actual Testing Environment:                   Simulator         Control Room         In-Plant     Other Testing Method:               Simulate             Perform Estimated Time to Complete: 10 minutes                          Actual Time Used:            minutes EVALUATION
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete:
10EVALUATION


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?                     Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory       Unsatisfactory Comments:
minutes Actual Time Used:
Evaluators Name:                                                             (Print)
minutes Were all the Critical Elements performed satisfactorily?
Evaluators Signature:                                                       Date:
Yes No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:
G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM g.docSRRS: 3D.105 (when utilized for operator initial or continuing training)
Satisfactory Unsatisfactory Comments:                   Evaluator's Name
Page 7 of 8
:   (Print) Evaluator's Signature:   Date:
 
SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS
INITIAL CONDITIONS
- The Unit is operating at _________% power.
- The Unit is operating at _________% power.
- The Periodic HPCI surveillance requiring Torus cooling has been completed.
- The Periodic HPCI surveillance requiring Torus cooling has been completed.
- The RHR system is in Torus Cooling with one RHR pump running IAW QCOP 1000
- The RHR system is in Torus Cooling with one RHR pump running IAW QCOP 1000-09.
-09. - Two RHR Service Water pumps are running (one per loop) IAW QCOP 1000
- Two RHR Service Water pumps are running (one per loop) IAW QCOP 1000-04.
-04. - This JPM is not time critical.
- This JPM is not time critical.
INITIATING CUE Shutdown Torus Cooling per QCOP 1000
INITIATING CUE Shutdown Torus Cooling per QCOP 1000-09.
-09.}}
SRRS: 3D.105 (when utilized for operator initial or continuing training)}}

Latest revision as of 12:58, 6 February 2020

2011 Quad Cities Nuclear Power Station Initial License Examination Proposed Job Performance Measures Test
ML12271A161
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 10/05/2012
From: Moore C
Operations Branch III
To:
Exelon Generation Co
Shared Package
ML11167A121 List:
References
Download: ML12271A161 (187)


Text

Exelon Nuclear Job Performance Measure Perform One-Rod-Out Interlock Surveillance JPM Number: RO Admin 1 Revision Number: 0 Date: 04/04/2011 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO Admin 1 - Rev 0 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 10

RO Admin 1 - Rev 0 Revision Record (Summary)

Revision 00, This JPM was developed new for the 2011 ILT NRC Exam.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 10

RO Admin 1 - Rev 0 SIMULATOR SETUP INSTRUCTIONS

1. Reset the Simulator to IC 8.

(Any Shutdown IC in which the Mode Switch can be placed in REFUEL)

NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Go to RUN.
3. Lock the Mode Switch in REFUEL.
4. Verify the RWM is NOT bypassed.
5. Turn Rod Select Power OFF and ON. (Verifies no rod selected at start of JPM)
6. Verify the REFUEL PERMIT light is ON.
7. Verify ROD OUT BLOCK annunciator (901-5, C-3) is ON.
8. Acknowledge annunciators as necessary.
9. Provide a current revision of the following procedures, signed off as follows:
  • QCOS 0300-17 o With applicable Mode-5 Prerequisites signed off.

o With Steps H.4.b and H.11.b marked N/A.

  • QCOP 0207-02 with Prerequisites signed off.
10. Provide Equipment Status Tag filled out as follows:
11. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
12. This completes the setup for this JPM.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 10

RO Admin 1 - Rev 0 INITIAL CONDITIONS Preparations are being made to begin refueling operations.

The Mode Switch is locked in REFUEL.

All Prerequisites have been completed for QCOS 0300-17, One-Rod-Out Interlock Surveillance.

The Unit Supervisor has reviewed steps of QCOS 0300-17 and identified the Not-Applicable (N/A) steps.

All QCOP 0207-02 All Prerequisites have been completed for bypassing the Rod Worth Minimizer (RWM).

The necessary Equipment Status Tag has been prepared.

INITIATING CUE Perform the One-Rod-Out Interlock Surveillance, QCOS 0300-17.

EVALULATOR: Provide the prepared support material:

  • QCOS 0300-17
  • QCOP 0207-02
  • Equipment Status Tag Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 10

RO Admin 1 - Rev 0 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number H.1 QCOP 0207-02 referenced for Bypass the RWM per QCOP ___ ___ ___

bypassing RWM 0207-02.

QCOP 0207-02 Initials step f. (Performing a Initial the reason that the RWM ___ ___ ___

Procedure or Test which is being bypassed.

F.1 specifically references bypassing the RWM)

QCOP 0207-02 Fills in Procedure/Test # as: Fill in Procedure/Test number. ___ ___ ___

QCOS 0300-17 F.1.f (1)

QCOP 0207-02 Fills in Step # as: Fill in Step number. ___ ___ ___

Step H.1 F.1.f (2)

QCOP 0207-02 Attaches the prepared Prepare an Equipment Status ___ ___ ___

Equipment Status Tag to the Tag to Read Rod Worth F.2.a ROD MOVEMENT CONT Minimizer in Bypass and attach SWITCH it to the ROD MOVEMENT CONT SWITCH.

QCOP 0207-02

  • RWM MODE SELECT switch Place the RWM MODE ___ ___ ___

selected to BYPASS

  • SELECT switch to BYPASS and
  • F.2.b and the date and time is record the Date and Time.

recorded EVALUATOR NOTE: The ROD OUT BLOCK annunciator will clear when a rod is selected.

which should be a peripheral rod H.3 Rod Out Permit light is Verify Rod Out Permit light is ___ ___ ___

verified ON on.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 10

RO Admin 1 - Rev 0 Comment STEP ELEMENT STANDARD SAT UNSAT Number

  • H.4.a *Selected Control Rod Withdraw the selected Control ___ ___ ___

withdrawn* one (1) notch Rod one (1) notch.

  • H.5 *ROD SELECT POWER Turn ROD SELECT POWER ___ ___ ___

switch placed in OFF* switch to OFF.

  • H.6 *ROD SELECT POWER Turn ROD SELECT POWER ___ ___ ___

switch placed in ON* switch to ON.

EVALUATOR NOTE: The ROD OUT BLOCK annunciator will alarm when the rod is selected.

selected*, which should be a on the opposite side of the core.

peripheral Rod on the opposite side of the core H.8 Control Rod Withdrawal Block Verify the Control Rod ___ ___ ___

verified in effect (Annunciator withdrawal block cannot be 901-5 A-3 ROD OUT BLOCK cleared.

in alarm)

H.9 ROD SELECT POWER switch Turn ROD SELECT POWER ___ ___ ___

placed in OFF switch to OFF.

H.10 ROD SELECT POWER switch Turn ROD SELECT POWER ___ ___ ___

placed in ON switch to ON.

H.11.a Withdrawn Rod fully inserted Insert the withdrawn Control ___ ___ ___

Rod to Position 00.

H.12 QCOP 0207-02 referenced for Return the RWM to normal ___ ___ ___

returning RWM to service operation per QCOP 0207-02.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 7 of 10

RO Admin 1 - Rev 0 Comment STEP ELEMENT STANDARD SAT UNSAT Number QCOP 0207-02 RWM MODE SELECT switch Place the RWM MODE ___ ___ ___

F.4.a selected to NORMAL SELECT switch to NORMAL and the date and time is and record the Date and Time.

recorded QCOP 0207-02 Equipment Status Tag If RWM is determined to be ___ ___

F.4.b removed from the ROD operable, THEN remove the MOVEMENT CONT SWITCH. Equipment Status Tag.

H.13.a NO checked and NONE If this surveillance was ___ ___ ___

supplied for COMMENTS. satisfactory THEN:

Identify if test was Satisfactory with discrepancies with corrective actions performed as noted.

H.13.b Surveillance performed by line If this surveillance was ___ ___ ___

signed and dated satisfactory THEN:

Sign and date the Surveillance performed by line.

H.13.c Completed Surveillance Sign and date the Surveillance ___ ___ ___

presented to the Unit approved by line.

Supervisor for approval EVALUATOR ROLE PLAY: As Unit Supervisor when presented with the completed QSOS 0300-17 to approve. You will review the surveillance.

EVALUATOR NOTE: The candidate should inform you that the task is complete.

JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 8 of 10

RO Admin 1 - Rev 0 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Perform One-Rod-Out Interlock Surveillance JPM Number: RO Admin 1 Revision Number: 0 Task Number and

Title:

SR-0280-K20, Given a Reactor Manual Control System (RMCS)/ Rod Position Information System (RPIS) operating mode and various plant conditions, EVALUATE the following Reactor Manual Control System (RMCS)/Rod Position Information System (RPIS) indications/responses and DETERMINE if the indication/ response is expected and normal:

c. Movement control Indicating lights, (1) Rod Out Permissive
e. Refuel Permissive K/A Number and Importance: KA: 2.1.44 Rating: 3.9/3.8 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): QCOS 0300-17, Rev. 10, One-Rod-Out Interlock Surveillance QCOP 0207-02, Rev. 11, Rod Worth Minimizer Bypass Control Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 9 of 10

RO Admin 1 - Rev 0 INITIAL CONDITIONS Preparations are being made to begin refueling operations.

The Mode Switch is locked in REFUEL.

All Prerequisites have been completed for QCOS 0300-17, One-Rod-Out Interlock Surveillance.

The Unit Supervisor has reviewed steps of QCOS 0300-17 and identified the Not-Applicable (N/A) steps.

All QCOP 0207-02 All Prerequisites have been completed for bypassing the Rod Worth Minimizer (RWM).

The necessary Equipment Status Tag has been prepared.

INITIATING CUE Perform the One-Rod-Out Interlock Surveillance, QCOS 0300-17.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 10 of 10

Exelon Nuclear Job Performance Measure Evaluate License Maintenance Requirements JPM Number: RO Admin 2 Revision Number: 01 Date: 04/04/2011 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date RO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 9

Rev. 01 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 through 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure OP-AA-105-102 Rev: 09 Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\RO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 9

Rev. 01 Revision Record (Summary)

Revision 00, This JPM was developed from Bank JPM RO A.1.b for ILT Certification Exam 03-1 IAW NUREG 1021, Rev. 9.

Revision 01, This JPM was revised to incorporate procedure changes to OP-AA-105-102, Rev. 9, and to update format and dates.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\RO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 9

Rev. 01 INITIAL CONDITIONS Today is March 24th, 2011.

You have been assigned to the cover the Unit-2 NSO position for April 4th, 2011.

The Operations department is working a hybrid 8-hour/12-hour schedule.

Your primary assignment has been as a clearance order writer since the beginning of the 1st quarter 2011, however, during the past quarter you have covered the following shifts:

  • One complete 12-hour day shift as the Unit 2 Assist NSO on January 9th.
  • Five 8-hour afternoon shifts as Unit 1 NSO on February 15th through the 19th.
  • Split two 12-hour midnight shifts, working six hours as the Unit 2 NSO and the other six hours as a clearance writer during a weekend outage on February 26th and 27th.
  • Split 8-hour day shifts working four hours as the Unit 1 Assist NSO and the other four hours as a clearance writer on March 7th, 8th, 9th, 10th, 11th, 14th, and 15th.
  • All shifts were logged by the Shift Manager.

The remainder of the time, you have worked 8-hour shifts on days as clearance writer Monday through Friday.

INITIATING CUE You are to review shift coverage for the 1st quarter, youre standing as an active licensed RO, and determine eligibility to assume shift for April 4th, 2011. Give an explanation for your determination.

Provide examinee with: a copy of OP-AA-105-102, NRC Active License Maintenance.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\RO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 9

Rev. 01 Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\RO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 9

Rev. 01 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number EVALUATOR NOTE: Provide the candidate with a completed copy of Attachment 1 Active License Tracking Log from OP-AA-105-102.

EVALUATOR NOTE: ONLY full shifts, either 8 or 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> with turnovers count towards shift coverage time allowed.

  • OP-AA-105-102 *Reviews requirements to Recognizes fact that the ___ ___ ___

maintain active license.* minimum number of required hours of shift watch to maintain an active license have NOT been completed.

  • OP-AA-105-102 *Reviews requirements to Determines he/she is NOT ___ ___ ___

maintain active license.* eligible to stand shift on April 4th, 2011 due to not having the minimum number of required shifts.

CUE: When the candidate has determined that they are presently ineligible to assume the shift, ask them what additional requirements are needed to be able to stand the shift on April 4th, 2011.

  • OP-AA-105-102 *Reviews requirements to Determines that a minimum ___ ___ ___

maintain active license.* of one more complete eight or twelve-hour shift in March is needed to fulfill the requirements to maintain their license active.

EVALUATOR NOTE: When the candidate determines that they cannot assume the shift for April 4th, 2011, and has determined the correct amount of time needed to maintain their license active, inform them that the JPM is complete.

JPM Stop Time:

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\RO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 9

Rev. 01 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Evaluate License Maintenance Requirements JPM Number: RO Admin 2 Revision Number: 01 Task Number and

Title:

NUREG 1021 Licensing Requirements K/A Number and Importance: K/A: 2.1.4 Rating: 3.3/3.8 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): OP-AA-105-102, Rev. 9 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 5 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\RO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 7 of 9

INITIAL CONDITIONS Today is March 24th, 2011.

You have been assigned to the cover the Unit-2 NSO position for April 4th, 2011.

The Operations department is working a hybrid 8-hour/12-hour schedule.

Your primary assignment has been as a clearance order writer since the beginning of the 1st quarter 2011, however, during the past quarter you have covered the following shifts:

  • One complete 12-hour day shift as the Unit 2 Assist NSO on January 9th.
  • Five 8-hour afternoon shifts as Unit 1 NSO on February 15th through the 19th.
  • Split two 12-hour midnight shifts, working six hours as the Unit 2 NSO and the other six hours as a clearance writer during a weekend outage on February 26th and 27th.
  • Split 8-hour day shifts working four hours as the Unit 1 Assist NSO and the other four hours as a clearance writer on March 7th, 8th, 9th, 10th, 11th, 14th, and 15th.
  • All shifts were logged by the Shift Manager.

The remainder of the time, you have worked 8-hour shifts on days as clearance writer Monday through Friday.

INITIATING CUE You are to review shift coverage for the 1st quarter, youre standing as an active licensed RO, and determine eligibility to assume shift for April 4th, 2011. Give an explanation for your determination.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Review Quarterly SBLC Pump Flow Rate Test RO Admin 3 Revision Number: 00 Date: 04/04/ 2011 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO Admin 3-Rev 00 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO Admin 3-Rev 00 Revision Record (Summary)

Revision 00, New JPM developed for ILT 09-1 NRC Exam.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO Admin 3-Rev 00 SIMULATOR SETUP INSTRUCTIONS

1. NOTE: This JPM may be conducted in any appropriate setting; i.e., simulator, classroom, or Control Room.
2. Prepare a copy of QCOS 1100-07, SBLC Pump Flow Rate Test as follows:

Sign off Prerequisites for a IST Group B Test / Partial for A Pump Initial complete all steps associated with SBLC Pump A IST Group B Test.

N/A all steps associated with SBLC Pump B N/A all steps associated with IST Comprehensive and IST-Pre Service Pump Test.

Step H.6.f. for SBLC Pump A, write in 52 psig and 1300 psig. Sign off the TS PASS and IST PASS blocks.

Step H.6.i.(3)., write in 49 gpm.

Step H.6.i.(4). Sign initial criteria met and enter 50 (H.6.f.) - 49 (H.6.i.(3) for 1 gpm on next line.

3. Provide a copy of IST Pump Test Acceptance Criteria Sheet for the SBLC Pump A.
4. This completes the setup for this JPM.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO Admin 3-Rev 00 INITIAL CONDITIONS QCOS 1100-07, SBLC Pump Flow Rate Test, has been completed for the A pump.

The surveillance is completed up to step H.12.

The Admin NSO has requested you to perform step H.12 by verifying all applicable acceptance criteria and calculations are correct.

This JPM is NOT time critical.

INITIATING CUE Complete Step H.12 a.(1) and a.(2) of QCOS 1100-07, SBLC Pump Flow Rate Test.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO Admin 3-Rev 00 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number Evaluator Step H.12 will require the examinee to review all applicable acceptance Note: criteria and calculations. Acceptance criteria G.3, G.5, and G.7 do NOT apply since the Group B test was performed for SBLC Pump A only. The steps listed below are those which correspond to the acceptance criteria.

G.1 Verify SBLC Pump flow Refers to Step H.6.e. and ___ ___ ___

rate > 42 gpm at discharge verifies that SBLC Pump A pressure > 1275 psig. flow of 52 gpm at a discharge pressure of 1300 psig passes TS criteria.

