ML17265A668: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORYlREGULATORY INFORMATION DXSTRIBUTIO SYSTEM(RIDS)7%CCESSION NBR:9906140111 DOC.DATE:
{{#Wiki_filter:CATEGORY l REGULATORY INFORMATION DXSTRIBUTIO SYSTEM (RIDS)7%CCESSION NBR:9906140111 DOC.DATE: 99/05/31 NOTARIZED:
99/05/31NOTARIZED:
NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G AUTH.NAME AUTHOR AFFILIATION WALDEN,J.V.
NOFACIL:50-244 RobertEmmetGinnaNuclearPlant,Unit1,Rochester GAUTH.NAMEAUTHORAFFILIATION WALDEN,J.V.
Rochester Gas&Electric Corp.WIDAY,J.A."-
Rochester Gas&ElectricCorp.WIDAY,J.A."-
'ochester Gas&Electric Corp.RECIP.NAME RECIPIENT AFFILIATION DOCKET¹05000244 VISSING,G.S.
'ochester Gas&ElectricCorp.RECIP.NAME RECIPIENT AFFILIATION DOCKET¹05000244VISSING,G.S.


==SUBJECT:==
==SUBJECT:==
Monthlyoperating reptforMay1999forREGinnaNuclearPowerPlant.With990608ltr.DISTRIBUTION CODE:IE24DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:MonthlyOperating Report(perTechSpecs)NOTES:License Expdateinaccordance with10CFR2,2.109(9/19/72).
Monthly operating rept for May 1999 for RE Ginna Nuclear Power Plant.With 990608 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
CAE05000244QRECIPIENT IDCODE/NAME LPD1-1PDINTERNAL:
C A E 05000244 Q RECIPIENT ID CODE/NAME LPD1-1 PD INTERNAL: AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL: LMITCO MARSHALL NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME VISSING,G.
AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL:
ECER0 RGNl NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 R D-'=cp'>>-i'E NOTE TO ALL"RIDS" RECIPIENTS:
LMITCOMARSHALLNRCPDRCOPIESLTTRENCL1111111111RECIPIENT IDCODE/NAME VISSING,G.
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATZONi CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9 k
ECER0RGNlNOACCOPIESLTTRENCL11111111RD-'=cp'>>-i'ENOTETOALL"RIDS"RECIPIENTS:
AND ROCHESTER GASANDEIECTRIC CORPORATION 89EASTAVENUE, ROCHESTER, NY.146490001 AREA CODE 716-546-2700 June 8, 1999 US Nuclear Regulatory Commission Document Control Desk Attn: Guy S.Vissing Project Directorate I-1 Washington, DC 20555
PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATZONi CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION 415-2083TOTALNUMBEROFCOPIESREQUIRED:
LTTR9ENCL9 k
ANDROCHESTER GASANDEIECTRIC CORPORATION 89EASTAVENUE, ROCHESTER, NY.146490001 AREACODE716-546-2700 June8,1999USNuclearRegulatory Commission DocumentControlDeskAttn:GuyS.VissingProjectDirectorate I-1Washington, DC20555


==Subject:==
==Subject:==
MonthlyReportforMay,1999Operating StatusInformation R.E.GinnaNuclearPowerPlantDocketNo.50-244
Monthly Report for May, 1999 Operating Status Information R.E.Ginna Nuclear Power Plant Docket No.50-244  


