ML020440797: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 01/10/2002
| issue date = 01/10/2002
| title = Response to November 20, 2001, Letter Concerning Public Release of EPRI Proprietary Information
| title = Response to November 20, 2001, Letter Concerning Public Release of EPRI Proprietary Information
| author name = Bateman W H
| author name = Bateman W
| author affiliation = NRC/NRR/DE/EMCB
| author affiliation = NRC/NRR/DE/EMCB
| addressee name = Marion A
| addressee name = Marion A
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Mr. Alex Marion, Director   Engineering Nuclear Energy Institute 1776 I Street, N.W., Suite 400 Washington, D.C. 20006-3708
{{#Wiki_filter:Mr. Alex Marion, Director Engineering Nuclear Energy Institute 1776 I Street, N.W., Suite 400 Washington, D.C. 20006-3708


==SUBJECT:==
==SUBJECT:==
RESPONSE TO NOVEMBER 20, 2001, LETTER CONCERNING PUBLICRELEASE OF EPRI PROPRIETARY INFORMATION
RESPONSE TO NOVEMBER 20, 2001, LETTER CONCERNING PUBLIC RELEASE OF EPRI PROPRIETARY INFORMATION


==Dear Mr. Marion:==
==Dear Mr. Marion:==


By letter dated November 20, 2001, you requested that the staff release to EPRI the completeproprietary version of the NRC report, Preliminary Staff Technical Assessment for PressurizedWater Reactor Vessel Head Penetration Nozzles Associated with NRC Bulletin 2001-01, Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles, datedNovember 2001. A non-proprietary version of the report was publicly released by the staff on November 6, 2001.The staff has discussed this report with EPRI, and by electronic mail (e-mail) datedDecember 3, 2001, Mr. C. Welty of EPRI agreed that the report can be publicly released as written with the following editorial corrections:   1)Reference 1 should read: "Presentation by P. Scott at Meeting of MRP Crack GrowthReview Team for Alloy 600 and Alloy 182, Arlie, VA, October 2-4, 2001," and   2)In the Reference Section the following references are EPRI Proprietary documents /items: 1, 3, 13, 15, 19, 22, 28, 33 and 34.The NRC staff has made the appropriate modifications to the report, as requested, and therevised report has been issued. A copy of the revised report is enclosed.If you have any question regarding this letter, please contact Mr. Allen Hiser of my staff at 301-415-1034.Sincerely, /ra/Mr. William H. Bateman, ChiefMaterials and Chemical Engineering Branch Division of Engineering Office of Nuclear Reactor Regulation
By letter dated November 20, 2001, you requested that the staff release to EPRI the complete proprietary version of the NRC report, Preliminary Staff Technical Assessment for Pressurized Water Reactor Vessel Head Penetration Nozzles Associated with NRC Bulletin 2001-01, Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles, dated November 2001. A non-proprietary version of the report was publicly released by the staff on November 6, 2001.
The staff has discussed this report with EPRI, and by electronic mail (e-mail) dated December 3, 2001, Mr. C. Welty of EPRI agreed that the report can be publicly released as written with the following editorial corrections:
: 1)   Reference 1 should read: Presentation by P. Scott at Meeting of MRP Crack Growth Review Team for Alloy 600 and Alloy 182, Arlie, VA, October 2-4, 2001," and
: 2)   In the Reference Section the following references are EPRI Proprietary documents /
items: 1, 3, 13, 15, 19, 22, 28, 33 and 34.
The NRC staff has made the appropriate modifications to the report, as requested, and the revised report has been issued. A copy of the revised report is enclosed.
If you have any question regarding this letter, please contact Mr. Allen Hiser of my staff at 301-415-1034.
Sincerely,
                                                  /ra/
Mr. William H. Bateman, Chief Materials and Chemical Engineering Branch Division of Engineering Office of Nuclear Reactor Regulation


==Enclosure:==
==Enclosure:==
As stated cc: See next page Mr. Alex Marion, DirectorEngineering Nuclear Energy Institute 1776 I Street, N.W., Suite 400 Washington, D.C. 20006-3708
As stated cc: See next page
 
Mr. Alex Marion, Director Engineering Nuclear Energy Institute 1776 I Street, N.W., Suite 400 Washington, D.C. 20006-3708


