ML14203A048: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:WASHINGTON STATE.UNIVERSITYNuclear Radiation CenterJuly 17, 2014Document Control DeskU.S. Nuclear Regulatory Commission11555 Rockville PikeRockville, MD 20852-2738The purpose of this letter is to inform the U.S. Nuclear Regulatory Commission (U.S. NRC) of apermanent change in the facility organization involving Level 1 management personnel.The facility organization for the Washington State University research reactor (Facility OperatingLicense R-76) is defined in Section 6.1 of the Technical Specifications for License R-76. Level 1management is assigned to the Vice President for Research of Washington State University.Section 6.10.2(3) of the Technical Specifications stipulates that a written report be submitted to theU.S. NRC within 30 days of a permanent change in Level I management. Washington StateUniversity named a new, permanent, Vice President for Research, Dr. Chris Keane, on July 1,2014.Please contact me if there are any questions.Respectfully Submitted,Donald Wall, Ph.D.Directorwee__aP.O. Box641300, Pullman, WA 99164-1 300509-335-8641
{{#Wiki_filter:WASHINGTON STATE.UNIVERSITY Nuclear Radiation CenterJuly 17, 2014Document Control DeskU.S. Nuclear Regulatory Commission 11555 Rockville PikeRockville, MD 20852-2738 The purpose of this letter is to inform the U.S. Nuclear Regulatory Commission (U.S. NRC) of apermanent change in the facility organization involving Level 1 management personnel.
* Fax: 509-335-4433 -www.wsu.edu/nrcP100(o}}
The facility organization for the Washington State University research reactor (Facility Operating License R-76) is defined in Section 6.1 of the Technical Specifications for License R-76. Level 1management is assigned to the Vice President for Research of Washington State University.
Section 6.10.2(3) of the Technical Specifications stipulates that a written report be submitted to theU.S. NRC within 30 days of a permanent change in Level I management.
Washington StateUniversity named a new, permanent, Vice President for Research, Dr. Chris Keane, on July 1,2014.Please contact me if there are any questions.
Respectfully Submitted, Donald Wall, Ph.D.Directorwee__aP.O. Box641300,  
: Pullman, WA 99164-1 300509-335-8641
* Fax: 509-335-4433  
-www.wsu.edu/nrc P100(o}}

Revision as of 12:11, 1 July 2018

Ltr. from Washington State Univ. to Inform the U.S. NRC of a Permanent Change in the Facility Organization Involving Level 1 Management Personnel
ML14203A048
Person / Time
Site: Washington State University
Issue date: 07/17/2014
From: Wall D
Washington State Univ
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML14203A048 (1)


Text

WASHINGTON STATE.UNIVERSITY Nuclear Radiation CenterJuly 17, 2014Document Control DeskU.S. Nuclear Regulatory Commission 11555 Rockville PikeRockville, MD 20852-2738 The purpose of this letter is to inform the U.S. Nuclear Regulatory Commission (U.S. NRC) of apermanent change in the facility organization involving Level 1 management personnel.

The facility organization for the Washington State University research reactor (Facility Operating License R-76) is defined in Section 6.1 of the Technical Specifications for License R-76. Level 1management is assigned to the Vice President for Research of Washington State University.

Section 6.10.2(3) of the Technical Specifications stipulates that a written report be submitted to theU.S. NRC within 30 days of a permanent change in Level I management.

Washington StateUniversity named a new, permanent, Vice President for Research, Dr. Chris Keane, on July 1,2014.Please contact me if there are any questions.

Respectfully Submitted, Donald Wall, Ph.D.Directorwee__aP.O. Box641300,

Pullman, WA 99164-1 300509-335-8641
  • Fax: 509-335-4433

-www.wsu.edu/nrc P100(o