{{#Wiki_filter:As of: December 24, 2014Received:
{{#Wiki_filter:As of: December 24, 2014 Received:
December 22, 2014PUBLIC SUBMISSIONenng_ost PUBLC S BMISIONTracking No. ljy-8g7a-4ks2 Comments Due: December 22, 201Submission Type: WebDocket: NRC-2014-0223 Southern California Edison Company; San Onofre Nuclear Generating  
December 22, 2014 PUBLIC SUBMISSIONenng_ost PUBLC S BMISIONTracking No. ljy-8g7a-4ks2 Comments Due: December 22, 201 Submission Type: Web Docket: NRC-2014-0223 Southern California Edison Company; San Onofre Nuclear Generating Station, Units 2 and 3 Comment On: NRC-2014-0223-0001 Southern California Edison Company; San Onofre Nuclear Generating Station, Units 2 and 3; Post-Shutdown Decommissioning Activities Report .j 4 Document:
: Station, Units 2 and 3Comment On: NRC-2014-0223-0001 Southern California Edison Company; San Onofre Nuclear Generating  
NRC-2014-0223-DRAFT-0008 Comment on FR Doc # 2014-24356 Submitter Information Name: Daniel Stetson General Comment See attached file(s)Attachments StetsonInputonPSDAR_EIE_DCE F10 17)I-.>.-'L~)m--SUNSI Review Complete Template = ADM -013 E-RIDS= ADM-03 Add= T OCEAN INSTITUTE EXPERIENCE IS THE TEACHER September 2, 2014 From: Daniel Stetson To: SCE, CEP Chairman David Victor & Members RE: Input on Draft PSDAR, EIE and DCE Reports Thank you for the opportunity to. review and provide input on these drafts.Draft Post-Shutdown DecommissioningsActivities Report As it is certain that the spent fuel will be stored on site in canisters for the foreseeable future, it is imperative that they be stored and maintained to the highest safety level possible.
: Station, Units 2 and 3; Post-Shutdown Decommissioning Activities Report .j4Document:
The two identified potential canister suppliers, Areva Trans Nuclear and Holtec International, continue to improve the design of their:products.
NRC-2014-0223-DRAFT-0008 Comment on FR Doc # 2014-24356 Submitter Information Name: Daniel StetsonGeneral CommentSee attached file(s)Attachments StetsonInputonPSDAR_EIE_DCE F1017)I-.>.-'L~)m--SUNSI Review CompleteTemplate
In a recent press release, Holtec describes that. they are going to a "double wall. construction" for a facility in.Ukraine."Like Ukraine's national facility, Holtec's HI-STORM ventilated system is the designated.technology for the Skull Valley (Utah) site; however, for added safety, the welded multi-purpose canisters employed at the CSFSF (Central SSpent Fuel Storage Facility-in Ukraine) site will be of a double wall construction, just like its sister facility for storing Chernobyl's spent fuel, located a few kilometers away.".How much "added safety" does this provide? Regardless of the supplier, does it make sense to utilize a canister with double wall construction for SONGS?After the Alaskan oil spill there was federal and state legislation that required every ship to have a detailed Emergency Preparedness Plan. In the case of a spill, regardless of the vessel's location along the US coast, the ship was required to have a plan that'included every single required resource necessary to respond, clean up the spill and address potential environmental damage. As such, resources were established along the coast and are being maintained in case of a spill emergency.
= ADM -013E-RIDS= ADM-03Add= T OCEAN INSTITUTE EXPERIENCE IS THE TEACHERSeptember 2, 2014From: Daniel StetsonTo: SCE, CEP Chairman David Victor & MembersRE: Input on Draft PSDAR, EIE and DCE ReportsThank you for the opportunity to. review and provide input on these drafts.Draft Post-Shutdown DecommissioningsActivities ReportAs it is certain that the spent fuel will be stored on site in canisters for the foreseeable future, it is imperative that they be stored and maintained to the highest safety levelpossible.
The Gulf spill demonstrated that, even :with this type of protection in place, we can never be too prepared.
The two identified potential canister suppliers, Areva Trans Nuclear and HoltecInternational, continue to improve the design of their:products.
SONGS should develop and have in place a "worst case scenario" emergency response plan. Removing the cooling pools, seawall and train rails appear to significantly reduce safety resources for protection and response.
