05000346/FIN-2008004-01: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
{{finding
{{finding
| title = Inoperability Of Component Cooling Water Train 1 Ventilation
| title = Inoperability of Component Cooling Water Train 1 Ventilation
 
| docket = 05000346
| docket = 05000346
| inspection report = IR 05000346/2008004
| inspection report = IR 05000346/2008004
Line 13: Line 12:
| identified by = NRC
| identified by = NRC
| Inspection procedure = IP 71111.15
| Inspection procedure = IP 71111.15
| Inspector = M Wilk, J Jacobson, T Bilik, G Wright, J Rutkowski, A Wilson, T Go, C Acosta, Acevedo J, Cameronc Zoia, D Mcneil, R Winter, J Jacobson, M Garza, J Rutkowski, A Wilson, T Go, J Cameron, R Murray
| Inspector = M Wilk, J Jacobson, T Bilik, G Wright, J Rutkowski, A Wilson, T Go, C Acosta, Acevedoj Cameronc, Zoiad Mcneil, R Winter, J Jacobson, M Garza, J Rutkowski, A Wilson, T Go, J Cameron, R Murray
| CCA = N/A for ROP
| CCA = N/A for ROP
| INPO aspect =  
| INPO aspect =  

Latest revision as of 22:05, 29 May 2018

01
Site: Davis Besse Cleveland Electric icon.png
Report IR 05000346/2008004 Section 1R15
Date counted Sep 30, 2008 (2008Q3)
Type: URI:
cornerstone Mitigating Systems
Identified by: NRC identified
Inspection Procedure: IP 71111.15
Inspectors (proximate) M Wilk
J Jacobson
T Bilik
G Wright
J Rutkowski
A Wilson
T Go
C Acosta
Acevedoj Cameronc
Zoiad Mcneil
R Winter
J Jacobson
M Garza
J Rutkowski
A Wilson
T Go
J Cameron
R Murray
INPO aspect
'