ML061780183: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:J~
{{#Wiki_filter:J~
19-APR-06                                                                         Page: 67 DISTRIBUTION CONTROL LIST
Page:
'cument     Name:   ITS/BASES/TRM CC-NAME NAME                         DEPT                       LOCATION I OPS PROCEDURE GROUP SUPV. OPS PROCEDURE GROUP       IP2 3 PLANT MANAGER'S OFFICE     UNIT 3(UNIT 3/IPEC ONLY)   IP2 5 CONTROL ROOM (FL)           OPS (--T-+/-0t7'(IP3/IPEC)   IP3
67 19-APR-06 DISTRIBUTION CONTROL LIST
          *11 RES DEPARTMENT MANAGER     RES (UNIT 3/IPEC ONLY)     45-4-A 19 STEWART ANN                 LICENSING                 GSB-2D
'cument Name:
            .20 CHEMISTRY SUPERVISOR       CHEMISTRY DEPARTMENT       45-4-A 21 TSC(IP3)                   EEC BUILDING               IP2 22 SHIFT MGR.(ELUD 88+/-1 3Ei)   OPERATIONS     (UNIT 3)   IP3 23 LIS                         LICENSING & INFO SERV     OFFSITE 25 SIMULATOR                   TRAIN(UNIT 3/IPEC ONLY)   48-2-A 28 RESIDENT INSPECTOR         US NRC 88' ELEVATION       IP2 32 EOF                         E-PLAN (ALL EP'S)         EOF 47 CHAPMAN N                   BECHTEL                   OFFSITE 50 HAAS, CHERYL A.             WESTINGHOUSE ELECTRIC     OFFSITE 61 SIMULATOR                   TRAIN(UNIT 3/IPEC ONLY)   48-2-A 69 CONROY PAT                 LICENSING/ROOM 205         GSB-2D 99 BARANSKI J (ALL)           ST. EMERG. MGMT. OFFICE   OFFSITE 106 SIMULATOR INSTRUCT AREA     TRG/9PT-D001 DOOG ONLY)   #48 164 CONTROL ROOM (FL)           OPS(BPT-
ITS/BASES/TRM CC-NAME NAME DEPT I OPS PROCEDURE GROUP SUPV.
                                                  -E-e4./7&(IP3/IPEC) IP3 273 FAISON CHARLENE             NUCLEAR LICENSING         WPO-12 319 L.GRANT (LRQ-OPS TRAIN)     LRQ (UNIT 3/IPEC ONLY)     #48 354 L.GRANT(LRQ-OPS/TRAIN)       LRQ (UNIT 3/IPEC ONLY)     #48 357 L.GRANT(ITS/INFO ONLY)       TRAINING - ILO CLASSES     48-2-A 424 GRANT LEAH                   (UNIT 3/IPEC ONLY)       #48 474 OUELLETTE P                 ENG., PLAN & MGMT INC     OFFSITE 489 CLOUGHNESSY PAT             PLANT SUPPORT TEAM         GSB-3B 492 WORK CONTROL                 OPERATIONS 72' ELEV       IP2 493 OPERATIONS FIN TEAM         33 TURBIN DECK             45-1-A 494 AEOF/A.GROSJEAN(ALL EP'S)   E-PLAN (EOP'S ONLY)       WPO-12D 496 L.GRANT(LRQ-OPS/TRAIN)       LRQ (UNIT 3/IPEC ONLY)     #48 497 L.GRANT(LRQ-OPS/TRAIN)       LRQ (UNIT 3/IPEC ONLY)     #48 500 L.GRANT (LRQ-OPS TRAIN)     LRQ (UNIT 3/IPEC ONLY)     #48 501 L.GRANT (LRQ-OPS TRAIN)     LRQ (UNIT 3/IPEC ONLY)     #48 512"L.GRANT (LRQ-OPS TRAIN)     LRQ (UNIT 3/IPEC ONLY)     #48 513 L.GRANT (LRQ-OPS TRAIN)     LRQ (UNIT 3/IPEC ONLY)     #48*
OPS PROCEDURE GROUP 3 PLANT MANAGER'S OFFICE UNIT 3(UNIT 3/IPEC ONLY) 5 CONTROL ROOM (FL)
        ý518-DOCUMENT. CONTROL DESK       NRC (ALL EP'S)             OFFSITE
OPS (--T-+/-0t7'(IP3/IPEC)
                                                                            .. iv.
*11 RES DEPARTMENT MANAGER RES (UNIT 3/IPEC ONLY) 19 STEWART ANN LICENSING
.20 CHEMISTRY SUPERVISOR CHEMISTRY DEPARTMENT 21 TSC(IP3)
EEC BUILDING 22 SHIFT MGR.(ELUD 88+/-1 3Ei)
OPERATIONS (UNIT 3) 23 LIS LICENSING & INFO SERV 25 SIMULATOR TRAIN(UNIT 3/IPEC ONLY) 28 RESIDENT INSPECTOR US NRC 88' ELEVATION 32 EOF E-PLAN (ALL EP'S) 47 CHAPMAN N BECHTEL 50 HAAS, CHERYL A.
