{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD | |||
) | |||
In the Matter of ) | |||
) Docket No. 50-346-LR FIRSTENERGY NUCLEAR OPERATING COMPANY ) | |||
) | |||
(Davis-Besse Nuclear Power Station, Unit 1) ) November 1, 2012 | |||
) FENOC'S ANSWER OPPOSING INTERVENORS' MOTION FOR RECONSIDERATION OF ORDER STRIKING INTERVENORS' ANSWER TO FENOC'S MOTION FOR | |||
==SUMMARY== | |||
DISPOSITION OF CONTENTION 4 I. INTRODUCTION Pursuant to 10 C.F.R. § 2.323, FirstEnergy Nuclear Operating Company ("FENOC") submits this Answer opposing "Intervenors' Motion for Reconsideration of ASLB Order Granting FENOC's Motion to Strike 'Intervenors' Reply in Opposition to FirstEnergy's Motion for Summary Disposition of Contention 4 (SAMA Analysis - Source Terms)'" ("Motion for Reconsideration"), dated October 22, 2012. As is apparent from its title, the Motion for Reconsideration requests that the Atomic Safety and Licensing Board ("Board") reconsider its October 11, 2012 Order striking Intervenors' Answer to FENOC's Motion for Summary Disposition of Contention 4. | |||
1 This Answer also addresses Intervenors' "Motion to File | |||
'Intervenors' Motion for Reconsideration of AS LB Order Granting FENOC's Motion to Strike' Nunc Pro Tunc" ("Nunc Pro Tunc Motion"), dated October 30, 2012, which requests the Board allow the late filing of the Motion for Rec onsideration through the E-Filing system. As discussed below, contrary to 10 C.F.R. § 2.323(b), Intervenors once again impermissibly filed their Motion for Recons ideration without consulting FENOC. This | |||
1 Motion for Reconsideration at 1. | |||
2 deficiency provides an indepe ndent basis for rejecting the Motion for Reconsideration. Intervenors also filed the Motion for Reconsideration late through the E-Filing system without good cause, and did not consult on the Nunc Pro Tunc Motion. Finally, the Motion for Reconsideration fails to satisfy the standard for reconsideration set forth in 10 C.F.R. § 2.323(e), because Intervenors have not shown "compelling circumstances, such as the existence of a clear and material error in a decision, which could not have reasonably been anticipated." Intervenors instead repeat arguments in the Motion for Reconsideration that they already made in earlier pleadings, and which already have been reject ed by the Board. Accordingly, Intervenors' Motion for Reconsiderati on should be denied. | |||
II. BACKGROUND Contention 4, as admitted by the Board and further limited by the Commission, relates solely to FENOC's use of the Modular Accident Analysis Program ("MAAP") computer code to generate source terms and release fractions fo r use in FENOC's Severe Accident Mitigation Alternatives ("SAMA") analysis for Davis-Besse license renewal. | |||
2 FENOC timely filed its Motion for Summary Disposition of Contention 4 on July 26, 2012 following a revision to the License Renewal Application. | |||
3 On September 14, 2012, the Nuclear Regulatory Commission | |||
("NRC") Staff filed an answer supporting FENOC's Motion for Summary Disposition, 4 and Intervenors filed an answer opposing. | |||
5 2 See FirstEnergy Nuclear Operating Co. (Davis-Besse Nuclear Power Station), CLI-12-08, 75 NRC __, slip op. at 20-21 (Mar. 27, 2012); see also Order (Granting Motion to Strike), at 6 (Oct. 11, 2012) ("Order Granting Motion to Strike"). | |||
3 FENOC Motion for Summary Disposition of Contention 4 (SAMA Analysis Source Term) (July 26, 2012) ("Motion for Summary Disposition"). | |||
4 NRC Staff's Answer to FirstEnergy's Motion for Summary Disposition of Contention 4 (SAMA Analysis Source Terms) (Sept. 14, 2012). | |||
5 Intervenors' Reply in Opposition to 'FirstEnergy's Motion for Summary Disposition of Contention 4 (SAMA Analysis - Source Terms)' (Sept. 14, 2012) ("Intervenors' Answer"). | |||
3 On September 24, 2012, FENOC moved to strike Intervenors' Answer to the Motion for Summary Disposition, on the grounds it included exclusively new arguments and information outside the scope of Contention 4. | |||
6 During consultation on FENOC's Motion to Strike, the Staff stated that it would not oppose striking the outside scope arguments. | |||
7 Intervenors filed an answer opposing FENOC's Motion to Strike on October 4, 2012. | |||
8 The Board granted the Motion to Strike on October 11, 2012, ruling that Intervenors' Answer was "irrelevant to FENOC's Motion for Summary Disposition of Contention 4" a nd "entirely unrelated to and beyond the scope of Contention 4 as admitted by the Board and limited by the Commission." | |||
9 Intervenors attempted to file the instant Motion for Recons ideration on October 22, 2012 and filed a related Nunc Pro Tunc Motion on October 30, 2012. | |||
III. LEGAL STANDARDS Motions for reconsideration "may not be f iled except upon leave of the presiding officer . . . , upon a showing of compelling circumstances, such as the existence of a clear and material error in a decision, which could not have reasonably been anticip ated, that rend ers the decision invalid."10 The Commission applies this standard strictly and does not grant motions for reconsideration lightly. | |||
11 6 FENOC Motion to Strike Intervenors' Reply in Opposition to FENOC's Motion for Summary Disposition of Contention 4 (SAMA Analysis - Source Terms) (Sept. 24, 2012) ("FENOC's Motion to Strike"). | |||
7 Id. at 1 n.1. | |||
8 Intervenors' Response in Opposition to FENOC's Motion to Strike Intervenors' Reply in Opposition to FENOC's Motion for Summary Disposition of Contention 4 (SAMA Analysis - Source Terms) (Oct. 4, 2012) ("Answer to FENOC's Motion to Strike"). | |||
