{{#Wiki_filter:RE {         I     An Energy East Company ROCHESTER GAS AND ELECTRIC CORPORATION
{{#Wiki_filter:RE
{
I An Energy East Company ROCHESTER GAS AND ELECTRIC CORPORATION
* 89 EASTAVENUE, ROCHESTER, N.Y 14649-0001
* 89 EASTAVENUE, ROCHESTER, N.Y 14649-0001
* 585 546-2700 wwwrge.com August 8, 2003 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Attn: Mr. Robert Clark (Mail Stop 0-8-E9)
* 585 546-2700 wwwrge.com August 8, 2003 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Attn: Mr. Robert Clark (Mail Stop 0-8-E9)
Line 24: Line 26:
In accordance with 10 CFR 50.4(b)(5), enclosed are revisions to Ginna Station Emergency Plan Implementing Procedures (EPIP).
In accordance with 10 CFR 50.4(b)(5), enclosed are revisions to Ginna Station Emergency Plan Implementing Procedures (EPIP).
We have determined, per the requirements of 10 CFR 50.54(q), that the procedure changes do not decrease the effectiveness of our Nuclear Emergency Response Plan.
We have determined, per the requirements of 10 CFR 50.54(q), that the procedure changes do not decrease the effectiveness of our Nuclear Emergency Response Plan.
Very truly yours, Richard J. Watts Manager, Nuclear Training Department Enclosures xc:     USNRC Region 1 (2 copies of letter and 2 copies of each procedure)
Very truly yours, Richard J. Watts Manager, Nuclear Training Department Enclosures xc:
USNRC Region 1 (2 copies of letter and 2 copies of each procedure)
Resident Inspector, Ginna Station (1 copy of letter and 1 copy of each procedure)
Resident Inspector, Ginna Station (1 copy of letter and 1 copy of each procedure)
RG&E Nuclear Safety and Licensing (1 copy of letter)
RG&E Nuclear Safety and Licensing (1 copy of letter)
Line 30: Line 33:
RJW/jtw A
RJW/jtw A


August 8, 2003 Page 2 of 2 PROCEDURE REVISION NUMBER EPIP 1-9       25 EPIP 2-1       21 EPIP 2-4       15 EPIP 3-1       23 EPIP 3-3       10 EPIP 4-1       7 EPIP 4-3       13
August 8, 2003 Page 2 of 2 PROCEDURE EPIP 1-9 EPIP 2-1 REVISION NUMBER 25 21 15 EPIP 2-4 EPIP 3-1 EPIP 3-3 EPIP 4-1 EPIP 4-3 23 10 7
13


ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER       13 PROCEDURE NO.     EPIP 1-9                   REV. NO. 25 TECHNICAL SUPPORT CENTER ACTIVATION RES&ONSIBLE MA     ER EFFE TIV DATE CATEGORY 1.0 THIS PROCEDURE CONTAINS       9     PAGES
ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER 13 PROCEDURE NO.
EPIP 1-9 REV. NO.
25 TECHNICAL SUPPORT CENTER ACTIVATION RES&ONSIBLE MA ER EFFE TIV DATE CATEGORY 1.0 THIS PROCEDURE CONTAINS 9
PAGES


EPIP 1-9:2 EPIP 1-9 TECHNICAL SUPPORT CENTER ACTIVATION
EPIP 1-9:2 EPIP 1-9 TECHNICAL SUPPORT CENTER ACTIVATION
Line 40: Line 47:


==2.0 RESPONSIBILITY==
==2.0 RESPONSIBILITY==
2.1   The first qualified person to arrive is responsible for initiating this procedure.
2.1 The first qualified person to arrive is responsible for initiating this procedure.
2.2   The TSC Director is responsible for activation of the TSC upon arrival.
2.2 The TSC Director is responsible for activation of the TSC upon arrival.
2.3   The TSC Director becomes the TSC Emergency Coordinator upon assuming Command and Control.
2.3 The TSC Director becomes the TSC Emergency Coordinator upon assuming Command and Control.
2.4   If the Severe Accident Management Guidelines (SAMG's) are entered, the following TSC staff assume SAM duties:
2.4 If the Severe Accident Management Guidelines (SAMG's) are entered, the following TSC staff assume SAM duties:
Decision Maker     -  TSC Emergency Coordinator Evaluators       -    TSC Operations Manager, TSC Technical Manager, TSC Nuclear Assessment
Decision Maker TSC Emergency Coordinator Evaluators TSC Operations Manager, TSC Technical Manager, TSC Nuclear Assessment


==3.0   REFERENCES==
==3.0 REFERENCES==
3.1   Developmental References 3.1.1 Nuclear Emergency Response Plan 3.1.2 NUREG-0654, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants.
3.1 Developmental References 3.1.1 Nuclear Emergency Response Plan 3.1.2 NUREG-0654, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants.
3.2   Implementing References 3.2.1 EPIP 1-10, OSC Activation 3.2.2 EPIP 1-11, Survey Center Activation 3.2.3 EPIP 3-3, Immediate Entry 3.2.4 EPIP 1-5, Notification 3.2.5 EPIP 5-7, Emergency Organization 3.2.6 EPIP 1-0, Ginna Station Event Evaluation and Classification 3.2.7 EPIP 2-13, Iodine and Particulate Activity Determination from Air Samples 3.2.8 RP-JC-AMS4, Routine Operation of the Eberline AMS-4 Air Monitoring System
3.2 Implementing References 3.2.1 EPIP 1-10, OSC Activation 3.2.2 EPIP 1-11, Survey Center Activation 3.2.3 EPIP 3-3, Immediate Entry 3.2.4 EPIP 1-5, Notification 3.2.5 EPIP 5-7, Emergency Organization 3.2.6 EPIP 1-0, Ginna Station Event Evaluation and Classification 3.2.7 EPIP 2-13, Iodine and Particulate Activity Determination from Air Samples 3.2.8 RP-JC-AMS4, Routine Operation of the Eberline AMS-4 Air Monitoring System


EPIP 1-9:3
EPIP 1-9:3
Line 56: Line 63:


==5.0 PREREQUISITES==
==5.0 PREREQUISITES==
5.1 An Alert, Site Area Emergency, or General Emergency has been declared in accordance with EPIP 1-0, Ginna Station Event Evaluation and Classification.
5.1 An Alert, Site Area Emergency, or General Emergency has been declared in accordance with EPIP 1-0, Ginna Station Event Evaluation and Classification.
5.2 The TSC could be activated anytime at the discretion of the TSC Director/Emergency Coordinator.
5.2 The TSC could be activated anytime at the discretion of the TSC Director/Emergency Coordinator.


==6.0 ACTIONS==
==6.0 ACTIONS==
6.1   Personnel Responding from Offsite 6.1.1 Personnel shall report to the TSC using normal security site access procedures.
6.1 Personnel Responding from Offsite 6.1.1 Personnel shall report to the TSC using normal security site access procedures.
6.1.2 If a hazardous condition prevents normal site access (e.g., release of radioactivity, security event, HAZMAT), responders may be directed by Community Alert Network to report to the designated staging area (Ontario Fire Department Exempt Hall, located on Route 104 between Route 350 and Knickbocker Road) or, upon arrival to the site, informed by Security to report to the Survey Center or designated location. Refer to EPIP 3-3, Immediate Entry, for site access.
6.1.2 If a hazardous condition prevents normal site access (e.g., release of radioactivity, security event, HAZMAT), responders may be directed by Community Alert Network to report to the designated staging area (Ontario Fire Department Exempt Hall, located on Route 104 between Route 350 and Knickbocker Road) or, upon arrival to the site, informed by Security to report to the Survey Center or designated location. Refer to EPIP 3-3, Immediate Entry, for site access.
6.2   Personnel Arriving at TSC CAUTION FRISK BEFORE ENTERING IF RP DETERMINES THAT FRISKING IS REQUIRED.
6.2 Personnel Arriving at TSC CAUTION FRISK BEFORE ENTERING IF RP DETERMINES THAT FRISKING IS REQUIRED.
NOTE:           DEPENDING ON THE NUMBER OF ARRIVING PERSONNEL, PERFORM STEPS CONCURRENTLY TO MINIMIZE ACTIVATION TIME.
NOTE:
DEPENDING ON THE NUMBER OF ARRIVING PERSONNEL, PERFORM STEPS CONCURRENTLY TO MINIMIZE ACTIVATION TIME.
6.2.1 Place your name under appropriate emergency position on magnetic organization chart and display associated job function badge.
6.2.1 Place your name under appropriate emergency position on magnetic organization chart and display associated job function badge.
6.2.2 If you leave the TSC, contact the RP/Chemistry Manager to determine if an electronic dosimeter is required.
6.2.2 If you leave the TSC, contact the RP/Chemistry Manager to determine if an electronic dosimeter is required.
6.2.3 Perform responsibilities as described in EPIP 5-7, Emergency Organization.
6.2.3 Perform responsibilities as described in EPIP 5-7, Emergency Organization.
6.3   TSC Director perform the following:
6.3 TSC Director perform the following:
6.3.1 Ensure minimum staff listed below is available to activate the TSC:
6.3.1 Ensure minimum staff listed below is available to activate the TSC:
: a.     Emergency Coordinator
: a.
Emergency Coordinator


EPIP 1-9:4
EPIP 1-9:4
: b.     Radiation Protection/Chemistry Manager
: b.
: c.       Dose Assessment Manager
Radiation Protection/Chemistry Manager
: d.       Technical Assessment Manager
: c.
: e.       Operations Assessment Manager
Dose Assessment Manager
: f.       Maintenance Assessment Manager
: d.
: g.       Communicator
Technical Assessment Manager
: h.       Survey Center Manager 6.3.2 If position is not staffed, notify personnel to report to the assigned duty location.
: e.
Operations Assessment Manager
: f.
Maintenance Assessment Manager
: g.
Communicator
: h.
Survey Center Manager 6.3.2 If position is not staffed, notify personnel to report to the assigned duty location.
Qualified responders are found in their position checklist in EPIP 5-7. The status of the call-in process can be monitored by obtaining a report from the incoming fax machine at 30 minutes into the event.
Qualified responders are found in their position checklist in EPIP 5-7. The status of the call-in process can be monitored by obtaining a report from the incoming fax machine at 30 minutes into the event.
6.3.3 Ensure Technical Assessment Manager establishes ERDS link to NRC within one hour per duties in EPIP 5-7.
6.3.3 Ensure Technical Assessment Manager establishes ERDS link to NRC within one hour per duties in EPIP 5-7.
6.3.4 Receive briefing from the Shift Supervisor on Plant conditions.
6.3.4 Receive briefing from the Shift Supervisor on Plant conditions.
6.3.5 Obtain notification forms sent by the Control Room from the TSC fax machine.
6.3.5 Obtain notification forms sent by the Control Room from the TSC fax machine.
Use these forms and brief response staff on plant conditions using Attachment 2 (TSC meeting agenda).
Use these forms and brief response staff on plant conditions using Attachment 2 (TSC meeting agenda).
CAUTION IF DOSE RATES EXCEEDS 50 mR/HR, CONSIDER RELOCATION OF TSC PERSONNEL.
CAUTION IF DOSE RATES EXCEEDS 50 mR/HR, CONSIDER RELOCATION OF TSC PERSONNEL.
IF AIR SAMPLE RADIOIODINE ACTIVITY IS GREATER THAN 1E-8 yCVcc, CONSIDER RELOCATION OF TSC PERSONNEL.
IF AIR SAMPLE RADIOIODINE ACTIVITY IS GREATER THAN 1E-8 yCVcc, CONSIDER RELOCATION OF TSC PERSONNEL.
6.3.6. Obtain results of radiation survey and air activity of TSC.
6.3.6.
6.3.7 If TSC is uninhabitable, relocate the following personnel to the Shift Supervisor's office:
Obtain results of radiation survey and air activity of TSC.
: a.       Operations Assessment Manager
6.3.7 If TSC is uninhabitable, relocate the following personnel to the Shift Supervisor's office:
: b.       Radiation Protection/Chemistry Manager
: a.
: c.     TSC Director/Emergency Coordinator
Operations Assessment Manager
: d.     Technical Manager
: b.
: e.     Nuclear Assessment
Radiation Protection/Chemistry Manager
: c.
TSC Director/Emergency Coordinator
: d.
Technical Manager
: e.
Nuclear Assessment


EPIP 1-9:5 Direct remaining personnel to the Survey Center or alternate location as directed by the TSC Director/Emergency Coordinator.
EPIP 1-9:5 Direct remaining personnel to the Survey Center or alternate location as directed by the TSC Director/Emergency Coordinator.
6.3.8   Obtain status of manpower from managers.
6.3.8 Obtain status of manpower from managers.
NOTE:           THE TSC DIRECTOR ASSUMES THE ROLE AND TITLE OF TSC EMERGENCY COORDINATOR WHEN TSC TAKES COMMAND AND CONTROL.
NOTE:
6.3.9   Assuming Command and Control 6.3.9.1 Ensure minimum activation staff (Step 6.3.1) is available to assume command and control.
THE TSC DIRECTOR ASSUMES THE ROLE AND TITLE OF TSC EMERGENCY COORDINATOR WHEN TSC TAKES COMMAND AND CONTROL.
6.3.9.2 Confer with Emergency Coordinator (Control Room Shift Supervisor) on shifting command and control of the emergency from the Control Room to the TSC.
6.3.9 Assuming Command and Control 6.3.9.1 Ensure minimum activation staff (Step 6.3.1) is available to assume command and control.
6.3.9.2 Confer with Emergency Coordinator (Control Room Shift Supervisor) on shifting command and control of the emergency from the Control Room to the TSC.
Normally, when command and control is transferred, the TSC assumes:
Normally, when command and control is transferred, the TSC assumes:
: a.       Overall direction for the emergency
: a.
: 1.     Emergency Classification
Overall direction for the emergency
: 2.     Protective Action Recommendations
: 1.
: b.       Notifications to New York State, Wayne and Monroe counties
Emergency Classification
: c.       Dose Assessment
: 2.
: d.       Notifications to the NRC However, certain conditions may warrant transferring a given responsibility area (or communications) at different times, per the discretion of the Emergency Coordinator (Shift Supervisor and TSC Director).
Protective Action Recommendations
: b.
Notifications to New York State, Wayne and Monroe counties
: c.
Dose Assessment
: d.
Notifications to the NRC However, certain conditions may warrant transferring a given responsibility area (or communications) at different times, per the discretion of the Emergency Coordinator (Shift Supervisor and TSC Director).
6.3.9.3 Brief the TSC on plant status using Attachment 2 for meeting agenda and inform them that command and control will be assumed at the agreed upon time.
6.3.9.3 Brief the TSC on plant status using Attachment 2 for meeting agenda and inform them that command and control will be assumed at the agreed upon time.
6.3.9.4 At agreed upon time, call the Control Room (Emergency Coordinator) and state that, unless he has any objections, the TSC is assuming command and control at this time.
6.3.9.4 At agreed upon time, call the Control Room (Emergency Coordinator) and state that, unless he has any objections, the TSC is assuming command and control at this time.
6.3.9.5 Announce to the TSC that the TSC has assumed command and control of the emergency.
6.3.9.5 Announce to the TSC that the TSC has assumed command and control of the emergency.


EPIP 1-9:6 6.3.9.6 Upon assuming command and control, direct the Administrative/Communications Manager to provide RECS line updates every 30 minutes using EPIP 1-5, Attachment 3.
EPIP 1-9:6 6.3.9.6 Upon assuming command and control, direct the Administrative/Communications Manager to provide RECS line updates every 30 minutes using EPIP 1-5,.
6.3.9.7 Notify EOF that the TSC has assumed command and control and to make preparations to transfer command and control to the EOF.
6.3.9.7 Notify EOF that the TSC has assumed command and control and to make preparations to transfer command and control to the EOF.
6.3.9.8 Conduct PORC meetings as required to support emergency operations. PORC meeting minutes are stored under S:\Forums\Forums\PORC\PORC minutes then choose year of interest.
6.3.9.8 Conduct PORC meetings as required to support emergency operations. PORC meeting minutes are stored under S:\\Forums\\Forums\\PORC\\PORC minutes then choose year of interest.
6.3.9.9 If the TSC will be activated for more than 12 hours, direct managers to complete Attachment 1 for continuous staffing.
6.3.9.9 If the TSC will be activated for more than 12 hours, direct managers to complete for continuous staffing.
6.3.10   Shift Turnover 6.3.10.1 If a turnover to another shift is needed, contact the personnel identified on Attachment 1 and inform them of the time and location to assemble.
6.3.10 Shift Turnover 6.3.10.1 If a turnover to another shift is needed, contact the personnel identified on and inform them of the time and location to assemble.
6.3.10.2 When the responders for the next shift have arrived, have them perform a detailed turnover with the person they are relieving. Have them log the turnover in their log book.
6.3.10.2 When the responders for the next shift have arrived, have them perform a detailed turnover with the person they are relieving. Have them log the turnover in their log book.
6.3.10.3 When the individual turnovers are complete, have the on-coming crew perform a briefing for each other using the standard meeting agenda (Attachment 2). The off-going crew should also be at the briefing to ensure that the information that is shared is correct and complete.
6.3.10.3 When the individual turnovers are complete, have the on-coming crew perform a briefing for each other using the standard meeting agenda (Attachment 2). The off-going crew should also be at the briefing to ensure that the information that is shared is correct and complete.
6.4     TSC Managers perform the following:
6.4 TSC Managers perform the following:
6.4.1   Check communications at work location.
6.4.1 Check communications at work location.
6.4.2   Determine status of manpower and report to the Emergency Coordinator.
6.4.2 Determine status of manpower and report to the Emergency Coordinator.
6.4.3   Radiation Protection/Chemistry Manager check survey results and air activity for TSC and report to TSC Director/Emergency Coordinator.
6.4.3 Radiation Protection/Chemistry Manager check survey results and air activity for TSC and report to TSC Director/Emergency Coordinator.
CAUTION IF AIR SAMPLE RADIOIODINE ACTIVITY IS GREATER THAN 1E-8 pCI/cc, INFORM THE EMERGENCY COORDINATOR.
CAUTION IF AIR SAMPLE RADIOIODINE ACTIVITY IS GREATER THAN 1 E-8 pCI/cc, INFORM THE EMERGENCY COORDINATOR.
IF DOSE RATES EXCEEDS 50 mR/HR, CONSIDER RELOCATION OF TSC PERSONNEL.
IF DOSE RATES EXCEEDS 50 mR/HR, CONSIDER RELOCATION OF TSC PERSONNEL.
6.4.3.1 If TSC is uninhabitable, the following personnel shall relocate to the Shift Supervisor's office:
6.4.3.1 If TSC is uninhabitable, the following personnel shall relocate to the Shift Supervisor's office:
: a.       Operations Assessment Manager
: a.
: b.       Radiation Protection/Chemistry Manager
Operations Assessment Manager
: b.
Radiation Protection/Chemistry Manager


EPIP 1-9:7
EPIP 1-9:7
: c.       TSC Director/TSC Emergency Coordinator
: c.
: d.       Technical Manager
TSC Director/TSC Emergency Coordinator
: e.     Nuclear Assessment 6.4.3.2 Direct remaining personnel to the Survey Center or other locations as directed by the Emergency Coordinator.
: d.
6.5     Radiation Protection Technician perform the following:
Technical Manager
6.5.1   Place step-off pad and frisker at each entrance to the TSC.
: e.
6.5.2   Start up TSC AMS-4 per RP-JC-AMS4.
Nuclear Assessment 6.4.3.2 Direct remaining personnel to the Survey Center or other locations as directed by the Emergency Coordinator.
CAUTION IF AIR SAMPLE RADIOIODINE ACTIVITY IS GREATER THAN 1E-8 pCIcc, INFORM THE RADIATION PROTECTIONICHEMISTRY MANAGER AND THE EMERGENCY COORDINATOR.
6.5 Radiation Protection Technician perform the following:
6.5.3   Take an air sample in accordance with EPIP 2-13, Iodine and Particulate Activity Determination from Air Samples, and report results to Radiation Protection/Chemistry Manager.
6.5.1 Place step-off pad and frisker at each entrance to the TSC.
6.5.4   Perform a survey of the TSC.
6.5.2 Start up TSC AMS-4 per RP-JC-AMS4.
CAUTION IF AIR SAMPLE RADIOIODINE ACTIVITY IS GREATER THAN 1 E-8 pCIcc, INFORM THE RADIATION PROTECTIONICHEMISTRY MANAGER AND THE EMERGENCY COORDINATOR.
6.5.3 Take an air sample in accordance with EPIP 2-13, Iodine and Particulate Activity Determination from Air Samples, and report results to Radiation Protection/Chemistry Manager.
6.5.4 Perform a survey of the TSC.
CAUTION IF DOSE RATES EXCEEDS 50 mR/HR, INFORM THE RADIATION PROTECTION/CHEMISTRY MANAGER AND EMERGENCY COORDINATOR.
CAUTION IF DOSE RATES EXCEEDS 50 mR/HR, INFORM THE RADIATION PROTECTION/CHEMISTRY MANAGER AND EMERGENCY COORDINATOR.
6.5.5   Report results of all TSC surveys to Radiation Protection/Chemistry Manager 6.5.6. Monitor the TSC radiation and contamination levels and air activity at the discretion of the Radiation Protection/Chemistry Manager.
6.5.5 Report results of all TSC surveys to Radiation Protection/Chemistry Manager 6.5.6.
6.6     TSC Support Personnel 6.6.1   Perform job functions in accordance with EPIP 5-7, Emergency Organization.
Monitor the TSC radiation and contamination levels and air activity at the discretion of the Radiation Protection/Chemistry Manager.
7.0     Attachments
6.6 TSC Support Personnel 6.6.1 Perform job functions in accordance with EPIP 5-7, Emergency Organization.
: 1.     TSC Continuous Staffing Schedule
7.0 Attachments
: 2.     TSC Meeting Agenda
: 1.
TSC Continuous Staffing Schedule
: 2.
TSC Meeting Agenda


EPIP 1-9:8 Attachment 1, Rev. 25 Page 1 of 2 TSC CONTiNUOUS STAFFING SCHEDULE (Consult EPIP 5-7 position checklists for qualified personnel and phone numbers to fill positions.)
EPIP 1-9:8, Rev. 25 Page 1 of 2 TSC CONTiNUOUS STAFFING SCHEDULE (Consult EPIP 5-7 position checklists for qualified personnel and phone numbers to fill positions.)
Shift A                     Shift B hrs.                         hrs.
Shift A Shift B hrs.
to  _      hrs.           to _       _ hrs.
to hrs.
POSITION                   Date:                       Date:
hrs.
to _
_ hrs.
POSITION Date:
Date:
Emergency Coordinator*
Emergency Coordinator*
Assistant Emergency Coordinator Radiation Protection/Chemistry*
Assistant Emergency Coordinator Radiation Protection/Chemistry*
Line 156: Line 197:
Communicator*
Communicator*
Survey Center Manager*
Survey Center Manager*
Admin./Comm. Manager Security Manager TSC Survey Team Coordinator Dose Assessment Support Messenger/Status Board Keepers Note:   All positions need not be filled. Select those
Admin./Comm. Manager Security Manager TSC Survey Team Coordinator Dose Assessment Support Messenger/Status Board Keepers
* Minimum staff needed as a resources for the event and the minimum staff required for TSC activation.
* Minimum staff Note:
All positions need not be filled. Select those needed as a resources for the event and the minimum staff required for TSC activation.


EPIP 1-9:9 Attachment 1, Rev. 25 Page 2 of 2 TSC CONTINUOUS STAFFING SCHEDULE (Consult EPIP 5-7 position checklists for qualified personnel and phone numbers to fill positions.)
EPIP 1-9:9, Rev. 25 Page 2 of 2 TSC CONTINUOUS STAFFING SCHEDULE (Consult EPIP 5-7 position checklists for qualified personnel and phone numbers to fill positions.)
Shift A       I           Shift B
Shift A I
_________hrs.                         hrs.
Shift B
to            hrs.           to _       _ hrs.
_________hrs.
POSITION                 Date:                         Date:
to hrs.
RP/Chemistry Technicians Nuclear Assessment I&C Electrical Assessment Mechanical/Hydraulic Assessment Computer Analysts Discipline Planners Manager of OSC Satellite Maintenance Personnel Assistant Survey Center Manager OSC Assignees Inventory Control Supervisor/Analyst Inventory Control Support Personnel OSC Director Note:   All positions need not be filled. Select those
hrs.
* Minimum staff needed as a resources for the event and the minimum staff required for TSC activation.
to _
_ hrs.
POSITION Date:
Date:
RP/Chemistry Technicians Nuclear Assessment I&C Electrical Assessment Mechanical/Hydraulic Assessment Computer Analysts Discipline Planners Manager of OSC Satellite Maintenance Personnel Assistant Survey Center Manager OSC Assignees Inventory Control Supervisor/Analyst Inventory Control Support Personnel OSC Director Note:
All positions need not be filled. Select those needed as a resources for the event and the minimum staff required for TSC activation.
* Minimum staff


EPIP 1-9:10 , Rev. 25                                                           Page 1 of 1 Meeting Date:                               Time:
EPIP 1-9:10, Rev. 25 Page 1 of 1 Meeting Date:
NOTE:   IF THE EOF IS ACTIVATED OR ACTIVATING, ATTEMPT TO INCLUDE NUCLEAR OPERATIONS MANAGER, OR AN ASSISTANT, IN THE TSC BRIEFING VIA CONFERENCE CALL.
Time:
: 1.     Emergency Coordinator
NOTE:
* Purpose of Meeting
IF THE EOF IS ACTIVATED OR ACTIVATING, ATTEMPT TO INCLUDE NUCLEAR OPERATIONS MANAGER, OR AN ASSISTANT, IN THE TSC BRIEFING VIA CONFERENCE CALL.
* Classification Level
: 1.
* Time Classification Declared
Emergency Coordinator Purpose of Meeting Classification Level Time Classification Declared Brief Event Description (use EAL reference manual)
* Brief Event Description (use EAL reference manual)
Injury/Fire Status
* Injury/Fire Status
: 2.
: 2.     Operations Assessment Manager
Operations Assessment Manager Plant activities in progress Safety Related Equipment Status Operational needs required for plant safety Operational manpower needs
* Plant activities in progress
: 3.
* Safety Related Equipment Status
Technical Assessment Manager Status of Plant Conditions Core Conditions Core Cooling capabilities
* Operational needs required for plant safety
: 4.
* Operational manpower needs
Maintenance Assessment Manager Equipment out of service Status of repairs in progress Manpower needs required to support Maintenance Supplies and Materials needed to support Maintenance activities
: 3.     Technical Assessment Manager
: 5.
* Status of Plant Conditions
Dose Assessment Manager Offsite areas of concern (downwind areas affected)
* Core Conditions
Protective Actions Recommended Releases in progress Status of radiological conditions outside the plant fence Brief status of Survey Team activity
* Core Cooling capabilities
: 6.
: 4.     Maintenance Assessment Manager
Administrative/Communications Manager Status of notifications to State and Counties Status of notifications to NRC
* Equipment out of service
: 7.
* Status of repairs in progress
Security Manager Status of accountability of plant personnel Status of Site Security Status of search and rescue operations
* Manpower needs required to support Maintenance
: 8.
* Supplies and Materials needed to support Maintenance activities
RP/Chemistry Manager Status of TSC habitability Status of radiological concerns inside the plant fence Status of PASS operation and availability Status of exposure to plant personnel (Ops, Maintenance, RP)
: 5.     Dose Assessment Manager
: 9.
* Offsite areas of concern (downwind areas affected)
EOF Concerns
* Protective Actions Recommended
: 10.
* Releases in progress
Review of Open Items Please write on these pages. New pages will be provided after each use.
* Status of radiological conditions outside the plant fence
* Brief status of Survey Team activity
: 6.     Administrative/Communications Manager
* Status of notifications to State and Counties
* Status of notifications to NRC
: 7.     Security Manager
* Status of accountability of plant personnel
* Status of Site Security
* Status of search and rescue operations
: 8.     RP/Chemistry Manager
* Status of TSC habitability
* Status of radiological concerns inside the plant fence
* Status of PASS operation and availability
* Status of exposure to plant personnel (Ops, Maintenance, RP)
: 9.       EOF Concerns
: 10.     Review of Open Items Please write on these pages. New pages will be provided after each use.


ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER 23 PROCEDURE NO. EPIP 2-1                         REV. NO. 21 PROTECTIVE ACTION RECOMMENDATIONS TECHNICAL REVIEW EFFE   VE ATE CATEGORY 1.0 THIS PROCEDURE CONTAINS   15 PAGES
ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER 23 PROCEDURE NO.
EPIP 2-1 REV. NO.
21 PROTECTIVE ACTION RECOMMENDATIONS TECHNICAL REVIEW EFFE VE ATE CATEGORY 1.0 THIS PROCEDURE CONTAINS 15 PAGES


EPIP 2-1:1 EPIP 2-1 PROTECTIVE ACTION RECOMMENDATIONS
EPIP 2-1:1 EPIP 2-1 PROTECTIVE ACTION RECOMMENDATIONS


==1.0 PURPOSE==
==1.0 PURPOSE==
1.1   The purpose of this procedure is to provide guidance to the Emergency Coordinator or EOF/Recovery Manager in making protective action recom-mendations to offsite authorities.
1.1 The purpose of this procedure is to provide guidance to the Emergency Coordinator or EOF/Recovery Manager in making protective action recom-mendations to offsite authorities.


==2.0 RESPONSIBILITY==
==2.0 RESPONSIBILITY==
2.1   The Shift Supervisor, Emergency Coordinator (TSC) or EOF/Recovery Manager is responsible for making protective action recommendations to Wayne County, Monroe County and New York State, depending on command and control status.
2.1 The Shift Supervisor, Emergency Coordinator (TSC) or EOF/Recovery Manager is responsible for making protective action recommendations to Wayne County, Monroe County and New York State, depending on command and control status.
2.2   The decision to implement any protective actions is solely the responsibility of the local authorities.
2.2 The decision to implement any protective actions is solely the responsibility of the local authorities.


==3.0   REFERENCES==
==3.0 REFERENCES==
3.1   Developmental References 3.1.1 Nuclear Emergency Response Plan 3.1.2 EPA-400, Manual of Protective Action Guides and Protective Actions for Nuclear Incidents (1991) 3.1.3 Evacuation Travel Time Estimates - Ginna Emergency Planning Zone, September 1992.
3.1 Developmental References 3.1.1 Nuclear Emergency Response Plan 3.1.2 EPA-400, Manual of Protective Action Guides and Protective Actions for Nuclear Incidents (1991) 3.1.3 Evacuation Travel Time Estimates - Ginna Emergency Planning Zone, September 1992.
3.1.4 NUREG/BR - 0150 Response Technical Manual (RTM-93) 3.1.5 Food and Drug Administration (FDA) 'Potassium Iodide as a Thyroid Blocking Agent in Radiation Emergencies", December 2001.
3.1.4 NUREG/BR - 0150 Response Technical Manual (RTM-93) 3.1.5 Food and Drug Administration (FDA) 'Potassium Iodide as a Thyroid Blocking Agent in Radiation Emergencies", December 2001.
3.1.6 NUREG-1633, "Assessment of the Use of Potassium Iodide (KI) as a Supplemental Public Protective Action During Severe Reactor Accidents".
3.1.6 NUREG-1633, "Assessment of the Use of Potassium Iodide (KI) as a Supplemental Public Protective Action During Severe Reactor Accidents".
3.1.7 NRC RIS 2003-12 "Clarification of NRC Guidance for Modifying Protective Actions" 3.2   Implementing References 3.2.1 EPIP 1-0, Ginna Station Event Evaluation and Classification
3.1.7 NRC RIS 2003-12 "Clarification of NRC Guidance for Modifying Protective Actions" 3.2 Implementing References 3.2.1 EPIP 1-0, Ginna Station Event Evaluation and Classification


EPIP 2-1:2 3.2.2 EPIP 1-5, Notification 3.2.3 EPIP 2-3, Emergency Release Rate Determination 3.2.4 EPIP 2-4, Emergency Dose Projections - Manual Method 3.2.5 EPIP 2-18, Control Room Dose Assessment 3.2.6 EPIP 2-5, Emergency Dose Projections - Personal Computer Method 3.2.7 EPIP 2-6, Emergency Dose Projections - MIDAS Program
EPIP 2-1:2 3.2.2 EPIP 1-5, Notification 3.2.3 EPIP 2-3, Emergency Release Rate Determination 3.2.4 EPIP 2-4, Emergency Dose Projections - Manual Method 3.2.5 EPIP 2-18, Control Room Dose Assessment 3.2.6 EPIP 2-5, Emergency Dose Projections - Personal Computer Method 3.2.7 EPIP 2-6, Emergency Dose Projections - MIDAS Program


==4.0 PRECAUTIONS==
==4.0 PRECAUTIONS==
Line 237: Line 271:
==6.0 INSTRUCTIONS==
==6.0 INSTRUCTIONS==
NOTE: PROTECTIVE ACTION RECOMMENDATIONS (PARs) WILL ONLY REFLECT RG&E RECOMMENDATIONS, NOT ACTIONS IMPLEMENTED BY OFFSITE OFFICIALS.
NOTE: PROTECTIVE ACTION RECOMMENDATIONS (PARs) WILL ONLY REFLECT RG&E RECOMMENDATIONS, NOT ACTIONS IMPLEMENTED BY OFFSITE OFFICIALS.
6.1   Obtain the event classification using EPIP 1-0.
6.1 Obtain the event classification using EPIP 1-0.
6.2   UNUSUAL EVENT. ALERT and SITE AREA EMERGENCY.
6.2 UNUSUAL EVENT. ALERT and SITE AREA EMERGENCY.
6.2.1 Report on EPIP 1-5, Attachment 3a, Item 7:
6.2.1 Report on EPIP 1-5, Attachment 3a, Item 7:
A. No need for protective actions outside the site boundary.
A. No need for protective actions outside the site boundary.
6.3   GENERAL EMERGENCY 6.3.1 Protective Action Recommendations shall be issued with the initial declaration of a General Emergency.
6.3 GENERAL EMERGENCY 6.3.1 Protective Action Recommendations shall be issued with the initial declaration of a General Emergency.
6.3.2 Using Attachment 1, Page 1 of 2, and the current wind direction, determine the initial ERPAs to be evacuated. The Counties will implement their KI plans for any evacuated ERPA. Any ERPA not evacuated will be sheltered.
6.3.2 Using Attachment 1, Page 1 of 2, and the current wind direction, determine the initial ERPAs to be evacuated. The Counties will implement their KI plans for any evacuated ERPA. Any ERPA not evacuated will be sheltered.
6.3.3 Record in EPIP 1-5, Attachment 3a, Item 7 the Protective Actions Recommended.
6.3.3 Record in EPIP 1-5, Attachment 3a, Item 7 the Protective Actions Recommended.
Line 247: Line 281:
EPIP 2-1:3 NOTE: ONCE AN ERPA HAS BEEN RECOMMENDED TO EVACUATE, THAT RECOMMENDATION WILL CONTINUE. AN ERPA PAR STATUS CANNOT BE CHANGED FROM "EVACUATE" TO "SHELTER".
EPIP 2-1:3 NOTE: ONCE AN ERPA HAS BEEN RECOMMENDED TO EVACUATE, THAT RECOMMENDATION WILL CONTINUE. AN ERPA PAR STATUS CANNOT BE CHANGED FROM "EVACUATE" TO "SHELTER".
6.3.4 Re-evaluate the PARs based on the following to determine if secondary PARs are required or if initial PARs need to be modified.:
6.3.4 Re-evaluate the PARs based on the following to determine if secondary PARs are required or if initial PARs need to be modified.:
: a.     Dose Assessment*
: a.
b.'     Survey Team data*
Dose Assessment*
: c.     EPA Protective Action Guidelines (Attachment 2)
b.'
: d.     Wind shifts
Survey Team data*
      * = If exposures in non-evacuated areas indicate that evacuation is warranted, use Attachment 1 page 2 of 2 to expand Protective Action Recommendations to an evacuated area of 5 mile radius and 10 miles downwind.
: c.
EPA Protective Action Guidelines (Attachment 2)
: d.
Wind shifts
* = If exposures in non-evacuated areas indicate that evacuation is warranted, use page 2 of 2 to expand Protective Action Recommendations to an evacuated area of 5 mile radius and 10 miles downwind.
6.3.5 The Evacuation Travel Time Estimate information (Attachment 3) is used by offsite agencies to determine the correct Protective Action Decision (PAD).
6.3.5 The Evacuation Travel Time Estimate information (Attachment 3) is used by offsite agencies to determine the correct Protective Action Decision (PAD).
6.3.6 If the EPA guidelines for evacuation or sheltering are exceeded beyond the 10 mile emergency planning zone and protective actions are required, specify the areas using roads, rivers, bodies of water or town boundaries.
6.3.6 If the EPA guidelines for evacuation or sheltering are exceeded beyond the 10 mile emergency planning zone and protective actions are required, specify the areas using roads, rivers, bodies of water or town boundaries.


