ML18003B323: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (3 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
| issue date = 06/16/1986 | | issue date = 06/16/1986 | ||
| title = Opposes Util Exemption from Requirements of Full Participation Emergency Plan Test within 1 Yr of OL Issuance | | title = Opposes Util Exemption from Requirements of Full Participation Emergency Plan Test within 1 Yr of OL Issuance | ||
| author name = | | author name = Horwitz A | ||
| author affiliation = AFFILIATION NOT ASSIGNED | | author affiliation = AFFILIATION NOT ASSIGNED | ||
| addressee name = | | addressee name = Denton H | ||
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR) | | addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR) | ||
| docket = 05000400 | | docket = 05000400 | ||
| Line 13: | Line 13: | ||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA TO NRC | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA TO NRC | ||
| page count = 4 | | page count = 4 | ||
| project = | |||
| stage = Other | |||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:REQUL TORY INFORNATION DISTRIBUT1 N SYSTEN{RIDS)C ACCESSIQN NBR: 8606160027 DOC.DATE: 86/06/16 NOTARIZED: | {{#Wiki_filter:REQUL TORY INFORNATION DISTRIBUT1 N SYSTEN {RIDS) | ||
NO DOC}(ET FACIL: 50-400 Shearon Hav ris Nuclear Pover Planti Unit 1.Cav olina 05000400 | C ACCESSIQN NBR: 8606160027 DOC. DATE: 86/06/16 NOTARIZED: | ||
Div ector (post 851125 | NO DOC}(ET FACIL:50-400 Shearon Hav ris Nuclear Pover Planti Unit 1. | ||
Cav olina 05000400 AuTH. NANE AUTHOR AFFILIATION HORUITSp A. | |||
AffiliationNot Assigned RECIP. NANE RECIPIENT AFFILIATl'GN DENTQNp H. | |||
Office of Nucleav Reactor Regulation~ | |||
Div ector (post 851125 | |||
==SUBJECT:== | ==SUBJECT:== | ||
Opposes util exemption+rom v equiv'ements of full participation emev gencg plan test within 1 gr of QL issuance.DISTRIBUTION CODE: YEO3D COPIEE RECEIVED: LTR g | Opposes util exemption | ||
Zc Related Correspondenc NOTES: Application fov pev | +rom v equiv'ements of full participation emev gencg plan test within 1 gr of QL issuance. | ||
DISTRIBUTION CODE: | |||
YEO3D COPIEE RECEIVED: LTR g ENCL SIZE: | |||
TITLE: Request fov NRR Action | |||
<e. g. | |||
: 2. 206 Petitions) | |||
Zc Related Correspondenc NOTES: Application fov pev mit v enewal filed. | |||
05000400 RECIPIENT ID CODE/NAI'tE PNR A PD2 LA BUCI(LEY B 01 INTERNAL: EDO/ACB 04 COPIES LTTR ENCL RECIPIENT ID CODE/NAltE PWR-A PD2 PD ELD/HD$1 NRR DIR COPIES LTTR ENCL EXTERNAL: 24X NRC PDR LPDR NSI C 03 05 TOTAL NUNBER 'QF COPIES REGUlRED: | |||
LTTR 12 ENCL 1 | |||
0 I | |||
t l | |||
f q | |||
K C | |||
I g | |||
p J | |||
I J, | |||
Mr. Harold Denton Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. | |||
20555 (301) 492-7000 | |||
==Subject:== | ==Subject:== | ||
Shearon Harris nuclear plant, Carolina Power&Light, Emergency Plan | Shearon Harris nuclear plant, Carolina Power | ||
& Light, Emergency Plan | |||
==Dear Mr. Denton,== | |||
Carolina Power 6 Light Company has not conducted a full participation test of the present emergency plan for the Shearon Harris nuclear plant as required by | |||
: federal, regulation, 10 CFR Part 50. | |||
This is most significant since Chatham | |||
: County, by formal action of the Board of Commissioners, has withdrawn from the emergency plan. | |||
: Thus, no plan which could actually be implemented if the plant were to operate has been tested. | |||
In addition, citizens and officials in other counties are considering withdrawing from the present emergency plan. | |||
: Clearly, any such action would further complicate this matter. | |||
At, least until such time as state and local governmental participation in an emergency plan for Shearon Harris is fully resolved, no exemption(s) from the requirement of a | |||
full participation test within one year prior to the granting of any full power license should be considered or approved. | |||
Sincerely, Q/8rz) ebObf.b | |||
~'b pDOGV pDR Ob 1b00> | |||
Og000 pQR H | |||
]p5 | |||
0 r | |||
'C t}} | |||
Latest revision as of 07:31, 7 January 2025
| ML18003B323 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 06/16/1986 |
| From: | Horwitz A AFFILIATION NOT ASSIGNED |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8606160027 | |
| Download: ML18003B323 (4) | |
Text
REQUL TORY INFORNATION DISTRIBUT1 N SYSTEN {RIDS)
C ACCESSIQN NBR: 8606160027 DOC. DATE: 86/06/16 NOTARIZED:
NO DOC}(ET FACIL:50-400 Shearon Hav ris Nuclear Pover Planti Unit 1.
Cav olina 05000400 AuTH. NANE AUTHOR AFFILIATION HORUITSp A.
AffiliationNot Assigned RECIP. NANE RECIPIENT AFFILIATl'GN DENTQNp H.
Office of Nucleav Reactor Regulation~
Div ector (post 851125
SUBJECT:
Opposes util exemption
+rom v equiv'ements of full participation emev gencg plan test within 1 gr of QL issuance.
DISTRIBUTION CODE:
YEO3D COPIEE RECEIVED: LTR g ENCL SIZE:
TITLE: Request fov NRR Action
<e. g.
- 2. 206 Petitions)
Zc Related Correspondenc NOTES: Application fov pev mit v enewal filed.
05000400 RECIPIENT ID CODE/NAI'tE PNR A PD2 LA BUCI(LEY B 01 INTERNAL: EDO/ACB 04 COPIES LTTR ENCL RECIPIENT ID CODE/NAltE PWR-A PD2 PD ELD/HD$1 NRR DIR COPIES LTTR ENCL EXTERNAL: 24X NRC PDR LPDR NSI C 03 05 TOTAL NUNBER 'QF COPIES REGUlRED:
LTTR 12 ENCL 1
0 I
t l
f q
K C
I g
p J
I J,
Mr. Harold Denton Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 (301) 492-7000
Subject:
Shearon Harris nuclear plant, Carolina Power
& Light, Emergency Plan
Dear Mr. Denton,
Carolina Power 6 Light Company has not conducted a full participation test of the present emergency plan for the Shearon Harris nuclear plant as required by
- federal, regulation, 10 CFR Part 50.
This is most significant since Chatham
- County, by formal action of the Board of Commissioners, has withdrawn from the emergency plan.
- Thus, no plan which could actually be implemented if the plant were to operate has been tested.
In addition, citizens and officials in other counties are considering withdrawing from the present emergency plan.
- Clearly, any such action would further complicate this matter.
At, least until such time as state and local governmental participation in an emergency plan for Shearon Harris is fully resolved, no exemption(s) from the requirement of a
full participation test within one year prior to the granting of any full power license should be considered or approved.
Sincerely, Q/8rz) ebObf.b
~'b pDOGV pDR Ob 1b00>
Og000 pQR H
]p5
0 r
'C t