9 Order Granting Motion to Strike at 5. | |||
10 10 C.F.R. § 2.323(e). | |||
11 Pac. Gas & Elec. Co. (Diablo Canyon Power Plant Indep. Spent Fuel Storage Installation), CLI-06-27, 64 NRC 399, 400-01 (2006). | |||
4 As part of its amendments to the NRC Rules of Practice in 2004, the Commission described the "compelling circumstances" standard in the context of moti ons for reconsideration as follows: | |||
This standard, which is a higher standard than the existing case law, is intended to permit reconsideration only where manifest | |||
injustice would occur in the absence of reconsideration, and the claim could not have been raised earlier. In the Commission's view, reconsideration should be an extraordinary action and should not be used as an opportunity to reargue facts and rationales which were (or should have been) discussed earlier. | |||
12 Therefore, reconsideration is appropriate only if the moving party has demonstrated that the presiding officer has committed a "clear" error and it is related to a new argument that the party was not able to make previously. | |||
13 Furthermore, a "clear" error is one that is "not even plausible in light of the record viewed in its entirety." | |||
14 IV. THE BOARD SHOULD DENY INTERVENORS' MOTION FOR RECONSIDERATION The Board should deny Intervenors' Motion for Reconsideration be cause Intervenors, once again, failed to consult with FENOC before filing their motion and also filed the motion late through the E-Filing system without good cause. Alterna tively, Intervenors' Motion for Reconsideration should be denied because it fails to meet the ex traordinarily high standard for reconsideration. | |||
A. The Board Should Deny Intervenors' Motion for Reconsideration Because Intervenors Failed to Consult with FENOC The Motion for Reconsideration is procedurally defective because Intervenors failed to consult with FENOC-at all-before filing it. Under 10 C.F.R. § 2.323(b), "[a] motion must be rejected if it doe s not include a certification by the attorney or representative of the moving party | |||
12 Changes to Adjudicatory Process, 69 Fed. Reg. 2182, 2207 (Jan. 14, 2004) (emphasis added). | |||
13 See Consumers Energy Co. (Palisades Nuclear Power Plant), CLI-07-22, 65 NRC 525, 527 (2007). | |||
14 Private Fuel Storage, L.L.C. (Indep. Spent Fuel Storage Installation), CLI-5-19, 62 NRC 403, 411 (2005). | |||
5that the movant has made a sincere effort to co ntact other parties in the proceeding and resolve the issue(s) raised in the motion, and that the movant's efforts to resolve the issue(s) have been unsuccessful." | |||
15 In this proceeding, the Board itself has mandated in the Initial Scheduling Order ("ISO"), Section G.1, that " | |||
motions will be summarily rejected if they do not include the certification specified in 10 C.F.R. § 2.323(b) that a sincere attempt to reso lve the issues has been made." | |||
16 Contrary to the NRC regulations and the Board's ISO, Intervenors made no attempt to contact FENOC and resolve the issues raised in the Motion for Reconsideration. Because Intervenors did not consult with FENOC and the Motion for Reconsideration does not include the mandatory certification, it must be rejected. | |||
17 Intervenors should be well-aware of this requirement as the Board and other Parties have previously pointed out Interven ors' failures to comply with the Section 2.323(b) consultation requirements. For example, Inte rvenors failed to consult or pr ovide the required certification when they submitted a proposed contention related to the Fukushima accident. | |||
18 The Board ruled that the proposed contention was "hopelessly flawed" and "must be denied" for failure to consult with FENOC or provide the requisite certification. | |||
19 The Board concluded that the proposed contention "can therefore be rejected on this ground alone." | |||
20 Intervenors repeated this same fatal deficiency in their June 4, 2012 Motion to Amend and Supplement Proposed | |||
15 Emphasis added. | |||
16 Initial Scheduling Order at 18 (June 15, 2011) (emphasis added). | |||
17 The Commission and licensing boards have supported this outcome in the past. See, e.g., Entergy Nuclear Operations, Inc. (Indian Point, Units 2 and 3), CLI-08-29, 68 NRC 899, 902 n.12 (2008) (rejecting a motion for failing to comply with consultation requirements of Section 2.323(b)); see also Entergy Nuclear Operations, Inc. (Indian Point, Units 2 & 3), Order (Denying New York State's Motion to Supplement), at 3-5 (June 7, 2012) (unpublished) (denying an intervenor's request to supplement the record because the intervenor failed to provide a sufficient Section 2.323(b) consultation). | |||
18 See FirstEnergy Nuclear Operating Co. (Davis-Besse Nuclear Power Station), LBP-11-34, 74 NRC __, slip op. at 12 (Nov. 23, 2011). | |||
19 Id. 20 Id. | |||
6 Contention No. 5 (Shield Buildi ng Cracking), which both FENOC a nd the NRC Staff pointed out in their answers to that motion. | |||
21 In summary, the Motion fo r Reconsideration should be summarily rejected, as required by the NRC regulations, the ISO, and precedent. | |||
B. The Board Should Deny Intervenors' Motion for Reconsideration Because Intervenors Filed It Late Without Good Cause The deadline for the Motion for Reconsideration was October 22, 2012. | |||
22 Intervenors' counsel e-mailed a copy of the Motion for Recons ideration to the Board and other Parties at 11:54 p.m. on October 22, 2012, and stated that he had been experiencing an error message when attempting to file the motion through the E-Filing system. | |||
