ML15203A490: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:L VMAO 1M | {{#Wiki_filter:L VMAO 1M OF INThRAGENCY AGREEMENT NRC-HQ-20-15-T-0014/MOO00 1 2 oNKR-15-0214 I ,. 1e,,,,, T... AVOM O 17.PUDRWoe 0 '''M 06/30/2015 06/30/2015 03/09/2015 TO 09/30/2015 IURRWINOMAWCY BROORHAVEN NATIONAL LABORATORY kLC: DUNS: 027579460 | ||
+4:BROOKHAVEN SITE | +4: BROOKHAVEN SITE OFrICE SHAUN ANDERSON US NUCLEAR REGULATORY COMMISSION OFFICE NRRDSS MAIL STOP 010E07 V 4~-~A-9~. | ||
.14*1,.U | .14*1,.U IUUU 6PTON NY 11973-5000 POO Kim Nakulak 1MA!POMit. | ||
631-344-7439 ILREQUMM1Y | 631-344-7439 ILREQUMM1Y | ||
: 11. | : 11. WlMOW205 ACM US NUCLEAR REGULATORY COMMIssIon ALC: 31000001 S: 3100001 ONE WHITE FLINT NORTH DUNS: +-4: US NUCLEAR REGULATORY COMMISSION 11555 ROCEVILLE PIKE ONE WHITE FLINT NORTH MRILSTOP 03-Ei7A 11555 ROCKVILLE PIKE ROCKVILLE HD 20852-2738 POO MORIE GUNTER-HENDERSON T 301 415-7924 iUS NRC -HQ Energy Reorganization Act of 1974 ACQUISITION MANAGEMENT DIVISION MAIL STOP TWFN-5E03 WASHINGTON DC 20555-0001 1.mR.,FM ILPro.Eox=lmE | ||
_CATAWBA'S MUR FLUENCE EVALUATION f&A0C0IVffNGOA 2015-K0200-FEEBASED-20-20D008-11-4-148-1061-251D | _CATAWBA'S MUR FLUENCE EVALUATION f&A0C0IVffNGOA 2015-K0200-FEEBASED-20-20D008-11-4-148-1061-251D | ||
: 17. la M 2¶, | : 17. la M 2¶, 21 Snm. QIUUnITY LEWVW IBc AUG WiT Master IAA: NRCHQ2514D0002 The purpose of this modification is to: (1), add- two additional -trips, to the licensee-facility to support the Catawba MNR review and trip to the NRC headquarters as seen in the attached revised Statement of Work.(2) Increase the ceiling by $20,009.00 from$65,306.00 to $85,315.00. | ||
-trips, to the licensee-facility to support the Catawba MNR review | (3) Add incremental funding in the, amount of Continued 2&AW&QgxrWR0B= | ||
(3) Add incremental funding in the, amount | 12C TOTALAMOAq£ ra~ PANE SUNI i~vVIW COMPLETL NEBIPLAJE | ||
12C TOTALAMOAq£ ra~ | -Aftfinn JUL 2 1 2015 MAUO O PAW O NRC-HQ-20-15-T-0014/MCO01 2 2$7,000.00, thereby increasing the obligation "$65,306.00 to $72,306.00. | ||
- | |||
All other terms and conditions remain unchanged. | All other terms and conditions remain unchanged. | ||
I I-STATEMENT OF | I I-STATEMENT OF WORK NRC Agreement Number NRC Agreement NRC Task Order Number NRC Task Order Modification NRC-HQ-25-14-D-0002 Modification Number Of Applicable) | ||
Number (If Applicable) | Number (If Applicable) | ||
NRCHQ201T50014 | NRCHQ201T50014 M1001 Project Tifsl:. Technical Assistance in ;Support of DUke Energy Nuclear Operations' Ucense Amendment Request for Catawba's Measurement Uncertainty Recapture Fluence Evaluation Job Code Ntumber B&R Number DOE Laboratory 11-4-149 Brookhaven National Laboratory (BNL)NRC Requisitioning Office Office of Nuclear Reactor Regulation (NRR)NRC Form 187, Contract Security and Classification RequirOments 0 Involves Proprietary Information O Applicable Dl Involves Sensitive Unclassified 0 Not Applicable U Non Fee-Recoverable E]Fee-Recoverable (if checked, complete an appilcable sections below)Docket Number (If Fee-RecoverabletApplicable) | ||
Inspection Report Number (if Fee Recoverable/Applicable) 50-413, 50-414 N/ | Inspection Report Number (if Fee Recoverable/Applicable) 50-413, 50-414 N/A Technical Assignment Control Number (W Fee- Technical Assignment Control Number Description Of Fee-RecoverbleoApplleable) | ||
Recoverable/Applicable) | Recoverable/Applicable) | ||
MF4526, | MF4526, MF4527 1.0 BACKGROUND The Duke Energy Carolinas, LLC (Duke Energy) has submitted this license application request (LAR) for a measurement uncertainty recapture (MUR) power uprate. Within this LAR(attached), Duke Energy has provided a fluence evaluation using the unapproved code RAPTOR-M3G, developed by Westinghouse. | ||
Duke Energy | The NRC needs technical assistance to review the RAPTOR-M3G fluence evaluation for Catawba's MUR LAR and that the review is completed according to schedule. | ||
The NRC needs technical assistance to review the RAPTOR-M3G fluence evaluation for Catawba's | The review wil be performed in accordance with Regulatory Guide 1.190, RCalculational and Dosimetry Methods for Determining Pressure Vessel Neutron Fluence." Under NRCHQ2514D0002 task order NRCHQ2015T0014, the Brookhaven National Laboratory (BNL) has been assisting the NRC staff in reviewing Catawba's Measurement Uncertainty Recapture Fluence evaluation for Duke Energy Nuclear.1 The purpose of this modification is to add an additional task to the Work Requirements and Schedule section, which involves two site audits. Based on the review conducted thus far and the findings to date, the NRC staff finds that a site audit will enable a more efficient and effective review, thereby improving the NRC staffs ability to fulfill our project goals 2.0 OBJECTIVE The objective of this task order is to obtain technical expertise from BNL to assist the NRC staff in determining the technical adequacy of the LAR submitted by Duke Energy for Catawba's MUR fluence evaluation (section IV.1.C.ii) in order to address the fluence evaluation issue described above.3.0 SCOPE OF WORK BNL must provide all resources necessary to accomplish the tasks and deliverables described in this statement of work (SOW).The scope of work involves review and evaluation of the technical and regulatory basis for the use of the RAPTOR-M3G code developed by Westinghouse.. | ||
