ML19056A374: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 02/26/2019
| issue date = 02/26/2019
| title = Vendor Inspection of Framatome Le Creusot
| title = Vendor Inspection of Framatome Le Creusot
| author name = Kavanagh K A
| author name = Kavanagh K
| author affiliation = NRC/NRO/DCIP/QVIB2
| author affiliation = NRC/NRO/DCIP/QVIB2
| addressee name = Convers P
| addressee name = Convers P
Line 9: Line 9:
| docket = 99902074
| docket = 99902074
| license number =  
| license number =  
| contact person = Lamb T A, NRO/DCIP
| contact person = Lamb T, NRO/DCIP
| document type = Letter
| document type = Letter
| page count = 2
| page count = 2
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Code of Federal Regulations}}
{{#Wiki_filter:February 26, 2019 Mr. Pascale CONVERS Quality Manager Framatome Le Creusot Rue de lÉtange de la Forge 71200 Le Creusot, France
 
==SUBJECT:==
VENDOR INSPECTION OF FRAMATOME
 
==Dear Mr. CONVERS:==
 
This letter documents the U.S. Nuclear Regulatory Commission (NRC) staffs plan to perform an inspection of Framatome to review implementation of your quality assurance program in accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix B, and 10 CFR Part 21. Specifically, the quality assurance program will be reviewed as it pertains to design control and corrective actions implemented as related to the issues identified during the 2016 Multinational Design Evaluation Programme inspection regarding the products supplied to the U.S. nuclear operating fleet. As discussed through email, the inspectors plan to arrive at the Le Creusot, France facility on Monday, March 11, 2019, and will conduct the inspection through Friday, March 15, 2019. Subsequent to the inspection, a report will be issued and transmitted to you via letter. The lead inspector for this effort is Jonathan Ortega-Luciano; you may contact him at (301) 415-1159 or via electronic mail at Jonathan.Ortega-Luciano@nrc.gov.
This inspection activity has been assigned the following docket number: 99902074. Please reference this number on any correspondence relating to this inspection activity sent to the NRC.
Sincerely, Kerri A. Kavanagh, Chief /RA/
Quality Assurance Vendor Inspection Branches 1 & 2 Division of Construction Inspection and Operational Programs Office of New Reactors Docket No.: 99902074
 
ML19056A374          NRO-002 OFFICE    NRO/DCIP          NRO/DCIP NAME      JOrtega-Luciano    KKavanagh DATE      02/26/19          02/26/19}}

Latest revision as of 01:18, 20 October 2019

Vendor Inspection of Framatome Le Creusot
ML19056A374
Person / Time
Site: 99902074
Issue date: 02/26/2019
From: Kerri Kavanagh
NRC/NRO/DCIP/QVIB2
To: Convers P
Framatome Le Creusot
Lamb T, NRO/DCIP
References
Download: ML19056A374 (2)


Text

February 26, 2019 Mr. Pascale CONVERS Quality Manager Framatome Le Creusot Rue de lÉtange de la Forge 71200 Le Creusot, France

SUBJECT:

VENDOR INSPECTION OF FRAMATOME

Dear Mr. CONVERS:

This letter documents the U.S. Nuclear Regulatory Commission (NRC) staffs plan to perform an inspection of Framatome to review implementation of your quality assurance program in accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix B, and 10 CFR Part 21. Specifically, the quality assurance program will be reviewed as it pertains to design control and corrective actions implemented as related to the issues identified during the 2016 Multinational Design Evaluation Programme inspection regarding the products supplied to the U.S. nuclear operating fleet. As discussed through email, the inspectors plan to arrive at the Le Creusot, France facility on Monday, March 11, 2019, and will conduct the inspection through Friday, March 15, 2019. Subsequent to the inspection, a report will be issued and transmitted to you via letter. The lead inspector for this effort is Jonathan Ortega-Luciano; you may contact him at (301) 415-1159 or via electronic mail at Jonathan.Ortega-Luciano@nrc.gov.

This inspection activity has been assigned the following docket number: 99902074. Please reference this number on any correspondence relating to this inspection activity sent to the NRC.

Sincerely, Kerri A. Kavanagh, Chief /RA/

Quality Assurance Vendor Inspection Branches 1 & 2 Division of Construction Inspection and Operational Programs Office of New Reactors Docket No.: 99902074

ML19056A374 NRO-002 OFFICE NRO/DCIP NRO/DCIP NAME JOrtega-Luciano KKavanagh DATE 02/26/19 02/26/19