ML20196D648: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:_-             -...     -,         - ~ . - . - - - _ . . _ . . - - . - - . . - -                               . . . - - . . _ . .
{{#Wiki_filter:_-
                            ,
-...
                  ,7.
-,
                                                                                      November 20,1998
- ~ . - . - - - _ . . _ . . - - . - - . . - -
                          Carolina Power and Light Company -
. . . - - . . _ . .
                        - ATTN: Mr. J. S. Keenan -
,
                                              Vice President
,7.
                          Brunswick Steam Electric Plant
November 20,1998
                                                                                                                                                                -l
Carolina Power and Light Company -
                          0. O. Box 10429
- ATTN: Mr. J. S. Keenan -
                                                                                                                                                                  i
Vice President
                          Southport, NC 28461                                                                                                                     l
Brunswick Steam Electric Plant
-l
0. O. Box 10429
i
Southport, NC 28461
'
.
.
    '
.
                                    .
SUBJECT:
                                                                                                                                                                  ;
SAFETY SYSTEM ENGINEERING INSPECTION (NRC INSPECTION REPORT
                          SUBJECT:           SAFETY SYSTEM ENGINEERING INSPECTION (NRC INSPECTION REPORT                                                         J
J
                                              NO. 50-325,324/99-01)
NO. 50-325,324/99-01)
                          Dear Mr. Keenan:                                                                                                                       I
Dear Mr. Keenan:
                                                                                                                                                                  ;
I
                          The purpose of this letter is to announce a safety system engineering inspection (SSEI) at your
;
;                         Brunswick facilny which is scheduled for January 11-15 and 25-29,1999. The designated team
The purpose of this letter is to announce a safety system engineering inspection (SSEI) at your
                          leader, Joseph J. Lenahan, will make arrangements with your staff to discuss the inspection
;
                          plan in more detail.
Brunswick facilny which is scheduled for January 11-15 and 25-29,1999. The designated team
leader, Joseph J. Lenahan, will make arrangements with your staff to discuss the inspection
plan in more detail.
l
The inspection objective will be to evaluate the capability of the high pressure coolant injection
' (HPCI) and reactor core isolation cooling (RCIC) systems to perform safety functions required
!.
by their design bases. The inspection will be conducted using Inspection Procedure 93809,
" Safety System Engineering Inspection (SSEI)", and willinvolve a team of five inspectors.
The team will require the information outlined in the enclosure for the HPCI and RCIC systems
!-
to review in preparation for the inspection. This information will be needed by December 16,
l
l
                          The inspection objective will be to evaluate the capability of the high pressure coolant injection
1998 in order to support the inspection effort.
                        ' (HPCI) and reactor core isolation cooling (RCIC) systems to perform safety functions required
!.                        by their design bases. The inspection will be conducted using Inspection Procedure 93809,
                          " Safety System Engineering Inspection (SSEI)", and willinvolve a team of five inspectors.
                          The team will require the information outlined in the enclosure for the HPCI and RCIC systems
!-                        to review in preparation for the inspection. This information will be needed by December 16,
l                          1998 in order to support the inspection effort.
!
!
l'                         Thank you for your cooperation in this matter. If you have any questions regarding this                                               I
l'
                          inspection, please contact Mr. J. Lenahan at (404) 562-4625 or Mr. K. Landis at (404) 562-4605.                                       ;
Thank you for your cooperation in this matter. If you have any questions regarding this
                                                                                                                                                                  '
I
inspection, please contact Mr. J. Lenahan at (404) 562-4625 or Mr. K. Landis at (404) 562-4605.
;
'
r
r
l-
l-
                                                                                                  Sincerely,
Sincerely,
;                                                                                                 Original signed by
;
l                                                                                                 Kerry D. Landis                                                 '
Original signed by
l
Kerry D. Landis
'
p
p
                                                                                                  Kerr) D. Landis, Chief -                                       -
Kerr) D. Landis, Chief -
                                                                                                  Engineering Branch
-
                                                                                                  Division of Reactor Safety                                     -
Engineering Branch
                          Docket Nos. 50-325, 50-324
Division of Reactor Safety
l                       - License Nos. DPR-71, DPR-62
-
i:                         Enclosure:         Information Requested for High Pressure Coolant injection (HPCI) and
Docket Nos. 50-325, 50-324
l
- License Nos. DPR-71, DPR-62
i:
Enclosure:
Information Requested for High Pressure Coolant injection (HPCI) and
[
[
Reactor Core isolation Cooling (RCIC) Systems
*
*
                                              Reactor Core isolation Cooling (RCIC) Systems
G
                                                                                                                                                                  G
;
;                       .cc w/ encl: (See page 2)
.cc w/ encl: (See page 2)
                                                                                                                                                                  '
'
(                             ..
(
      -
..
                      9812O20300 981120                                   f                                                                                    >
f
  '
-
                      PDR            ADOCK 05000324                       t
9812O20300 981120
                      G                           PDR                     ;
>
                                                                                                                                                            fdd/ ;
PDR
        . . . . .       .           .         -   _                         _ .                 _        _            _ - _-       __            _ _ _ _
ADOCK 05000324
t
'
G
PDR
;
fdd/ ;
. . . . .
.
.
-
_
_ .
_
-
_-


