{{#Wiki_filter:VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND,   VIRGINIA 23261 June 11, 2002 U. S. Nuclear Regulatory Commission                             Serial No. 02-339 Attention: Document Control Desk                                 SPS Lic/JSA RO Washington, D.C. 20555-0001                                     Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Gentlemen:
{{#Wiki_filter:VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 June 11, 2002 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Serial No.
SPS Lic/JSA Docket Nos.
License Nos.
Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of May 2002 is provided in the attachment.
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of May 2002 is provided in the attachment.
Ifyou have any questions or require additional information, please contact us.
If you have any questions or require additional information, please contact us.
Very truly yours,
Very truly yours, Richard H. Blount, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc:
ýe'. , -ý Richard H. Blount, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc:     United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Mr. R. A. Musser NRC Senior Resident Inspector Surry Power Station
United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Mr. R. A. Musser NRC Senior Resident Inspector Surry Power Station 02-339 RO 50-280 50-281 DPR-32 DPR-37
ýe'.
, -ý


VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 02-05 Approved:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 02-05 Approved:
SitdV ice President /bati
SitdV ice President  
/bati


Surry Monthly Operating Report No. 02-05 Page 2 of 15 TABLE OF CONTENTS Section                                                                                                                                                                 Page Operating Data Report - Unit No. 1 ............................................................................................................................           3 Operating Data Report - Unit No. 2 ............................................................................................................................           4 Unit Shutdowns and Power Reductions - Unit No. 1 .............................................................................................                             5 Unit Shutdowns and Power Reductions - Unit No. 2 ..............................................................................................                           6 Average Daily Unit Power Level - Unit No. 1 .....................................................................................................                         7 Average Daily Unit Power Level - Unit No. 2 ..............................................................................................................                 8 Summary of Operating Experience - Unit Nos. 1 and 2 .........................................................................................                             9 Facility Changes That Did Not Require NRC Approval .......................................................................................                               10 Procedure or Method of Operation Changes That Did Not Require NRC Approval ............................................                                                   11 Tests and Experiments That Did Not Require NRC Approval ..............................................................................                                   12 Chemistry Report ..................................................................................................................................................... 13 Fuel Handling - Unit Nos. 1 and 2 ............................................................................................................................           14 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications .......................................................................................................................             15
Surry Monthly Operating Report No. 02-05 Page 2 of 15 TABLE OF CONTENTS Section Page Operating Data Report - Unit No. 1............................................................................................................................
3 Operating Data Report - Unit No. 2............................................................................................................................
4 Unit Shutdowns and Power Reductions - Unit No. 1.............................................................................................
5 Unit Shutdowns and Power Reductions - Unit No. 2..............................................................................................
6 Average Daily Unit Power Level - Unit No. 1.....................................................................................................
7 Average Daily Unit Power Level - Unit No. 2..............................................................................................................
8 Summary of Operating Experience - Unit Nos. 1 and 2.........................................................................................
9 Facility Changes That Did Not Require NRC Approval.......................................................................................
10 Procedure or Method of Operation Changes That Did Not Require NRC Approval............................................
11 Tests and Experiments That Did Not Require NRC Approval..............................................................................
12 Chemistry Report.....................................................................................................................................................
13 Fuel Handling - Unit Nos. 1 and 2............................................................................................................................
14 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications.......................................................................................................................
15