G.2 *Verify SBLC Pump flow Refers to IST Pump Acceptance ___ ___ ___

rate within IST Acceptable Criteria Sheet and determines Range.* that SBLC Pump flow of 52 gpm is in the Required Action Range

(> 49 gpm). Step H.6.e(IST PASS) is incorrectly signed off.

G.4 Verify stroke open Refers to step H.6.h and ___ ___ ___

operability of 1-1101-43A, determines SBLC Pump flow is SBLC PMP DISCH CK > 42 gpm satisfying operability VLV. requirement.

G.6 *Verify stroke closed Refers to step H.6.i.(4), and ___ ___ ___

operability of 1-1101-43A, identifies SBLC Pump flow of 50 SBLC PMP DISCH CK gpm instead of 52 gpm has VLV.* been entered from step H.6.f.

IST flow reduction criteria (< 2 gpm) is NOT met. (Actual flow reduction is 3 gpm).

G.8 Verify 1A SBLC Refers to step H.1.b and notes ___ ___ ___

Accumulator 1-1101-7A recorded charge of 850 psig charge is > 750 psig. meets acceptance criteria of 750 psig.

Evaluator The examinee should inform you that step H.12 is NOT met due to SBLC Note: pump flow being in the Required Action Range AND the stroke closed criteria for the 1-1101-43A check valve is also NOT met with a reduction flow of 3 gpm.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO Admin 3-Rev 00 Comment STEP ELEMENT STANDARD SAT UNSAT Number CUE: As Unit Supervisor acknowledge report and state that you will determine the compensatory actions.

Evaluator The examinee should inform you that the task is complete.

Note:

JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO Admin 3-Rev 00 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Review Quarterly SBLC Pump Flow Rate Test JPM Number: RO Admin 3 Revision Number: 00 Task Number and

Title:

1100.051, Determine if SBLC meets IST requirements.

K/A Number and Importance: KA: 2.2.12 Rating: 3.7/4.1 Suggested Testing Environment: Simulator or Classroom Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): QCOS 1100-07, SBLC Pump Flow Rate Test, Rev. 33 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO Admin 3-Rev 00 INITIAL CONDITIONS QCOS 1100-07, SBLC Pump Flow Rate Test, has been completed for the A pump.

The surveillance is completed up to step H.12.

The Admin NSO has requested you to perform step H.12 by verifying all applicable acceptance criteria and calculations are correct.

This JPM is NOT time critical.

INITIATING CUE Complete Step H.12 a.(1) and a.(2) of QCOS 1100-07, SBLC Pump Flow Rate Test.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Disable NUMAC ARM Channel JPM Number: RO Admin 4 Revision Number: 00 Date: 04/04/2011 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO Admin 4-Rev 00 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO Admin 4-Rev 00 Revision Record (Summary)

Revision 00, This JPM was developed for the ILT 09-1 NRC Exam.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO Admin 4-Rev 00 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC-21.

NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Obtain a NUMAC ARM key from the simulator booth.
3. Fail ARM #9 using the command: imf rm0109 100
4. Prepare a copy of QCOP 1800-03 with the pre-requisites filled as follows:

C.2.a.(1) Write None for functional testing required following TMOD installation.

C.2.a.(2) Write None for functional testing required following TMOD removal C.2.a.(3) Enter 10 days for Duration.

C.2.a.(4) Sign off as Unit Supervisor and write in current for date.

5. This completes the setup for this JPM.
6. SIM OP NOTE: The NUMAC must be restored after each simulator reset. Perform QCOP 1800-03, step F.3 to take ARM#9 out of bypass and restore it to the NUMAC display screen.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO Admin 4-Rev 00 INITIAL CONDITIONS You are the Unit 1 Admin RO.

Unit 1 is in day 15 of a 35 day refuel outage.

A chemical decontamination of the RWCU system piping is in progress resulting in elevated radiation levels in the Reactor Building.

Radiation Protection has established access control into the Reactor Building.

Annunciator 901-3 A-1, RX BLDG HI RADIATION is in constant alarm due to ARM#9 failing upscale.

Per OP-AA-103-102, Watch-Standing Practices, the Unit Supervisor, has determined this to be a nuisance alarm and directed you to bypass it.

This JPM is NOT time critical.

INITIATING CUE Bypass ARM #9 per QCOP 1800-03, Operation of Area Radiation Monitor 1(2)-1806-1 (NUMAC Monitor) and reset annunciator 901-3 A-1, RX BLDG HI RADIATION.

Provide the examinee with a marked up copy of QCOP 1800-03.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO Admin 4-Rev 00 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number F.2.a Notify Unit Supervisor that Notifies Unit Supervisor that ___ ___ ___

TMOD is about to be Unit 1 ARM Channel 9 is about installed. to be bypassed per QCOP 1800-03.

F.2.b Obtains key for 1-1806-1 Obtains barrel key for the 1-NUMAC ARM 1806-1 NUMAC ARM from the Work Execution Center.

CUE: As Unit Supervisor, provide the key to the examinee and state: the WEC SRO has brought the key over.

F.2.c *Place the NUMAC ARM At the 901-11 panel, inserts key ___ ___ ___

into INOP mode.* and places the keylock mode switch to the INOP position.

CUE: Report to the examinee that, annunciator 901-3 F-1 is in alarm and the Unit NSO has acknowledged it. (Note: the alarm will be acknowledged by the Simulator Operator.)

F.2.c.(1) Verify the following: At the 901-3 panel, ___ ___ ___

acknowledges annunciator 901-Thru 1) Annunciator 901-3 3 F-1, AREA MONITOR F-1, in alarm.

F.2.c.(3) DOWNSCALE.

2) Bar Graph screen is displayed. At the 901-11 panel, verifies the following on the NUMAC ARM:
3) INOP-CAL menu is
1) Bar Graph screen is displayed.

displayed.

2) INOP-CAL is displayed at top right corner.

F.2.d. *Navigate to the (ENTER Depresses ETC softkey until ___ ___ ___

INOP-SET/CHECK desired menu appears on DISPLAY/CHECK KEYS/ bottom of screen.

ETC) menu.*

Evaluator The next step requires entry of the password, (9688). If this is not entered Note: in 10 seconds, then the NUMAC ARM will return to the Bar Graph display.

Step F.2.e and F.2.f, can be performed again if necessary.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO Admin 4-Rev 00 Comment STEP ELEMENT STANDARD SAT UNSAT Number F.2.e *Select the INOP-SET Depresses ENTER INOP-SET mode.* softkey.

F.2.f *Enter password.* Using DATA keypad softkeys ___ ___ ___

enters (9688) and then depresses ENT.

F.2.g *Navigate to CHANNEL 09 Using CURSOR softkeys, ___ ___ ___

METER DATA.* positions inverse video display box to CHANNEL 09 METER DATA.

F.2.h *Enter SET PARAMETER Depresses SET PARAMETER ___ ___ ___

function for CHANNEL 09 softkey and verifies (SET METER DATA.* METER PARAMETERS FOR ARM CHANNEL 09 screen is displayed.

F.2.i *Navigate to the USE? Positions inverse video display ___ ___ ___

column.* to the USE? column by depressing the right CURSOR softkey.

F.2.j *Change DESIRED row Depresses UPWARD CURSOR ___ ___ ___

option to NO.* softkey and verifies a change in DESIRED row from YES to NO.

F.2.k *Accept changes to Depress ACCEPT softkey and ___ ___ ___

CHANNEL 09 METER verify both PRESENT and DATA* DESIRED columns indicate NO.

F.2.l *Exit SET METER Depresses EXIT softkey and ___ ___ ___

PARAMETERS FOR ARM verifies:

CHANNEL 09 screen.* (HELP/SET PARAMETER/

EXIT INOP-SET) menu appears on bottom of screen.

F.2.m Navigate to CHANNEL Positions inverse video box to ___ ___ ___

DESIGNATIONS option. CHANNEL DESIGNATIONS using CURSOR softkeys.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO Admin 4-Rev 00 Comment STEP ELEMENT STANDARD SAT UNSAT Number F.2.n Select SET PARAMETERS Depresses SET PARAMETER ___ ___ ___

function. softkey and verifies SET CHANNEL DESIGNATIONS screen is displayed.

F.2.o Navigate to ARM Positions inverse video box to ___ ___ ___

CHANNEL 09. ARM CHANNEL 09 using right CURSOR softkey.

F.2.p Change ARM CHANNEL Changes ARM CHANNEL 09 ___ ___ ___

09 digits to 00. digits to 00 using left, right, and DOWNWARD CURSOR softkeys.

F.2.q Accept changes to ARM Depresses ACCEPT softkey ___ ___ ___

CHANNEL 09 display. and verifies both PRESENT and DESIRED columns indicate 00.

F.2.r Exit SET CHANNEL Depresses EXIT softkey and ___ ___ ___

DESIGNATIONS screen. verifies:

(HELP/SET PARAMETER/EXIT INOP-SET) menu appears on bottom of screen.

F.2.s Exit INOP-SET mode. 1) Depresses EXIT INOP- ___ ___ ___

SET softkey and verifies:

(EXIT INOP-SET MODE:

F.2.t (1), ARE YOU SURE?)

(2) message is displayed.

2) Depresses YES softkey
3) Verifies Bar Graph is displayed and ARM Channel 09 is removed.

CUE: As Unit Supervisor, inform the examinee that, another RO will perform steps F.2.v, F.2.w., and F.2.x.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO Admin 4-Rev 00 Comment STEP ELEMENT STANDARD SAT UNSAT Number F.2.y.(1) *Restore NUMAC ARM to At panel 901-11, places the ___ ___ ___

operational status by NUMAC ARM keylock mode placing mode switch to switch to OPERATE.

OPERATE.* Verifies the following:

1) OPERATE is displayed at the top right corner of screen.
2) Bar Graph is displayed.

F.y.(2) *Select OUTPUT STATUS Depresses OUTPUT STATUS ___ ___ ___

screen.* softkey to view all upscale and downscale trips.

F.2.y.(3) *Reset ARM 09 trip Depresses RESET softkey and ___ ___ ___

condition.* verifies trip condition clears.

CUE: Inform the examinee that, annunciator 901-3 A-1, RX BLDG HI RADIATION has been reset by the Unit NSO. Step F.2.y.(4) is complete.

F.2.y.(5) Exit OUTPUT STATUS Depresses EXIT softkey and ___ ___ ___

screen. verifies return to Bar Graph display.

F.2.y.(6) Remove key from NUMAC Removes barrel key from ___ ___ ___

ARM. NUMAC ARM and returns key to the WEC.

CUE: As Unit Supervisor state that you will have the key returned to the Work Execution Center (WEC).

Evaluator From Prerequisite step C.2.a.(1), NO functional testing I required, therefore Note: step F.2.z. is N/A.

Evaluator The examinee should inform you that the task is complete.

Note:

JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO Admin 4-Rev 00 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Disable NUMAC ARM Channel JPM Number: RO Admin 4 Revision Number: 00 Task Number and

Title:

SR-1800-P05 (Freq: LIC=I) Given a reactor plant, disable and re-enable a NUMAC ARM channel to service in accordance with QCOP 1800-03.

K/A Number and Importance: KA: 2.3.5 Rating: 2.9/2.9 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): OP-AA-103-102, Watch-Standing Practices, Rev. 8 QCOP 1800-03, Operation of Area Radiation Monitor 1(2)-1806-1 (NUMAC Monitor), Rev. 9 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO Admin 4-Rev 00 INITIAL CONDITIONS You are the Unit 1 Admin RO.

Unit 1 is in day 15 of a 35 day refuel outage.

A chemical decontamination of the RWCU system piping is in progress resulting in elevated radiation levels in the Reactor Building.

Radiation Protection has established access control into the Reactor Building.

Annunciator 901-3 A-1, RX BLDG HI RADIATION is in constant alarm due to ARM#9 failing upscale.

Per OP-AA-103-102, Watch-Standing Practices, the Unit Supervisor, has determined this to be a nuisance alarm and directed you to bypass it.

This JPM is NOT time critical.

INITIATING CUE Bypass ARM #9 per QCOP 1800-03, Operation of Area Radiation Monitor 1(2)-1806-1 (NUMAC Monitor) and reset annunciator 901-3 A-1, RX BLDG HI RADIATION.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Review a Fire Impairment Permit Requiring Compensatory Actions JPM Number: SRO Admin 1 Revision Number: 01 Date: 04/04/2011 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date SRO Admin 1.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 10

SRO Admin 1- Rev 01 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 through 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 1.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 10

SRO Admin 1- Rev 01 Revision Record (Summary)

Revision 00, This is a LORT Bank JPM (AD-SRO-6) that was used on the 2011 ILT NRC License Exam. Updated Fire Permit information.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 1.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 10

SRO Admin 1- Rev 01 SIMULATOR SETUP INSTRUCTIONS

1. NOTE: This JPM may be conducted in any appropriate setting; i.e., simulator, classroom, Control Room, provided that the following procedures are available to the candidate:
  • OP-MW-201-007, FIRE PROTECTION SYSTEM IMPAIRMENT CONTROL
  • QCAP 1500-01, ADMINISTRATIVE REQUIREMENTS FOR FIRE PROTECTION
2. Verify the following for this JPM setup:
  • A current revision of OP-MW-201-007 Attachment 1 Fire Protection Impairment Permit is filled out as follows:
1) One detector, (1-4141-109), that makes a detection system inoperable (ref. QCAP 1500-01 Attachment A) and the detection system in turn makes the suppression system inoperable (ref. QCAP 1500-01 Attachment C).
2) Fill out Section I Initiator: of the Fire Protection Permit as follows:

Initiator: IMD Supervisor Station: Quad Unit: 01 Name: K. Arney Phone: X 2667 Dept/Co: IMD/Exelon Sch. Start Date: current Bldg: TB EPN#: 1-4141-109 Sch. End Date: current + 1 Elev: 611 Door #: N/A AR/WR/OOS#: 108111-01 Det. Zone: N/A Pent #: N/A Do NOT check the Structural fireproofing OR Wall Penetration boxes.

Impairment

Description:

Disconnect and test Turbine Oil Reservoir smoke detector 1-4141-109 per surveillance per surveillance procedure and reconnect.

3) Fill out section II. FIRE MARSHAL REVIEW of the Fire Protection Impairment Permit as follows:
a. Fire Zone(s): 8.2.7.c / For Barriers: Check the Functional box.
b. Technical Requirement Manual? Check the Yes box.
c. Mark None in the Fire Watch Required: block and N/A below.
d. Check the NO box for Additional Compensatory Measures.
e. Fire Detector Operability Check Required? Check the Yes box.
f. NEIL Notification Required? Check the NO box.
g. Fire Marshal Instructions: Return to operable status in 14 days
h. Restoration/Testing Requirements: Completion of Work Package.
i. Sign and date as Fire Marshal for Authorization Block.
3. This completes the setup for this JPM.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 1.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 10

SRO Admin 1- Rev 01 INITIAL CONDITIONS

- You are the Work Execution Center Senior Reactor Operator.

- An Instrument Maintenance Supervisor has requested a permit to allow testing of smoke detectors in the Turbine Oil Reservoir area. The work will continue into the next shift.

INITIATING CUE Review Fire Protection Impairment Permit 11-21. Approve the permit OR explain the reason(s) why you cannot.

EVALUATOR: Provide candidate with a copy of fire permit 11-21, OP-MW-201-007, .

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 1.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 10

SRO Admin 1- Rev 01 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number Obtains Procedures. Obtains a copy of OP-MW-201- ___ ___ ___

007, QCAP 1500-01, QCOA 4100-11 as necessary.

EVALUATOR: When the candidate locates the procedures listed above, provide the candidate with a copy of each procedure.

EVALUATOR: The candidate may perform the following steps in any order.

Reviews Fire Permit. Reviews Fire Permit to ___ ___ ___

determine what is being impaired. Determines that one detector will be disconnected.

CUE:

Att. A Determines effect of Reviews QCAP 1500-01 Att. A ___ ___ ___

page 3 disconnecting detectors. page 3 and determines that one detector, if removed, will make the detection system inoperable (all 6 are required).

EVALUATOR: If the candidate states he cannot approve the permit because of errors, prompt him to explain all of the errors on the permit for you.

The following errors are built into the permit:

The Fire Protection Permit was filled out improperly in section II. FIRE MARSHAL REVIEW as follows:

  • None is marked in the Fire Watch Required: block (should be marked hourly with performed by marked as IMD).
  • NO is checked in the box for Additional Compensatory Measures (should be marked YES and a Description of the additional Compensatory Measures should be included i.e., backup suppression established or verified.)