==7.0 ATTACHMENTS==
==7.0 ATTACHMENTS==
: 1.     Evacuation Areas by Zones.
: 1.
: 2.     Projected Dose to the Population and Recommended Actions.
Evacuation Areas by Zones.
: 3.     Evacuation Travel Time Estimates.
: 2.
: 4.     Emergency Response Planning Areas (ERPA's).
Projected Dose to the Population and Recommended Actions.
: 3.
Evacuation Travel Time Estimates.
: 4.
Emergency Response Planning Areas (ERPA's).


EPIP 2-1:4 Attachment 1, Rev. 21 Page 1 of 2 EVACUATION AREAS BY ZONES PROTECTIVE ACTION RECOMMENDATIONS BY ERPA FOR GENERAL EMERGENCY CLASSIFICATION Wind From                     (Degrees)           Initial Protective Action Recommendations (Evacuation based on 2 mile radius & 5 miles downwind)
EPIP 2-1:4, Rev. 21 Page 1 of 2 EVACUATION AREAS BY ZONES PROTECTIVE ACTION RECOMMENDATIONS BY ERPA FOR GENERAL EMERGENCY CLASSIFICATION Wind From (Degrees)
N                             349 to 11 Evacuate: W (1,2,3) and implement KI plan Shelter:   All remaining ERPAs NNE                             12 to 33 Evacuate: W (1.2) M (1) and implement Ki plan Shelter:   All remaining ERPAs NE                             34 to 56 Evacuate: W (1,2) M (1) and implement Ki plan Shelter:   All remaining ERPAs ENE                           57 to 78 Evacuate: W (1,2) M (1) and implement KI plan
Initial Protective Action Recommendations (Evacuation based on 2 mile radius & 5 miles downwind)
____________________________            Shelter:   All remaining ERPAs E                             79 to 101 Evacuate: W (1,2) M (1) and implement KI plan Shelter:   All remaining ERPAs ESE                           102 to 124 Evacuate: W (1) M (1) and implement Ki plan Shelter:   All remaining ERPAs SE                           125 to 146 Evacuate: W (1) and implement KI plan Shelter. All remaining ERPAs SSE                         147 to 168 Evacuate: W (1) and implement KI plan Sheiter     All remaining ERPAs S                             169 to 191 Evacuate: W (1) and implement KI plan Shelter     All remaining ERPAs SSW                         192 to 213 Evacuate: W (1) and implement KI plan Shelter     All remaining ERPAs SW                           214 to 236 Evacuate: W (1,3) and implement Ki plan Shelter:   All remaining ERPAs WSW                         237 to 258 Evacuate: W (1,3) and implement Ki plan Shelter:   All remaining ERPAs W                             259 to 281 Evacuate: W (1,3) and implement Ki plan Shelter: All remaining ERPAs WNW                           282 to 303 Evacuate: W (1,2,3) and implement Ki plan Shelter:   All remaining ERPAs NW                           304 to 326 Evacuate: W (1,2,3) and implement KI plan Shelter:   All remaining ERPAs NNW                         327 to 348 Evacuate: W (1,2,3) and implement Ki plan Shelter:   All remaining ERPAs
N 349 to 11 Evacuate: W (1,2,3) and implement KI plan Shelter:
All remaining ERPAs NNE 12 to 33 Evacuate: W (1.2) M (1) and implement Ki plan Shelter:
All remaining ERPAs NE 34 to 56 Evacuate: W (1,2) M (1) and implement Ki plan Shelter:
All remaining ERPAs ENE 57 to 78 Evacuate: W (1,2) M (1) and implement KI plan Shelter:
All remaining ERPAs E
79 to 101 Evacuate: W (1,2) M (1) and implement KI plan Shelter:
All remaining ERPAs ESE 102 to 124 Evacuate: W (1) M (1) and implement Ki plan Shelter:
All remaining ERPAs SE 125 to 146 Evacuate: W (1) and implement KI plan Shelter.
All remaining ERPAs SSE 147 to 168 Evacuate: W (1) and implement KI plan Sheiter All remaining ERPAs S
169 to 191 Evacuate: W (1) and implement KI plan Shelter All remaining ERPAs SSW 192 to 213 Evacuate: W (1) and implement KI plan Shelter All remaining ERPAs SW 214 to 236 Evacuate: W (1,3) and implement Ki plan Shelter:
All remaining ERPAs WSW 237 to 258 Evacuate: W (1,3) and implement Ki plan Shelter:
All remaining ERPAs W
259 to 281 Evacuate: W (1,3) and implement Ki plan Shelter:
All remaining ERPAs WNW 282 to 303 Evacuate: W (1,2,3) and implement Ki plan Shelter:
All remaining ERPAs NW 304 to 326 Evacuate: W (1,2,3) and implement KI plan Shelter:
All remaining ERPAs NNW 327 to 348 Evacuate: W (1,2,3) and implement Ki plan Shelter:
All remaining ERPAs


C                                                                             (
C
EVACUATION AREAS BY ZONES
(
                                                                                                                                                                              ,' 2-1:5 Attachment 1, Rev, 20 PROTECTIVE ACTION RECOMMENDATIONS BY ERPA FOR                                                                  Page 2 of 2 GENERAL FMERGENCOY Ci ASIFICATION Wind From         (Degrees)           Initial Protective Action Recommendations                           Secondary Protective Action Recommendations (Evacuation based on 2 mile radius & 5 miles downwind)                   (Evacuation based on 5 mile radius & 10 miles downwind)
EVACUATION AREAS BY ZONES PROTECTIVE ACTION RECOMMENDATIONS BY ERPA FOR GENERAL FMERGENCOY Ci ASIFICATION
N                   349 to 11 Evacuate: W (1, 2,3)                 and implement KI plan Evacuate: W (1, 2, 3, 5, 6, 7)   M (1, 2, 4, 5)               and implement KI plan Shelter         All remaining ERPAs                         Shelter   All remaining ERPAs NNE                 12 to 33 Evacuate: W (1, 2) M (1)             and implement KI plan Evacuate: W (1, 2, 3, 6, 7)       M (1, 2, 3, 4, 5, 6, 7, 9)   and implement KI plan Shelter.       All remaining ERPAs                         Shelter   All remaining ERPAs NE                   34 to 56 Evacuate:       W (1, 2) M (1)     and Implement KI plan Evacuate: W (1, 2, 3, 7)         M (1, 2, 3, 4, 5, 6, 7, 8, 9) and implement KI plan Shelter         All remaining ERPAs                         Shelter   All remaining ERPAs ENE                 57 to 78 Evacuate: W (1, 2) M (1)             and implement KI plan Evacuate: W (1, 2,3, 7)           M (1, 2, 3, 4, 5, 6, 7, 8, 9) and implement KI plan Shelter.       All remaining ERPAs                         Shelter. All remaining ERPAs E                   79 to 101 Evacuate: W (1, 2) M (1)             and implement KI plan Evacuate: W (1, 2,3)             M (1. 2, 3, 4, 6, 7, 8, 9)   and implement KI plan Shelter         AN remaining ERPAs                         Shelter   All remaining ERPAs ESE               102 to 124 Evacuate: W (1)             M (1     and Implement KI plan Evacuate: W (1, 2, 3)             M (1, 3, 6, 8, 9)             and implement KI plan Shelter         All remaining ERPAs                         Shelter. All remaining ERPAs SE                 125 to 146 Evacuate: W (1)                       and Implement KI plan Evacuate: W (1, 2, 3)             M (1)                         and implement KI plan Shelter.       All remaining ERPAs                         Shelter   All remaining ERPAs SSE               147 to 168 Evacuate:       W (1)                 and implement KI plan Evacuate: W (1, 2,3)             M (1)                         and implement KI plan Shelter.       All remaining ERPAs                         Shelter: All remaining ERPAs S                 169 to 191 Evacuate:       W (1)                 and implement KI plan Evacuate: W (1, 2, 3)             M (1)                         and implement Ki plan Shelter.       All remaining ERPAs                         Shelter. All remaining ERPAs SSW               192 to 213 Evacuate         W (1)               and implement KI plan Evacuate: W (1, 2,3)             M (1)                         and Implement KI plan Shelter:       All remaining ERPAs                         Shelter. All remaining ERPAs SW                 214 to 236 Evacuate:       W (1, 3)             and implement KI plan Evacuate: W (1, 2,3,4)           M (1)                         and implement KI plan Shelter:       All remaining ERPAs                         Shelter: All remaining ERPAs WSW               237 to 258 Evacuate:       W (1, 3)             and implement KI plan Evacuate: W (1, 2,3,4,5)         M (1)                         and implement Ki plan Shelter:       All remaining ERPAs                         Shelter: All remaining ERPAs W                 259to 281 Evacuate:       W (1, 3)             and implement KI plan Evacuate: W (1, 2, 3, 4, 5, 6)   M (1)                         and Implement KI plan Shelter:       All remaining ERPAs                         Shelter   All remaining ERPAs WNW               282 to 303 Evacuate: W (1, 2,3)                 and implement KI plan Evacuate: W (1, 2, 3, 4, 5, 6, 7) M (1)                         and Implement KI plan Shelter:       All remaining ERPAs                         Shelter. All remaining ERPAs NW                 304 tO 326 Evacuate:       W (1, 2, 3)           and implement KI plan Evacuate: W (1, 2, 3, 4, 5, 6, 7) M (1, 2)                     and implement KI plan Shelter         An remaining ERPAs                         Shelter: All remaining ERPAs NNW               327 to 348 Evacuate: W (1, 2,3)                 and implement KI plan Evacuate: W (1, 2, 3, 4, 5, 6, 7) M (1, 2, 5)                   and implement Kl plan
,' 2-1:5, Rev, 20 Page 2 of 2 Wind From (Degrees)
Initial Protective Action Recommendations Secondary Protective Action Recommendations (Evacuation based on 2 mile radius & 5 miles downwind)
(Evacuation based on 5 mile radius & 10 miles downwind)
N 349 to 11 Evacuate: W (1, 2,3) and implement KI plan Evacuate: W (1, 2, 3, 5, 6, 7)
M (1, 2, 4, 5) and implement KI plan Shelter All remaining ERPAs Shelter All remaining ERPAs NNE 12 to 33 Evacuate:
W (1, 2)
M (1) and implement KI plan Evacuate: W (1, 2, 3, 6, 7)
M (1, 2, 3, 4, 5, 6, 7, 9) and implement KI plan Shelter.
All remaining ERPAs Shelter All remaining ERPAs NE 34 to 56 Evacuate:
W (1, 2) M (1) and Implement KI plan Evacuate: W (1, 2, 3, 7)
M (1, 2, 3, 4, 5, 6, 7, 8, 9) and implement KI plan Shelter All remaining ERPAs Shelter All remaining ERPAs ENE 57 to 78 Evacuate: W (1, 2)
M (1) and implement KI plan Evacuate: W (1, 2,3, 7)
M (1, 2, 3, 4, 5, 6, 7, 8, 9) and implement KI plan Shelter.
All remaining ERPAs Shelter.
All remaining ERPAs E
79 to 101 Evacuate: W (1, 2)
M (1) and implement KI plan Evacuate: W (1, 2,3)
M (1. 2, 3, 4, 6, 7, 8, 9) and implement KI plan Shelter AN remaining ERPAs Shelter All remaining ERPAs ESE 102 to 124 Evacuate: W (1)
M (1 and Implement KI plan Evacuate: W (1, 2, 3)
M (1, 3, 6, 8, 9) and implement KI plan Shelter All remaining ERPAs Shelter.
All remaining ERPAs SE 125 to 146 Evacuate: W (1) and Implement KI plan Evacuate: W (1, 2, 3)
M (1) and implement KI plan Shelter.
All remaining ERPAs Shelter All remaining ERPAs SSE 147 to 168 Evacuate:
W (1) and implement KI plan Evacuate: W (1, 2,3)
M (1) and implement KI plan Shelter.
All remaining ERPAs Shelter:
All remaining ERPAs S
169 to 191 Evacuate:
W (1) and implement KI plan Evacuate: W (1, 2, 3)
M (1) and implement Ki plan Shelter.
All remaining ERPAs Shelter.
All remaining ERPAs SSW 192 to 213 Evacuate W (1) and implement KI plan Evacuate:
W (1, 2,3)
M (1) and Implement KI plan Shelter:
All remaining ERPAs Shelter.
All remaining ERPAs SW 214 to 236 Evacuate:
W (1, 3) and implement KI plan Evacuate: W (1, 2,3,4)
M (1) and implement KI plan Shelter:
All remaining ERPAs Shelter:
All remaining ERPAs WSW 237 to 258 Evacuate:
W (1, 3) and implement KI plan Evacuate: W (1, 2,3,4,5)
M (1) and implement Ki plan Shelter:
All remaining ERPAs Shelter:
All remaining ERPAs W
259to 281 Evacuate:
W (1, 3) and implement KI plan Evacuate: W (1, 2, 3, 4, 5, 6)
M (1) and Implement KI plan Shelter:
All remaining ERPAs Shelter All remaining ERPAs WNW 282 to 303 Evacuate: W (1, 2,3) and implement KI plan Evacuate: W (1, 2, 3, 4, 5, 6, 7) M (1) and Implement KI plan Shelter:
All remaining ERPAs Shelter.
All remaining ERPAs NW 304 tO 326 Evacuate:
W (1, 2, 3) and implement KI plan Evacuate: W (1, 2, 3, 4, 5, 6, 7)
M (1, 2) and implement KI plan Shelter An remaining ERPAs Shelter:
All remaining ERPAs NNW 327 to 348 Evacuate: W (1, 2,3) and implement KI plan Evacuate: W (1, 2, 3, 4, 5, 6, 7) M (1, 2, 5) and implement Kl plan
* Secondary Protective Actions are recommended when dose projections or field teams indicate 2 1 REM TEDE beyond 5 miles.
* Secondary Protective Actions are recommended when dose projections or field teams indicate 2 1 REM TEDE beyond 5 miles.


(                                                           E. 2-1:6 Attachment 2, Rev, 20 Page 1 of 1 PROJECTED DOSE TO THE POPULATION AND RECOMMENDED ACTIONS PROJECTED DOSE TO THE                             RECOMMENDED ACTIONS                                   COMMENTS POPULATION                                                                                                                   l Total Whole Body < 1 REM*                     No planned protective actions. Local authorities None.
(
E.
2-1:6, Rev, 20 Page 1 of 1 PROJECTED DOSE TO THE POPULATION AND RECOMMENDED ACTIONS PROJECTED DOSE TO THE RECOMMENDED ACTIONS COMMENTS POPULATION l
Total Whole Body < 1 REM*
No planned protective actions. Local authorities None.
or State may issue an advisory to seek shelter and await further instructions. Monitor environmental radiation levels.
or State may issue an advisory to seek shelter and await further instructions. Monitor environmental radiation levels.
Total Whole Body   2 1 REM*                   Conduct evacuation.*                             Evacuation (or for some situation, Monitor environmental radiation levels and       sheltering**) should be initiated at one Committed Dose Equivalent to the thyroid adjust area for mandatory evacuation based on         REM. Seeking shelter would be an (child) 2 5 REM.                               these levels.                                   alternative if evacuation were not Control access.                                 immediately possible.
Total Whole Body 2 1 REM*
Conduct evacuation.*
Evacuation (or for some situation, Monitor environmental radiation levels and sheltering**) should be initiated at one Committed Dose Equivalent to the thyroid adjust area for mandatory evacuation based on REM. Seeking shelter would be an (child) 2 5 REM.
these levels.
alternative if evacuation were not Control access.
immediately possible.
Implement KI plan.
Implement KI plan.
Project Dose (REM) to Emergency Team Workers Total Whole Body 25 REM                       Control exposure of emergency team members       None.
Project Dose (REM) to Emergency Team Workers Total Whole Body 25 REM Control exposure of emergency team members None.
to these levels except for lifesaving mission.
to these levels except for lifesaving mission.
(Appropriate controls for emergency workers include time limitations, respirators and stable iodine.)
(Appropriate controls for emergency workers include time limitations, respirators and stable iodine.)
Total Whole Body 75 REM                       Control exposure of emergency team members       None.
Total Whole Body 75 REM Control exposure of emergency team members None.
performing lifesaving missions to this level.
performing lifesaving missions to this level.
(Control of time of exposure will be most effective.)
(Control of time of exposure will be most effective.)
NOTES:
NOTES:
* The sum of the effective dose equivalent resulting from exposure to external sources and the committed effective dose equivalent incurred from all significant inhalation pathways during the early phase.
The sum of the effective dose equivalent resulting from exposure to external sources and the committed effective dose equivalent incurred from all significant inhalation pathways during the early phase.
**        Sheltering may be the preferred protective action when it will provide protection equal to or greater than evacuation, based on consideration of factors such as source term characteristics and temporal or other site-specific conditions.
Sheltering may be the preferred protective action when it will provide protection equal to or greater than evacuation, based on consideration of factors such as source term characteristics and temporal or other site-specific conditions.


EPIP 2-1:7 Attachment 3, Rev. 21 Page 1 of 8 EVACUATION TRAVEL TIME ESTIMATES
EPIP 2-1:7, Rev. 21 Page 1 of 8 EVACUATION TRAVEL TIME ESTIMATES
: 1. When discussing an evacuation, use this attachment to resolve conflicts.
: 1.
: 2. 1992 Permanent Resident Population Estimates EPRA     Population               ERPA         Population W-1           3207               M-1           2421 W-2           5395               M-2             435 W-3           1200               M-3             258 W-4           2092               M-4           6681 W-5           3855               M-5           1253 W-6           2425               M-6           6943 W-7           4924               M-7           4750 M-8           3033 M-9           3285
When discussing an evacuation, use this attachment to resolve conflicts.
: 3. Use the following curves to assist in estimating evacuation decisions.
: 2.
Figure           Weather Conditions             Time of Week 41           Summer, Good Weather             Midweek, Midday 43           Summer, Rainy Weather           Midweek, Midday 45           Summer, Good Weather             Midweek, Evening 49           Summer, Good Weather             Weekend, Midday 53           Winter, Good Weather             Midweek, Midday 55           Winter, Rainy Weather           Midweek, Midday 57           Winter, Snowy Weather           Midweek, Midday
1992 Permanent Resident Population Estimates EPRA Population ERPA Population W-1 3207 M-1 2421 W-2 5395 M-2 435 W-3 1200 M-3 258 W-4 2092 M-4 6681 W-5 3855 M-5 1253 W-6 2425 M-6 6943 W-7 4924 M-7 4750 M-8 3033 M-9 3285
: 3.
Use the following curves to assist in estimating evacuation decisions.
Figure Weather Conditions Time of Week 41 Summer, Good Weather Midweek, Midday 43 Summer, Rainy Weather Midweek, Midday 45 Summer, Good Weather Midweek, Evening 49 Summer, Good Weather Weekend, Midday 53 Winter, Good Weather Midweek, Midday 55 Winter, Rainy Weather Midweek, Midday 57 Winter, Snowy Weather Midweek, Midday


(                                     (
(
FIGURE 41 Evacuation Travel time Estimates GInna Nuclear Power Station Summer, Midweek, Midday Good Weather 100 N
(
: a. g0 80 a'
FIGURE 41 Evacuation Travel time Estimates GInna Nuclear Power Station Summer, Midweek, Midday Good Weather 100 Na.
70
a'
'C 5   60 C
'C 5
50 4'
C 4'
0.
0.
40 0
0a.
a.
0 0
30 0
1!
0  20 1!
a.1 g0 80 70 60 50 40 30 20 10 0
0 a.1 10 0
0 CD~
0       1       2               3                               CD~ m 4         5   0<
0<
0 1
2 3
4 5
Time - Hours
Time - Hours
        * -WAYNE CO.         MONROE CO.         '-  FULL EPZ         *bb
-WAYNE CO.
MONROE CO.
FULL EPZ m
*bb


(                                                                             f
(
: 1. .
f
FIGURE 43 Evacuation Travel Time Estimates Ginna Nuclear Power Station Sunnner, Midweek, Midday Rainy Weather 100   I   I I I   a A I I I   I   I   I   I     I- I   f    .a I - I   I I       IU-. I                       .  -
: 1.
N 90 I1                            I M
FIGURE 43 Evacuation Travel Time Estimates Ginna Nuclear Power Station Sunnner, Midweek, Midday Rainy Weather N
s0 e  70                                                                          -I     Lj 0
M e
C 60 so a-LT 50                                                            Vt'-W a
C 0
a-tL 0.
tLa-a 0.
U-'-4         -u     a-40 a
a 0
30 H0-0 C  20 0hl                           TIM      EPZ papubtin to be ec         d dufin tt. scenb Is 59,577.
C 0.
: 0. 10                                      --      -        ~Th* tOW W"Mn Co"it popiAtk to bo evacute Is23.?M.
100 90 s0 70 60 so 50 40 30 20 10 0
            .n-      _    _  _    _  -  -  -      _  -  The MM PMMro.___--  Ca"d popuiflon to be revacae Is 35.81bsl7 (D
I I I I I
0 I              !            2                      3                      4                5                6            7   (0 (D
a A I I I
lo M :5 Time - Hours                                                              C, (D ">
I I
I I
I I
a I - I I I
I I
f
-I I1 U-.
I U-
'-4 Vt
-u
'-W a-a-
L T Lj H
0-TIM 0hl EPZ papubtin to be ec d dufin tt. scenb Is 59,577.
~Th* tOW W"Mn Co"it popiAtk to bo evacute Is 23.?M.
The MM PMMro Ca"d popuiflon to be revacae Is 35.81 7
.n-bsl (D
7 (0
lo (D M :5 C, (D ">
I
I
* WAYNE CO.             0--       MONROE CO.                 -            FULL EPZ
* 5
                                                                                                                    .1 I
-I
                                                                                                                                        -I CO 5
\\)
Nt
Nt CO
                                                                                                                                            -A
-A CD I
                                                                                                                                              \)
6 2
CD
3 4
5 Time - Hours I
* WAYNE CO.
0--
MONROE CO.
FULL EPZ
.1


l:
l:
FIGURE 45 Evacuation Travel Time Estimates Ginna Nuclear Power Station Summer, Midweek, Evening Good Weather 100
FIGURE 45 Evacuation Travel Time Estimates Ginna Nuclear Power Station Summer, Midweek, Evening Good Weather 100
    .N
.N 0.wu C
: 0. g0 wu 80 C
.C 00
70
.5 0.
  .C   60 00
a 0.
    .5   50 0.
4-0.
40 a
g0 80 70 60 50 40 30 20 10 0
: 0. 30 4-20
0
: 0.                                                                           0 10 0                                                                   -:3-~ m-a 0     1             2                 3               4       (0 G
-:3-~
                                                                                    -u Time - Hours                             0<
(0 G 0<
                                                                      .* 1 I a WAYNE CO. Wo      MONROE CO.       '    FULL EPZ               0 I
0 1
2 3
4 Time - Hours
.* 1 m-a
-u 0
I a
WAYNE CO.
W o MONROE CO.
FULL EPZ I


(                                                                           ,.
(
FIGURE 49 Evacuation Travel Time Estimates GInna Nuclear Power Station Summer, Weekend, Midday Good Weather 100 90 0
FIGURE 49 Evacuation Travel Time Estimates GInna Nuclear Power Station Summer, Weekend, Midday Good Weather 0
80 0'
0' C
70 C  60 0
0 rW 0
rW 50 0
0.
0.
40 0
0 CL a.
CL 3C a.
100 90 80 70 60 50 40 3C 20 10 0
20 10 0
0*
0*
a     1         2         3         .4             5             6   -3.
-3.
Time - Hours I -- WAYNE CO. -    -  MONROE CO.   ----    FULL EPZ -
a 1
                                                                        -I
2 3  
                                                                      -I I
.4 5
6 Time - Hours I  
-- WAYNE CO.
MONROE CO.
FULL EPZ --I-I I


(
(
FIGURE 53 Evacuation Travel Time Estimates Ginna Nuclear Power Station Winter, Midweek, Midday Good Weather
(
(
FIGURE 53 Evacuation Travel Time Estimates Ginna Nuclear Power Station Winter, Midweek, Midday Good Weather 100 N
100 N
g0 0.
0.
80 40 C" 70
40 C"
  .C 60 0
.C 0
  'U aC 50 40 0
'U aC 0
30 0
0 6I g0 80 70 60 50 40 30 20 10 0
20 C,
C, 0
6I  10                                                                  0 6~~_
6~~_
0 0    1         2               3               4         5 Time - Hours
0 1
            '-- WAYNE CO. -3   -  MONROE CO.     ---      FULL EPZ
2 3
4 5
Time - Hours WAYNE CO.  
-3 MONROE CO.
FULL EPZ


(                                                       (
(
FIGURE 55 Evacuation Travel Time Estimates GInna Nuclear Power Station Winter, Midweek, Midday Rainy Weather 100                I-t I t II II    I. I I I i I I  I  I    I    I    I cA mDfr~rE vN ll .
(
w g0                                                                          I.-
FIGURE 55 Evacuation Travel Time Estimates GInna Nuclear Power Station Winter, Midweek, Midday Rainy Weather w._
r-S 0~
S c0~
c 50 rz 70                                                                      '__    i I_  -          _  -    -    _II    _I_
C
C
  .C                                                               -
.C Sa0 U
60 U
S a0  50 I
0.
0.
rl4 -a           -a.
3 0I-a 0
* F. TIL'FM, 3  40 I-0  30 a
4.C a
0 4.
P-100 g0 50 70 60 50 40 30 20 10 0
C 20 a                                                        The total EPZ popuhlalon lo be nemueted dur"n this ,emnurlo Is80.357.
I I
P-                                                      The _da We Cu_ yppallon t be evcuted Is24.595 10  .  - -  -
I I
The WtdA Movrwe County ppubimon to be _eud Is 35.702.
I i
m                                                                                                                              (D 0  _* *U                     l-----                              ,-                                      ,        -        --
-t t
0         I             2                   3                 4                 S                   6                    7      CD Time - Hours                                                                       (DDN I
I I
* WAYNE CO.               0       MONROE CO.             -           FULL EPZ                                       am-!
I I
I
I I
I I
I I
I I
cA mDfr~rE vN ll.
rz I.- r-i I
_II
_I_
rl4 -a I
-a.
F.
T
_ IL 'FM, The total EPZ popuhlalon lo be nemueted dur"n this,emnurlo Is 80.357.
The _da We Cu_ yp pallon t be evcuted Is 24.595 The WtdA Movrwe County ppubimon to be _eud Is 35.702.
*U m
l-----
0 I
6 7
(D CD (D DN am-!
2 3
4 S
Time - Hours I
WAYNE CO.
0 MONROE CO. -
FULL EPZ I


(                             (
(
                                                                        -9 . I FIGURE S7 Evacuation Travel Time Estimates Ginna Nuclear Power Station Winter, Midweek, Midday Snowy Weather 100 N
(
90 IL 0.
-9.
80 S
I FIGURE S7 Evacuation Travel Time Estimates Ginna Nuclear Power Station Winter, Midweek, Midday Snowy Weather 100 N
w  70
IL0.
  .C 60 C
w S
0 Eu 50
.C C
  .3 0
0 Eu
0.
.300.
0    40 0
00 I-a 0
I-   30 a
IV 0.
0 IV 20 0.
90 80 70 60 50 40 30 20 10 0
10                                                             C, 0
0 1
0 1       2       3           4           5       6     7 0*    m Time - Hours
2 3
                                                                            -N
4 5
            *WAYNE CO.           MONsROE CO.           FULL EPZI
6 7
Time - Hours
*WAYNE CO.
MONsROE CO.
FULL EPZI C,
0*
m
-N


                                                                                                                                          -  4    4
(
(                                                   (                                                                  /
(
11 .
/
t!I auls ei ,. "X                 M Z        rt                          I I            /                                                               I*g 0
4 4
                                                                                            . -Pf
11.
                                                                                                /
t!I auls ei,. "X M
b I
I  
                                                                                                                              -I I
/
r '~~~~~~~~~                                                                             '.. .
t R.s9.M
LO I
. u.S.
t R.s9.M  . u.S.
r '~~~~~~~~~
Ix4...
I Ix
                                                                                          'I'                               I 10-mile Emergency                                                                              0 I           Planning Zone
: 4.
_i                  I               3 I
Z rt I
I . (
0 b
I           -u D
I *g
m K>       I I                               I         .!
- I
I,              SD CD
-Pf I
                                                                                                                                      -.A D    r
/
                                                                                                                                                -L PiIsw&AM.Sw ItS   .
I I
                                                                                                  -             SI        . _    -L -.L 0n I    H Emergency Response Planning Areas (ERPA's)                         I., N.
LO
I
'I' I
_.. of Evacuation Routes to ReceptionlConcregate Care Centers
_i I
I I,
S I I
I 10-mile Emergency Planning Zone K>
I H
I I
I  
. (
I PiIsw&AM.Sw ItS  
-u SD CD
-.A
-L 0
3 D
D
-.L m
r
-L 0n Emergency Response Planning Areas (ERPA's)
Evacuation Routes to ReceptionlConcregate Care Centers I., N. _..
of


ROCHESTER GAS & ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER __3 PROCEDURE NO.       EPIP 2-4                         REV. NO. 14 EMERGENCY DOSE PROJECTIONS - MANUAL METHOD RESPONN6BLE'GER EFFEWTIV DATE Category 1.0 This procedure contains j16 pages
ROCHESTER GAS & ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER __3 PROCEDURE NO.
EPIP 2-4 REV. NO. 14 EMERGENCY DOSE PROJECTIONS - MANUAL METHOD RESPONN6BLE'GER EFFEWTIV DATE Category 1.0 This procedure contains j16 pages


EPIP 2-4:1 EPIP 2-4 EMERGENCY DOSE PROJECTIONS - MANUAL METHOD 1.0 PURPOSE 1.1 The purpose of this procedure is to provide a manual method for performing projections of downwind doe rates and doses. Such information is needed to decided upon protective actions to be recommended to limit the exposure of the general public and emergency workers. This procedure is intended as a backup to EPIP 2-5.
EPIP 2-4:1 EPIP 2-4 EMERGENCY DOSE PROJECTIONS - MANUAL METHOD 1.0 PURPOSE 1.1 The purpose of this procedure is to provide a manual method for performing projections of downwind doe rates and doses. Such information is needed to decided upon protective actions to be recommended to limit the exposure of the general public and emergency workers. This procedure is intended as a backup to EPIP 2-5.
2.0   RESPONSIBILITY The TSC or EOF Dose Assessment Manager is responsible for implementing this procedure.
2.0 RESPONSIBILITY The TSC or EOF Dose Assessment Manager is responsible for implementing this procedure.


==3.0   REFERENCES==
==3.0 REFERENCES==
3.1 Developmental References 3.1.1 Nuclear Emergency Response Plan 3.1.2 EPA-400, Manual of Protective Action Guides and Protective Actions for Nuclear Incidents (1991) 3.1.3 Ginna UFSAR, Chapter 15 3.1.4 Regulatory Guide 1.109 3.2 Implementing References 3.2.1 EPIP 2-1, Protective Action Recommendations 3.2.2 EPIP 2-2, Obtaining Meteorological Data and Forecasts and their use is Emergency Dose Assessment 3.2.3 EPIP 2-3, Emergency Release Rate Determination 4.0 PRECAUTIONS None.


3.1  Developmental References 3.1.1 Nuclear Emergency Response Plan 3.1.2 EPA-400, Manual of Protective Action Guides and Protective Actions for Nuclear Incidents (1991) 3.1.3 Ginna UFSAR, Chapter 15 3.1.4 Regulatory Guide 1.109 3.2  Implementing References 3.2.1 EPIP 2-1, Protective Action Recommendations 3.2.2 EPIP 2-2, Obtaining Meteorological Data and Forecasts and their use is Emergency Dose Assessment 3.2.3 EPIP 2-3, Emergency Release Rate Determination 4.0  PRECAUTIONS None.
EPIP 2-4:2 5.0 PREREQUISITES 5.1 The following equipment and data sources are available for use in performing manual dose projections.
 