Surry Monthly Operating Report No. 02-05 Page 3 of 15 OPERATING DATA REPORT Docket No.:   50-280 Date:    06/03/02 Completed By:    R. Stief Telephone:    (757) 365-2486
Surry Monthly Operating Report No. 02-05 Page 3 of 15 OPERATING DATA REPORT Docket No.:
: 1. Unit Name: ........................................................... Surry Unit 1
Date:
: 2. Reporting Period: .................................................     May 2002
Completed By:
: 3. Licensed Thermal Power (MW t): ..........................                   2546
Telephone:
: 4. Nameplate Rating (Gross MW e): .........................                     847.5
50-280 06/03/02 R. Stief (757) 365-2486 Unit Name:...........................................................
: 5. Design Electrical Rating (Net MW e): ....................                     788
Reporting Period:.................................................
: 6. Maximum Dependable Capacity (Gross MWe): ...                                 842
Licensed Thermal Power (MW t):..........................
: 7. Maximum Dependable Capacity (Net MWe): .......                               810
Nameplate Rating (Gross MW e):.........................
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
Design Electrical Rating (Net MW e):....................
: 9. Power Level To Which Restricted, If Any (Net MWe):
Maximum Dependable Capacity (Gross MWe):...
: 10. Reasons For Restrictions, if Any:
Maximum Dependable Capacity (Net MWe):.......
This Month      Year-To-Date          Cumulative
Surry Unit 1 May 2002 2546 847.5 788 842 810
: 11. Hours in Reporting Period                                                             744.0            3623.0          258071.0
: 8.
: 12. Hours Reactor Was Critical                                                             744.0            3623.0          189384.6
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 13. Reactor Reserve Shutdown Hours                                                           0.0                0.0            3774.5
: 9.
: 14. Hours Generator On-Line                                                               744.0            3623.0          186725.2
Power Level To Which Restricted, If Any (Net MWe):
: 15. Unit Reserve Shutdown Hours                                                             0.0                0.0            3736.2
: 10.
: 16. Gross Thermal Energy Generated (MWH)                                             1866543.9          9166842.5      444474320.4
Reasons For Restrictions, if Any:
: 17. Gross Electrical Energy Generated (MWH)                                           624082.0          3071573.0      146151676.0
Hours in Reporting Period Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
: 18. Net Electrical Energy Generated (MWH)                                             601939.0           2959749.0       139552610.0
Gross Electrical Energy Generated (MWH)
: 19. Unit Service Factor                                                                100.0%             100.0%               72.4%
Net Electrical Energy Generated (MWH)
: 20. Unit Availability Factor                                                            100.0%             100.0%              73.8%
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)
: 21. Unit Capacity Factor (Using MDC Net)                                                  99.9%            100.9%               69.1%
Unit Capacity Factor (Using DER Net)
: 22. Unit Capacity Factor (Using DER Net)                                                102.7%             103.7%               68.6%
Unit Forced Outage Rate This Month 744.0 744.0 0.0 744.0 0.0 1866543.9 624082.0 601939.0 100.0%
: 23. Unit Forced Outage Rate                                                                0.0%               0.0%             12.5%
100.0%
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
99.9%
102.7%
0.0%
Year-To-Date 3623.0 3623.0 0.0 3623.0 0.0 9166842.5 3071573.0 2959749.0 100.0%
100.0%
100.9%
103.7%
0.0%
Cumulative 258071.0 189384.6 3774.5 186725.2 3736.2 444474320.4 146151676.0 139552610.0 72.4%
73.8%
69.1%
68.6%
12.5%
: 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Type and duration of scheduled shutdowns are no longer provided.
Type and duration of scheduled shutdowns are no longer provided.
[
[
Line 58: Line 91:
==Reference:==
==Reference:==
Letter S/N 00-069, dated February 7, 2000]
Letter S/N 00-069, dated February 7, 2000]
: 25. If Shut Down at End of Report Period, Estimated Date of Start-up:                         Estimated start-up dates are no longer provided. [
: 25.
If Shut Down at End of Report Period, Estimated Date of Start-up:
Estimated start-up dates are no longer provided. [


==Reference:==
==Reference:==
Letter S/N 00-069, dated February 7, 2000]
Letter S/N 00-069, dated February 7, 2000]
: 26. Unit In Test Status (Prior to Commercial Operation):
: 26.
FORECAST                 ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
Unit In Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
: 1.
: 2.
: 3.
: 4.
: 5.
: 6.
7.
: 11.
: 12.
: 13.
: 14.
: 15.
: 16.
: 17.
: 18.
: 19.
: 20.
: 21.
: 22.
23.