The one detector that was chosen to make a detection system inoperable (ref. QCAP 1500-01 Attachment A page 3), and the detection system in turn makes the preaction suppression system inoperable (ref. QCAP 1500-01 Attachment C page 2).

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 1.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 10

SRO Admin 1- Rev 01 Comment STEP ELEMENT STANDARD SAT UNSAT Number Att. C Determines consequence of Reviews QCAP 1500-01 Att. C ___ ___ ___

page 2 making the detection system page 2 (or determines info from inoperable. QCAP 1500-01 Att. A page 3) and determines that making the detection system inoperable makes the suppression system inoperable.

  • D.1.c.(2) *Determines hourly fire Reviews QCAP 1500-01 step ___ ___ ___

watch required.

  • D.1.c.(2) and D.2.c.(2) and
  • D.2.c.(2) determines an hourly fire watch must be conducted if this permit is approved.
  • D.2.c.(4) *Determines backup Reviews step D.2.c.(4) and ___ ___ ___

suppression required.

  • determines backup suppression will also be required.

Attach. 1 Determines that the Fire Recognizes the N/A is not ___ ___ ___

Watch Performed By field correct for this field.

must be filled in IMD or other appropriate department.

NOTE: The candidate may choose to correct the provided impairment. This is acceptable.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 1.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 7 of 10

SRO Admin 1- Rev 01 Comment STEP ELEMENT STANDARD SAT UNSAT Number Reviews the permit for The candidate reviews the ___ ___ ___

accuracy and Notifies the permit for accuracy in Evaluator of his conclusions. accordance with OP-MW-201-007 FIRE PROTECTION SYSTEM IMPAIRMENT CONTROL step 4.4 and determines the fire impairment permit cannot be approved as written because the Fire Protection Permit was filled out improperly in section II. FIRE MARSHAL REVIEW None is marked in the Fire Watch Performed By: block (should be marked YES and a Description of the additional Compensatory Measures should be included i.e.,

backup suppression required).

EVALUATOR: After the candidate explains why he cannot approve the fire permit as written, as the IM Supervisor requesting the permit that you will rewrite the permit and bring it back for approval on the next shift.

NOTE: The JPM is complete.

JPM Stop Time:

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 1.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 8 of 10

SRO Admin 1- Rev 01 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Review a Fire Impairment Permit Requiring Compensatory Actions JPM Number: SRO Admin 1 Revision Number: 01 Task Number and

Title:

4100.016 Complete / review / approve Fire Protection Impairment Permits and Fire Watch Waivers K/A Number and Importance: K/A: 2.1.25 Rating: 3.9/4.2 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): QCAP 1500-01, Administrative Requirements For Fire Protection, Rev. 29 OP-MW-201-007, Fire Protection System Impairment Control, Rev. 7 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 12.5 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 1.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 9 of 10

INITIAL CONDITIONS

- You are the Work Execution Center Senior Reactor Operator.

- An Instrument Maintenance Supervisor has requested a permit to allow testing of smoke detectors in the Turbine Oil Reservoir area. The work will continue into the next shift.

INITIATING CUE Review Fire Protection Impairment Permit 11-21. Approve the permit OR explain the reason(s) why you cannot.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Use Procedures Related to Shift Staffing JPM Number: SRO Admin 2 Revision Number: 01 Date: __04/04/2011__

Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date SRO Admin 2.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 9

SRO Admin 2- Rev 01 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 through 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 2.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 9

SRO Admin 2- Rev 01 Revision Record (Summary)

Revision 00, This JPM was developed IAW guidelines established in NUREG 1021 Rev. 9 Supplement 1, ES-301 and Appendix C. This JPM meets the criteria of ES-301 D.3 for Administrative Topics.

This JPM was developed NEW for the 2009 ILT NRC Exam.

Revision 01. Revised to incorporate procedure changes.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 2.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 9

SRO Admin 2- Rev 01 JPM SETUP INSTRUCTIONS

1. This is an Administrative JPM that may be performed in any setting where the necessary procedures and support information can be provided.
2. Verify the following information is available for the Initiating Cue:
  • The current shift schedule
3. Verify the following information is available for JPM performance:
  • QAP 0300-03, Rev. 39, Operations Shift Staffing
4. Fill out SY-AA-102-201, with all fit for duty and STA 1,2, and 3 arrival times as 0700, 0630, and 0530 respectively.
5. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
6. This completes the setup for this JPM.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 2.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 9

SRO Admin 2- Rev 01 (Evaluator Note: Provide the shift staffing information per the JPM Setup Instructions)

INITIAL CONDITIONS You are the Shift Manager.

Unit 1 and Unit 2 are at full power.

The STAs wife is expecting a baby. He has permission from the Operations Director to leave if necessary to join his wife.

At 0400 the STA departs the site when his wife calls him home because she has gone into labor.

There are no other STA qualified supervisors on shift.

INITIATING CUE Identify the staffing adjustments that need to be made and the time constraints involved.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 2.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 9

SRO Admin 2- Rev 01

  • JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number

  • QAP *Determine that the STA The requirement for STA ___ ___ ___

0300-03 position must be staffed for staff position manning is both Units in Mode 1, 2, or 3.

  • identified.

C.1.d

  • T. S. *Determine that the STA The requirement to fill the ___ ___ ___

5.2.2.b. position must be staffed in a STA staff position within 2 time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

  • hours is identified.

CUE: Role Play as Shift Supervisor who will make the call-outs and provide the completed SY-AA-102-101 form to the examinee.

  • T.S. Directs STA # 3 to report to The STA position can be ___ ___ ___

5.2.2.b work. vacant for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per T. S.

5.2.2.b.

CUE: As Shift Supervisor tell the candidate you will contact the selected STA to drive in and fill the position.

JPM Stop Time:

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 2.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 9

SRO Admin 2- Rev 01 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Use Procedures Related to Shift Staffing JPM Number: SRO Admin 2 Revision Number: 01 Task Number and

Title:

(Discussion requirement) SS-S-08 Operations Shift Staffing K/A Number and Importance: K/A: 2.1.5 Rating: 2.9*/3.9 Ability to use procedures related to shift staffing, such as minimum crew compliment, overtime limitations, etc.

Suggested Testing Environment: Classroom Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): QAP 0300-03 Rev. 39, Operations Shift Staffing Tech Spec 5.2, Organization OP-AA-112-101 Rev. 7, Shift Turnover and Relief SY-AA-102-201 Rev. 8, Call-Outs for Unscheduled Work Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 05 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 2.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 7 of 9

INITIAL CONDITIONS You are the Shift Manager.

Unit 1 and Unit 2 are at full power.

The STAs wife is expecting a baby. He has permission from the Operations Director to leave if necessary to join his wife.

At 0400 the STA departs the site when his wife calls him home because she has gone into labor.

There are no other STA qualified supervisors on shift.

INITIATING CUE Identify the staffing adjustments that need to be made and the time constraints involved.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Verify Reactor Mode Change Requirements JPM Number: SRO Admin 3 Revision Number: 03 Date: 04/04/2011 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date SRO Admin 3.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 8

SRO Admin 3 Rev 03 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 through 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 3.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 8

SRO Admin 3 Rev 03 Revision Record (Summary)

Revision 00, This JPM was modified from JPM ADM-A.1.1-SRO, Quad Cities NRC Exam March, 2000, IAW ILT NRC Exam 03-01, IAW NUREG 1021, Rev 9.

Revision 01, Changed estimated completion time to 18 minutes based on performance data.

Revision 02, Modified dates to current year, updated based on procedure revision.

Revision 03, Updated to current procedure revision and adjusted dates.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 3.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 8

SRO Admin 3 Rev 03 SIMULATOR SETUP INSTRUCTIONS

1. None. This JPM may be completed at any location, provided that the appropriate reference material is available.
2. Ensure the following references are available
  • QCGP 1-1, page 69-70. Do not sign off step F.6.hh.
  • QCGP 1-1 Attachment E completed as follows:

o Unit 1 Recirculation System Drive Flow Calibration (N/A for Unit 2) is incorrectly marked N/A (page 1 of 6) o MSIV Closure Monthly Scram Sensor Channel Functional Test is performed on 2/01/2011 (page 5 of 6) o All Unit 2 surveillances marked N/A The following dates include the 25% extension.

o All Unit 1 24 month surveillances dated AFTER 11/30/2009.

o All 184 day (6 month) surveillances dated AFTER 10/13/2010.

o All Unit 1 92 day surveillances dated AFTER 2/05/2011, except as noted above o The Unit 1 7-day surveillance dated AFTER 05/23/2011, (page 165) o All steps NOT marked N/A are initialed and dated 06/01/2011.

  • A Calendar for 2011
3. This completes the setup for this JPM.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 3.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 8

SRO Admin 3 Rev 03 INITIAL CONDITIONS Today is June 1st, 2011.

You are the Unit 1 Supervisor. Unit 1 is in Mode 2 at 10% reactor power, starting up following a 30 day Refuel Outage. QCGP 1-1 is in progress. All procedure steps up to, and including F.6.gg. have been completed.

INITIATING CUE The Shift Manager has directed you to perform QCGP 1-1 step F.6.hh. to VERIFY MODE 1 surveillance requirements met, and report to the Shift Manager when complete.

If MODE 1 surveillance requirements are not met, report to the Shift Manager, any action(s) required, to meet the requirements.

Provide the candidate with page 69-70 of QCGP 1-1 completed up to step F.6.hh, AND a copy of Attachment E with dates filled in as described in setup.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 3.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 8

SRO Admin 3 Rev 03 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number F.6.hh. Reviews Attachment E to ___ ___ ___

ensure all Mode 2 to Mode 1 surveillance requirements are met NOTE: There are TWO ERRORS on Attachment E that the candidate must identify. The ORDER which the candidate identifies the errors will affect the role-play required of the Evaluator.

  • ATT E *Verifies ALL surveillances Recognizes that the Unit 1 ___ ___ ___

applicable to Unit One have Recirculation System Drive been completed.* Flow Calibration (N/A for Unit 2) is incorrectly marked N/A CUE: Report, as the Operations Predefine Coordinator, that the surveillance was last performed on May 15, 2011. Change the N/A to 05/15/11 then initial and date the change, and initial the right column.

  • ATT E *Verifies ALL applicable Recognizes that the MSIV ___ ___ ___

surveillances completed within Closure Monthly Scram Sensor the proper timeframe.* Channel Functional Test should have been completed no earlier than Feb 05, 2011.

CUE: Report, as the Operations Predefine Coordinator, that the surveillance was last performed on March 02, 2011. Change the date to 03/02/11, initial and date the change, and initial the right column.

Candidate reports task ___ ___ ___

complete:

JPM Stop Time:

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 3.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 8

SRO Admin 3 Rev 03 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Verify Reactor Mode Change Requirements JPM Number: SRO Admin 3 Revision Number: 03 Task Number and

Title:

SR-0002-P10 (Freq: LIC=I), Given a shutdown reactor plant, perform a reactor plant startup in accordance with QCGP 1-1.

K/A Number and Importance: K/A: 2.2.12 Rating: 3.7/4.1 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): QCGP 1-1, Rev. 84, Normal Unit Startup Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 18 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 3.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 7 of 8

INITIAL CONDITIONS Today is June 1st, 2011.

You are the Unit 1 Supervisor. Unit 1 is in Mode 2 at 10% reactor power, starting up following a 30 day Refuel Outage. QCGP 1-1 is in progress. All procedure steps up to, and including F.6.gg. have been completed.

INITIATING CUE The Shift Manager has directed you to perform QCGP 1-1 step F.6.hh. to VERIFY MODE 1 surveillance requirements met, and report to the Shift Manager when complete.

If MODE 1 surveillance requirements are not met, report to the Shift Manager, any action(s) required, to meet the requirements.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Verify a Liquid Radwaste River Discharge Permit JPM Number: SRO Admin 4 Revision Number: 04 Date: 04/04/2011 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date SRO Admin 4.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 8

SRO Admin 4-Rev 04 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 through 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME/Instructor Date SME/Instructor Date SME/Instructor Date SRO Admin 4.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 8

SRO Admin 4-Rev 04 Revision Record (Summary)

1. Revision 00, This JPM is being developed for SRO testing during the Annual License Operator Requal cycle.
2. Revision 01, This JPM revised to reflect changing times.
3. Revision 02, This JPM revised to reflect procedure changes.
4. Revision 03, Changed Shift Supervisor to Field Supervisor and updated JPM to new procedure revision.
5. Revision 04, This JPM revised to reflect procedure changes.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 8

SRO Admin 4-Rev 04 INITIAL CONDITIONS You are the Shift Supervisor with the current plant conditions as follows:

The River Discharge Tank (RDT) is 94% and needs to be discharged into the river using the river discharge pump.

The Chemistry Department has sampled the contents of the river discharge tank and forwarded the sample analysis and discharge calculations.

NO other tanks are being discharged to the river.

NO other tanks are being pumped to the River Discharge Tank.

Valve lineup has been completed per Attachment B.

South Diffuser gate - 100% open Ice melt line - Closed

INITIATING CUE The Shift Manager has asked you, as Shift Supervisor, to independently calculate the maximum River Discharge Tank (RDT) discharge rate per QOP 2000-25. The following information was provided on the envelope:

RIVER DISCHARGE TANK Batch #

Total Percent of 10EC Minimum # Circ Water Pumps = 2 Minimum # Service Wtr Pumps = 1 Ice Melt Line OPEN or CLOSED? (Circle)

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 8

SRO Admin 4-Rev 04 Set Up Instructions:

On the Chemistry Batch sticker which is part of the Initiating Cue, fill in the following:

Batch #: 7371 Total Percent of 10EC: 63 Circle Closed for the Ice Melt Line.

Provide examinee with:

Calculator Fill in the JPM Start Time when the student acknowledges the Initiating Cue Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 8

SRO Admin 4-Rev 04 JPM Start Time:

Comment SAT UNSAT Number STEP ELEMENT STANDARD

  • F.7.b. Determines NET DILUTION Determines NET DILUTION ___ ___ ___

FLOW by determining the FLOW.

number of circulating water 2 circ wtr pmp x 157,000 gpm =

pumps operating x 157,000gpm 314,000 gpm

+ number of service water

+

pumps operating x 13,800gpm and subtracting 0 gpm for ice 1 service wtr pmps x 13,800 melt line being closed. gpm = 13,800 gpm - 0 gpm (due to ice melt line being closed.)

Determines total net dilution flow 327,800 gpm - 0 =327,800 gpm.

  • F.7.c. Determines effective dilution Divides NET DILUTION FLOW ___ ___ ___

flow by dividing net dilution flow by 2. Determines effective by 2. dilution flow to be 327,800 gpm/2=163,900 gpm.

  • F.7.d. Determines maximum Multiplies NET DILUTION ___ ___ ___

allowable discharge rate by FLOW by 10, and divides by multiplying the effective dilution Total % of 10*EC. Determines flow by 10, and dividing by the Max Allowable Discharge Rate total percent of 10*EC (from to be (163,900 x 10)/63=26,016 sample analysis). gpm EVALUATORS NOTE: JPM is complete when calculation is finished by candidate.

JPM Stop Time:

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 8

SRO Admin 4-Rev 04 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Verify a Liquid Radwaste River Discharge Permit JPM Number: SRO Admin 4 Revision Number: 04 Task Number and

Title:

SN-2000-P09 (Freq: LIC=I NF=I) Given Rad Waste systems in a normal lineup, discharge from the River Discharge Tank to the river using the Waste Surge Pump or the River Discharge Pump in accordance with QOP 2000-24 or QOP 2000-25. (Use pictures, rad maps, remote cameras etc.. to discuss actions in high dose areas)

K/A Number and Importance: K/A: 2.3.6 Rating: 2.0/3.8 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): QOP 2000-25, Rev. 43, DISCHARGING TO THE RIVER FROM THE RIVER DISCHARGE TANK USING THE RIVER DISCHARGING PUMP Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 10 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 7 of 8

INITIAL CONDITIONS You are the Shift Supervisor with the current plant conditions as follows:

The River Discharge Tank (RDT) is 94% and needs to be discharged into the river using the river discharge pump.

The Chemistry Department has sampled the contents of the river discharge tank and forwarded the sample analysis and discharge calculations.

NO other tanks are being discharged to the river.

NO other tanks are being pumped to the River Discharge Tank.

Valve lineup has been completed per Attachment B.

