{{#Wiki_filter:FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R19 N UMBER EXAM POINT WOR K R EQUES T WOR K ORDER D ESCR IPTIO N LOCATION SCAFFOLD I NS U LAT I ON PAINT PIPE P REP DRAWING PIPE SIZE R EMARK S CONDENSATE 1 CD-72 FE147552173441 Inspect piping downstream of flow element CD-72-FE. Inspect 2 pipe diameters. TB ELEV. 21 FT  off BFP-21 suction.YYNYSK-83 24" CHECWORKS - Ranked high on the
Service Life Report 2 CD-75N147554173444Nozzle. Insoect nozzle TB ELEV. 21 FT  off BFP-22 suction.YYNYSK-84 24" CHECWORKS - Ranked high on the
Service Life Report 3 CD-37N 147556 173447 FWH 24ATB ELEV. 42 FT  off FWH 24A.YYNYSK-81 14" CHECWORKS - Ranked high on the
Service Life Report 4 CD-VALVE-CD-18 (CD-31P-1 D/S)147559 173456 5 CD-34N 147560 173457 Nozzle. Insoect nozzle TB ELEV. 32 FT  off FWH 25B.YYNYSK-82 14" CHECWORKS - Ranked high on the
Service Life Report 6 CD-21N 147562 173461 Nozzle. Insoect nozzle TB ELEV. 41 FT  off FWH 24B.YYNYSK-81 14" RE-INSPECTION (TRENDING) 7 CD-108N 167217 198370 Inspect Nozzle on 22B FWH. TB ELEV. 39'-6"  off FWH 22B.YYNYSK-80A 14" CHECWORKS - Ranked high on the
Service Life Report8CD-37147597 173752 Inspect  elbow plus upstream & downstream
extension. Elbow plus 6 inches on either side of the elbow weld. TB ELEV. 41 FT  off FWH 24A.YYNYSK-8114" RE-INSPECTION (TRENDING)9CD-58P147598 173751 Inspect piping. Inspect 2 pipe diameters = 28 INCHES. TB ELEV. 32 FT  off FWH 25C.YYNYSK-8214" RE-INSPECTION (TRENDING)10CD-65P147600 173750 Inspect piping upstream of valve FE-72. Inspect 2 pipe diameters.
TB ELEV. 21 FT  off BFP-21
suction.Upstream of flow element FE-72YYNYSK-8324" RE-INSPECTION (TRENDING)11CD-75147602 173749 12 CD-9 147603 173747 Inspect  elbow plus upstream & downstream
extension. Elbow plus 10 inches on either side
of the elbow welds. TB. Elev. 24ft. 6"YYNYSK-8324" RE-INSPECTION (TRENDING)13CD-31147604 173746 Inspect  elbow plus upstream & downstream extension. Elbow plus 6 inches on either side of the elbow weld. TB ELEV. 45 FT  off FWH 25A.YYNYSK-8214" RE-INSPECTION (TRENDING)
CONDENSATE DESCOPED DESCOPED 1 of 11 2R19 FAC Scope (Ipe0067423).Xls ENT000057 Submitted:  March 28, 2012 United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of
: Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3)
ASLBP #:07-858-03-LR-BD01 Docket #:05000247 l 05000286 Exhibit #:
Identified:
Admitted: Withdrawn:
Rejected: Stricken: Other: ENT000057-00-BD01 10/15/2012 10/15/2012 FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R19 N UMBER EXAM POINT WOR K R EQUES T WOR K ORDER D ESCR IPTIO N LOCATION SCAFFOLD I NS U LAT I ON PAINT PIPE P REP DRAWING PIPE SIZE R EMARK S 14 3EXB-1147606173745 Inspect  elbow plus upstream & downstream extension. Elbow plus 6 inches on either side of the elbow weld.
TB Elev. 42ft- 2' off FWH 23BYYNYSK-2 20" RE-INSPECTION (TRENDING) 15 3EXB-1A147607173753 Inspect piping Downstream of valve elbow
3EXB-1. Inspect 2 pipe diameters = 40 inches.
TB Elev. 42ft- 2' off FWH 23BYYNYSK-2 20" RE-INSPECTION (TRENDING) 16 3EXB-9147608173754 Inspect  elbow plus upstream & downstream extension. Elbow plus 12 inches on either side of the elbow weld.
TB Elev. 39ft- 6' downstream of Valve-3EXB-VALVE - 3EX-4YYNYSK-2 28" RE-INSPECTION (TRENDING) 17 3EXB-14N167219198367Inspect turbine extraxtion nozzleInside Condenser 22 off  #22LP turbineYYYYSK-2 28" CHECWORKS - Ranked high on the Service Life Report 18 3EXC-10147609173755 Inspect  elbow plus upstream & downstream extension. Elbow plus 12 inches on either side of the elbow weld.
TB Elev. 39ft- 6' downstream of Valve 3EXC-VALVE -PCV-1161YYNYSK-3 28" RE-INSPECTION (TRENDING) 19 3EXC-8147613173758 Inspect  elbow plus upstream & downstream extension. Elbow plus 12 inches on either side of the elbow weld.
TB ELEV. 32 FT  downstream of Valve 3EXC-VALVE -PCV-1161.YYNYSK-3 28" RE-INSPECTION (TRENDING) 20 3EXC-9147617173759 21 4EXA-8A147621173776 22 4EX-D1167242198366 Inspect 45 degrees (back to back) elbows 4EX-D1 & 4EX-D1-1 . Also Inspect 2 inches on
either side of the elbow welds.
TB Elev. 42ft- 2'' upstream of  #23A FWH YYNYSK-21A 6" CHECWORKS - Ranked high on the Service Life Report 23 4EX-D1-1167242198366 Inspect 45 degrees (back to back) elbows 4EX-D1 & 4EX-D1-1 . Also Inspect 2 inches on either side of the elbow welds.
TB Elev. 42ft- 2'' upstream of  #23A FWH YYNYSK-21A 6" CHECWORKS - Ranked high on the
Service Life Report 24 4EX-D5167243198363Inspect  4x3 reducer.
TB ELEV. 38' 3" Upstream of # 23 FWH in vecinity of LCV-1115 YYNYSK-21A 6" CHECWORKS - Ranked high on the Service Life Report/ Re-inspection 25 4EX-D71167244198364 Inspect  elbow plus upstream & downstream
extension. Elbow plus 2 inches on either side
of the elbow weld.
TB ELEV. 33' 4". Downstream of #24C FWHYYNYSK-23A 6" RE-INSPECTION (TRENDING).
26 5EX-29147629173488 Inspect elbow plus piping upstream and downstream  ~ 4ft total.
TB ELEV. 26 ft 6". Downstream of Heater Drain Pump 22 towards HTR DRN TK.YYNYSK-19 2" RE-INSPECTION (TRENDING) 27 3EXA-14N147633173767 28 3EXD-51167241198365 Inspect  TEE  & Branch plus upstream &
downstream extension. Inspect 4 inches oneither side of welds.
TB Elev. 25ft- 0' In vecinity of Valve-LCV-1120A.YYNYSK-26B 8" RE-INSPECTION (TRENDING).                29BFD-5147635173764 Inspect  elbow plus upstream & downstream
extension. Elbow plus 10 inches on either side of the elbow weld.
TB. Elev. 24ft. 5". Down stream of valve BFD-2-21 discharge of  BFP No.
21.YYNYSK-7120" CHECWORKS - Ranked high on the Service Life Report EXTRACTION FEEDWATER DESCOPED DESCOPED DESCOPED 2 of 11 2R19 FAC Scope (Ipe0067423).Xls FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R19 N UMBER EXAM POINT WOR K R EQUES T WOR K ORDER D ESCR IPTIO N LOCATION SCAFFOLD I NS U LAT I ON PAINT PIPE P REP DRAWING PIPE SIZE R EMARK S 30 BFD-7147636173763 Inspect  elbow plus upstream
& downstream extension.
TB. Elev. 32ft. 0". Down stream of valve BFD-2-21 discharge of  BFP No.