==DearMr.Vissing:==
==Dear Mr.Vissing:==
PursuanttoGinnaImprovedTechnical Specifications Section5.6.4,attachedisthemonthlyoperating statusreportforGinnaStationforthemonthofMay,1999.Verytrulyyours,0:6seA.WidaylantManagerxc:U.S.NuclearRegulatory Commission Mr.GuyS.Vissing(MailStop14B2)ProjectDirectorate I-1Washington, D.C.20555U.S.NuclearRegulatory Commission RegionI475Allendale RoadKingofPrussia,PA19406U.S.NRCGinnaSeniorResidentInspector Attachments 990bi40iii 99053iPDRADGCK-05000244, IR'~'"PDR' OPERATING DATAREPORTCOMPLETED BY:50-244June8,1999JohnV.WaldenTELEPHONE (716)771-3588OPERATING STATUS4801.UnitName:R.E.GINNANUCLEARPOWERPLANT2.Reporting Period:Ma,19993.DesignElectricRating(NetMWe):4704.MaximumDependable Capacity(NetMWe):Notes:ThisMonthYr.-to-Date Cumulative**
Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of May, 1999.Very truly yours, 0:6 se A.Widay lant Manager xc: U.S.Nuclear Regulatory Commission Mr.Guy S.Vissing (Mail Stop 14B2)Project Directorate I-1 Washington, D.C.20555 U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S.NRC Ginna Senior Resident Inspector Attachments 990bi40iii 99053i PDR ADGCK-05000244, I R'~'"PDR' OPERATING DATA REPORT COMPLETED BY: 50-244 June 8, 1999 John V.Walden TELEPHONE (716)771-3588 OPERATING STATUS 480 1.Unit Name: R.E.GINNA NUCLEAR POWER PLANT 2.Reporting Period: Ma, 1999 3.Design Electric Rating (Net MWe): 470 4.Maximum Dependable Capacity (Net MWe): Notes: This Month Yr.-to-Date Cumulative**
5.NumberofhoursReactorWasCritical6.HoursGenerator On-line7.UnitReserveShutdownHours8.NetElectrical EnergyGenerated (MWH)744.0744.00.0344256.02357.82308.20.01034240.0 209077.0206006.98.5*92885320.4
5.Number of hours Reactor Was Critical 6.Hours Generator On-line 7.Unit Reserve Shutdown Hours 8.Net Electrical Energy Generated (MWH)744.0 744.0 0.0 344256.0 2357.8 2308.2 0.0 1034240.0 209077.0 206006.9 8.5*92885320.4
**CUMULATIVE TOTALCOMMENCING NOVEMBER8,1969 04I DOCKETNO:50-244UNITNAME:R.E.GINNANUCLEARPOWERPLANTDATE:June81999COMPLETED BY:JohnV.WaldenUNITSHUTDOWNREPORTING PERIOD:Ma1999(Month/Year)
**CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969 0 4 I DOCKET NO: 50-244 UNIT NAME: R.E.GINNA NUCLEAR POWER PLANT DATE: June 8 1999 COMPLETED BY: John V.Walden UNIT SHUTDOWN REPORTING PERIOD: Ma 1999 (Month/Year)
NO.DATETYPEF:FORCEDS:SCHEDULED DURATIONREASON<'>
NO.DATE TYPE F:FORCED S:SCHEDULED DURATION REASON<'>(HOURS)METHOD OF SHUTTING DOWN<'~CAUSE/CORRECTIVE ACTIONS COMMENTS
(HOURS)METHODOFSHUTTINGDOWN<'~CAUSE/CORRECTIVE ACTIONSCOMMENTSSUMMARY:TheunitpowerwasreducedonMay3,1999duetoproblemswithreactorprotection bistables.
 
TheunitwasrestoredtofullpoweronMay6,1999.Twoadditional powerreductions occurredonMay21,1999andMay29,1999duetooffsitecircuitmaintenance.
==SUMMARY==
Averagepowerforthemonthwas93.7%.(1)ReasonA-Equipment Failure(Explain)
: The unit power was reduced on May 3, 1999 due to problems with reactor protection bistables.
B-Maintenance orTestC-Refueling D-Regulatory Restriction E-OperatorTraining/License Examination F-Administrative G-Operational Error(Explain)
The unit was restored to full power on May 6, 1999.Two additional power reductions occurred on May 21, 1999 and May 29, 1999 due to offsite circuit maintenance.
H-Other(Explain)
Average power for the month was 93.7%.(1)Reason A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)(2)Method 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other (Explain)}}
(2)Method1-Manual2-ManualTrip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other(Explain)}}