Surry Monthly Operating Report No. 02-05 Page 4 of 15 OPERATING DATA REPORT Docket No.:   50-281 Date:    06/03/02 Completed By:    R. Stief Telephone:    (757) 365-2486
Surry Monthly Operating Report No. 02-05 Page 4 of 15 OPERATING DATA REPORT Docket No.:
: 1. Unit Name: ........................................................... Surry Unit 2
Date:
: 2. Reporting Period: .................................................     May 2002
Completed By:
: 3. Licensed Thermal Power (MW t): ..........................                   2546
Telephone:
: 4. Nameplate Rating (Gross MW e): .........................                     847.5
50-281 06/03/02 R. Stief (757) 365-2486
: 5. Design Electrical Rating (Net MW e): ....................                     788
: 1.
: 6. Maximum Dependable Capacity (Gross MWe):...                                   847
: 2.
: 7. Maximum Dependable Capacity (Net MWe): .......                               815
: 3.
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 4.
: 9. Power Level To Which Restricted, If Any (Net MWe):
: 5.
: 10. Reasons For Restrictions, If Any:
: 6.
This Month        Year-To-Date            Cumulative
7.
: 11. Hours in Reporting Period                                                             744.0              3623.0          254952.0
Unit Name:...........................................................
: 12. Hours Reactor Was Critical                                                             744.0              2964.8            186782.8
Reporting Period:.................................................
: 13. Reactor Reserve Shutdown Hours                                                           0.0                  0.0              328.1
Licensed Thermal Power (MW t):..........................
: 14. Hours Generator On-Line                                                               744.0              2926.3            184542.7
Nameplate Rating (Gross MW e):.........................
'15. Unit Reserve Shutdown Hours                                                             0.0                  0.0                0.0
Design Electrical Rating (Net MW e):....................
: 16. Gross Thermal Energy Generated (MWH)                                             1893674.1            7370688.4        440395592.6
Maximum Dependable Capacity (Gross MWe):...
: 17. Gross Electrical Energy Generated (MWH)                                           635108.0            2475926.0        144852933.0
Maximum Dependable Capacity (Net MWe):.......
: 18. Net Electrical Energy Generated (MWH)                                             613004.0           2390258.0         138347308.0
Surry Unit 2 May 2002 2546 847.5 788 847 815
: 19. Unit Service Factor                                                                100.0%                 80.8%               72.4%
: 8.
: 20. Unit Availability Factor                                                            100.0%                 80.8%/              72.4%
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 21. Unit Capacity Factor (Using MDC Net)                                                101.1%                 81.0%              69.1%
: 9.
: 22. Unit Capacity Factor (Using DER Net)                                                104.6%                83.7%               68.9%
Power Level To Which Restricted, If Any (Net MWe):
: 23. Unit Forced Outage Rate                                                                0.0%                  0.0%               10.0%
: 10.
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Reasons For Restrictions, If Any:
Hours in Reporting Period Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate This Month 744.0 744.0 0.0 744.0 0.0 1893674.1 635108.0 613004.0 100.0%
100.0%
101.1%
104.6%
0.0%
Year-To-Date 3623.0 2964.8 0.0 2926.3 0.0 7370688.4 2475926.0 2390258.0 80.8%
80.8%/
81.0%
83.7%
0.0%
Cumulative 254952.0 186782.8 328.1 184542.7 0.0 440395592.6 144852933.0 138347308.0 72.4%
72.4%
69.1%
68.9%
10.0%
: 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Type and duration of scheduled shutdowns are no longer provided.
Type and duration of scheduled shutdowns are no longer provided.
[
[
Line 96: Line 174:
==Reference:==
==Reference:==
Letter S/N 00-069, dated February 7, 2000]
Letter S/N 00-069, dated February 7, 2000]
: 25. If Shut Down at End of Report Period, Estimated Date of Start-up:                         Estimated start-up dates are no longer provided. [
: 25.
If Shut Down at End of Report Period, Estimated Date of Start-up:
Estimated start-up dates are no longer provided. [


==Reference:==
==Reference:==
Letter S/N 00-069, dated February 7, 2000]
Letter S/N 00-069, dated February 7, 2000]
: 26. Unit In Test Status (Prior to Commercial Operation):
: 26.
FORECAST               ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
Unit In Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
: 11.
: 12.
: 13.
: 14.
'15.
: 16.
: 17.
: 18.
: 19.
: 20.
: 21.
: 22.
23.


Surry Monthly Operating Report No. 02-05 Page 5 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)
Surry Monthly Operating Report No. 02-05 Page 5 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)
REPORT MONTH: May 2002 Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 06/03/02 Completed by: R. Stief Telephone: (757) 365-2486 (1)                    (2)      (3)                      (4)        (5)
REPORT MONTH: May 2002 Docket No.:
Method Duration                  of        LER No. System  Component        Cause & Corrective Action Date    Type      Hours      Reason    Shutting                  Code      Code            to Prevent Recurrence Down Rx 05/04/02      S        N/A          B        N/A          N/A        EL        BLO          Ramped power to replace fan pedestal bearings on Isophase Bus Duct Cooling Fan and perform Turbine Valve Freedom of Movement testing (1)                            (2)                                                (3)
Unit Name:
F:   Forced                 REASON:                                          METHOD:
Date:
S:   Scheduled               A - Equipment Failure (Explain)                   1  -  Manual B - Maintenance or Test                           2  -  Manual Scram C - Refueling                                     3  -  Automatic Scram D - Regulatory Restriction                       4  -   Other (Explain)
Completed by:
E - Operator Training & Licensing Examination F - Administrative G - Operational Error (Explain)
Telephone:
H     Other (Explain)
50-280 Surry Unit 1 06/03/02 R. Stief (757) 365-2486 (1)
(4)                                                                              (5)
(2)
Exhibit G - Instructions for Preparation of Data Entry Sheets                 Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161)
F:
Forced REASON:
S:
Scheduled A -
Equipment Failure (Explain)
B -
Maintenance or Test C -
Refueling D -
Regulatory Restriction E -
Operator Training & Licensing Examination F -
Administrative G -
Operational Error (Explain)
H Other (Explain)
(4)
Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)
(3)
METHOD:
1 Manual 2
Manual Scram 3
Automatic Scram 4
Other (Explain)
(5)
Exhibit 1 - Same Source (1)
(2)
(3)
(4)
(5)
Method Duration of LER No.
System Component Cause & Corrective Action Date Type Hours Reason Shutting Code Code to Prevent Recurrence Down Rx 05/04/02 S
N/A B
N/A N/A EL BLO Ramped power to replace fan pedestal bearings on Isophase Bus Duct Cooling Fan and perform Turbine Valve Freedom of Movement testing