South diffuser gate - 100% open Ice melt line - Closed INITIATING CUE The Shift Manager has asked you, as Shift Supervisor, to independently calculate the maximum River Discharge Tank (RDT) discharge rate per QOP 2000-25. The following information was provided on the envelope:

RIVER DISCHARGE TANK Batch #

Total Percent of 10EC Minimum # Circ Water Pumps = 2 Minimum # Service Wtr Pumps = 1 Ice Melt Line OPEN or CLOSED? (Circle)

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Classify a Security Event JPM Number: SRO Admin 5 Revision Number: 00 Date: 04/04/2011 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date SRO Admin 5.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 12

SRO Admin 5-Rev 00 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 through 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 5.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 12

SRO Admin 5-Rev 00 Revision Record (Summary)

Revision 00, This JPM was developed for the ILT 09-1 NRC Exam.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 5.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 12

SRO Admin 5-Rev 00 SIMULATOR SETUP INSTRUCTIONS Verify the following reference material is available:

1) EP-MW-114-100, Rev. 9, MIDWEST REGION OFFSITE NOTIFICATIONS
2) EP-AA-1006, Rev. 29, RADIOLOGICAL EMERGENCY PLAN ANNEX FOR QUAD CITIES STATION G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 5.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 12

SRO Admin 5-Rev 00 INITIAL CONDITIONS Both Units are operating at rated power.

You are the Shift Manager when the following events occur:

1) A Fork Truck carrying a load of scaffold has tipped over in the Reactor Building near the half-track. No equipment damage or personnel injuries resulted.
2) The Unit Supervisor has received the following authenticated message from the NRC:

A large commercial airliner has been hijacked and is on a flight path for the Quad Cities Nuclear Station. Estimated time of arrival is approximately 20 minutes.

3) During the placement of a Clearance Order on the Halon system, an inadvertent actuation occurred in the Main Computer Room located on the 1st floor of Service Building.

The meteorological conditions are as follows:

Wind direction 233 deg.

Wind speed 2.74 m/sec OR 6.09 miles/hr THIS JPM IS TIME CRITICAL.

INITIATING CUE Determine the highest Emergency Action Level (EAL) classification and prepare a NARS form for transmittal.

Provide examinee with: Candidate needs to have access to all Emergency Plan procedures as found in the simulator.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 5.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 12

SRO Admin 5-Rev 00 management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 5.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 12

SRO Admin 5-Rev 00 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number EVALUATOR: The following step (Classification) must be completed within 15 minutes from the JPM start time.

  • *Declares an ALERT < 15 Recognizes that the conditions ___ ___ ___

minutes of JPM start time.* for HA1 are met due to validated notification from NRC of an airliner attack threat < 30 minutes from site.

Refers to EP-MW-114-100 Time ALERT declared. ____ ___ ___ ___

Midwest Region OFFSITE NOTIFICATIONS as JPM start time.

necessary to fill out NARS Difference < 15 min.

form.

EVALUATOR: The following step (NARs completion ) must be completed within 15 minutes from the time of Classification.

NARS Fills out Utility Message Records Utility Message #1. ___ ___ ___

form Number.

NARS Fills out State Message Records N/A for State Message ___ ___ ___

form Number. Number.

Block #1 Fills out block #1 information Checks box [B] Drill/Exercise in ___ ___ ___

regarding Status. block #1.

Block #2 Fills out block #2 information Checks box [F] Quad Cities in ___ ___ ___

regarding Station. block #2.

  • Block *Fills out block #3 Checks box [B] ALERT. ___ ___ ___
  1. 3 information regarding onsite condition.*
  • Block *Fills out block #4 Records Accident Classification ___ ___ ___
  1. 4 information regarding as Accident Classified & Time= time ALERT declared Accident Terminated.* Date= todays date EAL=HA1 Records N/A for Accident Terminated in Time and Date space.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 5.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 7 of 12

SRO Admin 5-Rev 00 Comment STEP ELEMENT STANDARD SAT UNSAT Number

  • Block *Fills out block #5 Checks box [A] None. ___ ___ ___
  1. 5 information regarding Release Status.*

Block #6 Fills out block #6 information Checks box [A] NOT ___ ___ ___

regarding Type of Release. APPLICABLE Block #7 Fills out block #7 information Records 233 degrees. ___ ___ ___

regarding Wind Direction.

CUE: Examinee should derive the meteorological data from the Initial Conditions If asked about present conditions or the examinee starts to access the information from PPDS, state: the meteorological conditions have NOT changed from the Initial Conditions.

Block #8 Fills out block #8 information Checks both boxes and records ___ ___ ___

regarding Wind Speed. values for [A] Meters/Sec =

2.74 and [B] Miles/Hr = 6.09.

Block #9 Fills out block #9 information Checks box [A] NONE ( ___ ___ ___

regarding Recommended Actions.

Block Fills out block #10 Records NONE. ___ ___ ___

  1. 10 information regarding Additional Information.

NARS *Submits NARS form for Submits NARS form for ___ ___ ___

form transmittal < 14 minutes after transmittal.

classification.* Record time: ________

CUE: When candidate submits the NARS form for verification, state that the JPM is complete.

JPM Stop Time:

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 5.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 8 of 12

SRO Admin 5-Rev 00 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Classify a Security Event JPM Number: SRO-Admin 5 Revision Number: 00 Task Number and

Title:

S-EP-P01 (Freq: LIC=A) (ILT-MP) Given an event, classify the event and activate the Emergency Response organization in accordance with EP-AA-111 and EP-AA-112.

K/A Number and Importance: K/A: 2.4.41 Rating: 2.9/4.6 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): EP-MW-114-100, Rev. 10, MIDWEST REGION OFFSITE NOTIFICATIONS EP-AA-1006, Rev. 30, RADIOLOGICAL EMERGENCY PLAN ANNEX FOR QUAD CITIES STATION Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes 14 minutes Actual Time Used: minutes G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 5.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 9 of 12

SRO Admin 5-Rev 00 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\admin\SRO Admin 5.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 10 of 12

INITIAL CONDITIONS Both Units are operating at rated power.

You are the Shift Manager when the following events occur:

1) A Fork Truck carrying a load of scaffold has tipped over in the Reactor Building near the half-track. No equipment damage or personnel injuries resulted.
2) The Unit Supervisor has received the following authenticated message from the NRC:

A large commercial airliner has been hijacked and is on a flight path for the Quad Cities Nuclear Station. Estimated time of arrival is approximately 20 minutes.

3) During the placement of a Clearance Order on the Halon system, an inadvertent actuation occurred in the Main Computer Room located on the 1st floor of Service Building.

The meteorological conditions are as follows:

Wind direction 233 deg.

Wind speed 2.74 m/sec OR 6.09 miles/hr THIS JPM IS TIME CRITICAL.

INITIATING CUE Determine the highest Emergency Action Level (EAL) classification and prepare a NARS form for transmittal.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Locally Start-Up a Diesel Generator With a Failure of the Vent Fan to Start RO/SRO JPM i Revision Number: 19 Date: 04/04/2011 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date RO-SRO JPM i.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 11

RO/SRO JPM i - Rev 19 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 through 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM i.doc SRRS:

3D.105 (when utilized for operator initial or continuing training)

Page 2 of 11

RO/SRO JPM i - Rev 19 Revision Record (Summary)

Revision 10, This JPM is developed IAW guidelines established in NUREG 1021 Rev 8 ES-301 and Appendix C. This JPM meets the criteria of Category B.2 "In-Plant Systems," for RO/SRO candidates.

JPM revised to match procedure revision.

Revision 11, JPM revised to match procedure revision.

Revision 12, JPM revised to match procedure revision.

Revision 13, JPM revised to match procedure revision.

Revision 14, JPM revised to update expected completion time based upon JPM usage.

Revision 15, JPM revised to match procedure revision.

Revision 16, JPM revised to match procedure revision.

Revision 17, JPM revised objective to allow flexibility to perform task on more than one diesel.

Added note to instructor to verify the operator dons double hearing protection.

Revision 18, JPM revised to match procedure revision.

Revision 19, Revised Evaluator cues and notes.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM i.doc SRRS:

3D.105 (when utilized for operator initial or continuing training)

Page 3 of 11

RO/SRO JPM i - Rev 19 INITIAL CONDITIONS A loss of off-site power has occurred on Unit 1. The U-1(U1/2) Diesel failed to start.

A fire in the plant has damaged fire detection cabling associated with the U1(U1/2) Diesel Room as indicated by control room alarms.

A manual start from the Control Room was attempted but was not successful due to a faulty control switch.

Annunciator 901-8 G-8, DIESEL GEN 1 RELAY TRIP (901-5 G-5, DIESEL GEN 1/2 RELAY TRIP), is NOT alarming.

QCOA 6600-01 has been entered and other operators are taking action directed by that procedure.

The Unit Supervisor (US) has directed that the U1(U1/2) Diesel be started locally.

The U1(U1/2) Diesel is in its normal standby line-up with the output breaker open as verified by the Control Room and an EO, locally.

The EO will standby to verify that the output breaker closes after the U1(U1/2) Diesel is up to speed and locally load the diesel as directed by the Control Room.

U1(U1/2) Diesel Day Tank level is 90% and the storage tank level is 95%.

This JPM is not time critical.

INITIATING CUE The Unit Supervisor directs you to locally start the U-1(U1/2) Diesel Generator in accordance with QCOP 6600-11, to energize Bus 14-1(13-1) and ensure the U1(U1/2) Diesel is operating properly. Report to the US when Diesel Generator is ready to be loaded.

Provide the examinee with a blank copy of QCOP 6600-11.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM i.doc SRRS:

3D.105 (when utilized for operator initial or continuing training)

Page 4 of 11

RO/SRO JPM i - Rev 19 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number F.2. Verify maint. switch in Verifies maint. switch in "up" ___ ___ ___

"REMOTE AUTO START" position. (Engine Mounted position. Control Panel)

CUE: Point to the maintenance switch up position and state, This switch is here.

F.5. Verify SPEED DROOP set to At governor, ensures ___ ___ ___

0. SPEED DROOP knob set on 0 (upper left knob).

CUE: Point to 0 position on the speed droop knob and state, This knob is here.

  • F.6. *Isolate Diesel Generator Positions Transfer switch ___ ___ ___

controls.* to LOCAL at the 2251-10 (2212-45) panel.

CUE: Point to the local position on the transfer switch and state, This switch is in this position. Point to annunciator C-1 on the 2251-10(2212-45) panel and state, This annunciator is alarming.

F.7. Notify plant personnel of Notifies the CR to announce ___ ___ ___

starting the engine. the impending engine start, or uses page to announce it to the plant.

CUE: As appropriate state, I understand you are about to start the U1(U1/2)

EDG, I will make an announcement. Or the announcement has been delivered to the plant via the page.

NOTE: The candidate should indicate that they are wearing double hearing protection.

  • F.8. *Start the EDG.* Depresses DG START ___ ___ ___

pushbutton. (Engine Mounted Control Panel)

CUE: State the following to the candidate, The diesel has started and the EO at the Bus reports that the output breaker has closed.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM i.doc SRRS:

3D.105 (when utilized for operator initial or continuing training)

Page 5 of 11

RO/SRO JPM i - Rev 19 Comment STEP ELEMENT STANDARD SAT UNSAT Number F.9. Determines DG Room Vent Observes fan red run light ___ ___ ___

Fan has failed to autostart. on 2251-37 (2212-50) panel is NOT lit OR flow of air has not changed.

CUE: As appropriate state, Red light is out, green light is lit. OR Air flow has NOT changed.

CUE: IF the candidate chooses to align the alternate power source to the Vent Fan by placing the VENT FAN SELECTOR SWITCH to ALT, then give the following cues: The alternate power yellow light is LIT, the Vent Fan red light is OUT and green light is LIT. Air Flow has NOT changed.

EVALUATOR NOTE: Per the Initial Conditions, the operator should identify that the Vent Fan is locked out due to cable damage. The Fire Protection Bypass SW may be moved to Bypass per step E.3, OR QCOA 6600-08 (QCOA 6600-06). 4E-1350B sh 3 indicates that the fan will start after the selector switch is taken to Bypass.

EVALUATOR NOTE: Alternate path starts here.

D.2.b.(1) Unlock and open Diesel Diesel Generator Room ___ ___ ___

Generator Room Vent fan key Vent fan box opened and locked box. unlocked.

CUE: The examinee may either break the glass or go to the WEC and obtain the key from the Shift Manage Key Cabinet. If the latter is chosen, state you have the key.

Point to the EDG vent fan key lock box and state, Box is open or the glass is broken as appropriate.

  • D.2.b.(2) Start DG Room Vent Fan Position the D.G. 1 (1/2) ___ ___ ___

OR by::*placing the D.G. 1 (1/2) Vent Fan Fire Prot. Bypass VENT FAN FIRE switch to Bypass (QCOA

  • Step E.3.. PROTECTION BYPASS 6600-08, D.2.b., QCOA SWITCH to BYPASS.* 6600-06, D.2.b., or QCOP 6600-11, E.3.)

CUE: Point to bypass switch and state, Switch is in Bypass position and you feel increased air flow.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM i.doc SRRS:

3D.105 (when utilized for operator initial or continuing training)

Page 6 of 11

RO/SRO JPM i - Rev 19 Comment STEP ELEMENT STANDARD SAT UNSAT Number D.2.b.(3) Close and lock Diesel Diesel Generator Room ___ ___ ___

Generator Room Vent fan box. Vent Fan box closed and locked.

CUE: State, EDG vent fan lock box is closed and locked.

D.4. Verify proper operation of Observes louvers are open. ___ ___ ___

associated dampers.

CUE: Point to dampers and state, These are open.

F.10. Verify DGCWP automatically Verifies DGCWP red run ___ ___ ___

starts. light lit (2251-37/2212-50 panel)

OR Verifies pressure on DG HX SW gauges.

OR Observes flow meter outside DG room > 900 gpm (FI 1-3941-26/FI 1/2-3941-27).

CUE: As appropriate state, The DGCWP red light is lit" OR point to 50 psig on the Diesel heat exchanger pressure gauge and state, Pressure is here OR pointing at 950 gpm on flowmeter, Gauge indicates here.

CUE: At the 2251-10 (2212-45) panel, POINT to the following indications when the information is requested by the candidate.

F.11. Verify DG Frequency at 60hz. Checks DG frequency ___ ___ ___

meter CUE: Point to 60HZ on the gauge and state, Frequency is here.

F.12. Verify DG Voltage at 4160. Checks DG Voltage meter. ___ ___ ___

CUE: Point to 4160 on the gauge and state, Voltage is here.

Report DG status to CR. Reports to CR to provide ___ ___ ___

them with the current status of the DG.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM i.doc SRRS:

3D.105 (when utilized for operator initial or continuing training)

Page 7 of 11

RO/SRO JPM i - Rev 19 Comment STEP ELEMENT STANDARD SAT UNSAT Number CUE: As Unit Supervisor state: Bus 14-1(13-1) is energized and another operator will be dispatched to monitor voltage, frequency, and load.

EVALUATOR: The candidate should inform you that the task is complete.

JPM Stop Time:

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM i.doc SRRS:

3D.105 (when utilized for operator initial or continuing training)

Page 8 of 11

RO/SRO JPM i - Rev 19 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Locally Start-Up a Diesel Generator With a Failure of the Vent Fan to Start JPM Number: RO/SRO JPM i Revision Number: 19 Task Number and

Title:

SRN-6600-P04 (Freq: LIC=B NF=B) Given a condition where the 1/2 (U1)

Emergency DG has failed to auto start, Bus 18 (19) is de-energized, and fire detection cable damage has locked out the 1/2 (U1) DG vent fan, locally start the 1/2 (U1) Emergency DG and energize Bus 13-1(14-1) in accordance with QCOP 6600-11, QCOA 6600-06 (QCOA 6600-08) and QOP 6500-10.

K/A Number and Importance: K/A: 264000 A2.08 Rating: 3.3/3.7 Suggested Testing Environment: Plant Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): QCOP 6600-11, Rev. 25, DIESEL GENERATOR LOCAL OPERATION QCOA 6600-08, Rev. 10, UNIT 1(2) DIESEL GENERATOR ROOM VENT FAN FAILURE QCOA 6600-06, Rev. 10, 1/2 DIESEL GENERATOR ROOM VENT FAN FAILURE Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM i.doc SRRS:

3D.105 (when utilized for operator initial or continuing training)

Page 9 of 11

RO/SRO JPM i - Rev 19 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM i.doc SRRS:

3D.105 (when utilized for operator initial or continuing training)

Page 10 of 11

INITIAL CONDITIONS A loss of off-site power has occurred on Unit 1. The U-1(U1/2) Diesel failed to start.