The review wil be performed in accordance with Regulatory Guide 1.190, RCalculational and Dosimetry Methods for Determining Pressure | Review of the Code must show compliance with Regulatory Guide 1.190, "Calculational and Dosimetry Methods for Determining Pressure Vessel Neutron Fluence". | ||
Under NRCHQ2514D0002 task order NRCHQ2015T0014, the Brookhaven National Laboratory (BNL) has been assisting the NRC staff in reviewing Catawba's Measurement Uncertainty Recapture Fluence evaluation for Duke Energy Nuclear.1 The purpose of this modification is to add an additional task to the Work Requirements | BNL must provide input for the NRC staff's Safety Evaluation(SE) report that documents the NRC's technical, legal, and safety basis for approving the license amendment. | ||
The goal of the SE is to provide the technical, safety, and legal basis for the NRC's decision regarding approving this code. In support of this goal, BNL will review the methodology and results described in the application for technical adequacy and agreement with applicable NRC guidance. | |||
Review of the Code must show compliance | The Contractor will draft a Technical Evaluation Report (TER) describing their review and conclusions on the technical and regulatory adequacy of RAPTOR-M3G code.. If portions of the code are not shown to be technically adequate to support the conclusions expressed in the application, or if portions of the code do not agree with NRC guidance, then the Contractor will identify these "gaps" in writing as a request for additional information (RAI) and provide them to the NRC technical point of contact and Contracting Officer Representative (COR). The NRC technical point of contact and COR will coordinate issuing the RAI to the licensee to address the gaps and obtain responses. | ||
BNL must provide input for the NRC staff's Safety Evaluation(SE) report that documents | The BNL will review responses to the RAI and use those responses to finalize the TER.4.0 SPECIFIC TASKS BNL must-perform the following tasks: Using the criteria and guidelines found in Regulatory Guide (RG) 1.190 and 1.99 as necessary to review the acceptability of Catawba's MUR fluence evaluation (section IV.1.C.ii) within the LAR submitted by Duke Energy.Task I Kickoff Meeting 1.a Preparation for Kickoff Meeting Become familiar with the LAR submittal by Duke Energy.1.b Attend Kickoff Meeting 2 Attend a one-time kick-off meeting (either in person or via conference call) to discuss the scope of work, expectations, task order management, and performance requirements of the task order. The kick-off meeting shall be held within ten (10) working days after BNL receipt of LAR materials. | ||
The goal of the SE is | Task 2 Review LAR Submission 2.a Evaluate the LAR Submittal Review the LAR to determine the technical accuracy and regulatory compliance of the request.2.b Prepare Draft Technical Evaluation Report Prepare a draft Technical Evaluation Report (TER) that incorporates the results of the review and evaluation. | ||
The Contractor will draft a Technical Evaluation Report (TER) describing their review and conclusions on the technical and regulatory adequacy | The TER should be organized to parallel the applicable sections in NRC's Standard Review Plan, Chapters 4 and 15. The TER may include other relevant information that is not included in the SRP.Only input to SER sections requiring revision must be included In the TER. The TER must contain draft text, tables, and illustrations, as appropriate, suitable for Inclusion in NRC's SER. The TER must provide sufficient information to adequately support the NRC staff's rationale for why there is reasonable assurance that public health and safety is protected. | ||
The BNL will review responses to the RAI and use those responses to finalize | |||
Task 2 Review LAR Submission 2.a Evaluate the LAR Submittal Review the LAR to determine the technical accuracy and regulatory compliance of the request.2.b Prepare Draft Technical Evaluation | |||
The TER should be organized to parallel the applicable sections in NRC's Standard | |||
