| issue date = 10/23/1989 | | issue date = 10/23/1989 | ||
| title = Special Rept 89-TS2-00:on 890314,control Room Operators Identified That One Channel of Reactor Vessel Level Monitoring Sys Recorder Was Indicating Lower than Would Be Expected.Caused by Open Circuit within Thermocouple Heater | | title = Special Rept 89-TS2-00:on 890314,control Room Operators Identified That One Channel of Reactor Vessel Level Monitoring Sys Recorder Was Indicating Lower than Would Be Expected.Caused by Open Circuit within Thermocouple Heater | ||
| author name = | | author name = Johnson B, Kozup C | ||
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), | | author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), | ||
| addressee name = | | addressee name = | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = 89-TS2, 89-TS2-00, NUDOCS 8911010048 | | document report number = 89-TS2, 89-TS2-00, NUDOCS 8911010048 | ||
| document type = REPORTABLE OCCURRENCE REPORT (SEE ALSO AO | | document type = REPORTABLE OCCURRENCE REPORT (SEE ALSO AO LER), TEXT-SAFETY REPORT | ||
| page count = 5 | | page count = 5 | ||
}} | }} | ||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter::,'T,. | {{#Wiki_filter::,'T,. | ||
consumers Power | |||
. POWERING MICHIGAN"S PROGRESS General Offices: 1945 West Parnell Road, Jackson, Ml 49201 * (517) 788-0550 October 23, 1989 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - | |||
LICENSEE EVENT REPORT 89-TS2 (INOPERABLE REACTOR VESSEL LEVEL MONITORING SYSTEM CHANNEL) | |||
Licensee Event Report (LER) 89-TS2 (Inoperable Reactor Vessel Level Monitoring System Channel) is attached. | |||
This is a Technical Specification (TS) Special Report that is being submitted pursuant to T.S. Table 3.17.4 Action K which requires the minimum operable channels to be restored within seven days or a Special Report be submitted within the following 30 days | This is a Technical Specification (TS) Special Report that is being submitted pursuant to T.S. Table 3.17.4 Action K which requires the minimum operable channels to be restored within seven days or a Special Report be submitted within the following 30 days | ||
* outlining the action taken, the cause of the inoperability and the plans for returning the system to operable status. The report is being submitted in LER format with a Special Report number, i.e. TS2, even though it is not reportable per | * outlining the action taken, the cause of the inoperability and the plans for returning the system to operable status. | ||
It does, however, provide information that can be utilized in the trending process. Brian D Johnson Staff Licensing Engineer CC Administrator, Region III, USNRC NRG Resident Inspector | The report is being submitted in LER format with a Special Report number, i.e. TS2, even though it is not reportable per 10CFRS0.73. | ||
-Palisades Attachment OC01089-0211-NL04 | It does, however, provide information that can be utilized in the ~TRC trending process. | ||
/' Okf.S ENf:7?GY COMPANV | Brian D Johnson Staff Licensing Engineer CC Administrator, Region III, USNRC NRG Resident Inspector - Palisades Attachment OC01089-0211-NL04 | ||
/' Okf.S ENf:7?GY COMPANV | |||
*I YO NTH DAY YIAll YEAR !::::::: llQVINTIAL I>'' MV91CN MONTH DAV VEAR 'ACIL.ITY flilAlllU DOCKIT ltUMlllllll NUMel..- | NllC--- | ||
N/A 0 1&1010101 I I 013 1 I 4 8 9 819 -Tl SI 2 -ol 0 llo 2 I 3 819 N/A 0 115 I 0 I 0 I 0 I I I Ol'lllA TING THll lll'°llT II IU3MITTIO l'UlllUANT TO THI lllQUllllMINTI 01' 10 Cl'll §: fCltfc* OM°'.....,.. | u.a. llUCLIAll lllQUUTOllY CC 3 -- | ||
of.,,_ IW/1-) 1111 MODI Ill N 20.-lol ID.7119112IO*I 7ll.71C.I | 19.all | ||
~VIO C.. lllO. JllD-OUM LICENSEE EVENT REPORT (LERI | |||
*.* 111111 ID.7lllo1121Cwl 71.711111 LIVIL i 8 10 - | ..... 11111.*,,,.. | ||
.. 1 x OTMlll ,..,_.,,.,rt*.._, | l'ACILITY NAlllll 111 | ||
::::: {})'(?/:.:::;\\ | . r-*1.. | ||
20.-C.111111111 I0.7JCall21111 ID.7llll1C2111'11UIAI JllAI | PALISADES NUCLEAR PLANT IDOCICIT-11 lZI I | ||
0 15 Io IO I 0 I 21515 1 loF1n I L. | |||
TITLI loll INOPERABLE REACTOR VESSEL LEVEL MONITORING SYSTEM CHANNEL IVINT DATI Ill Liii 111..-111 Ill llll'OtlT DATI 171 OTHlll l'ACILITIU lllVO\\.VID *I YO NTH DAY YIAll YEAR | |||
!::::::: llQVINTIAL I>'' | |||
MV91CN MONTH DAV VEAR | |||
'ACIL.ITY flilAlllU DOCKIT ltUMlllllll NUMel..- | |||
~UM81,_ | |||
N/A 0 1&1010101 I | |||
I 013 1 I 4 8 9 819 - | |||
Tl SI 2 - ol 0 llo 2 I 3 819 N/A 0 115 I 0 I 0 I 0 I I | |||
I Ol'lllA TING THll lll'°llT II IU3MITTIO l'UlllUANT TO THI lllQUllllMINTI 01' 10 Cl'll §: fCltfc* OM°'.....,.. of.,,_ IW/1-) 1111 MODI Ill N | |||
n.em1~1 20.-lol ID.7119112IO*I 7ll.71C.I I | |||
'°"'" | |||
llll.-C.1111111 | |||
*.* 111111 ID.7lllo1121Cwl 71.711111 LIVIL i 8 10 - | |||
1101 | |||
:1111.-UlllllCMI I0.*111121 1D.n1111211.. 1 x | |||
