ML20197A878: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 21: Line 21:
{{#Wiki_filter:-
{{#Wiki_filter:-
.,
.,
                                          MAY 0 5 F
MAY 0 5 F
    In Reply Refer To:
In Reply Refer To:
    Docket: 50-285/86-02
Docket: 50-285/86-02
    Omaha Public Power District
Omaha Public Power District
    ATTN: R. L. Andrews, Division Manager-
ATTN:
            Nuclear Production
R. L. Andrews, Division Manager-
    1623 Harney Street
Nuclear Production
    Omaha, Nebraska 68102
1623 Harney Street
    Gentlemen:
Omaha, Nebraska 68102
    This refers to your letter of March 20, 1986, in response to our letter and the
Gentlemen:
    attached Notice of Violation dated February 18, 1986. As a result of our review,
This refers to your letter of March 20, 1986, in response to our letter and the
    we find your response generally lacks in scope and depth and that additional
attached Notice of Violation dated February 18, 1986. As a result of our review,
    information, as discussed with your Mr. J. Fisicaro during a meeting on March 31,
we find your response generally lacks in scope and depth and that additional
    1986, is required. You are requested to provide the additional information
information, as discussed with your Mr. J. Fisicaro during a meeting on March 31,
    requested below:
1986, is required. You are requested to provide the additional information
    'a.   Regarding item a, describe the actions you have taken to ensure other
requested below:
          inspections and/or surveillances required by other license comitments are
'a.
          not dependent on an individual's memory,
Regarding item a, describe the actions you have taken to ensure other
    b.   Regarding item b, based on the results of the NRC inspectior., it was
inspections and/or surveillances required by other license comitments are
          concluded that the inspection was not appropriate and licensee management
not dependent on an individual's memory,
          agreed with this conclusion. In light of this conclusion, it is requested
b.
          that you review other inspections performed by the licensee's inspector to
Regarding item b, based on the results of the NRC inspectior., it was
          determine whether or not those inspections were perfonned adequately and
concluded that the inspection was not appropriate and licensee management
          provide the results of the review.     Also, provide your basis for determining
agreed with this conclusion.
          this to be an isolated instance.
In light of this conclusion, it is requested
    c.   In response to item c, describe what actions you have taken to detennine
that you review other inspections performed by the licensee's inspector to
          whether or not QA is in a surveillance (performance) mode for other
determine whether or not those inspections were perfonned adequately and
          activities and what actions you will take to change the QA departraent to an
provide the results of the review.
          independent audit mode.
Also, provide your basis for determining
    Please provide the supplemental infonnation within 30 days of the date of this
this to be an isolated instance.
    letter.
c.
                                              Sincerely,
In response to item c, describe what actions you have taken to detennine
  fjkM g 4 e60505 0500    5
whether or not QA is in a surveillance (performance) mode for other
                              -
activities and what actions you will take to change the QA departraent to an
                                                Original signed ay
independent audit mode.
  G                                              .l. E. GagHardo
Please provide the supplemental infonnation within 30 days of the date of this
                                              J. E. Gagliardo, Chief
letter.
                                              Reactor Projects Branch
Sincerely,
    cc:   (see next page)
fjkM g 4 e60505
    RIV:
-
    PHa        tw
Original signed ay
                      C:RP
0500
                      DRH
5
                                    C:RP
.l. E. GagHardo
                                    JEGag
G
                                            /
J. E. Gagliardo, Chief
                                              rdo
Reactor Projects Branch
                                                                                          [
cc:
    {jf\f86           (Q/86         4/ S
(see next page)
RIV:
C:RP
C:RP
/
[
PHa
tw
DRH
JEGag
rdo
{jf\\f86
(Q/86
4/ S