        . . . _     _ _ _ _ . . _ .   .   _ . _ _ _ _ _ .... _ _ _ _ _ .. _ _ _ .                                         .- _ . - . . . .
. . . _
                    .
_ _ _ _ . . _ .
                p
.
                    CP&L                                                           2
_ . _ _ _ _ _ .... _ _ _ _ _ .. _ _ _ .
                  - cc w/ encl:
.- _ . - . . . .
                    Director                                                         Karen E. Long
.
                    Site Operations                                                   Assistant Attorney General
p
                    Brunswick Steam Electric Plant                                   State of North Carolina
CP&L
                    Carolina Power & Light Company                                   P. O. Box 629
2
                    P. O. Box 10429                                                   Raleigh, NC 27602
- cc w/ encl:
                    Southport, NC 28461
Director
                                                                                      Robert P. Gruber                                       j
Karen E. Long
                    J. J. Lyash, Plant Manager.                                       Executive Director                                     l
Site Operations
                                                                                                                                            '
Assistant Attorney General
                    Brunswick Steam Electric Plant                                   Public Staff NCUC
Brunswick Steam Electric Plant
                    Carolina Power & Light Company                                   P. O. Box 29520
State of North Carolina
                    P. O. Box 10429                                                   Raleigh, NC 27626-0520
Carolina Power & Light Company
                    Southport, NC 28461
P. O. Box 629
                                                                                      Public Service Commission
P. O. Box 10429
                    D. B. Alexander, Manager                                         State of South Carolina
Raleigh, NC 27602
                    Performance Evaluation and                                       P. O. Box 11649                                       I
Southport, NC 28461
                      Regulatory Affairs CPB 9                                       Columbia, SC 29211                                     i
Robert P. Gruber
                    Carolina Power & Light Company                                                                                           i
j
                    P. O. Box 1551 '                                                 Jerry W. Jones, Chairman
J. J. Lyash, Plant Manager.
                    Raleigh, NC 27602-1551_                                           Brunswick County Board of                             1
Executive Director
                                                                                      Commissioners                                         l
l
                    K. R. Jury, Manager                                               P. O. Box. 249
Brunswick Steam Electric Plant
                    Regulatory Affairs                                               Bolivia, NC 28422
Public Staff NCUC
                                                                                                                                            l
'
Carolina Power & Light Company
P. O. Box 29520
P. O. Box 10429
Raleigh, NC 27626-0520
Southport, NC 28461
Public Service Commission
D. B. Alexander, Manager
State of South Carolina
Performance Evaluation and
P. O. Box 11649
Regulatory Affairs CPB 9
Columbia, SC 29211
i
Carolina Power & Light Company
i
P. O. Box 1551 '
Jerry W. Jones, Chairman
Raleigh, NC 27602-1551_
Brunswick County Board of
1
Commissioners
K. R. Jury, Manager
P. O. Box. 249
Regulatory Affairs
Bolivia, NC 28422
Carolina Power & Light Company
'
'
                    Carolina Power & Light Company
Brunswick Steam Electric Plant
                    Brunswick Steam Electric Plant                                   Dan E. Summers
Dan E. Summers
                    P. O. Box 10429               _
P. O. Box 10429
                                                                                      Emergency Management Coordinator
Emergency Management Coordinator
                    Southport, NC 28461-0429                                         New Hanover County Department of
_
l                                   _
Southport, NC 28461-0429
                                                                                      Emergency Management
New Hanover County Department of
l                   William D. Johnson                                               P. O. Box 1525
l
!-               ; Vice President & Senior Counsel -                                 Wilmington, NC 28402
_
                    Carolina Power and Light Company
Emergency Management
                    P. O. Box 1551                                                   William H. Crowe, Mayor
l
                    Raleigh, NC 27602                                                 City of Southport
William D. Johnson
                                                                                      201 E. Moore Street
P. O. Box 1525
                    Mel Fry, Director                                                 Southport, NC 28461
!-
                    Division of Radiation Protection
; Vice President & Senior Counsel -
                    N. C. Department of Environment                                   (Distribution w/enci - See next page)
Wilmington, NC 28402
                    - and Natural Resources
Carolina Power and Light Company
l           .
P. O. Box 1551
                    3825 Barrett Drive
William H. Crowe, Mayor
!                   Raleigh, NC 27609-7721
Raleigh, NC 27602
                                                                                                                                            :
City of Southport
                                                                                                                                            i
201 E. Moore Street
  'k ::L
Mel Fry, Director
Southport, NC 28461
Division of Radiation Protection
N. C. Department of Environment
(Distribution w/enci - See next page)
- and Natural Resources
l
3825 Barrett Drive
.
!
Raleigh, NC 27609-7721
i
'k ::L