OTMlll,..,_.,,.,rt*.._, | |||
.._ _,,, r.. r. NltC,_ | |||
::::::::;:: ::::: {})'(?/:.:::;\\\\ | |||
20.-C.111111111 I0.7JCall21111 ID.7llll1C2111'11UIAI JllAI | |||
~ | |||
n.-11111111.1 I0.7"81C211MI ID.7llUllC211wllllll | n.-11111111.1 I0.7"81C211MI ID.7llUllC211wllllll | ||
?'.f :;:::/::::rn:::n+:::::: - | |||
ao.-11111 "'' | |||
"'' I0.7311112111111 ID.7JU.IC2llal LICINIU CONTACT 1'011 THll Lll'I 1121 HAME TILl .. HONI NUMHll | I0.7311112111111 ID.7JU.IC2llal LICINIU CONTACT 1'011 THll Lll'I 1121 HAME TILl.. HONI NUMHll AlllA COOi c s Kozup, Technical Engineer 61 116 71 614 I -, 8 19 11 I 3 | ||
ONE LINE 1'011 EACH COMl'ONENT l'AILUll! | ~LITE ONE LINE 1'011 EACH COMl'ONENT l'AILUll! OHClllllO IN THll lll'°llT 11:11 CAUSE SYSTEM CO""° NI NT MANUl'AC* | ||
OHClllllO IN THll lll'°llT 11:11 CAUSE SYSTEM CO""° NI NT MANUl'AC* | IRE,ORTAUE <<J::v*,.2'::::T:: | ||
IRE,ORTAUE | |||
<<J::v*,.2'::::T:: | |||
CAUSE SYSTEM COMl'ONINT MANUl'AC. | CAUSE SYSTEM COMl'ONINT MANUl'AC. | ||
llltl'OfllTA31..I TUl'IEll TO Nl'ROS i:*:::Jt'::< | llltl'OfllTA31..I | ||
):: TUllllll TO Nl'lllOS x I I I I I I I Yes :: | !:!:*:_:::::::::::~:::::::::::::::,:::::::,:::'::, | ||
._.::: /) I I* I I I I I ::=':i.i'j::::::::,:,::,::,.::,:::::.':!!:]::::::: | TUl'IEll TO Nl'ROS i:*:::Jt'::< | ||
IUPl'LIMINTAL llll'OlllT lll,lCTEO llCI YONTH CAY VJAl'I IXPICTIO IUIMISllON b --, VU f/f .-. -fXl'fCT'fO SVIM/$$/ON OATfi CATE 1181 NO I I I ASITlllACT ILimlt tD r400 .-... 1.* .* etlllf'0*1rNNly | ):: | ||
"""" ll"fl*-41>>CI t)l',_wnrrwn final l111 Ill llC--At approximately 1300 on March 14, 1989 Control Room operators identified that one channel (LTRI-0101B) of the reactor vessel level monitoring system (RVLMS) recorder was indicating lower than would be expected. | TUllllll TO Nl'lllOS x | ||
At this time it was also identified that the "B II channel level sensor thermocouple heat*er power supply had changed from current mode to voltage mode. Subsequently, the "B" channel was declared inoperable. | I I | ||
The reactor was critical with the Plant operating at 80 percent of rated power. The RVLMS consists of two redundant channels. | I I | ||
I I | |||
I Yes I | |||
I I | |||
I I | |||
I I | |||
i::::i::::::::::::::*:::=:::,:::::_::;::i!:~::;:: | |||
I I I I | |||
I I | |||
I t>::-:.:.*._.::: /) | |||
I I* I I | |||
I I | |||
I | |||
::=':i.i'j::::::::,:,::,::,.::,:::::.':!!:]::::::: | |||
IUPl'LIMINTAL llll'OlllT lll,lCTEO llCI YONTH CAY VJAl'I IXPICTIO IUIMISllON b | |||
--, VU f/f.-. - | |||
fXl'fCT'fO SVIM/$$/ON OATfi CATE 1181 NO I | |||
I I | |||
ASITlllACT ILimlt tD r400.-... 1.*.* etlllf'0*1rNNly """" ll"fl*-41>>CI t)l',_wnrrwn final l111 Ill llC-- | |||
1~1 At approximately 1300 on March 14, 1989 Control Room operators identified that one channel (LTRI-0101B) of the reactor vessel level monitoring system (RVLMS) recorder was indicating lower than would be expected. | |||
At this time it was also identified that the "B II channel level sensor thermocouple heat*er power supply had changed from current mode to voltage mode. | |||
Subsequently, the "B" channel was declared inoperable. | |||
The reactor was critical with the Plant operating at 80 percent of rated power. | |||
The RVLMS consists of two redundant channels. | |||
Each channel includes a rad cal level instrument (RLI) which extends from the inc ore instrument nozzle closure flange down to the top of the fuel assemblies. | Each channel includes a rad cal level instrument (RLI) which extends from the inc ore instrument nozzle closure flange down to the top of the fuel assemblies. | ||
Each RLI has eight sensors which consist of differentially connected thermocouple pairs. One thermocouple junction is heated.for each pair. Water level is determined by differential temperature indication resultant from heat transfer. | Each RLI has eight sensors which consist of differentially connected thermocouple pairs. | ||
Based on troubleshooting to-date, the RVLMS channel failure is believed to be due to an open circuit within the thermocouple heater; The open circuit is believed to be isolated with the probe which resides in the reactor vessel, LE-OlOlB will be replaced when the reactor head is removed during | One thermocouple junction is heated.for each pair. | ||
._,..t..V..I.. | Water level is determined by differential temperature indication resultant from heat transfer. | ||
Based on troubleshooting to-date, the RVLMS channel failure is believed to be due to an open circuit within the thermocouple heater; The open circuit is believed to be isolated with the probe which resides in the reactor | |||
NAC form 3MA 19-831 | : vessel, LE-OlOlB will be replaced when the reactor head is removed during the 1990 Refueling Outage. | ||
~~ | |||