Surry Monthly Operating Report No. 02-05 Page 6 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)
Surry Monthly Operating Report No. 02-05 Page 6 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)
REPORT MONTH: May 2002 Docket No.:   50-281 Unit Name:   Surry Unit 2 Date:   06/03/02 Completed by:   R. Stief Telephone:   (757) 365-2486 None during the Reporting Period (1)                           (2)                                                  (3)
REPORT MONTH: May 2002 Docket No.:
F:  Forced                  REASON:                                              METHOD:
50-281 Unit Name:
S:  Scheduled              A - Equipment Failure (Explain)                     1 - Manual B - Maintenance or Test                             2 - Manual Scram C - Refueling                                       3 - Automatic Scram D - Regulatory Restriction                           4 - Other (Explain)
Surry Unit 2 Date:
E - Operator Training & Licensing Examination F - Administrative G - Operational Error (Explain)
06/03/02 Completed by:
H     Other (Explain)
R. Stief Telephone:
(4)                                                                                 (5)
(757) 365-2486 None during the Reporting Period (1)
Exhibit G - Instructions for Preparation of Data Entry Sheets                     Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161)
F:
Forced S:
Scheduled (2)
REASON:
A -
Equipment Failure (Explain)
B -
Maintenance or Test C -
Refueling D -
Regulatory Restriction E -
Operator Training & Licensing Examination F -
Administrative G -
Operational Error (Explain)
H Other (Explain)
(3)
METHOD:
1 Manual 2 -
Manual Scram 3 -
Automatic Scram 4 -
Other (Explain)
(4)
Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)
(5)
Exhibit 1 - Same Source


Surry Monthly Operating Report No. 02-05 Page 7 of 15 AVERAGE DAILY UNIT POWER LEVEL Docket No.:   50-280 Unit Name:   Surry Unit 1 Date:   06/03/02 Completed by:     R. Stief Telephone:   (757) 365-2486 MONTH:    May 2002 Average Daily Power Level Average Daily Power Level Day                  (MWe - Net)                  Day                  (MWe - Net) 1                      823                      17                      822 2                      823                      18                      822 3                      823                      19                      822 4                      547                      20                      822 5                      713                      21                      820 6                      823                      22                      823 7                      823                     23                      819 8                      822                      24                      822 9                      822                     25                      822 10                      821                      26                      822 11                      821                      27                      822 12                      821                      28                      817 13                      821                      29                      820 14                      823                      30                      815 15                      823                      31                      820 16                      823 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.
Surry Monthly Operating Report No. 02-05 Page 7 of 15 AVERAGE DAILY UNIT POWER LEVEL MONTH:
May 2002 Day 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 823 823 823 547 713 823 823 822 822 821 821 821 821 823 823 823 Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Docket No.:
50-280 Unit Name:
Surry Unit 1 Date: 06/03/02 Completed by:
R. Stief Telephone:
(757) 365-2486 Average Daily Power Level (MWe - Net) 822 822 822 822 820 823 819 822 822 822 822 817 820 815 820 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.


Surry Monthly Operating Report No. 02-05 Page 8 of 15 AVERAGE DAILY UNIT POWER LEVEL Docket No.:   50-281 Unit Name:   Surry Unit 2 Date:   06/03/02 Completed by:   R. Stief Telephone:     (757) 365-2486 MONTH:     May 2002 Average Daily Power Level                     Average Daily Power Level Day                (MWe - Net)               Day                 (MWe - Net) 1                      824                   17                      824 2                      824                    18                      825 3                      824                    19                      827 4                      825                    20                      827 5                      826                    21                      827 6                      825                    22                      827 7                      824                    23                      827 8                      824                    24                      826 9                      824                    25                      821 10                      824                    26                      823 11                      820                    27                      823 12                      824                    28                      822 13                      822                   29                      822 14                      823                    30                      821 15                      824                    31                      821 16                      824 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.
Surry Monthly Operating Report No. 02-05 Page 8 of 15 AVERAGE DAILY UNIT POWER LEVEL Docket No.:
50-281 Unit Name:
Surry Unit 2 Date: 06/03/02 Completed by:
R. Stief Telephone:
(757) 365-2486 MONTH:
May 2002 Day 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 824 824 824 825 826 825 824 824 824 824 820 824 822 823 824 824 Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Average Daily Power Level (MWe - Net) 824 825 827 827 827 827 827 826 821 823 823 822 822 821 821 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.