      - . .                                                   -                     . . -             -.. .       - . _ . _ _ .
- . .
              .
-
            +
. . -
              CP&L                                                   3
-.. .
              Distribution w/ encl:
- . _ . _ _ .
              L. Plisco, Ril
.
              M. Ernstes, Ril
+
              D. Trimble, NRR
CP&L
              J. Coley, Ril
3
              R. Baldwin, Rll
Distribution w/ encl:
              J.Lenahan,Ril
L. Plisco, Ril
              E. Testa, Rll
M. Ernstes, Ril
              D. Thompson, Rll
D. Trimble, NRR
              D. Jones,Rll
J. Coley, Ril
              G. West, Rll
R. Baldwin, Rll
              PUBLIC
J.Lenahan,Ril
              NRC Resident inspector
E. Testa, Rll
              U. S. Nuclear Regulatory Commission
D. Thompson, Rll
              8470 River Road, SE
D. Jones,Rll
              Southport, NC 28461
G. West, Rll
                                            T
PUBLIC
    OFFICE     Rit: PRS       Rit:DRS   g ( F
NRC Resident inspector
                                                  Ril:oRP   _
U. S. Nuclear Regulatory Commission
    SIGNATURE       %b
8470 River Road, SE
                      ~
Southport, NC 28461
                                      M   "
T
                                                    M/
OFFICE
    NAME       Jien'ahan:pd   Klandit .
Rit: PRS
                                                  BBonser
Rit:DRS (
    DATE           _11/!# /98   f@ 198               _11/4 0/98       11/ /98             11/ 19 8   11/ 19 8   til 19 8
F
    COPY?       IYiS)     NO DYES / NO         /VnS       NO     YES   NO           YES     NO YES     NO YES         NO
Ril:oRP
              OFAetIL RECORD CDPI             DOCUii4ENT NAME: S:\DRS\EB\BRUSSEll.WPD
g
                                                                                                                .
_
SIGNATURE
%b
M
M/
NAME
Jien'ahan:pd
Klandit
.
BBonser
~
"
DATE
_11/!# /98
f@ 198
_11/4 0/98
11/ /98
11/ 19 8
11/ 19 8
til 19 8
COPY?
IYiS)
NO
DYES / NO
/VnS
NO
YES
NO
YES
NO
YES
NO
YES
NO
OFAetIL RECORD CDPI
DOCUii4ENT NAME: S:\\DRS\\EB\\BRUSSEll.WPD
.
j'_
j'_
                                                                                . ~ . ,                                     -
. ~ . ,
-


