{{#Wiki_filter: UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX  76011-4511 June 11, 2015   
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX  76011-4511 June 11, 2015   
   
   
Mr. Michael R. Chisum  
Mr. Michael R. Chisum  
Line 80: Line 80:
   
   
    
    
M. Chisum  - 2 -    requesting document displays a currently valid Office of Management and Budget control number.   
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
   ML15162A965  SUNSI Review By:  MJW ADAMS:    Yes      No  Sensitive    Non-Sensitive  Non-Publicly Available    Publicly Available Keyword NRC-002 OFFICE DRS/EB1/RI:  C: NAME MWilliams  TFarnholtz SIGNATURE /RA/ email  /RA/ DATE 6/10/15  6/11/15   
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).    Sincerely, 
/RA/  Thomas R. Farnholtz, Chief
Engineering Branch 1
Division of Reactor Safety    
Docket:  50-382
License:  NPF-38
Enclosure:  Evaluations of Changes, Tests, and Experiments  and Permanent Plant Modifications Inspection 
Request for Information 
Electronic Distribution to Waterford Steam Electric  Station, Unit 3 
Distribution See next page
 
ADAMS ACCESSION NUMBER:  ML15162A965  SUNSI Review By:  MJW ADAMS:    Yes      No  Sensitive    Non-Sensitive  Non-Publicly Available    Publicly Available Keyword NRC-002 OFFICE DRS/EB1/RI:  C: NAME MWilliams  TFarnholtz SIGNATURE /RA/ email  /RA/ DATE 6/10/15  6/11/15 OFFICIAL RECORD COPY  
   Letter to Michael Chisum from Thomas Farnholtz dated June 11, 2015  SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND  
   Letter to Michael Chisum from Thomas Farnholtz dated June 11, 2015  SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND  
PERMANENT PLANT MODIFICATIONS INSPECTION (05000382/2015007) AND REQUEST FOR INFORMATION   
PERMANENT PLANT MODIFICATIONS INSPECTION (05000382/2015007) AND REQUEST FOR INFORMATION   
Line 114: Line 98:
Regional Counsel (Karla.Fuller@nrc.gov)  
Regional Counsel (Karla.Fuller@nrc.gov)  
Congressional Affairs Officer (Jenny.Weil@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)  
Congressional Affairs Officer (Jenny.Weil@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)  
RIV/ETA: OEDO (Michael.Waters@nrc.gov)  
RIV/ETA: OEDO (Michael.Waters@nrc.gov)
 
 
}}
}}

Revision as of 04:02, 11 June 2018

Waterford Steam Electric Station, Unit 3 - Notification of Evaluations of Changes, Tests, and Experiments, and Permanent Plant Modifications Inspection (05000382/2015007) and Request for Information
ML15162A965
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/11/2015
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Chisum M R
Entergy Operations
M. Williams
References
IR 2015007
Download: ML15162A965 (6)


See also: IR 05000382/2015007

Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 June 11, 2015

Mr. Michael R. Chisum

Site Vice President Entergy Operations, Inc. 17265 River Road

Killona, LA 70057-0751

SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS INSPECTION (05000382/2015007) AND REQUEST FOR INFORMATION

Dear Mr. Chisum:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) staff will conduct the baseline inspection of changes, tests, experiments, and permanent plant modifications at your Waterford Steam Electric Station, Unit 3, from August 10-28, 2015. The inspection will consist of three reactor inspectors from the NRC's Region IV office for two

weeks. The inspection will be conducted in accordance with the NRC Inspection Procedure 71111.17T, "Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications."

Experience has shown that this inspection is resource intensive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. Please note that the documents are requested to be provided by August 3, 2015. Upon review of these documents, the inspectors will select additional documentation for review upon arrival. It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Leia Milste of your licensing organization. If

there are any questions about this inspection or the material requested, please contact the lead

inspector, Megan Williams, by telephone at 817-200-1076 or by e-mail at

megan.williams@nrc.gov. This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995. (44 U.S.C. 3501 et seq.) Existing information collection

requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

M. Chisum - 2 - In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely,

/RA/

Thomas R. Farnholtz, Chief Engineering Branch 1

Division of Reactor Safety

Docket: 50-382 License: NPF-38

Enclosure: Evaluations of Changes, Tests, and Experiments

and Permanent Plant Modifications Inspection Request for Information

Electronic Distribution to Waterford Steam Electric Station, Unit 3

- 1 - Enclosure Request for Information Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications Inspection Waterford Steam Electric Station, Unit 3

Inspection Report: 05000382/2015007

Inspection Dates: August 10-28, 2015

Inspection Procedure: IP 71111.17T, "Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications" Lead Inspector: Megan Williams, Reactor Inspector

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic format (preferred) by August 3, 2015, to the attention of Megan Williams. We request that you

categorize the documents in your response with the numbered list below. If only hard copies of

the requested documents are available or if the electronic format is too large, please inform the

lead inspector and provide the documents on the first day of the onsite inspection. Also, the

inspectors will select specific items from the information requested below and request from your staff additional documents needed during the onsite inspection weeks. We ask that the specific items requested be available and ready for review on the first day of inspection. If you have any questions regarding this information request, please contact the lead inspector as soon as

possible.

1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations. 2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) performed since the last triennial modification inspection that did not result in an evaluation. 3. A list with descriptions of all 10 CFR 50.59 evaluations performed the last triennial modification inspection that did not result in an application for license amendment. 4. A list with descriptions of all corrective action documents related to 10 CFR 50.59 screenings and evaluations since the last triennial modification inspection. 5. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations, including qualification dates. 6. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or evaluations, including qualification dates. 7. Procedure(s) for implementing permanent plant modifications.

- 2 - 8. A list with descriptions of all permanent plant modifications since the last triennial modification inspection. 9. A list with descriptions of all corrective action documents related to permanent plant modifications since the last triennial modification inspection. 10. Current revisions of the Technical Specifications and Bases and the Updated Final Safety Analysis Report. Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can

determine the safety and/or risk significance of the screenings, evaluations, and modifications.

Note: For this inspection, permanent plant modifications include permanent plant changes, design changes, set point changes, procedure changes, equivalency evaluations, suitability analyses, calculations, and commercial grade dedications.

Inspector Contact Information:

Megan Williams Ron Kopriva Wayne Sifre

Reactor Inspector Reactor Inspector Reactor Inspector

817-200-1076 817-200-1104 817-200-1193

megan.williams@nrc.gov ron.kopriva@nrc.gov wayne.sifre@nrc.gov

Mailing Address:

U.S. NRC, Region IV Attn: Megan Williams 1600 East Lamar Blvd.

Arlington, TX 76011-4125

ML15162A965 SUNSI Review By: MJW ADAMS: Yes No Sensitive Non-Sensitive Non-Publicly Available Publicly Available Keyword NRC-002 OFFICE DRS/EB1/RI: C: NAME MWilliams TFarnholtz SIGNATURE /RA/ email /RA/ DATE 6/10/15 6/11/15

Letter to Michael Chisum from Thomas Farnholtz dated June 11, 2015 SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND

PERMANENT PLANT MODIFICATIONS INSPECTION (05000382/2015007) AND REQUEST FOR INFORMATION

Distribution Regional Administrator (Marc.Dapas@nrc.gov) Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Frances.Ramirez@nrc.gov)

Resident Inspector (Chris.Speer@nrc.gov)

WAT Administrative Assistant (Linda.Dufrene@nrc.gov)

Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov) Senior Project Engineer, DRP/D (Bob.Hagar@nrc.gov) Project Engineer, DRP/D (Brian.Parks@nrc.gov)

Project Engineer, DRP/D (Jan.Tice@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Michael.Orenak@nrc.gov) Team Leader, DRS/TSS (Don.Allen@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Michael.Waters@nrc.gov)