23 Intervenors' counsel stated that he would "try to properly file [the motion] in the EIS [sic] system on October 23." | |||
24 NRC regulations state that "[s]ervice must be made electronically to the E-Filing system" and that service is only complete when it is electronically transmitted to the E-Filing system. | |||
25 Therefore, Intervenors had not properly filed the Moti on for Reconsideration on October 22, 2012. Over a week later, Interv enors filed their Nunc Pro Tunc Motion through the E-Filing system. They requested that the Board allow the late filing because when they originally attempted to file the Motion for Reconsideration through the E-Filing system, they "could not for the reason, they later learned, that ce rtain JAVA setting were wrongly set." | |||
26 This request to extend the deadline for the filing is governed by 10 C.F.R. § 2.307, wh ich states that a deadline "may be extended by . . . the presiding officer for good cause." | |||
21 FENOC's Answer Opposing Intervenors' Motion to Amend and Supplement Proposed Contention No. 5 (Shield Building Cracking), at 14-15 (June 29, 2012); NRC Staff's Answer to Motion to Amend and Supplement Proposed Contention No. 5 (Shield Building Cracking), at 12 (June 29, 2012). | |||
22 See 10 C.F.R. § 2.323(e) (requiring a motion for reconsideration to be filed within 10 days of the action for which reconsideration is requested). | |||
23 E-mail from T. Lodge, Counsel to Intervenors, to Board and Parties, NRC Proceeding "Davis Besse 50-346-LR" (Intervenors' Motion for Reconsideration) (Oct. 22, 2012). | |||
24 Id. 25 See 10 C.F.R. §§ 2.305(c), (f)(1). | |||
26 Nunc Pro Tunc Motion at 1-2. | |||
7 Although FENOC normally would not oppose a re quest to file late due to purported E-Filing difficulties, Intervenors have not shown good cause here for a number of reasons. First, Intervenors provide no justification for the week delay in filing through the E-Filing system, especially given that they told the Board and ot her Parties that they w ould file on October 23. | |||
Second, Intervenors' filing of the Nunc Pro Tunc Motion less than a week before the oral argument on the subject matter of the Motion for R econsideration adds unnecessary inefficiency and additional questions to this proceeding. Third, Intervenors repeatedly make filings at the last minute, eliminating any ability to resolve problems with the E-Filing system before deadlines. | |||
Finally, once again, Intervenors did not consult with FENOC about the Nunc Pro Tunc Motion, as required by 10 C.F.R. § 2.323(b). For these reasons, the Nunc Pro Tunc Motion should be denied, and the Motion for Reconsideration should be rejected as untimely. | |||
C. The Board Should Deny Intervenors' Motion for Reconsideration Because It Does Not Satisfy the Sta ndards for Reconsideration As identified above, a presiding officer may grant leave for a party to file a motion for reconsideration only "upon a showing of compelling circumstances, such as the existence of a clear and material error in a decision, which c ould not have reasonably been anticipated, that renders the decision invalid." | |||
27 The Commission has explained th at this "extraordinary action" is available only when "the claim c ould not have been raised earlier." | |||
28 Intervenors do not contest that "Contention 4, as limited by [the] Board and the Commission, challenges only the MAAP code generated source terms used by FENOC in performing its SAMA analysis." | |||
29 Rather, Intervenors argue th at the Board erred in granting FENOC's Motion to Strike becau se Intervenors "did, indeed , challenge the MAAP code- | |||
27 10 C.F.R. § 2.323(e). | |||
28 Changes to Adjudicatory Process, 69 Fed. Reg. at 2207. | |||
29 See Motion for Reconsideration at 2 (citing Order Granting FENOC's Motion to Strike at 6). | |||
8generated source terms used by FENOC." | |||
30 Intervenors contend that the arguments in Intervenors' Answer, which are all related to the Davis-Besse Shield Building cracking phenomena and the apparent corrosion of the Davis-Besse inner steel containment vessel, contain an adequate connection to the SAMA source terms such that they are within the scope of Contention 4. | |||
31 Intervenors, however, already made these arguments in their Answer to FENOC's Motion to Strike, and therefore do not satisfy the reconsideration standard that the claim could not have been raised earlier. | |||
32 For example, Intervenors themselves explain: "Intervenors pointed out in their opposition to summary disposition (and in their response to the Motion to Strike at p. 5) that the scenarios of a fatally-cracked and compromised shield building and corroded containment shell were not addressed in the course of benchmarking." | |||
33 Intervenors further explain: "Intervenors contended on summary disposition (and in their response to the Motion to Strike at p. 6) that the inputs and assumptions for the Davis-Besse SAMA are inappropriate." | |||
34 Therefore, by their own admission, In tervenors are only repeating earlier arguments. Similarly, arguments about "key plant-unique facts," "garbage in, garbage out," and "input data" all were included in Intervenor s' Answer to FENOC's Motion to Strike. | |||
35 The Commission has explained that reconsideration "should not be used as an opportunity to reargue | |||
