ML17334B157: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17334B157
| number = ML17334B157
| title = Forwards Final Seismic Analysis Rept, Crane Seismic Rept, Cask Handling Crane,150 Ton Capacity,Existing Bridge S/N 10038,New Trolley S/N 12124. Analysis for Mod to Auxiliary Bldg Crane W/Trolley for Single Failure Proof Requirements
| title = Forwards Final Seismic Analysis Rept, Crane Seismic Rept, Cask Handling Crane,150 Ton Capacity,Existing Bridge S/N 10038,New Trolley S/N 12124. Analysis for Mod to Auxiliary Bldg Crane W/Trolley for Single Failure Proof Requirements
| release date = 05/31/2018
| package contents = {{Adams package content
| package contents = {{Adams package content
| number = ML17334B158
| number = ML17334B158
| issue date = 08/21/1987
| issue date = 08/21/1987
| title = Forwards Final Seismic Analysis Rept, Crane Seismic Rept, Cask Handling Crane,150 Ton Capacity,Existing Bridge S/N 10038,New Trolley S/N 12124. Analysis for Mod to Auxiliary Bldg Crane W/Trolley for Single Failure Proof Requirements
| title = Crane Seismic Rept,Cask Handling Crane,150 Ton Capacity, Existing Bridge S/N 10038,New Trolley S/N 12124, Final Rept
| author name = GUMINSKI R G, MCMAHON M, ZACHARSASZ A S
| author name = Guminski R, Mcmahon M, Zacharsasz A
| author affiliation = WHITING CORP.
| author affiliation = WHITING CORP.
| addressee name =  
| addressee name =  
Line 21: Line 22:
| issue date = 10/06/1987
| issue date = 10/06/1987
| title = Forwards Final Seismic Analysis Rept, Crane Seismic Rept, Cask Handling Crane,150 Ton Capacity,Existing Bridge S/N 10038,New Trolley S/N 12124. Analysis for Mod to Auxiliary Bldg Crane W/Trolley for Single Failure Proof Requirements
| title = Forwards Final Seismic Analysis Rept, Crane Seismic Rept, Cask Handling Crane,150 Ton Capacity,Existing Bridge S/N 10038,New Trolley S/N 12124. Analysis for Mod to Auxiliary Bldg Crane W/Trolley for Single Failure Proof Requirements
| author name = ALEXICH M P
| author name = Alexich M
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| addressee name = MURLEY T E
| addressee name = MURLEY T E

Latest revision as of 01:44, 7 March 2020

Forwards Final Seismic Analysis Rept, Crane Seismic Rept, Cask Handling Crane,150 Ton Capacity,Existing Bridge S/N 10038,New Trolley S/N 12124. Analysis for Mod to Auxiliary Bldg Crane W/Trolley for Single Failure Proof Requirements
Date released: 05/31/2018 Download: ML17334B157


Crane Seismic Rept,Cask Handling Crane,150 Ton Capacity, Existing Bridge S/N 10038,New Trolley S/N 12124, Final Rept
ML17334B158
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 08/21/1987
From: Guminski R, Mcmahon M, Zacharsasz A
WHITING CORP.
To:
References
Download: ML17334B158 (468)
Forwards Final Seismic Analysis Rept, Crane Seismic Rept, Cask Handling Crane,150 Ton Capacity,Existing Bridge S/N 10038,New Trolley S/N 12124. Analysis for Mod to Auxiliary Bldg Crane W/Trolley for Single Failure Proof Requirements
ML17334B156
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 10/06/1987
From: Alexich M
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: MURLEY T E
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
RTR-NUREG-0554, RTR-NUREG-0612, RTR-NUREG-554, RTR-NUREG-612
Download: ML17334B156 (19)