ML17326A545: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17326A545
| number = ML17326A545
| title = Forwards LER 80-004/03L-0
| title = Forwards LER 80-004/03L-0
| release date = 05/31/2018
| package contents = {{Adams package content
| package contents = {{Adams package content
| number = ML17326A546
| number = ML17326A546
| issue date = 02/27/1980
| issue date = 02/27/1980
| title = Forwards LER 80-004/03L-0
| title = LER 80-004/03L-0:on 800202,during Normal Operation,While Investigating Problem W/Test Circuit for B Main Turbine Stop Valve,Found Mounting Bracket for Proximity Switch Failed. Caused by Loosened Mounting Assembly Due to Vibration
| author name = RISCHLING J
| author name = Rischling J
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| addressee name =  
| addressee name =  
Line 21: Line 22:
| issue date = 02/27/1980
| issue date = 02/27/1980
| title = Forwards LER 80-004/03L-0
| title = Forwards LER 80-004/03L-0
| author name = SHALLER D V
| author name = Shaller D
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| addressee name = KEPPLER J G
| addressee name = KEPPLER J G

Latest revision as of 05:52, 7 March 2020

Forwards LER 80-004/03L-0
Date released: 05/31/2018 Download: ML17326A545


LER 80-004/03L-0:on 800202,during Normal Operation,While Investigating Problem W/Test Circuit for B Main Turbine Stop Valve,Found Mounting Bracket for Proximity Switch Failed. Caused by Loosened Mounting Assembly Due to Vibration
ML17326A546
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 02/27/1980
From: Rischling J
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17326A546 (2)
Forwards LER 80-004/03L-0
ML17326A544
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 02/27/1980
From: Shaller D
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17326A544 (1)