==SUBJECT:==
==SUBJECT:==
RESPONSE TO NOVEMBER 20, 2001, LETTER CONCERNING PUBLICRELEASE OF EPRI PROPRIETARY INFORMATION
RESPONSE TO NOVEMBER 20, 2001, LETTER CONCERNING PUBLIC RELEASE OF EPRI PROPRIETARY INFORMATION


==Dear Mr. Marion:==
==Dear Mr. Marion:==


By letter dated November 20, 2001, you requested that the staff release to EPRI the completeproprietary version of the NRC report, Preliminary Staff Technical Assessment for PressurizedWater Reactor Vessel Head Penetration Nozzles Associated with NRC Bulletin 2001-01, Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles, datedNovember 2001. A non-proprietary version of the report was publicly released by the staff on November 6, 2001.The staff has discussed this report with EPRI, and by electronic mail (e-mail) datedDecember 3, 2001, Mr. C. Welty of EPRI agreed that the report can be publicly released as written with the following editorial corrections:   1)Reference 1 should read: "Presentation by P. Scott at Meeting of MRP Crack GrowthReview Team for Alloy 600 and Alloy 182, Arlie, VA, October 2-4, 2001," and   2)In the Reference Section the following references are EPRI Proprietary documents /items: 1, 3, 13, 15, 19, 22, 28, 33 and 34.The NRC staff has made the appropriate modifications to the report, as requested, and therevised report has been issued. A copy of the revised report is enclosed. If you have any question regarding this letter, please contact Mr. Allen Hiser of my staff at 301-415-1034.Sincerely, Mr. William H. Bateman, ChiefMaterials and Chemical Engineering Branch Division of Engineering Office of Nuclear Reactor Regulation
By letter dated November 20, 2001, you requested that the staff release to EPRI the complete proprietary version of the NRC report, Preliminary Staff Technical Assessment for Pressurized Water Reactor Vessel Head Penetration Nozzles Associated with NRC Bulletin 2001-01, Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles, dated November 2001. A non-proprietary version of the report was publicly released by the staff on November 6, 2001.
The staff has discussed this report with EPRI, and by electronic mail (e-mail) dated December 3, 2001, Mr. C. Welty of EPRI agreed that the report can be publicly released as written with the following editorial corrections:
: 1)     Reference 1 should read: Presentation by P. Scott at Meeting of MRP Crack Growth Review Team for Alloy 600 and Alloy 182, Arlie, VA, October 2-4, 2001," and
: 2)     In the Reference Section the following references are EPRI Proprietary documents /
items: 1, 3, 13, 15, 19, 22, 28, 33 and 34.
The NRC staff has made the appropriate modifications to the report, as requested, and the revised report has been issued. A copy of the revised report is enclosed.
If you have any question regarding this letter, please contact Mr. Allen Hiser of my staff at 301-415-1034.
Sincerely, Mr. William H. Bateman, Chief Materials and Chemical Engineering Branch Division of Engineering Office of Nuclear Reactor Regulation


==Enclosure:==
==Enclosure:==
As stated cc: See next page Distribution
As stated cc: See next page Distribution:
:EMCB R/FSDuraiswamy
EMCB R/F            WDLanning SDuraiswamy        CCasto JLarkins            JGrobe JAZwolinski        AHowell PCWen Document Name: C:\Program Files\Adobe\Acrobat 4.0\PDF Output\NEI Proprietary Information.wpd INDICATE IN BOX: C=COPY W/O ATTACHMENT/ENCLOSURE, E=COPY W/ATT/ENCL, N=NO COPY EMCB:DE            E EMCB:DE            EMCB:DE            EMCB:DE CECarpenter:cec        ALHiser:alh      BJElliot (A):bje  WHBateman:whb 01/ 7 /02              01/ 8 /02        01/8 /02          01/ 10 /02