It must be written so that a person with either non-nuclear technical background or non-technical background can understand the basis for conclusions cited.Prepare final draft TER that incorporates comments provided by the COR.As directed by the COR, participate in conference calls with Duke Energy to discuss the LAR materials. | It must be written so that a person with either non-nuclear technical background or non-technical background can understand the basis for conclusions cited.Prepare final draft TER that incorporates comments provided by the COR.As directed by the COR, participate in conference calls with Duke Energy to discuss the LAR materials. | ||
2.c Prepare | 2.c Prepare RAts Identify unresolved issues and any additional or clarifying Information needed in the LAR submission. | ||
Prepare draft RAIs for use by NRC in requesting more information from Duke Energy to clarify | Prepare draft RAIs for use by NRC in requesting more information from Duke Energy to clarify issues raised during review of the LAR.As directed by the COR, participate in conference calls with Duke Energy to discuss additional information to be provided or clarified with the LAR.2.d Review RAI Responses Review Duke Energy's responses to the RAIs to determine whether they adequately resolve the outstanding issues.2.e Audit at facility Prepare for and travel to the licensee facility to audit the design documents supporting Catawba's License Amendment Request Prepare a trip report.2.f Update the TER Update the draft TER prepared under Task 2.b to incorporate Duke Energy's RAJ responses and revise related portions of the draft text, tables, and illustrations in the TER. Prepare a final TER that Incorporates comments provided by the COR. | ||
As directed by the COR, participate in conference calls with Duke Energy to discuss the responses of | As directed by the COR, participate in conference calls with Duke Energy to discuss the responses of the RAls.6.0 DELIVERABLES ANDIOR MILESTONES SCHEDULE The schedule for project deliverables Is shown In the following table.Deliverable Deliverable and Acceptance Criteria Deliverable Number Due Date 1 For Task 2.b, Draft TER NLT 4 weeks after award of Acceptance Criteria: | ||
Report must have the required content and task | Report must have the required content and task order follow the required format 2 For Task 2.b, Final Draft TER NLT I week after receipt of Acceptance Criteria: | ||
All COR comments are addressed in the TER. COR | All COR comments are addressed in the TER. COR comments 3 For Task 2.c, Draft RAPs NLT4 weeks after award of Acceptance Criteria: | ||
RAts are technically sound, adequately | RAts are technically sound, adequately address Identified issues, and Include a regulatory basis for each request.4 For Task 2.c, Final RAls NLT I week after receipt of Acceptance Criteria: | ||
All COR comments are reflected in the RAls. COR | All COR comments are reflected in the RAls. COR comments 5 For Task 2.e, Audit at Facility NLT I week after trip Acceptance Criteria: | ||
Deliverable contains required | Deliverable contains required content 6 For Task 21, Draft Updated TER NLT 2 weeks... ....... ............ .. after-receipt-of Acceptance Criteria: | ||
Deliverable contains required content RAI responses 7 For Task 2.f, Final Updated TER NLT 1 | Deliverable contains required content RAI responses 7 For Task 2.f, Final Updated TER NLT 1 week after receipt of Acceptance Criteria: | ||
All COR comments are addressed in the COR | All COR comments are addressed in the COR comments updated TER AII.deliverables shall include the following identifying information: | ||
Agreement No.4 Task Order No.JCN No.TAC No. | Agreement No.4 Task Order No.JCN No.TAC No.Licensee Site BNL must provide all reports as draft products. | ||
The COR will review all draft deliverables (and coordinate any internal NRC staff review, If needed) and provide comments back to the laboratory. | The COR will review all draft deliverables (and coordinate any internal NRC staff review, If needed) and provide comments back to the laboratory. | ||
BNL must | BNL must revise the draft deliverables based on the comments provided by the COR, and then deliver the final version of the deliverable. | ||
When mutually agreed upon between BNL and the COR, BNL may submit preliminary | When mutually agreed upon between BNL and the COR, BNL may submit preliminary or partial drafts to help gauge BNL's understanding of the particular work requirement. | ||
The above deliverables shall be provided electronically and in hard copy (upon request) to | The above deliverables shall be provided electronically and in hard copy (upon request) to the Contracting Officer (CO) and COR. See Section 9.0 of this SOW for information on distribution of the MLSR.The COR will acknowledge receipt of deliverables by e-mail.6.0 TECHNICAL AND OTHER SPECIAL QUALIFICATIONS REQUIRED Specialized experience must include expertise In such areas as BWR fuel designs, CPR correlations, BWR systems, and transient and accident analysis. | ||