At this time it was also identified that the "B" channel level sensor thermocouple heater power supply [*;EHTR] had changed from current mode to voltage mode. Subsequently, the "B" channel was declared inoperable. | ~ | ||
The reactor was critical with the Plant operating at 80 per.cent; of rated power * | -~ | ||
The system provides indication of level in the primary coolant system (PCS) covering a range from near the.top of the reactor vessel head to just above the reactor core. The RVLMS consists of two independent, physically separated, redundant and identical channels. | ..._._,~ | ||
Each.channel includes one radcal level instrument (RLI), LE-0101 A&B, which extends from the incore instrument nozzle closure flange down through the guide .tube attached .to the control rod shroud, ending just above the fuel .assemblies. | ._,..t..V..I.. | ||
The RLis are inserted into existing incore instrument guide tubes. Two lE qualified in-containment cable assemblies, connected in series, are provided for each channel from the RLI connector to the containment penetration. | J.&-- ' | ||
Outside of containment, lE qualified cable is provided for each channel to transmit signals and supply power between the containment penetration and the level and temperature recording indicator (LTRI) located in the main Control Room. Each RVLMS channel is composed of a manometer tube and a RLI containing eight sensors. The manometer is created by cutting ports in the existing incore instrument guide tube and is divided into regions with hydraulic isolators which are part of the RLI. Two separate regions, the head and the upper guide structure (UGS) region, are monitored by four sensors each. The head region extends from the reactor head instrument nozzle flani:i:e.down approximately 5.5 feet to the first hydraulic isolator.* | |||
The UGS region extends from the first hydraulic isolator to the second hydraulic isolator located approximately at the top of the fuel alignment plate. The RLI is a stainless steel rod containing sensors which consist of differentially connected thermocouple pairs. One thermocouple junction is electrically heated and the other is not. In water the heat transfer from the junctions is high so that the differential temperature indication is low. In steam the transfer rate is reduced and the heated junction gets hotter, increasing the differential temperature indication. | NAC form 3MA 19-831 LICENSEE EVENT REPORT (LERI TEXT CONTINUATION U.I. NUCLEAR llEGULATOllY COMMIDION APPAOVEO OMI NO. 3150-0104 EXPIRES: 8/31185 FACILITY NAME 111 OOCKET NUM9Ell 121 LEll Nl.*9111 Ill PAGI 1:11 PALISADES NUCLEAR PLANT TEXT llf,,_ - | ||
High differential temperature is the indication of water uncovery of the sensor. Indication for the RVLMS is provided by two identical LTRI units, one for each .channel, located in the Control Rdom. The level indication consists of two strings of vertical light-emitting diodes (LEDs). A green LED indicates | : 11.,.,,._. - | ||
:JeeA LER 89-T:SL-LlUl 19-831 | <<ltJlllotwl NflC Foml.-.. "111171 Description At approximately 1300. on March 14, 1989 Control Room operators identified that one channel (LTRI-0101B) of the reactor vessel level monitoring system (RVLMS) [*;LI] recorder was indicating lower than would be expected. | ||
At this time it was also identified that the "B" channel level sensor thermocouple heater power supply [*;EHTR] had changed from current mode to voltage mode. | |||
Subsequently, the "B" channel was declared inoperable. | |||
Level information is also displayed on adjacent strip chart recorders, one for the head region and one for the UGS region. The recorders display differential temperature information from the sensors which can be used to diagnose potential degradation or failure of the sensors and aid in interpretation of level information. | The reactor was critical with the Plant operating at 80 per.cent; of rated power | ||
Cause Of The Event When* it was identified that recorder indications provided by LE-OlOlB were no_t as expected, initial. thoughts were that the differential thermocouple heater power supply had failed. However, immediate troubleshooting identified the problem* to be in the heater circuitry. | * The RVLMS was.installed to.provide indication for detection of inadequate cor.e cooling conditions. | ||
Heat.er cable resistance measured from the Control Room to the containment indicated resistance* | The system provides indication of level in the primary coolant system (PCS) covering a range from near the.top of the reactor vessel head to just above the reactor core. | ||
levels higher than the expected range of 20 to 100 ohms. Further troubleshooting of the heater power supply identified satisfactory performance when a simulated load was imposed. Also, resistance measurements taken at the containment penetration identified the problem to be inside the Containment Building. | The RVLMS consists of two independent, physically separated, redundant and identical channels. | ||