JLarkins JAZwolinskiWDLanningCCasto JGrobe AHowell PCWenDocument Name: C:\Program Files\Adobe\Acrobat 4.0\PDF Output\NEI Proprietary Information.wpdINDICATE IN BOX: "C"=COPY W/O ATTACHMENT/ENCLOSURE, "E"=COPY W/ATT/ENCL, "N"=NO COPY EMCB:DEEEMCB:DEEMCB:DEEMCB:DECECarpenter:cecALHiser:alhBJElliot (A):bjeWHBateman:whb 01/  7 /02 01/  8 /0201/8  /0201/ 10  /02 cc:Ralph Beedle, Senior Vice President and Chief Nuclear Officer Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708Mr. Jack Bailey, Chair  Materials Reliability Program 1101 Market Street - LP 6A Chattanooga, TN  37402Larry Mathews, MRP Southern Nuclear Operating Company Manager, Inspection and Testing Services P. O. Box 1295 Birmingham, AL  35201Vaughn Wagoner, Technical Chair Assessment Committee Carolina Power & Light Company One Hannover Square 9C1 P.O. Box 1551 Raleigh, NC 27612Frank Ammirato, EPRI   Inspection Manager EPRI NDE Center P. O. Box 217097 1300 W. T. Harris Blvd.
cc:
Charlotte, NC 28221C. Thomas Alley, Jr., Technical Chair  Inspection Task Duke Power Company Nuclear General Office 526 South Church Street Mail Code EC09O PO Box 1006 Charlotte NC 28201Avtar Singh, EPRI MRP ManagerChuck Welty, EPRI MRP Manager Allan McIlree, EPRI Assessment Manager Christine King, EPRI MRP Manager Electric Power Research Institute P. O. Box 10412 3412 Hillview Ave.
Ralph Beedle, Senior Vice President     Mr. Jack Bailey, Chair and Chief Nuclear Officer                 Materials Reliability Program Nuclear Energy Institute                 1101 Market Street - LP 6A Suite 400                               Chattanooga, TN 37402 1776 I Street, NW Washington, DC 20006-3708 Larry Mathews, MRP                       Vaughn Wagoner, Technical Chair Southern Nuclear Operating Company       Assessment Committee Manager, Inspection and Testing Services Carolina Power & Light Company P. O. Box 1295                           One Hannover Square 9C1 Birmingham, AL 35201                    P.O. Box 1551 Raleigh, NC 27612 Frank Ammirato, EPRI                     C. Thomas Alley, Jr., Technical Chair Inspection Manager                       Inspection Task EPRI NDE Center                         Duke Power Company P. O. Box 217097                         Nuclear General Office 1300 W. T. Harris Blvd.                 526 South Church Street Charlotte, NC 28221                      Mail Code EC09O PO Box 1006 Charlotte NC 28201 Avtar Singh, EPRI MRP Manager            Gary D. Moffatt, Technical Chair Chuck Welty, EPRI MRP Manager             Repair/Mitigation Task Allan McIlree, EPRI Assessment Manager   V. C. Summer Nuclear Station Christine King, EPRI MRP Manager         P. O. Box 88 Electric Power Research Institute       Jenkinsville, SC 29065 P. O. Box 10412 3412 Hillview Ave.
Palo Alto, CA 94303Gary D. Moffatt, Technical Chair  Repair/Mitigation Task V. C. Summer Nuclear Station P. O. Box 88 Jenkinsville, SC  29065}}
Palo Alto, CA 94303}}

Latest revision as of 04:28, 24 November 2019

Response to November 20, 2001, Letter Concerning Public Release of EPRI Proprietary Information
ML020440797
Person / Time
Issue date: 01/10/2002
From: Bateman W
NRC/NRR/DE/EMCB
To: Marion A
Nuclear Energy Institute
References
IEB-01-001
Download: ML020440797 (3)


Text

Mr. Alex Marion, Director Engineering Nuclear Energy Institute 1776 I Street, N.W., Suite 400 Washington, D.C. 20006-3708

SUBJECT:

RESPONSE TO NOVEMBER 20, 2001, LETTER CONCERNING PUBLIC RELEASE OF EPRI PROPRIETARY INFORMATION

Dear Mr. Marion:

By letter dated November 20, 2001, you requested that the staff release to EPRI the complete proprietary version of the NRC report, Preliminary Staff Technical Assessment for Pressurized Water Reactor Vessel Head Penetration Nozzles Associated with NRC Bulletin 2001-01, Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles, dated November 2001. A non-proprietary version of the report was publicly released by the staff on November 6, 2001.

The staff has discussed this report with EPRI, and by electronic mail (e-mail) dated December 3, 2001, Mr. C. Welty of EPRI agreed that the report can be publicly released as written with the following editorial corrections:

1) Reference 1 should read: Presentation by P. Scott at Meeting of MRP Crack Growth Review Team for Alloy 600 and Alloy 182, Arlie, VA, October 2-4, 2001," and
2) In the Reference Section the following references are EPRI Proprietary documents /

items: 1, 3, 13, 15, 19, 22, 28, 33 and 34.