21.YYNYSK-7120" CHECWORKS - Ranked high on the Service Life Report31BFD-14147637173491 Inspect  elbow plus upstream & downstream extension. Elbow plus 8 inches on either side of the elbow weld.
TB. Elev. 24ft. 5". Down stream of valve BFD-2-21 discharge of  BFP No.
21.YYNYSK-7120" CHECWORKS - Ranked high on the Service Life Report32BFD-17147638173760 Inspect  elbow plus upstream & downstream
extension. Elbow plus 8 inches on either side of the elbow weld.
TB. Elev. 24ft. 5". Down stream of valve BFD-2-22 discharge of  BFP No.
22.YYNYSK-7220" CHECWORKS - Ranked high on the Service Life Report33BFD-1814763917376134BFD-22147640173762 Inspect  elbow plus upstream & downstream extension. Elbow plus 10 inches on either side of the elbow weld.
TB. Elev. 32ft.- 5". Down stream of valve BFD-2-22 discharge of  BFP No.
22.YYNYSK-7220" CHECWORKS - Ranked high on the
Service Life Report35BFD-2714764217378436BFD-27P14764417379437BFD-28147645173795 Inspect  elbow plus upstream extension. Elbow plus 12 inches upstream of the elbow weld.
TB. Elev. 31ft.- 0". BFP discharge
header.YYNYSK-7330 " CHECWORKS - Ranked high on the Service Life Report38BFD-28P147647173798 Inspect piping. Inspect 2 pipe diameters = 60 INCHES. TB. Elev. 31ft.- 0". BFP discharge
header.YYNYSK-7330 " CHECWORKS - Ranked high on the Service Life Report39BFD-4914765017380240BFD-41147652173803 41 BFD-VALVE-BFD-3-2 (BFD-34P-1)147653173805 Inspect piping. Inspect 2 pipe diameters = 60 INCHES. TB. Elev. 34ft - 9". Off FWH 26A; D/S
of Valve BFD-3-2YYNYSK-73 18" CHECWORKS - Ranked high on the
Service Life Report DESCOPED DESCOPED DESCOPED DESCOPED DESCOPED 3 of 11 2R19 FAC Scope (Ipe0067423).Xls FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R19 N UMBER EXAM POINT WOR K R EQUES T WOR K ORDER D ESCR IPTIO N LOCATION SCAFFOLD I NS U LAT I ON PAINT PIPE P REP DRAWING PIPE SIZE R EMARK S 42 BFD-35147655173792 Inspect ELBOW, PIPE & ELBOW. Including 10 inches Upstream and downstream of elbow
welds. TB. Elev. 34ft - 9". Off FWH 26A; D/S of Valve BFD-3-2YYNYSK-73 18" CHECWORKS - Ranked high on the
Service Life Report 43 BFD-35P147656173791 Inspect piping. Inspect 2 pipe diameters = 36 INCHES. TB. Elev. 34ft - 9". Off FWH 26A; D/S
of Valve BFD-3-2YYNYSK-73 18" CHECWORKS - Ranked high on the
Service Life Report 44 BFD-36147657173790 Inspect ELBOW, PIPE & ELBOW. Including 8
inches Upstream and downstream of elbow
welds. TB. Elev. 34ft - 9". Off FWH 26A; D/S of Valve BFD-3-2YYNYSK-73 18" CHECWORKS - Ranked high on the Service Life Report 45 BFD-36N147659173789Inspect nozzleTB. Elev. 42ft - 9". Off FWH 26A.YYNYSK-73 18" CHECWORKS - Ranked high on the Service Life Report 46 BFD-53147661173788 Inspect Elbow and Pipe plus 8 inches upstream of elbow TB. Elev. 39ft - 9". Off FWH 26B.YYNYSK-7418" CHECWORKS - Ranked high on the Service Life Report47BFD-53P147663173793 Inspect Elbow and Pipe plus 8 inches upstream
of elbow weld. For pipe 2diameters = 36inches.
TB. Elev. 39ft - 9". Off FWH 26B.YYNYSK-7418" CHECWORKS - Ranked high on the Service Life Report48BFD-55N147665173796Inspect nozzle TB. Elev. 42ft - 9". Off FWH 26A.YYNYSK-7418" CHECWORKS - Ranked high on the Service Life Report49BFD-58147671173807 Inspect ELBOW, PIPE & ELBOW. Including 8 inches Upstream and downstream of elbow
welds. For pipe 2diameters = 36inches.
TB. Elev. 23ft - 6". Off FWH 26A.YYNYSK-7418" CHECWORKS - Ranked high on the
Service Life Report50BFD-58P147667173797 Inspect ELBOW, PIPE & ELBOW. Including 8 inches Upstream and downstream of elbow
welds. For pipe 2diameters = 36inches.
TB. Elev. 23ft - 6". Off FWH 26A.YYNYSK-7418" CHECWORKS - Ranked high on the Service Life Report51BFD-59147673173810 Inspect ELBOW, PIPE & ELBOW. Including 8 inches Upstream and downstream of elbow
welds. For pipe 2diameters = 36inches.
TB. Elev. 23ft - 6". Off FWH 26A.YYNYSK-7418" CHECWORKS - Ranked high on the Service Life Report 52 BFD-VALVE-BFD-4-2  (BFD-48P-1)14767517381153BFD-5014767717381254BFD-50P-1147678173813 Inspect piping. Inspect 2 pipe diameters = 60 INCHES. TB. Elev. 23ft - 6". YYNYSK-7430" CHECWORKS - Ranked high on the Service Life Report55BFD-6214768817389156BFD-62P US14768817389157BFD-63P DS147689173892Inspect piping 2 diameters = 60 inches TB. Elev. 29ft -9". YYNYSK-7430" CHECWORKS - Ranked high on the Service Life Report DESCOPED DESCOPED DESCOPED DESCOPED 4 of 11 2R19 FAC Scope (Ipe0067423).Xls FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R19 N UMBER EXAM POINT WOR K R EQUES T WOR K ORDER D ESCR IPTIO N LOCATION SCAFFOLD I NS U LAT I ON PAINT PIPE P REP DRAWING PIPE SIZE R EMARK S 58 BFD-65147690173893 Inspect ELBOW & PIPE. Including 8 inches Upstream elbow welds & . For pipe 2diameters
= 60inches.
TB. Elev. 43ft -0". YYNYSK-74 30" CHECWORKS - Ranked high on the
Service Life Report 59 BFD-65P-1147690173893 Inspect ELBOW & PIPE. Including 8 inches
Upstream elbow welds & . For pipe 2diameters
= 60inches.
TB. Elev. 43ft -0". YYNYSK-74 30" CHECWORKS - Ranked high on the
Service Life Report 60 BFD-101 61 BFD-21147691173894 Inspect  elbow plus upstream & downstream extension. Elbow plus 8 inches on either side
of the elbow weld. TB. Elev. 24ft-6". D/S of BFD-2-22YYNYsk-72 20" RE-INSPECTION (TRENDING) 62 BFD-33147693173895 Inspect  elbow plus upstream & downstream
extension. Elbow plus 8 inches on either side of the elbow weld.
TB. Elev. 29ft -9". YYNYSK-73 18" RE-INSPECTION (TRENDING) 63 BFD-38147694173902 Inspect  elbow plus upstream & downstream extension. Elbow plus 8 inches on either side of the elbow weld.
TB. Elev. 28ft -0". YYNYSK-73 18" RE-INSPECTION (TRENDING) 64 BFD-55147695173903 Inspect  elbow plus upstream & downstream extension. Elbow plus 8 inches on either side of the elbow weld.
TB. Elev. 45ft -0". Off FWH 26AYYNYSK-74 18" RE-INSPECTION (TRENDING) 65 BFD-71R147696173904 66 BFD-83R147698173905Inspect reducer .TB. Elev. 22ft-3" D/S OF FCV-447YYNYSK-77 18" RE-INSPECTION (TRENDING) 67 BFD-88147699173906 Inspect  elbow plus upstream & downstream