        '
'
  .
.
          Omaha Public Power District             -2-
Omaha Public Power District
          cc:
-2-
          W. G. Gates, Manager
cc:
          Fort Calhoun Station
W. G. Gates, Manager
          P.O. Box 399
Fort Calhoun Station
          Fort Calhoun, Nebraska 68023
P.O. Box 399
          Harry H. Voigt, Esq.
Fort Calhoun, Nebraska 68023
          LeBoeuf, Lamb, Leiby & MacRae
Harry H. Voigt, Esq.
          1333 New Hampshire Avenue, NW
LeBoeuf, Lamb, Leiby & MacRae
          Washington, DC 20036
1333 New Hampshire Avenue, NW
          Kansas Radiation Control Program Director
Washington, DC 20036
          Nebraska Radiation Control Program Director
Kansas Radiation Control Program Director
          bcc to DMB (IE35)
Nebraska Radiation Control Program Director
          bec distrib. by RIV:
bcc to DMB (IE35)
.       RPB                       DRS&P
bec distrib. by RIV:
          R&SPB                     R. D. Martin, RA
.
          RIV File                 MIS System
RPB
          Resident Inspector       RSTS Operator
DRS&P
          SectionChief(RPB/B)       RSB
R&SPB
R. D. Martin, RA
RIV File
MIS System
Resident Inspector
RSTS Operator
SectionChief(RPB/B)
RSB
i
i
    __       ,
__
,
}}
}}

Latest revision as of 06:25, 24 May 2025

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-285/86-02.Requests Addl Info Re Actions Taken to Ensure Adequate Performance of Required Insp & QA Dept Changes to Independent Audit
ML20197A878
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 05/05/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20197A883 List:
References
NUDOCS 8605120404
Download: ML20197A878 (2)


See also: IR 05000285/1986002

Text

-

.,

MAY 0 5 F

In Reply Refer To:

Docket: 50-285/86-02

Omaha Public Power District

ATTN:

R. L. Andrews, Division Manager-

Nuclear Production

1623 Harney Street

Omaha, Nebraska 68102

Gentlemen:

This refers to your letter of March 20, 1986, in response to our letter and the

attached Notice of Violation dated February 18, 1986. As a result of our review,

we find your response generally lacks in scope and depth and that additional

information, as discussed with your Mr. J. Fisicaro during a meeting on March 31,

1986, is required. You are requested to provide the additional information

requested below:

'a.

Regarding item a, describe the actions you have taken to ensure other

inspections and/or surveillances required by other license comitments are

not dependent on an individual's memory,

b.

Regarding item b, based on the results of the NRC inspectior., it was

concluded that the inspection was not appropriate and licensee management

agreed with this conclusion.

In light of this conclusion, it is requested

that you review other inspections performed by the licensee's inspector to

determine whether or not those inspections were perfonned adequately and

provide the results of the review.

Also, provide your basis for determining

this to be an isolated instance.

c.

In response to item c, describe what actions you have taken to detennine

whether or not QA is in a surveillance (performance) mode for other

activities and what actions you will take to change the QA departraent to an

independent audit mode.

Please provide the supplemental infonnation within 30 days of the date of this

letter.

Sincerely,

fjkM g 4 e60505

-

Original signed ay

0500

5

.l. E. GagHardo

G

J. E. Gagliardo, Chief

Reactor Projects Branch

cc:

(see next page)

RIV:

C:RP

C:RP

/

[

PHa

tw

DRH

JEGag

rdo

{jf\\f86

(Q/86

4/ S

'

.

Omaha Public Power District

-2-

cc:

W. G. Gates, Manager

Fort Calhoun Station

P.O. Box 399

Fort Calhoun, Nebraska 68023

Harry H. Voigt, Esq.

LeBoeuf, Lamb, Leiby & MacRae

1333 New Hampshire Avenue, NW

Washington, DC 20036

Kansas Radiation Control Program Director

Nebraska Radiation Control Program Director

bcc to DMB (IE35)

bec distrib. by RIV:

.

RPB

DRS&P

R&SPB

R. D. Martin, RA

RIV File

MIS System

Resident Inspector

RSTS Operator

SectionChief(RPB/B)

RSB

i

__

,