A fire in the plant has damaged fire detection cabling associated with the U1(U1/2) Diesel Room as indicated by control room alarms.

A manual start from the Control Room was attempted but was not successful due to a faulty control switch.

Annunciator 901-8 G-8, DIESEL GEN 1 RELAY TRIP (901-5 G-5, DIESEL GEN 1/2 RELAY TRIP), is NOT alarming.

QCOA 6600-01 has been entered and other operators are taking action directed by that procedure.

The Unit Supervisor (US) has directed that the U1(U1/2) Diesel be started locally.

The U1(U1/2) Diesel is in its normal standby line-up with the output breaker open as verified by the Control Room and an EO, locally.

The EO will standby to verify that the output breaker closes after the U1(U1/2) Diesel is up to speed and locally load the diesel as directed by the Control Room.

U1(U1/2) Diesel Day Tank level is 90% and the storage tank level is 95%.

This JPM is not time critical.

INITIATING CUE The Unit Supervisor directs you to locally start the U-1(U1/2) Diesel Generator in accordance with QCOP 6600-11, to energize Bus 14-1(13-1) and ensure the U1(U1/2) Diesel is operating properly. Report to the US when Diesel Generator is ready to be loaded.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Inject Water Into the RPV Using the Condensate System Crosstie RO/SRO JPM j Revision Number: 07 Date: 04/04/2011 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date RO-SRO JPM j.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 8

RO/SRO JPM j - Rev 07 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 through 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM j.doc Page 2 of 8

RO/SRO JPM j - Rev 07 Revision Record (Summary)

Revision 00, This JPM is developed IAW guidelines established in NUREG 1021 Rev 8 ES-301 and Appendix C. This JPM meets the criteria of Category B.2 "In-Plant Systems," for RO/SRO candidates.

JPM revised to match procedure changes.

Revision 01, JPM revised to match procedure changes.

Revision 02, JPM revised to update estimated times.

Revision 03, JPM revised to match procedure changes.

Revision 04, JPM revised to update estimated times.

Revision 05, JPM revised to update procedure reference.

Revision 06, JPM revised to update procedure reference.

Revision 07, Revised steps by adding valve names and cues. Also added two critical steps.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM j.doc Page 3 of 8

RO/SRO JPM j - Rev 07 INITIAL CONDITIONS

- Problems have developed on Unit 2(1) which require the Alternate Injection Systems to be lined-up in order to restore reactor water level.

- The Unit Supervisor has directed you to inject water from the Unit 1(2) Condensate system into the Unit 2(1) reactor using the Condensate system crosstie in accordance with QCOP 3300-12 as directed by QGA 100.

- The Unit 1(2) Condensate pumps are operating normally.

- The Unit 1 and 2 NSOs are aware of the situation and are standing by to monitor parameters in the Control Room.

- There are no Condensate Demin backwashes in progress on either unit.

- You have obtained an S-key and are ready to perform the task.

- This JPM is not time critical.

INITIATING CUE Line-up the Condensate System crosstie and begin restoring Unit 2(1) reactor level IAW QCOP 3300-12.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM j.doc Page 4 of 8

RO/SRO JPM j - Rev 07 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number EVALUATOR NOTE/CUE: Per OP-AA-103-105, if the candidate elects to manually close the outlet valves, the breakers should first be opened. Given the importance of restoring vessel level it is not considered vital that this is done (however, it should be discussed with the candidate at the conclusion of the walkthroughs). If the candidate does locally open the breakers, cue him that the outlet valve breaker is open, after each handle is taken to the trip position.

  • F.2.a.(1) *Remotely close all U-2(1) At U-2(1) Condensate Demin ___ ___ ___

or Demin Outlet E Valves.

  • Panels (2252(1)-11 & 16)
  • F.2.a.(2) depresses A through H OR DEMIN OUTLET E VALVE
  • Locally manually close all close pushbuttons.

COND DEMIN DSCH VLVS OR MO 2(1)-3302A-H*

Locates all COND DEMIN VESSEL DSCH VLVS (MO 2(1)-3302A through H),

depresses declutch lever and rotates handwheel clockwise.

CUE: Point to the indicating lights for each and state, Green light is lit, Red light is out OR, The handwheel will not rotate any further. If asked state threads are visible on the stem.

F.2.b. Verify closed 2(1)-3303, At U-2(1) Cond Demin Panel ___ ___ ___

COND DEMIN BYPASS verifies green light lit for MO VALVE. 2(1)-3303.

OR Locally, at MO 2(1)-3303 verifies green light lit.

OR Contacts Control Room to verify closed.

CUE: Point to indicating lights and state, Red light is out, Green light is lit or Control Room reports, U-2(1) Condemin Bypass Valve is closed.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM j.doc Page 5 of 8

RO/SRO JPM j - Rev 07 Comment STEP ELEMENT STANDARD SAT UNSAT Number

  • F.2.c. *Open 1-5599-68 U-1 COND Locates and rotates the 1-5599- ___ ___ ___

HDR TO 1/2 BACKWASH 68 vlv handwheel counter-HDR SV.* clockwise. (South of U-1 Condensate Demin Precoat Tank)

CUE: Point to the handwheel and state, The valve handwheel will not rotate any further.

F.2.d. Verify open MO 2(1)-3205A Contacts Control Room to verify ___ ___ ___

AND B, RX FW INLT VLV. MO 2(1)-3205A AND B are open.

CUE: Report as NSO that, The MO 2(1)-3205A and MO 2(1)-3205B valves are open.

F.2.e. Verify open MO 2(1)-3201A, Contacts Control Room to verify ___ ___ ___

B, OR C, RFP DISCH VLVs. open:

MO 2(1)-3201A OR MO 2(1)-3201B, OR MO 2(1)-3201C CUE: Report back as NSO that, The A & B RFP Discharge valves are open.

F.2.f. Verify Feedwater Regulator Contacts Control Room to verify ___ ___ ___

valves(s) in manual AND all 3 FWRVs are in manual and closed: closed.

2(1)-640-19A, 2(1)A FEEDWATER MAN/AUTO CONT STA 2(1)-640-19B, 2(1)B FEEDWATER MAN/AUTO CONT STA 2(1)-640-20, FEEDWATER LO FLOW CONTLR G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM j.doc Page 6 of 8

RO/SRO JPM j - Rev 07 Comment STEP ELEMENT STANDARD SAT UNSAT Number CUE: Report back as NSO that, All Feedwater Regulating Valves are in manual and closed.

  • F.2.g. *Unlock 2-5599-68 U-2 Unlocks the 2-5599-68, U-2 ___ ___ ___

COND HDR TO 1/2 COND HDR TO 1/2 BACKWASH HDR SV.* BACKWASH HDR SV, (located 20 East of U-1 Cond Demin Control Panel).

CUE: The valve is unlocked

  • F.2.h. Slowly *open the 2-5599-68 Rotates the 2-5599-68 valve.* handwheel counterclockwise.

CUE: Point to the 2-5599-68 handwheel and state, The valve handwheel will not rotate any further.

  • F.3. *Open one Feedwater Contacts the Control Room and Regulator Valve.
  • requests performance of QCOP 3300-12 step F.3.

CUE: After contacting the Control Room, as the NSO report the low flow feedwater reg valve is open and U-2(1) Reactor water level is rising.

EVALUATOR NOTE: The candidate should inform you that the task is complete.

JPM Stop Time:

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM j.doc Page 7 of 8

RO/SRO JPM j - Rev 07 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Inject Water Into the RPV Using the Condensate System Crosstie JPM Number: RO/SRO JPM j Revision Number: 07 Task Number and

Title:

SRN-3300-P07 (Freq: LIC=B NF=B) Given a reactor plant in a QGA condition, locally crosstie the unit condensate systems to inject into the RPV in accordance with QCOP 3300-12.

K/A Number and Importance: K/A: 295031 EA1.11 Rating: 4.1/4.1 Suggested Testing Environment: Plant Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): QCOP 3300-12, Rev. 11, Injection Into the Reactor Using the Condensate System Crosstie OP-AA-103-105, Rev. 01, Limitorque Motor Operated Valve Operations Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 17 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM j.doc Page 8 of 8

INITIAL CONDITIONS

- Problems have developed on Unit 2(1) which require the Alternate Injection Systems to be lined-up in order to restore reactor water level.

- The Shift Manager has directed you to inject water from the Unit 1(2) Condensate system into the Unit 2(1) reactor using the Condensate system crosstie in accordance with QCOP 3300-12 as directed by QGA 100.

- The Unit 1(2) Condensate pumps are operating normally.

- The Unit 1 and 2 NSOs are aware of the situation and are standing by to monitor parameters in the Control Room.

- There are no Condensate Demin backwashes in progress on either unit.

- You have obtained an S-key and are ready to perform the task.

- This JPM is not time critical.

INITIATING CUE Line-up the Condensate System crosstie and begin restoring Unit 2(1) reactor level IAW QCOP 3300-12.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Aligning Fire Protection Water to SSMP Room Cooler RO/SRO JPM k Revision Number: 06 Date: 04/04/2011 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date RO-SRO JPM k.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 8

RO/SRO JPM k - Rev 06 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 through 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate.

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM k.doc )

Page 2 of 8

RO/SRO JPM k - Rev 06 Revision Record (Summary)

Revision 01, The reason for this JPM is to demonstrate the ability to terminate one of the twenty most probable Core Damage Sequences.

This JPM is developed IAW guidelines established in NUREG 1021 Rev 9 ES-301 and Appendix C. This JPM meets the criteria of Category B.2 "In-Plant Systems," for RO/SRO candidates.

JPM revised to match procedure changes.

Revision 02, JPM revised to match procedure changes.

Revision 03, JPM verified to match procedure changes.

Revision 04, JPM revised to match objective changes.

Revision 05, JPM revised to match objective and procedure changes.

Revision 06, JPM cues revised.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM k.doc )

Page 3 of 8

RO/SRO JPM k - Rev 06 INITIAL CONDITIONS

- There is a severe fire in the South end of the Reactor Building 1st Floor (RB 1S).

- The US has entered QCARP 0010-01.

- SSMP is injecting into U-1.

- Service Water is no longer available to the SSMP Room Cooler.

- You have obtained an S Key.

- This JPM is NOT time critical.

INITIATING CUE Align Fire Protection Water to SSMP Room Cooler in accordance with QCARP 0010-01 Attachment D and notify the Unit Supervisor when complete.

Provide examinee with:

Copy of QCARP 0010-01 Attachment D, Rev. 9 Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM k.doc )

Page 4 of 8

RO/SRO JPM k - Rev 06 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number

  • Attachment D, *Close 1/2-2901-25, SERV Turns valve handwheel ___ ___ ___

Step 1 WTR TO SAFE clockwise until valve no longer SHUTDOWN PMP RM moves.

HVAC CLR SV.*

CUE: Point to the valve and state, The handwheel cannot be turned anymore .

  • Attachment D, *Unlock 1/2-2901-9, FIRE Unlocks or breaks lock. ___ ___ ___

Step 2 PROTECTION WTR TO SAFE SHUTDOWN PMP RM HVAC CLR SV.*

  • Attachment D, *Open 1/2-2901-9.* Turns valve handwheel ___ ___ ___

Step 3 counterclockwise until valve no longer moves.

CUE: Point to the valve and state, The lock is unlocked and the handwheel cannot be turned anymore.

  • Attachment D, *Close 1/2-2999-9 Turns valve handwheel ___ ___ ___

Step 4 SERVICE WATER TO clockwise until valve no longer SSMP ROOM COOLER moves.

BYPASS VALVE.*

CUE: Point to the valve and state, The handwheel cannot be turned anymore Attachment D, Verify Room Cooler Checks Room Cooler operation ___ ___ ___

Step 5 Operation. by verifying discharge air flow and/or motor operation.

CUE: After proper checks are made for Cooler operation (Proper checks should include that the candidate listens or feels for air flow discharging from the cooler), indicate to the candidate that the room is becoming cooler.

Attachment D, Notify U1 US that the steps Uses phone or radio to contact ___ ___ ___

Step 6 are complete. the U-1 US in the Control Room and reports QCARP 0010-1 Attachment D is complete.

CUE: When informed, acknowledge as Unit One Unit Supervisor that you understand that the SSMP Room Cooler is lined up to the fire header.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM k.doc )

Page 5 of 8

RO/SRO JPM k - Rev 06 JPM Stop Time:

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM k.doc )

Page 6 of 8

RO/SRO JPM k - Rev 06 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Aligning Fire Protection Water to SSMP Room Cooler JPM Number: RO/SRO JPM k Revision Number: 06 Task Number and

Title:

SN-2900-P08 (Freq: LIC=A NF=A) Given Unit 1 in an QCARP condition, transfer SSMP HVAC cooling water supply to the fire header and verify SSMP room cooler operation in accordance with QCARP 0010-01 Attachment D. (Important PRA Operator Action - transferring SSMP cooling water supply to fire header in combination with starting the SSMP has a RAW of 1600)

K/A Number and Importance: K/A: 286000 K1.01 Rating: 2.7/2.8 Suggested Testing Environment: Plant Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): QCARP 0010-01 Attachment D, Rev. 9 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 10 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\inplant\RO-SRO JPM k.doc )

Page 7 of 8

INITIAL CONDITIONS

- There is a severe fire in the South end of the Reactor Building 1st Floor (RB 1S).

- The US has entered QCARP 0010-01.

- SSMP is injecting into U-1.

- Service Water is no longer available to the SSMP Room Cooler.

- You have obtained an S Key.

- This JPM is NOT time critical.

INITIATING CUE Align Fire Protection Water to SSMP Room Cooler in accordance with QCARP 0010-01 Attachment D and notify the Unit Supervisor when complete.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Post Accident Pumping of the DWFDS to the WCT RO JPM h Revision Number: 00 Date: 04/04/2011 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO JPM h-Rev 00 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 11

RO JPM h-Rev 00 Revision Record (Summary)

Revision 00, New JPM for the ILT 09-1 NRC Exam.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 11

RO JPM h-Rev 00 SIMULATOR SETUP INSTRUCTIONS

1. Reset the Simulator to IC-21.

NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Insert a Group II Isolation with the following commands:

imf rp07a imf rp07b After the automatic actions have occurred, acknowledge annunciators, then clear Group II Isolation signal using:

dmf rp07a dmf rp07b Do NOT reset the Group II isolation.

3. Fill the Drywell Equipment Floor Drain Sump by inserting a 50% RBCCW line break for 2 1/2 minutes and then deleting it.

imf pc05 50 dmf pc05

4. Secure SBGTS and restore Reactor Building Ventilation to its normal lineup.
5. Acknowledge annunciators.
6. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
7. This completes the setup for this JPM.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 11

RO JPM h-Rev 00 INITIAL CONDITIONS A manual reactor scram was inserted due to high Drywell pressure resulting from a small break on the A Recirc loop.

QGAs 100, 200, and 300 have been entered.

Group II and Group III isolations occurred.

RPV water level is at 30 inches and being maintained by the Low Flow Feed Reg Valve (LFFRV).

The reactor is depressurized.

The Unit Supervisor has directed pumping of the Drywell Floor Drain Sump, (DWFDS), to the Waste Collector Tank.

B SBGTS is operating and Reactor Building ventilation is isolated.

No Radwaste discharges are in progress.

Radwaste Ventilation system is in operation.

Radwaste has been informed and is ready to process the water.

Chemistry has obtained a Reactor Coolant sample and has concurred with pumping the DWFDS to the Waste Collector Tank per QOP 2040-11.

This JPM is NOT time critical.

INITIATING CUE Pump the Drywell Floor Drain Sump to the Waste Collector Tank per QOP 2040-11. Inform the Unit Supervisor when flow to the Waste Collector Tank is established.

Provide the examinee with a blank copy of QOP 2040-11.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 11

RO JPM h-Rev 00 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number C.1 Reset Group I and *Group At the 901-5 panel: ___ ___ ___

II isolation signals.* 1) Resets the Group I isolation by: placing the MN STM ISOL RESET switch to the INBD and OTBD positions.

2) Resets the Group II isolation by: placing the ISOL VLV RESET switch to the INBD and OTBD positions.

C.2 Verify closed the DWFDS At the 901-4 panel verifies ___ ___ ___

and DWEDS isolation CLOSED lights are lit for:

valves. 1) AO 1- 2001-3

2) AO 1-2001-4
3) AO 1-2001-15
4) AO 1-2001-16 C.3 Verify RBEDT is in Contacts Radwaste operator to ___ ___ ___

recirculation mode. verify at the 2212-4 panel:

1) RBET DISCH OR RECIRC switch is in the RECIRC position.
2) Red RECIRC light is lit.