30 Id. 31 See id. at 4 ("Intervenors challenged the sufficiency of input data used in the MAAP model since that model did not account for the shield building cracking and containment structure corrosion."). | |||
32 See, e.g., Answer to FENOC's Motion to Strike at 2 ("To meet their burden on summary disposition, Intervenors came forward with a factual showing that Davis-Besse's plant-unique shield building cracking and containment shell corrosion phenomena were categorically excluded from consideration within FENOC's SAMA analysis."). | |||
33 Motion for Reconsideration at 2 (emphasis added). | |||
34 Id. (emphasis added). | |||
35 See Answer to FENOC's Motion to Strike at 4-6. | |||
9 facts and rationales which were (or should have been) discussed earlier." | |||
36 This is exactly what Intervenors attempt here. | |||
Additionally, there is no indication that the Board somehow missed or ignored Intervenors' arguments about the connection between SAMA source terms and the Davis-Besse Shield Building cracking phenomena or the appare nt corrosion of the Davis-Besse inner steel containment vessel. To the contrary, in its Order, the Board acknowledged: | |||
Intervenors assert that their opposition arguments are relevant to the source terms used in FENOC's SAMA analysis because the source terms do not account for a cracked shield building or a | |||
corroded steel containment. | |||
37 The Board then rejected Intervenors' argument, finding Intervenors' Answer beyond the scope of Contention 4 as admitted by the Board and limited by the Commission: | |||
While Intervenors' concerns regarding the Davis-Besse containment may well have some relation to FENOC's SAMA | |||
analysis, the scope of Contention 4 does not encompass any and all arguments Intervenors have relati ng to SAMAs. Contention 4 is a very narrow contention, and it is beyond reason to suggest that Intervenors' arguments regarding the Davis-Besse shield building and containment are within its scope. | |||
38 Because Intervenors have simply repeated earlier arguments that were acknowledged and rejected by the Board, Intervenors have failed to demonstrate the "compelling circumstances" required by 10 C.F.R. § 2.323(e). Intervenors' arguments reflect a disagreement with the Board's ruling, not a "clear and material erro r" that "could not have reasonably been anticipated," as Secti on 2.323(e) requires. Moreover, Intervenors have identified no "manifest | |||
36 Changes to Adjudicatory Process, 69 Fed. Reg. at 2207; see also Progress Energy Carolinas, Inc. (Shearon Harris Nuclear Power Plant, Units 2 & 3), CLI-10-9, 71 NRC 245, 252 (2010). | |||
37 Order Granting FENOC's Motion to Strike at 5. | |||
38 Id. at 6. | |||
10 injustice" that would oc cur by the Board's Order. | |||
39 Accordingly, Intervenors do not satisfy the standards for reconsideration and their Motion for Reconsid eration should be denied. | |||
V. CONCLUSION As explained above, Intervenors failed to consult with FENOC about their Motion for Reconsideration, this motion is untimely without good cause, and this motion does not satisfy the high standards for reconsideration. Therefore, the Board should deny Intervenors' Motion for Reconsideration and Nunc Pro Tunc Motion in their entirety. Respectfully submitted, Executed in Accord with 10 C.F.R. § 2.304(d) | |||
Signed (electronically) by Timothy P. Matthews Timothy P. Matthews Kathryn M. Sutton Martin J. O'Neill | |||
Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, N.W. | |||
Washington, DC 20004 | |||
Phone: 202-739-5527 E-mail: tmatthews@morganlewis.com | |||
David W. Jenkins Senior Corporate Counsel II | |||
FirstEnergy Service Company Mailstop: A-GO-15 | |||
76 South Main Street | |||
Akron, OH 44308 | |||
Phone: 330-384-5037 E-mail: djenkins@firstenergycorp.com COUNSEL FOR FENOC Dated in Washington, D.C. | |||
this 1st day of November 2012 | |||
39 Changes to Adjudicatory Process, 69 Fed. Reg. at 2207. | |||
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD | |||
) | |||
In the Matter of ) | |||
) Docket No. 50-346-LR FIRSTENERGY NUCLEAR OPERATING COMPANY ) | |||
) | |||
(Davis-Besse Nuclear Power Station, Unit 1) ) November 1, 2012 | |||
) CERTIFICATE OF SERVICE I hereby certify that, on this date, a copy of "FENOC's Answer Opposing Intervenors' Motion for Reconsideration of Order Striking Intervenors' Answer to FENOC's Motion for Summary Disposition of Contention 4" was filed with the Electronic Information Exchange in the above-captioned proceeding on the following recipients. Administrative Judge William J. Froehlich, Chair Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: wjf1@nrc.gov | |||
Administrative Judge Dr. William E. Kastenberg Atomic Safety and Licensing Board Panel | |||
U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: wek1@nrc.gov | |||
Office of the Secretary | |||
U.S. Nuclear Regulatory Commission Rulemakings and Adjudications Staff | |||
Washington, DC 20555-0001 E-mail: hearingdocket@nrc.gov | |||
Administrative Judge Nicholas G. Trikouros Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: nicholas.trikouros@nrc.gov | |||
Office of the General Counsel | |||
U.S. Nuclear Regulatory Commission Mail Stop O-15D21 | |||
Washington, DC 20555-0001 | |||
Brian G. Harris Megan Wright Catherine E. Kanatas E-mail: Brian.Harris@nrc.gov; Megan.Wright@nrc.gov; | |||
Catherine.Kanatas@nrc.gov | |||
- - 2DB1/ 71501208.5 Office of Commission Appellate Adjudication | |||
U.S. Nuclear Regulatory Commission Mail Stop: O-16C1 | |||
Washington, DC 20555-0001 E-mail: ocaamail@nrc.gov | |||
Kevin Kamps | |||
