ML13247A231

From kanterella
Jump to navigation Jump to search
2013-08 Final Op Test Outlines
ML13247A231
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/27/2013
From: Kelly Clayton
Operations Branch IV
To:
Union Electric Co
laura hurley
References
50-483/13-008
Download: ML13247A231 (2)


Text

ES-301 Administrative Topics Outline Form ES-301-1 Facility: __Callaway_______________________ Date of Examination: _8/27/13______

Examination Level: RO SRO Operating Test Number: 2013 Re-Exam Administrative Topic Type Describe activity to be performed (see Note) Code*

RSA-1 R Review ECP Calculation Conduct of Operations 2.1.37 Knowledge of procedures, guidelines, or N limitations associated with reactivity management. (4.6)

RSA-2 R Determine the volume and RMCS control settings for raising RWST level Conduct of Operations D 2.1.25 Ability to interpret reference materials, such as graphs, curves, tables, etc. (4.2)

RSA-3 R Review CCP Surveillance for Operability Equipment Control 2.2.12 Knowledge of surveillance procedures. (4.1)

N RSA-4 R Determine Maximum Allowable Stay Time Radiation Control 2.3.4 Knowledge of radiation exposure limits under M normal or emergency conditions. (3.7)

RSA-5 R Classify Emergency Events Requiring Emergency Plan Implementation Emergency Procedures/Plan D 2.4.41 Knowledge of the emergency action level thresholds and classifications. (4.6)

NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1; randomly selected)

Administrative Topic Outline Task Summary RSA-1: Review ECP Calculation The Applicant will review an ECP calculation performed in accordance with OSP-SF-00005 Estimated Critical Position Calculation. The critical steps include identifying the errors of using the wrong temperature used, wrong boron worth, and identifying wrong maximum rod height.

This is a new JPM.

RSA-2: Determine the volume and RMCS control settings for raising RWST level The Applicant will determine the potentiometer settings for Boric Acid and Blended flow using RWST level/volume curves and OTN-BG-002, Reactor Makeup Control and Boron Thermal Regeneration System. The critical steps include determining the volume to be added to the RWST, interpolating curves to determine Boric Acid and Makeup Water flows, and determining the potentiometer settings for Boric Acid and Blended flow.

This JPM is from the bank and was used on the 2005 ILT SRO Exam.

RSA-3: Review CCP Surveillance for Operability The Applicant will review Attachment 2 of OSP-BG-P005B Centrifugal Charging Pump B Inservice Test - Group and identify the pump D/P was calculated incorrectly. The critical steps include identifying the calculation error, declaring the pump inoperable and entering the correct Technical Specification.

This is a new JPM.

RSA-4: Determine Maximum Allowable Stay Time The Applicant will determine the allowable stay time using a RWP and Survey Map. The critical steps include determining the correct RWP, dosimeter setting, dose rate from survey map, and calculate stay time.

This JPM is modified from a bank JPM that was used on the 2005 ILT SRO Exam RSA-5: Classify Emergency Events Requiring Emergency Plan Implementation The Applicant will be given a set of plant conditions and will implement the Radiological Emergency Response Plan (RERP) to classify the event within 15 minutes (Time Critical)

This JPM is from the bank and has not been used on an ILT exam since 2004.