5.1.1 Xu/Q tabulated values (Attachment 2) 5.1.2 Wind and temperature indications from the Control Room 5.1.3 Plant Process Computer System (PPCS) - EVENT 2 Report 5.1.4 Control Room Radiation Monitor System (RMD) Panel read-outs of effluent monitors 5.1.5 Personal Computer in TSC and EOF (for obtaining 15 minute meteorological data average from Ginna Primary Weather Tower) 5.1.6 Back-up wind speed and direction indications at Station 13A (accessible from TSC or EOF IBM terminals) and National Weather Service.
EPIP 2-4:2 5.0   PREREQUISITES 5.1   The following equipment and data sources are available for use in performing manual dose projections.
6.0 ACTIONS 6.1 Preliminary Downwind Dose Estimates 6.1.1 For initial notifications purposes, a preliminary estimate of potential offsite doses and releases may be obtained by the Control Room using EPIP 2-18.
5.1.1 Xu/Q tabulated values (Attachment 2) 5.1.2 Wind and temperature indications from the Control Room 5.1.3 Plant Process Computer System (PPCS) - EVENT 2 Report 5.1.4 Control Room Radiation Monitor System (RMD) Panel read-outs of effluent monitors 5.1.5 Personal Computer in TSC and EOF (for obtaining 15 minute meteorological data average from Ginna Primary Weather Tower) 5.1.6 Back-up wind speed and direction indications at Station 13A (accessible from TSC or EOF IBM terminals) and National Weather Service.
6.0   ACTIONS 6.1   Preliminary Downwind Dose Estimates 6.1.1 For initial notifications purposes, a preliminary estimate of potential offsite doses and releases may be obtained by the Control Room using EPIP 2-18.
6.1.2 For calculations performed by the Control Room, TSC and EOF staffs,a 4-hour release duration should be used if the duration is not known. A 4-hour release duration is consistent with the value used by Wayne and Monroe Counties.
6.1.2 For calculations performed by the Control Room, TSC and EOF staffs,a 4-hour release duration should be used if the duration is not known. A 4-hour release duration is consistent with the value used by Wayne and Monroe Counties.
6.1.3 If iodine effluent monitor or isotopic data are unavailable, a default value of 1.E-4 should be used to reflect the estimated release concentration ratio of gross iodine to noble gas. (See Attachment 1)
6.1.3 If iodine effluent monitor or isotopic data are unavailable, a default value of 1.E-4 should be used to reflect the estimated release concentration ratio of gross iodine to noble gas. (See Attachment 1)
NOTE:           WHEN DATA IS AVAILABLE, CALCULATE AN IODINE-TO-NOBLE GAS RATIO THAT REFLECTS PRESENT CONDITIONS.
NOTE:
WHEN DATA IS AVAILABLE, CALCULATE AN IODINE-TO-NOBLE GAS RATIO THAT REFLECTS PRESENT CONDITIONS.
6.1.4 Determine the classification of the emergency with respect to plant releases and site boundary doses from the criteria provided in EPIP 1-0.
6.1.4 Determine the classification of the emergency with respect to plant releases and site boundary doses from the criteria provided in EPIP 1-0.
6.2   Use of Meteorological and Release Data with EPA Dose Factors Manual Method
6.2 Use of Meteorological and Release Data with EPA Dose Factors Manual Method


EPIP 2-4:3 NOTE:         ANY PRELIMINARY DOES ESTIMATES USED AS A BASIS FOR EMERGENCY CLASSIFICATION OR PROTECTIVE ACTION RECOMMENDATIONS SHOULD BE REFINED AS FOLLOWS USING RELEASE MEASUREMENTS AND ACTUAL METEOROLOGICAL SAMPLING DATA AS THEY BECOME AVAILABLE.
EPIP 2-4:3 NOTE:
ANY PRELIMINARY DOES ESTIMATES USED AS A BASIS FOR EMERGENCY CLASSIFICATION OR PROTECTIVE ACTION RECOMMENDATIONS SHOULD BE REFINED AS FOLLOWS USING RELEASE MEASUREMENTS AND ACTUAL METEOROLOGICAL SAMPLING DATA AS THEY BECOME AVAILABLE.
6.2.1 Meteorological Data (15 min. averages) can be obtained by modem from the MIDAS storage computer in the Meteorological Tower Trailer by using the Personal Computer. (See EPIP 2-2 for instructions.)
6.2.1 Meteorological Data (15 min. averages) can be obtained by modem from the MIDAS storage computer in the Meteorological Tower Trailer by using the Personal Computer. (See EPIP 2-2 for instructions.)
6.2.2 Determine Pasquill Stability Class (A-G), using Attachment 2, in this procedure.
6.2.2 Determine Pasquill Stability Class (A-G), using Attachment 2, in this procedure.
6.2.3 Obtain concentration or particulate, noble gas or iodines and vent flow to determine release rate. Refer to EPIP 2-3 or refer to the listing of effluent monitor calibration factors provided in Attachment 6 to this procedure.
6.2.3 Obtain concentration or particulate, noble gas or iodines and vent flow to determine release rate. Refer to EPIP 2-3 or refer to the listing of effluent monitor calibration factors provided in Attachment 6 to this procedure.
NOTE:         Standard Release Rates*
NOTE:
Plant Vent           =   Normal = 77,854 cfm, Emergency = 71,289 cfm Containment         =   Normal and Emergency = 15,300 cfm Air Ejector         =   Normal and Emergency = 6.00E2
Standard Release Rates*
* Verify values with Dose Assessment Manager 6.2.4 To calculate the downwind concentration of noble gas, particulates or radioiodine, multiply the release rate of radioactivity (Cisec) from the plant times the X/Q (sec/i 3) dispersion coefficient determined in Attachment 1. The resultant concentration will be pCicc. Perform these calculations on Attachment 1.
Plant Vent  
=
Normal = 77,854 cfm, Emergency = 71,289 cfm Containment  
=
Normal and Emergency = 15,300 cfm Air Ejector  
=
Normal and Emergency = 6.00E2
* Verify values with Dose Assessment Manager 6.2.4 To calculate the downwind concentration of noble gas, particulates or radioiodine, multiply the release rate of radioactivity (Cisec) from the plant times the X/Q (sec/i
: 3) dispersion coefficient determined in Attachment 1. The resultant concentration will be pCicc. Perform these calculations on Attachment 1.
6.2.5 Obtain an initial release estimate of release duration from the TSC Emergency Coordinator or Recovery Manager. If this estimate is unavailable, use an initial release duration estimate of 4 hours for dose projection purposes.
6.2.5 Obtain an initial release estimate of release duration from the TSC Emergency Coordinator or Recovery Manager. If this estimate is unavailable, use an initial release duration estimate of 4 hours for dose projection purposes.
6.2.6 Whole body gamma dose rate due to noble gas and radioiodine isotopes is estimated using Attachments 3 and 4 and using the listed factor corresponding to the approximate time after shutdown. Multiply this factor times the concentration calculated in Step 6.2.4 to get Rem/hour.
6.2.6 Whole body gamma dose rate due to noble gas and radioiodine isotopes is estimated using Attachments 3 and 4 and using the listed factor corresponding to the approximate time after shutdown. Multiply this factor times the concentration calculated in Step 6.2.4 to get Rem/hour.
Line 464: Line 686:
To determine the dose or dose rate for adults (which would only be necessary for emergency workers) divide the dose or dose rate for the child by 2.
To determine the dose or dose rate for adults (which would only be necessary for emergency workers) divide the dose or dose rate for the child by 2.
6.2.9 Thyroid dose is found by multiplying the dose rate calculated in step 6.2.8 times the exposure time determined in step. 6.2.5.
6.2.9 Thyroid dose is found by multiplying the dose rate calculated in step 6.2.8 times the exposure time determined in step. 6.2.5.
6.3   Protective Action Recommendations 6.3.1 Recommend the appropriate measures for the general public in accordance with EPIP 2-1.
6.3 Protective Action Recommendations 6.3.1 Recommend the appropriate measures for the general public in accordance with EPIP 2-1.
6.3.2 Weather forecast information should be considered when planning protective actions. Refer to EPIP 2-2 for instructions to obtain weather forecast information.
6.3.2 Weather forecast information should be considered when planning protective actions. Refer to EPIP 2-2 for instructions to obtain weather forecast information.
7.0   ATTACHMENTS
7.0 ATTACHMENTS
: 1. Dose Assessment Calculation
: 1.
: 2. Pasquill Stability Class Criteria
Dose Assessment Calculation
: 3. Noble Gas Whole Body Dose Conversion Factors
: 2.
: 4. Radioiodine Whole Body Dose Conversion Factors
Pasquill Stability Class Criteria
: 5. Radioiodine Thyroid Dose Conversion Factors
: 3.
: 6. RMS Process Monitor Calibration Factors
Noble Gas Whole Body Dose Conversion Factors
: 4.
Radioiodine Whole Body Dose Conversion Factors
: 5.
Radioiodine Thyroid Dose Conversion Factors
: 6.
RMS Process Monitor Calibration Factors


EPIP 2-4:5 Attachment 1, Rev. 14 Page 1 of 5 DOSE ASSESSMENT CALCULATION GENERAL INFORMATION:
EPIP 2-4:5, Rev. 14 Page 1 of 5 DOSE ASSESSMENT CALCULATION GENERAL INFORMATION:
Current Time:
Current Time:
Shutdown Time:
Shutdown Time:
Release Start Time:
Release Start Time:
Release Vent:         Plani I Vent             Air Ejector             ARV or Safety Containment Vent                Other Stability Class:        A B C                        D                    E F G able              Neutral                  Stable Vent Flow (CFM):
Release Vent:
Plani Stability Class:
A B I Vent Air Ejector Containment Vent C
D able Neutral ARV or Safety Other E F G Stable Vent Flow (CFM):
See Step 6.2.3 for flow rates VENT CONCENTRATION FROM EFFLUENT MONITOR READING:
See Step 6.2.3 for flow rates VENT CONCENTRATION FROM EFFLUENT MONITOR READING:
NOTE: Vent concentration can be Input directly from SPING monitors, If available.
NOTE: Vent concentration can be Input directly from SPING monitors, If available.
Noble Gas (Monitor Number                     ):
Noble Gas (Monitor Number  
cpm     X       _Ci/CC                       =               pCVcc*
):
(count rate)                     (calib. factor) cpm             (vent cond.)
cpm X
Radlolodine (Montior Number                       :
_Ci/CC  
hours (later counts)                   (initial counts)         (time between readings) x                                               pCicc (A cpm/hr from monitor)         (calib. factor)          (vent cond.)
=
Particulate (Monitor Number                   ):
pCVcc*
cpm     X                           WuCi=cc =                   IJCicC*
(count rate)
(count rate)                     (calib. factor) cpm             (vent cond.)
(calib. factor) cpm (vent cond.)
Radlolodine (Montior Number (later counts)
(initial counts) hours (time between readings) pCicc (vent cond.)
x (A cpm/hr from monitor)
(calib. factor)
Particulate (Monitor Number  
):
cpm X
WuCi=cc =
IJCicC*
(count rate)
(calib. factor) cpm (vent cond.)
Flowrate Conversion (Convert CFM to cclsec) (Step 6.2.3)
Flowrate Conversion (Convert CFM to cclsec) (Step 6.2.3)
_ CFM     X       2.8E4 cc/ft     X       1 min/60 sec =               cc/sec
_ CFM X
2.8E4 cc/ft X
1 min/60 sec =
cc/sec


EPIP 2-4:6 Attachment 1, Rev. 14 Page 2 of 5 NOBLE GAS:
EPIP 2-4:6, Rev. 14 Page 2 of 5 NOBLE GAS:
To calculate release RATE in Ci/sec from monitors:
To calculate release RATE in Ci/sec from monitors:
pCi/cc x             cc/sec x 1E-6pCicc =                 C/sec NOTE: TO PREDICT DOWNWIND CONCENTRATION, OBTAIN FIRST VALUE FROM ATTACHMENT 2.
pCi/cc x cc/sec x 1E-6pCicc =
C/sec NOTE: TO PREDICT DOWNWIND CONCENTRATION, OBTAIN FIRST VALUE FROM ATTACHMENT 2.
NOTE: THE WIND SPEED INDICATOR AT THE 33 FOOT LEVEL IS DESIGNED TO MEASURE ONLY TO 50 MILES PER HOUR.
NOTE: THE WIND SPEED INDICATOR AT THE 33 FOOT LEVEL IS DESIGNED TO MEASURE ONLY TO 50 MILES PER HOUR.
sec-mph x           Ci/sec x 1/( ) mph   =         pCVcc at S.B. 500 meters m3               (windspeed) sec-mph x           Cl/sec x 1/( ) mph   =         pC/cc at 2 miles m3               (windspeed) sec-mph x           Ci/sec x 1/( ) mph   =         pCi/cc at 5 miles m3               (windspeed) sec-mph x           Cl/sec x 1/( ) mph   =         pC/cc at 10 miles m3               (windspeed) sec-mph x           Cl/sec x 1/( ) mph   =         pCi/cc at m3               (windspeed)                   (distance)
sec-mph x Ci/sec x 1/( ) mph  
=
pCVcc at S.B. 500 meters m3 (windspeed) sec-mph x Cl/sec x 1/( ) mph  
=
pC/cc at 2 miles m3 (windspeed) sec-mph x Ci/sec x 1/( ) mph  
=
pCi/cc at 5 miles m3 (windspeed) sec-mph x Cl/sec x 1/( ) mph  
=
pC/cc at 10 miles m3 (windspeed) sec-mph x Cl/sec x 1/( ) mph  
=
pCi/cc at m3 (windspeed)
(distance)
Hours after shutdown Rem/hr. per pCi/cc (Attachment 3):
Hours after shutdown Rem/hr. per pCi/cc (Attachment 3):
Distance                       SB         2 miles    5 miles        10 miles Noble Gas Whole Body Dose Rate (REM/hour)
Distance SB 2 miles Noble Gas Whole Body Dose Rate (REM/hour)
Projected duration (Hours)
Projected duration (Hours)
Noble Gas Projected Whole Body Dose (REM)
Noble Gas Projected Whole Body Dose (REM)
(Extemal Dose Equivalent - EDE)
(Extemal Dose Equivalent - EDE) 5 miles 10 miles


EPIP 2-4:7 Attachment 1, Rev. 14 Page 3 of 5 RADIOIODINE:
EPIP 2-4:7, Rev. 14 Page 3 of 5 RADIOIODINE:
To calculate release RATE in Cl/sec from monitor:
To calculate release RATE in Cl/sec from monitor:
(or use appropriate NG to I Default 1:1 E-4) pCVcc x     _ _    cc/sec x 1E-6pCi/cc =     .      . Ci/sec NOTE:     THE WIND SPEED INDICATOR AT THE 33 FOOT LEVEL IS DESIGNED TO MEASURE ONLY TO 50 MILES PER HOUR.
(or use appropriate NG to I Default 1:1 E-4) pCVcc x _
cc/sec x 1E-6pCi/cc =
Ci/sec NOTE:
THE WIND SPEED INDICATOR AT THE 33 FOOT LEVEL IS DESIGNED TO MEASURE ONLY TO 50 MILES PER HOUR.
To predict downwind concentration:
To predict downwind concentration:
sec-mrh x           Ci/sec x 1/( ) mph     =  ..      pCVcc at S.B. 500 meters ms3(windspeed) sec-mph x           Cl/sec x 1/( ) mph     =  ..      pCi/cc at 2 miles m3                   (windspeed) sec-mph x           Cl/sec x 1/( ) mph     =  ..      pCi/cc at 5 miles m3                   (windspeed) sec-mph x           Ci/sec x 1/( ) mph     =  ..      pCi/cc at 10 miles m3                   (windspeed) sec-mph x           Cl/sec x 11( ) mph     =   ..     PCVcc at m3                    (windspeed)                          (distance)
sec-mrh x Ci/sec x 1/( ) mph ms 3(windspeed) sec-mph x Cl/sec x 1 /( ) mph m3 (windspeed) sec-mph x Cl/sec x 1/( ) mph m3 (windspeed) sec-mph x Ci/sec x 1/( ) mph m3 (windspeed) sec-mph x Cl/sec x 11( ) mph m3 (windspeed)
=
pCVcc at S.B. 500 meters
=
pCi/cc at 2 miles
=
pCi/cc at 5 miles
=
pCi/cc at 10 miles
=
PCVcc at (distance)
Hours after shutdown Rem/hr. per lCi/cc (Attachment 4):
Hours after shutdown Rem/hr. per lCi/cc (Attachment 4):
Distance                             SB           2 miles   5 miles       10 miles Radioiodine Whole Body Dose Rate (REM/hour)
Distance SB 2 miles 5 miles 10 miles Radioiodine Whole Body Dose Rate (REM/hour)
Projected duration (Hours)
Projected duration (Hours)
Radioiodine Projected Whole Body Dose (REM)
Radioiodine Projected Whole Body Dose (REM)
(Committed Effective Dose Equivalent - CEDE)
(Committed Effective Dose Equivalent - CEDE)
  + PLUS +
+ PLUS +
Noble Gas Projected Whole Body Dose (REM) from previous page (External Dose Equivalent - EDE)
Noble Gas Projected Whole Body Dose (REM) from previous page (External Dose Equivalent - EDE)
  + EQUALS +
+ EQUALS +
TOTAL Projected Whole Whole Body Dose (REM)
TOTAL Projected Whole Whole Body Dose (REM)
(Total Effective Dose Equivalent - (TEDE)
(Total Effective Dose Equivalent - (TEDE)


EPIP 2-4:8 Attachment 1, Rev. 14 Page 4 of 5 RADIOIODINE: (continued)
EPIP 2-4:8, Rev. 14 Page 4 of 5 RADIOIODINE: (continued)
To calculate release RATE in Ci/sec from monitors:
To calculate release RATE in Ci/sec from monitors:
(or use appropriate NG to I DEFAULT 1:1 E-4) pCicc x               cc/sec x 1E-6 pCi/cc =           Ci/sec Rem/hr. per pCVcc (Attachment 5):
(or use appropriate NG to I DEFAULT 1:1 E-4) pCicc x cc/sec x 1 E-6 pCi/cc =
Distance                       3B         2 miles   5 miles 10 miles     _
Ci/sec Rem/hr. per pCVcc (Attachment 5):
Radioiodine Whole Body Dose Rate (REM/hour)
Distance 3B 2 miles 5 miles 10 miles Radioiodine Whole Body Dose Rate (REM/hour)
Projected duration (Hours)                       _
Projected duration (Hours)
Radioiodine Projected Thyroid Dose (REM)                                 _
Radioiodine Projected Thyroid Dose (REM)
(Committed Dose Equivalent - CDE)
(Committed Dose Equivalent - CDE)


EPIP 2-4:9 Attachment 1, Rev. 14 Page 5 of 5 PARTICULATE:
EPIP 2-4:9, Rev. 14 Page 5 of 5 PARTICULATE:
To calculate release RATE in Cisec from monitors:
To calculate release RATE in Cisec from monitors:
pCi/cc x             cc/sec x 1E-6 pCi/cc =               Ci/sec NOTE: THE WIND SPEED INDICATOR AT THE 33 FOOT LEVEL IS DESIGNED TO MEASURE ONLY TO 50 MILES PER HOUR.
pCi/cc x cc/sec x 1 E-6 pCi/cc =
Ci/sec NOTE: THE WIND SPEED INDICATOR AT THE 33 FOOT LEVEL IS DESIGNED TO MEASURE ONLY TO 50 MILES PER HOUR.
To predict downwind concentration:
To predict downwind concentration:
sec-mph x   _   _    Ci/sec x 1/( ) mph =  _______  pCi/cc at S.B. 500 meters m3         (windspeed) sec-mph x   _   _    Ci/sec x 1/( ) mph =  ______  pCi/cc at 2 miles m3         (windspeed) sec-mph x   _   _    Ci/sec x 1/( ) mph =  _______  pCVcc at 5 miles 3
sec-mph x _
m          (windspeed) sec-mph x   __     CVsec x 1/( ) mph   =  ______  pCi/cc at 10 miles m3         (windspeed) sec-mgh x   _   _  Cisec x 1/( ) mph   =   ______   pCi/cc at m3          (windspeed)                                  (distance)
Ci/sec x 1/( ) mph m3 (windspeed) sec-mph x _
Ci/sec x 1/( ) mph m3 (windspeed) sec-mph x _
Ci/sec x 1/( ) mph m3 (windspeed) sec-mph x __
CVsec x 1/( ) mph m3 (windspeed) sec-mgh x _
Cisec x 1/( ) mph m3 (windspeed)
= _______
pCi/cc at S.B. 500 meters
=
pCi/cc at 2 miles
= _______
pCVcc at 5 miles
= ______
pCi/cc at 10 miles
= ______
pCi/cc at (distance)
Hours after shutdown Rem/hr. per pCi/cc:
Hours after shutdown Rem/hr. per pCi/cc:
Distance                                   2 miles 5 miles   10 miles Particulate Whole Body Dose Rate (REM/hour)
Distance 2 miles 5 miles 10 miles Particulate Whole Body Dose Rate (REM/hour)
Projected duration (Hours)
Projected duration (Hours)
Particulate Projected Whole Body Dose (REM)
Particulate Projected Whole Body Dose (REM)
NOTE: THE APPROPRIATE DOSE CONVERSION FACTOR FOR PARTICULATES WOULD BE BASED UPON THE RESULTS OF AN ISOTOPIC ANALYSIS OF THE MIXTURE AND REFERENCING EPA-400-R-92-001.
NOTE: THE APPROPRIATE DOSE CONVERSION FACTOR FOR PARTICULATES WOULD BE BASED UPON THE RESULTS OF AN ISOTOPIC ANALYSIS OF THE MIXTURE AND REFERENCING EPA-400-R-92-001.


!                                      (f                                                     (
(f
EPIP 2-4:10 Attachment 2, Rev. 14 Page 1 of 2 PASQUILL STABILITY CLASS CRITERIA PASQUILL                                 150 FT 33 FT                 250 FT   - 33 FT STABILITY   DELTAT (DEG F/100 FT)     DELTAT   (DEG F/117 FT)       DELTAT     (DEG F1217 CLASS                                                                         FT)
(
GREATER   LESS THAN     GREATER       LESS THAN       GREATER           LESS THAN THAN   OR EQUAL TO       THAN       OR EQUAL TO       THAN           OR EQUAL TO l   A       --          1.0           _-            -1.17           ---              2.17 B     -1.0       -0.9         -1.17           -1.05         -2.17             -1.95 C     -0.9       -0.8         -1.05           -0.94         -1.95             -1.74 D     -0.8       -0.3         -0.94           -0.35         -1.74             -0.65 E     -0.3       0.8         -0.35           0.94         -0.65               1.74 F       0.8       2.2           0.94           2.57           1.74               4.77 G       2.2                     2.57               .          4.77
EPIP 2-4:10, Rev. 14 Page 1 of 2 PASQUILL STABILITY CLASS CRITERIA PASQUILL 150 FT 33 FT 250 FT 33 FT STABILITY DELTAT (DEG F/100 FT)
DELTAT (DEG F/117 FT)
DELTAT (DEG F1217 CLASS FT)
GREATER LESS THAN GREATER LESS THAN GREATER LESS THAN THAN OR EQUAL TO THAN OR EQUAL TO THAN OR EQUAL TO l
A 1.0  
-1.17 2.17 B  
-1.0  
-0.9  
-1.17  
-1.05  
-2.17  
-1.95 C  
-0.9  
-0.8  
-1.05  
-0.94  
-1.95  
-1.74 D  
-0.8  
-0.3  
-0.94  
-0.35  
-1.74  
-0.65 E  
-0.3 0.8  
-0.35 0.94  
-0.65 1.74 F
0.8 2.2 0.94 2.57 1.74 4.77 G
2.2 2.57 4.77


EPIP 2-4:11 PASQUILL STABILITY CLASS CRITERIA       Attachment 2, Rev. 14 Page 2 of 2 GINNA SITE VALUES OF Xu/Q AS A FUNCTION OF STABILITY AND DISTANCE UNSTABLE                     NEUTRAL (D)         STABLE (F)
EPIP 2-4:11 PASQUILL STABILITY CLASS CRITERIA, Rev. 14 Page 2 of 2 GINNA SITE VALUES OF Xu/Q AS A FUNCTION OF STABILITY AND DISTANCE UNSTABLE NEUTRAL (D)
MILES             A       B             C           D         E       F           G 0.1           4.48E-5   2.32E-4       6.44E-4     9.16E-4   9.35E-4 1.18E-3     1.22E-3 0.2           1.91 E-5 7.88E-5       2.29E-4     3.89E-4   4.37E-4 6.30E-4     7.35E-4 0.3 SB         1.16E-5 4.20E-5       1.25E-4     2.36E-4   2.80E-4 4.36E-4     5.46E-4SB 0.4           8.12E-6 2.68E-5       8.15E-5     1.65E-4   2.04E-4 3.35E-4     4.43E-4 0.5           6.17E-6 1.90E-5       5.84E-5     1.26E-4   1.60E-4 2.74E-4     3.76E-4 0.6           4.93E-6   1.43E-5       4.45E-5     1.OOE-4   1.31 E-4 2.32E-4     3.29E-4 0.7           4.08E-6   1.12E-5       3.54E-5     8.29E-5   1.11E-4 1.60E-4     2.94E-4 0.9           2.99E-6   7.60E-6       2.43E-5     6.08E-5   8.40E-5 1.60E-4     2.44E-4 1.0           2.63E-6   6.45E-6       2.08E-5     5.33E-5   7.49E-5 1.46E4     2.26E-4 1.1           2.34E-6   5.56E-6       1.80E-5     4.74E-5   6.74E-5 1.34E-4     2.11 E-4 1.2           2.1OE-6   4.86E-6       1.58E-5     4.26E-5   6.13E-5 123E-4     1.98E-4 1.6           1.47E-6 3.11 E-6     1.03E-5     2.99E-5   4.47E-5 9.50E-5     1.60E-4 1.9           1.19E-6 2.38E-6       7.98E-6     2.41E-5   3.70E-5 8.12E-5     1.41E-4 2.0           1.12E-6 2.20E-6       7.39E-6     2.27E-5   3.50E-5 7.75E-5     1.36E-4 22           9.95E-7   1.89E-6       6.41 E-6   2.01 E-5   3.15E-5 7.11 E-5   1.27E-4 2.5           8.50E-7   1.55E-6       5.30E-6     1.72E-5   2.74E-5 6.33E-5     1.1 6E-4 2.8           7.39E-7   1.30E-6       4.47E-6     1.50E-5   2.42E-5 5.71 E-5   1.06E-4 3.0           6.79E-7   1.17E-6       4.04E-6     1.37E-5   2.24E-5 5.36E-5     1.01E-4 3.5           5.62E-7 9.20E-7       3.21 E-6   1.14E-5   1.90E-5 4.66E-5     9.04E-5 3.7           5.24E-7 8.44E-7       2.95E-6     1.06E-5   1.78E-5 4.43E-5     8.68E-5 4.0           4.76E-7   7.47E-7       2.63E-6     9.63E-6   1.64E-5 4.41 E-5   8.20E-5 4.2           4.49E-7   6.93E-7       2.44E-6     9.07E-6   1.55E-5 3.95E-5     791 E-5 4.5           4.12E-7   6.22E-7       2.20E-6     8.33E-6   1.44E-5 3.71 E-5   7.52E-5 4.8           3.81 E-7 5.63E-7       2.OOE-6     7.69E-6   1.34E-5 3.50E-5     7.17E-5 5.0           3.62E-7   5.28E-7       1.88E-6     7.31 E-6   1-28E-5 3.37E-5     6-98E-5 5.2           3.45E-7   4.97E-7       1.78E-6     6.96E-6   1.23E-5 3.25E-5     6.76E-5 5.5           3.22E-7   4.55E-7       1.63E-6     6.50E-6   1.1 5E-5 3.09E-5     6.49E-5 5.8           3.01E-7 4.19E-7       1.51E-6     6-09E-6   1.09E-5 2.94E-5     6.24E-5 6.0           2.98E-7   3.98E-7       1.44E-6     5.84E-6   1.05E-5 2.85E-5     6-09E-5 6.2           2.78E-7   3.78E-7       1.37E-6     5.60E-6   1.01 E-5 2.77E-5     5.95E-5 6.5           2.62E-7 3.51 E-7     1.27E-6     5.29E-6   9.61 E-6 2.65E-5     5.74E-5 6.8           2.48E-7   3.27E-7       1.19E-6     5.OOE-6   9.15E-6 2.55E-5     5.56E-5 7.0           2.39E-7 3.13E-7       1.14E-6     4.82E-6   8.86E-6 2.48E-5     5.44E-5 7.2           2.31 E-7 3.OOE-7       1.09E-6     4.66E-6   8.59E-6 2.42E-5     5.33E-5 7.5           2.20E-7 2.81 E-7     1.03E-6     4.43E-6   8.22E-6 2.33E-5     5.17E-5 7.8           2.09E-7   2.65E-7       9.71E-7     4.22E-6   7.87E-6 2.25E-5     5.03E-5 8.0           2.03E-7   2.54E-7       9.35E-7     4.09E-6   7.66E-6 2.20E-5     4.93E-5 82             1.&sect;7E-7 2.45E-7       9.01 E-7   3.97E-6   7.45E-6 2.15E-5     4-85E-5 8.5           1.88E-7 2.31 E-7     8.54E-7     3.80E-6   7.16E-6 2.08E-5     4.72E-5 8.8           1.80E-7 2.19E-7       8.11E-7     3.64E-6   6.90E-6 2.01 E-5   4.60E-5 9.0           1.75E-7 2.12E-7       7.84E-7     3.54E-6   6.73E-6 1.97E-5     4.53E-5 9.2           1.71E-7 2.05E-7       7.59E-7     3.44E-6   6.57E-6 1.93E-5     4.45E-5 9.5           1.64E-7 1.95E-7       7.23E-7     3.31 E-6   6.34E-6 1.88E-5     4.35E-5 9.8           1.58E-7 1.85E-7       6.91E-7     3.18E-6   6.13E-6 1.83E-5     4.25E-5 10.0           1.54E-7 1.80E-7       6.70E.7     3.1 1E-6   5.99E-6 1.79E-5     4.19E-5 SB = Site Boundary
STABLE (F)
MILES A
B C
D E
F G
0.1 4.48E-5 2.32E-4 6.44E-4 9.16E-4 9.35E-4 1.18E-3 1.22E-3 0.2 1.91 E-5 7.88E-5 2.29E-4 3.89E-4 4.37E-4 6.30E-4 7.35E-4 0.3 SB 1.16E-5 4.20E-5 1.25E-4 2.36E-4 2.80E-4 4.36E-4 5.46E-4SB 0.4 8.12E-6 2.68E-5 8.15E-5 1.65E-4 2.04E-4 3.35E-4 4.43E-4 0.5 6.17E-6 1.90E-5 5.84E-5 1.26E-4 1.60E-4 2.74E-4 3.76E-4 0.6 4.93E-6 1.43E-5 4.45E-5 1.OOE-4 1.31 E-4 2.32E-4 3.29E-4 0.7 4.08E-6 1.12E-5 3.54E-5 8.29E-5 1.11E-4 1.60E-4 2.94E-4 0.9 2.99E-6 7.60E-6 2.43E-5 6.08E-5 8.40E-5 1.60E-4 2.44E-4 1.0 2.63E-6 6.45E-6 2.08E-5 5.33E-5 7.49E-5 1.46E4 2.26E-4 1.1 2.34E-6 5.56E-6 1.80E-5 4.74E-5 6.74E-5 1.34E-4 2.11 E-4 1.2 2.1OE-6 4.86E-6 1.58E-5 4.26E-5 6.13E-5 123E-4 1.98E-4 1.6 1.47E-6 3.11 E-6 1.03E-5 2.99E-5 4.47E-5 9.50E-5 1.60E-4 1.9 1.19E-6 2.38E-6 7.98E-6 2.41E-5 3.70E-5 8.12E-5 1.41E-4 2.0 1.12E-6 2.20E-6 7.39E-6 2.27E-5 3.50E-5 7.75E-5 1.36E-4 22 9.95E-7 1.89E-6 6.41 E-6 2.01 E-5 3.15E-5 7.11 E-5 1.27E-4 2.5 8.50E-7 1.55E-6 5.30E-6 1.72E-5 2.74E-5 6.33E-5 1.1 6E-4 2.8 7.39E-7 1.30E-6 4.47E-6 1.50E-5 2.42E-5 5.71 E-5 1.06E-4 3.0 6.79E-7 1.17E-6 4.04E-6 1.37E-5 2.24E-5 5.36E-5 1.01E-4 3.5 5.62E-7 9.20E-7 3.21 E-6 1.14E-5 1.90E-5 4.66E-5 9.04E-5 3.7 5.24E-7 8.44E-7 2.95E-6 1.06E-5 1.78E-5 4.43E-5 8.68E-5 4.0 4.76E-7 7.47E-7 2.63E-6 9.63E-6 1.64E-5 4.41 E-5 8.20E-5 4.2 4.49E-7 6.93E-7 2.44E-6 9.07E-6 1.55E-5 3.95E-5 791 E-5 4.5 4.12E-7 6.22E-7 2.20E-6 8.33E-6 1.44E-5 3.71 E-5 7.52E-5 4.8 3.81 E-7 5.63E-7 2.OOE-6 7.69E-6 1.34E-5 3.50E-5 7.17E-5 5.0 3.62E-7 5.28E-7 1.88E-6 7.31 E-6 1-28E-5 3.37E-5 6-98E-5 5.2 3.45E-7 4.97E-7 1.78E-6 6.96E-6 1.23E-5 3.25E-5 6.76E-5 5.5 3.22E-7 4.55E-7 1.63E-6 6.50E-6 1.1 5E-5 3.09E-5 6.49E-5 5.8 3.01E-7 4.19E-7 1.51E-6 6-09E-6 1.09E-5 2.94E-5 6.24E-5 6.0 2.98E-7 3.98E-7 1.44E-6 5.84E-6 1.05E-5 2.85E-5 6-09E-5 6.2 2.78E-7 3.78E-7 1.37E-6 5.60E-6 1.01 E-5 2.77E-5 5.95E-5 6.5 2.62E-7 3.51 E-7 1.27E-6 5.29E-6 9.61 E-6 2.65E-5 5.74E-5 6.8 2.48E-7 3.27E-7 1.19E-6 5.OOE-6 9.15E-6 2.55E-5 5.56E-5 7.0 2.39E-7 3.13E-7 1.14E-6 4.82E-6 8.86E-6 2.48E-5 5.44E-5 7.2 2.31 E-7 3.OOE-7 1.09E-6 4.66E-6 8.59E-6 2.42E-5 5.33E-5 7.5 2.20E-7 2.81 E-7 1.03E-6 4.43E-6 8.22E-6 2.33E-5 5.17E-5 7.8 2.09E-7 2.65E-7 9.71E-7 4.22E-6 7.87E-6 2.25E-5 5.03E-5 8.0 2.03E-7 2.54E-7 9.35E-7 4.09E-6 7.66E-6 2.20E-5 4.93E-5 82 1.&sect;7E-7 2.45E-7 9.01 E-7 3.97E-6 7.45E-6 2.15E-5 4-85E-5 8.5 1.88E-7 2.31 E-7 8.54E-7 3.80E-6 7.16E-6 2.08E-5 4.72E-5 8.8 1.80E-7 2.19E-7 8.11E-7 3.64E-6 6.90E-6 2.01 E-5 4.60E-5 9.0 1.75E-7 2.12E-7 7.84E-7 3.54E-6 6.73E-6 1.97E-5 4.53E-5 9.2 1.71E-7 2.05E-7 7.59E-7 3.44E-6 6.57E-6 1.93E-5 4.45E-5 9.5 1.64E-7 1.95E-7 7.23E-7 3.31 E-6 6.34E-6 1.88E-5 4.35E-5 9.8 1.58E-7 1.85E-7 6.91E-7 3.18E-6 6.13E-6 1.83E-5 4.25E-5 10.0 1.54E-7 1.80E-7 6.70E.7 3.1 1E-6 5.99E-6 1.79E-5 4.19E-5 SB = Site Boundary


EPIP 2-4:12 Attachment 3, Rev. 14 Page 1 of 1 NOBLE GAS DOSE CONVERSION FACTORS FOR WHOLE BODY (EDE)
EPIP 2-4:12, Rev. 14 Page 1 of 1 NOBLE GAS DOSE CONVERSION FACTORS FOR WHOLE BODY (EDE)
Time After Shutdown (Hours)     Rem/Hour Per pCi/cc 0                          470 1                          434 2                            331 3                            265 4                            221 6                            159 12                            65 NOTE: MULTIPLY MCI/CC BY THE LISTED FACTOR TO OBTAIN REMIHOUR.
Time After Shutdown (Hours) 0 1
2 3
4 6
12 Rem/Hour Per pCi/cc 470 434 331 265 221 159 65 NOTE: MULTIPLY MCI/CC BY THE LISTED FACTOR TO OBTAIN REMIHOUR.