On October 14, 1989 associated cables for LE-OlOlB were inspected and resistance measured from the reactor head to the Control Room. No anomalies were noted *. Resistance m*easurements were also taken from the reactor head into the probe-LE-OlOlB. | Each.channel includes one radcal level instrument (RLI), LE-0101 A&B, which extends from the incore instrument nozzle closure flange down through the guide.tube attached.to the control rod shroud, ending just above the fuel | ||
The heater circuit and one sensor were found to be open internal to the* probe. Based on trouble.shooting to-date, the failure of the heater circuit is believed to be an open circuit within which resides within the . reactor vessel. The *exact cause cannot be determined until at least such time as LE....:OlOlB is accessed. | .assemblies. | ||
Corrective Actions Troubleshooting has been performed as indicated above. LE-OlOlB will be replaced when the reactor head is removed during the 1990 Refueling Outage. Analysis Of The Event At the time LE-OlOlB was declared inoperable, Technical Specifications (TS) covering RVLMS operation had not been issued, however, administrative controls were inplace. On September 15, 1989 Amendment 129 was issued by the NRC. This license amendment was effective the date of issuance and associated actions to be implemented not later than October 30, 1989. A part of this amendment, TS Table 3.17.4 Item 18 was added. The item provides that when the PCS is heated above 325 degrees, both channels of the RVLMS shall be operable. | The RLis are inserted into existing incore instrument guide tubes. | ||
TS Table 3.17.4 Action J of this TS provides that ""c *o"M 38u Lt.K | Two lE qualified in-containment cable assemblies, connected in series, are provided for each channel from the RLI connector to the containment penetration. | ||
NRC Farm 3MA 19-831 FACILITY NAME 111 | Outside of containment, lE qualified cable is provided for each channel to transmit signals and supply power between the containment penetration and the level and temperature recording indicator (LTRI) located in the main Control Room. | ||
Each RVLMS channel is composed of a manometer tube and a RLI containing eight sensors. | |||
EXPIRES: 8/31185 LEll NUMalll Ill PAQI 131 PALISADES NUCLEAR PLANT o 1s 1 o Io 1 o 12 1 5 8 19 -T I s1 2 0 I 0 01 4 OF 0 I 4 TEXT (If - | The manometer is created by cutting ports in the existing incore instrument guide tube and is divided into regions with hydraulic isolators which are part of the RLI. | ||
TS Table 3.17.4, Action K provides that if one channel is inoperable, the system shall be restored to operable status within seven days if repairs are feasible without shutting down, or submit a Special Report within 30 days outlining actions taken, the cause of inoperability and the plans and schedule for restoring the system to operable status. This Special Report is being submitted to satisfy TS Table 3.17.4 Action K. During the* period in which LE-0101B was inoperable,-the redundant RVLMS channel remained operable, all other TS requirements for monitoring the condition of the PCS were met and all applicable actions of this Amendment were satisfied. | Two separate regions, the head regio~ | ||
Therefore, no threat to the health and safety of the public was present. Additional Information | and the upper guide structure (UGS) region, are monitored by four sensors each. | ||
* Denotes no available code per IEEE 805/1984 LEK 19-831}} | The head region extends from the reactor head instrument nozzle flani:i:e.down approximately 5.5 feet to the first hydraulic isolator.* The UGS region extends from the first hydraulic isolator to the second hydraulic isolator located approximately at the top of the fuel alignment plate. | ||
The RLI is a stainless steel rod containing sensors which consist of differentially connected thermocouple pairs. | |||
One thermocouple junction is electrically heated and the other is not. | |||
In water the heat transfer from the junctions is high so that the differential temperature indication is low. | |||
In steam the he~t transfer rate is reduced and the heated junction gets hotter, increasing the differential temperature indication. | |||
High differential temperature is the indication of water uncovery of the sensor. | |||
Indication for the RVLMS is provided by two identical LTRI units, one for each.channel, located in the Control Rdom. | |||
The level indication consists of two strings of vertical light-emitting diodes (LEDs). | |||
A green LED indicates covered and a red LED indicates uncovered for each sensor in the RLI. | |||