Paul Gunter | |||
Beyond Nuclear | |||
6930 Carroll Avenue, Suite 400 Takoma Park, MD 20912 E-mail: kevin@beyondnuclear.org; | |||
paul@beyondnuclear.org | |||
Michael Keegan Don't Waste Michigan | |||
811 Harrison Street | |||
Monroe, MI 48161 E-mail: mkeeganj@comcast.net | |||
Terry J. Lodge | |||
316 N. Michigan St., Ste. 520 | |||
Toledo, OH 43604 E-mail: tjlodge50@yahoo.com Signed (electronically) by Stephen J. Burdick Stephen J. Burdick Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, N.W. | |||
Washington, DC 20004 | |||
Phone: 202-739-5059 E-mail: sburdick@morganlewis.com COUNSEL FOR FENOC}} |
Revision as of 19:53, 1 August 2018
ML12306A273 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 11/01/2012 |
From: | Matthews T P FirstEnergy Nuclear Operating Co, Morgan, Morgan, Lewis & Bockius, LLP |
To: | Atomic Safety and Licensing Board Panel |
SECY RAS | |
References | |
RAS 23688, 50-346-LR, ASLBP 11-901-01-LR-BD01 | |
Download: ML12306A273 (12) | |
Text
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD
)
In the Matter of )
) Docket No. 50-346-LR FIRSTENERGY NUCLEAR OPERATING COMPANY )
)
(Davis-Besse Nuclear Power Station, Unit 1) ) November 1, 2012
) FENOC'S ANSWER OPPOSING INTERVENORS' MOTION FOR RECONSIDERATION OF ORDER STRIKING INTERVENORS' ANSWER TO FENOC'S MOTION FOR
SUMMARY
DISPOSITION OF CONTENTION 4 I. INTRODUCTION Pursuant to 10 C.F.R. § 2.323, FirstEnergy Nuclear Operating Company ("FENOC") submits this Answer opposing "Intervenors' Motion for Reconsideration of ASLB Order Granting FENOC's Motion to Strike 'Intervenors' Reply in Opposition to FirstEnergy's Motion for Summary Disposition of Contention 4 (SAMA Analysis - Source Terms)'" ("Motion for Reconsideration"), dated October 22, 2012. As is apparent from its title, the Motion for Reconsideration requests that the Atomic Safety and Licensing Board ("Board") reconsider its October 11, 2012 Order striking Intervenors' Answer to FENOC's Motion for Summary Disposition of Contention 4.
1 This Answer also addresses Intervenors' "Motion to File
'Intervenors' Motion for Reconsideration of AS LB Order Granting FENOC's Motion to Strike' Nunc Pro Tunc" ("Nunc Pro Tunc Motion"), dated October 30, 2012, which requests the Board allow the late filing of the Motion for Rec onsideration through the E-Filing system. As discussed below, contrary to 10 C.F.R. § 2.323(b), Intervenors once again impermissibly filed their Motion for Recons ideration without consulting FENOC. This
1 Motion for Reconsideration at 1.
2 deficiency provides an indepe ndent basis for rejecting the Motion for Reconsideration. Intervenors also filed the Motion for Reconsideration late through the E-Filing system without good cause, and did not consult on the Nunc Pro Tunc Motion. Finally, the Motion for Reconsideration fails to satisfy the standard for reconsideration set forth in 10 C.F.R. § 2.323(e), because Intervenors have not shown "compelling circumstances, such as the existence of a clear and material error in a decision, which could not have reasonably been anticipated." Intervenors instead repeat arguments in the Motion for Reconsideration that they already made in earlier pleadings, and which already have been reject ed by the Board. Accordingly, Intervenors' Motion for Reconsiderati on should be denied.
II. BACKGROUND Contention 4, as admitted by the Board and further limited by the Commission, relates solely to FENOC's use of the Modular Accident Analysis Program ("MAAP") computer code to generate source terms and release fractions fo r use in FENOC's Severe Accident Mitigation Alternatives ("SAMA") analysis for Davis-Besse license renewal.
2 FENOC timely filed its Motion for Summary Disposition of Contention 4 on July 26, 2012 following a revision to the License Renewal Application.
3 On September 14, 2012, the Nuclear Regulatory Commission
("NRC") Staff filed an answer supporting FENOC's Motion for Summary Disposition, 4 and Intervenors filed an answer opposing.
5 2 See FirstEnergy Nuclear Operating Co. (Davis-Besse Nuclear Power Station), CLI-12-08, 75 NRC __, slip op. at 20-21 (Mar. 27, 2012); see also Order (Granting Motion to Strike), at 6 (Oct. 11, 2012) ("Order Granting Motion to Strike").
3 FENOC Motion for Summary Disposition of Contention 4 (SAMA Analysis Source Term) (July 26, 2012) ("Motion for Summary Disposition").
4 NRC Staff's Answer to FirstEnergy's Motion for Summary Disposition of Contention 4 (SAMA Analysis Source Terms) (Sept. 14, 2012).
5 Intervenors' Reply in Opposition to 'FirstEnergy's Motion for Summary Disposition of Contention 4 (SAMA Analysis - Source Terms)' (Sept. 14, 2012) ("Intervenors' Answer").
3 On September 24, 2012, FENOC moved to strike Intervenors' Answer to the Motion for Summary Disposition, on the grounds it included exclusively new arguments and information outside the scope of Contention 4.
6 During consultation on FENOC's Motion to Strike, the Staff stated that it would not oppose striking the outside scope arguments.
7 Intervenors filed an answer opposing FENOC's Motion to Strike on October 4, 2012.
8 The Board granted the Motion to Strike on October 11, 2012, ruling that Intervenors' Answer was "irrelevant to FENOC's Motion for Summary Disposition of Contention 4" a nd "entirely unrelated to and beyond the scope of Contention 4 as admitted by the Board and limited by the Commission."
9 Intervenors attempted to file the instant Motion for Recons ideration on October 22, 2012 and filed a related Nunc Pro Tunc Motion on October 30, 2012.