EPIP 2-4:13 Attachment 4, Rev. 14 Page 1 of 1 RADIOIODINE DOSE CONVERSION FACTORS FOR WHOLE BODY (CEDE)
EPIP 2-4:13, Rev. 14 Page 1 of 1 RADIOIODINE DOSE CONVERSION FACTORS FOR WHOLE BODY (CEDE)
Time After Shutdown (Hours)     Rem/Hour Per   jCi/cc 0                          1.73E4 1                          1.57E4 2                          1.76E4 3                          1.92E4 4                          2.05E4 6                          2.24E4 12                          2.65E4 NOTE: MULTIPLY MCVCC BY THE LISTED FACTOR TO OBTAIN REM/HOUR.
Time After Shutdown (Hours) 0 1
2 3
4 6
12 Rem/Hour Per jCi/cc 1.73E4 1.57E4 1.76E4 1.92E4 2.05E4 2.24E4 2.65E4 NOTE: MULTIPLY MCVCC BY THE LISTED FACTOR TO OBTAIN REM/HOUR.


EPIP 2-4:14 Attachment 5, Rev. 14 Page 1 of 1 RADIOIODINE CONVERSION FACTORS FOR THYROID (CDE)
EPIP 2-4:14, Rev. 14 Page 1 of 1 RADIOIODINE CONVERSION FACTORS FOR THYROID (CDE)
Time After Shutdown (Hours)                   Rem/Hour Per VCVCC*
Time After Shutdown (Hours) 0 1
0                                        4.4E5 1                                        5.4E5 2                                        6.4E5 3                                        7.4E5 4                                        7.8E5 6                                        8.8E5 12                                        1.1E6 NOTE:   MULTIPLY MCI/CC BY THE LISTED FACTOR TO OBTAIN REM/HOUR.
2 3
* These conversion factors have been increased by a factor of two. EPA-400 uses the adult thyroid. New York State has increased EPA-400 factors by two to adjust for child thyroid.
4 6
12 Rem/Hour Per VCVCC*
4.4E5 5.4E5 6.4E5 7.4E5 7.8E5 8.8E5 1.1E6 NOTE:
MULTIPLY MCI/CC BY THE LISTED FACTOR TO OBTAIN REM/HOUR.
These conversion factors have been increased by a factor of two. EPA-400 uses the adult thyroid. New York State has increased EPA-400 factors by two to adjust for child thyroid.


EPIP 2-4:15 Attachment 6, Rev. 14 Page 1 of 2 RMS PROCESS MONITOR CALIBRATION FACTORS R-10A CONTAINMENT IODINE:
EPIP 2-4:15, Rev. 14 Page 1 of 2 RMS PROCESS MONITOR CALIBRATION FACTORS R-10A CONTAINMENT IODINE:
pCi/cc lodine-131 = (Acpm/hour) (1.10 E-11)
pCi/cc lodine-131 = (A cpm/hour) (1.10 E-11)
RIOB PLANT VENT IODINE:
RIOB PLANT VENT IODINE:
pCicc lodine-1 31 = (Acpmlhour) (9.02 E-12)
pCicc lodine-1 31 = (A cpmlhour) (9.02 E-12)
R-i1 CONTAINMENT PARTICULATE:
R-i1 CONTAINMENT PARTICULATE:
pCi/cc as Cs-137 = ( cpm) (3.12 E-12)
pCi/cc as Cs-137 = ( cpm) (3.12 E-12)
R-12 CONTAINMENT GAS:
R-12 CONTAINMENT GAS:
pCi/cc Xe-I 33 = ( cpm) (5.6 E-8)
pCi/cc Xe-I 33 = ( cpm) (5.6 E-8)
R-13 PLANT VENT PARTICULATE:
R-13 PLANT VENT PARTICULATE:
pCVcc as Cs-137 = ( cpm) (2.91 E-12)
pCVcc as Cs-137 = ( cpm) (2.91 E-12)
R-14 PLANT VENT GAS:
R-14 PLANT VENT GAS:
Calibration factors calculated based on Kr-85 and Xe-1 33 calibration factors.
Calibration factors calculated based on Kr-85 and Xe-1 33 calibration factors.
pCicc as Xe-133 = ( cpm) (5.6 E-8)
pCicc as Xe-133 = ( cpm) (5.6 E-8)
R-15 AIR EJECTOR AND GLAND STEAM EXHAUST GAS:
R-15 AIR EJECTOR AND GLAND STEAM EXHAUST GAS:
pCi/cc Xe-133 = ( cpm) (4.6 E-8) pCVcc as normal gas mixture * = ( cpm) (5.0 E-8)
pCi/cc Xe-133 = ( cpm) (4.6 E-8) pCVcc as normal gas mixture * = ( cpm) (5.0 E-8)
* Based on the mixture of noble gas present in the reactor coolant during the 01/25/82 tube rupture which is representative of normal operations.
Based on the mixture of noble gas present in the reactor coolant during the 01/25/82 tube rupture which is representative of normal operations.
R-16 CONTAINMENT FAN COOLER SERVICE WATER:
R-16 CONTAINMENT FAN COOLER SERVICE WATER:
pCi/cc as Cs- 37 = ( cpm) (1.5 E-8)
pCi/cc as Cs-37 = ( cpm) (1.5 E-8)
R-17 COMPONENT COOLING:
R-17 COMPONENT COOLING:
pCi/cc as Cs-137 = ( cpm) (1.4 E-8)
pCi/cc as Cs-137 = ( cpm) (1.4 E-8)


EPIP 2-4:16 Attachment 6, Rev. 14 Page 2 of 2 RMS PROCESS MONITOR CALIBRATION FACTORS R-18 RADWASTE SYSTEM DISCHARGE::
EPIP 2-4:16, Rev. 14 Page 2 of 2 RMS PROCESS MONITOR CALIBRATION FACTORS R-18 RADWASTE SYSTEM DISCHARGE::
pCVcc as Cs-137= ( cpm) (1.4 E-8)
pCVcc as Cs-137= ( cpm) (1.4 E-8)
R-19 STEAM GENERATOR BLOWDOWN:
R-19 STEAM GENERATOR BLOWDOWN:
pCVcc as Cs-137= ( cpm) (1.4 E-8)
pCVcc as Cs-137= ( cpm) (1.4 E-8)
R-20A SPENT FUEL POOL HEAT EXCHANGER SERVICE WATER:
R-20A SPENT FUEL POOL HEAT EXCHANGER SERVICE WATER:
pCVcc as Cs-137 = ( cpm) (2.4 E-8)
pCVcc as Cs-137 = ( cpm) (2.4 E-8)
R-20B SPENT FUEL POOL HEAT EXCHANGER SERVICE WATER pCVcc as Cs-137 = ( cpm) (1.7 E-7)
R-20B SPENT FUEL POOL HEAT EXCHANGER SERVICE WATER pCVcc as Cs-137 = ( cpm) (1.7 E-7)
R-21 RETENTION TANK:
R-21 RETENTION TANK:
pCi/cc as Cs-137 = ( cpm) (1.5 E-8)
pCi/cc as Cs-137 = ( cpm) (1.5 E-8)
R-22 HIGH CONDUCTIVITY WASTE TANK:
R-22 HIGH CONDUCTIVITY WASTE TANK:
pCVcc as Cs-137= ( cpm) (1.2 E-8)
pCVcc as Cs-137= ( cpm) (1.2 E-8)
R-31 STEAM LINE RADIATION MONITOR:
R-31 STEAM LINE RADIATION MONITOR:
mr/hr = ( cpm) (2.11 E-2)
mr/hr = ( cpm) (2.11 E-2)
R-32 STEAM LINE RADIATION MONITOR:
R-32 STEAM LINE RADIATION MONITOR:
mr/hr = ( cpm) (2.02 E-2)
mr/hr = (
R-36 CONTROL ROOM NOBLE GAS MONITOR:
cpm) (2.02 E-2)
R-36 CONTROL ROOM NOBLE GAS MONITOR:
pCicc as Kr-85 = ( cpm) (1.75 E-8) pCVcc as Xe-133 = ( cpm) (1.41 E-7)
pCicc as Kr-85 = ( cpm) (1.75 E-8) pCVcc as Xe-133 = ( cpm) (1.41 E-7)
R-37 CONTROL ROOM PARTICULATE MONITOR:
R-37 CONTROL ROOM PARTICULATE MONITOR:
pCi/cc as Cs-137 = ( cpm) (1.68 E-12)
pCi/cc as Cs-137 = ( cpm) (1.68 E-12)
R38   CONTROL ROOM IODINE MONITOR:
R38 CONTROL ROOM IODINE MONITOR:
pCi/cc as 1-131 = ( cpm) (2.51 E-12)
pCi/cc as 1-131 = ( cpm) (2.51 E-12)


ROCHESTER GAS & ELECTRIC CORPORATION GINNA STATION Controlled Copy Number   _   _3 Procedure Number     EPIP 3-1                             Revision Number 23 Emergency Operations Facility (EOF) Activation Responsi
ROCHESTER GAS & ELECTRIC CORPORATION GINNA STATION Controlled Copy Number _
()Pj~qn7 Eff~ctivefDate Category 1.0 This procedure contains 9   pages
_3 Procedure Number EPIP 3-1 Revision Number 23 Emergency Operations Facility (EOF) Activation Responsi
 
()Pj~qn7 Eff~ctivefDate Category 1.0 This procedure contains 9
EPIP 3-1:1 EPIP 3-1 EMERGENCY OPERATIONS FACILITY (EOF) ACTIVATION 1.0  PURPOSE The purpose of this procedure is to designate actions and responsibility of individuals who would report to the Emergency Operations Facility upon a decision to activate the facility.
pages
2.0  RESPONSIBILITY 2.1  The first qualified person to arrive is responsible for initiating this procedure.
2.2  The EOF/Recovery Manager is responsible for activation of the EOF upon arrival.


==3.0   REFERENCES==
EPIP 3-1:1 EPIP 3-1 EMERGENCY OPERATIONS FACILITY (EOF) ACTIVATION 1.0 PURPOSE The purpose of this procedure is to designate actions and responsibility of individuals who would report to the Emergency Operations Facility upon a decision to activate the facility.
2.0 RESPONSIBILITY 2.1 The first qualified person to arrive is responsible for initiating this procedure.
2.2 The EOF/Recovery Manager is responsible for activation of the EOF upon arrival.


3.1   Developmental References 3.1.1 Nuclear Emergency Response Plan 3.1.2 NUREG-0654 "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants".
==3.0 REFERENCES==
3.2   Implementing References 3.2.1 EPIP 1-0, Ginna Station Event Evaluation and Classification 3.2.2 EPIP 1-5, Notifications 3.2.3 EPIP 3-3, Engineering Support Center (ESC) Activation 3.2.4 EPIP 3-6, Corporate Notifications 3.2.5 EPIP 4-6, Joint Emergency News Center (JENC) Activation 3.2.6 EPIP 5-7, Emergency Organization 4.0   PRECAUTIONS As noted in this procedure.
3.1 Developmental References 3.1.1 Nuclear Emergency Response Plan 3.1.2 NUREG-0654 "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants".
3.2 Implementing References 3.2.1 EPIP 1-0, Ginna Station Event Evaluation and Classification 3.2.2 EPIP 1-5, Notifications 3.2.3 EPIP 3-3, Engineering Support Center (ESC) Activation 3.2.4 EPIP 3-6, Corporate Notifications 3.2.5 EPIP 4-6, Joint Emergency News Center (JENC) Activation 3.2.6 EPIP 5-7, Emergency Organization 4.0 PRECAUTIONS As noted in this procedure.


EPIP 3-1:2 5.0     PREREQUISITES 5.1   An Alert, Site Area Emergency or a General Emergency has been declared in accordance with EPIP 1-0.
EPIP 3-1:2 5.0 PREREQUISITES 5.1 An Alert, Site Area Emergency or a General Emergency has been declared in accordance with EPIP 1-0.
5.2   The EOF could be activated anytime at the discretion of the EOF/Recovery Manager.
5.2 The EOF could be activated anytime at the discretion of the EOF/Recovery Manager.
6.0   ACTIONS 6.1   Arriving Personnel NOTE: Depending on the number of arriving personnel, perform steps concurrently to minimize activation time.
6.0 ACTIONS 6.1 Arriving Personnel NOTE: Depending on the number of arriving personnel, perform steps concurrently to minimize activation time.
6.1.1 Sign in at the Security Desk at the entrance to the EOF.
6.1.1 Sign in at the Security Desk at the entrance to the EOF.
6.1.2 Place your name under the appropriate emergency position on the magnetic organization chart.
6.1.2 Place your name under the appropriate emergency position on the magnetic organization chart.
6.1.3 Perform responsibilities as described in EPIP 5-7, Emergency Organization 6.1.4 Personnel arriving from the Ginna plant should perform a whole body frisk to check for contamination if there has been a release of radioactivity.
6.1.3 Perform responsibilities as described in EPIP 5-7, Emergency Organization 6.1.4 Personnel arriving from the Ginna plant should perform a whole body frisk to check for contamination if there has been a release of radioactivity.
6.2   EOF/Recovery Manager perform the following:
6.2 EOF/Recovery Manager perform the following:
NOTE: In the event of power loss at the EOF, contact the TSC Emergency Coordinator and discuss the need for the TSC to re-assume or maintain command and control, as appropriate.
NOTE: In the event of power loss at the EOF, contact the TSC Emergency Coordinator and discuss the need for the TSC to re-assume or maintain command and control, as appropriate.
6.2.1 Ensure minimum response staff listed below is available (as indicated by the red dots on the sign in board):
6.2.1 Ensure minimum response staff listed below is available (as indicated by the red dots on the sign in board):
: a.     Nuclear Operations Manager (NOM)
: a.
: b.     Engineering Manager
Nuclear Operations Manager (NOM)
: c.     Dose Assessment Manager
: b.
: d.     News Center Manager 6.2.2 If a position is not staffed, call in personnel. Qualified responders are found in their position checklist in EPIP 5-7. The TSC will fax the status of the call-in process to the incoming fax machine (located in the Administrative area across the hall) when they are staffed.
Engineering Manager
: c.
Dose Assessment Manager
: d.
News Center Manager 6.2.2 If a position is not staffed, call in personnel. Qualified responders are found in their position checklist in EPIP 5-7. The TSC will fax the status of the call-in process to the incoming fax machine (located in the Administrative area across the hall) when they are staffed.


EPIP 3-1:3 6.2.3 Obtain a briefing from the TSC Director on plant conditions. If the Ginna responders have been directed to the Ontario Fire Department Exempt Hall (located on Route 104 between Route 350 and Knickerbocker Road, phone number 315-524-8078), have the EOF responders obtain the checklists for their counterparts in EPIP 5-7. Ensure that all functions required by the onsite emergency organization are performed by the EOF responders to the extent practical.
EPIP 3-1:3 6.2.3 Obtain a briefing from the TSC Director on plant conditions. If the Ginna responders have been directed to the Ontario Fire Department Exempt Hall (located on Route 104 between Route 350 and Knickerbocker Road, phone number 315-524-8078), have the EOF responders obtain the checklists for their counterparts in EPIP 5-7. Ensure that all functions required by the onsite emergency organization are performed by the EOF responders to the extent practical.
6.2.4 Obtain notification forms from EOF fax machine that the Control Room and TSC have sent to notify offsite agencies. Use these forms and brief the response staff on plant conditions. Ensure that the staff makes contact with their counterparts.
6.2.4 Obtain notification forms from EOF fax machine that the Control Room and TSC have sent to notify offsite agencies. Use these forms and brief the response staff on plant conditions. Ensure that the staff makes contact with their counterparts.
The counterparts are:
The counterparts are:
: a.       EOF/Recovery Manager - TSC Director
: a.
: b.       EOF Dose Assessment Manager - TSC Dose Assessment Manager
EOF/Recovery Manager - TSC Director
: c.       Nuclear Operations Manager - TSC Operations Manager
: b.
: d.       Engineering Manager - TSC Technical Manager 6.2.5 If the Ginna responders will not be allowed site access for greater than four (4) hours, have the Ginna Engineering, Operations and Dose Assessment personnel report to the EOF to assist in technical evaluations.
EOF Dose Assessment Manager - TSC Dose Assessment Manager
: c.
Nuclear Operations Manager - TSC Operations Manager
: d.
Engineering Manager - TSC Technical Manager 6.2.5 If the Ginna responders will not be allowed site access for greater than four (4) hours, have the Ginna Engineering, Operations and Dose Assessment personnel report to the EOF to assist in technical evaluations.
6.2.6 Brief Federal, State and County Representatives in the EOF on the status of the emergency. Request that they contact their respective emergency operation facilities and determine if the county response organizations have any concerns.
6.2.6 Brief Federal, State and County Representatives in the EOF on the status of the emergency. Request that they contact their respective emergency operation facilities and determine if the county response organizations have any concerns.
NOTE: IF ONE OF THE INDIVIDUALS CANNOT BE CONTACTED, HAVE ONE OF THE OTHER CONTACTS ASSUME THE RESPONSIBILITY.
NOTE:
IF ONE OF THE INDIVIDUALS CANNOT BE CONTACTED, HAVE ONE OF THE OTHER CONTACTS ASSUME THE RESPONSIBILITY.
6.2.7 Contact RG&E management and notify them that you are the EOF/Recovery Manager and that the EOF is activated in response to a Ginna emergency.
6.2.7 Contact RG&E management and notify them that you are the EOF/Recovery Manager and that the EOF is activated in response to a Ginna emergency.
Inform them of the following:
Inform them of the following:
      'This is the EOF/Recovery Manager. Ginna has declared an emergency and we are activating our emergency facilities. Can you be the management contact for this event? You are to act as the liaison between RG&E and our parent company, Energy East.'
'This is the EOF/Recovery Manager. Ginna has declared an emergency and we are activating our emergency facilities. Can you be the management contact for this event? You are to act as the liaison between RG&E and our parent company, Energy East.'
Primary Notifications Jim Laurito                   Work:       (585) 724-8077 Home:       (585) 218-9528 Cellular:   (806) 306-7917
Primary Notifications Jim Laurito Work:
(585) 724-8077 Home:
(585) 218-9528 Cellular:
(806) 306-7917


EPIP 3-1:4 Primary Notifications (Cont'd.)
EPIP 3-1:4 Primary Notifications (Cont'd.)
Wes von Schack                 Work:       (607) 762-4550 Energy East                    Home:        (212) 396-9792 Cellular:    (607) 760-5200 Ken Jasinski                  Work:        (607) 762-4315 Energy East                    Home:        (914) 738-3065 Cellular:    (914) 441-5770 "This is the EOF/Recovery Manager. Ginna has declared an emergency and we are activating our emergency facilities. Can you be the financial contact for this event?"
Wes von Schack Energy East Work:
I         Joe Syta                               Work:       (585) 724-8003 I          Controller and Treasurer              Home:        (585) 425-4474 I                                                Pager:      (585) 528-8712 Debbie Merwin                          Work:        (585) 771-2212 I                                                Cellular:    (585) 329-6148 "This is the EOF/Recovery Manager. Ginna has declared an emergency and we are activating our emergency facilities. Can you be the RG&E outside/government agencies liaison for this event?"
Home:
Robert Bergin                         Work:       (585) 771-2294 Assistant General Counsel              Home:        (585) 377-4399 Government and Community              Cellular:    (585) 315-0040 Relations 6.2.8   Contact INPO at (800) 321-0614 and inform them of the declared emergency.
Cellular:
6.2.9   Request the Facilities and Personnel Manager contact hotels and food service providers for support of TSC and EOF responders.
(607) 762-4550 (212) 396-9792 (607) 760-5200 (607) 762-4315 (914) 738-3065 (914) 441-5770 Ken Jasinski Energy East Work:
6.2.11   Assuming Command and Control of the Emergency 6.2.11.1 Ensure minimum activation staff listed below is available to assume command and control:
Home:
: a. EOF Dose Assessment Manager
Cellular:
: b. Dose Assessment Support (3)
"This is the EOF/Recovery Manager. Ginna has declared an emergency and we are activating our emergency facilities. Can you be the financial contact for this event?"
: c. Nuclear Operations Manager (NOM)
I I
I Joe Syta Controller and Treasurer Work:
Home:
Pager:
(585) 724-8003 (585) 425-4474 (585) 528-8712 (585) 771-2212 (585) 329-6148 I
Debbie Merwin Work:
Cellular:
"This is the EOF/Recovery Manager. Ginna has declared an emergency and we are activating our emergency facilities. Can you be the RG&E outside/government agencies liaison for this event?"
Robert Bergin Assistant General Counsel Government and Community Relations Work:
Home:
Cellular:
(585) 771-2294 (585) 377-4399 (585) 315-0040 6.2.8 Contact INPO at (800) 321-0614 and inform them of the declared emergency.
6.2.9 Request the Facilities and Personnel Manager contact hotels and food service providers for support of TSC and EOF responders.
6.2.11 Assuming Command and Control of the Emergency 6.2.11.1 Ensure minimum activation staff listed below is available to assume command and control:
: a.
EOF Dose Assessment Manager
: b.
Dose Assessment Support (3)
: c.
Nuclear Operations Manager (NOM)


EPIP 3-1:5
EPIP 3-1:5
: d.     Technical Assistant to the NOM
: d.
: e.     Administrative Assistant to the NOM
Technical Assistant to the NOM
: f.     Communicator
: e.
: 9.       Engineering Manager
Administrative Assistant to the NOM
: h.     Facilities and Personnel Manager
: f.
: i.     EOF/JENC Security Manager
Communicator
: j.       Offsite Agency Liaison
: 9.
: k.     Technical Representative Liaison I.     Corporate Spokesperson
Engineering Manager
: m.     News Center Manager 6.2.11.2 If a position is not staffed, call in personnel. Qualified responders are found in their position checklist in EPIP 5-7.
: h.
Facilities and Personnel Manager
: i.
EOF/JENC Security Manager
: j.
Offsite Agency Liaison
: k.
Technical Representative Liaison I.
Corporate Spokesperson
: m.
News Center Manager 6.2.11.2 If a position is not staffed, call in personnel. Qualified responders are found in their position checklist in EPIP 5-7.
6.2.11.3 Confer with the TSC Emergency Coordinator on shifting command and control of the emergency from the TSC organization to the EOF. Normally when command and control is transferred, the EOF assumes:
6.2.11.3 Confer with the TSC Emergency Coordinator on shifting command and control of the emergency from the TSC organization to the EOF. Normally when command and control is transferred, the EOF assumes:
: a.     Overall direction for the emergency
: a.
: 1.       Emergency Classification
Overall direction for the emergency
: 2.       Protective Action Recommendations
: 1.
: b.     Notifications to New York State, Wayne and Monroe Counties
Emergency Classification
: c.     Dose Assessment and Offsite Survey Team coordination However, certain conditions may warrant transferring a given responsibility area (e.g. survey team coordination) at different times, per the discretion of the Emergency Coordinator and EOF/Recovery Manager.
: 2.
Protective Action Recommendations
: b.
Notifications to New York State, Wayne and Monroe Counties
: c.
Dose Assessment and Offsite Survey Team coordination However, certain conditions may warrant transferring a given responsibility area (e.g. survey team coordination) at different times, per the discretion of the Emergency Coordinator and EOF/Recovery Manager.
6.2.11.4 Brief EOF personnel on plant status and notify them that command and control will be assumed at the agreed upon time using Attachment 2 for meeting agenda.
6.2.11.4 Brief EOF personnel on plant status and notify them that command and control will be assumed at the agreed upon time using Attachment 2 for meeting agenda.


Line 674: Line 1,050:
6.2.11.8 Direct the Federal, State and County representatives in the EOF to contact their emergency management organizations and inform them that the EOF has assumed command and control.
6.2.11.8 Direct the Federal, State and County representatives in the EOF to contact their emergency management organizations and inform them that the EOF has assumed command and control.
6.2.11.9 Ensure the EOF Dose Assessment Manager notifies the Survey Center Manager that the EOF has assumed command and control.
6.2.11.9 Ensure the EOF Dose Assessment Manager notifies the Survey Center Manager that the EOF has assumed command and control.
6.3     Shift Tumover 6.3.1   If the EOF will be activated for more than 12 hours, direct the Facilities and Personnel Manager to complete Attachment 1 for continuous staffing.
6.3 Shift Tumover 6.3.1 If the EOF will be activated for more than 12 hours, direct the Facilities and Personnel Manager to complete Attachment 1 for continuous staffing.
6.3.2   When the responders for the next shift have arrived, have them perform a detailed turnover with the person that they are relieving. Have them log the turnover in their log book.
6.3.2 When the responders for the next shift have arrived, have them perform a detailed turnover with the person that they are relieving. Have them log the turnover in their log book.
6.3.3   When the individual turnovers are complete, have the on-coming crew perform a briefing for each other using the standard meeting agenda (Attachment 2). The off-going crew should also be at the briefing to ensure that the information that is shared is correct and complete.
6.3.3 When the individual turnovers are complete, have the on-coming crew perform a briefing for each other using the standard meeting agenda (Attachment 2). The off-going crew should also be at the briefing to ensure that the information that is shared is correct and complete.
6.3.4   To terminate the emergency or to transition to the recovery phase use EPIP 3-4.
6.3.4 To terminate the emergency or to transition to the recovery phase use EPIP 3-4.
7.0     ATTACHMENTS
7.0 ATTACHMENTS
: 1.     EOF Continuous Staffing Schedule
: 1.
: 2.     EOF Meeting Agenda
EOF Continuous Staffing Schedule
: 2.
EOF Meeting Agenda


EPIP 3-1:7 Attachment 1, Rev. 23 Page 1 of 2 EOF CONTINUOUS STAFFING SCHEDULE (Consult EPIP 5-7 position checklists for qualified personnel and phone numbers to fill positions.)
EPIP 3-1:7, Rev. 23 Page 1 of 2 EOF CONTINUOUS STAFFING SCHEDULE (Consult EPIP 5-7 position checklists for qualified personnel and phone numbers to fill positions.)
Shift _A            I Shift B_~~
Shift A Shift B I
hrs                           hrs to              hrs             to           hrs POSITION                           Date:                               Date:
_~~
hrs to hrs hrs to hrs POSITION Date:
Date:
EOF/Recovery Manager Secretary, Recovery Mgr Nuclear Operations Manager Technical Asst. to NOM Admin Asst to NOM Corporate Spokesperson Assistant to Corporate Spokesperson Technical Advisor to Corporate Spokesperson News Writer Engineering Manager Offsite Agency Liaison EOF Technical Representative Monroe County Tech. Rep.
EOF/Recovery Manager Secretary, Recovery Mgr Nuclear Operations Manager Technical Asst. to NOM Admin Asst to NOM Corporate Spokesperson Assistant to Corporate Spokesperson Technical Advisor to Corporate Spokesperson News Writer Engineering Manager Offsite Agency Liaison EOF Technical Representative Monroe County Tech. Rep.
Wayne County Tech. Rep.
Wayne County Tech. Rep.
Line 690: Line 1,070:
Facilities and Personnel Mgr EOF/JENC Security Manager
Facilities and Personnel Mgr EOF/JENC Security Manager


EPIP 3-1:8 Attachment 1, Rev.23 Page 2 of 2 EOF CONTINUOUS STAFFING SCHEDULE (Consult EPIP 5-7 position checklists for qualified personnel and phone numbers to fill positions.)
EPIP 3-1:8, Rev.23 Page 2 of 2 EOF CONTINUOUS STAFFING SCHEDULE (Consult EPIP 5-7 position checklists for qualified personnel and phone numbers to fill positions.)
Shift A                       Shift B hrs                           hrs to              hrs               to           hrs POSITION                           Date:                             Date:
Shift A Shift B hrs to hrs hrs to hrs POSITION Date:
Date:
Clerical Supervisor Fax Operator Copier Operator Courier Dose Assessment Manager Assistant DA Manager Dose Assessment Liaison Calculator Calculator Radio Operator Communicator Plotter Weather/Status Board Survey Team Survey Team Communicator Communicator Status Board Keeper
Clerical Supervisor Fax Operator Copier Operator Courier Dose Assessment Manager Assistant DA Manager Dose Assessment Liaison Calculator Calculator Radio Operator Communicator Plotter Weather/Status Board Survey Team Survey Team Communicator Communicator Status Board Keeper


EPIP 3-1:9 Attachment 2, Rev. 23                                                           Page 1 of 1 EOF MEETING AGENDA Meeting Date:                               Time:
EPIP 3-1:9, Rev. 23 Page 1 of 1 EOF MEETING AGENDA Meeting Date:
: 1.     Recovery Manager
Time:
* Purpose of Meeting
: 1.
* Classification level
Recovery Manager Purpose of Meeting Classification level Time classification declared Brief event description (use EAL reference manual)
* Time classification declared
Injury/Fire Status
* Brief event description (use EAL reference manual)
: 2.
* Injury/Fire Status
Dose Assessment Offsite Areas of concern (downwind areas)
: 2.       Dose Assessment
Protective Actions Recommended Abnormal radiation levels
* Offsite Areas of concern (downwind areas)
: 3.
* Protective Actions Recommended
Nuclear Operations Manager (Ginna to report if on conference calls)
* Abnormal radiation levels
Plant Status Maintenance Equipment out of service Repairs planned or in progress
: 3.       Nuclear Operations Manager (Ginna to report if on conference calls)
: 4.
* Plant Status
Engineering Manager (Ginna to report if on conference calls)
* Maintenance
Brief technical issues
* Equipment out of service
: 5.
* Repairs planned or in progress
Security Accountability of plant personnel Movement of response personnel to and from site.
: 4.       Engineering Manager (Ginna to report if on conference calls)
: 6.
* Brief technical issues
Facility and Personnel Manager Staffing of facilities Transportation of personnel Food Requests received
: 5.     Security
: 7.
* Accountability of plant personnel
Corporate Spokesperson Media questions
* Movement of response personnel to and from site.
: 8.
: 6.     Facility and Personnel Manager
Other RG&E Concerns
* Staffing of facilities
: 9.
* Transportation of personnel
County Concerns Wayne County Monroe County
* Food
: 10.
* Requests received
State Concerns State Emergency Management Office (SEMO)
: 7.     Corporate Spokesperson
Department of Health (DOH)
* Media questions
Department of Environmental Conservation
: 8.     Other RG&E Concerns
: 11.
: 9.     County Concerns
Federal Concerns Nuclear Regulatory Commission (NRC)
* Wayne County
Federal Emergency Management Agency (FEMA)
* Monroe County
Department of Energy (DOE)
: 10.     State Concerns
: 12.
* State Emergency Management Office (SEMO)
Review of Open Items Please write on these pages. New pages will be provided after each use.
* Department of Health (DOH)
* Department of Environmental Conservation
: 11.     Federal Concerns
* Nuclear Regulatory Commission (NRC)
* Federal Emergency Management Agency (FEMA)
* Department of Energy (DOE)
: 12.     Review of Open Items Please write on these pages. New pages will be provided after each use.


9 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER         t7-?
9 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER t7-?
PROCEDURE NO.           EPIP 3-3                         REV. NO. 10 IMMEDIATE ENTRY RESPONSER RESPONSIBLE   M   ER EFFEC IVE IATE Category 1.0 This procedure contains   6..j pages
PROCEDURE NO.
EPIP 3-3 REV. NO.
10 IMMEDIATE ENTRY RESPONSIBLE M ER RESPONSER EFFEC IVE IATE Category 1.0 This procedure contains 6..j pages


EPIP 3 -3:1 EPIP 3-3 IMMEDIATE ENTRY
EPIP 3 -3:1 EPIP 3-3 IMMEDIATE ENTRY


==1.0 PURPOSE==
==1.0 PURPOSE==
1.1 To provide instructions for immediate entry to the Ginna site from the Survey Center as required by the Emergency Response Organization.
1.1 To provide instructions for immediate entry to the Ginna site from the Survey Center as required by the Emergency Response Organization.


==2.0 RESPONSIBILITY==
==2.0 RESPONSIBILITY==
2.1   The Survey Center Manager is responsible for providing entry teams as requested by the Ginna Station TSC and/or Control Room and assisting in immediate entry preparation.
2.1 The Survey Center Manager is responsible for providing entry teams as requested by the Ginna Station TSC and/or Control Room and assisting in immediate entry preparation.
2.2   Entry team members are responsible for implementation of this procedure.
2.2 Entry team members are responsible for implementation of this procedure.