In a recent press release,Holtec describes that. they are going to a "double wall. construction" for a facility in.Ukraine."Like Ukraine's national  
As the Decommissioning Cost Analysis Report states, "Maintaining the spent fuel pool for an extended duration following cessation of operations prevents termination of the Part 50 license...." Is this, however, the safest course of action?24200 DANA POINT HARBOR DRIVE. DANA POINT, CALIFORNIA 92629 TEL: 949.496.2274
: facility, Holtec's HI-STORM ventilated system is the designated
.technology for the Skull Valley (Utah) site; however, for added safety, the welded multi-purpose canisters employed at the CSFSF (Central SSpent Fuel Storage Facility-inUkraine) site will be of a double wall construction, just like its sister facility for storingChernobyl's spent fuel, located a few kilometers away.".How much "added safety" does this provide?
Regardless of the supplier, does it makesense to utilize a canister with double wall construction for SONGS?After the Alaskan oil spill there was federal and state legislation that required every shipto have a detailed Emergency Preparedness Plan. In the case of a spill, regardless ofthe vessel's location along the US coast, the ship was required to have a plan that'included every single required resource necessary to respond, clean up the spill andaddress potential environmental damage. As such, resources were established alongthe coast and are being maintained in case of a spill emergency.
The Gulf spilldemonstrated that, even :with this type of protection in place, we can never be tooprepared.
SONGS should develop and have in place a "worst case scenario" emergency response plan. Removing the cooling pools, seawall and train rails appearto significantly reduce safety resources for protection and response.
As theDecommissioning Cost Analysis Report states, "Maintaining the spent fuel pool for anextended duration following cessation of operations prevents termination of the Part 50license...."
Is this, however, the safest course of action?24200 DANA POINT HARBOR DRIVE. DANA POINT, CALIFORNIA 92629TEL: 949.496.2274
* FAX: 949.496.4296
* FAX: 949.496.4296
* WEB: WWW.OCEAN-INSTITUTE.ORG Draft Environmental Impact Evaluation ReportThe EIE is incomplete as it does not include an analysis of the ocean impact, primarily the removal of the intake and exhaust conduits.
* WEB: WWW.OCEAN-INSTITUTE.ORG Draft Environmental Impact Evaluation Report The EIE is incomplete as it does not include an analysis of the ocean impact, primarily the removal of the intake and exhaust conduits.
A study of the conduits and thesurrounding aquatic biology should be undertaken right away. Should eel grass or otherprotected species.
A study of the conduits and the surrounding aquatic biology should be undertaken right away. Should eel grass or other protected species. be found in the area, a case can be made for leaving the conduits in place. 'If chemical, nuclear or other contaminants are found, the conduits obviously need to be removed. If contaminants and protected species are both found, the conduits still need to be removed and a mitigation plan developed.
be found in the area, a case can be made for leaving the conduits inplace. 'If chemical, nuclear or other contaminants are found, the conduits obviously need to be removed.
None of this can take place, however, until the underwater area is surveyed and the evaluation criteria established.
If contaminants and protected species are both found, the conduitsstill need to be removed and a mitigation plan developed.
Draft Decommissioning Cost Analysis Report Given the parameters of how this report was prepared and our own lack of experience in this area, it seems impossible to properly evaluate and comment upon its findings.As such, independent, outside expert peer review is recommended to confirm its findings.Sinc ly, Da iel T. Stettson President
None of this can take place,however, until the underwater area is surveyed and the evaluation criteria established.
Draft Decommissioning Cost Analysis ReportGiven the parameters of how this report was prepared and our own lack of experience in this area, it seems impossible to properly evaluate and comment upon its findings.
As such, independent, outside expert peer review is recommended to confirm itsfindings.
Sinc ly,Da iel T. StettsonPresident
& CEO}}
& CEO}}