CUE: As Radwaste Operator state: The RBET DISCH OR RECIRC switch is in the RECIRC position and the red RECIRC light is lit.

C.4 Verify a SBGTS is Verifies SBGTS operation and ___ ___ ___

operating AND Reactor Rx. Bldg. ventilation status from Building Vent system is the Initial Conditions.

isolated.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 11

RO JPM h-Rev 00 Comment STEP ELEMENT STANDARD SAT UNSAT Number C.5 Place control switches for At the 901-4 panel, places the ___ ___ ___

DWFD and DWED sump following control switches in pumps in PTL. PTL:

1) 1-2001-241A
2) 1-2001-241B
3) 1-2001-245A
4) 1-2001-245B C.6 Radwaste ventilation Verifies Radwaste ventilation ___ ___ ___

system in operation. system status from the Initial Conditions.

F.1 Terminate any Radwaste From Initial Conditions, ___ ___ ___

discharges. verifies NO Radwaste discharges are in progress.

F.2 Verify Radwaste is ready to Contacts Radwaste Operator ___ ___ ___

receive and process highly and verifies Radwaste is ready contaminated water. to receive and process highly contaminated water.

CUE: As Radwaste Operator state that you are ready to receive and process water to the Waste Collector Tank.

F.3 Verify open the 1/2-2001- Contacts Radwaste Operator to ___ ___ ___

826, EQIP DRN HDR verify the 1/2-2001-826 valve is STOP TO WASTE open.

COLLECTOR TK SV.

F.4 Verify closed 1/2-2001- Contacts Radwaste Operator to ___ ___ ___

825,FLR DRN/EQUIP DRN verify the 1/2-2001-825, FLR TO COLLECTOR TK XTIE DRN/EQUIP DRN TO VLV. COLLECTOR TK XTIE VLV is closed.

CUE: When contacted, as Radwaste Operator state that the 1/2-2001-826 valve is OPEN and the 1/2-2001-825 valve is CLOSED.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 7 of 11

RO JPM h-Rev 00 Comment STEP ELEMENT STANDARD SAT UNSAT Number F.5a./b. Process the DWFDS by From the Initial Conditions, ___ ___ ___

directing Chemistry to: verifies that a reactor coolant sample has been obtained and

1) Obtain a Reactor Chemistry recommends coolant sample pumping to the WCT per QOP AND 2040-11 flow path.
2) Determine which tank the DWFDS will be pumped to and the flow path.

F.5.d.(1), Establish valve lineup: Contacts Radwaste Operator to ___ ___ ___

(2), & (3). 1) Close 1-2001-837, establish the following valve U1 DW FLR DRN lineup to the WCT:

SUMP PMP RW 1) Close the 1-2001-837 DSCH VLV TO

2) Open the 1-2001-836 FDCT.

At the 901-4 panel:

2) Open 1-2001-836, U1 DW FLR DRN 3) Places the AO 1-8941-SUMP PMP DSCH 728 vlv control switch to VLV TO WCT. CLOSE and verifies CLOSED light lit.
3) Verify closed AO 1-8941-728, DW EQUIP DRN SUMP AND RX BLDG EQUIP DRN TK TO WCT.

F.5.e *Open AO 1-2001-3 and At the 901-4 panel: ___ ___ ___

AO 1-2001-4.* Places the SUMP ISOL VLVS AO 1-2001-3 AND 4 control switch to OPEN and verifies the OPEN light is lit.

CUE: As Unit Supervisor, inform the examinee that another NSO will log all the information required in step F.5.f.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 8 of 11

RO JPM h-Rev 00 Comment STEP ELEMENT STANDARD SAT UNSAT Number F.5.g *Start one or both DWFDS At the 901-4 panel:

pump(s).* Takes one or both control switches for 1-2001-241A and/or 1-2001-241B sump pumps out of PTL and verifies RUN light(s) lit.

CUE: As Unit Supervisor inform the examinee that another NSO will monitor the transfer and secure the sump pumps.

Evaluator The examinee should inform you that the task is complete.

Note:

JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 9 of 11

RO JPM h-Rev 00 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Post Accident Pumping of the DWFDS to the WCT JPM Number: RO JPM h Revision Number: 00 Task Number and

Title:

SR-2000-P37, (Freq: LIC-I) Given a reactor plant in a post accident condition, pump the DW floor drain sump to the WCT in accordance with QOP 2040-11.

K/A Number and Importance: KA: 268000 2.1.30 Rating: 4.4/4.0 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): QOP 2040-11, Post-Accident Sump Pumping Operations, Rev. 6 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 10 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 10 of 11

RO JPM h-Rev 00 INITIAL CONDITIONS A manual reactor scram was inserted due to high Drywell pressure resulting from a small break on the A Recirc loop.

QGAs 100, 200, and 300 have been entered.

Group II and Group III isolations occurred.

RPV water level is at 30 inches and being maintained by the Low Flow Feed Reg Valve (LFFRV).

The reactor is depressurized.

The Unit Supervisor has directed pumping of the Drywell Floor Drain Sump, (DWFDS), to the Waste Collector Tank.

B SBGTS is operating and Reactor Building ventilation is isolated.

No Radwaste discharges are in progress.

Radwaste Ventilation system is in operation.

Radwaste has been informed and is ready to process the water.

Chemistry has obtained a Reactor Coolant sample and has concurred with pumping the DWFDS to the Waste Collector Tank per QOP 2040-11.

This JPM is NOT time critical.

INITIATING CUE Pump the Drywell Floor Drain Sump to the Waste Collector Tank per QOP 2040-11. Inform the Unit Supervisor when flow to the Waste Collector Tank is established.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 11 of 11

Exelon Nuclear Job Performance Measure Initiate Standby Liquid Control With RWCU Failure to Isolate RO/SRO JPM a Revision Number: 04 Date: 04/04/2011 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date RO-SRO JPM a.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 9

RO/SRO JPM a-Rev. 04 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 through 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure QCOP 1100-02 Rev: 12 Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME/Instructor Date SME/Instructor Date SME/Instructor Date RO-SRO JPM a.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 9

RO/SRO JPM a-Rev. 04 Revision Record (Summary)

Revision 00, This JPM is developed IAW guidelines established in NUREG 1021 Rev 9.

Revision 01, JPM revised for procedure revision.

Revision 02, Deleted instruction to run Computer Aided Exercise. Revised JPM to match procedure revision. Major changes account for >5% Reactor power entry to QGA 100 and ATWS rule requiring only one SBLC pump.

Revision 03, This JPM revised to update the format and for procedure revisions.

Revision 04, Revised Initial Conditions to include more detail in QGA 101 actions taken.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM a.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 9

RO/SRO JPM a-Rev. 04 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to any IC at power > 20%
2. Manual Actuation:

Ensure the SBLC key is in the Control switch.

3. Malfunctions Fail RWCU to isolate by failing the Group 3 Division 1 logic; imf rp10a Fail RWCU to isolate by failing the Group 3 Division 2 logic; imf rp10b
4. Remotes:

NONE

5. Overrides:

NONE

6. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
7. This completes the setup for this JPM.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM a.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 9

RO/SRO JPM a-Rev. 04 INITIAL CONDITIONS

- U-1 has experienced a Hydraulic ATWS. The following conditions and QGA 101 actions taken are:

o Reactor power > 20%.

o Mode Switch is in Shutdown.

o Both Recirc pumps were tripped o Control rods are being inserted using Emergency Rod In.

o The Unit Supervisor anticipates reaching 110°F in the Torus.

- The SBLC system is in standby lineup.

- The Unit Supervisor has directed SBLC system injected per QGA 101.

- This JPM is NOT time critical.

INITIATING CUE Inject with the Standby Liquid Control System.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM a.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 9

RO/SRO JPM a-Rev. 04 JPM Start Time:

Comment SAT UNSAT Number STEP ELEMENT STANDARD Obtain procedure to be used. Obtains procedure QCOP 1100- ___ ___ ___

02 or the ATWS portion of the Standby Liquid Control Hard Card.

  • F.1. *Select system 1 OR 2 using Positions SBLC keylock switch ___ ___ ___

or keylock switch A AND B SYS 1 OR SYS 2.

Hard Card PUMP SELECT.*

Step 1 F.3.a Verify applicable squib A & B Verifies A OR B continuity lights ___ ___ ___

or continuity. out.

Hard Card Step 2.a F.3.b Verify SBLC Flow light lit. Observes Flow light lit. ___ ___ ___

or Hard Card Step 2.b EVALUATOR NOTE: The examinee may report to the Unit Supervisor that the RWCU system failed to isolate. If this occurs, as Unit Supervisor acknowledge the report. If prompted by examinee for direction, state Verify auto actions.

EVALUATOR NOTE: Start of alternate path.

  • F.3.c. Verify RWCU System Closes the MO 1-1201-2, ___ ___ ___

or isolates: MO 1-1201-5, and MO 1-1201-Hard Card 80 vlvs with the respective Step 2.c *MO-1-1201-2 vlv closed* control switches and verifies both RWCU pumps trip.

  • MO 1-1201- 5 vlv closed*

MO 1-1201-80 vlv closed Both RWCU pumps tripped G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM a.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 9

RO/SRO JPM a-Rev. 04 Comment SAT UNSAT Number STEP ELEMENT STANDARD F.3.d. Verify SLBC tank level Verifies SBLC tank level ___ ___ ___

or decreasing. decreasing on LI 1-1140-2.

Hard Card Step 2.d F.3.e. Verify SBLC pump discharge Determines SBLC Pump ___ ___ ___

or pressure > Reactor pressure. discharge pressure > Reactor Hard Card pressure on PI 1-1140-1.

Step 2.e F.3.f. Verify alarm 901-5 H-6 Annunciator 901-5 H-6 ___ ___ ___

or STANDBY LIQ SQUIB VLV STANDBY LIQ SQUIB VALVE Hard Card CIRCUIT FAILURE. CIRCUIT FAIL is lit.

Step 2.f F.3.g. Verify neutron flux level Verifies neutron flux level ___ ___ ___

or decreasing decreasing on APRM recorders.

Hard Card Step 2.g EVALUATOR: The candidate should inform you that the task is complete.

JPM Stop Time:

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM a.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 7 of 9

RO/SRO JPM a-Rev. 04 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Initiate Standby Liquid Control with RWCU Failure to Isolate JPM Number: RO/SRO JPM a Revision Number: 04 Task Number and

Title:

SR-1100-P02 (Freq: LIC=A) (ILT-MP) Given a reactor plant with an ATWS, inject boron prior to exceeding 110 degrees torus water temperature OR if core instability is observed in accordance with QGA 101 and QCOP 1100-02.

(Important PRA Operator Action - starting SBLC terminates 1 of the top 100 most probable Core Damage Sequences and has a RAW of 17.3)

K/A Number and Importance: K/A: 211000 A4.06 Rating: 3.9/3.9 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): QCOP 1100-02, Rev. 12 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 4 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM a.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 8 of 9

INITIAL CONDITIONS

- U-1 has experienced a Hydraulic ATWS. The following conditions and QGA 101 actions taken are:

o Reactor power > 20%.

o Mode Switch is in Shutdown.

o Both Recirc pumps were tripped o Control rods are being inserted using Emergency Rod In.

o The Unit Supervisor anticipates reaching 110°F in the Torus.

- The SBLC system is in standby lineup.

- The Unit Supervisor has directed SBLC system injected per QGA 101.

- This JPM is NOT time critical.

INITIATING CUE Inject with the Standby Liquid Control System.

Exelon Nuclear Job Performance Measure Manual Initiation of RCIC RO/SRO JPM b Revision Number: 03 Date: 04/04/2011 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date RO-SRO JPM b.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 9

RO/SRO JPM b-Rev 03 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 through 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM b.doc Page 2 of 9

RO/SRO JPM b-Rev 03 Revision Record (Summary) 1.Revision 00, Developed JPM. Formatted: Bullets and Numbering Revision 01, Procedure revision required revision.

Revision 02, Grammatical corrections.

Revision 03, Modified description of Standards column actions.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM b.doc Page 3 of 9

RO/SRO JPM b-Rev 03 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 19.

NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

3.2. Insert the following: ior dihs11300rmi default Malfunction will prevent Formatted: Bullets and Numbering injection using the RCIC pushbutton.

4.3. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.

4. This completes the setup for this JPM.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM b.doc Page 4 of 9

RO/SRO JPM b-Rev 03 INITIAL CONDITIONS Unit One is in a LOCA condition.

Drywell pressure is at 4 psig and holding steady.

Reactor level is at -40 and slowly lowering.

The Unit Supervisor has ordered RCIC for injection.

All appropriate QGAs have been entered.

This JPM is NOT time critical.

INITIATING CUE Start the Unit One RCIC system for injection using the manual initiation pushbutton. Notify the Unit Supervisor when RCIC is injection.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM b.doc Page 5 of 9

RO/SRO JPM b-Rev 03 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number Hard Card Depress and hold RCIC Depress and hold RCIC MAN ___ ___ ___

Step 1 MAN INITIATION INITIATION pushbutton for at OR pushbutton for at least 30 least 30 sec.

QCOP sec.

1300-02, F.4.a CUE: IF told RCIC failed to initiate with pushbutton, acknowledge. If asked for direction, respond with continue with efforts to inject with RCIC.

EVALUATOR NOTE: Alternate Path starts here.

EVALUATOR NOTE: RCIC will fail using the pushbutton. Operator must proceed with manual startup actions on Hard Card or per QCOP 1300-02 step F.5.

Hard Card Start TURB VACU PMP. Places the TURB VACU PMP Step 1 control switch to Start and OR verifies the RUN light is lit.

F.5.a

  • Hard *Open MO 1-1301-62, Places the MO 1-1301-62, ___ ___ ___

Card TURB CLG WTR VLV.

  • TURB CLG WTR VLV control Step 2 switch to OPEN and verifies OR the OPEN light is lit.

F.5.b Hard Card Verify open MO 1-1301- Verifies the OPEN light for the Step 3 48, PMP DISCH VLV. MO 1-1301-48, PMP DISCH OR VLV is lit.

F.5.c

  • Hard *Open MO 1-1301-49, Places the MO 1-1301-49, PMP Card PMP DISCH VLV.
  • DISCH VLV control switch to Step 4 OPEN and verifies the OR OPEN light is lit.

F.5.d G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM b.doc Page 6 of 9

RO/SRO JPM b-Rev 03 Comment STEP ELEMENT STANDARD SAT UNSAT Number Hard Card Open MO 1-1301-60, MIN Places the MO 1-1301-60, MIN Step 5 FLOW VLV. FLOW VLV control switch to OR OPEN and verifies the F.5.e OPEN light is lit.

  • Hard *Open MO 1-1301-61, Places the MO 1-1301-61, STM ___ ___ ___

Card STM TO TURB VLV.

  • TO TURB VLV control switch to Step 6 OPEN and verifies the OR OPEN light is lit.

F.5.f Also verifies:

  • RCIC discharge flow increases to 400 gpm.
  • MO 1-1301-60, MIN FLOW VLV fully closes.

7 If necessary, adjusts Adjusts flow in MANUAL OR ___ ___ ___

(Hard discharge flow in MANUAL AUTO mode using the manual Card) OR AUTO mode.

adjustment lever or the setpoint or pushbutton respectively on FIC F.5.i 1-1340-1, RCIC FLOW CONTROLLER.

CUE: If candidate reports that RCIC is injecting, acknowledge the report I understand that RCIC is injecting into the vessel.

EVALUATOR NOTE: Operator will inform you that the task is complete.

JPM Stop Time:

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM b.doc Page 7 of 9

RO/SRO JPM b-Rev 03 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Manual Initiation of RCIC JPM Number: RO/SRO JPM b Revision Number: 03 Task Number and

Title:

SR-1300-P01 (Freq: LIC=B) (ILT-MP) Given a reactor plant in an accident condition where RCIC fails to autostart and/or fails to start with auto pushbutton, start RCIC for injection in accordance with QCOP 1300-02.

K/A Number and Importance: K/A: 217000.A4.04 Rating: 3.6/3.6 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): QCOP 1300-02, Rev 27, RCIC SYSTEM MANUAL STARTUP, (INJECTION/PRESSURE CONTROL)

Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 5 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM b.doc Page 8 of 9

INITIAL CONDITIONS Unit One is in a LOCA condition.