Specific qualifications for this effort include:Senior Level Engineer with extensive background experience in BWR technology including | Specific qualifications for this effort include: Senior Level Engineer with extensive background experience in BWR technology including fuel designs, CPR correlations, systems, transient and accident analysis.BNL shall provide a project manager to oversee the effort and ensure the timely submittal of accurate and complete deliverables. | ||
The NRC will rely on representation made by BNL conceming the qualifications of the personnel assigned to this task order, including assurance that all information contained in the technical and cost proposals, Including resumes, Is accurate and truthful. | |||
BNL shall provide a project manager to oversee the effort and ensure the timely submittal of accurate | The resume for each professional proposed to work under this task order (principal Investigators, technical staff, employees, consultants, specialists or subcontractors) shall describe the individual's experience in applying his or her area of engineering specialization to work in the proposed area. The use of particular personnel on this task order is subject to the COR and CO approval. | ||
The NRC will rely on representation made by BNL conceming the qualifications of the personnel | This includes any proposed changes to key personnel during the life of the task order.7.0 ESTIMATED LABOR CATEGORIES AND LEVELS OF EFFORT (OPTIONAL SECTION)The estimated level of effort in professional staff hours apportioned among the tasks by labor category is as shown in the table below. The estimate is advisory only and not to be considered as the sole basis for development of a staffing plan.5 Senior Engineer 10 10 Project Manager 2 2 Senior Engineer 182 182 I Total 1192 1192 8.0 MEETINGS AND TRAVEL Optional: | ||
3 one Person, two Day Trips to NRC Headquarters or Licensee Facility.All travel requires written approval from the COR. Foreign travel for the DOE laboratory personnel requires a 60-day lead time for NRC approval. | |||
The resume for each professional proposed to work | For prior approval of foreign travel, the DOE laboratory shall submit an NRC Form 445, 'Request for Approval of Official Foreign Travel.! NRC Form 445 is available in the MD 11.7 Documents library and on the NRC Web site at: htt://www, nrc.gov/reading-rm/doc-collections/forms/. | ||
This includes any proposed changes to key personnel during the life of | |||
3 one Person, two Day Trips to NRC Headquarters or Licensee Facility. | |||
All travel requires written approval from the COR. Foreign travel for the DOE laboratory personnel requires a 60-day lead time for NRC approval. | |||
For prior approval of foreign travel, the DOE laboratory shall submit an NRC Form 445, 'Request for Approval of Official Foreign Travel.! | |||
NRC Form 445 | |||
Foreign travel is approved by the NRC Executive Director for Operations (EDO).9.0 REPORTING REQUIREMENTS BNL is responsible for structuring the deliverables to follow agency standards. | Foreign travel is approved by the NRC Executive Director for Operations (EDO).9.0 REPORTING REQUIREMENTS BNL is responsible for structuring the deliverables to follow agency standards. | ||
The current | The current agency standard software for developing documents is Microsoft Office Suite 2010, Including Word 2010 for text documents | ||
(.docx) and Excel 2010 for spreadsheets | (.docx) and Excel 2010 for spreadsheets | ||
(.xlsx). | (.xlsx). The current agency Portable Document Format (.pdf) standard is Adobe Acrobat X Pro. Deliverables shall be submitted free of spelling and grammatical errors and conform to requirements stated in this SOW.Monthly Letter Status Reports In accordance with Management Directive 11.7, "NRC Procedures for Placement and Monitoring of Work with the U.S. Department of Energy," BNL shall electronically submit a MLSR by the 20 day of each month to the following:-COR ...CO Acquisition Management Division at ContractsPOT.Resourceonrc.gov Christopher.Jackson@nrc.gov Matthew.Hardgrove@nrc.gov RidsNrrDss. | ||
The current agency Portable | Resource(nm.gov If a project Is a task ordering agreement, separate MLSRs shall be submitted for each task order with a summary project MLSR, even if no work has been performed during a reporting period. Once NRC has determined that all work on a task order is completed and that final costs are acceptable, a task order may be omitted from the MLSR.6 The content and format of the MLSR shall be consistent with Attachment 5 (Monthly Letter Report Instructions) to the base ordering agreement SOW.10.0 PERIOD OF PERFORMIANCE The period of performance for this task order is from the effective date of this task order award through September 30, 2105.11.0 CONTRACTING OFFICER'S REPRESENTATIVE The COR monitors all technical aspects of the agreementitask order and assists in its administration. | ||