Surry Monthly Operating Report No. 02-05 Page 9 of 15
Surry Monthly Operating Report No. 02-05 Page 9 of 15  


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE MoNTH/YEAR: May 2002 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related incidents.
OF OPERATING EXPERIENCE MoNTH/YEAR: May 2002 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related incidents.
UNIT ONE:
UNIT ONE:
05/01/02     0000           Unit started the month at 100% / 847 MWe.
05/01/02 0000 Unit started the month at 100% / 847 MWe.
05/04/02     0108           Commenced ramp from 100% to 85% for 1-OSP-TM-001 and work to 1-EP-F-1 A.
05/04/02 0108 Commenced ramp from 100% to 85% for 1 -OSP-TM-001 and work to 1 -EP-F-1 A.
05/04/02     0250           1-OSP-TM-001 completed SAT. Unit at 88% / 753 MWe.
05/04/02 0250 1 -OSP-TM-001 completed SAT. Unit at 88% / 753 MWe.
05/04/02     0256           Recommenced ramp to 65% for 1-EP-F-1 A work.
05/04/02 0256 Recommenced ramp to 65% for 1 -EP-F-1 A work.
05/04/02     0442           Stopped ramp at 65% / 527 MWe.
05/04/02 0442 Stopped ramp at 65% / 527 MWe.
05/05/02     0620           1 -EP-F-1A RTS. Unit at 65% / 534 MWe.
05/05/02 0620 1 -EP-F-1A RTS. Unit at 65% / 534 MWe.
05/05/02     1140           Unit at 100% / 851 MWe.
05/05/02 1140 Unit at 100% / 851 MWe.
05/31/02     2400           Unit finished the month at 100% / 848 MWe.
05/31/02 2400 Unit finished the month at 100% / 848 MWe.
UNITTwo:
UNITTwo:
05/01/02     0000           Unit started the month at 100% / 854 MWe.
05/01/02 0000 Unit started the month at 100% / 854 MWe.
05/31/02     2400           Unit finished the month at 100% / 851 MWe.
05/31/02 2400 Unit finished the month at 100% / 851 MWe.


Surry Monthly Operating Report No. 02-05 Page 10 of 15 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHIYEAR: May 2002 None during the Reporting Period
Surry Monthly Operating Report No. 02-05 Page 10 of 15 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHIYEAR: May 2002 None during the Reporting Period
Line 149: Line 316:
Surry Monthly Operating Report No. 02-05 Page 12 of 15 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTH/YEAR: May 2002 None during the Reporting Period
Surry Monthly Operating Report No. 02-05 Page 12 of 15 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTH/YEAR: May 2002 None during the Reporting Period


Surry Monthly Operating Report No. 02-05 Page 13 of 15 CHEMISTRY REPORT MONTH/YEAR: May 2002 Unit No. 1                         Unit No. 2 Primary Coolant Analysis           Max.         Min.       Avg. Max.         Min.         Avg.
Surry Monthly Operating Report No. 02-05 Page 13 of 15 CHEMISTRY REPORT MONTH/YEAR: May 2002 Unit No. 1 Unit No. 2 Primary Coolant Analysis Max.
Gross Radioactivity, jtCi/ml         3.90E-1       2.06E-1     2.81 E-1 3.83E-1       1.91 E-1     2.58E-1 Suspended Solids, ppm                                               -        -            -
Min.
Gross Tritium, jiCi/ml               1.14E+0       1.03E+0     1.09E+0 4.25E-1       2.09E-1     3.14E-1 1131, ltCi/ml                         1.94E-4       9.02E-5     1.41 E-4 1.16E-4       7.59E-5       1.01 E-4 1131/1133                               0.09         0.05       0.07     0.14         0.09         0.12 Hydrogen, cc/kg                         39.2         34.7       37.3     40.4         34.2         37.2 Lithium, ppm                           2.33         2.12       2.22     2.69         2.37         2.54 Boron - 10, ppm*                       238           206         217     287           276           280 Oxygen, (DO), ppm                     _ 0.005     < 0.005     < 0.005 *0.005       *0.005       *0.005 Chloride, ppm                         0.013         0.006       0.007   0.004         0.003         0.004 pH @ 25 degree Celsius                 6.82         6.47       6.58     6.7         6.33         6.45
Avg.
* Boron - 10 = Total Boron x 0.196 Comments:
Max.
Min.
Avg.
Gross Radioactivity, jtCi/ml 3.90E-1 2.06E-1 2.81 E-1 3.83E-1 1.91 E-1 2.58E-1 Suspended Solids, ppm Gross Tritium, jiCi/ml 1.14E+0 1.03E+0 1.09E+0 4.25E-1 2.09E-1 3.14E-1 1131, ltCi/ml 1.94E-4 9.02E-5 1.41 E-4 1.16E-4 7.59E-5 1.01 E-4 1131/1133 0.09 0.05 0.07 0.14 0.09 0.12 Hydrogen, cc/kg 39.2 34.7 37.3 40.4 34.2 37.2 Lithium, ppm 2.33 2.12 2.22 2.69 2.37 2.54 Boron - 10, ppm*
238 206 217 287 276 280 Oxygen, (DO), ppm
_ 0.005  
< 0.005  
< 0.005  
*0.005  
*0.005  
*0.005 Chloride, ppm 0.013 0.006 0.007 0.004 0.003 0.004 pH @ 25 degree Celsius 6.82 6.47 6.58 6.7 6.33 6.45 Boron - 10 = Total Boron x 0.196 Comments:
None
None


