ML11221A299: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 13: Line 13:
| page count = 17
| page count = 17
}}
}}
=Text=
{{#Wiki_filter:RancoSecoLoss of ICS Power Chapter 15.0B&WCrossTrainingCourse 1 B&W Cross-Training Course R-326C OBJECTIVES1.Describe the symptoms of an overcooling transient.2.Explain how the loss of power to the ICS controlstationsresultedin:
2 control stations resulted in:a.An overheating event and b.A subsequent overcooling event.3.Describe the effect of operating a multi-stage centrifugal pump without a suction
source.
Appendix -Sequence of Events 3
Appendix -Sequence of Events 4
Appendix -Sequence of Events 5
Appendix -Sequence of Events 6
Appendix -Sequence of Events 7
Appendix -Sequence of Events 8
Appendix -Sequence of Events 9
Appendix -Sequence of Events 10 ICS Power Supplies Fig 15-1 11 Fig. 15-1 12Main Steam System (Fig. 15-2)
MFW reg. valves assume 50% open positions.MFW block valves close.
13Main Feedwater System (Fig. 15-3) 14Auxiliary Feedwater System (Fig. 15-4) 15High Pressure Injection System (Fig. 15-5)
Dominant Core Vulnerability Sequence Event Tree Fig 15 6 16 Fig. 15-6 Dominant Core Damage Sequence Event TreeFig. 15-7 17}}

Revision as of 11:46, 4 August 2018

521- R326C B&W Tech Cross Training - Chapter 15 Rancho Seco Loss of ICS Power
ML11221A299
Person / Time
Site: Rancho Seco
Issue date: 08/01/2011
From:
NRC/HR/ADHRTD/RTTB-PWR
To:
References
Download: ML11221A299 (17)


Text

RancoSecoLoss of ICS Power Chapter 15.0B&WCrossTrainingCourse 1 B&W Cross-Training Course R-326C OBJECTIVES1.Describe the symptoms of an overcooling transient.2.Explain how the loss of power to the ICS controlstationsresultedin:

2 control stations resulted in:a.An overheating event and b.A subsequent overcooling event.3.Describe the effect of operating a multi-stage centrifugal pump without a suction

source.

Appendix -Sequence of Events 3

Appendix -Sequence of Events 4

Appendix -Sequence of Events 5

Appendix -Sequence of Events 6

Appendix -Sequence of Events 7

Appendix -Sequence of Events 8

Appendix -Sequence of Events 9

Appendix -Sequence of Events 10 ICS Power Supplies Fig 15-1 11 Fig. 15-1 12Main Steam System (Fig. 15-2)

MFW reg. valves assume 50% open positions.MFW block valves close.

13Main Feedwater System (Fig. 15-3) 14Auxiliary Feedwater System (Fig. 15-4) 15High Pressure Injection System (Fig. 15-5)

Dominant Core Vulnerability Sequence Event Tree Fig 15 6 16 Fig. 15-6 Dominant Core Damage Sequence Event TreeFig. 15-7 17