BNL shall electronically submit a MLSR by the 20 day of | The COR is authorized to perform the following functions: | ||
-COR ... | assure that the DOE Laboratory performs the technical requirements of the agreement/task order;, perform inspections necessary in connection with agreement/task order performance: | ||
Resource(nm.gov If a project Is a task ordering agreement, separate MLSRs shall be submitted for each task order with | maintain written and oral communications with the DOE Laboratory concerning technical aspects of the agreement/task order;, issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor the DOE Laboratorfs performance and notify the DOE Laboratory of any deficiencies; coordinate availability of NRC-fumished material and/or GFP; and provide site entry of DOE Laboratory personnel. | ||
Alternate Contracting Officer's Representative Name: Davida Cunanan Agency: U.S. Nuclear Regulatory Commission Office: NRR/DSSISRXB Mail Stop: 010B03 Washington, DC 20555-0001 E-Mail davida.cunanan@nre.gov Phone: (301) 415-3573 Officer's Reoresentative Name: Shaun Anderson Agency: U.S. Nuclear Regulatory Commission Office: NRR/DSS Mail Stop: O10E07 Washington, DC 20555-0001 | |||
assure that the DOE Laboratory performs | |||
maintain written and oral communications with the DOE Laboratory concerning technical aspects of the agreement/task order;, issue written interpretations of technical requirements, including Government | |||
Alternate Contracting Officer's Representative Name: Davida | |||
-.E-Mail: Shaun;Anderson@nrc.gov | -.E-Mail: Shaun;Anderson@nrc.gov | ||
.-.Phone: (301) 415- | .-.Phone: (301) 415-2039 12.0 MATERIALS REQUIRED (TYPE N/A IF NOT APPLICABLE) | ||
N/ | N/A 13.0 NRC-FURNISHED PROPERTYIMATERIALS (TYPE NWA IF NOT APPLICABLE) | ||
The LAR and associated documents will be provided. | The LAR and associated documents will be provided.NOTE: These documents contain proprletary Information and they must be safeguarded against unauthorized disclosure. | ||
NOTE: These documents contain proprletary Information and they must be safeguarded against unauthorized disclosure. | After completion of work, the documents should 7 either be destroyed or returned to NRC. If they are destroyed, please confirm this in an e-mall to the COR with a copy to the Contracting Officer and include the date and manner in which the documents were destroyed. | ||
After completion of work, the documents | |||
14.0 RESEARCH QUALITY (TYPE N/A IF NOT APPLICABLE) | 14.0 RESEARCH QUALITY (TYPE N/A IF NOT APPLICABLE) | ||
N/ | N/A 15.0 STANDARDS FOR CONTRACTORS WHO PREPARE NUREG-SERIES MANUSCRIPTS (TYPE WA IF NOT APPLICABLE) | ||
N/ | N/A 16.0 OTHER CONSIDERATIONS (TYPE NIA IF NOT APPLICABLE) | ||
N/ | N/A 8}} |
Revision as of 00:26, 9 July 2018
ML15203A490 | |
Person / Time | |
---|---|
Site: | Catawba |
Issue date: | 07/21/2015 |
From: | Gunter-Henderson M E Acquisition Management Division |
To: | Nekulak K M Brookhaven National Lab (BNL) |
References | |
NRC-HQ-2514-D-0002 | |
Download: ML15203A490 (10) | |
Text
L VMAO 1M OF INThRAGENCY AGREEMENT NRC-HQ-20-15-T-0014/MOO00 1 2 oNKR-15-0214 I ,. 1e,,,,, T... AVOM O 17.PUDRWoe 0 M 06/30/2015 06/30/2015 03/09/2015 TO 09/30/2015 IURRWINOMAWCY BROORHAVEN NATIONAL LABORATORY kLC: DUNS: 027579460
+4: BROOKHAVEN SITE OFrICE SHAUN ANDERSON US NUCLEAR REGULATORY COMMISSION OFFICE NRRDSS MAIL STOP 010E07 V 4~-~A-9~.
.14*1,.U IUUU 6PTON NY 11973-5000 POO Kim Nakulak 1MA!POMit.
631-344-7439 ILREQUMM1Y
- 11. WlMOW205 ACM US NUCLEAR REGULATORY COMMIssIon ALC: 31000001 S: 3100001 ONE WHITE FLINT NORTH DUNS: +-4: US NUCLEAR REGULATORY COMMISSION 11555 ROCEVILLE PIKE ONE WHITE FLINT NORTH MRILSTOP 03-Ei7A 11555 ROCKVILLE PIKE ROCKVILLE HD 20852-2738 POO MORIE GUNTER-HENDERSON T 301 415-7924 iUS NRC -HQ Energy Reorganization Act of 1974 ACQUISITION MANAGEMENT DIVISION MAIL STOP TWFN-5E03 WASHINGTON DC 20555-0001 1.mR.,FM ILPro.Eox=lmE
_CATAWBA'S MUR FLUENCE EVALUATION f&A0C0IVffNGOA 2015-K0200-FEEBASED-20-20D008-11-4-148-1061-251D
- 17. la M 2¶, 21 Snm. QIUUnITY LEWVW IBc AUG WiT Master IAA: NRCHQ2514D0002 The purpose of this modification is to: (1), add- two additional -trips, to the licensee-facility to support the Catawba MNR review and trip to the NRC headquarters as seen in the attached revised Statement of Work.(2) Increase the ceiling by $20,009.00 from$65,306.00 to $85,315.00.