The | |||
"~C FO~M :JeeA LER 89-T:SL-LlUl 19-831 | |||
N*Ac Form :JllA 19-631 LICENSEE EVENT REPORT (LER* TEXT CONTINUATION U.I. NUCLEAll llEQULATOAY COMMllalON APPAOVEO OMll NO. 3150...Ql°'' | |||
. EXPIRES: 8/31 /85 FACILITY NAME C1I DOCKET-NUMSIEll IZI Liii NI.Mall! 111 PAGI 131 o 1s 1 o 1o1 o 12 1 5J 5 8 I 9 - | |||
T I s1 2 0 I 0 o, 3 OF 0 I 4 PALISADES NUCLEAR PLANT TEXT flf,_ - | |||
II,.,,.._, -.-,. | |||
NltC Fotrn.-..**11171 sensors. are numbered and their *distance above the fuel is indicated. | |||
Level information is also displayed on adjacent strip chart recorders, one for the head region and one for the UGS region. | |||
The recorders display differential temperature information from the ~I sensors which can be used to diagnose potential degradation or failure of the sensors and aid in interpretation of level information. | |||
Cause Of The Event When* it was identified that recorder indications provided by LE-OlOlB were no_t as expected, initial. thoughts were that the differential thermocouple heater power supply had failed. | |||
However, immediate troubleshooting identified the problem* to be in the heater circuitry. | |||
Heat.er cable resistance measured from the Control Room to the containment indicated resistance* levels higher than the expected range of 20 to 100 ohms. | |||
Further troubleshooting of the heater power supply identified satisfactory performance when a simulated load was imposed. | |||
Also, resistance measurements taken at the containment penetration identified the problem to be inside the Containment Building. | |||
On October 14, 1989 associated cables for LE-OlOlB were inspected and resistance measured from the reactor vessel~ | |||
head to the Control Room. | |||
No anomalies were noted *. Resistance m*easurements were also taken from the reactor head into the probe-LE-OlOlB. | |||
The heater circuit and one sensor were found to be open internal to the* probe. | |||
Based on trouble.shooting to-date, the failure of the heater circuit is believed to be an open circuit within LE~OlOlB which resides within the | |||
. reactor vessel. | |||
The *exact cause cannot be determined until at least such time as LE....:OlOlB is accessed. | |||
Corrective Actions Troubleshooting has been performed as indicated above. | |||
LE-OlOlB will be replaced when the reactor head is removed during the 1990 Refueling Outage. | |||
Analysis Of The Event At the time LE-OlOlB was declared inoperable, Technical Specifications (TS) covering RVLMS operation had not been issued, however, administrative controls were inplace. | |||
On September 15, 1989 Amendment 129 was issued by the NRC. | |||
This license amendment was effective the date of issuance and associated actions to be implemented not later than October 30, 1989. | |||
A part of this amendment, TS Table 3.17.4 Item 18 was added. | |||
The item provides that when the PCS is heated above 325 degrees, both channels of the RVLMS shall be operable. | |||
TS Table 3.17.4 Action J of this TS provides that | |||
""c *o"M 38u Lt.K o~-i.<:>.<.-L.1.v1 19-831 | |||
NRC Farm 3MA 19-831 FACILITY NAME 111 LICENSEE EVENT REPORT (LERI TEXT CONTINUATION DOCKET NUMllEll 121 U.11. NUCLEAll llEGULATORY COMMIDION APPROVED OMB NO. 3151l~1~ | |||
EXPIRES: 8/31185 LEll NUMalll Ill PAQI 131 PALISADES NUCLEAR PLANT o 1s 1 o Io 1 o 12 1 5~ 5 8 19 - | |||
T I s1 2 0 I 0 01 4 OF 0 I 4 TEXT (If - | |||
II,.,._, - | |||
eddifkltW NlfC Fotrn.... '111171 a RVLMS channel is operable if two or more of the upper four sensors and two or more of the lower four sensors.are operable. | |||
TS Table 3.17.4, Action K provides that if one channel is inoperable, the system shall be restored to operable status within seven days if repairs are feasible without shutting down, or submit a Special Report within 30 days outlining actions taken, the cause of inoperability and the plans and schedule for restoring the system to operable status. | |||
This Special Report is being submitted to satisfy TS Table 3.17.4 Action K. | |||
During the* period in which LE-0101B was inoperable,-the redundant RVLMS channel remained operable, all other TS requirements for monitoring the condition of the PCS were met and all applicable actions of this Amendment were satisfied. | |||
Therefore, no threat to the health and safety of the public was present. | |||
Additional Information | |||
* Denotes no available code per IEEE 805/1984 N~CFO~M3e!A LEK lj~-l::::>L-LlUl 19-831}} | |||
Latest revision as of 09:09, 6 January 2025
| ML18054B056 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 10/23/1989 |
| From: | Johnson B, Kozup C CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 89-TS2, 89-TS2-00, NUDOCS 8911010048 | |
| Download: ML18054B056 (5) | |
Text
- ,'T,.