==3.0   REFERENCES==
==3.0 REFERENCES==
3.1   Developmental References None.
3.1 Developmental References None.
3.2   Implementing References 3.2.1 EPIP 1-12, Repair and Corrective Action Guidelines During Emergency Situations 3.2.2 EPIP 1-8, Search and Rescue Operation 3.2.3 EPIP 1-9, Technical Support Center Activation 3.2.4 EPIP 1-10, Operational Support Center (OSC) Activation 3.2.5 EPIP 1-11, Survey Center Activation
3.2 Implementing References 3.2.1 EPIP 1-12, Repair and Corrective Action Guidelines During Emergency Situations 3.2.2 EPIP 1-8, Search and Rescue Operation 3.2.3 EPIP 1-9, Technical Support Center Activation 3.2.4 EPIP 1-10, Operational Support Center (OSC) Activation 3.2.5 EPIP 1-11, Survey Center Activation


==4.0 PRECAUTIONS==
==4.0 PRECAUTIONS==
4.1   Designated personnel may be required to enter the site as members of Emergency Response Organization or Emergency Support Organization (EPIP 1-12, EPIP 1-9, EPIP 1-8, EPIP 1-10).
4.1 Designated personnel may be required to enter the site as members of Emergency Response Organization or Emergency Support Organization (EPIP 1-12, EPIP 1-9, EPIP 1-8, EPIP 1-10).
4.2   The size of entry teams shall be two individuals or more.
4.2 The size of entry teams shall be two individuals or more.


EPIP 3 -3:2
EPIP 3 -3:2


==5.0 PREREQUISITES==
==5.0 PREREQUISITES==
5.1       The Emergency Coordinator has requested the dispatch of Entry Teams to the Ginna Site.
5.1 The Emergency Coordinator has requested the dispatch of Entry Teams to the Ginna Site.
5.2       A current EPIP 1-5 NEW YORK STATE (NYS) RADIOLOGICAL EMERGENCY DATA FORM (PART I), (Attachment 3a) should be provided to the Survey Center by the RG&E emergency facility (Control Room, TSC or EOF) which has command and control.
5.2 A current EPIP 1-5 NEW YORK STATE (NYS) RADIOLOGICAL EMERGENCY DATA FORM (PART I), (Attachment 3a) should be provided to the Survey Center by the RG&E emergency facility (Control Room, TSC or EOF) which has command and control.


==6.0 ACTIONS==
==6.0 ACTIONS==
6.1       Survey Center Manager 6.1.1     Using the NYS Part I Form that was faxed to the Survey Center, determine wind direction, wind speed, initiating event conditions and pertinent plant conditions and post information on status board at the Survey Center.
6.1 Survey Center Manager 6.1.1 Using the NYS Part I Form that was faxed to the Survey Center, determine wind direction, wind speed, initiating event conditions and pertinent plant conditions and post information on status board at the Survey Center.
6.1.3     Assemble the Entry Teams.
6.1.3 Assemble the Entry Teams.
6.1.3.1   Designate an Entry Team Leader.
6.1.3.1 Designate an Entry Team Leader.
6.1.3.2   Obtain the names of the Entry Team Members.
6.1.3.2 Obtain the names of the Entry Team Members.
6.1.3.3   Request a Radiation Protection Technician or Survey Team member to escort the team; otherwise, designate an Entry Team Member to perform the Radiation Protection function.
6.1.3.3 Request a Radiation Protection Technician or Survey Team member to escort the team; otherwise, designate an Entry Team Member to perform the Radiation Protection function.
6.1.3.4   Provide the Entry Team Leader with a portable radio.
6.1.3.4 Provide the Entry Team Leader with a portable radio.
6.1.3.4.1 Ensure the Entry Team Leader understands the use of the portable radio.
6.1.3.4.1 Ensure the Entry Team Leader understands the use of the portable radio.
6.1.4     If the TSC has assumed command and control, notify the TSC Security Manager (or the TSC Radio Communicator) that personnel, by name, will require entry to the Ginna Site.
6.1.4 If the TSC has assumed command and control, notify the TSC Security Manager (or the TSC Radio Communicator) that personnel, by name, will require entry to the Ginna Site.
6.1.4.1   If the Control Room has command and control, notify the Control Room Communicator that personnel, by name, will require entry to the Ginna Site.
6.1.4.1 If the Control Room has command and control, notify the Control Room Communicator that personnel, by name, will require entry to the Ginna Site.
6.1.5     Request the Emergency Coordinator provide an entry route.
6.1.5 Request the Emergency Coordinator provide an entry route.
6.1.5.1   If available, request the TSC RP/Chemistry Manager assist with and recommend necessary radiation protection equipment, dosimetry, protective clothing and respiratory protection.
6.1.5.1 If available, request the TSC RP/Chemistry Manager assist with and recommend necessary radiation protection equipment, dosimetry, protective clothing and respiratory protection.


IT EPIP 3 -3:3 6.1.5.2 If available, request the TSC RP/Chemistry Manager assist in briefing the team on the radiological conditions they may encounter.
IT EPIP 3 -3:3 6.1.5.2 If available, request the TSC RP/Chemistry Manager assist in briefing the team on the radiological conditions they may encounter.
6.1.6   Brief the team(s) using the NYS Radiological Emergency Data Form (Part I),
6.1.6 Brief the team(s) using the NYS Radiological Emergency Data Form (Part I),
which was faxed to the Survey Center, before departure to the Ginna Site.
which was faxed to the Survey Center, before departure to the Ginna Site.
6.1.6.1 The Departure briefing should include:
6.1.6.1 The Departure briefing should include:
: a.     Name of the Entry Team Leader
: a.
: b.     Names of the members of the Entry Team
Name of the Entry Team Leader
: c.       Weather conditions
: b.
: d.     Radiological conditions
Names of the members of the Entry Team
: e.       Plant status, event classification
: c.
: f.       Radiological protection equipment, dosimetry and protective clothing
Weather conditions
: g.       Respiratory protection
: d.
: h.       Route
Radiological conditions
: i.       A reminder that the teams DO NOT enter areas with radiation levels greater than 2 Rern/hr unless directed by the Emergency Coordinator
: e.
: j.       A reminder for the teams to remove their anti-contamination clothing upon arrival at the final destination in accordance with radiation protection procedures.
Plant status, event classification
: k.       A reminder to perform a whole body frisk upon arrival at their destination.
: f.
6.2     Entry Teams NOTE:           ENSURE DOSE RATE METER AND RADIO ARE FUNCTIONING PROPERLY PRIOR TO DEPARTURE.
Radiological protection equipment, dosimetry and protective clothing
6.2.1   Entry Team Leader 6.2.1.1 Obtain the names of all members of the Entry Team.
: g.
6.2.1.2 Obtain a portable radio.
Respiratory protection
: h.
Route
: i.
A reminder that the teams DO NOT enter areas with radiation levels greater than 2 Rern/hr unless directed by the Emergency Coordinator
: j.
A reminder for the teams to remove their anti-contamination clothing upon arrival at the final destination in accordance with radiation protection procedures.
: k.
A reminder to perform a whole body frisk upon arrival at their destination.
6.2 Entry Teams NOTE:
ENSURE DOSE RATE METER AND RADIO ARE FUNCTIONING PROPERLY PRIOR TO DEPARTURE.
6.2.1 Entry Team Leader 6.2.1.1 Obtain the names of all members of the Entry Team.
6.2.1.2 Obtain a portable radio.


EPIP 3 -3:4 6.2.1.3 The entry team shall obtain necessary equipment as recommended by a Radiation Protection Technician, TSC RP/Chemistry Manager or the Survey Center Manager. In their absence, obtain the equipment listed below:
EPIP 3 -3:4 6.2.1.3 The entry team shall obtain necessary equipment as recommended by a Radiation Protection Technician, TSC RP/Chemistry Manager or the Survey Center Manager. In their absence, obtain the equipment listed below:
: a.     Thermoluminescent dosimeter (TLD)
: a.
: b.     High range self-reading dosimeter (SRD) at least 0 to 1500mR
Thermoluminescent dosimeter (TLD)
: c.     High range dose rate meter (0-1000 R/hr)
: b.
: d.     Anti-contamination clothing
High range self-reading dosimeter (SRD) at least 0 to 1500mR
: e.     Full face mask with charcoal filter
: c.
: f.     Radio 6.2.1.4 Ensure each Entry Team member logs in on Dosimetry Log in accordance with EPIP 1-11.
High range dose rate meter (0-1000 R/hr)
: d.
Anti-contamination clothing
: e.
Full face mask with charcoal filter
: f.
Radio 6.2.1.4 Ensure each Entry Team member logs in on Dosimetry Log in accordance with EPIP 1-11.
6.2.1.5 Ensure each Entry Team member is aware of the following:
6.2.1.5 Ensure each Entry Team member is aware of the following:
a)     Weather conditions b)     Plant conditions c)     Event Classification d)     Route e)     Radiological conditions 6.2.1.6 Just before departure, contact the Emergency Coordinator and brief them on your route and obtain any last minute instructions.
a)
Weather conditions b)
Plant conditions c)
Event Classification d)
Route e)
Radiological conditions 6.2.1.6 Just before departure, contact the Emergency Coordinator and brief them on your route and obtain any last minute instructions.
6.2.1.7 Ensure the Entry Team does not enter areas with radiation levels greater than 2 Rem/hr unless directed by the Emergency Coordinator.
6.2.1.7 Ensure the Entry Team does not enter areas with radiation levels greater than 2 Rem/hr unless directed by the Emergency Coordinator.
6.2.1.8 Ensure Entry Team members remove their anti-contamination clothing upon arrival at the final destination in accordance with radiation protection procedures.
6.2.1.8 Ensure Entry Team members remove their anti-contamination clothing upon arrival at the final destination in accordance with radiation protection procedures.
Line 812: Line 1,211:
6.2.1.13 Ensure the entire team attends a de-briefing.
6.2.1.13 Ensure the entire team attends a de-briefing.
6.2.1.14 Ensure all SRDs, radios and survey meters are turned over to the TSC RP/Chemistry Manager for return to the Survey Center.
6.2.1.14 Ensure all SRDs, radios and survey meters are turned over to the TSC RP/Chemistry Manager for return to the Survey Center.
6.2.2   Entry Team Member 6.2.2.1 Notify Survey Center Manager, if present, and log on status board that team is leaving for the site.
6.2.2 Entry Team Member 6.2.2.1 Notify Survey Center Manager, if present, and log on status board that team is leaving for the site.
6.2.2.2 Provide name to the Entry Team Leader.
6.2.2.2 Provide name to the Entry Team Leader.
6.2.2.3 Obtain the necessary radiation protection equipment, dosimetry, and respiratory protection equipment.
6.2.2.3 Obtain the necessary radiation protection equipment, dosimetry, and respiratory protection equipment.
6.2.2.4 Know the following:
6.2.2.4 Know the following:
a)     Weather conditions b)     Plant conditions c)     Route d)     Radiological conditions 6.2.2.5 Note any unusual conditions encountered during the entry.
a)
6.2.2.6 Do not enter areas with radiation levels greater than 2 Rem/hr unless directed by the Emergency Coordinator.
Weather conditions b)
6.2.2.7 Remove anti-contamination clothing upon arrival at the final destination in accordance with radiation protection procedures.
Plant conditions c)
6.2.2.8 Perform a whole body frisk upon arrival at the final destination.
Route d)
6.2.2.9 Report any radiation survey results to the TSC Dose Assessment Manager.
Radiological conditions 6.2.2.5 Note any unusual conditions encountered during the entry.
6.2.2.6 Do not enter areas with radiation levels greater than 2 Rem/hr unless directed by the Emergency Coordinator.
6.2.2.7 Remove anti-contamination clothing upon arrival at the final destination in accordance with radiation protection procedures.
6.2.2.8 Perform a whole body frisk upon arrival at the final destination.
6.2.2.9 Report any radiation survey results to the TSC Dose Assessment Manager.


EPIP 3 -3:6 6.2.2.10 Record SRD dose on Dosimetry Log that was faxed to the TSC RP/Chemistry Manager and turn over SRD to TSC RP/Chemistry Manager.
EPIP 3 -3:6 6.2.2.10 Record SRD dose on Dosimetry Log that was faxed to the TSC RP/Chemistry Manager and turn over SRD to TSC RP/Chemistry Manager.
6.2.2.11 Attend a de-briefing.
6.2.2.11 Attend a de-briefing.
6.3     TSC RP/Chemistry Manager 6.3.1   Assists entry team by providing radiological conditions that they may encounter.
6.3 TSC RP/Chemistry Manager 6.3.1 Assists entry team by providing radiological conditions that they may encounter.
6.3.2   Ensures SRDs, radios and survey meters are returned to the Survey Center.
6.3.2 Ensures SRDs, radios and survey meters are returned to the Survey Center.
6.3.3   Turns over Dosimetry Logs to Dosimetry for entry into the Radiation Dose Management System (RDMS).
6.3.3 Turns over Dosimetry Logs to Dosimetry for entry into the Radiation Dose Management System (RDMS).


==7.0 ATTACHMENTS==
==7.0 ATTACHMENTS==
Line 832: Line 1,235:


ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER A-'
ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER A-'
PROCEDURE NO.         EPIP 4-1                         REV. NO. 7 PUBLIC INFORMATION RESPONSE TO AN UNUSUAL EVENT RESIONBLE M       ER EFSFEC 1EDE EFFECTIVE DATE Category 1.0 This procedure contains 2 pages
PROCEDURE NO.
 
EPIP 4-1 REV. NO.
EPIP 4-1:1 EPIP 4-1 PUBLIC INFORMATION RESPONSE TO AN UNUSUAL EVENT 1.0  PURPOSE To provide instruction for implementing the Public Information response to an Unusual Event at the R.E. Ginna Nuclear Power Plant.
7 PUBLIC INFORMATION RESPONSE TO AN UNUSUAL EVENT RESIONBLE M ER EFSFEC 1E DE EFFECTIVE DATE Category 1.0 This procedure contains 2 pages
2.0  RESPONSIBILITY 1 2.1  Emergency Preparedness is responsible for notifying the News Center Manager and the Duty Corporate Communications Representative of the Unusual Event.
2.2  The News Center Manager is responsible for informing the appropriate News Center personnel of the Unusual Event condition as deemed necessary.


==3.0   REFERENCES==
EPIP 4-1:1 EPIP 4-1 PUBLIC INFORMATION RESPONSE TO AN UNUSUAL EVENT 1.0 PURPOSE To provide instruction for implementing the Public Information response to an Unusual Event at the R.E. Ginna Nuclear Power Plant.
2.0 1 2.1 RESPONSIBILITY Emergency Preparedness is responsible for notifying the News Center Manager and the Duty Corporate Communications Representative of the Unusual Event.
2.2 The News Center Manager is responsible for informing the appropriate News Center personnel of the Unusual Event condition as deemed necessary.


3.1   Developmental References 3.1.1 Rochester Gas and Electric Corporation Nuclear Emergency Response Plan.
==3.0 REFERENCES==
3.2   Implementing References 3.2.1 EPIP 4-7, Public Information Organization Staffing 4.0   PRECAUTIONS None.
3.1 Developmental References 3.1.1 Rochester Gas and Electric Corporation Nuclear Emergency Response Plan.
5.0   PREREQUISITES 5.1   An Unusual Event has been declared at the R.E. Ginna Nuclear Power Plant in accordance with EPIP 1-0, Ginna Station Event Evaluation and Classification.
3.2 Implementing References 3.2.1 EPIP 4-7, Public Information Organization Staffing 4.0 PRECAUTIONS None.
6.0   ACTIONS 6.1   News Center Manager 6.1.1 Upon notification by Emergency Preparedness, notify the key personnel listed below using EPIP 4-7 and request that they stand-by for further information as the situation develops and as judgement dictates.
5.0 PREREQUISITES 5.1 An Unusual Event has been declared at the R.E. Ginna Nuclear Power Plant in accordance with EPIP 1-0, Ginna Station Event Evaluation and Classification.
6.0 ACTIONS 6.1 News Center Manager 6.1.1 Upon notification by Emergency Preparedness, notify the key personnel listed below using EPIP 4-7 and request that they stand-by for further information as the situation develops and as judgement dictates.


EPIP 4-1:2 6.1.2 Use EPIP 4-7, Public Information Organization Staffing, to document calls and responses.
EPIP 4-1:2 6.1.2 Use EPIP 4-7, Public Information Organization Staffing, to document calls and responses.
6.1.3 Standby for further information from Emergency Preparedness.
6.1.3 Standby for further information from Emergency Preparedness.
6.2   Joint Emergency News Center Personnel 6.2.1 When notified by the News Center Manager, key JENC supervisory personnel will remain accessible to the News Center Manager.
6.2 Joint Emergency News Center Personnel 6.2.1 When notified by the News Center Manager, key JENC supervisory personnel will remain accessible to the News Center Manager.
Key Supervisory Personnel are:
Key Supervisory Personnel are:
: a.     Media Monitoring and Public Inquiry Manager
: a.
: b.     Assistant News Center Manager
Media Monitoring and Public Inquiry Manager
: c.     JENC Security personnel
: b.
: d.     Facilities & Materials Coordinator
Assistant News Center Manager
: e.     Corporate Spokesperson 6.2.2 A News Announcement is required. The News Announcement will be prepared by either the Duty Corporate Communications Representative and approved by the Manager of Corporate Communications using their normal process.
: c.
JENC Security personnel
: d.
Facilities & Materials Coordinator
: e.
Corporate Spokesperson 6.2.2 A News Announcement is required. The News Announcement will be prepared by either the Duty Corporate Communications Representative and approved by the Manager of Corporate Communications using their normal process.
6.2.3 No further action is required by Emergency News Center Personnel at the Unusual Event Level. All News Announcements of public information will be handled per normal Public Affairs departmental operating procedures.
6.2.3 No further action is required by Emergency News Center Personnel at the Unusual Event Level. All News Announcements of public information will be handled per normal Public Affairs departmental operating procedures.
7.0   ATTACHMENTS None.
7.0 ATTACHMENTS None.


ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER 7-3 PROCEDURE NO.         EPIP 4-3                               REV. NO. 13 ACCIDENTAL ACTIVATION OF GINNA ALERT AND NOTIFICATION SYSTEM SIRENS RESPONSIBLE MANAGER 66     (6o7 tO EFFECI IVE CATE Category 1.0 This procedure contains 3 pages
ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER 7-3 PROCEDURE NO.
EPIP 4-3 REV. NO.
13 ACCIDENTAL ACTIVATION OF GINNA ALERT AND NOTIFICATION SYSTEM SIRENS RESPONSIBLE MANAGER 66 (6o7 tO EFFECI IVE CATE Category 1.0 This procedure contains 3 pages


EPIP 4-3:1 EPIP 4-3 ACCIDENTAL ACTIVATION OF GINNA EMERGENCY NOTIFICATION SYSTEM SIRENS
EPIP 4-3:1 EPIP 4-3 ACCIDENTAL ACTIVATION OF GINNA EMERGENCY NOTIFICATION SYSTEM SIRENS 1.0 1.1 2.0 2.1 3.0 3.1


==1.0 PURPOSE==
====3.1.1 PURPOSE====
1.1  To specify the means by which notifications are to be made in the event of an accidental activation of Ginna Alert and Notification System (ANS) Sirens.
To specify the means by which notifications are to be made in the event of an accidental activation of Ginna Alert and Notification System (ANS) Sirens.
RESPONSIBILITY:
The Ginna Control Room is responsible for initiating this procedure.


==2.0 RESPONSIBILITY==
==REFERENCES:==
2.1  The Ginna Control Room is responsible for initiating this procedure.
Developmental References IEN 81-34 Accidental Activation of Prompt Public Notification System 3.1.2 NRC NUREG-1022, Event Reporting Guidelines 3.2 Imolementino References 4.0 None.
 
PRECAUTIONS:
==3.0  REFERENCES==
3.1  Developmental References 3.1.1 IEN 81-34 Accidental Activation of Prompt Public Notification System 3.1.2 NRC NUREG-1022, Event Reporting Guidelines 3.2   Imolementino References None.
 
==4.0 PRECAUTIONS==
None.
None.
PREREQUISITES:
5.0 5.1 RG&E has been notified that an ANS siren has sounded.
ACTIONS:
6.0 NOTE:
IF THERE IS AN ACTUAL GINNA EMERGENCY, INSTRUCT THE CALLER TO REFER TO THEIR EMERGENCY PLANNING CALENDAR AND/OR TUNE IN TO THEIR EMERGENCY ALERT SYSTEM STATION (WHAM) 11 80AM, (WVOR) 100.5FM OR (WHEC) TV10 FOR ADDITIONAL INFORMATION.


==5.0 PREREQUISITES==
EPIP 4-3:2 6.1 Obtain the following information from the caller:
5.1  RG&E has been notified that an ANS siren has sounded.
: a.
 
Name
==6.0 ACTIONS==
: b.
NOTE:        IF THERE IS AN ACTUAL GINNA EMERGENCY, INSTRUCT THE CALLER TO REFER TO THEIR EMERGENCY PLANNING CALENDAR AND/OR TUNE IN TO THEIR EMERGENCY ALERT SYSTEM STATION (WHAM) 11 80AM, (WVOR) 100.5FM OR (WHEC) TV10 FOR ADDITIONAL INFORMATION.
Address
 
: c.
EPIP 4-3:2 6.1   Obtain the following information from the caller:
Telephone number I 6.2 Verify if a siren has activated. Have the Fire Brigade, l&C Special Projects or System Engineer perform a Silent Test by pushing the Silent Test button at Ginna TSC Controller or applicable County Controller. This will check the status of each siren. A siren with a failure code will show red on the screen. Review report printed on the printer, an "X" in the OVR (Overrun) column indicates that the siren inadvertently activated.
: a.       Name
I 6.2.1 If the siren computer indicates no sirens activated, go to 6.5. If the siren computer indicates a siren is activated, go to 6.4.
: b.       Address
6.3 Use Siren System Controller at Ginna TSC or at County Controller to attempt immediate siren shutdown. Push CANCEL button, hold until XMIT light comes on indicating that CANCEL signal has been sent out.
: c.       Telephone number I 6.2   Verify if a siren has activated. Have the Fire Brigade, l&C Special Projects or System Engineer perform a Silent Test by pushing the Silent Test button at Ginna TSC Controller or applicable County Controller. This will check the status of each siren. A siren with a failure code will show red on the screen. Review report printed on the printer, an "X"in the OVR (Overrun) column indicates that the siren inadvertently activated.
I 6.2.1 If the siren computer indicates no sirens activated, go to 6.5. If the siren computer indicates a siren is activated, go to 6.4.
6.3   Use Siren System Controller at Ginna TSC or at County Controller to attempt immediate siren shutdown. Push CANCEL button, hold until XMIT light comes on indicating that CANCEL signal has been sent out.
6.3.1 To determine if the siren has stopped activation, reset the status of the siren that reported the OVR (Overrun) status by performing the following steps:
6.3.1 To determine if the siren has stopped activation, reset the status of the siren that reported the OVR (Overrun) status by performing the following steps:
        -        Click on menus item 'Status"
Click on menus item 'Status" Click on "Reset Status" Enter password-x, click OK Enter siren number in three digit form (i.e. 036), SEND.
        -        Click on "Reset Status"
This should reset the Overrun Status. Check to see if the siren has stopped Alerting. Single Poll siren. If Overrun Status is cleared, then the siren has reported that it has stopped.
        -        Enter password-x, click OK
        -        Enter siren number in three digit form (i.e. 036), SEND.
        -        This should reset the Overrun Status. Check to see if the siren has stopped Alerting. Single Poll siren. If Overrun Status is cleared, then the siren has reported that it has stopped.
6.3.2 Call one of the following Nuclear Emergency Preparedness personnel and inform them of the situation. Have Emergency Preparedness make contact with the affected county, contact the Duty PIO, and ensure l&C Special Projects is made aware of the problem.
6.3.2 Call one of the following Nuclear Emergency Preparedness personnel and inform them of the situation. Have Emergency Preparedness make contact with the affected county, contact the Duty PIO, and ensure l&C Special Projects is made aware of the problem.
Tim Laursen                                 Peter Polfleit Work:           585-771-6185               Work:       585-771-6772 Pager:           585-528-5982               Pager:     585-527-2207 Home:           585-396-1149               Home:       315-524-7101 Cellular:       585-315-1854               Cellular: 585-315-1201
Tim Laursen Peter Polfleit Work:
585-771-6185 Work:
585-771-6772 Pager:
585-528-5982 Pager:
585-527-2207 Home:
585-396-1149 Home:
315-524-7101 Cellular:
585-315-1854 Cellular:
585-315-1201


EPIP 4-3:3 Frank Cordaro                               Rick Watts Work:         585-771-3108                 Work:       585-724-8706 Pager:       585-527-3650                 Pager:     585-527-3749 Home:         315-524-2924                 Home:       585-425-2644 Cellular:     585-315-1277                 Cellular: 585-315-1204 Jill Willoughby Work:         585-771-4033 Pager:         585-528-3295 Home:         585-787-9075 Cellular:     585-315-1205 6.5 If no sirens are activated, ask the caller if there may be a possible source other than a Ginna siren that may be sounding. If there are more than three calls about a siren activation within ten minutes, notify the Corporate Communications Manager at (585) 771-2230 during working hours. During off hours notify the Duty Public Information Officer at (585) 771-2133 to inform them of the situation. The duty public information officer will determine if there is a need to notify the media.
EPIP 4-3:3 Frank Cordaro Rick Watts Work:
6.6 The licensee shall notify the USNRC immediately after notification of Nuclear Emergency Preparedness in step 6.3.2. The notification shall not be later than four hours after the licensee was notified of the accidental activation of the siren(s) using procedure 0-9.3, "NRC Immediate Notification".
585-771-3108 Work:
585-724-8706 Pager:
585-527-3650 Pager:
585-527-3749 Home:
315-524-2924 Home:
585-425-2644 Cellular:
585-315-1277 Cellular:
585-315-1204 Jill Willoughby Work:
585-771-4033 Pager:
585-528-3295 Home:
585-787-9075 Cellular:
585-315-1205 6.5 If no sirens are activated, ask the caller if there may be a possible source other than a Ginna siren that may be sounding. If there are more than three calls about a siren activation within ten minutes, notify the Corporate Communications Manager at (585) 771-2230 during working hours. During off hours notify the Duty Public Information Officer at (585) 771-2133 to inform them of the situation. The duty public information officer will determine if there is a need to notify the media.
6.6 The licensee shall notify the USNRC immediately after notification of Nuclear Emergency Preparedness in step 6.3.2. The notification shall not be later than four hours after the licensee was notified of the accidental activation of the siren(s) using procedure 0-9.3, "NRC Immediate Notification".


==7.0 ATTACHMENTS==
==7.0 ATTACHMENTS==
None.
None.


(                                                     ~~~                                                               (    ~     ~~~ V ~
(  
NPSP0200                                                           Ginna Nuclear Power Plant                                     Fri 8/8/2003 8:09:11 am WILLOUGHBYJ                                                           PROCEDURE INDE)X                                                         Page 1 of 2 INPUT PARAMETERS: TYPE:         PREPIP                           STATUSVALUE(S):   EF                   5YEARS ONLY:
~~~  
PREPIP         EMERGENC       PLAN IMPLEMENTNGPROCEDURE PROCEDURE                                                                                             EFFECT         LAST           NEXT NUMBER           PROCEDURE TITLE                                                               R1V   DATE         REVIEW         REVIW     _  ST EPIP-1-0             GINNA STATION EVENT EVALUATION AND CLASSIFICATION                             031 06/20/2003   06/20/2003       06/20/2008     EF EPIP-1-1             UNUSUAL EVENT                                                                 004 05/23/2003   05/23/2003       05/23/2008       EF EPIP-1-2             ALERT                                                                         004 11/02/2001   11/02/2001       11/02/2006       EF EPIP-1-3             SITE AREA EMERGENCY                                                           005 12/09/1996   04/09/2003       04/09/2008       EF EPIP-1-4             GENERAL EMERGENCY                                                             006 05/05/2003   05/05/2003       05/05/2008       EF EPIP-1-5             NOTIFICATIONS                                                                 055 06/20/2003   06/20/2003       06/20/2008       EF EPIP-1-6             SITE EVACUATION                                                               017 06/20/2003   06/20/2003       06/20/2008       EF EPIP-1-7             ACCOUNTABILITY OF PERSONNEL                                                   009 11/02/2001   11/02/2001       11/0212006       EF EPIP-1-8           SEARCH AND RESCUE OPERATION                                                   006 05/23/2003   05/23/2003       05/23/2008       EF EPIP-1-9             TECHNICAL SUPPORT CENTER ACTIVATION                                           025 08/08/2003   08/08/2003       08/08/2008       EF EPIP-1-10           OPERATIONAL SUPPORT CENTER (OSC) ACTIVATION                                   013 05/23/2003   05/23/2003       05/23/2008       EF EPIP-1-11           SURVEY CENTER ACTIVATION                                                     029 02/25/2003   02/25/2003       02/25/2008       EF EPIP-1-12           REPAIR AND CORRECTIVE ACTION GUIDELINES DURING EMERGENCY SITUATIONS           009 12/20/2001   12/20/2001       12/20/2006       EF EPIP-1-13           LOCAL RADIATION EMERGENCY                                                     004 02/25/2003   02/25/2003       02/25/2008       EF EPIP-1-15           USE OF THE HEALTH PHYSICS NETWORK HPN                                         005 04/24/1996   03/03/1999       03/03/2004       EF EPIP-1-16           RADIOACTIVE LIQUID RELEASE TO LAKE ONTARIO OR DEER CREEK                     005 02/25/2003   02/25/2003       02/25/2008       EF EPIP-1-17           PLANNING FOR ADVERSE WEATHER                                                 004 05/23/2003   05/23/2003       05/23/2008       EF EPIP-1-18           DISCRETIONARY ACTIONS FOR EMERGENCY CONDITIONS                               006 05/05/2003   05/05/2003       05/05/2008       EF EPIP-2-1           PROTECTIVE ACTION RECOMMENDATIONS                                             021 08/08/2003   08/08/2003       08/08/2008       EF EPIP-2-2           OBTAINING METEOROLOGICAL DATA AND FORECASTS AND THEIR USE INEMERGENCY DOSE AS 013 12/03/2002   12/03/2002       12/03/2007       EF EPIP-2-3           EMERGENCY RELEASE RATE DETERMINATION                                         015 07/01/2002   07/01/2002       07/01/2007       EF EPIP-2-4           EMERGENCY DOSE PROJECTIONS -MANUAL METHOD                                     014 08/08/2003   08/08/2003       08/08/2008       EF EPIP-2-5           EMERGENCY DOSE PROJECTIONS PERSONAL COMPUTER METHOD                           014 05/15/2002   05/15/2002       05/15/2007       EF EPIP-2-6           EMERGENCY DOSE PROJECTIONS - MIDAS PROGRAM                                   012 02/25/2003   02/25/2003       02/25/2008       EF EPIP-2-7           MANAGEMENT OF EMERGENCY SURVEY TEAMS                                         011 08/09/2002   08/09/2002       08/09/2007       EF EPIP-2-8           VOLUNTARY ACCEPTANCE OF EMERGENCY RADIATION EXPOSURE                         005 05/16/2000   05/16/2000       05/16/2005       EF EPIP-2-9           ADMINISTRATION OF POTASSIUM IODIDE (1<1)                                       008 05/23/2003   05/23/2003       05/23/2008       EF EPIP-2-10           INPLANT RADIATION SURVEYS                                                     004 08/09/2002   08/09/2002       08/09/2007       EF EPIP-2-11           ONSITE SURVEYS                                                                 019 05/15/2002   05/15/2002       05/15/2007       EF EPIP-2-12           OFFSITE SURVEYS                                                               022 05/15/2002   05/15/2002       05/15/2007       EF
~  
~~~  
~
(
V NPSP0200 Ginna Nuclear Power Plant Fri 8/8/2003 8:09:11 am WILLOUGHBYJ PROCEDURE INDE)X Page 1 of 2 INPUT PARAMETERS: TYPE:
PREPIP STATUSVALUE(S):
EF 5 YEARS ONLY:
PREPIP EMERGENC PLAN IMPLEMENTNGPROCEDURE PROCEDURE EFFECT LAST NEXT NUMBER PROCEDURE TITLE R1V DATE REVIEW REVIW ST EPIP-1-0 GINNA STATION EVENT EVALUATION AND CLASSIFICATION 031 06/20/2003 06/20/2003 06/20/2008 EF EPIP-1-1 UNUSUAL EVENT 004 05/23/2003 05/23/2003 05/23/2008 EF EPIP-1-2 ALERT 004 11/02/2001 11/02/2001 11/02/2006 EF EPIP-1-3 SITE AREA EMERGENCY 005 12/09/1996 04/09/2003 04/09/2008 EF EPIP-1-4 GENERAL EMERGENCY 006 05/05/2003 05/05/2003 05/05/2008 EF EPIP-1-5 NOTIFICATIONS 055 06/20/2003 06/20/2003 06/20/2008 EF EPIP-1-6 SITE EVACUATION 017 06/20/2003 06/20/2003 06/20/2008 EF EPIP-1-7 ACCOUNTABILITY OF PERSONNEL 009 11/02/2001 11/02/2001 11/0212006 EF EPIP-1-8 SEARCH AND RESCUE OPERATION 006 05/23/2003 05/23/2003 05/23/2008 EF EPIP-1-9 TECHNICAL SUPPORT CENTER ACTIVATION 025 08/08/2003 08/08/2003 08/08/2008 EF EPIP-1-10 OPERATIONAL SUPPORT CENTER (OSC) ACTIVATION 013 05/23/2003 05/23/2003 05/23/2008 EF EPIP-1-11 SURVEY CENTER ACTIVATION 029 02/25/2003 02/25/2003 02/25/2008 EF EPIP-1-12 REPAIR AND CORRECTIVE ACTION GUIDELINES DURING EMERGENCY SITUATIONS 009 12/20/2001 12/20/2001 12/20/2006 EF EPIP-1-13 LOCAL RADIATION EMERGENCY 004 02/25/2003 02/25/2003 02/25/2008 EF EPIP-1-15 USE OF THE HEALTH PHYSICS NETWORK HPN 005 04/24/1996 03/03/1999 03/03/2004 EF EPIP-1-16 RADIOACTIVE LIQUID RELEASE TO LAKE ONTARIO OR DEER CREEK 005 02/25/2003 02/25/2003 02/25/2008 EF EPIP-1-17 PLANNING FOR ADVERSE WEATHER 004 05/23/2003 05/23/2003 05/23/2008 EF EPIP-1-18 DISCRETIONARY ACTIONS FOR EMERGENCY CONDITIONS 006 05/05/2003 05/05/2003 05/05/2008 EF EPIP-2-1 PROTECTIVE ACTION RECOMMENDATIONS 021 08/08/2003 08/08/2003 08/08/2008 EF EPIP-2-2 OBTAINING METEOROLOGICAL DATA AND FORECASTS AND THEIR USE IN EMERGENCY DOSE AS 013 12/03/2002 12/03/2002 12/03/2007 EF EPIP-2-3 EMERGENCY RELEASE RATE DETERMINATION 015 07/01/2002 07/01/2002 07/01/2007 EF EPIP-2-4 EMERGENCY DOSE PROJECTIONS -MANUAL METHOD 014 08/08/2003 08/08/2003 08/08/2008 EF EPIP-2-5 EMERGENCY DOSE PROJECTIONS PERSONAL COMPUTER METHOD 014 05/15/2002 05/15/2002 05/15/2007 EF EPIP-2-6 EMERGENCY DOSE PROJECTIONS - MIDAS PROGRAM 012 02/25/2003 02/25/2003 02/25/2008 EF EPIP-2-7 MANAGEMENT OF EMERGENCY SURVEY TEAMS 011 08/09/2002 08/09/2002 08/09/2007 EF EPIP-2-8 VOLUNTARY ACCEPTANCE OF EMERGENCY RADIATION EXPOSURE 005 05/16/2000 05/16/2000 05/16/2005 EF EPIP-2-9 ADMINISTRATION OF POTASSIUM IODIDE (1<1) 008 05/23/2003 05/23/2003 05/23/2008 EF EPIP-2-10 INPLANT RADIATION SURVEYS 004 08/09/2002 08/09/2002 08/09/2007 EF EPIP-2-11 ONSITE SURVEYS 019 05/15/2002 05/15/2002 05/15/2007 EF EPIP-2-12 OFFSITE SURVEYS 022 05/15/2002 05/15/2002 05/15/2007 EF