The NRC staff has made the appropriate modifications to the report, as requested, and the revised report has been issued. A copy of the revised report is enclosed.

If you have any question regarding this letter, please contact Mr. Allen Hiser of my staff at 301-415-1034.

Sincerely,

/ra/

Mr. William H. Bateman, Chief Materials and Chemical Engineering Branch Division of Engineering Office of Nuclear Reactor Regulation

Enclosure:

As stated cc: See next page

Mr. Alex Marion, Director Engineering Nuclear Energy Institute 1776 I Street, N.W., Suite 400 Washington, D.C. 20006-3708

SUBJECT:

RESPONSE TO NOVEMBER 20, 2001, LETTER CONCERNING PUBLIC RELEASE OF EPRI PROPRIETARY INFORMATION

Dear Mr. Marion:

By letter dated November 20, 2001, you requested that the staff release to EPRI the complete proprietary version of the NRC report, Preliminary Staff Technical Assessment for Pressurized Water Reactor Vessel Head Penetration Nozzles Associated with NRC Bulletin 2001-01, Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles, dated November 2001. A non-proprietary version of the report was publicly released by the staff on November 6, 2001.

The staff has discussed this report with EPRI, and by electronic mail (e-mail) dated December 3, 2001, Mr. C. Welty of EPRI agreed that the report can be publicly released as written with the following editorial corrections:

1) Reference 1 should read: Presentation by P. Scott at Meeting of MRP Crack Growth Review Team for Alloy 600 and Alloy 182, Arlie, VA, October 2-4, 2001," and
2) In the Reference Section the following references are EPRI Proprietary documents /

items: 1, 3, 13, 15, 19, 22, 28, 33 and 34.

The NRC staff has made the appropriate modifications to the report, as requested, and the revised report has been issued. A copy of the revised report is enclosed.

If you have any question regarding this letter, please contact Mr. Allen Hiser of my staff at 301-415-1034.

Sincerely, Mr. William H. Bateman, Chief Materials and Chemical Engineering Branch Division of Engineering Office of Nuclear Reactor Regulation

Enclosure:

As stated cc: See next page Distribution:

EMCB R/F WDLanning SDuraiswamy CCasto JLarkins JGrobe JAZwolinski AHowell PCWen Document Name: C:\Program Files\Adobe\Acrobat 4.0\PDF Output\NEI Proprietary Information.wpd INDICATE IN BOX: C=COPY W/O ATTACHMENT/ENCLOSURE, E=COPY W/ATT/ENCL, N=NO COPY EMCB:DE E EMCB:DE EMCB:DE EMCB:DE CECarpenter:cec ALHiser:alh BJElliot (A):bje WHBateman:whb 01/ 7 /02 01/ 8 /02 01/8 /02 01/ 10 /02

cc:

Ralph Beedle, Senior Vice President Mr. Jack Bailey, Chair and Chief Nuclear Officer Materials Reliability Program Nuclear Energy Institute 1101 Market Street - LP 6A Suite 400 Chattanooga, TN 37402 1776 I Street, NW Washington, DC 20006-3708 Larry Mathews, MRP Vaughn Wagoner, Technical Chair Southern Nuclear Operating Company Assessment Committee Manager, Inspection and Testing Services Carolina Power & Light Company P. O. Box 1295 One Hannover Square 9C1 Birmingham, AL 35201 P.O. Box 1551 Raleigh, NC 27612 Frank Ammirato, EPRI C. Thomas Alley, Jr., Technical Chair Inspection Manager Inspection Task EPRI NDE Center Duke Power Company P. O. Box 217097 Nuclear General Office 1300 W. T. Harris Blvd. 526 South Church Street Charlotte, NC 28221 Mail Code EC09O PO Box 1006 Charlotte NC 28201 Avtar Singh, EPRI MRP Manager Gary D. Moffatt, Technical Chair Chuck Welty, EPRI MRP Manager Repair/Mitigation Task Allan McIlree, EPRI Assessment Manager V. C. Summer Nuclear Station Christine King, EPRI MRP Manager P. O. Box 88 Electric Power Research Institute Jenkinsville, SC 29065 P. O. Box 10412 3412 Hillview Ave.

Palo Alto, CA 94303