(3) Add incremental funding in the, amount of Continued 2&AW&QgxrWR0B=
12C TOTALAMOAq£ ra~ PANE SUNI i~vVIW COMPLETL NEBIPLAJE
-Aftfinn JUL 2 1 2015 MAUO O PAW O NRC-HQ-20-15-T-0014/MCO01 2 2$7,000.00, thereby increasing the obligation "$65,306.00 to $72,306.00.
All other terms and conditions remain unchanged.
I I-STATEMENT OF WORK NRC Agreement Number NRC Agreement NRC Task Order Number NRC Task Order Modification NRC-HQ-25-14-D-0002 Modification Number Of Applicable)
Number (If Applicable)
NRCHQ201T50014 M1001 Project Tifsl:. Technical Assistance in ;Support of DUke Energy Nuclear Operations' Ucense Amendment Request for Catawba's Measurement Uncertainty Recapture Fluence Evaluation Job Code Ntumber B&R Number DOE Laboratory 11-4-149 Brookhaven National Laboratory (BNL)NRC Requisitioning Office Office of Nuclear Reactor Regulation (NRR)NRC Form 187, Contract Security and Classification RequirOments 0 Involves Proprietary Information O Applicable Dl Involves Sensitive Unclassified 0 Not Applicable U Non Fee-Recoverable E]Fee-Recoverable (if checked, complete an appilcable sections below)Docket Number (If Fee-RecoverabletApplicable)
Inspection Report Number (if Fee Recoverable/Applicable) 50-413, 50-414 N/A Technical Assignment Control Number (W Fee- Technical Assignment Control Number Description Of Fee-RecoverbleoApplleable)
Recoverable/Applicable)
MF4526, MF4527 1.0 BACKGROUND The Duke Energy Carolinas, LLC (Duke Energy) has submitted this license application request (LAR) for a measurement uncertainty recapture (MUR) power uprate. Within this LAR(attached), Duke Energy has provided a fluence evaluation using the unapproved code RAPTOR-M3G, developed by Westinghouse.
The NRC needs technical assistance to review the RAPTOR-M3G fluence evaluation for Catawba's MUR LAR and that the review is completed according to schedule.
The review wil be performed in accordance with Regulatory Guide 1.190, RCalculational and Dosimetry Methods for Determining Pressure Vessel Neutron Fluence." Under NRCHQ2514D0002 task order NRCHQ2015T0014, the Brookhaven National Laboratory (BNL) has been assisting the NRC staff in reviewing Catawba's Measurement Uncertainty Recapture Fluence evaluation for Duke Energy Nuclear.1 The purpose of this modification is to add an additional task to the Work Requirements and Schedule section, which involves two site audits. Based on the review conducted thus far and the findings to date, the NRC staff finds that a site audit will enable a more efficient and effective review, thereby improving the NRC staffs ability to fulfill our project goals 2.0 OBJECTIVE The objective of this task order is to obtain technical expertise from BNL to assist the NRC staff in determining the technical adequacy of the LAR submitted by Duke Energy for Catawba's MUR fluence evaluation (section IV.1.C.ii) in order to address the fluence evaluation issue described above.3.0 SCOPE OF WORK BNL must provide all resources necessary to accomplish the tasks and deliverables described in this statement of work (SOW).The scope of work involves review and evaluation of the technical and regulatory basis for the use of the RAPTOR-M3G code developed by Westinghouse..
Review of the Code must show compliance with Regulatory Guide 1.190, "Calculational and Dosimetry Methods for Determining Pressure Vessel Neutron Fluence".
BNL must provide input for the NRC staff's Safety Evaluation(SE) report that documents the NRC's technical, legal, and safety basis for approving the license amendment.
The goal of the SE is to provide the technical, safety, and legal basis for the NRC's decision regarding approving this code. In support of this goal, BNL will review the methodology and results described in the application for technical adequacy and agreement with applicable NRC guidance.
The Contractor will draft a Technical Evaluation Report (TER) describing their review and conclusions on the technical and regulatory adequacy of RAPTOR-M3G code.. If portions of the code are not shown to be technically adequate to support the conclusions expressed in the application, or if portions of the code do not agree with NRC guidance, then the Contractor will identify these "gaps" in writing as a request for additional information (RAI) and provide them to the NRC technical point of contact and Contracting Officer Representative (COR). The NRC technical point of contact and COR will coordinate issuing the RAI to the licensee to address the gaps and obtain responses.