III. LEGAL STANDARDS Motions for reconsideration "may not be f iled except upon leave of the presiding officer . . . , upon a showing of compelling circumstances, such as the existence of a clear and material error in a decision, which could not have reasonably been anticip ated, that rend ers the decision invalid."10 The Commission applies this standard strictly and does not grant motions for reconsideration lightly.
11 6 FENOC Motion to Strike Intervenors' Reply in Opposition to FENOC's Motion for Summary Disposition of Contention 4 (SAMA Analysis - Source Terms) (Sept. 24, 2012) ("FENOC's Motion to Strike").
7 Id. at 1 n.1.
8 Intervenors' Response in Opposition to FENOC's Motion to Strike Intervenors' Reply in Opposition to FENOC's Motion for Summary Disposition of Contention 4 (SAMA Analysis - Source Terms) (Oct. 4, 2012) ("Answer to FENOC's Motion to Strike").
9 Order Granting Motion to Strike at 5.
10 10 C.F.R. § 2.323(e).
11 Pac. Gas & Elec. Co. (Diablo Canyon Power Plant Indep. Spent Fuel Storage Installation), CLI-06-27, 64 NRC 399, 400-01 (2006).
4 As part of its amendments to the NRC Rules of Practice in 2004, the Commission described the "compelling circumstances" standard in the context of moti ons for reconsideration as follows:
This standard, which is a higher standard than the existing case law, is intended to permit reconsideration only where manifest
injustice would occur in the absence of reconsideration, and the claim could not have been raised earlier. In the Commission's view, reconsideration should be an extraordinary action and should not be used as an opportunity to reargue facts and rationales which were (or should have been) discussed earlier.
12 Therefore, reconsideration is appropriate only if the moving party has demonstrated that the presiding officer has committed a "clear" error and it is related to a new argument that the party was not able to make previously.
13 Furthermore, a "clear" error is one that is "not even plausible in light of the record viewed in its entirety."
14 IV. THE BOARD SHOULD DENY INTERVENORS' MOTION FOR RECONSIDERATION The Board should deny Intervenors' Motion for Reconsideration be cause Intervenors, once again, failed to consult with FENOC before filing their motion and also filed the motion late through the E-Filing system without good cause. Alterna tively, Intervenors' Motion for Reconsideration should be denied because it fails to meet the ex traordinarily high standard for reconsideration.
A. The Board Should Deny Intervenors' Motion for Reconsideration Because Intervenors Failed to Consult with FENOC The Motion for Reconsideration is procedurally defective because Intervenors failed to consult with FENOC-at all-before filing it. Under 10 C.F.R. § 2.323(b), "[a] motion must be rejected if it doe s not include a certification by the attorney or representative of the moving party
12 Changes to Adjudicatory Process, 69 Fed. Reg. 2182, 2207 (Jan. 14, 2004) (emphasis added).
13 See Consumers Energy Co. (Palisades Nuclear Power Plant), CLI-07-22, 65 NRC 525, 527 (2007).
14 Private Fuel Storage, L.L.C. (Indep. Spent Fuel Storage Installation), CLI-5-19, 62 NRC 403, 411 (2005).
5that the movant has made a sincere effort to co ntact other parties in the proceeding and resolve the issue(s) raised in the motion, and that the movant's efforts to resolve the issue(s) have been unsuccessful."
15 In this proceeding, the Board itself has mandated in the Initial Scheduling Order ("ISO"), Section G.1, that "
motions will be summarily rejected if they do not include the certification specified in 10 C.F.R. § 2.323(b) that a sincere attempt to reso lve the issues has been made."
16 Contrary to the NRC regulations and the Board's ISO, Intervenors made no attempt to contact FENOC and resolve the issues raised in the Motion for Reconsideration. Because Intervenors did not consult with FENOC and the Motion for Reconsideration does not include the mandatory certification, it must be rejected.
17 Intervenors should be well-aware of this requirement as the Board and other Parties have previously pointed out Interven ors' failures to comply with the Section 2.323(b) consultation requirements. For example, Inte rvenors failed to consult or pr ovide the required certification when they submitted a proposed contention related to the Fukushima accident.
18 The Board ruled that the proposed contention was "hopelessly flawed" and "must be denied" for failure to consult with FENOC or provide the requisite certification.
19 The Board concluded that the proposed contention "can therefore be rejected on this ground alone."
20 Intervenors repeated this same fatal deficiency in their June 4, 2012 Motion to Amend and Supplement Proposed
15 Emphasis added.
16 Initial Scheduling Order at 18 (June 15, 2011) (emphasis added).
17 The Commission and licensing boards have supported this outcome in the past. See, e.g., Entergy Nuclear Operations, Inc. (Indian Point, Units 2 and 3), CLI-08-29, 68 NRC 899, 902 n.12 (2008) (rejecting a motion for failing to comply with consultation requirements of Section 2.323(b)); see also Entergy Nuclear Operations, Inc. (Indian Point, Units 2 & 3), Order (Denying New York State's Motion to Supplement), at 3-5 (June 7, 2012) (unpublished) (denying an intervenor's request to supplement the record because the intervenor failed to provide a sufficient Section 2.323(b) consultation).
18 See FirstEnergy Nuclear Operating Co. (Davis-Besse Nuclear Power Station), LBP-11-34, 74 NRC __, slip op. at 12 (Nov. 23, 2011).
19 Id. 20 Id.
6 Contention No. 5 (Shield Buildi ng Cracking), which both FENOC a nd the NRC Staff pointed out in their answers to that motion.
21 In summary, the Motion fo r Reconsideration should be summarily rejected, as required by the NRC regulations, the ISO, and precedent.