Drywell pressure is at 4 psig and holding steady.

Reactor level is at -40 and slowly lowering.

The Unit Supervisor has ordered RCIC for injection.

All appropriate QGAs have been entered.

This JPM is NOT time critical.

INITIATING CUE Start the Unit One RCIC system for injection using the manual initiation pushbutton. Notify the Unit Supervisor when RCIC is injection.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Adjust Turbine/Generator System Load Set RO/SRO JPM c Revision Number: 00 Date: 04/04/2011 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO/SRO JPM c-Rev 00 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO/SRO JPM c-Rev 00 Revision Record (Summary)

Revision 00, New JPM created from Task Training Matrix for the 09-1 ILT NRC Exam.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO/SRO JPM c-Rev 00 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC-20.

NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. On the Speed Load Screen, change the Load Set Setpoint to 80%.
3. Select the <Status> and <Steam Pressure> Screens for the Digital EHC Monitors.
4. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
5. This completes the setup for this JPM.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO/SRO JPM c-Rev 00 INITIAL CONDITIONS Unit-1 is presently at 74% power with a load increase in progress per QCGP 3-1 step F.3.

The Unit Supervisor has directed you to maintain Load Set approximately 10% above Reactor power until the Unit is at 100% power.

This JPM is NOT time critical.

INITIATING CUE Raise the Load Set Setpoint to 85% at a ramp rate of 10% per minute in accordance with QCGP 3-1 Attachment D.

Provide a copy of QCGP 3-1 Attachment D.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO/SRO JPM c-Rev 00 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number Attachment D *Navigate to the From the <Status> OR <Steam ___ ___ ___

<Speed-Load> Pressure> screens:

Step 2.a.

screen.*

  • Select <Control> to display the Control Screen Group
  • Select <Speed-Load> to display the Speed-Load screen.
  • Attachment D *Select STPT/RAMP* In the Load Set box: ___ ___ ___

Step 2.a.(1)

  • Selects STPT/RAMP.
  • Attachment D *Enter a value for In the Load Setpoint and ___ ___ ___

Step 2.a.(2) SETPOINT and select RAMP box:

OK*

  • Enters 85 for Load Set Enter the value for Setpoint RAMP and select OK.
  • Enters 10 for the RAMP value.
  • Selects OK.

Evaluator If no change is entered for the RAMP value, the default ramp rate is Note: 5%.

  • Attachment D *Select OK to confirm In the Confirm Setpoint box: ___ ___ ___

Step 2.a.(3) setpoint changes.*

  • Selects OK AND In the Load Set box:
  • Verifies both Load Ref Cmd and Load Reference indicate 85%

after approx. 1 minute.

Evaluator If a value of 85% was entered for Step 2.a.(2), then the next step is Note: NOT required.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO/SRO JPM c-Rev 00 Comment STEP ELEMENT STANDARD SAT UNSAT Number Attachment D Selects RAISE or In the Load Set box: ___ ___ ___

LOWER to manually Step 2.a.(4)

  • Select RAISE or LOWER bump final auto until Load Reference setpoint.

indicates 85%.

Evaluator The candidate should inform you that the task is complete Note:

JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO/SRO JPM c-Rev 00 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Adjust Turbine/Generator System Load Set JPM Number: RO/SRO JPM c Revision Number: 00 Task Number and

Title:

SR-5600-P15, Perform the following DEHC operations on the Operator Work Station (OWS): Adjust Load Set.

K/A Number and Importance: Reactor/Turbine Pressure Regulating System, 241000 A4.15, 3.2/3.2 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): QCGP 3-1, Reactor Power Operations, Rev.63 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 5 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO/SRO JPM c-Rev 00 INITIAL CONDITIONS Unit-1 is presently at 74% power with a load increase in progress per QCGP 3-1 step F.3.

The Unit Supervisor has directed you to maintain Load Set approximately 10% above Reactor power until the Unit is at 100% power.

This JPM is NOT time critical.

INITIATING CUE Raise the Load Set Setpoint to 85% at a ramp rate of 10% per minute in accordance with QCGP 3-1 Attachment D.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Place Shutdown Cooling In Operation with Spurious Group II RO/SRO JPM d Revision Number: 02 Date: 04/04/2011 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date RO-SRO JPM d.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 11

RO/SRO JPM d-Rev. 02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 through 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure QCOP 1000-05 Rev: 43 Procedure QCOA 1000-02 Rev: 16 Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date RO-SRO JPM d.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 11

RO/SRO JPM d-Rev. 02 Revision Record (Summary)

Revision 00, This JPM was developed for ILT NRC exam 03-01 IAW NUREG 1021, rev. 9.

Revision 01, This JPM was revised to update format and for procedure revisions. This JPM was also revised to delete the Reactor Recirc Pump Trip and add a spurious Group II.

Revision 02, Modified Initial Conditions and role-plays, deleted procedure steps C.1 through C.4 and reformatted steps.

RO-SRO JPM d.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 11

RO/SRO JPM d-Rev. 02 SIMULATOR SETUP INSTRUCTIONS

1) Reset simulator to IC 5, shutdown cooling on service and go to RUN
2) Manual Actuations :
  • Shutdown SDC per QCOP 1000-05 step F.5, SDC Lineup for Subsequent Restart.
  • Verify MO 1-1001-16A shows dual position indication.
  • Fill out a copy of QCOP 1000-05. Sign off the prerequisites, all of step F.1 and F.5.

except step F.5.c. (N/A). N/A steps F.3 and F.4.

3) Run setup CAEP file (if available)
4) Malfunctions VERIFY the following commands are in the Instructor Summary: (enter in expert mode as necessary) a) Trigger 1 is set to cause a spurious Group II 30 seconds after the 1A RHR pump is started.
  • trgset 1 zdihs110021A(5)
  • imf rp07a(1 :30)
  • imf rp07b(1 :30) b) PLACE an Equipment Status Tag on the MO 1-1001-16A valve control switch stating:

1-1001-17A RHR HX OUTLET VLV, is throttled 28.5 turns closed from full open.

c) PLACE an Equipment Status Tag on the MO 1-1001-18A valve control switch stating:

MO 1-1001-18A, RHR LOOP MIN FLOW VLV, is closed with the breaker open.

5) When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
6) This completes the setup for this JPM.

RO-SRO JPM d.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 11

RO/SRO JPM d-Rev. 02 INITIAL CONDITIONS

- Unit 1 is in Mode 4 and has been shut down for 2 days.

- Both reactor recirc pumps are running at minimum speed.

- RHR is lined up for a subsequent restart of Shutdown Cooling (SDC) on A loop per QCOP 1000-05 step F.5.

- RHRSW is still in operation.

- Rad Protection has been notified that SDC will be restarted.

- Reactor water temperature is 153 degrees F in a band of 150 - 160 degrees F.

- The Unit Supervisor has directed you to establish a new Reactor water temperature band of 130 -150 degrees F.

INITIATING CUE Place the "A" loop of RHR in Shutdown Cooling using the "A" RHR pump per QCOP 1000-05 step F.2.

Cool down to the new temperature band slowly, (25-30 degrees F per hour.)

Notify the Unit Supervisor when Reactor cooldown has begun.

Provide the candidate with a copy of QCOP 1000-05 marked up IAW the setup instructions.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

RO-SRO JPM d.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 11

RO/SRO JPM d-Rev. 02 JPM Start Time:

Comment SAT UNSAT Number STEP ELEMENT STANDARD F.2.a Verify RHRSW Loop A in Verifies "A" RHRSW pump on ___ ___ ___

operation per QCOP 1000-04. per QCOP 1000-05 from Initial Conditions.

F.2.b.(1) Verify closed: Verifies the following valve ___ ___ ___

indications on RHR Loop A:

thru MO 1-1001-19A, A RHR LOOP X-TIE TO B RHR LOOP SV.

  • MO 1-1001-19A closed b(4).

light lit.

MO 1-1001-7A, A RHR PMP TORUS SUCT VLV.

  • MO 1-1001-7A closed MO 1-1001-7B, B RHR PMP light lit.

TORUS SUCT VLV.

  • MO 1-1001-7B closed MO 1-1001-29A, LPCI LOOP light lit.

DOWNSTREAM SV .

  • MO 1-1001-29A closed light lit.

F.2.c.(1) Verify open: Verifies the following valve ___ ___ ___

indications on RHR Loop A:

thru MO 1-1001-43A, RHR PMP SDC SUCT VLV.

  • MO 1-1001 43A open c(3).

light lit.

MO 1-1001-47, SDC SUCT HDR DOWNSTREAM SV.

  • MO 1-1001-47 open MO 1-1001-50, SDC SUCT light lit.

HDR UPSTREAM SV.

  • MO 1-1001-50 open light lit.

F.2.d.(1) Verify throttled open: Verifies both open and closed ___ ___ ___

thru lights are lit for:

MO 1-1001-28A, A LPCI LOOP d(2).

UPSTREAM SV.

  • MO 1-1001-16A VLV.

F.2.e. If Reactor Recirc Pump A is off, Determines 1A Recirc pump ___ ___ ___

THEN close MO 1-202-5A, is running by observing ASD RECIRC PMP DISCH VLV, OR A Run Status ON light is lit.

MO 1-202-4A, RECIRC PMP N/As step F.2.e.

SUCTION VLV.

RO-SRO JPM d.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 11

RO/SRO JPM d-Rev. 02 Comment SAT UNSAT Number STEP ELEMENT STANDARD F.2.f. Verify a slow cooldown rate of Determines from Initial ___ ___ ___

25-30°F per hour is desired Conditions that a slow and then verify the 1-1001- cooldown rate is desired and 17A throttled (approx 28.5 turns verifies 1-1001-17A is closed) to maintain a slow throttled closed 28.5 turns as cooldown rate. indicated on the Equipment Status Tag.

F.2.f.(1) Verify Equipment Status Tag Verifies Equipment Status ___ ___ ___

on MO 1-1001-16A., RHR HX Tag is placed on the MO 1-BYP VLV control switch 1001-16A control switch stating, 1-1001-17A RHR HX OUTLET VLV, is throttled.

F.2.g. Push RESET FOR GRP 2 Depresses the RESET FOR ___ ___ ___

ISOL VLV 1-1001-29, GRP 2 ISOL VLV 1-1001-29, pushbutton at panel 901(2)-3. pushbutton for RHR Loop A on the 901-3 Panel.

EVALUATOR NOTE: The next two steps will be done in rapid succession. Placekeeping is not required between steps but should be done at the completion of both.

  • F.2.h.(1) *Initiate opening MO 1-1001- Places the MO 1-1001-29A ___ ___ ___

29A, A LPCI LOOP control switch to OPEN.

DOWNSTREAM SV.*

  • F.2.h.(2) After MO 1-1001-29A opens for 2 seconds after placing the ___ ___ ___

approx. 2 seconds, *start the MO 1-1001-29A c/s to open, 1A RHR Pump.* places the A RHR pump CS to START.

RO-SRO JPM d.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 7 of 11

RO/SRO JPM d-Rev. 02 Comment SAT UNSAT Number STEP ELEMENT STANDARD SIMOP: Approximately 30 seconds after the start of the 1A RHR pump, verify trigger 1 goes true. If not then insert the following commands for a Group II isolation:

  • imf rp07a,
  • imf rp07c Wait approximately 1 minute then delete both malfunctions with the commands:
  • dmf rp07a,
  • dmf rp07b Alternate Path Starts Here E.9 On a Group 2 isolation, the Verifies the following valve ___ ___ ___

following RHR valves close: indications on RHR Loop A:

MO 1-1001-20 RHR SYS to

  • MO 1-1001-20 closed RW UPSTREAM SV. light lit.

MO 1-1001-21, RHR SYS TO

  • MO 1-1001-21 closed RW DOWNSTREAM SV. light lit.

MO 1-1001-47, SDC SUCT

  • MO 1-1001-47 closed HDR DOWNSTREAM SV. light lit.

MO 1-1001-50, RHR SDC

  • MO 1-1001-50 closed SUCT HDR UPSTREAM SV light lit.

EVALUATOR ROLE PLAY: As the Shift Supervisor just calling in from the Aux Electric Room, report that Electrical Maintenance was assisting an EO by placing jumpers in the 901-40 and 901-41 panels for a Clearance Order when they heard a couple of relays change state. You have directed the EMs to remove all jumpers and return to the WEC with the Clearance Order.

EVALUATOR ROLE PLAY: As Unit Supervisor, acknowledge the call in from the Aux Electric Room and direct SDC to be placed back in service.

RO-SRO JPM d.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 8 of 11

RO/SRO JPM d-Rev. 02 Comment SAT UNSAT Number STEP ELEMENT STANDARD EVALUATOR NOTE: Per QCOP 1000-05, Limitations and Actions step E.3, the candidate should refer to QCOA 1000-02, Loss of Shutdown Cooling. Only applicable steps are shown. All others are N/Ad. However the candidate may also accomplish the task by referring directly to QCOP 1000-05 steps F.1.i. through F.1.r.

D.2.a. Verify closed: Verifies the following valve ___ ___ ___

indications on RHR Loop A:

thru MO 1-1001-18A, RHR MIN FLOW BYP.

  • MO 1-1001-18A closed D.2.d light lit.

MO 1-1001-34A, TORUS TEST OR SPRAY VALVE.

  • MO 1-1001-34A closed MO 1-1001-36A, TORUS H2O light lit.

TEST VALVE.

  • MO 1-1001-36A closed MO 1-1001-37A, TORUS light lit.

SPRAY SHUTOFF

  • MO 1-1001-37A closed light lit.

EVALUATOR NOTE: Student may ask if the Shift Manager has been notified, reply that the Shift Manager has been notified and that another NSO will monitor Reactor Water/Metal temps per step D.5.

D.8.c.(1)(a) Alarm 901-3 E-15, SDC low Verifies 901-3 E-15 alarm ___ ___ ___

pressure permissive is clear. clear.

D.8.c.(1)(b) Alarm 901-5 A-8, Group 2 ISOL Verifies 901-5 A-8 is in alarm. ___ ___ ___

CH TRIP, in alarm.

  • D.8.c.(4) If a spurious Group 2 Isolation At 901-5 panel, takes Group ___ ___ ___

(a) signal has caused a loss of isolation reset switch to both Shutdown Cooling, THEN: INBD and OTBD.

OR

  • Reset Group II at 901-5 QCOP 1000-05 panel.*

F.1.i.(1)

RO-SRO JPM d.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 9 of 11

RO/SRO JPM d-Rev. 02 Comment SAT UNSAT Number STEP ELEMENT STANDARD

  • D.8.c.(4) Depress both RESET FOR Depresses both RESET FOR ___ ___ ___

(b). GRP ISOL VLV 1-1001-29A/B GRP ISOL VLV 1-1001-29A/B pushbuttons: pushbuttons.

OR

  • Reset 1-1001-29A isolation.*

QCOP 1000-05 Reset 1-1001-29B isolation.

F.1.i.(2).

D.8.c.(4)(c) Restart Shutdown Cooling per Refers to QCOP 1000-05 to ___ ___ ___

QCOP 1000-05. restart Shutdown Cooling.

EVALUATOR CUE: Inform candidate that QCOP 1000-05, Shutdown Cooling Operations, prerequisites are met.

Time Compression: Procedural steps have been verified through step F.1.i.

  • F.1.j. *Open MO 1-1001-47, SDC Places C/S for MO 1-1001-47 ___ ___ ___

HDR DOWNSTREAM SV.* to OPEN and verifies valve open light is lit.

  • F.1.k. *Open MO 1-1001-50, SDC Places C/S for MO 1-1001-50 ___ ___ ___

HDR UPSTREAM SV.* to OPEN and verifies valve open light is lit.

F.1.l. Verify open MO 1-1001-16A, A Verifies MO 1-1001-16A valve ___ ___ ___

RHR HX BYP VLV. open light is lit.

  • F.1.m. *Close MO 1-1001-28A, A Places the C/S for MO 1- ___ ___ ___

LPCI LOOP UPSTREAM SV.* 1001-28A to CLOSE and holds until valve closed light is lit and open light is out.

  • F.1.n. *Open MO 1-1001-29A, A LPCI Places C/S for MO 1-1001- ___ ___ ___

LOOP DOWNSTREAM SV.* 29A to OPEN and verifies valve opens light is lit.

EVALUATOR NOTE: Step F.1.o. is N/Ad. Steps F.1.p.(1), (2), and (3) are all Condition Met (CM).