(                                                                     (                                                                           (
(
NPSP0200                                                             Ginna Nuclear Power Plant                                       Fri 8/8/2003 8:09:11 am WILLOUGHBYJ                                                             PROCEDURE INDE)                                                                   Page 2 of 2 INPUT PARAMETERS: TYPE:           PiEPP                             STATUSVALUE(S):   EF                   5 YEARS ONLY:
(
riQS:
(
r-w 1; -1 .fi.-,.   :r-z -g I-PREPIP        EMERGENCY PLAN IMPLEMENTING PROCEDURE PROCEDURE                                                                                                  EFFECT           LAST                  NEXT NUMBER            PROCEDURE TITLE                                                                        DATE           REVIEW              REVIEW          ST EPIP-2-13            IODINE AND PARTICULATE ACTIVITY DETERMINATION FROM AIR SAMPLES                  008 0712711999     07/27/1999          07/27/2004 EPIP-2-14            POST PLUME ENVIRONMENTAL SAMPLING                                                                                                            E:
NPSP0200 Ginna Nuclear Power Plant Fri 8/8/2003 8:09:11 am WILLOUGHBYJ PROCEDURE INDE)
015 10/08/2002     10/08/2002           10/08/2007 E:
INPUT PARAMETERS: TYPE:
EPIP-2-15            POST PLUME EVALUATION OF OFFSITE DOSES DUE TO DEPOSITION                        006 10/08/2002     10/08/2002           10/08/2007 EPIP-2-16            CORE DAMAGE ESTIMATION E:
PiEPP STATUSVALUE(S):
013 12103/2002     12/03/2002           12/03/2007 E:
EF PREPIP EMERGENCY PLAN IMPLEMENTING PROCEDURE PROCEDURE NUMBER PROCEDURE TITLE EPIP-2-13 IODINE AND PARTICULATE ACTIVITY DETERMINATION FROM AIR SAMPLES EPIP-2-14 POST PLUME ENVIRONMENTAL SAMPLING EPIP-2-15 POST PLUME EVALUATION OF OFFSITE DOSES DUE TO DEPOSITION EPIP-2-16 CORE DAMAGE ESTIMATION EPIP-2-17 HYPOTHETICAL (PRE-RELEASE) DOSE ESTIMATES EPIP-2-18 CONTROL ROOM DOSE ASSESSMENT EPIP-3-1 EMERGENCY OPERATIONS FACIUlTY (EOF) ACTIVATION AND OPERATIONS EPIP-3-2 ENGINEERING SUPPORT CENTER (ESC)
EPIP-2-17            HYPOTHETICAL (PRE-RELEASE) DOSE ESTIMATES                                        007 03/01/2002    03/01/2002          03/01/2007 a:
EPIP-3-3 IMMEDIATE ENTRY EPIP-3-4 EMERGENCY TERMINATION AND RECOVERY EPIP-3-7 SECURITY DURING EMERGENCIES EPIP-4-1 PUBUC INFORMATION RESPONSE TO AN UNUSUAL EVENT EPIP-4-3 ACCIDENTAL ACTIVATION OF GINNA EMERGENCY NOTIFICATION SYSTEM SIRENS EPIP46 JOINT EMERGENCY NEWS CENTER ACTIVATION EPIP-4-7 PUBUC INFORMATION ORGANIZEATION STAFFING EPIP-4-8 SILENT TESTING OF THE GINNA SIRENS FROM THE TECHNICAL SUPPORT CENTER EPIP-4-9 ACTIVATION OF GINNA EMERGENCY SIRENS FROM THE TECHNICAL SUPPORT CENT EPIP4-10 SILENT TESTING OF THE GINNA SIRENS FROM THE COUNTY ACTIVATION POINTS EPIP-4-11 ACTIVATION OF THE GINNA SIRENS FROM THE COUNTY ACTIVATION POINTS EPIP-5-1 OFFSITE EMERGENCY RESPONSE FACIUTIES AND EQUIPMENT PERIODIC INVENTOR EPIP-5-2 ONSITE EMERGENCY RESPONSE FACTES AND EQUIPMENT PERIODIC INVENTORY EPIP-5-5 CONDUCT OF DRILLS AND EXERCISES EPIP-5-6 ANNUAL REVIEW OF NUCLEAR EMERGENCY RESPONSE PLAN (NERP)
EPIP-2-18            CONTROL ROOM DOSE ASSESSMENT                                                    015 05/23/2003    05/2312003          05/23/2008 a:
EPIP-5-7 EMERGENCY ORGANIZATION EPIP-5-9 TESTING THE OFF HOURS CALL-IN PROCEDURE AND QUARTERLY TELEPHONE NUM EPIP-5-10 EMERGENCY RESPONSE DATA SYSTEM (ERDS)
EPIP-3-1              EMERGENCY OPERATIONS FACIUlTY (EOF) ACTIVATION AND OPERATIONS                    023 08108/2003    08/08/2003          08/08/2008 EPIP-3-2              ENGINEERING SUPPORT CENTER (ESC)
NERP GINNA STATION NUCLEAR EMERGENCY RESPONSE PLAN PREPIP TOTAL:
57 5 YEARS ONLY:
Page 2 of 2 riQS:
r-w 1; -1  
.fi.-,.
:r-z -g I-
'ER Y CHECKS AN CHECKS AND BER CHECK EFFECT DATE 008 0712711999 015 10/08/2002 006 10/08/2002 013 12103/2002 007 03/01/2002 015 05/23/2003 023 08108/2003 010 08/09/2002 010 08/08/2003 009 02/25/2003 010 10/08/2002 007 08/08/2003 013 08/08/2003 009 0813112001 023 05/23/2003 001 02/25/2003 002 05/08/2003 000 02/25/2003 001 05/08/2003 028 06/20/2003 031 06/20/2003 015 05/23/2003 004 05/28/1999 040 05/23/2003 007 10/08/2002 007 12/03/2002 022 07/31/2003 LAST REVIEW 07/27/1999 10/08/2002 10/08/2002 12/03/2002 03/01/2002 05/2312003 08/08/2003 08/09/2002 08/08/2003 02125/2003 10/08/2002 08/08/2003 08/08/2003 08/31/2001 05/23/2003 02/25/2003 05/08/2003 02/25/2003 05/08/2003 06/20/2003 06/20/2003 05/23/2003 05/28/1999 05/23/2003 10/08/2002 12/03/2002 07/31/2003 NEXT REVIEW 07/27/2004 10/08/2007 10/08/2007 12/03/2007 03/01/2007 05/23/2008 08/08/2008 08/09/2007 08/08/2008 02/25/2008 10/08/2007 08/08/2008 08/08/2008 08/31/2006 05/23/2008 02/25/2008 05/08/2008 02/25/2008 05/08/2008 06/20/2008 06/20/2008 05/23/2008 05/28/2004 05/23/2008 10/08/2007 12/03/2007 07/31/2005 ST E:
E:
E:
E:
a:
a:
E:
E:
E:
E:
E:
a:
E:
a:
a:
E:
E:
a:
E:
a:
a:
a:
E:
E:
a:
E:
E:
010 08/09/2002    08/09/2002          08/09/2007 E:
GRAND TOTAL:
EPIP-3-3              IMMEDIATE ENTRY                                                                  010 08/08/2003    08/08/2003          08/08/2008 E:
57}}
EPIP-3-4              EMERGENCY TERMINATION AND RECOVERY                                              009 02/25/2003    02125/2003          02/25/2008 E:
EPIP-3-7              SECURITY DURING EMERGENCIES                                                      010 10/08/2002    10/08/2002          10/08/2007 E:
EPIP-4-1              PUBUC INFORMATION RESPONSE TO AN UNUSUAL EVENT                                  007 08/08/2003    08/08/2003          08/08/2008 a:
EPIP-4-3              ACCIDENTAL ACTIVATION OF GINNA EMERGENCY NOTIFICATION SYSTEM SIRENS              013 08/08/2003    08/08/2003          08/08/2008 E:
EPIP46                JOINT EMERGENCY NEWS CENTER ACTIVATION                                          009 0813112001    08/31/2001          08/31/2006 a:
EPIP-4-7              PUBUC INFORMATION ORGANIZEATION STAFFING                                        023 05/23/2003    05/23/2003          05/23/2008 a:
EPIP-4-8            SILENT TESTING OF THE GINNA SIRENS FROM THE TECHNICAL SUPPORT CENTER            001 02/25/2003    02/25/2003          02/25/2008 E:
EPIP-4-9              ACTIVATION OF GINNA EMERGENCY SIRENS FROM THE TECHNICAL SUPPORT CENT'ER          002 05/08/2003    05/08/2003          05/08/2008 E:
EPIP4-10              SILENT TESTING OF THE GINNA SIRENS FROM THE COUNTY ACTIVATION POINTS            000 02/25/2003    02/25/2003          02/25/2008 a:
EPIP-4-11            ACTIVATION OF THE GINNA SIRENS FROM THE COUNTY ACTIVATION POINTS                001 05/08/2003    05/08/2003          05/08/2008 E:
EPIP-5-1              OFFSITE EMERGENCY RESPONSE FACIUTIES AND EQUIPMENT PERIODIC INVENTOR Y CHECKS AN 028 06/20/2003    06/20/2003          06/20/2008 a:
EPIP-5-2              ONSITE EMERGENCY RESPONSE FACTES AND EQUIPMENT PERIODIC INVENTORY CHECKS AND 031    06/20/2003    06/20/2003          06/20/2008 a:
EPIP-5-5              CONDUCT OF DRILLS AND EXERCISES                                                015 05/23/2003    05/23/2003          05/23/2008 a:
EPIP-5-6            ANNUAL REVIEW OF NUCLEAR EMERGENCY RESPONSE PLAN (NERP)                          004 05/28/1999    05/28/1999          05/28/2004 E:
EPIP-5-7              EMERGENCY ORGANIZATION                                                          040 05/23/2003    05/23/2003          05/23/2008 E:
EPIP-5-9              TESTING THE OFF HOURS CALL-IN PROCEDURE AND QUARTERLY TELEPHONE NUM BER CHECK  007  10/08/2002    10/08/2002          10/08/2007 a:
EPIP-5-10            EMERGENCY RESPONSE DATA SYSTEM (ERDS)                                          007  12/03/2002    12/03/2002          12/03/2007 E:
NERP                  GINNA STATION NUCLEAR EMERGENCY RESPONSE PLAN                                  022 07/31/2003    07/31/2003          07/31/2005 PREPIP      TOTAL:      57 GRAND TOTAL:     57}}

Latest revision as of 08:07, 16 January 2025

Revision to Emergency Plan Implementing Procedures
ML032320016
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/08/2003
From: Watts R
Rochester Gas & Electric Corp
To: Clark R
Document Control Desk, NRC/NRR/DLPM/LPD1
References
Download: ML032320016 (71)


Text

RE

{

I An Energy East Company ROCHESTER GAS AND ELECTRIC CORPORATION

  • 89 EASTAVENUE, ROCHESTER, N.Y 14649-0001
  • 585 546-2700 wwwrge.com August 8, 2003 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Attn: Mr. Robert Clark (Mail Stop 0-8-E9)

Project Directorate 1-1

Subject:

Revision to Emergency Plan Implementing Procedures R.E. Ginna Nuclear Power Plant Docket No. 50-244 Gentlemen:

In accordance with 10 CFR 50.4(b)(5), enclosed are revisions to Ginna Station Emergency Plan Implementing Procedures (EPIP).

We have determined, per the requirements of 10 CFR 50.54(q), that the procedure changes do not decrease the effectiveness of our Nuclear Emergency Response Plan.

Very truly yours, Richard J. Watts Manager, Nuclear Training Department Enclosures xc:

USNRC Region 1 (2 copies of letter and 2 copies of each procedure)

Resident Inspector, Ginna Station (1 copy of letter and 1 copy of each procedure)

RG&E Nuclear Safety and Licensing (1 copy of letter)

Dr. Robert C. Mecredy (2 copies of letter only)

RJW/jtw A

August 8, 2003 Page 2 of 2 PROCEDURE EPIP 1-9 EPIP 2-1 REVISION NUMBER 25 21 15 EPIP 2-4 EPIP 3-1 EPIP 3-3 EPIP 4-1 EPIP 4-3 23 10 7

13

ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER 13 PROCEDURE NO.

EPIP 1-9 REV. NO.

25 TECHNICAL SUPPORT CENTER ACTIVATION RES&ONSIBLE MA ER EFFE TIV DATE CATEGORY 1.0 THIS PROCEDURE CONTAINS 9

PAGES

EPIP 1-9:2 EPIP 1-9 TECHNICAL SUPPORT CENTER ACTIVATION

1.0 PURPOSE

The purpose of this procedure is to designate actions and responsibility of individuals who would report to the Technical Support Center upon a decision to activate at an Alert level or greater.

2.0 RESPONSIBILITY

2.1 The first qualified person to arrive is responsible for initiating this procedure.

2.2 The TSC Director is responsible for activation of the TSC upon arrival.

2.3 The TSC Director becomes the TSC Emergency Coordinator upon assuming Command and Control.

2.4 If the Severe Accident Management Guidelines (SAMG's) are entered, the following TSC staff assume SAM duties:

Decision Maker TSC Emergency Coordinator Evaluators TSC Operations Manager, TSC Technical Manager, TSC Nuclear Assessment

3.0 REFERENCES

3.1 Developmental References 3.1.1 Nuclear Emergency Response Plan 3.1.2 NUREG-0654, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants.

3.2 Implementing References 3.2.1 EPIP 1-10, OSC Activation 3.2.2 EPIP 1-11, Survey Center Activation 3.2.3 EPIP 3-3, Immediate Entry 3.2.4 EPIP 1-5, Notification 3.2.5 EPIP 5-7, Emergency Organization 3.2.6 EPIP 1-0, Ginna Station Event Evaluation and Classification 3.2.7 EPIP 2-13, Iodine and Particulate Activity Determination from Air Samples 3.2.8 RP-JC-AMS4, Routine Operation of the Eberline AMS-4 Air Monitoring System

EPIP 1-9:3

4.0 PRECAUTIONS

As noted in this procedure.

5.0 PREREQUISITES

5.1 An Alert, Site Area Emergency, or General Emergency has been declared in accordance with EPIP 1-0, Ginna Station Event Evaluation and Classification.

5.2 The TSC could be activated anytime at the discretion of the TSC Director/Emergency Coordinator.

6.0 ACTIONS

6.1 Personnel Responding from Offsite 6.1.1 Personnel shall report to the TSC using normal security site access procedures.

6.1.2 If a hazardous condition prevents normal site access (e.g., release of radioactivity, security event, HAZMAT), responders may be directed by Community Alert Network to report to the designated staging area (Ontario Fire Department Exempt Hall, located on Route 104 between Route 350 and Knickbocker Road) or, upon arrival to the site, informed by Security to report to the Survey Center or designated location. Refer to EPIP 3-3, Immediate Entry, for site access.

6.2 Personnel Arriving at TSC CAUTION FRISK BEFORE ENTERING IF RP DETERMINES THAT FRISKING IS REQUIRED.

NOTE:

DEPENDING ON THE NUMBER OF ARRIVING PERSONNEL, PERFORM STEPS CONCURRENTLY TO MINIMIZE ACTIVATION TIME.

6.2.1 Place your name under appropriate emergency position on magnetic organization chart and display associated job function badge.

6.2.2 If you leave the TSC, contact the RP/Chemistry Manager to determine if an electronic dosimeter is required.

6.2.3 Perform responsibilities as described in EPIP 5-7, Emergency Organization.

6.3 TSC Director perform the following:

6.3.1 Ensure minimum staff listed below is available to activate the TSC:

a.

Emergency Coordinator

EPIP 1-9:4

b.

Radiation Protection/Chemistry Manager

c.

Dose Assessment Manager

d.

Technical Assessment Manager

e.

Operations Assessment Manager

f.

Maintenance Assessment Manager

g.

Communicator

h.

Survey Center Manager 6.3.2 If position is not staffed, notify personnel to report to the assigned duty location.

Qualified responders are found in their position checklist in EPIP 5-7. The status of the call-in process can be monitored by obtaining a report from the incoming fax machine at 30 minutes into the event.

6.3.3 Ensure Technical Assessment Manager establishes ERDS link to NRC within one hour per duties in EPIP 5-7.

6.3.4 Receive briefing from the Shift Supervisor on Plant conditions.

6.3.5 Obtain notification forms sent by the Control Room from the TSC fax machine.

Use these forms and brief response staff on plant conditions using Attachment 2 (TSC meeting agenda).

CAUTION IF DOSE RATES EXCEEDS 50 mR/HR, CONSIDER RELOCATION OF TSC PERSONNEL.

IF AIR SAMPLE RADIOIODINE ACTIVITY IS GREATER THAN 1E-8 yCVcc, CONSIDER RELOCATION OF TSC PERSONNEL.

6.3.6.

Obtain results of radiation survey and air activity of TSC.

6.3.7 If TSC is uninhabitable, relocate the following personnel to the Shift Supervisor's office:

a.

Operations Assessment Manager

b.

Radiation Protection/Chemistry Manager

c.

TSC Director/Emergency Coordinator

d.

Technical Manager

e.

Nuclear Assessment

EPIP 1-9:5 Direct remaining personnel to the Survey Center or alternate location as directed by the TSC Director/Emergency Coordinator.

6.3.8 Obtain status of manpower from managers.

NOTE:

THE TSC DIRECTOR ASSUMES THE ROLE AND TITLE OF TSC EMERGENCY COORDINATOR WHEN TSC TAKES COMMAND AND CONTROL.

6.3.9 Assuming Command and Control 6.3.9.1 Ensure minimum activation staff (Step 6.3.1) is available to assume command and control.

6.3.9.2 Confer with Emergency Coordinator (Control Room Shift Supervisor) on shifting command and control of the emergency from the Control Room to the TSC.

Normally, when command and control is transferred, the TSC assumes:

a.

Overall direction for the emergency

1.

Emergency Classification

2.

Protective Action Recommendations

b.

Notifications to New York State, Wayne and Monroe counties

c.

Dose Assessment

d.

Notifications to the NRC However, certain conditions may warrant transferring a given responsibility area (or communications) at different times, per the discretion of the Emergency Coordinator (Shift Supervisor and TSC Director).

6.3.9.3 Brief the TSC on plant status using Attachment 2 for meeting agenda and inform them that command and control will be assumed at the agreed upon time.

6.3.9.4 At agreed upon time, call the Control Room (Emergency Coordinator) and state that, unless he has any objections, the TSC is assuming command and control at this time.

6.3.9.5 Announce to the TSC that the TSC has assumed command and control of the emergency.

EPIP 1-9:6 6.3.9.6 Upon assuming command and control, direct the Administrative/Communications Manager to provide RECS line updates every 30 minutes using EPIP 1-5,.

6.3.9.7 Notify EOF that the TSC has assumed command and control and to make preparations to transfer command and control to the EOF.

6.3.9.8 Conduct PORC meetings as required to support emergency operations. PORC meeting minutes are stored under S:\\Forums\\Forums\\PORC\\PORC minutes then choose year of interest.

6.3.9.9 If the TSC will be activated for more than 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, direct managers to complete for continuous staffing.

6.3.10 Shift Turnover 6.3.10.1 If a turnover to another shift is needed, contact the personnel identified on and inform them of the time and location to assemble.

6.3.10.2 When the responders for the next shift have arrived, have them perform a detailed turnover with the person they are relieving. Have them log the turnover in their log book.

6.3.10.3 When the individual turnovers are complete, have the on-coming crew perform a briefing for each other using the standard meeting agenda (Attachment 2). The off-going crew should also be at the briefing to ensure that the information that is shared is correct and complete.

6.4 TSC Managers perform the following:

6.4.1 Check communications at work location.

6.4.2 Determine status of manpower and report to the Emergency Coordinator.

6.4.3 Radiation Protection/Chemistry Manager check survey results and air activity for TSC and report to TSC Director/Emergency Coordinator.

CAUTION IF AIR SAMPLE RADIOIODINE ACTIVITY IS GREATER THAN 1 E-8 pCI/cc, INFORM THE EMERGENCY COORDINATOR.

IF DOSE RATES EXCEEDS 50 mR/HR, CONSIDER RELOCATION OF TSC PERSONNEL.

6.4.3.1 If TSC is uninhabitable, the following personnel shall relocate to the Shift Supervisor's office:

a.

Operations Assessment Manager

b.

Radiation Protection/Chemistry Manager

EPIP 1-9:7

c.

TSC Director/TSC Emergency Coordinator

d.

Technical Manager

e.

Nuclear Assessment 6.4.3.2 Direct remaining personnel to the Survey Center or other locations as directed by the Emergency Coordinator.

6.5 Radiation Protection Technician perform the following:

6.5.1 Place step-off pad and frisker at each entrance to the TSC.

6.5.2 Start up TSC AMS-4 per RP-JC-AMS4.

CAUTION IF AIR SAMPLE RADIOIODINE ACTIVITY IS GREATER THAN 1 E-8 pCIcc, INFORM THE RADIATION PROTECTIONICHEMISTRY MANAGER AND THE EMERGENCY COORDINATOR.

6.5.3 Take an air sample in accordance with EPIP 2-13, Iodine and Particulate Activity Determination from Air Samples, and report results to Radiation Protection/Chemistry Manager.

6.5.4 Perform a survey of the TSC.

CAUTION IF DOSE RATES EXCEEDS 50 mR/HR, INFORM THE RADIATION PROTECTION/CHEMISTRY MANAGER AND EMERGENCY COORDINATOR.

6.5.5 Report results of all TSC surveys to Radiation Protection/Chemistry Manager 6.5.6.

Monitor the TSC radiation and contamination levels and air activity at the discretion of the Radiation Protection/Chemistry Manager.

6.6 TSC Support Personnel 6.6.1 Perform job functions in accordance with EPIP 5-7, Emergency Organization.

7.0 Attachments

1.

TSC Continuous Staffing Schedule

2.

TSC Meeting Agenda

EPIP 1-9:8, Rev. 25 Page 1 of 2 TSC CONTiNUOUS STAFFING SCHEDULE (Consult EPIP 5-7 position checklists for qualified personnel and phone numbers to fill positions.)

Shift A Shift B hrs.

to hrs.

hrs.

to _

_ hrs.

POSITION Date:

Date:

Emergency Coordinator*

Assistant Emergency Coordinator Radiation Protection/Chemistry*

Manager Dose Assessment Manager*

Technical Assessment Manager*

Operations Assessment Manager*

Maintenance Assessment Manager*

Communicator*

Survey Center Manager*

Admin./Comm. Manager Security Manager TSC Survey Team Coordinator Dose Assessment Support Messenger/Status Board Keepers

All positions need not be filled. Select those needed as a resources for the event and the minimum staff required for TSC activation.

EPIP 1-9:9, Rev. 25 Page 2 of 2 TSC CONTINUOUS STAFFING SCHEDULE (Consult EPIP 5-7 position checklists for qualified personnel and phone numbers to fill positions.)

Shift A I

Shift B

_________hrs.

to hrs.

hrs.

to _

_ hrs.

POSITION Date:

Date:

RP/Chemistry Technicians Nuclear Assessment I&C Electrical Assessment Mechanical/Hydraulic Assessment Computer Analysts Discipline Planners Manager of OSC Satellite Maintenance Personnel Assistant Survey Center Manager OSC Assignees Inventory Control Supervisor/Analyst Inventory Control Support Personnel OSC Director Note:

All positions need not be filled. Select those needed as a resources for the event and the minimum staff required for TSC activation.

EPIP 1-9:10, Rev. 25 Page 1 of 1 Meeting Date:

Time:

NOTE:

IF THE EOF IS ACTIVATED OR ACTIVATING, ATTEMPT TO INCLUDE NUCLEAR OPERATIONS MANAGER, OR AN ASSISTANT, IN THE TSC BRIEFING VIA CONFERENCE CALL.

1.

Emergency Coordinator Purpose of Meeting Classification Level Time Classification Declared Brief Event Description (use EAL reference manual)

Injury/Fire Status

2.

Operations Assessment Manager Plant activities in progress Safety Related Equipment Status Operational needs required for plant safety Operational manpower needs

3.

Technical Assessment Manager Status of Plant Conditions Core Conditions Core Cooling capabilities

4.

Maintenance Assessment Manager Equipment out of service Status of repairs in progress Manpower needs required to support Maintenance Supplies and Materials needed to support Maintenance activities

5.

Dose Assessment Manager Offsite areas of concern (downwind areas affected)

Protective Actions Recommended Releases in progress Status of radiological conditions outside the plant fence Brief status of Survey Team activity

6.

Administrative/Communications Manager Status of notifications to State and Counties Status of notifications to NRC

7.

Security Manager Status of accountability of plant personnel Status of Site Security Status of search and rescue operations

8.

RP/Chemistry Manager Status of TSC habitability Status of radiological concerns inside the plant fence Status of PASS operation and availability Status of exposure to plant personnel (Ops, Maintenance, RP)

9.

EOF Concerns

10.

Review of Open Items Please write on these pages. New pages will be provided after each use.

ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER 23 PROCEDURE NO.

EPIP 2-1 REV. NO.

21 PROTECTIVE ACTION RECOMMENDATIONS TECHNICAL REVIEW EFFE VE ATE CATEGORY 1.0 THIS PROCEDURE CONTAINS 15 PAGES

EPIP 2-1:1 EPIP 2-1 PROTECTIVE ACTION RECOMMENDATIONS

1.0 PURPOSE

1.1 The purpose of this procedure is to provide guidance to the Emergency Coordinator or EOF/Recovery Manager in making protective action recom-mendations to offsite authorities.

2.0 RESPONSIBILITY

2.1 The Shift Supervisor, Emergency Coordinator (TSC) or EOF/Recovery Manager is responsible for making protective action recommendations to Wayne County, Monroe County and New York State, depending on command and control status.

2.2 The decision to implement any protective actions is solely the responsibility of the local authorities.

3.0 REFERENCES

3.1 Developmental References 3.1.1 Nuclear Emergency Response Plan 3.1.2 EPA-400, Manual of Protective Action Guides and Protective Actions for Nuclear Incidents (1991) 3.1.3 Evacuation Travel Time Estimates - Ginna Emergency Planning Zone, September 1992.

3.1.4 NUREG/BR - 0150 Response Technical Manual (RTM-93) 3.1.5 Food and Drug Administration (FDA) 'Potassium Iodide as a Thyroid Blocking Agent in Radiation Emergencies", December 2001.

3.1.6 NUREG-1633, "Assessment of the Use of Potassium Iodide (KI) as a Supplemental Public Protective Action During Severe Reactor Accidents".

3.1.7 NRC RIS 2003-12 "Clarification of NRC Guidance for Modifying Protective Actions" 3.2 Implementing References 3.2.1 EPIP 1-0, Ginna Station Event Evaluation and Classification

EPIP 2-1:2 3.2.2 EPIP 1-5, Notification 3.2.3 EPIP 2-3, Emergency Release Rate Determination 3.2.4 EPIP 2-4, Emergency Dose Projections - Manual Method 3.2.5 EPIP 2-18, Control Room Dose Assessment 3.2.6 EPIP 2-5, Emergency Dose Projections - Personal Computer Method 3.2.7 EPIP 2-6, Emergency Dose Projections - MIDAS Program

4.0 PRECAUTIONS

None

5.0 PREREQUISITES

None.

6.0 INSTRUCTIONS

NOTE: PROTECTIVE ACTION RECOMMENDATIONS (PARs) WILL ONLY REFLECT RG&E RECOMMENDATIONS, NOT ACTIONS IMPLEMENTED BY OFFSITE OFFICIALS.

6.1 Obtain the event classification using EPIP 1-0.

6.2 UNUSUAL EVENT. ALERT and SITE AREA EMERGENCY.

6.2.1 Report on EPIP 1-5, Attachment 3a, Item 7:

A. No need for protective actions outside the site boundary.

6.3 GENERAL EMERGENCY 6.3.1 Protective Action Recommendations shall be issued with the initial declaration of a General Emergency.

6.3.2 Using Attachment 1, Page 1 of 2, and the current wind direction, determine the initial ERPAs to be evacuated. The Counties will implement their KI plans for any evacuated ERPA. Any ERPA not evacuated will be sheltered.

6.3.3 Record in EPIP 1-5, Attachment 3a, Item 7 the Protective Actions Recommended.

EPIP 2-1:3 NOTE: ONCE AN ERPA HAS BEEN RECOMMENDED TO EVACUATE, THAT RECOMMENDATION WILL CONTINUE. AN ERPA PAR STATUS CANNOT BE CHANGED FROM "EVACUATE" TO "SHELTER".

6.3.4 Re-evaluate the PARs based on the following to determine if secondary PARs are required or if initial PARs need to be modified.:

a.

Dose Assessment*

b.'

Survey Team data*

c.

EPA Protective Action Guidelines (Attachment 2)

d.

Wind shifts

  • = If exposures in non-evacuated areas indicate that evacuation is warranted, use page 2 of 2 to expand Protective Action Recommendations to an evacuated area of 5 mile radius and 10 miles downwind.

6.3.5 The Evacuation Travel Time Estimate information (Attachment 3) is used by offsite agencies to determine the correct Protective Action Decision (PAD).

6.3.6 If the EPA guidelines for evacuation or sheltering are exceeded beyond the 10 mile emergency planning zone and protective actions are required, specify the areas using roads, rivers, bodies of water or town boundaries.

7.0 ATTACHMENTS

1.

Evacuation Areas by Zones.

2.

Projected Dose to the Population and Recommended Actions.

3.

Evacuation Travel Time Estimates.

4.

Emergency Response Planning Areas (ERPA's).

EPIP 2-1:4, Rev. 21 Page 1 of 2 EVACUATION AREAS BY ZONES PROTECTIVE ACTION RECOMMENDATIONS BY ERPA FOR GENERAL EMERGENCY CLASSIFICATION Wind From (Degrees)

Initial Protective Action Recommendations (Evacuation based on 2 mile radius & 5 miles downwind)

N 349 to 11 Evacuate: W (1,2,3) and implement KI plan Shelter:

All remaining ERPAs NNE 12 to 33 Evacuate: W (1.2) M (1) and implement Ki plan Shelter:

All remaining ERPAs NE 34 to 56 Evacuate: W (1,2) M (1) and implement Ki plan Shelter:

All remaining ERPAs ENE 57 to 78 Evacuate: W (1,2) M (1) and implement KI plan Shelter:

All remaining ERPAs E

79 to 101 Evacuate: W (1,2) M (1) and implement KI plan Shelter:

All remaining ERPAs ESE 102 to 124 Evacuate: W (1) M (1) and implement Ki plan Shelter:

All remaining ERPAs SE 125 to 146 Evacuate: W (1) and implement KI plan Shelter.

All remaining ERPAs SSE 147 to 168 Evacuate: W (1) and implement KI plan Sheiter All remaining ERPAs S

169 to 191 Evacuate: W (1) and implement KI plan Shelter All remaining ERPAs SSW 192 to 213 Evacuate: W (1) and implement KI plan Shelter All remaining ERPAs SW 214 to 236 Evacuate: W (1,3) and implement Ki plan Shelter:

All remaining ERPAs WSW 237 to 258 Evacuate: W (1,3) and implement Ki plan Shelter:

All remaining ERPAs W

259 to 281 Evacuate: W (1,3) and implement Ki plan Shelter:

All remaining ERPAs WNW 282 to 303 Evacuate: W (1,2,3) and implement Ki plan Shelter:

All remaining ERPAs NW 304 to 326 Evacuate: W (1,2,3) and implement KI plan Shelter:

All remaining ERPAs NNW 327 to 348 Evacuate: W (1,2,3) and implement Ki plan Shelter:

All remaining ERPAs

C

(

EVACUATION AREAS BY ZONES PROTECTIVE ACTION RECOMMENDATIONS BY ERPA FOR GENERAL FMERGENCOY Ci ASIFICATION

,' 2-1:5, Rev, 20 Page 2 of 2 Wind From (Degrees)

Initial Protective Action Recommendations Secondary Protective Action Recommendations (Evacuation based on 2 mile radius & 5 miles downwind)

(Evacuation based on 5 mile radius & 10 miles downwind)

N 349 to 11 Evacuate: W (1, 2,3) and implement KI plan Evacuate: W (1, 2, 3, 5, 6, 7)

M (1, 2, 4, 5) and implement KI plan Shelter All remaining ERPAs Shelter All remaining ERPAs NNE 12 to 33 Evacuate:

W (1, 2)

M (1) and implement KI plan Evacuate: W (1, 2, 3, 6, 7)

M (1, 2, 3, 4, 5, 6, 7, 9) and implement KI plan Shelter.

All remaining ERPAs Shelter All remaining ERPAs NE 34 to 56 Evacuate:

W (1, 2) M (1) and Implement KI plan Evacuate: W (1, 2, 3, 7)

M (1, 2, 3, 4, 5, 6, 7, 8, 9) and implement KI plan Shelter All remaining ERPAs Shelter All remaining ERPAs ENE 57 to 78 Evacuate: W (1, 2)

M (1) and implement KI plan Evacuate: W (1, 2,3, 7)

M (1, 2, 3, 4, 5, 6, 7, 8, 9) and implement KI plan Shelter.

All remaining ERPAs Shelter.