      -.               .-                 .               .   -     .       -                 =-     . - .
-.
                                                                                                            ,
.-
          *
.
.
-
.
-
=-
.
-
.
,
*
y
y
                                        INFORMATION REQUESTED FOR                                           !
INFORMATION REQUESTED FOR
<                                                                                                           I
<
                                  THE HIGH COOLANT INJECTION (HPCI) AND
THE HIGH COOLANT INJECTION (HPCI) AND
                -
-
                          REACTOR CORE ISOLATION COOLING (RCIC) SYSTEMS
REACTOR CORE ISOLATION COOLING (RCIC) SYSTEMS
          .
Site specific administrative procedures related to standard operation, abnormal
              Site specific administrative procedures related to standard operation, abnormal
.
              operation, and emergency operation of the HPCI and RCIC systems.                             i
operation, and emergency operation of the HPCI and RCIC systems.
        -
i
              Design criteria for the HPCI and RCIC Systems in addition to support systems and
Design criteria for the HPCI and RCIC Systems in addition to support systems and
              interfaces including but not limited to the Main Steam System, Conden sate /feedwater
-
              System, the Class 1E AC Power System and the Class 1E DC Power system.                         -
interfaces including but not limited to the Main Steam System, Conden sate /feedwater
        .
System, the Class 1E AC Power System and the Class 1E DC Power system.
              HPCI and RCIC Technical Specification requirements and associated surveillance
-
              test / calibration procedures.
HPCI and RCIC Technical Specification requirements and associated surveillance
        .
.
              HPCI and RCIC systems piping and instrumentation drawings; one line diagrams;
test / calibration procedures.
              electrical schematics; wiring and logic diagrams.
HPCI and RCIC systems piping and instrumentation drawings; one line diagrams;
        .
.
              A list of engineering calculations (Electrical, Instrumentation and Controls and
electrical schematics; wiring and logic diagrams.
              Mechanical / Nuclear) applicable to the HPCI and RCIC systems.
A list of engineering calculations (Electrical, Instrumentation and Controls and
        .
.
              A list of plant modifications to the HPCI and RCIC systems implemented since plant
Mechanical / Nuclear) applicable to the HPCI and RCIC systems.
              licensing.
A list of plant modifications to the HPCI and RCIC systems implemented since plant
                                                                                                            )
.
                                                                                                            i
licensing.
                                                                                                            i
)
        .
i
              Relevant regulatory information regarding information notices, generic letters and special     j
i
              studies that CP&L has performed for the HPCI and RCIC systems,
Relevant regulatory information regarding information notices, generic letters and special
                                                                                                            j
.
        -
j
              HPCI and RCIC systems related LERs for the past 24 months.
studies that CP&L has performed for the HPCI and RCIC systems,
        .
j
              A list of Adverse Condition Reports and Condition Reports initiated since 1990 affecting
HPCI and RCIC systems related LERs for the past 24 months.
              the HPCI and RCIC systems.
-
      .
A list of Adverse Condition Reports and Condition Reports initiated since 1990 affecting
              List of current open temporary modifications and operator work arounds involving
.
              operation of the HPCI and RCIC systems.
the HPCI and RCIC systems.
      .
List of current open temporary modifications and operator work arounds involving
              System Health Report and Performance Trends for the HPCI and RCIC systems.
.
      .
operation of the HPCI and RCIC systems.
            ' Maintenance Rule Performance criteria for the HPCI system.
System Health Report and Performance Trends for the HPCI and RCIC systems.
      .
.
              Documentation of corrective and preventive maintenance activities, including the
' Maintenance Rule Performance criteria for the HPCI system.
              maintenance rule event log, performed on the HPCI and RCIC systems in the past 12
.
              months.
Documentation of corrective and preventive maintenance activities, including the
      .
.
              Copies of applicable sections of the UFSAR for the HPCI and RCIC systems.
maintenance rule event log, performed on the HPCI and RCIC systems in the past 12
      .
months.
              An index of drawings for the HPCI and RCIC systems.
Copies of applicable sections of the UFSAR for the HPCI and RCIC systems.
      .
.
              Copies of self-assessment pertamed on the HPCI and RCIC systems in the last 24
An index of drawings for the HPCI and RCIC systems.
              months.
.
              The system description and operator training module for the HPCI and RCIC systems.
Copies of self-assessment pertamed on the HPCI and RCIC systems in the last 24
    -
.
      .
months.
  b                                                                                           Enclosure
The system description and operator training module for the HPCI and RCIC systems.
                                                                                                              l
-
.
b
Enclosure
l
}}
}}