Revision as of 08:24, 9 July 2018

Comment (12) of Daniel Stetson, on Behalf of Ocean Institute, on Southern California Edison Company; San Onofre Nuclear Generating Station, Units 2 and 3; Post-Shutdown Decommissioning Activities Report
ML14364A013
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 09/02/2014
From: Stetson D T
Ocean Institute
To:
Rules, Announcements, and Directives Branch
References
79FR61668 00012, NRC-2014-0223
Download: ML14364A013 (3)


Text

As of: December 24, 2014 Received:

December 22, 2014 PUBLIC SUBMISSIONenng_ost PUBLC S BMISIONTracking No. ljy-8g7a-4ks2 Comments Due: December 22, 201 Submission Type: Web Docket: NRC-2014-0223 Southern California Edison Company; San Onofre Nuclear Generating Station, Units 2 and 3 Comment On: NRC-2014-0223-0001 Southern California Edison Company; San Onofre Nuclear Generating Station, Units 2 and 3; Post-Shutdown Decommissioning Activities Report .j 4 Document:

NRC-2014-0223-DRAFT-0008 Comment on FR Doc # 2014-24356 Submitter Information Name: Daniel Stetson General Comment See attached file(s)Attachments StetsonInputonPSDAR_EIE_DCE F10 17)I-.>.-'L~)m--SUNSI Review Complete Template = ADM -013 E-RIDS= ADM-03 Add= T OCEAN INSTITUTE EXPERIENCE IS THE TEACHER September 2, 2014 From: Daniel Stetson To: SCE, CEP Chairman David Victor & Members RE: Input on Draft PSDAR, EIE and DCE Reports Thank you for the opportunity to. review and provide input on these drafts.Draft Post-Shutdown DecommissioningsActivities Report As it is certain that the spent fuel will be stored on site in canisters for the foreseeable future, it is imperative that they be stored and maintained to the highest safety level possible.

The two identified potential canister suppliers, Areva Trans Nuclear and Holtec International, continue to improve the design of their:products.

In a recent press release, Holtec describes that. they are going to a "double wall. construction" for a facility in.Ukraine."Like Ukraine's national facility, Holtec's HI-STORM ventilated system is the designated.technology for the Skull Valley (Utah) site; however, for added safety, the welded multi-purpose canisters employed at the CSFSF (Central SSpent Fuel Storage Facility-in Ukraine) site will be of a double wall construction, just like its sister facility for storing Chernobyl's spent fuel, located a few kilometers away.".How much "added safety" does this provide? Regardless of the supplier, does it make sense to utilize a canister with double wall construction for SONGS?After the Alaskan oil spill there was federal and state legislation that required every ship to have a detailed Emergency Preparedness Plan. In the case of a spill, regardless of the vessel's location along the US coast, the ship was required to have a plan that'included every single required resource necessary to respond, clean up the spill and address potential environmental damage. As such, resources were established along the coast and are being maintained in case of a spill emergency.

The Gulf spill demonstrated that, even :with this type of protection in place, we can never be too prepared.

SONGS should develop and have in place a "worst case scenario" emergency response plan. Removing the cooling pools, seawall and train rails appear to significantly reduce safety resources for protection and response.

As the Decommissioning Cost Analysis Report states, "Maintaining the spent fuel pool for an extended duration following cessation of operations prevents termination of the Part 50 license...." Is this, however, the safest course of action?24200 DANA POINT HARBOR DRIVE. DANA POINT, CALIFORNIA 92629 TEL: 949.496.2274

  • FAX: 949.496.4296
  • WEB: WWW.OCEAN-INSTITUTE.ORG Draft Environmental Impact Evaluation Report The EIE is incomplete as it does not include an analysis of the ocean impact, primarily the removal of the intake and exhaust conduits.

A study of the conduits and the surrounding aquatic biology should be undertaken right away. Should eel grass or other protected species. be found in the area, a case can be made for leaving the conduits in place. 'If chemical, nuclear or other contaminants are found, the conduits obviously need to be removed. If contaminants and protected species are both found, the conduits still need to be removed and a mitigation plan developed.

None of this can take place, however, until the underwater area is surveyed and the evaluation criteria established.

Draft Decommissioning Cost Analysis Report Given the parameters of how this report was prepared and our own lack of experience in this area, it seems impossible to properly evaluate and comment upon its findings.As such, independent, outside expert peer review is recommended to confirm its findings.Sinc ly, Da iel T. Stettson President

& CEO