ML041070044: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Duke                                                             R. A. JONES MEkPower.                                                              Vice President A Duke Energy Company Duke Power 29672 / Oconee Nuclear Site 7800 Rochester Highway Seneca, SC 29672 864 885 3158 864 885 3564 fax April 12, 2004 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555
{{#Wiki_filter:Duke MEkPower.
A Duke Energy Company R. A. JONES Vice President Duke Power 29672 / Oconee Nuclear Site 7800 Rochester Highway Seneca, SC 29672 864 885 3158 864 885 3564 fax April 12, 2004 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C.
20555


==Subject:==
==Subject:==
Oconee Nuclear Station Docket Nos. 50-269, -270, -287 Emergency Plan Implementing Procedures Manual Volume C Revision 2004-04 Please find attached for your use and review copies of the revision to the Oconee Nuclear Station Emergency Plan: Volume C Revision 2004-04, April 2004.
Oconee Nuclear Station Docket Nos. 50-269, -270, -287 Emergency Plan Implementing Procedures Manual Volume C Revision 2004-04 Please find attached for your use and review copies of the revision to the Oconee Nuclear Station Emergency Plan:
Volume C Revision 2004-04, April 2004.
This revision is being submitted in accordance with 10 CFR 50-54(q) and does not decrease the effectiveness of the Emergency Plan or the Emergency Plan Implementing Procedures.
This revision is being submitted in accordance with 10 CFR 50-54(q) and does not decrease the effectiveness of the Emergency Plan or the Emergency Plan Implementing Procedures.
Revision 2004-04, Volume C does not contain Safeguards Information and is not subject to 10 CFR 73.21 restrictions.     However, procedure RP/0/B/1000/007, (Security Event) does contain licensee physical protection information.
Revision 2004-04, Volume C does not contain Safeguards Information and is not subject to 10 CFR 73.21 restrictions.
However, procedure RP/0/B/1000/007, (Security Event) does contain licensee physical protection information.
Therefore, Duke Energy Corporation requests that RP/0/B/1000/007, be withheld from public disclosure pursuant to 10 CFR 2.790(d)(1).
Therefore, Duke Energy Corporation requests that RP/0/B/1000/007, be withheld from public disclosure pursuant to 10 CFR 2.790(d)(1).
Any questions or concerns pertaining to this revision please call Rodney Brown, Emergency Planning Manager at 864-885-3301.
Any questions or concerns pertaining to this revision please call Rodney Brown, Emergency Planning Manager at 864-885-3301.
By copy of this letter, two copies of this revision are being provided to the NRC, Re     n II, Atlanta, Georgia.
By copy of this letter, two copies of this revision are being provided to the NRC, Re n II, Atlanta, Georgia.
Very tru     yours, R A VP, Oconee Nuclear Site xc:     (w/2 copies of attachments)
Very tru
Mr. Luis Reyes, Regional Administrator, Region II U. S. Nuclear Regulatory Commission 61 Forsyth St., SW, Suite 24T23 Atlanta, GA 30303 w/copy of attachments Mr. James R. Hall Rockville, Maryland (w/o Attachments, Oconee Nuclear Station)
: yours, R A VP, Oconee Nuclear Site xc:
NRC Resident Inspector 04S J. R. Brown, Manager, Emergency Planning www.duke-energy. corn
(w/2 copies of attachments)
Mr. Luis Reyes, Regional Administrator, Region II U.
S. Nuclear Regulatory Commission 61 Forsyth St., SW, Suite 24T23 Atlanta, GA 30303 w/copy of attachments Mr. James R. Hall Rockville, Maryland (w/o Attachments, Oconee Nuclear Station)
NRC Resident Inspector J. R. Brown, Manager, Emergency Planning
 04S www.duke-energy. corn