All remaining ERPAs E

79 to 101 Evacuate: W (1, 2)

M (1) and implement KI plan Evacuate: W (1, 2,3)

M (1. 2, 3, 4, 6, 7, 8, 9) and implement KI plan Shelter AN remaining ERPAs Shelter All remaining ERPAs ESE 102 to 124 Evacuate: W (1)

M (1 and Implement KI plan Evacuate: W (1, 2, 3)

M (1, 3, 6, 8, 9) and implement KI plan Shelter All remaining ERPAs Shelter.

All remaining ERPAs SE 125 to 146 Evacuate: W (1) and Implement KI plan Evacuate: W (1, 2, 3)

M (1) and implement KI plan Shelter.

All remaining ERPAs Shelter All remaining ERPAs SSE 147 to 168 Evacuate:

W (1) and implement KI plan Evacuate: W (1, 2,3)

M (1) and implement KI plan Shelter.

All remaining ERPAs Shelter:

All remaining ERPAs S

169 to 191 Evacuate:

W (1) and implement KI plan Evacuate: W (1, 2, 3)

M (1) and implement Ki plan Shelter.

All remaining ERPAs Shelter.

All remaining ERPAs SSW 192 to 213 Evacuate W (1) and implement KI plan Evacuate:

W (1, 2,3)

M (1) and Implement KI plan Shelter:

All remaining ERPAs Shelter.

All remaining ERPAs SW 214 to 236 Evacuate:

W (1, 3) and implement KI plan Evacuate: W (1, 2,3,4)

M (1) and implement KI plan Shelter:

All remaining ERPAs Shelter:

All remaining ERPAs WSW 237 to 258 Evacuate:

W (1, 3) and implement KI plan Evacuate: W (1, 2,3,4,5)

M (1) and implement Ki plan Shelter:

All remaining ERPAs Shelter:

All remaining ERPAs W

259to 281 Evacuate:

W (1, 3) and implement KI plan Evacuate: W (1, 2, 3, 4, 5, 6)

M (1) and Implement KI plan Shelter:

All remaining ERPAs Shelter All remaining ERPAs WNW 282 to 303 Evacuate: W (1, 2,3) and implement KI plan Evacuate: W (1, 2, 3, 4, 5, 6, 7) M (1) and Implement KI plan Shelter:

All remaining ERPAs Shelter.

All remaining ERPAs NW 304 tO 326 Evacuate:

W (1, 2, 3) and implement KI plan Evacuate: W (1, 2, 3, 4, 5, 6, 7)

M (1, 2) and implement KI plan Shelter An remaining ERPAs Shelter:

All remaining ERPAs NNW 327 to 348 Evacuate: W (1, 2,3) and implement KI plan Evacuate: W (1, 2, 3, 4, 5, 6, 7) M (1, 2, 5) and implement Kl plan

  • Secondary Protective Actions are recommended when dose projections or field teams indicate 2 1 REM TEDE beyond 5 miles.

(

E.

2-1:6, Rev, 20 Page 1 of 1 PROJECTED DOSE TO THE POPULATION AND RECOMMENDED ACTIONS PROJECTED DOSE TO THE RECOMMENDED ACTIONS COMMENTS POPULATION l

Total Whole Body < 1 REM*

No planned protective actions. Local authorities None.

or State may issue an advisory to seek shelter and await further instructions. Monitor environmental radiation levels.

Total Whole Body 2 1 REM*

Conduct evacuation.*

Evacuation (or for some situation, Monitor environmental radiation levels and sheltering**) should be initiated at one Committed Dose Equivalent to the thyroid adjust area for mandatory evacuation based on REM. Seeking shelter would be an (child) 2 5 REM.

these levels.

alternative if evacuation were not Control access.

immediately possible.

Implement KI plan.

Project Dose (REM) to Emergency Team Workers Total Whole Body 25 REM Control exposure of emergency team members None.

to these levels except for lifesaving mission.

(Appropriate controls for emergency workers include time limitations, respirators and stable iodine.)

Total Whole Body 75 REM Control exposure of emergency team members None.

performing lifesaving missions to this level.

(Control of time of exposure will be most effective.)

NOTES:

The sum of the effective dose equivalent resulting from exposure to external sources and the committed effective dose equivalent incurred from all significant inhalation pathways during the early phase.

Sheltering may be the preferred protective action when it will provide protection equal to or greater than evacuation, based on consideration of factors such as source term characteristics and temporal or other site-specific conditions.

EPIP 2-1:7, Rev. 21 Page 1 of 8 EVACUATION TRAVEL TIME ESTIMATES

1.

When discussing an evacuation, use this attachment to resolve conflicts.

2.

1992 Permanent Resident Population Estimates EPRA Population ERPA Population W-1 3207 M-1 2421 W-2 5395 M-2 435 W-3 1200 M-3 258 W-4 2092 M-4 6681 W-5 3855 M-5 1253 W-6 2425 M-6 6943 W-7 4924 M-7 4750 M-8 3033 M-9 3285

3.

Use the following curves to assist in estimating evacuation decisions.

Figure Weather Conditions Time of Week 41 Summer, Good Weather Midweek, Midday 43 Summer, Rainy Weather Midweek, Midday 45 Summer, Good Weather Midweek, Evening 49 Summer, Good Weather Weekend, Midday 53 Winter, Good Weather Midweek, Midday 55 Winter, Rainy Weather Midweek, Midday 57 Winter, Snowy Weather Midweek, Midday

(

(

FIGURE 41 Evacuation Travel time Estimates GInna Nuclear Power Station Summer, Midweek, Midday Good Weather 100 Na.

a'

'C 5

C 4'

0.

0a.

0 0

1!

a.1 g0 80 70 60 50 40 30 20 10 0

0 CD~

0<

0 1

2 3

4 5

Time - Hours

-WAYNE CO.

MONROE CO.

FULL EPZ m

  • bb

(

f

1.

FIGURE 43 Evacuation Travel Time Estimates Ginna Nuclear Power Station Sunnner, Midweek, Midday Rainy Weather N

M e

C 0

tLa-a 0.

a 0

C 0.

100 90 s0 70 60 so 50 40 30 20 10 0

I I I I I

a A I I I

I I

I I

I I

a I - I I I

I I

f

-I I1 U-.

I U-

'-4 Vt

-u

'-W a-a-

L T Lj H

0-TIM 0hl EPZ papubtin to be ec d dufin tt. scenb Is 59,577.

~Th* tOW W"Mn Co"it popiAtk to bo evacute Is 23.?M.

The MM PMMro Ca"d popuiflon to be revacae Is 35.81 7

.n-bsl (D

7 (0

lo (D M :5 C, (D ">

I

  • 5

-I

\\)

Nt CO

-A CD I

6 2

3 4

5 Time - Hours I

  • WAYNE CO.

0--

MONROE CO.

FULL EPZ

.1

l:

FIGURE 45 Evacuation Travel Time Estimates Ginna Nuclear Power Station Summer, Midweek, Evening Good Weather 100

.N 0.wu C

.C 00

.5 0.

a 0.

4-0.

g0 80 70 60 50 40 30 20 10 0

0

-:3-~

(0 G 0<

0 1

2 3

4 Time - Hours

.* 1 m-a

-u 0

I a

WAYNE CO.

W o MONROE CO.

FULL EPZ I

(

FIGURE 49 Evacuation Travel Time Estimates GInna Nuclear Power Station Summer, Weekend, Midday Good Weather 0

0' C

0 rW 0

0.

0 CL a.

100 90 80 70 60 50 40 3C 20 10 0

0*

-3.

a 1

2 3

.4 5

6 Time - Hours I

-- WAYNE CO.

MONROE CO.

FULL EPZ --I-I I

(

FIGURE 53 Evacuation Travel Time Estimates Ginna Nuclear Power Station Winter, Midweek, Midday Good Weather

(

100 N

0.

40 C"

.C 0

'U aC 0

0 6I g0 80 70 60 50 40 30 20 10 0

C, 0

6~~_

0 1

2 3

4 5

Time - Hours WAYNE CO.

-3 MONROE CO.

FULL EPZ

(

(

FIGURE 55 Evacuation Travel Time Estimates GInna Nuclear Power Station Winter, Midweek, Midday Rainy Weather w._

S c0~

C

.C Sa0 U

0.

3 0I-a 0

4.C a

P-100 g0 50 70 60 50 40 30 20 10 0

I I

I I

I i

-t t

I I

I I

I I

I I

I I

I I

cA mDfr~rE vN ll.

rz I.- r-i I

_II

_I_

rl4 -a I

-a.

F.

T

_ IL 'FM, The total EPZ popuhlalon lo be nemueted dur"n this,emnurlo Is 80.357.

The _da We Cu_ yp pallon t be evcuted Is 24.595 The WtdA Movrwe County ppubimon to be _eud Is 35.702.

  • U m

l-----

0 I

6 7

(D CD (D DN am-!

2 3

4 S

Time - Hours I

WAYNE CO.

0 MONROE CO. -

FULL EPZ I

(

(

-9.

I FIGURE S7 Evacuation Travel Time Estimates Ginna Nuclear Power Station Winter, Midweek, Midday Snowy Weather 100 N

IL0.

w S

.C C

0 Eu

.300.

00 I-a 0

IV 0.

90 80 70 60 50 40 30 20 10 0

0 1

2 3

4 5

6 7

Time - Hours

  • WAYNE CO.

MONsROE CO.

FULL EPZI C,

0*

m

-N

(

(

/

4 4

11.

t!I auls ei,. "X M

I

/

t R.s9.M

. u.S.

r '~~~~~~~~~

I Ix

4.

Z rt I

0 b

I *g

- I

-Pf I

/

I I

LO

'I' I

_i I

I I,

S I I

I 10-mile Emergency Planning Zone K>

I H

I I

I

. (

I PiIsw&AM.Sw ItS

-u SD CD

-.A

-L 0

3 D

D

-.L m

r

-L 0n Emergency Response Planning Areas (ERPA's)

Evacuation Routes to ReceptionlConcregate Care Centers I., N. _..

of

ROCHESTER GAS & ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER __3 PROCEDURE NO.

EPIP 2-4 REV. NO. 14 EMERGENCY DOSE PROJECTIONS - MANUAL METHOD RESPONN6BLE'GER EFFEWTIV DATE Category 1.0 This procedure contains j16 pages

EPIP 2-4:1 EPIP 2-4 EMERGENCY DOSE PROJECTIONS - MANUAL METHOD 1.0 PURPOSE 1.1 The purpose of this procedure is to provide a manual method for performing projections of downwind doe rates and doses. Such information is needed to decided upon protective actions to be recommended to limit the exposure of the general public and emergency workers. This procedure is intended as a backup to EPIP 2-5.

2.0 RESPONSIBILITY The TSC or EOF Dose Assessment Manager is responsible for implementing this procedure.

3.0 REFERENCES

3.1 Developmental References 3.1.1 Nuclear Emergency Response Plan 3.1.2 EPA-400, Manual of Protective Action Guides and Protective Actions for Nuclear Incidents (1991) 3.1.3 Ginna UFSAR, Chapter 15 3.1.4 Regulatory Guide 1.109 3.2 Implementing References 3.2.1 EPIP 2-1, Protective Action Recommendations 3.2.2 EPIP 2-2, Obtaining Meteorological Data and Forecasts and their use is Emergency Dose Assessment 3.2.3 EPIP 2-3, Emergency Release Rate Determination 4.0 PRECAUTIONS None.

EPIP 2-4:2 5.0 PREREQUISITES 5.1 The following equipment and data sources are available for use in performing manual dose projections.

5.1.1 Xu/Q tabulated values (Attachment 2) 5.1.2 Wind and temperature indications from the Control Room 5.1.3 Plant Process Computer System (PPCS) - EVENT 2 Report 5.1.4 Control Room Radiation Monitor System (RMD) Panel read-outs of effluent monitors 5.1.5 Personal Computer in TSC and EOF (for obtaining 15 minute meteorological data average from Ginna Primary Weather Tower) 5.1.6 Back-up wind speed and direction indications at Station 13A (accessible from TSC or EOF IBM terminals) and National Weather Service.

6.0 ACTIONS 6.1 Preliminary Downwind Dose Estimates 6.1.1 For initial notifications purposes, a preliminary estimate of potential offsite doses and releases may be obtained by the Control Room using EPIP 2-18.

6.1.2 For calculations performed by the Control Room, TSC and EOF staffs,a 4-hour release duration should be used if the duration is not known. A 4-hour release duration is consistent with the value used by Wayne and Monroe Counties.

6.1.3 If iodine effluent monitor or isotopic data are unavailable, a default value of 1.E-4 should be used to reflect the estimated release concentration ratio of gross iodine to noble gas. (See Attachment 1)

NOTE:

WHEN DATA IS AVAILABLE, CALCULATE AN IODINE-TO-NOBLE GAS RATIO THAT REFLECTS PRESENT CONDITIONS.

6.1.4 Determine the classification of the emergency with respect to plant releases and site boundary doses from the criteria provided in EPIP 1-0.

6.2 Use of Meteorological and Release Data with EPA Dose Factors Manual Method

EPIP 2-4:3 NOTE:

ANY PRELIMINARY DOES ESTIMATES USED AS A BASIS FOR EMERGENCY CLASSIFICATION OR PROTECTIVE ACTION RECOMMENDATIONS SHOULD BE REFINED AS FOLLOWS USING RELEASE MEASUREMENTS AND ACTUAL METEOROLOGICAL SAMPLING DATA AS THEY BECOME AVAILABLE.

6.2.1 Meteorological Data (15 min. averages) can be obtained by modem from the MIDAS storage computer in the Meteorological Tower Trailer by using the Personal Computer. (See EPIP 2-2 for instructions.)

6.2.2 Determine Pasquill Stability Class (A-G), using Attachment 2, in this procedure.

6.2.3 Obtain concentration or particulate, noble gas or iodines and vent flow to determine release rate. Refer to EPIP 2-3 or refer to the listing of effluent monitor calibration factors provided in Attachment 6 to this procedure.

NOTE:

Standard Release Rates*

Plant Vent

=

Normal = 77,854 cfm, Emergency = 71,289 cfm Containment

=

Normal and Emergency = 15,300 cfm Air Ejector

=

Normal and Emergency = 6.00E2

  • Verify values with Dose Assessment Manager 6.2.4 To calculate the downwind concentration of noble gas, particulates or radioiodine, multiply the release rate of radioactivity (Cisec) from the plant times the X/Q (sec/i
3) dispersion coefficient determined in Attachment 1. The resultant concentration will be pCicc. Perform these calculations on Attachment 1.

6.2.5 Obtain an initial release estimate of release duration from the TSC Emergency Coordinator or Recovery Manager. If this estimate is unavailable, use an initial release duration estimate of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for dose projection purposes.

6.2.6 Whole body gamma dose rate due to noble gas and radioiodine isotopes is estimated using Attachments 3 and 4 and using the listed factor corresponding to the approximate time after shutdown. Multiply this factor times the concentration calculated in Step 6.2.4 to get Rem/hour.

EPIP 2-4:4 6.2.7 Whole body gamma dose is obtained by multiplying the dose rate calculated in Step 6.2.6 times the integrated exposure determined in Step 6.2.5.

6.2.8 Thyroid dose rate to the child (actually, the thyroid dose commitment per hour of inhalation) is estimated using Attachment 5 and using the listed factor corresponding to the time after shutdown. Multiply this factor times the concentration calculated in Step 6.2.4 to get Rem/hour. Project dose rates are always determined for child thyroid as they are the most critical population group.

To determine the dose or dose rate for adults (which would only be necessary for emergency workers) divide the dose or dose rate for the child by 2.

6.2.9 Thyroid dose is found by multiplying the dose rate calculated in step 6.2.8 times the exposure time determined in step. 6.2.5.

6.3 Protective Action Recommendations 6.3.1 Recommend the appropriate measures for the general public in accordance with EPIP 2-1.

6.3.2 Weather forecast information should be considered when planning protective actions. Refer to EPIP 2-2 for instructions to obtain weather forecast information.

7.0 ATTACHMENTS

1.

Dose Assessment Calculation

2.

Pasquill Stability Class Criteria

3.

Noble Gas Whole Body Dose Conversion Factors

4.

Radioiodine Whole Body Dose Conversion Factors

5.

Radioiodine Thyroid Dose Conversion Factors

6.

RMS Process Monitor Calibration Factors

EPIP 2-4:5, Rev. 14 Page 1 of 5 DOSE ASSESSMENT CALCULATION GENERAL INFORMATION:

Current Time:

Shutdown Time:

Release Start Time:

Release Vent:

Plani Stability Class:

A B I Vent Air Ejector Containment Vent C

D able Neutral ARV or Safety Other E F G Stable Vent Flow (CFM):

See Step 6.2.3 for flow rates VENT CONCENTRATION FROM EFFLUENT MONITOR READING:

NOTE: Vent concentration can be Input directly from SPING monitors, If available.

Noble Gas (Monitor Number

):

cpm X

_Ci/CC

=

pCVcc*

(count rate)

(calib. factor) cpm (vent cond.)

Radlolodine (Montior Number (later counts)

(initial counts) hours (time between readings) pCicc (vent cond.)

x (A cpm/hr from monitor)

(calib. factor)

Particulate (Monitor Number

):

cpm X

WuCi=cc =

IJCicC*

(count rate)

(calib. factor) cpm (vent cond.)

Flowrate Conversion (Convert CFM to cclsec) (Step 6.2.3)

_ CFM X

2.8E4 cc/ft X

1 min/60 sec =

cc/sec

EPIP 2-4:6, Rev. 14 Page 2 of 5 NOBLE GAS:

To calculate release RATE in Ci/sec from monitors:

pCi/cc x cc/sec x 1E-6pCicc =

C/sec NOTE: TO PREDICT DOWNWIND CONCENTRATION, OBTAIN FIRST VALUE FROM ATTACHMENT 2.

NOTE: THE WIND SPEED INDICATOR AT THE 33 FOOT LEVEL IS DESIGNED TO MEASURE ONLY TO 50 MILES PER HOUR.

sec-mph x Ci/sec x 1/( ) mph

=

pCVcc at S.B. 500 meters m3 (windspeed) sec-mph x Cl/sec x 1/( ) mph

=

pC/cc at 2 miles m3 (windspeed) sec-mph x Ci/sec x 1/( ) mph

=

pCi/cc at 5 miles m3 (windspeed) sec-mph x Cl/sec x 1/( ) mph

=

pC/cc at 10 miles m3 (windspeed) sec-mph x Cl/sec x 1/( ) mph

=

pCi/cc at m3 (windspeed)

(distance)

Hours after shutdown Rem/hr. per pCi/cc (Attachment 3):

Distance SB 2 miles Noble Gas Whole Body Dose Rate (REM/hour)

Projected duration (Hours)

Noble Gas Projected Whole Body Dose (REM)

(Extemal Dose Equivalent - EDE) 5 miles 10 miles

EPIP 2-4:7, Rev. 14 Page 3 of 5 RADIOIODINE:

To calculate release RATE in Cl/sec from monitor:

(or use appropriate NG to I Default 1:1 E-4) pCVcc x _

cc/sec x 1E-6pCi/cc =

Ci/sec NOTE:

THE WIND SPEED INDICATOR AT THE 33 FOOT LEVEL IS DESIGNED TO MEASURE ONLY TO 50 MILES PER HOUR.

To predict downwind concentration:

sec-mrh x Ci/sec x 1/( ) mph ms 3(windspeed) sec-mph x Cl/sec x 1 /( ) mph m3 (windspeed) sec-mph x Cl/sec x 1/( ) mph m3 (windspeed) sec-mph x Ci/sec x 1/( ) mph m3 (windspeed) sec-mph x Cl/sec x 11( ) mph m3 (windspeed)

=

pCVcc at S.B. 500 meters

=

pCi/cc at 2 miles

=

pCi/cc at 5 miles

=

pCi/cc at 10 miles

=

PCVcc at (distance)

Hours after shutdown Rem/hr. per lCi/cc (Attachment 4):

Distance SB 2 miles 5 miles 10 miles Radioiodine Whole Body Dose Rate (REM/hour)

Projected duration (Hours)

Radioiodine Projected Whole Body Dose (REM)

(Committed Effective Dose Equivalent - CEDE)

+ PLUS +

Noble Gas Projected Whole Body Dose (REM) from previous page (External Dose Equivalent - EDE)

+ EQUALS +

TOTAL Projected Whole Whole Body Dose (REM)

(Total Effective Dose Equivalent - (TEDE)

EPIP 2-4:8, Rev. 14 Page 4 of 5 RADIOIODINE: (continued)

To calculate release RATE in Ci/sec from monitors:

(or use appropriate NG to I DEFAULT 1:1 E-4) pCicc x cc/sec x 1 E-6 pCi/cc =

Ci/sec Rem/hr. per pCVcc (Attachment 5):

Distance 3B 2 miles 5 miles 10 miles Radioiodine Whole Body Dose Rate (REM/hour)

Projected duration (Hours)

Radioiodine Projected Thyroid Dose (REM)

(Committed Dose Equivalent - CDE)

EPIP 2-4:9, Rev. 14 Page 5 of 5 PARTICULATE:

To calculate release RATE in Cisec from monitors:

pCi/cc x cc/sec x 1 E-6 pCi/cc =

Ci/sec NOTE: THE WIND SPEED INDICATOR AT THE 33 FOOT LEVEL IS DESIGNED TO MEASURE ONLY TO 50 MILES PER HOUR.

To predict downwind concentration:

sec-mph x _

Ci/sec x 1/( ) mph m3 (windspeed) sec-mph x _

Ci/sec x 1/( ) mph m3 (windspeed) sec-mph x _

Ci/sec x 1/( ) mph m3 (windspeed) sec-mph x __

CVsec x 1/( ) mph m3 (windspeed) sec-mgh x _

Cisec x 1/( ) mph m3 (windspeed)

= _______

pCi/cc at S.B. 500 meters

=

pCi/cc at 2 miles

= _______

pCVcc at 5 miles

= ______

pCi/cc at 10 miles

= ______

pCi/cc at (distance)

Hours after shutdown Rem/hr. per pCi/cc:

Distance 2 miles 5 miles 10 miles Particulate Whole Body Dose Rate (REM/hour)

Projected duration (Hours)

Particulate Projected Whole Body Dose (REM)

NOTE: THE APPROPRIATE DOSE CONVERSION FACTOR FOR PARTICULATES WOULD BE BASED UPON THE RESULTS OF AN ISOTOPIC ANALYSIS OF THE MIXTURE AND REFERENCING EPA-400-R-92-001.

(f

(

EPIP 2-4:10, Rev. 14 Page 1 of 2 PASQUILL STABILITY CLASS CRITERIA PASQUILL 150 FT 33 FT 250 FT 33 FT STABILITY DELTAT (DEG F/100 FT)

DELTAT (DEG F/117 FT)

DELTAT (DEG F1217 CLASS FT)

GREATER LESS THAN GREATER LESS THAN GREATER LESS THAN THAN OR EQUAL TO THAN OR EQUAL TO THAN OR EQUAL TO l

A 1.0

-1.17 2.17 B

-1.0

-0.9

-1.17

-1.05

-2.17

-1.95 C

-0.9

-0.8

-1.05

-0.94

-1.95

-1.74 D

-0.8

-0.3

-0.94

-0.35

-1.74

-0.65 E

-0.3 0.8

-0.35 0.94

-0.65 1.74 F

0.8 2.2 0.94 2.57 1.74 4.77 G

2.2 2.57 4.77

EPIP 2-4:11 PASQUILL STABILITY CLASS CRITERIA, Rev. 14 Page 2 of 2 GINNA SITE VALUES OF Xu/Q AS A FUNCTION OF STABILITY AND DISTANCE UNSTABLE NEUTRAL (D)

STABLE (F)

MILES A

B C

D E

F G

0.1 4.48E-5 2.32E-4 6.44E-4 9.16E-4 9.35E-4 1.18E-3 1.22E-3 0.2 1.91 E-5 7.88E-5 2.29E-4 3.89E-4 4.37E-4 6.30E-4 7.35E-4 0.3 SB 1.16E-5 4.20E-5 1.25E-4 2.36E-4 2.80E-4 4.36E-4 5.46E-4SB 0.4 8.12E-6 2.68E-5 8.15E-5 1.65E-4 2.04E-4 3.35E-4 4.43E-4 0.5 6.17E-6 1.90E-5 5.84E-5 1.26E-4 1.60E-4 2.74E-4 3.76E-4 0.6 4.93E-6 1.43E-5 4.45E-5 1.OOE-4 1.31 E-4 2.32E-4 3.29E-4 0.7 4.08E-6 1.12E-5 3.54E-5 8.29E-5 1.11E-4 1.60E-4 2.94E-4 0.9 2.99E-6 7.60E-6 2.43E-5 6.08E-5 8.40E-5 1.60E-4 2.44E-4 1.0 2.63E-6 6.45E-6 2.08E-5 5.33E-5 7.49E-5 1.46E4 2.26E-4 1.1 2.34E-6 5.56E-6 1.80E-5 4.74E-5 6.74E-5 1.34E-4 2.11 E-4 1.2 2.1OE-6 4.86E-6 1.58E-5 4.26E-5 6.13E-5 123E-4 1.98E-4 1.6 1.47E-6 3.11 E-6 1.03E-5 2.99E-5 4.47E-5 9.50E-5 1.60E-4 1.9 1.19E-6 2.38E-6 7.98E-6 2.41E-5 3.70E-5 8.12E-5 1.41E-4 2.0 1.12E-6 2.20E-6 7.39E-6 2.27E-5 3.50E-5 7.75E-5 1.36E-4 22 9.95E-7 1.89E-6 6.41 E-6 2.01 E-5 3.15E-5 7.11 E-5 1.27E-4 2.5 8.50E-7 1.55E-6 5.30E-6 1.72E-5 2.74E-5 6.33E-5 1.1 6E-4 2.8 7.39E-7 1.30E-6 4.47E-6 1.50E-5 2.42E-5 5.71 E-5 1.06E-4 3.0 6.79E-7 1.17E-6 4.04E-6 1.37E-5 2.24E-5 5.36E-5 1.01E-4 3.5 5.62E-7 9.20E-7 3.21 E-6 1.14E-5 1.90E-5 4.66E-5 9.04E-5 3.7 5.24E-7 8.44E-7 2.95E-6 1.06E-5 1.78E-5 4.43E-5 8.68E-5 4.0 4.76E-7 7.47E-7 2.63E-6 9.63E-6 1.64E-5 4.41 E-5 8.20E-5 4.2 4.49E-7 6.93E-7 2.44E-6 9.07E-6 1.55E-5 3.95E-5 791 E-5 4.5 4.12E-7 6.22E-7 2.20E-6 8.33E-6 1.44E-5 3.71 E-5 7.52E-5 4.8 3.81 E-7 5.63E-7 2.OOE-6 7.69E-6 1.34E-5 3.50E-5 7.17E-5 5.0 3.62E-7 5.28E-7 1.88E-6 7.31 E-6 1-28E-5 3.37E-5 6-98E-5 5.2 3.45E-7 4.97E-7 1.78E-6 6.96E-6 1.23E-5 3.25E-5 6.76E-5 5.5 3.22E-7 4.55E-7 1.63E-6 6.50E-6 1.1 5E-5 3.09E-5 6.49E-5 5.8 3.01E-7 4.19E-7 1.51E-6 6-09E-6 1.09E-5 2.94E-5 6.24E-5 6.0 2.98E-7 3.98E-7 1.44E-6 5.84E-6 1.05E-5 2.85E-5 6-09E-5 6.2 2.78E-7 3.78E-7 1.37E-6 5.60E-6 1.01 E-5 2.77E-5 5.95E-5 6.5 2.62E-7 3.51 E-7 1.27E-6 5.29E-6 9.61 E-6 2.65E-5 5.74E-5 6.8 2.48E-7 3.27E-7 1.19E-6 5.OOE-6 9.15E-6 2.55E-5 5.56E-5 7.0 2.39E-7 3.13E-7 1.14E-6 4.82E-6 8.86E-6 2.48E-5 5.44E-5 7.2 2.31 E-7 3.OOE-7 1.09E-6 4.66E-6 8.59E-6 2.42E-5 5.33E-5 7.5 2.20E-7 2.81 E-7 1.03E-6 4.43E-6 8.22E-6 2.33E-5 5.17E-5 7.8 2.09E-7 2.65E-7 9.71E-7 4.22E-6 7.87E-6 2.25E-5 5.03E-5 8.0 2.03E-7 2.54E-7 9.35E-7 4.09E-6 7.66E-6 2.20E-5 4.93E-5 82 1.§7E-7 2.45E-7 9.01 E-7 3.97E-6 7.45E-6 2.15E-5 4-85E-5 8.5 1.88E-7 2.31 E-7 8.54E-7 3.80E-6 7.16E-6 2.08E-5 4.72E-5 8.8 1.80E-7 2.19E-7 8.11E-7 3.64E-6 6.90E-6 2.01 E-5 4.60E-5 9.0 1.75E-7 2.12E-7 7.84E-7 3.54E-6 6.73E-6 1.97E-5 4.53E-5 9.2 1.71E-7 2.05E-7 7.59E-7 3.44E-6 6.57E-6 1.93E-5 4.45E-5 9.5 1.64E-7 1.95E-7 7.23E-7 3.31 E-6 6.34E-6 1.88E-5 4.35E-5 9.8 1.58E-7 1.85E-7 6.91E-7 3.18E-6 6.13E-6 1.83E-5 4.25E-5 10.0 1.54E-7 1.80E-7 6.70E.7 3.1 1E-6 5.99E-6 1.79E-5 4.19E-5 SB = Site Boundary

EPIP 2-4:12, Rev. 14 Page 1 of 1 NOBLE GAS DOSE CONVERSION FACTORS FOR WHOLE BODY (EDE)

Time After Shutdown (Hours) 0 1

2 3

4 6

12 Rem/Hour Per pCi/cc 470 434 331 265 221 159 65 NOTE: MULTIPLY MCI/CC BY THE LISTED FACTOR TO OBTAIN REMIHOUR.

EPIP 2-4:13, Rev. 14 Page 1 of 1 RADIOIODINE DOSE CONVERSION FACTORS FOR WHOLE BODY (CEDE)

Time After Shutdown (Hours) 0 1

2 3

4 6

12 Rem/Hour Per jCi/cc 1.73E4 1.57E4 1.76E4 1.92E4 2.05E4 2.24E4 2.65E4 NOTE: MULTIPLY MCVCC BY THE LISTED FACTOR TO OBTAIN REM/HOUR.

EPIP 2-4:14, Rev. 14 Page 1 of 1 RADIOIODINE CONVERSION FACTORS FOR THYROID (CDE)

Time After Shutdown (Hours) 0 1

2 3

4 6

12 Rem/Hour Per VCVCC*

4.4E5 5.4E5 6.4E5 7.4E5 7.8E5 8.8E5 1.1E6 NOTE:

MULTIPLY MCI/CC BY THE LISTED FACTOR TO OBTAIN REM/HOUR.

These conversion factors have been increased by a factor of two. EPA-400 uses the adult thyroid. New York State has increased EPA-400 factors by two to adjust for child thyroid.

EPIP 2-4:15, Rev. 14 Page 1 of 2 RMS PROCESS MONITOR CALIBRATION FACTORS R-10A CONTAINMENT IODINE:

pCi/cc lodine-131 = (A cpm/hour) (1.10 E-11)

RIOB PLANT VENT IODINE:

pCicc lodine-1 31 = (A cpmlhour) (9.02 E-12)

R-i1 CONTAINMENT PARTICULATE:

pCi/cc as Cs-137 = ( cpm) (3.12 E-12)

R-12 CONTAINMENT GAS:

pCi/cc Xe-I 33 = ( cpm) (5.6 E-8)

R-13 PLANT VENT PARTICULATE:

pCVcc as Cs-137 = ( cpm) (2.91 E-12)

R-14 PLANT VENT GAS:

Calibration factors calculated based on Kr-85 and Xe-1 33 calibration factors.

pCicc as Xe-133 = ( cpm) (5.6 E-8)

R-15 AIR EJECTOR AND GLAND STEAM EXHAUST GAS:

pCi/cc Xe-133 = ( cpm) (4.6 E-8) pCVcc as normal gas mixture * = ( cpm) (5.0 E-8)

Based on the mixture of noble gas present in the reactor coolant during the 01/25/82 tube rupture which is representative of normal operations.

R-16 CONTAINMENT FAN COOLER SERVICE WATER:

pCi/cc as Cs-37 = ( cpm) (1.5 E-8)

R-17 COMPONENT COOLING:

pCi/cc as Cs-137 = ( cpm) (1.4 E-8)

EPIP 2-4:16, Rev. 14 Page 2 of 2 RMS PROCESS MONITOR CALIBRATION FACTORS R-18 RADWASTE SYSTEM DISCHARGE::

pCVcc as Cs-137= ( cpm) (1.4 E-8)

R-19 STEAM GENERATOR BLOWDOWN:

pCVcc as Cs-137= ( cpm) (1.4 E-8)

R-20A SPENT FUEL POOL HEAT EXCHANGER SERVICE WATER:

pCVcc as Cs-137 = ( cpm) (2.4 E-8)

R-20B SPENT FUEL POOL HEAT EXCHANGER SERVICE WATER pCVcc as Cs-137 = ( cpm) (1.7 E-7)

R-21 RETENTION TANK:

pCi/cc as Cs-137 = ( cpm) (1.5 E-8)

R-22 HIGH CONDUCTIVITY WASTE TANK:

pCVcc as Cs-137= ( cpm) (1.2 E-8)

R-31 STEAM LINE RADIATION MONITOR:

mr/hr = ( cpm) (2.11 E-2)

R-32 STEAM LINE RADIATION MONITOR:

mr/hr = (

cpm) (2.02 E-2)

R-36 CONTROL ROOM NOBLE GAS MONITOR:

pCicc as Kr-85 = ( cpm) (1.75 E-8) pCVcc as Xe-133 = ( cpm) (1.41 E-7)

R-37 CONTROL ROOM PARTICULATE MONITOR:

pCi/cc as Cs-137 = ( cpm) (1.68 E-12)

R38 CONTROL ROOM IODINE MONITOR:

pCi/cc as 1-131 = ( cpm) (2.51 E-12)

ROCHESTER GAS & ELECTRIC CORPORATION GINNA STATION Controlled Copy Number _

_3 Procedure Number EPIP 3-1 Revision Number 23 Emergency Operations Facility (EOF) Activation Responsi

()Pj~qn7 Eff~ctivefDate Category 1.0 This procedure contains 9

pages

EPIP 3-1:1 EPIP 3-1 EMERGENCY OPERATIONS FACILITY (EOF) ACTIVATION 1.0 PURPOSE The purpose of this procedure is to designate actions and responsibility of individuals who would report to the Emergency Operations Facility upon a decision to activate the facility.