B. The Board Should Deny Intervenors' Motion for Reconsideration Because Intervenors Filed It Late Without Good Cause The deadline for the Motion for Reconsideration was October 22, 2012.
22 Intervenors' counsel e-mailed a copy of the Motion for Recons ideration to the Board and other Parties at 11:54 p.m. on October 22, 2012, and stated that he had been experiencing an error message when attempting to file the motion through the E-Filing system.
23 Intervenors' counsel stated that he would "try to properly file [the motion] in the EIS [sic] system on October 23."
24 NRC regulations state that "[s]ervice must be made electronically to the E-Filing system" and that service is only complete when it is electronically transmitted to the E-Filing system.
25 Therefore, Intervenors had not properly filed the Moti on for Reconsideration on October 22, 2012. Over a week later, Interv enors filed their Nunc Pro Tunc Motion through the E-Filing system. They requested that the Board allow the late filing because when they originally attempted to file the Motion for Reconsideration through the E-Filing system, they "could not for the reason, they later learned, that ce rtain JAVA setting were wrongly set."
26 This request to extend the deadline for the filing is governed by 10 C.F.R. § 2.307, wh ich states that a deadline "may be extended by . . . the presiding officer for good cause."
21 FENOC's Answer Opposing Intervenors' Motion to Amend and Supplement Proposed Contention No. 5 (Shield Building Cracking), at 14-15 (June 29, 2012); NRC Staff's Answer to Motion to Amend and Supplement Proposed Contention No. 5 (Shield Building Cracking), at 12 (June 29, 2012).
22 See 10 C.F.R. § 2.323(e) (requiring a motion for reconsideration to be filed within 10 days of the action for which reconsideration is requested).
23 E-mail from T. Lodge, Counsel to Intervenors, to Board and Parties, NRC Proceeding "Davis Besse 50-346-LR" (Intervenors' Motion for Reconsideration) (Oct. 22, 2012).
24 Id. 25 See 10 C.F.R. §§ 2.305(c), (f)(1).
26 Nunc Pro Tunc Motion at 1-2.
7 Although FENOC normally would not oppose a re quest to file late due to purported E-Filing difficulties, Intervenors have not shown good cause here for a number of reasons. First, Intervenors provide no justification for the week delay in filing through the E-Filing system, especially given that they told the Board and ot her Parties that they w ould file on October 23.
Second, Intervenors' filing of the Nunc Pro Tunc Motion less than a week before the oral argument on the subject matter of the Motion for R econsideration adds unnecessary inefficiency and additional questions to this proceeding. Third, Intervenors repeatedly make filings at the last minute, eliminating any ability to resolve problems with the E-Filing system before deadlines.
Finally, once again, Intervenors did not consult with FENOC about the Nunc Pro Tunc Motion, as required by 10 C.F.R. § 2.323(b). For these reasons, the Nunc Pro Tunc Motion should be denied, and the Motion for Reconsideration should be rejected as untimely.
C. The Board Should Deny Intervenors' Motion for Reconsideration Because It Does Not Satisfy the Sta ndards for Reconsideration As identified above, a presiding officer may grant leave for a party to file a motion for reconsideration only "upon a showing of compelling circumstances, such as the existence of a clear and material error in a decision, which c ould not have reasonably been anticipated, that renders the decision invalid."
27 The Commission has explained th at this "extraordinary action" is available only when "the claim c ould not have been raised earlier."
28 Intervenors do not contest that "Contention 4, as limited by [the] Board and the Commission, challenges only the MAAP code generated source terms used by FENOC in performing its SAMA analysis."
29 Rather, Intervenors argue th at the Board erred in granting FENOC's Motion to Strike becau se Intervenors "did, indeed , challenge the MAAP code-
27 10 C.F.R. § 2.323(e).
28 Changes to Adjudicatory Process, 69 Fed. Reg. at 2207.
29 See Motion for Reconsideration at 2 (citing Order Granting FENOC's Motion to Strike at 6).
8generated source terms used by FENOC."
30 Intervenors contend that the arguments in Intervenors' Answer, which are all related to the Davis-Besse Shield Building cracking phenomena and the apparent corrosion of the Davis-Besse inner steel containment vessel, contain an adequate connection to the SAMA source terms such that they are within the scope of Contention 4.
31 Intervenors, however, already made these arguments in their Answer to FENOC's Motion to Strike, and therefore do not satisfy the reconsideration standard that the claim could not have been raised earlier.
32 For example, Intervenors themselves explain: "Intervenors pointed out in their opposition to summary disposition (and in their response to the Motion to Strike at p. 5) that the scenarios of a fatally-cracked and compromised shield building and corroded containment shell were not addressed in the course of benchmarking."
33 Intervenors further explain: "Intervenors contended on summary disposition (and in their response to the Motion to Strike at p. 6) that the inputs and assumptions for the Davis-Besse SAMA are inappropriate."
34 Therefore, by their own admission, In tervenors are only repeating earlier arguments. Similarly, arguments about "key plant-unique facts," "garbage in, garbage out," and "input data" all were included in Intervenor s' Answer to FENOC's Motion to Strike.
35 The Commission has explained that reconsideration "should not be used as an opportunity to reargue
30 Id. 31 See id. at 4 ("Intervenors challenged the sufficiency of input data used in the MAAP model since that model did not account for the shield building cracking and containment structure corrosion.").
32 See, e.g., Answer to FENOC's Motion to Strike at 2 ("To meet their burden on summary disposition, Intervenors came forward with a factual showing that Davis-Besse's plant-unique shield building cracking and containment shell corrosion phenomena were categorically excluded from consideration within FENOC's SAMA analysis.").