April 12,2004 OCONEE NUCLEAR SITE INTRASITE LETTER
April 12,2004 OCONEE NUCLEAR SITE INTRASITE LETTER
Line 32: Line 40:
==SUBJECT:==
==SUBJECT:==
Emergency Plan Implementing Procedures Volume C, Revision 2004-04 Please make the following changes to the Emergency Plan Implementing Procedures Volume C by following the below instructions.
Emergency Plan Implementing Procedures Volume C, Revision 2004-04 Please make the following changes to the Emergency Plan Implementing Procedures Volume C by following the below instructions.
REMOVE                               INSERT Cover Sheet 2004-03                   Cover Sheet 2004-04 Table of Contents page 1, 2 & 3      Table of Contents page 1, 2 & 3 RP/0/B/1000/007 - 09/29/02           RP/0/B/1000/007 - 03/30/04 RP/0/B/1000/019 - 03/10/04           RP/0/B/1000/019 - 04/05/04}}
REMOVE INSERT Cover Sheet 2004-03 Table of Contents page 1, 2 & 3 RP/0/B/1000/007 -
09/29/02 RP/0/B/1000/019 -
03/10/04 Cover Sheet 2004-04 Table of Contents page 1, 2 & 3 RP/0/B/1000/007 -
03/30/04 RP/0/B/1000/019 -
04/05/04}}

Latest revision as of 03:35, 16 January 2025

Transmittal of Oconee Nuclear Station Emergency Plan Implementing Procedures Manual Volume C Revision 2004-04
ML041070044
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 04/12/2004
From: Rosalyn Jones
Duke Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML041070044 (2)


Text

Duke MEkPower.

A Duke Energy Company R. A. JONES Vice President Duke Power 29672 / Oconee Nuclear Site 7800 Rochester Highway Seneca, SC 29672 864 885 3158 864 885 3564 fax April 12, 2004 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C.

20555

Subject:

Oconee Nuclear Station Docket Nos. 50-269, -270, -287 Emergency Plan Implementing Procedures Manual Volume C Revision 2004-04 Please find attached for your use and review copies of the revision to the Oconee Nuclear Station Emergency Plan:

Volume C Revision 2004-04, April 2004.

This revision is being submitted in accordance with 10 CFR 50-54(q) and does not decrease the effectiveness of the Emergency Plan or the Emergency Plan Implementing Procedures.

Revision 2004-04, Volume C does not contain Safeguards Information and is not subject to 10 CFR 73.21 restrictions.

However, procedure RP/0/B/1000/007, (Security Event) does contain licensee physical protection information.

Therefore, Duke Energy Corporation requests that RP/0/B/1000/007, be withheld from public disclosure pursuant to 10 CFR 2.790(d)(1).

Any questions or concerns pertaining to this revision please call Rodney Brown, Emergency Planning Manager at 864-885-3301.

By copy of this letter, two copies of this revision are being provided to the NRC, Re n II, Atlanta, Georgia.

Very tru

yours, R A VP, Oconee Nuclear Site xc:

(w/2 copies of attachments)

Mr. Luis Reyes, Regional Administrator, Region II U.

S. Nuclear Regulatory Commission 61 Forsyth St., SW, Suite 24T23 Atlanta, GA 30303 w/copy of attachments Mr. James R. Hall Rockville, Maryland (w/o Attachments, Oconee Nuclear Station)

NRC Resident Inspector J. R. Brown, Manager, Emergency Planning

 04S www.duke-energy. corn

April 12,2004 OCONEE NUCLEAR SITE INTRASITE LETTER

SUBJECT:

Emergency Plan Implementing Procedures Volume C, Revision 2004-04 Please make the following changes to the Emergency Plan Implementing Procedures Volume C by following the below instructions.

REMOVE INSERT Cover Sheet 2004-03 Table of Contents page 1, 2 & 3 RP/0/B/1000/007 -

09/29/02 RP/0/B/1000/019 -

03/10/04 Cover Sheet 2004-04 Table of Contents page 1, 2 & 3 RP/0/B/1000/007 -

03/30/04 RP/0/B/1000/019 -

04/05/04