The BNL will review responses to the RAI and use those responses to finalize the TER.4.0 SPECIFIC TASKS BNL must-perform the following tasks: Using the criteria and guidelines found in Regulatory Guide (RG) 1.190 and 1.99 as necessary to review the acceptability of Catawba's MUR fluence evaluation (section IV.1.C.ii) within the LAR submitted by Duke Energy.Task I Kickoff Meeting 1.a Preparation for Kickoff Meeting Become familiar with the LAR submittal by Duke Energy.1.b Attend Kickoff Meeting 2 Attend a one-time kick-off meeting (either in person or via conference call) to discuss the scope of work, expectations, task order management, and performance requirements of the task order. The kick-off meeting shall be held within ten (10) working days after BNL receipt of LAR materials.
Task 2 Review LAR Submission 2.a Evaluate the LAR Submittal Review the LAR to determine the technical accuracy and regulatory compliance of the request.2.b Prepare Draft Technical Evaluation Report Prepare a draft Technical Evaluation Report (TER) that incorporates the results of the review and evaluation.
The TER should be organized to parallel the applicable sections in NRC's Standard Review Plan, Chapters 4 and 15. The TER may include other relevant information that is not included in the SRP.Only input to SER sections requiring revision must be included In the TER. The TER must contain draft text, tables, and illustrations, as appropriate, suitable for Inclusion in NRC's SER. The TER must provide sufficient information to adequately support the NRC staff's rationale for why there is reasonable assurance that public health and safety is protected.
It must be written so that a person with either non-nuclear technical background or non-technical background can understand the basis for conclusions cited.Prepare final draft TER that incorporates comments provided by the COR.As directed by the COR, participate in conference calls with Duke Energy to discuss the LAR materials.
2.c Prepare RAts Identify unresolved issues and any additional or clarifying Information needed in the LAR submission.
Prepare draft RAIs for use by NRC in requesting more information from Duke Energy to clarify issues raised during review of the LAR.As directed by the COR, participate in conference calls with Duke Energy to discuss additional information to be provided or clarified with the LAR.2.d Review RAI Responses Review Duke Energy's responses to the RAIs to determine whether they adequately resolve the outstanding issues.2.e Audit at facility Prepare for and travel to the licensee facility to audit the design documents supporting Catawba's License Amendment Request Prepare a trip report.2.f Update the TER Update the draft TER prepared under Task 2.b to incorporate Duke Energy's RAJ responses and revise related portions of the draft text, tables, and illustrations in the TER. Prepare a final TER that Incorporates comments provided by the COR.
As directed by the COR, participate in conference calls with Duke Energy to discuss the responses of the RAls.6.0 DELIVERABLES ANDIOR MILESTONES SCHEDULE The schedule for project deliverables Is shown In the following table.Deliverable Deliverable and Acceptance Criteria Deliverable Number Due Date 1 For Task 2.b, Draft TER NLT 4 weeks after award of Acceptance Criteria:
Report must have the required content and task order follow the required format 2 For Task 2.b, Final Draft TER NLT I week after receipt of Acceptance Criteria:
All COR comments are addressed in the TER. COR comments 3 For Task 2.c, Draft RAPs NLT4 weeks after award of Acceptance Criteria:
RAts are technically sound, adequately address Identified issues, and Include a regulatory basis for each request.4 For Task 2.c, Final RAls NLT I week after receipt of Acceptance Criteria:
All COR comments are reflected in the RAls. COR comments 5 For Task 2.e, Audit at Facility NLT I week after trip Acceptance Criteria:
Deliverable contains required content 6 For Task 21, Draft Updated TER NLT 2 weeks... ....... ............ .. after-receipt-of Acceptance Criteria:
Deliverable contains required content RAI responses 7 For Task 2.f, Final Updated TER NLT 1 week after receipt of Acceptance Criteria:
All COR comments are addressed in the COR comments updated TER AII.deliverables shall include the following identifying information:
Agreement No.4 Task Order No.JCN No.TAC No.Licensee Site BNL must provide all reports as draft products.
The COR will review all draft deliverables (and coordinate any internal NRC staff review, If needed) and provide comments back to the laboratory.
BNL must revise the draft deliverables based on the comments provided by the COR, and then deliver the final version of the deliverable.
When mutually agreed upon between BNL and the COR, BNL may submit preliminary or partial drafts to help gauge BNL's understanding of the particular work requirement.
The above deliverables shall be provided electronically and in hard copy (upon request) to the Contracting Officer (CO) and COR. See Section 9.0 of this SOW for information on distribution of the MLSR.The COR will acknowledge receipt of deliverables by e-mail.6.0 TECHNICAL AND OTHER SPECIAL QUALIFICATIONS REQUIRED Specialized experience must include expertise In such areas as BWR fuel designs, CPR correlations, BWR systems, and transient and accident analysis.
Specific qualifications for this effort include: Senior Level Engineer with extensive background experience in BWR technology including fuel designs, CPR correlations, systems, transient and accident analysis.BNL shall provide a project manager to oversee the effort and ensure the timely submittal of accurate and complete deliverables.
The NRC will rely on representation made by BNL conceming the qualifications of the personnel assigned to this task order, including assurance that all information contained in the technical and cost proposals, Including resumes, Is accurate and truthful.