Surry Monthly Operating Report No. 02-05 Page 14 of 15 FUEL HANDLING UNITS 1 & 2 MONTH/YEAR: May 2002 New Fuel                        Number of                                              New or Spent Shipment or    Date Stored or   Assemblies     Assembly         ANSI     Initial     Fuel Shipping Cask No.         Received      ner Shioment      Number          Number Enrichment    Cask Activity C.. s . .. ... Re.. ... ive-d     ..
Surry Monthly Operating Report No. 02-05 Page 14 of 15 FUEL HANDLING UNITS 1 & 2 MONTH/YEAR: May 2002 Date Stored or Received Number of Assemblies ner Shioment Assembly Number ANSI Number New or Spent Initial Fuel Shipping Enrichment Cask Activity None during the Reporting Period New Fuel Shipment or Cask No.
None during the Reporting Period
C s
Re..
ive-d


Surry Monthly Operating Report No. 02-05 Page 15 of 15 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTH/YEAR: May 2002 None during the Reporting Period}}
Surry Monthly Operating Report No. 02-05 Page 15 of 15 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTH/YEAR: May 2002 None during the Reporting Period}}

Latest revision as of 17:54, 16 January 2025

May 2002 Monthly Operating Report for Surry Power Station, Units 1 & 2
ML021710424
Person / Time
Site: Surry  Dominion icon.png
Issue date: 06/11/2002
From: Blount R
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
02-339
Download: ML021710424 (16)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 June 11, 2002 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Serial No.

SPS Lic/JSA Docket Nos.

License Nos.

Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of May 2002 is provided in the attachment.

If you have any questions or require additional information, please contact us.

Very truly yours, Richard H. Blount, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc:

United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Mr. R. A. Musser NRC Senior Resident Inspector Surry Power Station 02-339 RO 50-280 50-281 DPR-32 DPR-37

ýe'.

, -ý

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 02-05 Approved:

SitdV ice President

/bati

Surry Monthly Operating Report No. 02-05 Page 2 of 15 TABLE OF CONTENTS Section Page Operating Data Report - Unit No. 1............................................................................................................................

3 Operating Data Report - Unit No. 2............................................................................................................................

4 Unit Shutdowns and Power Reductions - Unit No. 1.............................................................................................

5 Unit Shutdowns and Power Reductions - Unit No. 2..............................................................................................

6 Average Daily Unit Power Level - Unit No. 1.....................................................................................................

7 Average Daily Unit Power Level - Unit No. 2..............................................................................................................

8 Summary of Operating Experience - Unit Nos. 1 and 2.........................................................................................

9 Facility Changes That Did Not Require NRC Approval.......................................................................................

10 Procedure or Method of Operation Changes That Did Not Require NRC Approval............................................

11 Tests and Experiments That Did Not Require NRC Approval..............................................................................

12 Chemistry Report.....................................................................................................................................................

13 Fuel Handling - Unit Nos. 1 and 2............................................................................................................................

14 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications.......................................................................................................................

15

Surry Monthly Operating Report No. 02-05 Page 3 of 15 OPERATING DATA REPORT Docket No.:

Date:

Completed By:

Telephone:

50-280 06/03/02 R. Stief (757) 365-2486 Unit Name:...........................................................

Reporting Period:.................................................

Licensed Thermal Power (MW t):..........................