consumers Power
. POWERING MICHIGAN"S PROGRESS General Offices: 1945 West Parnell Road, Jackson, Ml 49201 * (517) 788-0550 October 23, 1989 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -
LICENSEE EVENT REPORT 89-TS2 (INOPERABLE REACTOR VESSEL LEVEL MONITORING SYSTEM CHANNEL)
Licensee Event Report (LER) 89-TS2 (Inoperable Reactor Vessel Level Monitoring System Channel) is attached.
This is a Technical Specification (TS) Special Report that is being submitted pursuant to T.S. Table 3.17.4 Action K which requires the minimum operable channels to be restored within seven days or a Special Report be submitted within the following 30 days
- outlining the action taken, the cause of the inoperability and the plans for returning the system to operable status.
The report is being submitted in LER format with a Special Report number, i.e. TS2, even though it is not reportable per 10CFRS0.73.
It does, however, provide information that can be utilized in the ~TRC trending process.
Brian D Johnson Staff Licensing Engineer CC Administrator, Region III, USNRC NRG Resident Inspector - Palisades Attachment OC01089-0211-NL04
/' Okf.S ENf:7?GY COMPANV
NllC---
u.a. llUCLIAll lllQUUTOllY CC 3 --
19.all
~VIO C.. lllO. JllD-OUM LICENSEE EVENT REPORT (LERI
..... 11111.*,,,..
l'ACILITY NAlllll 111
. r-*1..
PALISADES NUCLEAR PLANT IDOCICIT-11 lZI I
0 15 Io IO I 0 I 21515 1 loF1n I L.
TITLI loll INOPERABLE REACTOR VESSEL LEVEL MONITORING SYSTEM CHANNEL IVINT DATI Ill Liii 111..-111 Ill llll'OtlT DATI 171 OTHlll l'ACILITIU lllVO\\.VID *I YO NTH DAY YIAll YEAR
!::::::: llQVINTIAL I>
MV91CN MONTH DAV VEAR
'ACIL.ITY flilAlllU DOCKIT ltUMlllllll NUMel..-
~UM81,_
N/A 0 1&1010101 I
I 013 1 I 4 8 9 819 -
Tl SI 2 - ol 0 llo 2 I 3 819 N/A 0 115 I 0 I 0 I 0 I I
I Ol'lllA TING THll lll'°llT II IU3MITTIO l'UlllUANT TO THI lllQUllllMINTI 01' 10 Cl'll §: fCltfc* OM°'.....,.. of.,,_ IW/1-) 1111 MODI Ill N
n.em1~1 20.-lol ID.7119112IO*I 7ll.71C.I I
'°"'"
llll.-C.1111111
- .* 111111 ID.7lllo1121Cwl 71.711111 LIVIL i 8 10 -
1101
- 1111.-UlllllCMI I0.*111121 1D.n1111211.. 1 x
OTMlll,..,_.,,.,rt*.._,
.._ _,,, r.. r. NltC,_
- :::: {})'(?/:.:::;\\\\
20.-C.111111111 I0.7JCall21111 ID.7llll1C2111'11UIAI JllAI
~
n.-11111111.1 I0.7"81C211MI ID.7llUllC211wllllll
?'.f :;:::/::::rn:::n+:::::: -
ao.-11111 "
I0.7311112111111 ID.7JU.IC2llal LICINIU CONTACT 1'011 THll Lll'I 1121 HAME TILl.. HONI NUMHll AlllA COOi c s Kozup, Technical Engineer 61 116 71 614 I -, 8 19 11 I 3
~LITE ONE LINE 1'011 EACH COMl'ONENT l'AILUll! OHClllllO IN THll lll'°llT 11:11 CAUSE SYSTEM CO""° NI NT MANUl'AC*
IRE,ORTAUE <<J::v*,.2'::::T::
CAUSE SYSTEM COMl'ONINT MANUl'AC.
