==Dear Mr. McCree,== | ==Dear Mr. McCree,== | ||
VIRGINIA ELECTRIC AND POWER COMPANYSURRY STATION UNITS 1 AND 2SUBMITTAL OF FINAL | VIRGINIA ELECTRIC AND POWER COMPANYSURRY STATION UNITS 1 AND 2SUBMITTAL OF FINAL OPERATING AND WRITTEN EXAMINATION Following completion of Initial License Examination preparation week held from June 30through July 3, 2014, NRC Inspector Mr. David Lanyi requested transmittal of the FinalOperating and Written Examinations by July 15, 2014 for examinations scheduled during the weeks of July 21 and July 28, 2014. This letter is to inform you that the FinalOperating and Written Examinations were transmitted on July 10, 2014, and received byMr. David Lanyi, NRC Chief Examiner, on July 11, 2014.In addition, the following supporting documents were included in the transmittal: | ||
Serial No. 14-080DDocket Nos. 50-280/50- | " Form ES-201-3, Examination Security Agreement | ||
* Form ES-301-1, Administrative Topics Outline* Form ES-301-2, Control Room/In-Plant Systems Outline" Form ES-301-3, Operating Test Quality Checklist | |||
* Form ES-301-4, Simulator Scenario Quality Checklist | |||
* Form ES-301-5, Transient and Event Checklist | |||
* Form ES-301-6, Competencies Checklist | |||
" Form ES-401-4, Record of Rejected Knowledge and Abilities | |||
* Form ES-401-6, Written Examination Quality Checklist | |||
" ES-D-1, Scenario Outlines" ES-D2, Required Operator Actions Serial No. 14-080DDocket Nos. 50-280/50-281 Page 2 of 3We request that the materials submitted to the NRC be withheld from public disclosure until after the operator examinations have been administered. | |||
If you have any questions or require additional information, please contact Mr. PaulOrrison or Mr. Mike Meyer at (757) 365-2835. | |||
Sincer ,,,, | |||
tVL. LlkeSite Vice IV(esident Surry Power StationCommitments made by this letter: None. | |||
Serial No. 14-080DDocket Nos. 50-280/50-281 Page 3 of 3copy:Mr. Malcolm T. WidmannChief, Operations BranchUnited States Nuclear Regulatory Commission Region IIMarquis One Tower245 Peachtree Center Ave., NE, Suite 1200Atlanta, Georgia 30303-1257 Document Control DeskUnited States Nuclear Regulatory Commission Washington, D.C. 20555-0001 Senior Resident Inspector Surry Power Station}} | |||
Revision as of 12:14, 1 July 2018
| ML14202A204 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 07/14/2014 |
| From: | Lane N L Virginia Electric & Power Co (VEPCO) |
| To: | Region 2 Administrator |
| References | |
| 14-080D | |
| Download: ML14202A204 (3) | |
Text
VIRGINI ELECTRic AND POWER COMPANYRICHMOND, VIRGINIA 23261July 14, 2014Victor McCree, Regional Adminstrator Serial Number 14-080DUnited States Nuclear Regulatory Commission Region II SS&L/KAMMarquis One Tower Docket Nos. 50-280245 Peachtree Center Ave., NE, Suite 1200 50-281Atlanta, Georgia 30303-1257 License Nos. DPR-32DPR-37
Dear Mr. McCree,
VIRGINIA ELECTRIC AND POWER COMPANYSURRY STATION UNITS 1 AND 2SUBMITTAL OF FINAL OPERATING AND WRITTEN EXAMINATION Following completion of Initial License Examination preparation week held from June 30through July 3, 2014, NRC Inspector Mr. David Lanyi requested transmittal of the FinalOperating and Written Examinations by July 15, 2014 for examinations scheduled during the weeks of July 21 and July 28, 2014. This letter is to inform you that the FinalOperating and Written Examinations were transmitted on July 10, 2014, and received byMr. David Lanyi, NRC Chief Examiner, on July 11, 2014.In addition, the following supporting documents were included in the transmittal:
" Form ES-201-3, Examination Security Agreement
- Form ES-301-1, Administrative Topics Outline* Form ES-301-2, Control Room/In-Plant Systems Outline" Form ES-301-3, Operating Test Quality Checklist
- Form ES-301-4, Simulator Scenario Quality Checklist
- Form ES-301-6, Competencies Checklist
" Form ES-401-4, Record of Rejected Knowledge and Abilities
- Form ES-401-6, Written Examination Quality Checklist
" ES-D-1, Scenario Outlines" ES-D2, Required Operator Actions Serial No. 14-080DDocket Nos. 50-280/50-281 Page 2 of 3We request that the materials submitted to the NRC be withheld from public disclosure until after the operator examinations have been administered.
If you have any questions or require additional information, please contact Mr. PaulOrrison or Mr. Mike Meyer at (757) 365-2835.
Sincer ,,,,
tVL. LlkeSite Vice IV(esident Surry Power StationCommitments made by this letter: None.
Serial No. 14-080DDocket Nos. 50-280/50-281 Page 3 of 3copy:Mr. Malcolm T. WidmannChief, Operations BranchUnited States Nuclear Regulatory Commission Region IIMarquis One Tower245 Peachtree Center Ave., NE, Suite 1200Atlanta, Georgia 30303-1257 Document Control DeskUnited States Nuclear Regulatory Commission Washington, D.C. 20555-0001 Senior Resident Inspector Surry Power Station