Nameplate Rating (Gross MW e):.........................

Design Electrical Rating (Net MW e):....................

Maximum Dependable Capacity (Gross MWe):...

Maximum Dependable Capacity (Net MWe):.......

Surry Unit 1 May 2002 2546 847.5 788 842 810

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net MWe):

10.

Reasons For Restrictions, if Any:

Hours in Reporting Period Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate This Month 744.0 744.0 0.0 744.0 0.0 1866543.9 624082.0 601939.0 100.0%

100.0%

99.9%

102.7%

0.0%

Year-To-Date 3623.0 3623.0 0.0 3623.0 0.0 9166842.5 3071573.0 2959749.0 100.0%

100.0%

100.9%

103.7%

0.0%

Cumulative 258071.0 189384.6 3774.5 186725.2 3736.2 444474320.4 146151676.0 139552610.0 72.4%

73.8%

69.1%

68.6%

12.5%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Type and duration of scheduled shutdowns are no longer provided.

[

Reference:

Letter S/N 00-069, dated February 7, 2000]

25.

If Shut Down at End of Report Period, Estimated Date of Start-up:

Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7, 2000]

26.

Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

1.
2.
3.
4.
5.
6.

7.

11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.

23.

Surry Monthly Operating Report No. 02-05 Page 4 of 15 OPERATING DATA REPORT Docket No.:

Date:

Completed By:

Telephone:

50-281 06/03/02 R. Stief (757) 365-2486

1.
2.
3.
4.
5.
6.

7.

Unit Name:...........................................................

Reporting Period:.................................................

Licensed Thermal Power (MW t):..........................

Nameplate Rating (Gross MW e):.........................

Design Electrical Rating (Net MW e):....................

Maximum Dependable Capacity (Gross MWe):...

Maximum Dependable Capacity (Net MWe):.......

Surry Unit 2 May 2002 2546 847.5 788 847 815

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net MWe):

10.

Reasons For Restrictions, If Any:

Hours in Reporting Period Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate This Month 744.0 744.0 0.0 744.0 0.0 1893674.1 635108.0 613004.0 100.0%

100.0%

101.1%

104.6%

0.0%

Year-To-Date 3623.0 2964.8 0.0 2926.3 0.0 7370688.4 2475926.0 2390258.0 80.8%

80.8%/

81.0%

83.7%

0.0%

Cumulative 254952.0 186782.8 328.1 184542.7 0.0 440395592.6 144852933.0 138347308.0 72.4%

72.4%

69.1%

68.9%

10.0%

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Type and duration of scheduled shutdowns are no longer provided.

[

Reference:

Letter S/N 00-069, dated February 7, 2000]

25.

If Shut Down at End of Report Period, Estimated Date of Start-up:

Estimated start-up dates are no longer provided. [

Reference:

Letter S/N 00-069, dated February 7, 2000]

26.

Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

11.
12.
13.
14.

'15.

16.
17.
18.
19.
20.
21.
22.

23.

Surry Monthly Operating Report No. 02-05 Page 5 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: May 2002 Docket No.:

Unit Name:

Date:

Completed by:

Telephone:

50-280 Surry Unit 1 06/03/02 R. Stief (757) 365-2486 (1)

(2)

F:

Forced REASON:

S:

Scheduled A -

Equipment Failure (Explain)

B -

Maintenance or Test C -

Refueling D -

Regulatory Restriction E -

Operator Training & Licensing Examination F -

Administrative G -

Operational Error (Explain)

H Other (Explain)

(4)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)

(3)

METHOD:

1 Manual 2

Manual Scram 3

Automatic Scram 4

Other (Explain)

(5)

Exhibit 1 - Same Source (1)

(2)

(3)

(4)

(5)

Method Duration of LER No.

System Component Cause & Corrective Action Date Type Hours Reason Shutting Code Code to Prevent Recurrence Down Rx 05/04/02 S

N/A B

N/A N/A EL BLO Ramped power to replace fan pedestal bearings on Isophase Bus Duct Cooling Fan and perform Turbine Valve Freedom of Movement testing

Surry Monthly Operating Report No. 02-05 Page 6 of 15 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: May 2002 Docket No.:

50-281 Unit Name:

Surry Unit 2 Date:

06/03/02 Completed by:

R. Stief Telephone:

(757) 365-2486 None during the Reporting Period (1)

F:

Forced S:

Scheduled (2)

REASON:

A -

Equipment Failure (Explain)

B -

Maintenance or Test C -

Refueling D -

Regulatory Restriction E -

Operator Training & Licensing Examination F -

Administrative G -

Operational Error (Explain)

H Other (Explain)

(3)

METHOD:

1 Manual 2 -

Manual Scram 3 -

Automatic Scram 4 -

Other (Explain)

(4)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)

(5)

Exhibit 1 - Same Source

Surry Monthly Operating Report No. 02-05 Page 7 of 15 AVERAGE DAILY UNIT POWER LEVEL MONTH:

May 2002 Day 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 823 823 823 547 713 823 823 822 822 821 821 821 821 823 823 823 Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Docket No.:

50-280 Unit Name:

Surry Unit 1 Date: 06/03/02 Completed by:

R. Stief Telephone:

(757) 365-2486 Average Daily Power Level (MWe - Net) 822 822 822 822 820 823 819 822 822 822 822 817 820 815 820 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

Surry Monthly Operating Report No. 02-05 Page 8 of 15 AVERAGE DAILY UNIT POWER LEVEL Docket No.:

50-281 Unit Name:

Surry Unit 2 Date: 06/03/02 Completed by:

R. Stief Telephone:

(757) 365-2486 MONTH:

May 2002 Day 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 824 824 824 825 826 825 824 824 824 824 820 824 822 823 824 824 Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Average Daily Power Level (MWe - Net) 824 825 827 827 827 827 827 826 821 823 823 822 822 821 821 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

Surry Monthly Operating Report No. 02-05 Page 9 of 15

SUMMARY

OF OPERATING EXPERIENCE MoNTH/YEAR: May 2002 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related incidents.

UNIT ONE:

05/01/02 0000 Unit started the month at 100% / 847 MWe.

05/04/02 0108 Commenced ramp from 100% to 85% for 1 -OSP-TM-001 and work to 1 -EP-F-1 A.

05/04/02 0250 1 -OSP-TM-001 completed SAT. Unit at 88% / 753 MWe.

05/04/02 0256 Recommenced ramp to 65% for 1 -EP-F-1 A work.

05/04/02 0442 Stopped ramp at 65% / 527 MWe.

05/05/02 0620 1 -EP-F-1A RTS. Unit at 65% / 534 MWe.

05/05/02 1140 Unit at 100% / 851 MWe.

05/31/02 2400 Unit finished the month at 100% / 848 MWe.

UNITTwo:

05/01/02 0000 Unit started the month at 100% / 854 MWe.

05/31/02 2400 Unit finished the month at 100% / 851 MWe.

Surry Monthly Operating Report No. 02-05 Page 10 of 15 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHIYEAR: May 2002 None during the Reporting Period

Surry Monthly Operating Report No. 02-05 Page 11 of 15 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHIYEAR: May 2002 None during the Reporting Period

Surry Monthly Operating Report No. 02-05 Page 12 of 15 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTH/YEAR: May 2002 None during the Reporting Period

Surry Monthly Operating Report No. 02-05 Page 13 of 15 CHEMISTRY REPORT MONTH/YEAR: May 2002 Unit No. 1 Unit No. 2 Primary Coolant Analysis Max.

Min.

Avg.

Max.

Min.

Avg.

Gross Radioactivity, jtCi/ml 3.90E-1 2.06E-1 2.81 E-1 3.83E-1 1.91 E-1 2.58E-1 Suspended Solids, ppm Gross Tritium, jiCi/ml 1.14E+0 1.03E+0 1.09E+0 4.25E-1 2.09E-1 3.14E-1 1131, ltCi/ml 1.94E-4 9.02E-5 1.41 E-4 1.16E-4 7.59E-5 1.01 E-4 1131/1133 0.09 0.05 0.07 0.14 0.09 0.12 Hydrogen, cc/kg 39.2 34.7 37.3 40.4 34.2 37.2 Lithium, ppm 2.33 2.12 2.22 2.69 2.37 2.54 Boron - 10, ppm*

238 206 217 287 276 280 Oxygen, (DO), ppm

_ 0.005

< 0.005

< 0.005

  • 0.005
  • 0.005
  • 0.005 Chloride, ppm 0.013 0.006 0.007 0.004 0.003 0.004 pH @ 25 degree Celsius 6.82 6.47 6.58 6.7 6.33 6.45 Boron - 10 = Total Boron x 0.196 Comments:

None

Surry Monthly Operating Report No. 02-05 Page 14 of 15 FUEL HANDLING UNITS 1 & 2 MONTH/YEAR: May 2002 Date Stored or Received Number of Assemblies ner Shioment Assembly Number ANSI Number New or Spent Initial Fuel Shipping Enrichment Cask Activity None during the Reporting Period New Fuel Shipment or Cask No.

C s

Re..

ive-d

Surry Monthly Operating Report No. 02-05 Page 15 of 15 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTH/YEAR: May 2002 None during the Reporting Period