33 Motion for Reconsideration at 2 (emphasis added).
34 Id. (emphasis added).
35 See Answer to FENOC's Motion to Strike at 4-6.
9 facts and rationales which were (or should have been) discussed earlier."
36 This is exactly what Intervenors attempt here.
Additionally, there is no indication that the Board somehow missed or ignored Intervenors' arguments about the connection between SAMA source terms and the Davis-Besse Shield Building cracking phenomena or the appare nt corrosion of the Davis-Besse inner steel containment vessel. To the contrary, in its Order, the Board acknowledged:
Intervenors assert that their opposition arguments are relevant to the source terms used in FENOC's SAMA analysis because the source terms do not account for a cracked shield building or a
corroded steel containment.
37 The Board then rejected Intervenors' argument, finding Intervenors' Answer beyond the scope of Contention 4 as admitted by the Board and limited by the Commission:
While Intervenors' concerns regarding the Davis-Besse containment may well have some relation to FENOC's SAMA
analysis, the scope of Contention 4 does not encompass any and all arguments Intervenors have relati ng to SAMAs. Contention 4 is a very narrow contention, and it is beyond reason to suggest that Intervenors' arguments regarding the Davis-Besse shield building and containment are within its scope.
38 Because Intervenors have simply repeated earlier arguments that were acknowledged and rejected by the Board, Intervenors have failed to demonstrate the "compelling circumstances" required by 10 C.F.R. § 2.323(e). Intervenors' arguments reflect a disagreement with the Board's ruling, not a "clear and material erro r" that "could not have reasonably been anticipated," as Secti on 2.323(e) requires. Moreover, Intervenors have identified no "manifest
36 Changes to Adjudicatory Process, 69 Fed. Reg. at 2207; see also Progress Energy Carolinas, Inc. (Shearon Harris Nuclear Power Plant, Units 2 & 3), CLI-10-9, 71 NRC 245, 252 (2010).
37 Order Granting FENOC's Motion to Strike at 5.
38 Id. at 6.
10 injustice" that would oc cur by the Board's Order.
39 Accordingly, Intervenors do not satisfy the standards for reconsideration and their Motion for Reconsid eration should be denied.
V. CONCLUSION As explained above, Intervenors failed to consult with FENOC about their Motion for Reconsideration, this motion is untimely without good cause, and this motion does not satisfy the high standards for reconsideration. Therefore, the Board should deny Intervenors' Motion for Reconsideration and Nunc Pro Tunc Motion in their entirety. Respectfully submitted, Executed in Accord with 10 C.F.R. § 2.304(d)
Signed (electronically) by Timothy P. Matthews Timothy P. Matthews Kathryn M. Sutton Martin J. O'Neill
Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, N.W.
Washington, DC 20004
Phone: 202-739-5527 E-mail: tmatthews@morganlewis.com
David W. Jenkins Senior Corporate Counsel II
FirstEnergy Service Company Mailstop: A-GO-15
76 South Main Street
Akron, OH 44308
Phone: 330-384-5037 E-mail: djenkins@firstenergycorp.com COUNSEL FOR FENOC Dated in Washington, D.C.
this 1st day of November 2012
39 Changes to Adjudicatory Process, 69 Fed. Reg. at 2207.
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD
)
In the Matter of )
) Docket No. 50-346-LR FIRSTENERGY NUCLEAR OPERATING COMPANY )
)
(Davis-Besse Nuclear Power Station, Unit 1) ) November 1, 2012
) CERTIFICATE OF SERVICE I hereby certify that, on this date, a copy of "FENOC's Answer Opposing Intervenors' Motion for Reconsideration of Order Striking Intervenors' Answer to FENOC's Motion for Summary Disposition of Contention 4" was filed with the Electronic Information Exchange in the above-captioned proceeding on the following recipients. Administrative Judge William J. Froehlich, Chair Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: wjf1@nrc.gov
Administrative Judge Dr. William E. Kastenberg Atomic Safety and Licensing Board Panel
U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: wek1@nrc.gov
Office of the Secretary
U.S. Nuclear Regulatory Commission Rulemakings and Adjudications Staff
Washington, DC 20555-0001 E-mail: hearingdocket@nrc.gov
Administrative Judge Nicholas G. Trikouros Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: nicholas.trikouros@nrc.gov
Office of the General Counsel
U.S. Nuclear Regulatory Commission Mail Stop O-15D21
Washington, DC 20555-0001
Brian G. Harris Megan Wright Catherine E. Kanatas E-mail: Brian.Harris@nrc.gov; Megan.Wright@nrc.gov;
Catherine.Kanatas@nrc.gov
- - 2DB1/ 71501208.5 Office of Commission Appellate Adjudication
U.S. Nuclear Regulatory Commission Mail Stop: O-16C1
Washington, DC 20555-0001 E-mail: ocaamail@nrc.gov
Kevin Kamps
Paul Gunter
6930 Carroll Avenue, Suite 400 Takoma Park, MD 20912 E-mail: kevin@beyondnuclear.org;
paul@beyondnuclear.org
Michael Keegan Don't Waste Michigan
811 Harrison Street
Monroe, MI 48161 E-mail: mkeeganj@comcast.net
Terry J. Lodge
316 N. Michigan St., Ste. 520
Toledo, OH 43604 E-mail: tjlodge50@yahoo.com Signed (electronically) by Stephen J. Burdick Stephen J. Burdick Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, N.W.
Washington, DC 20004
Phone: 202-739-5059 E-mail: sburdick@morganlewis.com COUNSEL FOR FENOC