ML14336A244: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 15: Line 15:
| page count = 2
| page count = 2
}}
}}
=Text=
{{#Wiki_filter:Attachment 1 to Enclosure 1 ofPLA-7169 . Facility Operating License No. NPF-14, PPL Susquehanna Unit 1 Mark-Up  (39) Containment Operability for EPU PPL shall ensure that the CPPU containment analysis is consistent with the SSES 1 and 2 operating and emergency procedures.
Prior to operation above CLTP, for each respective unit, PPL shall notify the NRC project manager that all appropriate actions have been completed.
(40) Primary Containment Leakage Rate Testing Program Those primary containment local leak rate program tests (Type B boundary and Type C -containment isolation valves) as modified by approved exemptions, required by 10 CFR Part 50, Appendix J, Option B and Technical Specification 5.5.12, are not required to be performed at the CPPU peak calculated containment internal pressure of 48.6 psig (Amendment No. 246 to this Operating License) until their next required performance.
D. The operating licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
The plan, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Security and Contingency Plan for Independent Spent Fuel Storage Facility," and was submitted October 8, 2004. The operating licensee shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
The PPL Susquehanna, LLC CSP was approved by License Amendment E. Exemptions from certain requirements of Appendices G and H to 10 CFR Part 50 are described in the Safety Evaluation Report and Supplements 1 and 2 to the Safety Evaluation Report. In addition, an exemption was requested until receipt of new fuel for first refueling from the requirements for criticality monitors in the spent fuel pool area, 10 CFR Part 70.24. Also, an exemption was requested from the requirements of Appendix J of 10 CFR Part 50 for the first fuel cycle when performing local leak rate testing of Residual Heat Removal (RHR) relief valves in accordance with Technical Specification 4.6.1.2. This latter exemption is described in the safety evaluation of License Amendment No. 13. These exemptions are authorized by law and will not endanger life or property or the common defense and security and are otherwise in the public interest and have been granted pursuant to 10 CFR 50.12. Except as here exempted, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, and.the rules and regulations of the Commission and the provisions of the Act. Renewed Operating License No. NPF-14 Amendment Corrected by letter dated July 28, 2011}}

Latest revision as of 09:49, 9 July 2018

Attachment 1 to Enclosure 1 of PLA-7169 Facility Operating License No. NPF-14, PPL Susquehanna Unit 1 Mark-Up
ML14336A244
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 12/02/2014
From:
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML14336A239 List:
References
PLA-7169
Download: ML14336A244 (2)


Text

Attachment 1 to Enclosure 1 ofPLA-7169 . Facility Operating License No. NPF-14, PPL Susquehanna Unit 1 Mark-Up (39) Containment Operability for EPU PPL shall ensure that the CPPU containment analysis is consistent with the SSES 1 and 2 operating and emergency procedures.

Prior to operation above CLTP, for each respective unit, PPL shall notify the NRC project manager that all appropriate actions have been completed.

(40) Primary Containment Leakage Rate Testing Program Those primary containment local leak rate program tests (Type B boundary and Type C -containment isolation valves) as modified by approved exemptions, required by 10 CFR Part 50, Appendix J, Option B and Technical Specification 5.5.12, are not required to be performed at the CPPU peak calculated containment internal pressure of 48.6 psig (Amendment No. 246 to this Operating License) until their next required performance.

D. The operating licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).

The plan, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Security and Contingency Plan for Independent Spent Fuel Storage Facility," and was submitted October 8, 2004. The operating licensee shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).

The PPL Susquehanna, LLC CSP was approved by License Amendment E. Exemptions from certain requirements of Appendices G and H to 10 CFR Part 50 are described in the Safety Evaluation Report and Supplements 1 and 2 to the Safety Evaluation Report. In addition, an exemption was requested until receipt of new fuel for first refueling from the requirements for criticality monitors in the spent fuel pool area, 10 CFR Part 70.24. Also, an exemption was requested from the requirements of Appendix J of 10 CFR Part 50 for the first fuel cycle when performing local leak rate testing of Residual Heat Removal (RHR) relief valves in accordance with Technical Specification 4.6.1.2. This latter exemption is described in the safety evaluation of License Amendment No. 13. These exemptions are authorized by law and will not endanger life or property or the common defense and security and are otherwise in the public interest and have been granted pursuant to 10 CFR 50.12. Except as here exempted, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, and.the rules and regulations of the Commission and the provisions of the Act. Renewed Operating License No. NPF-14 Amendment Corrected by letter dated July 28, 2011