ML17263A305: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 7: Line 7:
| issue date = 05/24/1993
| issue date = 05/24/1993
| title = Forwards Ginna Nuclear Power Plant Eop,Including Rev 7 to AP-TURB.1, Turbine Trip W/O Rx Trip Required & Rev 8 to FR-C.2, Response to Degraded Core Cooling.
| title = Forwards Ginna Nuclear Power Plant Eop,Including Rev 7 to AP-TURB.1, Turbine Trip W/O Rx Trip Required & Rev 8 to FR-C.2, Response to Degraded Core Cooling.
| author name = MECREDY R C
| author name = Mecredy R
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name = JOHNSON A
| addressee name = JOHNSON A
Line 21: Line 21:
| number = ML17263A306
| number = ML17263A306
| issue date = 05/19/1993
| issue date = 05/19/1993
| title = Forwards Ginna Nuclear Power Plant Eop,Including Rev 7 to AP-TURB.1, Turbine Trip W/O Rx Trip Required & Rev 8 to FR-C.2, Response to Degraded Core Cooling.
| title = Rev 8 to FR-C.2, Response to Degraded Core Cooling.
| author name = MARLOW T A
| author name = Marlow T
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name =  
| addressee name =  
Line 36: Line 36:
| number = ML17263A304
| number = ML17263A304
| issue date = 05/07/1993
| issue date = 05/07/1993
| title = Forwards Ginna Nuclear Power Plant Eop,Including Rev 7 to AP-TURB.1, Turbine Trip W/O Rx Trip Required & Rev 8 to FR-C.2, Response to Degraded Core Cooling.
| title = Rev 7 to AP-TURB.1, Turbine Trip W/O Rx Trip Required.
| author name = MARLOW T A
| author name = Marlow T
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name =  
| addressee name =  

Latest revision as of 00:40, 8 March 2020

Forwards Ginna Nuclear Power Plant Eop,Including Rev 7 to AP-TURB.1, Turbine Trip W/O Rx Trip Required & Rev 8 to FR-C.2, Response to Degraded Core Cooling.
Date released: 04/30/2018 Download: ML17263A305


Forwards Ginna Nuclear Power Plant Eop,Including Rev 7 to AP-TURB.1, Turbine Trip W/O Rx Trip Required & Rev 8 to FR-C.2, Response to Degraded Core Cooling.
ML17309A519
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/24/1993
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: JOHNSON A
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
References
Download: ML17309A519 (18)
Rev 8 to FR-C.2, Response to Degraded Core Cooling.
ML17263A306
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/19/1993
From: Marlow T
ROCHESTER GAS & ELECTRIC CORP.
To:
References
Download: ML17263A306 (82)
Rev 7 to AP-TURB.1, Turbine Trip W/O Rx Trip Required.
ML17263A304
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/07/1993
From: Marlow T
ROCHESTER GAS & ELECTRIC CORP.
To:
References
Download: ML17263A304 (19)