ML14203A048

From kanterella
Jump to navigation Jump to search
Ltr. from Washington State Univ. to Inform the U.S. NRC of a Permanent Change in the Facility Organization Involving Level 1 Management Personnel
ML14203A048
Person / Time
Site: Washington State University
Issue date: 07/17/2014
From: Wall D
Washington State Univ
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML14203A048 (1)


Text

WASHINGTON STATE Nuclear Radiation Center

. UNIVERSITY July 17, 2014 Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738 The purpose of this letter is to inform the U.S. Nuclear Regulatory Commission (U.S. NRC) of a permanent change in the facility organization involving Level 1 management personnel.

The facility organization for the Washington State University research reactor (Facility Operating License R-76) is defined in Section 6.1 of the Technical Specifications for License R-76. Level 1 management is assigned to the Vice President for Research of Washington State University.

Section 6.10.2(3) of the Technical Specifications stipulates that a written report be submitted to the U.S. NRC within 30 days of a permanent change in Level I management. Washington State University named a new, permanent, Vice President for Research, Dr. Chris Keane, on July 1,2014.

Please contact me if there are any questions.

Respectfully Submitted, wee__a Donald Wall, Ph.D.

Director P.O. Box641300, Pullman, WA 99164-1 300 509-335-8641

  • Fax: 509-335-4433 - www.wsu.edu/nrc P100(o