05000440/FIN-2000010-01a: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{finding
{{finding
| title = Failure to Update Procedure Oni-054 in a Timely Manner to Include Information Used to Alert Operators About Potential Fire Impacts Upon RHR Valves
| title = Failure to Update Procedure ONI-054 in a Timely Manner to Include Information Used to Alert Operators About Potential Fire Impacts Upon RHR Valves
| docket = 05000440
| docket = 05000440
| inspection report = IR 05000440/2000010-
| inspection report = IR 05000440/2000010-

Latest revision as of 22:03, 29 May 2018

1a
Site: Perry FirstEnergy icon.png
Report IR 05000440/2000010- Section 1R05
Date counted Dec 31, 2000 (2000Q4)
Type: NCV:
cornerstone Initiating Events, Mitigating Systems
Identified by: NRC identified
Inspection Procedure: IP 71111.05
Inspectors (proximate) R Langstaff
D Chyu
R Gardner
F Wyant
T Wheeler
Z Falevitz
INPO aspect
'