  • F.1.q.(1), *Throttle open MO 1-1001-28A Places the C/S for MO 1- ___ ___ ___

(2) for ~2 seconds and start the 1A 1001-28A to OPEN for ~2 RHR pump.

  • seconds and then takes the C/S for the 1A RHR pump to START.

RO-SRO JPM d.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 10 of 11

RO/SRO JPM d-Rev. 02 Comment SAT UNSAT Number STEP ELEMENT STANDARD

  • F.1.r. *Throttle open MO 1-1001-28A Moves C/S for MO 1-1001- ___ ___ ___

to maintain >2500 gpm flow.* 28A to adjust flow to >2500 gpm.

EVALUATOR NOTE: The candidate should inform you that the RPV cooldown has begun.

CUE: Inform candidate that another NSO will monitor and adjust RPV cooldown rate, water temperature and level as needed.

EVALUATOR NOTE: The candidate should inform you that the task is complete.

JPM Stop Time:

RO-SRO JPM d.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 11 of 11

RO/SRO JPM d-Rev. 02 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Place Shutdown Cooling In Operation with Spurious Group II JPM Number: RO/SRO JPM d Revision Number: 02 Task Number and

Title:

SR-1000-P07 (Freq: LIC=B) (ILT - Must Perform or Must Supervise)

Given a shutdown reactor plant, start RHR in shutdown cooling mode in accordance with QCOP 1000-5. (Important PRA task. Starting SDC has a Risk Achievement Worth (RAW) of 2.35)

K/A Number and Importance: K/A: 205000.A2.06 Rating: 3.4 / 3.5 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): QCOP 1000-05, Rev. 43, Shutdown Cooling Start-Up and Operation QCOA 1000-02, Rev. 16, Loss of Shutdown Cooling Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 20 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

RO-SRO JPM d.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 12 of 11

INITIAL CONDITIONS

- Unit 1 is in Mode 4 and has been shut down for 2 days.

- Both reactor recirc pumps are running at minimum speed.

- RHR is lined up for a subsequent restart of Shutdown Cooling (SDC) on A loop per QCOP 1000-05 step F.5.

- RHRSW is still in operation.

- Rad Protection has been notified that SDC will be restarted.

- Reactor water temperature is 153 degrees F in a band of 150 - 160 degrees F.

- The Unit Supervisor has directed you to establish a new Reactor water temperature band of 130 -150 degrees F.

INITIATING CUE Place the "A" loop of RHR in Shutdown Cooling using the "A" RHR pump.

Cool down to the new temperature band slowly, (25-30 degrees F per hour.)

Notify the Unit Supervisor when Reactor cooldown has begun.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Energize 480 VAC Bus 15 With a Failure of the Normal Feed RO/SRO JPM e Revision Number: 00 Date: 04/04/2011 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO/SRO JPM e-Rev 00 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO/SRO JPM e-Rev 00 Revision Record (Summary)

Revision 00, New JPM developed for ILT 09-1 NRC Exam.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO/SRO JPM e-Rev 00 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC-18 NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
2. Take the following actions:
  • Prevent reclosure of the Bus 15 Main Feed Breaker: imf ed06a
  • Trip T-12 using the command: imf ed02
  • Verify the U-1 and U1/2 EDG are supplying the ECCS Busses.
  • Restore RPS A and B from the normal feeds: irf rp28r reset, irf rp29r reset
  • Backfeed Bus 13 and Bus 14.
  • Allow the simulator to stabilize, i.e. RPV water level 30 inches (use RCIC if necessary),

and RPV pressure stable at < 1060 psig.

  • Perform the following steps of QCOA 6100-03, D.3, D.15, D.18, D.23, D.24, and D.28.
  • Snap the setup to IC-0 or any other available IC.
3. Prepare a copy of QCOA 6100-03 with the following steps signed of as complete, N/A , or in progress (circled), up step D.29.
4. When the above steps are completed for this and other JPMs to be run concurrently then validate, if not previously validated, the concurrently run JPMs using the JPM Validation Checklist.
5. This completes the setup for this JPM.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO/SRO JPM e-Rev 00 INITIAL CONDITIONS A loss of offsite power has occurred on Unit 1.

The Unit Supervisor has entered QGA 100 and directed actions to control RPV water level and pressure.

Actions taken per QCOA 6100-03, Loss of Offsite Power actions up to step D.29 have been completed.

Hard Cards are authorized.

The Unit Supervisor has directed you to assume Electric Plant restoration activities.

This JPM is NOT time critical.

INITIATING CUE Re-energize Bus 15 and Bus 17 from their Normal Feeds per QCOA 6100-03, step D.29.

Do NOT energize Bus 16.

Notify the Unit Supervisor when Bus 15 and Bus 17 are energized.

Provide the examinee with a copy of QCOA 6100-03.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO/SRO JPM e-Rev 00 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number QCOA 6100- Close Bus 15 Main

  • Places the Bus 15 ___ ___ ___

03 Feed breaker control switch to NAT Step 29 a. to clear the Auto Trip.

  • Places the Bus 15 control switch to NAC to close the breaker.

CUE: If the examinee reports the trip of the Bus 15 Main Feed breaker and asks for direction, as Unit Supervisor acknowledge the report and state: Continue efforts to energize Bus 15..

CUE: If an EO is dispatched to investigate the Bus 15 Main Feed breaker, then report back as the EO from Bus 15 cubicle 2B that EMs are here and they have identified a problem with the closing spring and are unable to charge it. There are no other problems preventing Bus 15 from being energized.

QCOA 6100- *Close Bus 17 Main

  • Places the Bus 17 03 Feed Breaker* control switch to NAT to clear the Auto Trip lights.

Step 29 c.

  • Places the Bus 17 control switch to NAC and verifies breaker CLOSED and Bus 17 LIVE lights are lit.

Alternate Path Starts Here Evaluator The task may be accomplished by using the QOA 6700-01 Hard Card Note: OR QOP 6700-02. The step below is critical if Bus 17 was NOT energized using QCOA 6100-03.

Hard Card Verify closed the Bus

  • If necessary, places the ___ ___ ___

Step 1 17 Main Feed Breaker Bus 17 control switch to OR NAC.

QOP 6700-02

  • Verifies breaker CLOSED and Bus 17 Step F.1.d.(1). LIVE lights are lit.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO/SRO JPM e-Rev 00 Comment STEP ELEMENT STANDARD SAT UNSAT Number Hard Card Verify open Bus 15 Verifies Bus 15 breaker OPEN Main Feed Breaker. and AUTO TRIP lights are lit.

Step 2.a OR OR Places Bus 15 control switch to QOP 6700-02 NAT and verifies Breaker OPEN Step F.1.d.(2) lights are lit.

Hard Card Verify open Bus 15 to Verifies Bus 15 to Bus 16 tie- ___ ___ ___

Step 2.c Bus 16 Tie-Breaker. breaker OPEN light is lit.

OR QOP 6700-02 Step F.1.d.(3)

Hard Card *Close Bus 15 to Bus Places Bus 15 to Bus 17 tie- ___ ___ ___

Step 2.d 17 Tie-Breaker.* breaker control switch to NAC and verifies CLOSED light and OR BUS 15 LIVE lights are lit.

QOP 6700-02 Step F.1.d.(4)

Evaluator The examinee should inform you that the task is complete.

Note:

JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO/SRO JPM e-Rev 00 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Energize 480 VAC Bus 15 With a Failure of the Normal Feed JPM Number: RO/SRO JPM e Revision Number: 00 Task Number and

Title:

SR 6500-P04, K/A Number and Importance: Electrical, 262001 A4.01, 3.4/3.7 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): QCOA 6100-03, Loss of Offsite Power, Rev. 26 QOA 6700-01, Attachment B, Crosstie Busses 15,16, and 17, Rev. 11 QOP 6700-02, 480 Bus Volt Tie Circuit Breakers, Rev. 30 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 10 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO/SRO JPM e-Rev 00 INITIAL CONDITIONS A loss of offsite power has occurred on Unit 1.

The Unit Supervisor has entered QGA 100 and directed actions to control RPV water level and pressure.

Actions taken per QCOA 6100-03, Loss of Offsite Power actions up to step D.29 have been completed.

Hard Cards are authorized.

The Unit Supervisor has directed you to assume Electric Plant restoration activities.

This JPM is NOT time critical.

INITIATING CUE Re-energize Bus 15 and Bus 17 from their Normal Feeds per QCOA 6100-03, step D.29.

Do NOT energize Bus 16.

Notify the Unit Supervisor when Bus 15 and Bus 17 are energized.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Bypass A Channel of the Reactor Mode Switch to Shutdown Scram RO/SRO JPM f Revision Number: 00 Date: 04/04/2011 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO/SRO JPM f-Rev 00 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO/SRO JPM f-Rev 00 Revision Record (Summary)

Revision 00, New JPM developed for the 09-1 ILT NRC Exam.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO/SRO JPM f-Rev 00 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to any IC.
2. Obtain a switchable jumper with banana type connectors.
3. Provide a copy of QCOP 0500-07 with the prerequisites signed.
4. Fill out an EST per QCOP 0500-07, step F.2.
5. This completes the setup for this JPM.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO/SRO JPM f-Rev 00 INITIAL CONDITIONS A Reactor shutdown is in progress per QCGP 2-1.

All control rods have been inserted to position 00.

NO half scrams are present on either RPS channel.

NO half scram testing is in progress.

The Reactor Mode Switch is ready to be placed to the Shutdown position per QCGP 2-1 step F.12.l.

This JPM is NOT time critical.

INITIATING CUE Bypass the RPS Channel A Reactor Mode Switch to Shutdown scram per QCOP 0500-07.

Notify the Unit Supervisor when the task is complete.

Provide the examinee with a copy of QCOP 0500-07, a completed Equipment Status Tag (EST), and a switchable jumper with banana type connectors. (Note: Verify the switch is in the OFF position.)

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO/SRO JPM f-Rev 00 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number F.1 Notify US of TMOD installation. Informs Unit Supervisor of ___ ___ ___

installation of jumper per QCOP 0500-07.

CUE: As Unit Supervisor, acknowledge installation of TMOD.

F.2 Place EST on Reactor Mode Verifies EST states: ___ ___ ___

Switch. Reactor Mode Switch to Shutdown Scram is bypassed for A channel per QCOP 0500-07.

AND Places EST on the Reactor Mode Switch.

CUE: After the examinee verifies the EST, as Unit Supervisor state: another NSO will place the EST on the Reactor Mode Switch. (Note: Do NOT allow actual placement of the EST as it may cue other examinees in the simulator.)

F.3 *Install the switchable jumper.* Verifies the switch is in the OFF ___ ___ ___

position At the 901-15 panel, Terminal Board C:

  • Places the jumper between terminals C-54 and C-55.

F.3.a *Turn ON switchable jumper.* Places the jumper toggle switch ___ ___ ___

to the ON position.

F.4 Notify Unit Supervisor of jumper Notifies Unit Supervisor jumper placement. is placed per QCOP 0500-07.

CUE As Unit Supervisor, acknowledge jumper placement and inform the examinee that another NSO will perform the remaining steps of the procedure.

JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO/SRO JPM f-Rev 00 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Bypass A Channel of the Reactor Mode Switch to Shutdown Scram JPM Number: RO/SRO JPM f Revision Number: 00 Task Number and

Title:

SRN-TMOD-P3, Install/Remove Jumper From Correct Terminals K/A Number and Importance: Reactor Protection System, 212000 2.1.23, 4.3/4.4 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): QCOP 0500-07, Rev. 10 Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 05 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

RO/SRO JPM f-Rev 00 INITIAL CONDITIONS A Reactor shutdown is in progress per QCGP 2-1.

All control rods have been inserted to position 00.

NO half scrams are present on either RPS channel.

NO half scram testing is in progress.

The Reactor Mode Switch is ready to be placed to the Shutdown position per QCGP 2-1 step F.12.l.

This JPM is NOT time critical.

INITIATING CUE Bypass the RPS Channel A Reactor Mode Switch to Shutdown scram per QCOP 0500-07.

Notify the Unit Supervisor when the task is complete.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Exelon Nuclear Job Performance Measure Shutdown Torus Cooling RO/SRO JPM g Revision Number: 12 Date: 04/04/2011___

Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date RO-SRO JPM g.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 8

RO/SRO JPM g-Rev 12 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 through 12 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

________ 9. Verify cues both verbal and visual are free of conflict.

________ 10. Verify performance time is accurate

________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM g.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 8

RO/SRO JPM g-Rev 12 Revision Record (Summary)

Revision 09, This JPM is being revised to reflect procedures changes and new format.

Revision 10, This JPM is being revised to reflect procedure changes.

Revision 11, This JPM was revised to reflect procedure changes.

Revision 12, This JPM was revised to reflect procedure changes.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM g.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 8

RO/SRO JPM g-Rev 12 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to IC 21 (rst 21).

NOTE: It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Run the setup Computer Aided Exercise _____-__ (jcae! _____-__)
3. Manual Actuation:

Start one RHRSW pump per loop per QCOP 1000-04.

Start-up Torus Cooling on either Loop of RHR with one RHR pump on IAW QCOP 1000-

09. Fully close the MO 1-1001-16A/B, Heat Exchanger Bypass valve.

Prepare a copy of QCOP 1000-09 with the Prerequisites and either step F.1 or F.2 signed off. (depending on which loop of Torus Cooling is running).

Malfunctions:

NONE Remotes:

NONE Overrides:

NONE

4. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
5. This completes the setup for this JPM.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM g.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 8

RO/SRO JPM g-Rev 12 INITIAL CONDITIONS

- The Unit is operating at _________% power.

- The Periodic HPCI surveillance requiring Torus cooling has been completed.

- The RHR system is in Torus Cooling with one RHR pump running IAW QCOP 1000-09.

- Two RHR Service Water pumps are running (one per loop) IAW QCOP 1000-04.

- This JPM is not time critical.

INITIATING CUE Shutdown Torus Cooling per QCOP 1000-09.

Provide examinee with: Copy of QCOP 1000-09.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM g.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 8

RO/SRO JPM g-Rev 12 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number

  • F.5/6.a Throttle closed MO 1-1001- Positions and holds the MO 1- ___ ___ ___

36A/B. 1001-36A/B CS to CLOSED.

  • F.5/6.b Stop running RHR pump and When RHR pump discharge ___ ___ ___

fully close MO 1-1001-36A/B. pressure increases to within 25 psig of RHRSW pressure, positions RHR pump CS to STOP 1A/1B/1C/1D -OFF light lit AND positions MO 1-1001-36A/B CS to CLOSE. -

CLOSED light lit.

F.5/6.c. Close MO 1-1001-34A/B. Positions MO 1-1001-34A/B CS ___ ___ ___

to CLOSE. - CLOSED light lit.

F.5/6.d. Open MO 1-1001-16A/B. Positions MO 1-1001-16A/B CS ___ ___ ___

to OPEN. - OPEN light lit.

  • F.5./ OPEN MO 1-1001-18A/B. Position MO 1-1001-18A/B CS ___ ___ ___

6.e. to open. - OPEN light lit.

CUE: Inform the candidate that you will have another operator secure RHRSW and verify RHR Loop A/B is in standby lineup per QCOP 1000-02.

EVALUATOR: The candidate should inform you that the task is complete.

JPM Stop Time:

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM g.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 8

RO/SRO JPM g-Rev 12 JPM

SUMMARY

Operators Name: Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Shutdown Torus Cooling JPM Number: RO/SRO JPM g Revision Number: 12 Task Number and

Title:

SR-1000-P39 (Freq: LIC=I) Given a reactor plant with RHR torus cooling in operation, stop the RHRSW system and RHR system in accordance with QCOP 1000-04 and QCOP 1000-09 or QCOP 1000-30.

K/A Number and Importance: K/A: 219000 A4.01 Rating: 3.8/3.7 Suggested Testing Environment: Simulator Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): QCOP 1000-09, Rev. 22, TORUS COOLING STARTUP AND OPERATION Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 10 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

G:\DRSIII\License Examinations\2011\Quad Cities\Proposed\JPMs\simulator\RO-SRO JPM g.docSRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 7 of 8

INITIAL CONDITIONS

- The Unit is operating at _________% power.

- The Periodic HPCI surveillance requiring Torus cooling has been completed.

- The RHR system is in Torus Cooling with one RHR pump running IAW QCOP 1000-09.

- Two RHR Service Water pumps are running (one per loop) IAW QCOP 1000-04.

- This JPM is not time critical.

INITIATING CUE Shutdown Torus Cooling per QCOP 1000-09.

SRRS: 3D.105 (when utilized for operator initial or continuing training)