extension. Elbow plus 8 inches on either side of the elbow weld. TB. Elev. 35ft-0" D/S OF FCV-437YYNYSK-78 18" RE-INSPECTION (TRENDING) 68 BFD-99147707173907 69 3EXD-18147709173908 Inspect TEE, BRANCH and upstream &
downstream extensions, TEE & BRANCH PLUS 4 INCHES ON ALL SIDES OF TEE welds. TB. Elev. 17ft-10". D/S OF LCV-1118AYYNYSK-24B 8" RE-INSPECTION (TRENDING) 70 3EXD-29147710173931 Inspect  elbow plus upstream & downstream
extension. Elbow plus 4 inches on either side of the elbow weld. TB. Elev. 30ft-3" OFF 23B FWHYYNYSK-25A 8" RE-INSPECTION (TRENDING) 71 3EXD-3 147712 173933 Inspect  elbow plus upstream & downstream extension. Elbow plus 4 inches on either side of the elbow weld. TB. Elev. 32ft-0" OFF 23A FWHYYNYSK-24A 8" RE-INSPECTION (TRENDING) 72 3EXD-51 147716 173935 Inspect TEE, BRANCH and upstream &
downstream extensions, TEE & BRANCH PLUS 4 INCHES ON ALL SIDES OF TEE welds. TB. Elev. 24ft-6". U/S OF LCV-1120AYYNYSK-26B 8" RE-INSPECTION (TRENDING)
HEATER DRAINS DESCOPED DESCOPED DESCOPED 5 of 11 2R19 FAC Scope (Ipe0067423).Xls FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R19 N UMBER EXAM POINT WOR K R EQUES T WOR K ORDER D ESCR IPTIO N LOCATION SCAFFOLD I NS U LAT I ON PAINT PIPE P REP DRAWING PIPE SIZE R EMARK S 73 4EXD-1P147718173936Inspect piping 2 diameters = 12 inches TB. Elev. 42t-2". Downstream of LCV-1115YYNYSK-21A 6" CHECWORKS - Ranked high on the Service Life Report 74 4EXD-4147721173938 Inspect TEE, BRANCH and upstream &
downstream extensions, TEE & BRANCH
PLUS 4 INCHES ON ALL SIDES OF TEE
welds. TB. Elev. 38ft-3". Adjacent to LCV-
1115YYNYSK-21A6"x4" RE-INSPECTION (TRENDING) 75 4EXD-40147724173939 Inspect ELBOW & PIPE. Including 2 inches Upstream elbow welds & . For pipe 2diameters
= 12inches.
TB. Elev. 38ft-3". Upstream OF LCV-
1116YYNYSK-22A 6" RE-INSPECTION (TRENDING) 76 4EXD-40P DS 147724 173939 Inspect ELBOW & PIPE. Including 2 inches Upstream elbow welds & . For pipe 2diameters
= 12inches.
TB. Elev. 38ft-3". Upstream OF LCV-
1116YYNYSK-22A 6" RE-INSPECTION (TRENDING) 77 4EXD-57147726173941Inspect reducer .
TB. Elev. 17ft-0". Adjacent to LCV-1116AYYNYsk-22B 6"x3" RE-INSPECTION (TRENDING) 78 4EXD-6147727173942Inspect reducer .
TB. Elev. 38ft-3". Adjacent to LCV-
1115YYNYSK-21A4"x3" RE-INSPECTION (TRENDING) 79 4EXD-70P147729173944Inspect piping 2 diameters = 12 inchesTB. Elev. 33ft-4" OFF 24C FWHYYNYSK-23A 6" RE-INSPECTION (TRENDING) 80 5EXV-11147732173947 Inspect  elbow plus upstream & downstream extension. Elbow plus 4 inches on either side
of the elbow weld. TB. Elev. 30ft-3" OFF 25A FWHYYNYSK-15 10 RE-INSPECTION (TRENDING) 81 HD-10P147734173946Inspect piping 2 diameters = 16 inches TB. Elev. 13ft-7". Adjacent to HTR
DRN PUMP 22YYNYSK-20 8" RE-INSPECTION (TRENDING) 82 HD-5147735173949 Inspect TEE, BRANCH and upstream &
downstream extensions, TEE & BRANCH PLUS 8 INCHES ON ALL SIDES OF TEE welds. TB. Elev. 32ft-0" Downstream of LCV
1127YYNYSK-2016"x12" RE-INSPECTION (TRENDING) 83 MS-1A67P US 147742173962Inspect piping 2 diameters = 12 inches TB. Elev 38ft- 0". OFF FWH 26CYYNYSK-45C6" RE-INSPECTION (TRENDING)84MS-1B35 147745 173963 Inspect  elbow plus upstream & downstream extension. Elbow plus 2 inches on either side oftheelbowweld TB. Elev. 35 ft -5". Downstream OF
LCV-1105YYNYSK-48B6" RE-INSPECTION (TRENDING)85MS-2A13 147747 173964 Inspect  elbow plus upstream & downstream extension. Elbow plus 2 inches on either side of the elbow weld.
TB. Elev 49ft- 4". OFF Reheater 22A drainYYNYSK-46A6" RE-INSPECTION (TRENDING)
RE-HEATER DRAINS 6 of 11 2R19 FAC Scope (Ipe0067423).Xls FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R19 N UMBER EXAM POINT WOR K R EQUES T WOR K ORDER D ESCR IPTIO N LOCATION SCAFFOLD I NS U LAT I ON PAINT PIPE P REP DRAWING PIPE SIZE R EMARK S 86 MS-2A14 167247 198361 Inspect  elbow plus upstream & downstream extension. Elbow plus 2 inches on either side
of the elbow weld.
TB. Elev 49ft- 4". OFF Reheater 22A
drainYYNYSK-46A6" RE-INSPECTION (TRENDING) 87 MS-2B11147748173965 Inspect  elbow plus upstream & downstream
extension. Elbow plus 2 inches on either side
of the elbow weld.
TB. Elev 49ft- 1". OFF Reheater 22BYYNYSK-49A 6" RE-INSPECTION (TRENDING)88MS-2B13P147750173951Inspect piping 2 diameters = 12 inches TB. Elev 49ft- 1". OFF Reheater 22BYYNYSK-49A 6" RE-INSPECTION (TRENDING) 89 MS-2B17 147751 173950 Inspect  elbow plus upstream & downstream extension. Elbow plus 2 inches on either side
of the elbow weld.
TB. Elev 47ft- 10". OFF Reheater 22BYYNYSK-49A 6" RE-INSPECTION (TRENDING)90MS-2B22147752173954 Inspect  elbow plus upstream & downstream extension. Elbow plus 2 inches on either side of the elbow weld.
TB. Elev 40ft- 0". OFF Reheater 22BYYNYSK-49A 10" RE-INSPECTION (TRENDING)91MS-2B30R1147753173966Inspect (10x4) reducer .
TB. Elev. 38 ft -9". Upstream OF LCV-1105AYYNYSK-49B10"x4" RE-INSPECTION (TRENDING) 92 MS-2B42 147756 173968 Inspect TEE, BRANCH and upstream &
downstream extensions, TEE & BRANCH PLUS 2 INCHES ON ALL SIDES OF TEE welds. TB. Elev 39ft- 3". OFF FWH 26AYYNYSK-49C 6" RE-INSPECTION (TRENDING)93MS-2B52147757173969 Inspect  elbow plus upstream & downstream
extension. Elbow plus 2 inches on either side of the elbow weld. TB. Elev. 32ft-9" OFF 26C FWHYYNYSK-49C6" RE-INSPECTION (TRENDING)94MS-3B13P147758173970Inspect piping 2 diameters = 12 inches TB. Elev 49ft- 8". OFF Reheater 23B drain tank YYNYSK-50A6" RE-INSPECTION (TRENDING) 7 of 11 2R19 FAC Scope (Ipe0067423).Xls FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R19 N UMBER EXAM POINT WOR K R EQUES T WOR K ORDER D ESCR IPTIO N LOCATION SCAFFOLD I NS U LAT I ON PAINT PIPE P REP DRAWING PIPE SIZE R EMARK S 95 MS-2B30 R2 167249198362Inspect (10x4) reducer .
TB. Elev. 38 ft -9". Downstream OF LCV-1105AYYNYSK-49B10"x4" Snapshot Assessment96MS-3B26147761173972 Inspect  elbow plus upstream & downstream extension. Elbow plus 2 inches on either side
of the elbow weld.
TB. Elev 37ft- 9". OFF Reheater 23B drain tank YYNYSK-50A6" RE-INSPECTION (TRENDING)97MST43-PIPE US147763173974 Inspect piping upstream and down stream of mst 43 Tb elev 36' 0"YYNY 9321-F-20423/
9321-F-2131 1"& 3/4'RE-INSPECTION (TRENDING)981A-18 (TEE)147765173975 Inspect TEE, BRANCH and upstream &
downstream extensions, TEE & BRANCH PLUS 2 INCHES ON ALL SIDES OF TEE welds. TB. Elev 53ft- 9". OFF MS-21A YYNYSK-2712" RE-INSPECTION (TRENDING)991A-20P147767174052 Inspect piping 2 diameters = 24 inches.
Component d/s of valve 5ex-19L TB. Elev 53ft- 9". OFF MS-21A YYNYSK-27 12" CHECWORKS 100 1A-20P-1147769174053 Inspect piping 2 diameters = 24 inches.
Component d/s of valve 5ex-19M TB. Elev 53ft- 1". OFF MS-21A YYNYSK-27 12" CHECWORKS 101 1A-20N147773174054 Nozzle and Tank  Component d/s of valve 5ex-
19M reference CR-HQN-2007-00915-CA-16 TB. Elev 53ft- 1". OFF MSDT-21A YYNYSK-2712" Operating Experience /CHECWORKS1022A-20P1147777174057 Inspect piping 2 diameters = 24 inches.
Component d/s of valve 5ex-19K TB. Elev 53ft- 1". OFF MS-22A YYNYSK-2712" CHECWORKS 1032A-20P147775174056 Inspect piping 2 diameters = 24 inches.
Component d/s of valve 5ex-19J TB. Elev 53ft- 1". OFF MS-22A YYNYSK-2712" CHECWORKS 1042A-20N147774174055 Nozzle and Tank  Component d/s of valve 5ex-
19K reference CR-HQN-2007-00915-CA-16 TB. Elev 53ft- 1". OFF MSDT-22A YYNYSK-2712" Operating Experience /CHECWORKS1052B-1147780173500 Inspect TEE, BRANCH and upstream &
downstream extensions, TEE & BRANCH PLUS 4 INCHES ON ALL SIDES OF TEE
welds. TB. Elev 45ft- 10". OFF MSDT-22B YYNYSK-37A8"X6" RE-INSPECTION (TRENDING)1062B-3147782173501 Reducing elbow. Inspect  elbow plus upstream
& downstream extension. Elbow plus 4 inches on either side of the elbow weld.
TB. Elev 43ft- 6". OFF MSDT-22B YYNYSK-37A8"X6" RE-INSPECTION (TRENDING)107208-6P147784174058Inspect piping 2 diameters = 24 inches.
TB. ELEV 10ft- 0. Downstream of LCV-1126 @ COND. 21YYNYSK-20812" RE-INSPECTION (TRENDING)108212-1P US147786174059Inspect piping 2 diameters = 12 inches TB. ELEV 10ft- 0. Downstream of LCV-
1139 @ COND. 23YYNYSK-2126" RE-INSPECTION (TRENDING)109219-13P147787174060Inspect piping 2 diameters = 24 inches.
TB. ELEV 36 ft- 0. Downstream of FCV
-1208 @ COND. 22YYNYSK-21912" RE-INSPECTION (TRENDING)
MSR  DRAINS MAIN STEAM 8 of 11 2R19 FAC Scope (Ipe0067423).Xls FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R19 N UMBER EXAM POINT WOR K R EQUES T WOR K ORDER D ESCR IPTIO N LOCATION SCAFFOLD I NS U LAT I ON PAINT PIPE P REP DRAWING PIPE SIZE R EMARK S 110 235-5P US147788173922Inspect piping 2 diameters = 6 inches TB. ELEV  ft- 0. Upstream of COND.
23 PEN.YYNYSK-235 3" RE-INSPECTION (TRENDING) 111 248-16P US 147789173921Inspect piping 2 diameters = 6 inches TB. ELEV. 15ft-0". @ BFP TURBINEYYNY SK-248 3" RE-INSPECTION (TRENDING)112254-9E147796173917 Inspect  elbow plus upstream & downstream extension. Elbow plus 2 inches on either side of the elbow weld.
TB. ELEV 53 ft- 0. Downstream of MS-1207(Stop valve) west side. YYNYSK-2544" RE-INSPECTION (TRENDING)113270-3E147797173916 Inspect elbow plus piping upstream and downstream  ~ 4ft.
TB. YYNYSK-2701" RE-INSPECTION (TRENDING)114283-20R147794173918 Inspect reducer .
TB. ELEV. 15ft-0" AUX. STEAM TO UNIT COOLERS.YYNYSK-2836" X 4" RE-INSPECTION (TRENDING)115283-8R147795173487 Inspect reducer .
TB. ELEV. 15ft-0" AUX. STEAM TO UNIT COOLERS.YYNYSK-2836" X 4" RE-INSPECTION (TRENDING) 9 of 11 2R19 FAC Scope (Ipe0067423).Xls FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R19 N UMBER EXAM POINT WOR K R EQUES T WOR K ORDER D ESCR IPTIO N LOCATION SCAFFOLD I NS U LAT I ON PAINT PIPE P REP DRAWING PIPE SIZE R EMARK S 116 FWH 21A132254155698 Inspect FWH 21A shell 2 pipe dia. From  center line of inlet nozzle radially and axially.IINSIDE CONDENSER 23 YYNYShellOPERATING EXPERIENCE117FWH 21B132255155699 Inspect FWH 21B shell 2 pipe dia. From  center line of nozzle radially and axially.IINSIDE CONDENSER 22 YYNYShellOPERATING EXPERIENCE118FWH 22B132327155705 Inspect FWH 22B shell 2 pipe dia. From  center line of nozzle radially and axially.
INSIDE CONDENSER 22YYNYShellOPERATING EXPERIENCE119FWH 22A 148045 173900 Inspect FWH 22A shell 2 pipe dia. From  center
line of nozzle radially and axially.
INSIDE CONDENSER 23YYNYShellOPERATING EXPERIENCE 120 EST-24 147800 173914 Inspect  elbow plus upstream & downstream extension. Elbow plus 2 inches on either side of the elbow weld.
TB. ELEV. 25ft-8" off DRAIN COLLECTING TANK SK-914" RE-INSPECTION (TRENDING) 121 EST-31P US147802173896Inspect piping 2 diameters = 8 inches TB. ELEV. 25ft-8" off DRAIN COLLECTING TANK SK-914" RE-INSPECTION (TRENDING) 122 Valve LCV-1110147803173897 Inspect PIPE & REDUCER d/s of LCV-1110; 23A MSR DRAIN TO DCT TB ELEV 22ft-3" D/S OF LCV-11110
Near DCTYYNYSK-35B6" &  6X4R Plant Specific OPERATING EXPERIENCE 123 Valve FCV-1115147806173899 Inspect piping & fitting d/s of FCV-1115; 21 MBDP RECIRC. to DCT TB. Elev. 22ft-8" d/s of FCV-1115YYNYSK-356 " Plant Specific OPERATING
EXPERIENCE 124 Valve-LCV- 1127D147805173898 Inspect piping & fitting d/s of LCV-1127D;  HDT Large Dump to 23 Condenser.TB ELEV 16ft-5" D/S OF LCV-1127DYYNYSK-1814" Plant Specific OPERATING EXPERIENCE 125 COND-22 NOZ (3EXB-18N)167262198084 Inspect turbine extraxtion nozzle 3EXB-18N (previously inspected as COND-22 NOZ)Inside Condenser 22YYNYSK-128" RE-INSPECTION (TRENDING)126LPFW 22A-1P3167258198359127LPFW 22A-1P4167258198359 128LPFW 22B-1P4167260198360129FWH shell inspection148046173901open condenser 22 & 23 condenser SCOPE ADDITIONS DESCOPED SUPPORT FEEDWATER HEATER SHELLS LOW PRESSURE FEED W ATER HEATERS EXTRACTION STEAM Drain Miscellaneous DESCOPED DESCOPED DESCOPED 10 of 11 2R19 FAC Scope (Ipe0067423).Xls FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R19 N UMBER EXAM POINT WOR K R EQUES T WOR K ORDER D ESCR IPTIO N LOCATION SCAFFOLD I NS U LAT I ON PAINT PIPE P REP DRAWING PIPE SIZE R EMARK S ASBESTOS 11 of 11 2R19 FAC Scope (Ipe0067423).Xls}}

Revision as of 19:28, 1 August 2018

Official Exhibit - ENT000057-00-BD01 - Flow Accelerated Corrosion Inspection Points for 2R19
ML12338A450
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 03/28/2012
From:
Entergy Nuclear Operations
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 22102, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01
Download: ML12338A450 (11)


Text

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R19 N UMBER EXAM POINT WOR K R EQUES T WOR K ORDER D ESCR IPTIO N LOCATION SCAFFOLD I NS U LAT I ON PAINT PIPE P REP DRAWING PIPE SIZE R EMARK S CONDENSATE 1 CD-72 FE147552173441 Inspect piping downstream of flow element CD-72-FE. Inspect 2 pipe diameters. TB ELEV. 21 FT off BFP-21 suction.YYNYSK-83 24" CHECWORKS - Ranked high on the

Service Life Report 2 CD-75N147554173444Nozzle. Insoect nozzle TB ELEV. 21 FT off BFP-22 suction.YYNYSK-84 24" CHECWORKS - Ranked high on the

Service Life Report 3 CD-37N 147556 173447 FWH 24ATB ELEV. 42 FT off FWH 24A.YYNYSK-81 14" CHECWORKS - Ranked high on the

Service Life Report 4 CD-VALVE-CD-18 (CD-31P-1 D/S)147559 173456 5 CD-34N 147560 173457 Nozzle. Insoect nozzle TB ELEV. 32 FT off FWH 25B.YYNYSK-82 14" CHECWORKS - Ranked high on the

Service Life Report 6 CD-21N 147562 173461 Nozzle. Insoect nozzle TB ELEV. 41 FT off FWH 24B.YYNYSK-81 14" RE-INSPECTION (TRENDING) 7 CD-108N 167217 198370 Inspect Nozzle on 22B FWH. TB ELEV. 39'-6" off FWH 22B.YYNYSK-80A 14" CHECWORKS - Ranked high on the

Service Life Report8CD-37147597 173752 Inspect elbow plus upstream & downstream

extension. Elbow plus 6 inches on either side of the elbow weld. TB ELEV. 41 FT off FWH 24A.YYNYSK-8114" RE-INSPECTION (TRENDING)9CD-58P147598 173751 Inspect piping. Inspect 2 pipe diameters = 28 INCHES. TB ELEV. 32 FT off FWH 25C.YYNYSK-8214" RE-INSPECTION (TRENDING)10CD-65P147600 173750 Inspect piping upstream of valve FE-72. Inspect 2 pipe diameters.

TB ELEV. 21 FT off BFP-21

suction.Upstream of flow element FE-72YYNYSK-8324" RE-INSPECTION (TRENDING)11CD-75147602 173749 12 CD-9 147603 173747 Inspect elbow plus upstream & downstream

extension. Elbow plus 10 inches on either side

of the elbow welds. TB. Elev. 24ft. 6"YYNYSK-8324" RE-INSPECTION (TRENDING)13CD-31147604 173746 Inspect elbow plus upstream & downstream extension. Elbow plus 6 inches on either side of the elbow weld. TB ELEV. 45 FT off FWH 25A.YYNYSK-8214" RE-INSPECTION (TRENDING)

CONDENSATE DESCOPED DESCOPED 1 of 11 2R19 FAC Scope (Ipe0067423).Xls ENT000057 Submitted: March 28, 2012 United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of

Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3)

ASLBP #:07-858-03-LR-BD01 Docket #:05000247 l 05000286 Exhibit #:

Identified:

Admitted: Withdrawn:

Rejected: Stricken: Other: ENT000057-00-BD01 10/15/2012 10/15/2012 FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R19 N UMBER EXAM POINT WOR K R EQUES T WOR K ORDER D ESCR IPTIO N LOCATION SCAFFOLD I NS U LAT I ON PAINT PIPE P REP DRAWING PIPE SIZE R EMARK S 14 3EXB-1147606173745 Inspect elbow plus upstream & downstream extension. Elbow plus 6 inches on either side of the elbow weld.

TB Elev. 42ft- 2' off FWH 23BYYNYSK-2 20" RE-INSPECTION (TRENDING) 15 3EXB-1A147607173753 Inspect piping Downstream of valve elbow

3EXB-1. Inspect 2 pipe diameters = 40 inches.

TB Elev. 42ft- 2' off FWH 23BYYNYSK-2 20" RE-INSPECTION (TRENDING) 16 3EXB-9147608173754 Inspect elbow plus upstream & downstream extension. Elbow plus 12 inches on either side of the elbow weld.

TB Elev. 39ft- 6' downstream of Valve-3EXB-VALVE - 3EX-4YYNYSK-2 28" RE-INSPECTION (TRENDING) 17 3EXB-14N167219198367Inspect turbine extraxtion nozzleInside Condenser 22 off #22LP turbineYYYYSK-2 28" CHECWORKS - Ranked high on the Service Life Report 18 3EXC-10147609173755 Inspect elbow plus upstream & downstream extension. Elbow plus 12 inches on either side of the elbow weld.

TB Elev. 39ft- 6' downstream of Valve 3EXC-VALVE -PCV-1161YYNYSK-3 28" RE-INSPECTION (TRENDING) 19 3EXC-8147613173758 Inspect elbow plus upstream & downstream extension. Elbow plus 12 inches on either side of the elbow weld.

TB ELEV. 32 FT downstream of Valve 3EXC-VALVE -PCV-1161.YYNYSK-3 28" RE-INSPECTION (TRENDING) 20 3EXC-9147617173759 21 4EXA-8A147621173776 22 4EX-D1167242198366 Inspect 45 degrees (back to back) elbows 4EX-D1 & 4EX-D1-1 . Also Inspect 2 inches on

either side of the elbow welds.

TB Elev. 42ft- 2 upstream of #23A FWH YYNYSK-21A 6" CHECWORKS - Ranked high on the Service Life Report 23 4EX-D1-1167242198366 Inspect 45 degrees (back to back) elbows 4EX-D1 & 4EX-D1-1 . Also Inspect 2 inches on either side of the elbow welds.

TB Elev. 42ft- 2 upstream of #23A FWH YYNYSK-21A 6" CHECWORKS - Ranked high on the

Service Life Report 24 4EX-D5167243198363Inspect 4x3 reducer.

TB ELEV. 38' 3" Upstream of # 23 FWH in vecinity of LCV-1115 YYNYSK-21A 6" CHECWORKS - Ranked high on the Service Life Report/ Re-inspection 25 4EX-D71167244198364 Inspect elbow plus upstream & downstream

extension. Elbow plus 2 inches on either side

of the elbow weld.

TB ELEV. 33' 4". Downstream of #24C FWHYYNYSK-23A 6" RE-INSPECTION (TRENDING).

26 5EX-29147629173488 Inspect elbow plus piping upstream and downstream ~ 4ft total.

TB ELEV. 26 ft 6". Downstream of Heater Drain Pump 22 towards HTR DRN TK.YYNYSK-19 2" RE-INSPECTION (TRENDING) 27 3EXA-14N147633173767 28 3EXD-51167241198365 Inspect TEE & Branch plus upstream &

downstream extension. Inspect 4 inches oneither side of welds.

TB Elev. 25ft- 0' In vecinity of Valve-LCV-1120A.YYNYSK-26B 8" RE-INSPECTION (TRENDING). 29BFD-5147635173764 Inspect elbow plus upstream & downstream

extension. Elbow plus 10 inches on either side of the elbow weld.

TB. Elev. 24ft. 5". Down stream of valve BFD-2-21 discharge of BFP No.

21.YYNYSK-7120" CHECWORKS - Ranked high on the Service Life Report EXTRACTION FEEDWATER DESCOPED DESCOPED DESCOPED 2 of 11 2R19 FAC Scope (Ipe0067423).Xls FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R19 N UMBER EXAM POINT WOR K R EQUES T WOR K ORDER D ESCR IPTIO N LOCATION SCAFFOLD I NS U LAT I ON PAINT PIPE P REP DRAWING PIPE SIZE R EMARK S 30 BFD-7147636173763 Inspect elbow plus upstream

& downstream extension.

TB. Elev. 32ft. 0". Down stream of valve BFD-2-21 discharge of BFP No.

21.YYNYSK-7120" CHECWORKS - Ranked high on the Service Life Report31BFD-14147637173491 Inspect elbow plus upstream & downstream extension. Elbow plus 8 inches on either side of the elbow weld.

TB. Elev. 24ft. 5". Down stream of valve BFD-2-21 discharge of BFP No.

21.YYNYSK-7120" CHECWORKS - Ranked high on the Service Life Report32BFD-17147638173760 Inspect elbow plus upstream & downstream

extension. Elbow plus 8 inches on either side of the elbow weld.

TB. Elev. 24ft. 5". Down stream of valve BFD-2-22 discharge of BFP No.

22.YYNYSK-7220" CHECWORKS - Ranked high on the Service Life Report33BFD-1814763917376134BFD-22147640173762 Inspect elbow plus upstream & downstream extension. Elbow plus 10 inches on either side of the elbow weld.

TB. Elev. 32ft.- 5". Down stream of valve BFD-2-22 discharge of BFP No.

22.YYNYSK-7220" CHECWORKS - Ranked high on the

Service Life Report35BFD-2714764217378436BFD-27P14764417379437BFD-28147645173795 Inspect elbow plus upstream extension. Elbow plus 12 inches upstream of the elbow weld.

TB. Elev. 31ft.- 0". BFP discharge

header.YYNYSK-7330 " CHECWORKS - Ranked high on the Service Life Report38BFD-28P147647173798 Inspect piping. Inspect 2 pipe diameters = 60 INCHES. TB. Elev. 31ft.- 0". BFP discharge

header.YYNYSK-7330 " CHECWORKS - Ranked high on the Service Life Report39BFD-4914765017380240BFD-41147652173803 41 BFD-VALVE-BFD-3-2 (BFD-34P-1)147653173805 Inspect piping. Inspect 2 pipe diameters = 60 INCHES. TB. Elev. 34ft - 9". Off FWH 26A; D/S

of Valve BFD-3-2YYNYSK-73 18" CHECWORKS - Ranked high on the

Service Life Report DESCOPED DESCOPED DESCOPED DESCOPED DESCOPED 3 of 11 2R19 FAC Scope (Ipe0067423).Xls FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R19 N UMBER EXAM POINT WOR K R EQUES T WOR K ORDER D ESCR IPTIO N LOCATION SCAFFOLD I NS U LAT I ON PAINT PIPE P REP DRAWING PIPE SIZE R EMARK S 42 BFD-35147655173792 Inspect ELBOW, PIPE & ELBOW. Including 10 inches Upstream and downstream of elbow

welds. TB. Elev. 34ft - 9". Off FWH 26A; D/S of Valve BFD-3-2YYNYSK-73 18" CHECWORKS - Ranked high on the

Service Life Report 43 BFD-35P147656173791 Inspect piping. Inspect 2 pipe diameters = 36 INCHES. TB. Elev. 34ft - 9". Off FWH 26A; D/S

of Valve BFD-3-2YYNYSK-73 18" CHECWORKS - Ranked high on the

Service Life Report 44 BFD-36147657173790 Inspect ELBOW, PIPE & ELBOW. Including 8

inches Upstream and downstream of elbow

welds. TB. Elev. 34ft - 9". Off FWH 26A; D/S of Valve BFD-3-2YYNYSK-73 18" CHECWORKS - Ranked high on the Service Life Report 45 BFD-36N147659173789Inspect nozzleTB. Elev. 42ft - 9". Off FWH 26A.YYNYSK-73 18" CHECWORKS - Ranked high on the Service Life Report 46 BFD-53147661173788 Inspect Elbow and Pipe plus 8 inches upstream of elbow TB. Elev. 39ft - 9". Off FWH 26B.YYNYSK-7418" CHECWORKS - Ranked high on the Service Life Report47BFD-53P147663173793 Inspect Elbow and Pipe plus 8 inches upstream

of elbow weld. For pipe 2diameters = 36inches.

TB. Elev. 39ft - 9". Off FWH 26B.YYNYSK-7418" CHECWORKS - Ranked high on the Service Life Report48BFD-55N147665173796Inspect nozzle TB. Elev. 42ft - 9". Off FWH 26A.YYNYSK-7418" CHECWORKS - Ranked high on the Service Life Report49BFD-58147671173807 Inspect ELBOW, PIPE & ELBOW. Including 8 inches Upstream and downstream of elbow

welds. For pipe 2diameters = 36inches.

TB. Elev. 23ft - 6". Off FWH 26A.YYNYSK-7418" CHECWORKS - Ranked high on the

Service Life Report50BFD-58P147667173797 Inspect ELBOW, PIPE & ELBOW. Including 8 inches Upstream and downstream of elbow

welds. For pipe 2diameters = 36inches.

TB. Elev. 23ft - 6". Off FWH 26A.YYNYSK-7418" CHECWORKS - Ranked high on the Service Life Report51BFD-59147673173810 Inspect ELBOW, PIPE & ELBOW. Including 8 inches Upstream and downstream of elbow

welds. For pipe 2diameters = 36inches.

TB. Elev. 23ft - 6". Off FWH 26A.YYNYSK-7418" CHECWORKS - Ranked high on the Service Life Report 52 BFD-VALVE-BFD-4-2 (BFD-48P-1)14767517381153BFD-5014767717381254BFD-50P-1147678173813 Inspect piping. Inspect 2 pipe diameters = 60 INCHES. TB. Elev. 23ft - 6". YYNYSK-7430" CHECWORKS - Ranked high on the Service Life Report55BFD-6214768817389156BFD-62P US14768817389157BFD-63P DS147689173892Inspect piping 2 diameters = 60 inches TB. Elev. 29ft -9". YYNYSK-7430" CHECWORKS - Ranked high on the Service Life Report DESCOPED DESCOPED DESCOPED DESCOPED 4 of 11 2R19 FAC Scope (Ipe0067423).Xls FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R19 N UMBER EXAM POINT WOR K R EQUES T WOR K ORDER D ESCR IPTIO N LOCATION SCAFFOLD I NS U LAT I ON PAINT PIPE P REP DRAWING PIPE SIZE R EMARK S 58 BFD-65147690173893 Inspect ELBOW & PIPE. Including 8 inches Upstream elbow welds & . For pipe 2diameters

= 60inches.

TB. Elev. 43ft -0". YYNYSK-74 30" CHECWORKS - Ranked high on the

Service Life Report 59 BFD-65P-1147690173893 Inspect ELBOW & PIPE. Including 8 inches

Upstream elbow welds & . For pipe 2diameters

= 60inches.

TB. Elev. 43ft -0". YYNYSK-74 30" CHECWORKS - Ranked high on the

Service Life Report 60 BFD-101 61 BFD-21147691173894 Inspect elbow plus upstream & downstream extension. Elbow plus 8 inches on either side

of the elbow weld. TB. Elev. 24ft-6". D/S of BFD-2-22YYNYsk-72 20" RE-INSPECTION (TRENDING) 62 BFD-33147693173895 Inspect elbow plus upstream & downstream

extension. Elbow plus 8 inches on either side of the elbow weld.

TB. Elev. 29ft -9". YYNYSK-73 18" RE-INSPECTION (TRENDING) 63 BFD-38147694173902 Inspect elbow plus upstream & downstream extension. Elbow plus 8 inches on either side of the elbow weld.

TB. Elev. 28ft -0". YYNYSK-73 18" RE-INSPECTION (TRENDING) 64 BFD-55147695173903 Inspect elbow plus upstream & downstream extension. Elbow plus 8 inches on either side of the elbow weld.

TB. Elev. 45ft -0". Off FWH 26AYYNYSK-74 18" RE-INSPECTION (TRENDING) 65 BFD-71R147696173904 66 BFD-83R147698173905Inspect reducer .TB. Elev. 22ft-3" D/S OF FCV-447YYNYSK-77 18" RE-INSPECTION (TRENDING) 67 BFD-88147699173906 Inspect elbow plus upstream & downstream

extension. Elbow plus 8 inches on either side of the elbow weld. TB. Elev. 35ft-0" D/S OF FCV-437YYNYSK-78 18" RE-INSPECTION (TRENDING) 68 BFD-99147707173907 69 3EXD-18147709173908 Inspect TEE, BRANCH and upstream &

downstream extensions, TEE & BRANCH PLUS 4 INCHES ON ALL SIDES OF TEE welds. TB. Elev. 17ft-10". D/S OF LCV-1118AYYNYSK-24B 8" RE-INSPECTION (TRENDING) 70 3EXD-29147710173931 Inspect elbow plus upstream & downstream

extension. Elbow plus 4 inches on either side of the elbow weld. TB. Elev. 30ft-3" OFF 23B FWHYYNYSK-25A 8" RE-INSPECTION (TRENDING) 71 3EXD-3 147712 173933 Inspect elbow plus upstream & downstream extension. Elbow plus 4 inches on either side of the elbow weld. TB. Elev. 32ft-0" OFF 23A FWHYYNYSK-24A 8" RE-INSPECTION (TRENDING) 72 3EXD-51 147716 173935 Inspect TEE, BRANCH and upstream &

downstream extensions, TEE & BRANCH PLUS 4 INCHES ON ALL SIDES OF TEE welds. TB. Elev. 24ft-6". U/S OF LCV-1120AYYNYSK-26B 8" RE-INSPECTION (TRENDING)

HEATER DRAINS DESCOPED DESCOPED DESCOPED 5 of 11 2R19 FAC Scope (Ipe0067423).Xls FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R19 N UMBER EXAM POINT WOR K R EQUES T WOR K ORDER D ESCR IPTIO N LOCATION SCAFFOLD I NS U LAT I ON PAINT PIPE P REP DRAWING PIPE SIZE R EMARK S 73 4EXD-1P147718173936Inspect piping 2 diameters = 12 inches TB. Elev. 42t-2". Downstream of LCV-1115YYNYSK-21A 6" CHECWORKS - Ranked high on the Service Life Report 74 4EXD-4147721173938 Inspect TEE, BRANCH and upstream &

downstream extensions, TEE & BRANCH

PLUS 4 INCHES ON ALL SIDES OF TEE

welds. TB. Elev. 38ft-3". Adjacent to LCV-

1115YYNYSK-21A6"x4" RE-INSPECTION (TRENDING) 75 4EXD-40147724173939 Inspect ELBOW & PIPE. Including 2 inches Upstream elbow welds & . For pipe 2diameters

= 12inches.

TB. Elev. 38ft-3". Upstream OF LCV-

1116YYNYSK-22A 6" RE-INSPECTION (TRENDING) 76 4EXD-40P DS 147724 173939 Inspect ELBOW & PIPE. Including 2 inches Upstream elbow welds & . For pipe 2diameters

= 12inches.

TB. Elev. 38ft-3". Upstream OF LCV-

1116YYNYSK-22A 6" RE-INSPECTION (TRENDING) 77 4EXD-57147726173941Inspect reducer .

TB. Elev. 17ft-0". Adjacent to LCV-1116AYYNYsk-22B 6"x3" RE-INSPECTION (TRENDING) 78 4EXD-6147727173942Inspect reducer .

TB. Elev. 38ft-3". Adjacent to LCV-

1115YYNYSK-21A4"x3" RE-INSPECTION (TRENDING) 79 4EXD-70P147729173944Inspect piping 2 diameters = 12 inchesTB. Elev. 33ft-4" OFF 24C FWHYYNYSK-23A 6" RE-INSPECTION (TRENDING) 80 5EXV-11147732173947 Inspect elbow plus upstream & downstream extension. Elbow plus 4 inches on either side

of the elbow weld. TB. Elev. 30ft-3" OFF 25A FWHYYNYSK-15 10 RE-INSPECTION (TRENDING) 81 HD-10P147734173946Inspect piping 2 diameters = 16 inches TB. Elev. 13ft-7". Adjacent to HTR

DRN PUMP 22YYNYSK-20 8" RE-INSPECTION (TRENDING) 82 HD-5147735173949 Inspect TEE, BRANCH and upstream &

downstream extensions, TEE & BRANCH PLUS 8 INCHES ON ALL SIDES OF TEE welds. TB. Elev. 32ft-0" Downstream of LCV

1127YYNYSK-2016"x12" RE-INSPECTION (TRENDING) 83 MS-1A67P US 147742173962Inspect piping 2 diameters = 12 inches TB. Elev 38ft- 0". OFF FWH 26CYYNYSK-45C6" RE-INSPECTION (TRENDING)84MS-1B35 147745 173963 Inspect elbow plus upstream & downstream extension. Elbow plus 2 inches on either side oftheelbowweld TB. Elev. 35 ft -5". Downstream OF

LCV-1105YYNYSK-48B6" RE-INSPECTION (TRENDING)85MS-2A13 147747 173964 Inspect elbow plus upstream & downstream extension. Elbow plus 2 inches on either side of the elbow weld.

TB. Elev 49ft- 4". OFF Reheater 22A drainYYNYSK-46A6" RE-INSPECTION (TRENDING)

RE-HEATER DRAINS 6 of 11 2R19 FAC Scope (Ipe0067423).Xls FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R19 N UMBER EXAM POINT WOR K R EQUES T WOR K ORDER D ESCR IPTIO N LOCATION SCAFFOLD I NS U LAT I ON PAINT PIPE P REP DRAWING PIPE SIZE R EMARK S 86 MS-2A14 167247 198361 Inspect elbow plus upstream & downstream extension. Elbow plus 2 inches on either side

of the elbow weld.

TB. Elev 49ft- 4". OFF Reheater 22A

drainYYNYSK-46A6" RE-INSPECTION (TRENDING) 87 MS-2B11147748173965 Inspect elbow plus upstream & downstream

extension. Elbow plus 2 inches on either side

of the elbow weld.

TB. Elev 49ft- 1". OFF Reheater 22BYYNYSK-49A 6" RE-INSPECTION (TRENDING)88MS-2B13P147750173951Inspect piping 2 diameters = 12 inches TB. Elev 49ft- 1". OFF Reheater 22BYYNYSK-49A 6" RE-INSPECTION (TRENDING) 89 MS-2B17 147751 173950 Inspect elbow plus upstream & downstream extension. Elbow plus 2 inches on either side

of the elbow weld.

TB. Elev 47ft- 10". OFF Reheater 22BYYNYSK-49A 6" RE-INSPECTION (TRENDING)90MS-2B22147752173954 Inspect elbow plus upstream & downstream extension. Elbow plus 2 inches on either side of the elbow weld.

TB. Elev 40ft- 0". OFF Reheater 22BYYNYSK-49A 10" RE-INSPECTION (TRENDING)91MS-2B30R1147753173966Inspect (10x4) reducer .

TB. Elev. 38 ft -9". Upstream OF LCV-1105AYYNYSK-49B10"x4" RE-INSPECTION (TRENDING) 92 MS-2B42 147756 173968 Inspect TEE, BRANCH and upstream &

downstream extensions, TEE & BRANCH PLUS 2 INCHES ON ALL SIDES OF TEE welds. TB. Elev 39ft- 3". OFF FWH 26AYYNYSK-49C 6" RE-INSPECTION (TRENDING)93MS-2B52147757173969 Inspect elbow plus upstream & downstream

extension. Elbow plus 2 inches on either side of the elbow weld. TB. Elev. 32ft-9" OFF 26C FWHYYNYSK-49C6" RE-INSPECTION (TRENDING)94MS-3B13P147758173970Inspect piping 2 diameters = 12 inches TB. Elev 49ft- 8". OFF Reheater 23B drain tank YYNYSK-50A6" RE-INSPECTION (TRENDING) 7 of 11 2R19 FAC Scope (Ipe0067423).Xls FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R19 N UMBER EXAM POINT WOR K R EQUES T WOR K ORDER D ESCR IPTIO N LOCATION SCAFFOLD I NS U LAT I ON PAINT PIPE P REP DRAWING PIPE SIZE R EMARK S 95 MS-2B30 R2 167249198362Inspect (10x4) reducer .

TB. Elev. 38 ft -9". Downstream OF LCV-1105AYYNYSK-49B10"x4" Snapshot Assessment96MS-3B26147761173972 Inspect elbow plus upstream & downstream extension. Elbow plus 2 inches on either side

of the elbow weld.

TB. Elev 37ft- 9". OFF Reheater 23B drain tank YYNYSK-50A6" RE-INSPECTION (TRENDING)97MST43-PIPE US147763173974 Inspect piping upstream and down stream of mst 43 Tb elev 36' 0"YYNY 9321-F-20423/

9321-F-2131 1"& 3/4'RE-INSPECTION (TRENDING)981A-18 (TEE)147765173975 Inspect TEE, BRANCH and upstream &

downstream extensions, TEE & BRANCH PLUS 2 INCHES ON ALL SIDES OF TEE welds. TB. Elev 53ft- 9". OFF MS-21A YYNYSK-2712" RE-INSPECTION (TRENDING)991A-20P147767174052 Inspect piping 2 diameters = 24 inches.

Component d/s of valve 5ex-19L TB. Elev 53ft- 9". OFF MS-21A YYNYSK-27 12" CHECWORKS 100 1A-20P-1147769174053 Inspect piping 2 diameters = 24 inches.

Component d/s of valve 5ex-19M TB. Elev 53ft- 1". OFF MS-21A YYNYSK-27 12" CHECWORKS 101 1A-20N147773174054 Nozzle and Tank Component d/s of valve 5ex-

19M reference CR-HQN-2007-00915-CA-16 TB. Elev 53ft- 1". OFF MSDT-21A YYNYSK-2712" Operating Experience /CHECWORKS1022A-20P1147777174057 Inspect piping 2 diameters = 24 inches.

Component d/s of valve 5ex-19K TB. Elev 53ft- 1". OFF MS-22A YYNYSK-2712" CHECWORKS 1032A-20P147775174056 Inspect piping 2 diameters = 24 inches.

Component d/s of valve 5ex-19J TB. Elev 53ft- 1". OFF MS-22A YYNYSK-2712" CHECWORKS 1042A-20N147774174055 Nozzle and Tank Component d/s of valve 5ex-

19K reference CR-HQN-2007-00915-CA-16 TB. Elev 53ft- 1". OFF MSDT-22A YYNYSK-2712" Operating Experience /CHECWORKS1052B-1147780173500 Inspect TEE, BRANCH and upstream &

downstream extensions, TEE & BRANCH PLUS 4 INCHES ON ALL SIDES OF TEE

welds. TB. Elev 45ft- 10". OFF MSDT-22B YYNYSK-37A8"X6" RE-INSPECTION (TRENDING)1062B-3147782173501 Reducing elbow. Inspect elbow plus upstream

& downstream extension. Elbow plus 4 inches on either side of the elbow weld.

TB. Elev 43ft- 6". OFF MSDT-22B YYNYSK-37A8"X6" RE-INSPECTION (TRENDING)107208-6P147784174058Inspect piping 2 diameters = 24 inches.

TB. ELEV 10ft- 0. Downstream of LCV-1126 @ COND. 21YYNYSK-20812" RE-INSPECTION (TRENDING)108212-1P US147786174059Inspect piping 2 diameters = 12 inches TB. ELEV 10ft- 0. Downstream of LCV-

1139 @ COND. 23YYNYSK-2126" RE-INSPECTION (TRENDING)109219-13P147787174060Inspect piping 2 diameters = 24 inches.

TB. ELEV 36 ft- 0. Downstream of FCV

-1208 @ COND. 22YYNYSK-21912" RE-INSPECTION (TRENDING)

MSR DRAINS MAIN STEAM 8 of 11 2R19 FAC Scope (Ipe0067423).Xls FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R19 N UMBER EXAM POINT WOR K R EQUES T WOR K ORDER D ESCR IPTIO N LOCATION SCAFFOLD I NS U LAT I ON PAINT PIPE P REP DRAWING PIPE SIZE R EMARK S 110 235-5P US147788173922Inspect piping 2 diameters = 6 inches TB. ELEV ft- 0. Upstream of COND.

23 PEN.YYNYSK-235 3" RE-INSPECTION (TRENDING) 111 248-16P US 147789173921Inspect piping 2 diameters = 6 inches TB. ELEV. 15ft-0". @ BFP TURBINEYYNY SK-248 3" RE-INSPECTION (TRENDING)112254-9E147796173917 Inspect elbow plus upstream & downstream extension. Elbow plus 2 inches on either side of the elbow weld.

TB. ELEV 53 ft- 0. Downstream of MS-1207(Stop valve) west side. YYNYSK-2544" RE-INSPECTION (TRENDING)113270-3E147797173916 Inspect elbow plus piping upstream and downstream ~ 4ft.

TB. YYNYSK-2701" RE-INSPECTION (TRENDING)114283-20R147794173918 Inspect reducer .

TB. ELEV. 15ft-0" AUX. STEAM TO UNIT COOLERS.YYNYSK-2836" X 4" RE-INSPECTION (TRENDING)115283-8R147795173487 Inspect reducer .

TB. ELEV. 15ft-0" AUX. STEAM TO UNIT COOLERS.YYNYSK-2836" X 4" RE-INSPECTION (TRENDING) 9 of 11 2R19 FAC Scope (Ipe0067423).Xls FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R19 N UMBER EXAM POINT WOR K R EQUES T WOR K ORDER D ESCR IPTIO N LOCATION SCAFFOLD I NS U LAT I ON PAINT PIPE P REP DRAWING PIPE SIZE R EMARK S 116 FWH 21A132254155698 Inspect FWH 21A shell 2 pipe dia. From center line of inlet nozzle radially and axially.IINSIDE CONDENSER 23 YYNYShellOPERATING EXPERIENCE117FWH 21B132255155699 Inspect FWH 21B shell 2 pipe dia. From center line of nozzle radially and axially.IINSIDE CONDENSER 22 YYNYShellOPERATING EXPERIENCE118FWH 22B132327155705 Inspect FWH 22B shell 2 pipe dia. From center line of nozzle radially and axially.

INSIDE CONDENSER 22YYNYShellOPERATING EXPERIENCE119FWH 22A 148045 173900 Inspect FWH 22A shell 2 pipe dia. From center

line of nozzle radially and axially.

INSIDE CONDENSER 23YYNYShellOPERATING EXPERIENCE 120 EST-24 147800 173914 Inspect elbow plus upstream & downstream extension. Elbow plus 2 inches on either side of the elbow weld.

TB. ELEV. 25ft-8" off DRAIN COLLECTING TANK SK-914" RE-INSPECTION (TRENDING) 121 EST-31P US147802173896Inspect piping 2 diameters = 8 inches TB. ELEV. 25ft-8" off DRAIN COLLECTING TANK SK-914" RE-INSPECTION (TRENDING) 122 Valve LCV-1110147803173897 Inspect PIPE & REDUCER d/s of LCV-1110; 23A MSR DRAIN TO DCT TB ELEV 22ft-3" D/S OF LCV-11110

Near DCTYYNYSK-35B6" & 6X4R Plant Specific OPERATING EXPERIENCE 123 Valve FCV-1115147806173899 Inspect piping & fitting d/s of FCV-1115; 21 MBDP RECIRC. to DCT TB. Elev. 22ft-8" d/s of FCV-1115YYNYSK-356 " Plant Specific OPERATING

EXPERIENCE 124 Valve-LCV- 1127D147805173898 Inspect piping & fitting d/s of LCV-1127D; HDT Large Dump to 23 Condenser.TB ELEV 16ft-5" D/S OF LCV-1127DYYNYSK-1814" Plant Specific OPERATING EXPERIENCE 125 COND-22 NOZ (3EXB-18N)167262198084 Inspect turbine extraxtion nozzle 3EXB-18N (previously inspected as COND-22 NOZ)Inside Condenser 22YYNYSK-128" RE-INSPECTION (TRENDING)126LPFW 22A-1P3167258198359127LPFW 22A-1P4167258198359 128LPFW 22B-1P4167260198360129FWH shell inspection148046173901open condenser 22 & 23 condenser SCOPE ADDITIONS DESCOPED SUPPORT FEEDWATER HEATER SHELLS LOW PRESSURE FEED W ATER HEATERS EXTRACTION STEAM Drain Miscellaneous DESCOPED DESCOPED DESCOPED 10 of 11 2R19 FAC Scope (Ipe0067423).Xls FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 2R19 N UMBER EXAM POINT WOR K R EQUES T WOR K ORDER D ESCR IPTIO N LOCATION SCAFFOLD I NS U LAT I ON PAINT PIPE P REP DRAWING PIPE SIZE R EMARK S ASBESTOS 11 of 11 2R19 FAC Scope (Ipe0067423).Xls