Revision as of 12:33, 7 July 2018

Monthly Operating Rept for May 1999 for Re Ginna Nuclear Power Plant.With 990608 Ltr
ML17265A668
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/31/1999
From: WALDEN J V, WIDAY J A
ROCHESTER GAS & ELECTRIC CORP.
To: VISSING G S
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9906140111
Download: ML17265A668 (6)


Text

CATEGORY l REGULATORY INFORMATION DXSTRIBUTIO SYSTEM (RIDS)7%CCESSION NBR:9906140111 DOC.DATE: 99/05/31 NOTARIZED:

NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G AUTH.NAME AUTHOR AFFILIATION WALDEN,J.V.

Rochester Gas&Electric Corp.WIDAY,J.A."-

'ochester Gas&Electric Corp.RECIP.NAME RECIPIENT AFFILIATION DOCKET¹05000244 VISSING,G.S.

SUBJECT:

Monthly operating rept for May 1999 for RE Ginna Nuclear Power Plant.With 990608 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

C A E 05000244 Q RECIPIENT ID CODE/NAME LPD1-1 PD INTERNAL: AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL: LMITCO MARSHALL NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME VISSING,G.

ECER0 RGNl NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 R D-'=cp'>>-i'E NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATZONi CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9 k

AND ROCHESTER GASANDEIECTRIC CORPORATION 89EASTAVENUE, ROCHESTER, NY.146490001 AREA CODE 716-546-2700 June 8, 1999 US Nuclear Regulatory Commission Document Control Desk Attn: Guy S.Vissing Project Directorate I-1 Washington, DC 20555

Subject:

Monthly Report for May, 1999 Operating Status Information R.E.Ginna Nuclear Power Plant Docket No.50-244

Dear Mr.Vissing:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of May, 1999.Very truly yours, 0:6 se A.Widay lant Manager xc: U.S.Nuclear Regulatory Commission Mr.Guy S.Vissing (Mail Stop 14B2)Project Directorate I-1 Washington, D.C.20555 U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S.NRC Ginna Senior Resident Inspector Attachments 990bi40iii 99053i PDR ADGCK-05000244, I R'~'"PDR' OPERATING DATA REPORT COMPLETED BY: 50-244 June 8, 1999 John V.Walden TELEPHONE (716)771-3588 OPERATING STATUS 480 1.Unit Name: R.E.GINNA NUCLEAR POWER PLANT 2.Reporting Period: Ma, 1999 3.Design Electric Rating (Net MWe): 470 4.Maximum Dependable Capacity (Net MWe): Notes: This Month Yr.-to-Date Cumulative**

5.Number of hours Reactor Was Critical 6.Hours Generator On-line 7.Unit Reserve Shutdown Hours 8.Net Electrical Energy Generated (MWH)744.0 744.0 0.0 344256.0 2357.8 2308.2 0.0 1034240.0 209077.0 206006.9 8.5*92885320.4

    • CUMULATIVE TOTAL COMMENCING NOVEMBER 8, 1969 0 4 I DOCKET NO: 50-244 UNIT NAME: R.E.GINNA NUCLEAR POWER PLANT DATE: June 8 1999 COMPLETED BY: John V.Walden UNIT SHUTDOWN REPORTING PERIOD: Ma 1999 (Month/Year)

NO.DATE TYPE F:FORCED S:SCHEDULED DURATION REASON<'>(HOURS)METHOD OF SHUTTING DOWN<'~CAUSE/CORRECTIVE ACTIONS COMMENTS

SUMMARY

The unit power was reduced on May 3, 1999 due to problems with reactor protection bistables.

The unit was restored to full power on May 6, 1999.Two additional power reductions occurred on May 21, 1999 and May 29, 1999 due to offsite circuit maintenance.

Average power for the month was 93.7%.(1)Reason A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)(2)Method 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other (Explain)