llltl'OfllTA31..I
!:!:*:_:::::::::::~:::::::::::::::,:::::::,:::'::,
TUl'IEll TO Nl'ROS i:*:::Jt'::<
)::
TUllllll TO Nl'lllOS x
I I
I I
I I
I Yes I
I I
I I
I I
i::::i::::::::::::::*:::=:::,:::::_::;::i!:~::;::
I I I I
I I
I t>::-:.:.*._.::: /)
I I* I I
I I
I
- =':i.i'j::::::::,:,::,::,.::,:::::.':!!:]:::::::
IUPl'LIMINTAL llll'OlllT lll,lCTEO llCI YONTH CAY VJAl'I IXPICTIO IUIMISllON b
--, VU f/f.-. -
fXl'fCT'fO SVIM/$$/ON OATfi CATE 1181 NO I
I I
ASITlllACT ILimlt tD r400.-... 1.*.* etlllf'0*1rNNly """" ll"fl*-41>>CI t)l',_wnrrwn final l111 Ill llC--
1~1 At approximately 1300 on March 14, 1989 Control Room operators identified that one channel (LTRI-0101B) of the reactor vessel level monitoring system (RVLMS) recorder was indicating lower than would be expected.
At this time it was also identified that the "B II channel level sensor thermocouple heat*er power supply had changed from current mode to voltage mode.
Subsequently, the "B" channel was declared inoperable.
The reactor was critical with the Plant operating at 80 percent of rated power.
The RVLMS consists of two redundant channels.
Each channel includes a rad cal level instrument (RLI) which extends from the inc ore instrument nozzle closure flange down to the top of the fuel assemblies.
Each RLI has eight sensors which consist of differentially connected thermocouple pairs.
One thermocouple junction is heated.for each pair.
Water level is determined by differential temperature indication resultant from heat transfer.
Based on troubleshooting to-date, the RVLMS channel failure is believed to be due to an open circuit within the thermocouple heater; The open circuit is believed to be isolated with the probe which resides in the reactor
- vessel, LE-OlOlB will be replaced when the reactor head is removed during the 1990 Refueling Outage.
~~
~
-~
..._._,~
._,..t..V..I..
J.&-- '
NAC form 3MA 19-831 LICENSEE EVENT REPORT (LERI TEXT CONTINUATION U.I. NUCLEAR llEGULATOllY COMMIDION APPAOVEO OMI NO. 3150-0104 EXPIRES: 8/31185 FACILITY NAME 111 OOCKET NUM9Ell 121 LEll Nl.*9111 Ill PAGI 1:11 PALISADES NUCLEAR PLANT TEXT llf,,_ -
- 11.,.,,._. -
<<ltJlllotwl NflC Foml.-.. "111171 Description At approximately 1300. on March 14, 1989 Control Room operators identified that one channel (LTRI-0101B) of the reactor vessel level monitoring system (RVLMS) [*;LI] recorder was indicating lower than would be expected.
At this time it was also identified that the "B" channel level sensor thermocouple heater power supply [*;EHTR] had changed from current mode to voltage mode.
Subsequently, the "B" channel was declared inoperable.
The reactor was critical with the Plant operating at 80 per.cent; of rated power
- The RVLMS was.installed to.provide indication for detection of inadequate cor.e cooling conditions.
The system provides indication of level in the primary coolant system (PCS) covering a range from near the.top of the reactor vessel head to just above the reactor core.
The RVLMS consists of two independent, physically separated, redundant and identical channels.
Each.channel includes one radcal level instrument (RLI), LE-0101 A&B, which extends from the incore instrument nozzle closure flange down through the guide.tube attached.to the control rod shroud, ending just above the fuel
.assemblies.
The RLis are inserted into existing incore instrument guide tubes.
Two lE qualified in-containment cable assemblies, connected in series, are provided for each channel from the RLI connector to the containment penetration.
Outside of containment, lE qualified cable is provided for each channel to transmit signals and supply power between the containment penetration and the level and temperature recording indicator (LTRI) located in the main Control Room.
Each RVLMS channel is composed of a manometer tube and a RLI containing eight sensors.
The manometer is created by cutting ports in the existing incore instrument guide tube and is divided into regions with hydraulic isolators which are part of the RLI.
Two separate regions, the head regio~
and the upper guide structure (UGS) region, are monitored by four sensors each.
The head region extends from the reactor head instrument nozzle flani:i:e.down approximately 5.5 feet to the first hydraulic isolator.* The UGS region extends from the first hydraulic isolator to the second hydraulic isolator located approximately at the top of the fuel alignment plate.
The RLI is a stainless steel rod containing sensors which consist of differentially connected thermocouple pairs.
One thermocouple junction is electrically heated and the other is not.
