ML13074A092: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[DCL-13-025, Withdrawal of License Amendment Request 09-07, Delayed Access Offsite Power Circuit Conformance with GDC 17]]
| number = ML13074A092
| issue date = 03/14/2013
| title = Withdrawal of License Amendment Request 09-07, Delayed Access Offsite Power Circuit Conformance with GDC 17
| author name = Allen B S
| author affiliation = Pacific Gas & Electric Co
| addressee name =
| addressee affiliation = NRC/NRR, NRC/Document Control Desk
| docket = 05000275, 05000323
| license number = DPR-080, DPR-082
| contact person =
| case reference number = DCL-13-025
| document type = Letter
| page count = 2
| project =
| stage = Withdrawal
}}
 
=Text=
{{#Wiki_filter:Pacific Gas and Electric Company March 14,2013 PG&E Letter DCL-13-025 B a rr y S. Allen Site Vice President Diablo Canyon Power Plant Mail Code 104/6 P. O. Box 56 Avila Beach, CA 93424 805.545.4888 In t ernal: 691.4888 Fax: 805.545.6445 u.s. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 10 CFR 50.90 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Withdrawal of License Amendment Request 09-07! "Delayed Access Offsite Povv'er Circuit Conformance with GDC 17"
 
==References:==
: 1. PG&E Letter DCL-09-093, "License Amendment Request 09-07, Delayed Access Offsite Power Circuit Conformance with GDC 17," dated December 29, 2009. 2. PG&E Letter DCL-11-121, "Response to NRC Request for Additional Information Regarding License Amendment Request 09-07, 'Delayed Access Offsite Power Circuit Conformance with 1971 GDC-17,'" dated November 22,2011. 3. NRC Integrated Inspection Report 05000275/2009003 and 05000323/2009003, dated August 5, 2009. Dear Commissioners and Staff: In Reference 1, Pacific Gas and Electric Company (PG&E) submitted License Amendment Request (LAR) 09-07 to revise the licensing basis as described in the Updated Final Safety Analysis Report (UFSAR) regarding the conformance of the delayed access offsite power circuit (the 500 kilovolt (kV) delayed access circuit) to 1971 General Design Criterion
: 17. The change was proposed in response to a cited violation discussed in Reference
: 3. On November 22, 2011, PG&E responded (Reference
: 2) to a NRC Staff request for additional information received via e-mail. On January 24, 2013, PG&E met with the NRC to discuss modifications that PG&E is considering to the offsite power supplies for Diablo Canyon Power Plant (DCPP) and the status of a December 29, 2009, LAR related to offsite power. PG&E A member of th e S TA RS (Str ateg i c Teaming a nd R eso u r ce Sh a rin g) A ll ia n ce Callaway
* Comanche Peak
* Diablo Canyon
* Palo Verde. San Onofre
* South Texas P r oject
* Wolf Creek m Document Control Desk March 14, 2013 I & Page 2 PG&E Letter DCL-13-025 discussed plans to, within 60 days of the meeting, withdraw the current LAR and resubmit a new LAR by the end of 2013. PG&E is making the following regulatory commitment (as defined by NEI 99 04) in this letter: PG&E will submit a new LAR, which will include one of two options: 1) provide additional justification for the delayed 500 kV circuit, or 2) provide a design change to the 500 kV circuit that would include the addition of main generator output breakers that would make the 500 kV circuit an immediate source of offsite power. This LAR will be submitted by December 31,2013. If you have any questions, or require additional information, please contact Tom Baldwin at (805) 545-4720.
Sincerely, Jt, 5. AtL-Barrys 1 en Site Vice President dngd/4955 cc: Diablo Distribution Gonzalo L. Perez, Branch Chief, California Dept of Public Health Elmo E. Collins, NRC Region IV Thomas R. Hipschman, NRC, Senior Resident Inspector James T. Polickoski, NRR Project Manager A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway