ML13247A231: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 27: | Line 27: | ||
(N)ew or (M)odified from | (N)ew or (M)odified from | ||
Administrative Topic Outline Task Summary RSA-1: Review ECP Calculation The Applicant will review a n ECP calculation performed in accordance with OSP-SF-00005 "Estimated Critical Position Calculation". The critical steps include identifying the | Administrative Topic Outline Task Summary RSA-1: Review ECP Calculation The Applicant will review a n ECP calculation performed in accordance with OSP-SF-00005 "Estimated Critical Position Calculation". The critical steps include identifying the error s of using the wrong temperature used , wrong boron worth, and identifying wrong maximum rod height. | ||
, wrong boron worth, and identifying wrong maximum rod height. | |||
This is a new JPM. | This is a new JPM. | ||
| Line 34: | Line 33: | ||
-BG-002, "Reactor Makeup Control and Boron Thermal Regeneration System". The critical steps include determining the volume to be added to the RWST, interpolating curves to determine Boric Acid and Makeup Water flows, and determining the potentiometer settings for Boric Acid and Blended flow | -BG-002, "Reactor Makeup Control and Boron Thermal Regeneration System". The critical steps include determining the volume to be added to the RWST, interpolating curves to determine Boric Acid and Makeup Water flows, and determining the potentiometer settings for Boric Acid and Blended flow | ||
. This JPM is from the bank and was used on the 2005 ILT SRO Exam. | . This JPM is from the bank and was used on the 2005 ILT SRO Exam. | ||
RS A-3: Review CCP Surveillance for Operability The Applicant will review Attachment 2 of OSP | |||
-BG-P005B "Centrifugal Charging Pump B Inservice Test | -BG-P005B "Centrifugal Charging Pump B Inservice Test | ||
- Group and identify the pump D/P was calculated incorrectly. The critical steps include identifying the calculation error, declaring the pump inoperable and entering the correct Technical Specification. | - Group and identify the pump D/P was calculated incorrectly. The critical steps include identifying the calculation error, declaring the pump inoperable and entering the correct Technical Specification. | ||
| Line 41: | Line 39: | ||
. RSA-4: Determine Maximum Allowable Stay Time The Applicant will determine the allowable stay time using a RWP and Survey Map. The | . RSA-4: Determine Maximum Allowable Stay Time The Applicant will determine the allowable stay time using a RWP and Survey Map. The | ||
critical steps include determining the correct RWP, dosimeter setting, dose rate from survey map, and calculate stay time | critical steps include determining the correct RWP, dosimeter setting, dose rate from survey map, and calculate stay time. This JPM is modified from a bank JPM that was used on the 2005 ILT SRO Exam | ||
. This JPM is modified from a bank JPM that was used on the 2005 ILT SRO Exam | |||
RSA-5: Classify Emergency Events Requiring Emergency Plan Implementation The Applicant will be given a set of plant conditions and will implement the Radiological Emergency Response Plan (RERP) to classify the event within 15 minutes (Time Critical) | RSA-5: Classify Emergency Events Requiring Emergency Plan Implementation The Applicant will be given a set of plant conditions and will implement the Radiological Emergency Response Plan (RERP) to classify the event within 15 minutes (Time Critical) This JPM is from the bank and has not been used on an ILT exam since 2004.}} | ||
This JPM is from the bank and has not been used on an ILT exam since 2004.}} | |||
Revision as of 00:12, 14 July 2018
| ML13247A231 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 08/27/2013 |
| From: | Kelly Clayton Operations Branch IV |
| To: | Union Electric Co |
| laura hurley | |
| References | |
| 50-483/13-008 | |
| Download: ML13247A231 (2) | |
Text
ES-301 Administrative Topics Outline Form ES-301-1 Facility: __Callaway_______________________
Date of Examination: _8/27/13______ Examination Level: RO SRO Operating Test Number: 2013 Re-Exam Administrative Topic (see Note) Type Code* Describe activity to be performed RSA-1 Conduct of Operations R N Review ECP Calculation 2.1.37 Knowledge of procedures, guidelines, or limitations associated with reactivity management. (4.6
) RSA-2 Conduct of Operations R D Determine the volume and RMCS control settings for raising RWST level 2.1.25 Ability to interpret reference materials, such as graphs, curves, tables, etc. (4.2)
RSA-3 Equipment Control R N Review CCP Surveillance for Operability 2.2.12 Knowledge of surveillance procedures. (4.1)
RSA-4 Radiation Control R M Determine Maximum Allowable Stay Time 2.3.4 Knowledge of radiation exposure limits under normal or emergency conditions. (3.7)
RSA-5 Emergency Procedures/Plan R D Classify Emergency Events Requiring Emergency Plan Implementation 2.4.41 Knowledge of the emergency action level thresholds and classifications. (4.6)
NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
- Type Codes & Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from RO retakes)
(N)ew or (M)odified from
Administrative Topic Outline Task Summary RSA-1: Review ECP Calculation The Applicant will review a n ECP calculation performed in accordance with OSP-SF-00005 "Estimated Critical Position Calculation". The critical steps include identifying the error s of using the wrong temperature used , wrong boron worth, and identifying wrong maximum rod height.
This is a new JPM.
RSA-2: Determine the volume and RMCS control settings for raising RWST level The Applicant will determine the potentiometer settings for Boric Acid and Blended flow using RWST level/volume curves and OTN
-BG-002, "Reactor Makeup Control and Boron Thermal Regeneration System". The critical steps include determining the volume to be added to the RWST, interpolating curves to determine Boric Acid and Makeup Water flows, and determining the potentiometer settings for Boric Acid and Blended flow
. This JPM is from the bank and was used on the 2005 ILT SRO Exam.
RS A-3: Review CCP Surveillance for Operability The Applicant will review Attachment 2 of OSP
-BG-P005B "Centrifugal Charging Pump B Inservice Test
- Group and identify the pump D/P was calculated incorrectly. The critical steps include identifying the calculation error, declaring the pump inoperable and entering the correct Technical Specification.
This is a new JPM
. RSA-4: Determine Maximum Allowable Stay Time The Applicant will determine the allowable stay time using a RWP and Survey Map. The
critical steps include determining the correct RWP, dosimeter setting, dose rate from survey map, and calculate stay time. This JPM is modified from a bank JPM that was used on the 2005 ILT SRO Exam
RSA-5: Classify Emergency Events Requiring Emergency Plan Implementation The Applicant will be given a set of plant conditions and will implement the Radiological Emergency Response Plan (RERP) to classify the event within 15 minutes (Time Critical) This JPM is from the bank and has not been used on an ILT exam since 2004.