2.0 RESPONSIBILITY 2.1 The first qualified person to arrive is responsible for initiating this procedure.

2.2 The EOF/Recovery Manager is responsible for activation of the EOF upon arrival.

3.0 REFERENCES

3.1 Developmental References 3.1.1 Nuclear Emergency Response Plan 3.1.2 NUREG-0654 "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants".

3.2 Implementing References 3.2.1 EPIP 1-0, Ginna Station Event Evaluation and Classification 3.2.2 EPIP 1-5, Notifications 3.2.3 EPIP 3-3, Engineering Support Center (ESC) Activation 3.2.4 EPIP 3-6, Corporate Notifications 3.2.5 EPIP 4-6, Joint Emergency News Center (JENC) Activation 3.2.6 EPIP 5-7, Emergency Organization 4.0 PRECAUTIONS As noted in this procedure.

EPIP 3-1:2 5.0 PREREQUISITES 5.1 An Alert, Site Area Emergency or a General Emergency has been declared in accordance with EPIP 1-0.

5.2 The EOF could be activated anytime at the discretion of the EOF/Recovery Manager.

6.0 ACTIONS 6.1 Arriving Personnel NOTE: Depending on the number of arriving personnel, perform steps concurrently to minimize activation time.

6.1.1 Sign in at the Security Desk at the entrance to the EOF.

6.1.2 Place your name under the appropriate emergency position on the magnetic organization chart.

6.1.3 Perform responsibilities as described in EPIP 5-7, Emergency Organization 6.1.4 Personnel arriving from the Ginna plant should perform a whole body frisk to check for contamination if there has been a release of radioactivity.

6.2 EOF/Recovery Manager perform the following:

NOTE: In the event of power loss at the EOF, contact the TSC Emergency Coordinator and discuss the need for the TSC to re-assume or maintain command and control, as appropriate.

6.2.1 Ensure minimum response staff listed below is available (as indicated by the red dots on the sign in board):

a.

Nuclear Operations Manager (NOM)

b.

Engineering Manager

c.

Dose Assessment Manager

d.

News Center Manager 6.2.2 If a position is not staffed, call in personnel. Qualified responders are found in their position checklist in EPIP 5-7. The TSC will fax the status of the call-in process to the incoming fax machine (located in the Administrative area across the hall) when they are staffed.

EPIP 3-1:3 6.2.3 Obtain a briefing from the TSC Director on plant conditions. If the Ginna responders have been directed to the Ontario Fire Department Exempt Hall (located on Route 104 between Route 350 and Knickerbocker Road, phone number 315-524-8078), have the EOF responders obtain the checklists for their counterparts in EPIP 5-7. Ensure that all functions required by the onsite emergency organization are performed by the EOF responders to the extent practical.

6.2.4 Obtain notification forms from EOF fax machine that the Control Room and TSC have sent to notify offsite agencies. Use these forms and brief the response staff on plant conditions. Ensure that the staff makes contact with their counterparts.

The counterparts are:

a.

EOF/Recovery Manager - TSC Director

b.

EOF Dose Assessment Manager - TSC Dose Assessment Manager

c.

Nuclear Operations Manager - TSC Operations Manager

d.

Engineering Manager - TSC Technical Manager 6.2.5 If the Ginna responders will not be allowed site access for greater than four (4) hours, have the Ginna Engineering, Operations and Dose Assessment personnel report to the EOF to assist in technical evaluations.

6.2.6 Brief Federal, State and County Representatives in the EOF on the status of the emergency. Request that they contact their respective emergency operation facilities and determine if the county response organizations have any concerns.

NOTE:

IF ONE OF THE INDIVIDUALS CANNOT BE CONTACTED, HAVE ONE OF THE OTHER CONTACTS ASSUME THE RESPONSIBILITY.

6.2.7 Contact RG&E management and notify them that you are the EOF/Recovery Manager and that the EOF is activated in response to a Ginna emergency.

Inform them of the following:

'This is the EOF/Recovery Manager. Ginna has declared an emergency and we are activating our emergency facilities. Can you be the management contact for this event? You are to act as the liaison between RG&E and our parent company, Energy East.'

Primary Notifications Jim Laurito Work:

(585) 724-8077 Home:

(585) 218-9528 Cellular:

(806) 306-7917

EPIP 3-1:4 Primary Notifications (Cont'd.)

Wes von Schack Energy East Work:

Home:

Cellular:

(607) 762-4550 (212) 396-9792 (607) 760-5200 (607) 762-4315 (914) 738-3065 (914) 441-5770 Ken Jasinski Energy East Work:

Home:

Cellular:

"This is the EOF/Recovery Manager. Ginna has declared an emergency and we are activating our emergency facilities. Can you be the financial contact for this event?"

I I

I Joe Syta Controller and Treasurer Work:

Home:

Pager:

(585) 724-8003 (585) 425-4474 (585) 528-8712 (585) 771-2212 (585) 329-6148 I

Debbie Merwin Work:

Cellular:

"This is the EOF/Recovery Manager. Ginna has declared an emergency and we are activating our emergency facilities. Can you be the RG&E outside/government agencies liaison for this event?"

Robert Bergin Assistant General Counsel Government and Community Relations Work:

Home:

Cellular:

(585) 771-2294 (585) 377-4399 (585) 315-0040 6.2.8 Contact INPO at (800) 321-0614 and inform them of the declared emergency.

6.2.9 Request the Facilities and Personnel Manager contact hotels and food service providers for support of TSC and EOF responders.

6.2.11 Assuming Command and Control of the Emergency 6.2.11.1 Ensure minimum activation staff listed below is available to assume command and control:

a.

EOF Dose Assessment Manager

b.

Dose Assessment Support (3)

c.

Nuclear Operations Manager (NOM)

EPIP 3-1:5

d.

Technical Assistant to the NOM

e.

Administrative Assistant to the NOM

f.

Communicator

9.

Engineering Manager

h.

Facilities and Personnel Manager

i.

EOF/JENC Security Manager

j.

Offsite Agency Liaison

k.

Technical Representative Liaison I.

Corporate Spokesperson

m.

News Center Manager 6.2.11.2 If a position is not staffed, call in personnel. Qualified responders are found in their position checklist in EPIP 5-7.

6.2.11.3 Confer with the TSC Emergency Coordinator on shifting command and control of the emergency from the TSC organization to the EOF. Normally when command and control is transferred, the EOF assumes:

a.

Overall direction for the emergency

1.

Emergency Classification

2.

Protective Action Recommendations

b.

Notifications to New York State, Wayne and Monroe Counties

c.

Dose Assessment and Offsite Survey Team coordination However, certain conditions may warrant transferring a given responsibility area (e.g. survey team coordination) at different times, per the discretion of the Emergency Coordinator and EOF/Recovery Manager.

6.2.11.4 Brief EOF personnel on plant status and notify them that command and control will be assumed at the agreed upon time using Attachment 2 for meeting agenda.

EPIP 3-1:6 6.2.11.5 At the agreed upon time, call the TSC Emergency Coordinator and state that, unless he has any objections, the EOF is assuming command and control at this time.

6.2.11.6 Announce to the EOF that the EOF has assumed command and control of the emergency.

6.2.11.7 Upon assuming command and control, direct the NOM to provide RECS line updates every 30 minutes using procedure EPIP 1-5, Attachment 3.

6.2.11.8 Direct the Federal, State and County representatives in the EOF to contact their emergency management organizations and inform them that the EOF has assumed command and control.

6.2.11.9 Ensure the EOF Dose Assessment Manager notifies the Survey Center Manager that the EOF has assumed command and control.

6.3 Shift Tumover 6.3.1 If the EOF will be activated for more than 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, direct the Facilities and Personnel Manager to complete Attachment 1 for continuous staffing.

6.3.2 When the responders for the next shift have arrived, have them perform a detailed turnover with the person that they are relieving. Have them log the turnover in their log book.

6.3.3 When the individual turnovers are complete, have the on-coming crew perform a briefing for each other using the standard meeting agenda (Attachment 2). The off-going crew should also be at the briefing to ensure that the information that is shared is correct and complete.

6.3.4 To terminate the emergency or to transition to the recovery phase use EPIP 3-4.

7.0 ATTACHMENTS

1.

EOF Continuous Staffing Schedule

2.

EOF Meeting Agenda

EPIP 3-1:7, Rev. 23 Page 1 of 2 EOF CONTINUOUS STAFFING SCHEDULE (Consult EPIP 5-7 position checklists for qualified personnel and phone numbers to fill positions.)

Shift A Shift B I

_~~

hrs to hrs hrs to hrs POSITION Date:

Date:

EOF/Recovery Manager Secretary, Recovery Mgr Nuclear Operations Manager Technical Asst. to NOM Admin Asst to NOM Corporate Spokesperson Assistant to Corporate Spokesperson Technical Advisor to Corporate Spokesperson News Writer Engineering Manager Offsite Agency Liaison EOF Technical Representative Monroe County Tech. Rep.

Wayne County Tech. Rep.

Albany Tech. Rep.

Facilities and Personnel Mgr EOF/JENC Security Manager

EPIP 3-1:8, Rev.23 Page 2 of 2 EOF CONTINUOUS STAFFING SCHEDULE (Consult EPIP 5-7 position checklists for qualified personnel and phone numbers to fill positions.)

Shift A Shift B hrs to hrs hrs to hrs POSITION Date:

Date:

Clerical Supervisor Fax Operator Copier Operator Courier Dose Assessment Manager Assistant DA Manager Dose Assessment Liaison Calculator Calculator Radio Operator Communicator Plotter Weather/Status Board Survey Team Survey Team Communicator Communicator Status Board Keeper

EPIP 3-1:9, Rev. 23 Page 1 of 1 EOF MEETING AGENDA Meeting Date:

Time:

1.

Recovery Manager Purpose of Meeting Classification level Time classification declared Brief event description (use EAL reference manual)

Injury/Fire Status

2.

Dose Assessment Offsite Areas of concern (downwind areas)

Protective Actions Recommended Abnormal radiation levels

3.

Nuclear Operations Manager (Ginna to report if on conference calls)

Plant Status Maintenance Equipment out of service Repairs planned or in progress

4.

Engineering Manager (Ginna to report if on conference calls)

Brief technical issues

5.

Security Accountability of plant personnel Movement of response personnel to and from site.

6.

Facility and Personnel Manager Staffing of facilities Transportation of personnel Food Requests received

7.

Corporate Spokesperson Media questions

8.

Other RG&E Concerns

9.

County Concerns Wayne County Monroe County

10.

State Concerns State Emergency Management Office (SEMO)

Department of Health (DOH)

Department of Environmental Conservation

11.

Federal Concerns Nuclear Regulatory Commission (NRC)

Federal Emergency Management Agency (FEMA)

Department of Energy (DOE)

12.

Review of Open Items Please write on these pages. New pages will be provided after each use.

9 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER t7-?

PROCEDURE NO.

EPIP 3-3 REV. NO.

10 IMMEDIATE ENTRY RESPONSIBLE M ER RESPONSER EFFEC IVE IATE Category 1.0 This procedure contains 6..j pages

EPIP 3 -3:1 EPIP 3-3 IMMEDIATE ENTRY

1.0 PURPOSE

1.1 To provide instructions for immediate entry to the Ginna site from the Survey Center as required by the Emergency Response Organization.

2.0 RESPONSIBILITY

2.1 The Survey Center Manager is responsible for providing entry teams as requested by the Ginna Station TSC and/or Control Room and assisting in immediate entry preparation.

2.2 Entry team members are responsible for implementation of this procedure.

3.0 REFERENCES

3.1 Developmental References None.

3.2 Implementing References 3.2.1 EPIP 1-12, Repair and Corrective Action Guidelines During Emergency Situations 3.2.2 EPIP 1-8, Search and Rescue Operation 3.2.3 EPIP 1-9, Technical Support Center Activation 3.2.4 EPIP 1-10, Operational Support Center (OSC) Activation 3.2.5 EPIP 1-11, Survey Center Activation

4.0 PRECAUTIONS

4.1 Designated personnel may be required to enter the site as members of Emergency Response Organization or Emergency Support Organization (EPIP 1-12, EPIP 1-9, EPIP 1-8, EPIP 1-10).

4.2 The size of entry teams shall be two individuals or more.

EPIP 3 -3:2

5.0 PREREQUISITES

5.1 The Emergency Coordinator has requested the dispatch of Entry Teams to the Ginna Site.

5.2 A current EPIP 1-5 NEW YORK STATE (NYS) RADIOLOGICAL EMERGENCY DATA FORM (PART I), (Attachment 3a) should be provided to the Survey Center by the RG&E emergency facility (Control Room, TSC or EOF) which has command and control.

6.0 ACTIONS

6.1 Survey Center Manager 6.1.1 Using the NYS Part I Form that was faxed to the Survey Center, determine wind direction, wind speed, initiating event conditions and pertinent plant conditions and post information on status board at the Survey Center.

6.1.3 Assemble the Entry Teams.

6.1.3.1 Designate an Entry Team Leader.

6.1.3.2 Obtain the names of the Entry Team Members.

6.1.3.3 Request a Radiation Protection Technician or Survey Team member to escort the team; otherwise, designate an Entry Team Member to perform the Radiation Protection function.

6.1.3.4 Provide the Entry Team Leader with a portable radio.

6.1.3.4.1 Ensure the Entry Team Leader understands the use of the portable radio.

6.1.4 If the TSC has assumed command and control, notify the TSC Security Manager (or the TSC Radio Communicator) that personnel, by name, will require entry to the Ginna Site.

6.1.4.1 If the Control Room has command and control, notify the Control Room Communicator that personnel, by name, will require entry to the Ginna Site.

6.1.5 Request the Emergency Coordinator provide an entry route.

6.1.5.1 If available, request the TSC RP/Chemistry Manager assist with and recommend necessary radiation protection equipment, dosimetry, protective clothing and respiratory protection.

IT EPIP 3 -3:3 6.1.5.2 If available, request the TSC RP/Chemistry Manager assist in briefing the team on the radiological conditions they may encounter.

6.1.6 Brief the team(s) using the NYS Radiological Emergency Data Form (Part I),

which was faxed to the Survey Center, before departure to the Ginna Site.

6.1.6.1 The Departure briefing should include:

a.

Name of the Entry Team Leader

b.

Names of the members of the Entry Team

c.

Weather conditions

d.

Radiological conditions

e.

Plant status, event classification

f.

Radiological protection equipment, dosimetry and protective clothing

g.

Respiratory protection

h.

Route

i.

A reminder that the teams DO NOT enter areas with radiation levels greater than 2 Rern/hr unless directed by the Emergency Coordinator

j.

A reminder for the teams to remove their anti-contamination clothing upon arrival at the final destination in accordance with radiation protection procedures.

k.

A reminder to perform a whole body frisk upon arrival at their destination.

6.2 Entry Teams NOTE:

ENSURE DOSE RATE METER AND RADIO ARE FUNCTIONING PROPERLY PRIOR TO DEPARTURE.

6.2.1 Entry Team Leader 6.2.1.1 Obtain the names of all members of the Entry Team.

6.2.1.2 Obtain a portable radio.

EPIP 3 -3:4 6.2.1.3 The entry team shall obtain necessary equipment as recommended by a Radiation Protection Technician, TSC RP/Chemistry Manager or the Survey Center Manager. In their absence, obtain the equipment listed below:

a.

Thermoluminescent dosimeter (TLD)

b.

High range self-reading dosimeter (SRD) at least 0 to 1500mR

c.

High range dose rate meter (0-1000 R/hr)

d.

Anti-contamination clothing

e.

Full face mask with charcoal filter

f.

Radio 6.2.1.4 Ensure each Entry Team member logs in on Dosimetry Log in accordance with EPIP 1-11.

6.2.1.5 Ensure each Entry Team member is aware of the following:

a)

Weather conditions b)

Plant conditions c)

Event Classification d)

Route e)

Radiological conditions 6.2.1.6 Just before departure, contact the Emergency Coordinator and brief them on your route and obtain any last minute instructions.

6.2.1.7 Ensure the Entry Team does not enter areas with radiation levels greater than 2 Rem/hr unless directed by the Emergency Coordinator.

6.2.1.8 Ensure Entry Team members remove their anti-contamination clothing upon arrival at the final destination in accordance with radiation protection procedures.

6.2.1.9 Ensure Entry Team members perform a whole body frisk upon arrival at their destination.

A EPIP 3 -3:5 6.2.1.10 Report the arrival of the Entry Team to the Emergency Coordinator.

6.2.1.11 Ensure each Entry Team member records their SRD dose in accordance with EPIP 1-11, using the Dosimetry Log faxed to the TSC RP/Chemistry Manager.

6.2.1.12 Ensure each Entry Team member is accounted for from departure from the Survey Center until arrival at the final destination.

6.2.1.13 Ensure the entire team attends a de-briefing.

6.2.1.14 Ensure all SRDs, radios and survey meters are turned over to the TSC RP/Chemistry Manager for return to the Survey Center.

6.2.2 Entry Team Member 6.2.2.1 Notify Survey Center Manager, if present, and log on status board that team is leaving for the site.

6.2.2.2 Provide name to the Entry Team Leader.

6.2.2.3 Obtain the necessary radiation protection equipment, dosimetry, and respiratory protection equipment.

6.2.2.4 Know the following:

a)

Weather conditions b)

Plant conditions c)

Route d)

Radiological conditions 6.2.2.5 Note any unusual conditions encountered during the entry.

6.2.2.6 Do not enter areas with radiation levels greater than 2 Rem/hr unless directed by the Emergency Coordinator.

6.2.2.7 Remove anti-contamination clothing upon arrival at the final destination in accordance with radiation protection procedures.

6.2.2.8 Perform a whole body frisk upon arrival at the final destination.

6.2.2.9 Report any radiation survey results to the TSC Dose Assessment Manager.

EPIP 3 -3:6 6.2.2.10 Record SRD dose on Dosimetry Log that was faxed to the TSC RP/Chemistry Manager and turn over SRD to TSC RP/Chemistry Manager.

6.2.2.11 Attend a de-briefing.

6.3 TSC RP/Chemistry Manager 6.3.1 Assists entry team by providing radiological conditions that they may encounter.

6.3.2 Ensures SRDs, radios and survey meters are returned to the Survey Center.

6.3.3 Turns over Dosimetry Logs to Dosimetry for entry into the Radiation Dose Management System (RDMS).

7.0 ATTACHMENTS

None.

ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER A-'

PROCEDURE NO.

EPIP 4-1 REV. NO.

7 PUBLIC INFORMATION RESPONSE TO AN UNUSUAL EVENT RESIONBLE M ER EFSFEC 1E DE EFFECTIVE DATE Category 1.0 This procedure contains 2 pages

EPIP 4-1:1 EPIP 4-1 PUBLIC INFORMATION RESPONSE TO AN UNUSUAL EVENT 1.0 PURPOSE To provide instruction for implementing the Public Information response to an Unusual Event at the R.E. Ginna Nuclear Power Plant.

2.0 1 2.1 RESPONSIBILITY Emergency Preparedness is responsible for notifying the News Center Manager and the Duty Corporate Communications Representative of the Unusual Event.

2.2 The News Center Manager is responsible for informing the appropriate News Center personnel of the Unusual Event condition as deemed necessary.

3.0 REFERENCES

3.1 Developmental References 3.1.1 Rochester Gas and Electric Corporation Nuclear Emergency Response Plan.

3.2 Implementing References 3.2.1 EPIP 4-7, Public Information Organization Staffing 4.0 PRECAUTIONS None.

5.0 PREREQUISITES 5.1 An Unusual Event has been declared at the R.E. Ginna Nuclear Power Plant in accordance with EPIP 1-0, Ginna Station Event Evaluation and Classification.

6.0 ACTIONS 6.1 News Center Manager 6.1.1 Upon notification by Emergency Preparedness, notify the key personnel listed below using EPIP 4-7 and request that they stand-by for further information as the situation develops and as judgement dictates.

EPIP 4-1:2 6.1.2 Use EPIP 4-7, Public Information Organization Staffing, to document calls and responses.

6.1.3 Standby for further information from Emergency Preparedness.

6.2 Joint Emergency News Center Personnel 6.2.1 When notified by the News Center Manager, key JENC supervisory personnel will remain accessible to the News Center Manager.

Key Supervisory Personnel are:

a.

Media Monitoring and Public Inquiry Manager

b.

Assistant News Center Manager

c.

JENC Security personnel

d.

Facilities & Materials Coordinator

e.

Corporate Spokesperson 6.2.2 A News Announcement is required. The News Announcement will be prepared by either the Duty Corporate Communications Representative and approved by the Manager of Corporate Communications using their normal process.

6.2.3 No further action is required by Emergency News Center Personnel at the Unusual Event Level. All News Announcements of public information will be handled per normal Public Affairs departmental operating procedures.

7.0 ATTACHMENTS None.

ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER 7-3 PROCEDURE NO.

EPIP 4-3 REV. NO.

13 ACCIDENTAL ACTIVATION OF GINNA ALERT AND NOTIFICATION SYSTEM SIRENS RESPONSIBLE MANAGER 66 (6o7 tO EFFECI IVE CATE Category 1.0 This procedure contains 3 pages

EPIP 4-3:1 EPIP 4-3 ACCIDENTAL ACTIVATION OF GINNA EMERGENCY NOTIFICATION SYSTEM SIRENS 1.0 1.1 2.0 2.1 3.0 3.1

3.1.1 PURPOSE

To specify the means by which notifications are to be made in the event of an accidental activation of Ginna Alert and Notification System (ANS) Sirens.

RESPONSIBILITY:

The Ginna Control Room is responsible for initiating this procedure.

REFERENCES:

Developmental References IEN 81-34 Accidental Activation of Prompt Public Notification System 3.1.2 NRC NUREG-1022, Event Reporting Guidelines 3.2 Imolementino References 4.0 None.

PRECAUTIONS:

None.

PREREQUISITES:

5.0 5.1 RG&E has been notified that an ANS siren has sounded.

ACTIONS:

6.0 NOTE:

IF THERE IS AN ACTUAL GINNA EMERGENCY, INSTRUCT THE CALLER TO REFER TO THEIR EMERGENCY PLANNING CALENDAR AND/OR TUNE IN TO THEIR EMERGENCY ALERT SYSTEM STATION (WHAM) 11 80AM, (WVOR) 100.5FM OR (WHEC) TV10 FOR ADDITIONAL INFORMATION.

EPIP 4-3:2 6.1 Obtain the following information from the caller:

a.

Name

b.

Address

c.

Telephone number I 6.2 Verify if a siren has activated. Have the Fire Brigade, l&C Special Projects or System Engineer perform a Silent Test by pushing the Silent Test button at Ginna TSC Controller or applicable County Controller. This will check the status of each siren. A siren with a failure code will show red on the screen. Review report printed on the printer, an "X" in the OVR (Overrun) column indicates that the siren inadvertently activated.

I 6.2.1 If the siren computer indicates no sirens activated, go to 6.5. If the siren computer indicates a siren is activated, go to 6.4.

6.3 Use Siren System Controller at Ginna TSC or at County Controller to attempt immediate siren shutdown. Push CANCEL button, hold until XMIT light comes on indicating that CANCEL signal has been sent out.

6.3.1 To determine if the siren has stopped activation, reset the status of the siren that reported the OVR (Overrun) status by performing the following steps:

Click on menus item 'Status" Click on "Reset Status" Enter password-x, click OK Enter siren number in three digit form (i.e. 036), SEND.

This should reset the Overrun Status. Check to see if the siren has stopped Alerting. Single Poll siren. If Overrun Status is cleared, then the siren has reported that it has stopped.

6.3.2 Call one of the following Nuclear Emergency Preparedness personnel and inform them of the situation. Have Emergency Preparedness make contact with the affected county, contact the Duty PIO, and ensure l&C Special Projects is made aware of the problem.

Tim Laursen Peter Polfleit Work:

585-771-6185 Work:

585-771-6772 Pager:

585-528-5982 Pager:

585-527-2207 Home:

585-396-1149 Home:

315-524-7101 Cellular:

585-315-1854 Cellular:

585-315-1201

EPIP 4-3:3 Frank Cordaro Rick Watts Work:

585-771-3108 Work:

585-724-8706 Pager:

585-527-3650 Pager:

585-527-3749 Home:

315-524-2924 Home:

585-425-2644 Cellular:

585-315-1277 Cellular:

585-315-1204 Jill Willoughby Work:

585-771-4033 Pager:

585-528-3295 Home:

585-787-9075 Cellular:

585-315-1205 6.5 If no sirens are activated, ask the caller if there may be a possible source other than a Ginna siren that may be sounding. If there are more than three calls about a siren activation within ten minutes, notify the Corporate Communications Manager at (585) 771-2230 during working hours. During off hours notify the Duty Public Information Officer at (585) 771-2133 to inform them of the situation. The duty public information officer will determine if there is a need to notify the media.

6.6 The licensee shall notify the USNRC immediately after notification of Nuclear Emergency Preparedness in step 6.3.2. The notification shall not be later than four hours after the licensee was notified of the accidental activation of the siren(s) using procedure 0-9.3, "NRC Immediate Notification".

7.0 ATTACHMENTS

None.

(

~~~

~

~~~

~

(

V NPSP0200 Ginna Nuclear Power Plant Fri 8/8/2003 8:09:11 am WILLOUGHBYJ PROCEDURE INDE)X Page 1 of 2 INPUT PARAMETERS: TYPE:

PREPIP STATUSVALUE(S):

EF 5 YEARS ONLY:

PREPIP EMERGENC PLAN IMPLEMENTNGPROCEDURE PROCEDURE EFFECT LAST NEXT NUMBER PROCEDURE TITLE R1V DATE REVIEW REVIW ST EPIP-1-0 GINNA STATION EVENT EVALUATION AND CLASSIFICATION 031 06/20/2003 06/20/2003 06/20/2008 EF EPIP-1-1 UNUSUAL EVENT 004 05/23/2003 05/23/2003 05/23/2008 EF EPIP-1-2 ALERT 004 11/02/2001 11/02/2001 11/02/2006 EF EPIP-1-3 SITE AREA EMERGENCY 005 12/09/1996 04/09/2003 04/09/2008 EF EPIP-1-4 GENERAL EMERGENCY 006 05/05/2003 05/05/2003 05/05/2008 EF EPIP-1-5 NOTIFICATIONS 055 06/20/2003 06/20/2003 06/20/2008 EF EPIP-1-6 SITE EVACUATION 017 06/20/2003 06/20/2003 06/20/2008 EF EPIP-1-7 ACCOUNTABILITY OF PERSONNEL 009 11/02/2001 11/02/2001 11/0212006 EF EPIP-1-8 SEARCH AND RESCUE OPERATION 006 05/23/2003 05/23/2003 05/23/2008 EF EPIP-1-9 TECHNICAL SUPPORT CENTER ACTIVATION 025 08/08/2003 08/08/2003 08/08/2008 EF EPIP-1-10 OPERATIONAL SUPPORT CENTER (OSC) ACTIVATION 013 05/23/2003 05/23/2003 05/23/2008 EF EPIP-1-11 SURVEY CENTER ACTIVATION 029 02/25/2003 02/25/2003 02/25/2008 EF EPIP-1-12 REPAIR AND CORRECTIVE ACTION GUIDELINES DURING EMERGENCY SITUATIONS 009 12/20/2001 12/20/2001 12/20/2006 EF EPIP-1-13 LOCAL RADIATION EMERGENCY 004 02/25/2003 02/25/2003 02/25/2008 EF EPIP-1-15 USE OF THE HEALTH PHYSICS NETWORK HPN 005 04/24/1996 03/03/1999 03/03/2004 EF EPIP-1-16 RADIOACTIVE LIQUID RELEASE TO LAKE ONTARIO OR DEER CREEK 005 02/25/2003 02/25/2003 02/25/2008 EF EPIP-1-17 PLANNING FOR ADVERSE WEATHER 004 05/23/2003 05/23/2003 05/23/2008 EF EPIP-1-18 DISCRETIONARY ACTIONS FOR EMERGENCY CONDITIONS 006 05/05/2003 05/05/2003 05/05/2008 EF EPIP-2-1 PROTECTIVE ACTION RECOMMENDATIONS 021 08/08/2003 08/08/2003 08/08/2008 EF EPIP-2-2 OBTAINING METEOROLOGICAL DATA AND FORECASTS AND THEIR USE IN EMERGENCY DOSE AS 013 12/03/2002 12/03/2002 12/03/2007 EF EPIP-2-3 EMERGENCY RELEASE RATE DETERMINATION 015 07/01/2002 07/01/2002 07/01/2007 EF EPIP-2-4 EMERGENCY DOSE PROJECTIONS -MANUAL METHOD 014 08/08/2003 08/08/2003 08/08/2008 EF EPIP-2-5 EMERGENCY DOSE PROJECTIONS PERSONAL COMPUTER METHOD 014 05/15/2002 05/15/2002 05/15/2007 EF EPIP-2-6 EMERGENCY DOSE PROJECTIONS - MIDAS PROGRAM 012 02/25/2003 02/25/2003 02/25/2008 EF EPIP-2-7 MANAGEMENT OF EMERGENCY SURVEY TEAMS 011 08/09/2002 08/09/2002 08/09/2007 EF EPIP-2-8 VOLUNTARY ACCEPTANCE OF EMERGENCY RADIATION EXPOSURE 005 05/16/2000 05/16/2000 05/16/2005 EF EPIP-2-9 ADMINISTRATION OF POTASSIUM IODIDE (1<1) 008 05/23/2003 05/23/2003 05/23/2008 EF EPIP-2-10 INPLANT RADIATION SURVEYS 004 08/09/2002 08/09/2002 08/09/2007 EF EPIP-2-11 ONSITE SURVEYS 019 05/15/2002 05/15/2002 05/15/2007 EF EPIP-2-12 OFFSITE SURVEYS 022 05/15/2002 05/15/2002 05/15/2007 EF

(

(

(

NPSP0200 Ginna Nuclear Power Plant Fri 8/8/2003 8:09:11 am WILLOUGHBYJ PROCEDURE INDE)

INPUT PARAMETERS: TYPE:

PiEPP STATUSVALUE(S):

EF PREPIP EMERGENCY PLAN IMPLEMENTING PROCEDURE PROCEDURE NUMBER PROCEDURE TITLE EPIP-2-13 IODINE AND PARTICULATE ACTIVITY DETERMINATION FROM AIR SAMPLES EPIP-2-14 POST PLUME ENVIRONMENTAL SAMPLING EPIP-2-15 POST PLUME EVALUATION OF OFFSITE DOSES DUE TO DEPOSITION EPIP-2-16 CORE DAMAGE ESTIMATION EPIP-2-17 HYPOTHETICAL (PRE-RELEASE) DOSE ESTIMATES EPIP-2-18 CONTROL ROOM DOSE ASSESSMENT EPIP-3-1 EMERGENCY OPERATIONS FACIUlTY (EOF) ACTIVATION AND OPERATIONS EPIP-3-2 ENGINEERING SUPPORT CENTER (ESC)

EPIP-3-3 IMMEDIATE ENTRY EPIP-3-4 EMERGENCY TERMINATION AND RECOVERY EPIP-3-7 SECURITY DURING EMERGENCIES EPIP-4-1 PUBUC INFORMATION RESPONSE TO AN UNUSUAL EVENT EPIP-4-3 ACCIDENTAL ACTIVATION OF GINNA EMERGENCY NOTIFICATION SYSTEM SIRENS EPIP46 JOINT EMERGENCY NEWS CENTER ACTIVATION EPIP-4-7 PUBUC INFORMATION ORGANIZEATION STAFFING EPIP-4-8 SILENT TESTING OF THE GINNA SIRENS FROM THE TECHNICAL SUPPORT CENTER EPIP-4-9 ACTIVATION OF GINNA EMERGENCY SIRENS FROM THE TECHNICAL SUPPORT CENT EPIP4-10 SILENT TESTING OF THE GINNA SIRENS FROM THE COUNTY ACTIVATION POINTS EPIP-4-11 ACTIVATION OF THE GINNA SIRENS FROM THE COUNTY ACTIVATION POINTS EPIP-5-1 OFFSITE EMERGENCY RESPONSE FACIUTIES AND EQUIPMENT PERIODIC INVENTOR EPIP-5-2 ONSITE EMERGENCY RESPONSE FACTES AND EQUIPMENT PERIODIC INVENTORY EPIP-5-5 CONDUCT OF DRILLS AND EXERCISES EPIP-5-6 ANNUAL REVIEW OF NUCLEAR EMERGENCY RESPONSE PLAN (NERP)

EPIP-5-7 EMERGENCY ORGANIZATION EPIP-5-9 TESTING THE OFF HOURS CALL-IN PROCEDURE AND QUARTERLY TELEPHONE NUM EPIP-5-10 EMERGENCY RESPONSE DATA SYSTEM (ERDS)

NERP GINNA STATION NUCLEAR EMERGENCY RESPONSE PLAN PREPIP TOTAL:

57 5 YEARS ONLY:

Page 2 of 2 riQS:

r-w 1; -1

.fi.-,.

r-z -g I-

'ER Y CHECKS AN CHECKS AND BER CHECK EFFECT DATE 008 0712711999 015 10/08/2002 006 10/08/2002 013 12103/2002 007 03/01/2002 015 05/23/2003 023 08108/2003 010 08/09/2002 010 08/08/2003 009 02/25/2003 010 10/08/2002 007 08/08/2003 013 08/08/2003 009 0813112001 023 05/23/2003 001 02/25/2003 002 05/08/2003 000 02/25/2003 001 05/08/2003 028 06/20/2003 031 06/20/2003 015 05/23/2003 004 05/28/1999 040 05/23/2003 007 10/08/2002 007 12/03/2002 022 07/31/2003 LAST REVIEW 07/27/1999 10/08/2002 10/08/2002 12/03/2002 03/01/2002 05/2312003 08/08/2003 08/09/2002 08/08/2003 02125/2003 10/08/2002 08/08/2003 08/08/2003 08/31/2001 05/23/2003 02/25/2003 05/08/2003 02/25/2003 05/08/2003 06/20/2003 06/20/2003 05/23/2003 05/28/1999 05/23/2003 10/08/2002 12/03/2002 07/31/2003 NEXT REVIEW 07/27/2004 10/08/2007 10/08/2007 12/03/2007 03/01/2007 05/23/2008 08/08/2008 08/09/2007 08/08/2008 02/25/2008 10/08/2007 08/08/2008 08/08/2008 08/31/2006 05/23/2008 02/25/2008 05/08/2008 02/25/2008 05/08/2008 06/20/2008 06/20/2008 05/23/2008 05/28/2004 05/23/2008 10/08/2007 12/03/2007 07/31/2005 ST E:

E:

E:

E:

a:

a:

E:

E:

E:

E:

E:

a:

E:

a:

a:

E:

E:

a:

E:

a:

a:

a:

E:

E:

a:

E:

GRAND TOTAL: