{{#Wiki_filter:SAFEGUARDS INFORMATION N1i Committed to Nuclear Excellenc                                               Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC August 30, 2004                                                                        NRC 2004-0093 10 CFR 50.4 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266, 50-301 and 72-005 License Nos. DPR-24 and DPR-27 Updated Security Plan On April 28, 2004, Nuclear Management Company, LLC (NMC) submitted a revised Security Plan for the Point Beach Nuclear Plant, Units 1 and 2 (PBNP) in response to NRC Order EA-03-086, "Order Requiring Compliance with Revised Design Basis Threat for Operating Power Reactors," dated April 29, 2003. Subsequent to that submittal, NRC issued requests for additional Information and NMC responded with proposed revisions to the Security Plan on July 29, August 5 and August 12, 2004.
{{#Wiki_filter:SAFEGUARDS INFORMATION N1i Committed to Nuclear Excellenc August 30, 2004 Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC NRC 2004-0093 10 CFR 50.4 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266, 50-301 and 72-005 License Nos. DPR-24 and DPR-27 Updated Security Plan On April 28, 2004, Nuclear Management Company, LLC (NMC) submitted a revised Security Plan for the Point Beach Nuclear Plant, Units 1 and 2 (PBNP) in response to NRC Order EA-03-086, "Order Requiring Compliance with Revised Design Basis Threat for Operating Power Reactors," dated April 29, 2003. Subsequent to that submittal, NRC issued requests for additional Information and NMC responded with proposed revisions to the Security Plan on July 29, August 5 and August 12, 2004.
In addition to clarifications developed by the Nuclear Energy Institute (NEI), this version incorporates revisions discussed with members of the NRC staff on August 19 and 20, 2004. Please replace the previously submitted PBNP Security Plan with the enclosed version.
In addition to clarifications developed by the Nuclear Energy Institute (NEI), this version incorporates revisions discussed with members of the NRC staff on August 19 and 20, 2004. Please replace the previously submitted PBNP Security Plan with the enclosed version.
This letter makes no new commitments or changes to existing commitments.
This letter makes no new commitments or changes to existing commitments.
Line 22: Line 22:
Executed on August 30, 2004.
Executed on August 30, 2004.
Dennis L. Koehl Site Vice President, Point Beach Nuclear Plant Nuclear Management Company, LLC Enclosure THE ENCLOSURES TO THIS LETTER CONTAIN "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY.
Dennis L. Koehl Site Vice President, Point Beach Nuclear Plant Nuclear Management Company, LLC Enclosure THE ENCLOSURES TO THIS LETTER CONTAIN "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY.
UPON SEPARATION OF THE ENCLOSURES, THIS LETTER IS "DECONTROLLED" cc:     (Without Enclosures)
UPON SEPARATION OF THE ENCLOSURES, THIS LETTER IS "DECONTROLLED" cc:
Regional Administrator, USNRC, Region IlIl Project Manager, Point Beach Nuclear Plant, USNRC NRC Resident Inspector, Point Beach Nuclear Plant, USNRC                                         ?zj) 6590 Nuclear Road
(Without Enclosures)
* Two Rivers, Wisconsin 54241 Telephone: 920.755.2321}}
Regional Administrator, USNRC, Region IlIl Project Manager, Point Beach Nuclear Plant, USNRC NRC Resident Inspector, Point Beach Nuclear Plant, USNRC 6590 Nuclear Road
* Two Rivers, Wisconsin 54241 Telephone: 920.755.2321
?zj)}}

Latest revision as of 01:34, 16 January 2025

Updated Security Plan
ML042450551
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/30/2004
From: Koehl D
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Security and Incident Response
References
+sispmjr200506, -RFPFR, FOIA/PA-2005-0236, NRC 2004-0093
Download: ML042450551 (1)


Text

SAFEGUARDS INFORMATION N1i Committed to Nuclear Excellenc August 30, 2004 Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC NRC 2004-0093 10 CFR 50.4 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266, 50-301 and 72-005 License Nos. DPR-24 and DPR-27 Updated Security Plan On April 28, 2004, Nuclear Management Company, LLC (NMC) submitted a revised Security Plan for the Point Beach Nuclear Plant, Units 1 and 2 (PBNP) in response to NRC Order EA-03-086, "Order Requiring Compliance with Revised Design Basis Threat for Operating Power Reactors," dated April 29, 2003. Subsequent to that submittal, NRC issued requests for additional Information and NMC responded with proposed revisions to the Security Plan on July 29, August 5 and August 12, 2004.

In addition to clarifications developed by the Nuclear Energy Institute (NEI), this version incorporates revisions discussed with members of the NRC staff on August 19 and 20, 2004. Please replace the previously submitted PBNP Security Plan with the enclosed version.

This letter makes no new commitments or changes to existing commitments.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on August 30, 2004.

Dennis L. Koehl Site Vice President, Point Beach Nuclear Plant Nuclear Management Company, LLC Enclosure THE ENCLOSURES TO THIS LETTER CONTAIN "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY.

UPON SEPARATION OF THE ENCLOSURES, THIS LETTER IS "DECONTROLLED" cc:

(Without Enclosures)

Regional Administrator, USNRC, Region IlIl Project Manager, Point Beach Nuclear Plant, USNRC NRC Resident Inspector, Point Beach Nuclear Plant, USNRC 6590 Nuclear Road

  • Two Rivers, Wisconsin 54241 Telephone: 920.755.2321

?zj)