The resume for each professional proposed to work under this task order (principal Investigators, technical staff, employees, consultants, specialists or subcontractors) shall describe the individual's experience in applying his or her area of engineering specialization to work in the proposed area. The use of particular personnel on this task order is subject to the COR and CO approval.
This includes any proposed changes to key personnel during the life of the task order.7.0 ESTIMATED LABOR CATEGORIES AND LEVELS OF EFFORT (OPTIONAL SECTION)The estimated level of effort in professional staff hours apportioned among the tasks by labor category is as shown in the table below. The estimate is advisory only and not to be considered as the sole basis for development of a staffing plan.5 Senior Engineer 10 10 Project Manager 2 2 Senior Engineer 182 182 I Total 1192 1192 8.0 MEETINGS AND TRAVEL Optional:
3 one Person, two Day Trips to NRC Headquarters or Licensee Facility.All travel requires written approval from the COR. Foreign travel for the DOE laboratory personnel requires a 60-day lead time for NRC approval.
For prior approval of foreign travel, the DOE laboratory shall submit an NRC Form 445, 'Request for Approval of Official Foreign Travel.! NRC Form 445 is available in the MD 11.7 Documents library and on the NRC Web site at: htt://www, nrc.gov/reading-rm/doc-collections/forms/.
Foreign travel is approved by the NRC Executive Director for Operations (EDO).9.0 REPORTING REQUIREMENTS BNL is responsible for structuring the deliverables to follow agency standards.
The current agency standard software for developing documents is Microsoft Office Suite 2010, Including Word 2010 for text documents
(.docx) and Excel 2010 for spreadsheets
(.xlsx). The current agency Portable Document Format (.pdf) standard is Adobe Acrobat X Pro. Deliverables shall be submitted free of spelling and grammatical errors and conform to requirements stated in this SOW.Monthly Letter Status Reports In accordance with Management Directive 11.7, "NRC Procedures for Placement and Monitoring of Work with the U.S. Department of Energy," BNL shall electronically submit a MLSR by the 20 day of each month to the following:-COR ...CO Acquisition Management Division at ContractsPOT.Resourceonrc.gov Christopher.Jackson@nrc.gov Matthew.Hardgrove@nrc.gov RidsNrrDss.
Resource(nm.gov If a project Is a task ordering agreement, separate MLSRs shall be submitted for each task order with a summary project MLSR, even if no work has been performed during a reporting period. Once NRC has determined that all work on a task order is completed and that final costs are acceptable, a task order may be omitted from the MLSR.6 The content and format of the MLSR shall be consistent with Attachment 5 (Monthly Letter Report Instructions) to the base ordering agreement SOW.10.0 PERIOD OF PERFORMIANCE The period of performance for this task order is from the effective date of this task order award through September 30, 2105.11.0 CONTRACTING OFFICER'S REPRESENTATIVE The COR monitors all technical aspects of the agreementitask order and assists in its administration.
The COR is authorized to perform the following functions:
assure that the DOE Laboratory performs the technical requirements of the agreement/task order;, perform inspections necessary in connection with agreement/task order performance:
maintain written and oral communications with the DOE Laboratory concerning technical aspects of the agreement/task order;, issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor the DOE Laboratorfs performance and notify the DOE Laboratory of any deficiencies; coordinate availability of NRC-fumished material and/or GFP; and provide site entry of DOE Laboratory personnel.
Alternate Contracting Officer's Representative Name: Davida Cunanan Agency: U.S. Nuclear Regulatory Commission Office: NRR/DSSISRXB Mail Stop: 010B03 Washington, DC 20555-0001 E-Mail davida.cunanan@nre.gov Phone: (301) 415-3573 Officer's Reoresentative Name: Shaun Anderson Agency: U.S. Nuclear Regulatory Commission Office: NRR/DSS Mail Stop: O10E07 Washington, DC 20555-0001
-.E-Mail: Shaun;Anderson@nrc.gov
.-.Phone: (301) 415-2039 12.0 MATERIALS REQUIRED (TYPE N/A IF NOT APPLICABLE)
N/A 13.0 NRC-FURNISHED PROPERTYIMATERIALS (TYPE NWA IF NOT APPLICABLE)
The LAR and associated documents will be provided.NOTE: These documents contain proprletary Information and they must be safeguarded against unauthorized disclosure.
After completion of work, the documents should 7 either be destroyed or returned to NRC. If they are destroyed, please confirm this in an e-mall to the COR with a copy to the Contracting Officer and include the date and manner in which the documents were destroyed.
14.0 RESEARCH QUALITY (TYPE N/A IF NOT APPLICABLE)
N/A 15.0 STANDARDS FOR CONTRACTORS WHO PREPARE NUREG-SERIES MANUSCRIPTS (TYPE WA IF NOT APPLICABLE)
N/A 16.0 OTHER CONSIDERATIONS (TYPE NIA IF NOT APPLICABLE)
N/A 8