Latest revision as of 07:10, 24 May 2025

Informs That Ssei Repts 50-324/99-01 & 50-325/99-01 at Brunswick Facility Have Been Scheduled for 990111-15 & 25-29.Insp Objective Will Be to Evaluate Capability of Hpci& RCIC Sys to Perform Safety Functions Required
ML20196D648
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 11/20/1998
From: Landis K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Keenan J
CAROLINA POWER & LIGHT CO.
References
50-324-99-01, 50-324-99-1, 50-325-99-01, 50-325-99-1, NUDOCS 9812020300
Download: ML20196D648 (4)


See also: IR 05000324/1999001

Text

_-

-...

-,

- ~ . - . - - - _ . . _ . . - - . - - . . - -

. . . - - . . _ . .

,

,7.

November 20,1998

Carolina Power and Light Company -

- ATTN: Mr. J. S. Keenan -

Vice President

Brunswick Steam Electric Plant

-l

0. O. Box 10429

i

Southport, NC 28461

'

.

.

SUBJECT:

SAFETY SYSTEM ENGINEERING INSPECTION (NRC INSPECTION REPORT

J

NO. 50-325,324/99-01)

Dear Mr. Keenan:

I

The purpose of this letter is to announce a safety system engineering inspection (SSEI) at your

Brunswick facilny which is scheduled for January 11-15 and 25-29,1999. The designated team

leader, Joseph J. Lenahan, will make arrangements with your staff to discuss the inspection

plan in more detail.

l

The inspection objective will be to evaluate the capability of the high pressure coolant injection

' (HPCI) and reactor core isolation cooling (RCIC) systems to perform safety functions required

!.

by their design bases. The inspection will be conducted using Inspection Procedure 93809,

" Safety System Engineering Inspection (SSEI)", and willinvolve a team of five inspectors.

The team will require the information outlined in the enclosure for the HPCI and RCIC systems

!-

to review in preparation for the inspection. This information will be needed by December 16,

l

1998 in order to support the inspection effort.

!

l'

Thank you for your cooperation in this matter. If you have any questions regarding this

I

inspection, please contact Mr. J. Lenahan at (404) 562-4625 or Mr. K. Landis at (404) 562-4605.

'

r

l-

Sincerely,

Original signed by

l

Kerry D. Landis

'

p

Kerr) D. Landis, Chief -

-

Engineering Branch

Division of Reactor Safety

-

Docket Nos. 50-325, 50-324

l

- License Nos. DPR-71, DPR-62

i:

Enclosure:

Information Requested for High Pressure Coolant injection (HPCI) and

[

Reactor Core isolation Cooling (RCIC) Systems

G

.cc w/ encl: (See page 2)

'

(

..

f

-

9812O20300 981120

>

PDR

ADOCK 05000324

t

'

G

PDR

fdd/ ;

. . . . .

.

.

-

_

_ .

_

-

_-

. . . _

_ _ _ _ . . _ .

.

_ . _ _ _ _ _ .... _ _ _ _ _ .. _ _ _ .

.- _ . - . . . .

.

p

CP&L

2

- cc w/ encl:

Director

Karen E. Long

Site Operations

Assistant Attorney General

Brunswick Steam Electric Plant

State of North Carolina

Carolina Power & Light Company

P. O. Box 629

P. O. Box 10429

Raleigh, NC 27602

Southport, NC 28461

Robert P. Gruber

j

J. J. Lyash, Plant Manager.

Executive Director

l

Brunswick Steam Electric Plant

Public Staff NCUC

'

Carolina Power & Light Company

P. O. Box 29520

P. O. Box 10429

Raleigh, NC 27626-0520

Southport, NC 28461

Public Service Commission

D. B. Alexander, Manager

State of South Carolina

Performance Evaluation and

P. O. Box 11649

Regulatory Affairs CPB 9

Columbia, SC 29211

i

Carolina Power & Light Company

i

P. O. Box 1551 '

Jerry W. Jones, Chairman

Raleigh, NC 27602-1551_

Brunswick County Board of

1

Commissioners

K. R. Jury, Manager

P. O. Box. 249

Regulatory Affairs

Bolivia, NC 28422

Carolina Power & Light Company

'

Brunswick Steam Electric Plant

Dan E. Summers

P. O. Box 10429

Emergency Management Coordinator

_

Southport, NC 28461-0429

New Hanover County Department of

l

_

Emergency Management

l

William D. Johnson

P. O. Box 1525

!-

Vice President & Senior Counsel -

Wilmington, NC 28402

Carolina Power and Light Company

P. O. Box 1551

William H. Crowe, Mayor

Raleigh, NC 27602

City of Southport

201 E. Moore Street

Mel Fry, Director

Southport, NC 28461

Division of Radiation Protection

N. C. Department of Environment

(Distribution w/enci - See next page)

- and Natural Resources

l

3825 Barrett Drive

.

!

Raleigh, NC 27609-7721

i

'k ::L

- . .

-

. . -

-.. .

- . _ . _ _ .

.

+

CP&L

3

Distribution w/ encl:

L. Plisco, Ril

M. Ernstes, Ril

D. Trimble, NRR

J. Coley, Ril

R. Baldwin, Rll

J.Lenahan,Ril

E. Testa, Rll

D. Thompson, Rll

D. Jones,Rll

G. West, Rll

PUBLIC

NRC Resident inspector

U. S. Nuclear Regulatory Commission

8470 River Road, SE

Southport, NC 28461

T

OFFICE

Rit: PRS

Rit:DRS (

F

Ril:oRP

g

_

SIGNATURE

%b

M

M/

NAME

Jien'ahan:pd

Klandit

.

BBonser

~

"

DATE

_11/!# /98

f@ 198

_11/4 0/98

11/ /98

11/ 19 8

11/ 19 8

til 19 8

COPY?

IYiS)

NO

DYES / NO

/VnS

NO

YES

NO

YES

NO

YES

NO

YES

NO

OFAetIL RECORD CDPI

DOCUii4ENT NAME: S:\\DRS\\EB\\BRUSSEll.WPD

.

j'_

. ~ . ,

-

-.

.-

.

.

-

.

-

=-

.

-

.

,

y

INFORMATION REQUESTED FOR

<

THE HIGH COOLANT INJECTION (HPCI) AND

-

REACTOR CORE ISOLATION COOLING (RCIC) SYSTEMS

Site specific administrative procedures related to standard operation, abnormal

.

operation, and emergency operation of the HPCI and RCIC systems.

i

Design criteria for the HPCI and RCIC Systems in addition to support systems and

-

interfaces including but not limited to the Main Steam System, Conden sate /feedwater

System, the Class 1E AC Power System and the Class 1E DC Power system.

-

HPCI and RCIC Technical Specification requirements and associated surveillance

.

test / calibration procedures.

HPCI and RCIC systems piping and instrumentation drawings; one line diagrams;

.

electrical schematics; wiring and logic diagrams.

A list of engineering calculations (Electrical, Instrumentation and Controls and

.

Mechanical / Nuclear) applicable to the HPCI and RCIC systems.

A list of plant modifications to the HPCI and RCIC systems implemented since plant

.

licensing.

)

i

i

Relevant regulatory information regarding information notices, generic letters and special

.

j

studies that CP&L has performed for the HPCI and RCIC systems,

j

HPCI and RCIC systems related LERs for the past 24 months.

-

A list of Adverse Condition Reports and Condition Reports initiated since 1990 affecting

.

the HPCI and RCIC systems.

List of current open temporary modifications and operator work arounds involving

.

operation of the HPCI and RCIC systems.

System Health Report and Performance Trends for the HPCI and RCIC systems.

.

' Maintenance Rule Performance criteria for the HPCI system.

.

Documentation of corrective and preventive maintenance activities, including the

.

maintenance rule event log, performed on the HPCI and RCIC systems in the past 12

months.

Copies of applicable sections of the UFSAR for the HPCI and RCIC systems.

.

An index of drawings for the HPCI and RCIC systems.

.

Copies of self-assessment pertamed on the HPCI and RCIC systems in the last 24

.

months.

The system description and operator training module for the HPCI and RCIC systems.

-

.

b

Enclosure

l