In water the heat transfer from the junctions is high so that the differential temperature indication is low.
In steam the he~t transfer rate is reduced and the heated junction gets hotter, increasing the differential temperature indication.
High differential temperature is the indication of water uncovery of the sensor.
Indication for the RVLMS is provided by two identical LTRI units, one for each.channel, located in the Control Rdom.
The level indication consists of two strings of vertical light-emitting diodes (LEDs).
A green LED indicates covered and a red LED indicates uncovered for each sensor in the RLI.
The
"~C FO~M :JeeA LER 89-T:SL-LlUl 19-831
N*Ac Form :JllA 19-631 LICENSEE EVENT REPORT (LER* TEXT CONTINUATION U.I. NUCLEAll llEQULATOAY COMMllalON APPAOVEO OMll NO. 3150...Ql°
. EXPIRES: 8/31 /85 FACILITY NAME C1I DOCKET-NUMSIEll IZI Liii NI.Mall! 111 PAGI 131 o 1s 1 o 1o1 o 12 1 5J 5 8 I 9 -
T I s1 2 0 I 0 o, 3 OF 0 I 4 PALISADES NUCLEAR PLANT TEXT flf,_ -
II,.,,.._, -.-,.
NltC Fotrn.-..**11171 sensors. are numbered and their *distance above the fuel is indicated.
Level information is also displayed on adjacent strip chart recorders, one for the head region and one for the UGS region.
The recorders display differential temperature information from the ~I sensors which can be used to diagnose potential degradation or failure of the sensors and aid in interpretation of level information.
Cause Of The Event When* it was identified that recorder indications provided by LE-OlOlB were no_t as expected, initial. thoughts were that the differential thermocouple heater power supply had failed.
However, immediate troubleshooting identified the problem* to be in the heater circuitry.
Heat.er cable resistance measured from the Control Room to the containment indicated resistance* levels higher than the expected range of 20 to 100 ohms.
Further troubleshooting of the heater power supply identified satisfactory performance when a simulated load was imposed.
Also, resistance measurements taken at the containment penetration identified the problem to be inside the Containment Building.
On October 14, 1989 associated cables for LE-OlOlB were inspected and resistance measured from the reactor vessel~
head to the Control Room.
No anomalies were noted *. Resistance m*easurements were also taken from the reactor head into the probe-LE-OlOlB.
The heater circuit and one sensor were found to be open internal to the* probe.
Based on trouble.shooting to-date, the failure of the heater circuit is believed to be an open circuit within LE~OlOlB which resides within the
. reactor vessel.
The *exact cause cannot be determined until at least such time as LE....:OlOlB is accessed.
Corrective Actions Troubleshooting has been performed as indicated above.
LE-OlOlB will be replaced when the reactor head is removed during the 1990 Refueling Outage.
Analysis Of The Event At the time LE-OlOlB was declared inoperable, Technical Specifications (TS) covering RVLMS operation had not been issued, however, administrative controls were inplace.
On September 15, 1989 Amendment 129 was issued by the NRC.
This license amendment was effective the date of issuance and associated actions to be implemented not later than October 30, 1989.
A part of this amendment, TS Table 3.17.4 Item 18 was added.
The item provides that when the PCS is heated above 325 degrees, both channels of the RVLMS shall be operable.
TS Table 3.17.4 Action J of this TS provides that
""c *o"M 38u Lt.K o~-i.<:>.<.-L.1.v1 19-831
NRC Farm 3MA 19-831 FACILITY NAME 111 LICENSEE EVENT REPORT (LERI TEXT CONTINUATION DOCKET NUMllEll 121 U.11. NUCLEAll llEGULATORY COMMIDION APPROVED OMB NO. 3151l~1~
EXPIRES: 8/31185 LEll NUMalll Ill PAQI 131 PALISADES NUCLEAR PLANT o 1s 1 o Io 1 o 12 1 5~ 5 8 19 -
T I s1 2 0 I 0 01 4 OF 0 I 4 TEXT (If -
II,.,._, -
eddifkltW NlfC Fotrn.... '111171 a RVLMS channel is operable if two or more of the upper four sensors and two or more of the lower four sensors.are operable.
TS Table 3.17.4, Action K provides that if one channel is inoperable, the system shall be restored to operable status within seven days if repairs are feasible without shutting down, or submit a Special Report within 30 days outlining actions taken, the cause of inoperability and the plans and schedule for restoring the system to operable status.
This Special Report is being submitted to satisfy TS Table 3.17.4 Action K.
During the* period in which LE-0101B was inoperable,-the redundant RVLMS channel remained operable, all other TS requirements for monitoring the condition of the PCS were met and all applicable actions of this Amendment were satisfied.
Therefore, no threat to the health and safety of the public was present.
Additional Information
- Denotes no available code per IEEE 805/1984 N~CFO~M3e!A LEK lj~-l::::>L-LlUl 19-831