ML18072A101: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
{{Adams
#REDIRECT [[L-2018-030, Nuclear Energy Institute Commitments]]
| number = ML18072A101
| issue date = 03/09/2018
| title = Florida Power & Light Co. - Nuclear Energy Institute Commitments
| author name = Nicholson L
| author affiliation = Florida Power & Light Co
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000250, 05000251, 05000266, 05000301, 05000331, 05000335, 05000389, 05000443
| license number =
| contact person =
| case reference number = L-2018-030
| document type = Letter
| page count = 2
}}
 
=Text=
{{#Wiki_filter:-~ Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Florida Power & Light Company MAR a 9 2018 St. Lucie Units 1 and 2, Docket Nos. 50-335, 50-389 *Florida Power & Light Company Turkey Point Units 3 and 4, Docket Nos. 50-250, 50-251 NextEra Energy Seabrook, LLC Seabrook Station, Docket No. 50-443 NextEra Energy Duane Arnold, LLC Duane Arnold Energy Center, Docket No. 50-331 NextEra Energy Point Beach, LLC
* Point Beach Units 1 and 2, Docket Nos. 50-266, 50-301 Nuclear Energy Institute Commitments  
**,;,;**--**
L-2018-030 Effective February 1, *2018, Florida Power & Light Company, the licensee for the St. Lucie Nuclear Plant, Units 1 and 2, and the Turkey Point Nuclear Plant, Units 3 and 4, and on behalf of NextEra Energy Seabrook, LLC (NextEra Energy Seabrook), the licensee for Seabrook Station; NextEra . Energy Duane Arnold, LLC (NextEra Energy Dwme Arnold), the licensee for Duane Arnold Energy Center; and NextEra Energy Point Beach, LLC (NextEra Energy Point Beach), the licensee for Point Beach Nuclear Plant, Units 1 and 2 (collectively referred to as NextEra Energy) are no longer members of the Nuclear Energy Institute (NEI). This letter is to inform the NRC that the withdrawal from NEI does not impact any prior commitments made by our operating fleet to NEI documents or any commitments made on behalf of Florida Power & Light and NextEra Energy operating fleet by NEI. This letter contains no new regulatory commitments.
Should you have any questions, please contact Larry Nicholson at (561) 304-6224.
Sincerely, iolson Nuclear Licensing and Regulatory Compliance Director Cc list (next page) Florida Power & Light Company 700 Universe Boulevard, Juno Beach, FL 33408 
. ' L-2018-030 cc: USNRC Regional Administrator, Region I USNRC Regional Administrator, Region II USNRC Regional Administrator, Region Ill USNRC Project Manager, Seabrook Station USNRC Project Manager, St. Lucie Nuclear Plant USNRC Project Manager, Turkey Point Nuclear Plant
* USNRC Project Manager, Duane Arnold Energy Center USNRC Project Manager,.
Point Beach Nuclear Plant USNRC Senior Resident Inspector, Seabrook Station USNRC Senior Resident Inspector, St. Lucie Nuclear Plant USNRC Senior Resident Inspector, Turkey Point Nuclear Plant USNRC Senior Resident Inspector, Duane Arnold Energy Center USNRC Senior Resident Inspector, Point Beach Nuclear Plant}}

Latest revision as of 15:38, 7 March 2020