WESTINGHOUSE ELECTRIC 61 SIMULATOR TRAIN(UNIT 3/IPEC ONLY) 69 CONROY PAT LICENSING/ROOM 205 99 BARANSKI J (ALL)
ST.
EMERG.
MGMT.
OFFICE 106 SIMULATOR INSTRUCT AREA TRG/9PT-D001 DOOG ONLY) 164 CONTROL ROOM (FL)
OPS(BPT-  
-E-e4./7&(IP3/IPEC) 273 FAISON CHARLENE NUCLEAR LICENSING 319 L.GRANT (LRQ-OPS TRAIN)
LRQ (UNIT 3/IPEC ONLY) 354 L.GRANT(LRQ-OPS/TRAIN)
LRQ (UNIT 3/IPEC ONLY) 357 L.GRANT(ITS/INFO ONLY)
TRAINING -
ILO CLASSES 424 GRANT LEAH (UNIT 3/IPEC ONLY) 474 OUELLETTE P ENG.,
PLAN & MGMT INC 489 CLOUGHNESSY PAT PLANT SUPPORT TEAM 492 WORK CONTROL OPERATIONS 72' ELEV 493 OPERATIONS FIN TEAM 33 TURBIN DECK 494 AEOF/A.GROSJEAN(ALL EP'S) E-PLAN (EOP'S ONLY) 496 L.GRANT(LRQ-OPS/TRAIN)
LRQ (UNIT 3/IPEC ONLY) 497 L.GRANT(LRQ-OPS/TRAIN)
LRQ (UNIT 3/IPEC ONLY) 500 L.GRANT (LRQ-OPS TRAIN)
LRQ (UNIT 3/IPEC ONLY) 501 L.GRANT (LRQ-OPS TRAIN)
LRQ (UNIT 3/IPEC ONLY) 512"L.GRANT (LRQ-OPS TRAIN)
LRQ (UNIT 3/IPEC ONLY) 513 L.GRANT (LRQ-OPS TRAIN)
LRQ (UNIT 3/IPEC ONLY)
ý518-DOCUMENT. CONTROL DESK NRC (ALL EP'S)
LOCATION IP2 IP2 IP3 45-4-A GSB-2D 45-4-A IP2 IP3 OFFSITE 48-2-A IP2 EOF OFFSITE OFFSITE 48-2-A GSB-2D OFFSITE
#48 IP3 WPO-12
#48
#48 48-2-A
#48 OFFSITE GSB-3B IP2 45-1-A WPO-12D
#48
#48
#48
#48
#48
#48*
OFFSITE
.. iv.


E17Etergy              IPEC SITE MANAGEMENT                    -QUALITY RELATED ADMINISTRATIVE    PROCEDURE IP-SMM-AD-103         Revision 0 MANUAL             __"_____...            _"_"_                              ..
IPEC SITE  
INFORMATIONAL USE               Page       13     of     21 ATTACHMENT 10.1                                             SMM CONTROLLED DOCUMENT TRANSMITTAL FORM SITE MANAGEMENT MANUAL CONTROLLED DOCUMENT TRANSMITTAL FORM - PROCEDURES Page 1 of 1 Zý-Entergy                                                               CONTROLLED DOCUMENT TRANSMITTAL FORM - PROCEDURES TO: DISTRIBUTION                                   DATE:     6/15/06                     PHONE NUMBER: 271-7057 FROM: IPEC DOCUMENT CONTROL The Document(s) identified below are forwarded for use. In accordance with IP-SMM-AD-103, please review to verify receipt, incorporate the document(s) into your controlled document file, properly disposition superseded, void, or inactive document(s). Sign and return the receipt acknowledgement below within fifteen (15) working days.
-QUALITY RELATED IP-SMM-AD-103 Revision 0 E17Etergy MANAGEMENT ADMINISTRATIVE PROCEDURE MANUAL INFORMATIONAL USE Page 13 of 21 ATTACHMENT 10.1 SMM CONTROLLED DOCUMENT TRANSMITTAL FORM SITE MANAGEMENT MANUAL CONTROLLED DOCUMENT TRANSMITTAL FORM - PROCEDURES Page 1 of 1 Zý-Entergy CONTROLLED DOCUMENT TRANSMITTAL FORM - PROCEDURES TO: DISTRIBUTION DATE:
AFFECTED DOCUMENT:                                   IP3 ITSIBASESITRM DOC#         J   REV#                       TITLE                                     INSTRUCTIONS
6/15/06 PHONE NUMBER: 271-7057 FROM: IPEC DOCUMENT CONTROL The Document(s) identified below are forwarded for use. In accordance with IP-SMM-AD-103, please review to verify receipt, incorporate the document(s) into your controlled document file, properly disposition superseded, void, or inactive document(s). Sign and return the receipt acknowledgement below within fifteen (15) working days.
  ****************       FOLLOW THE ATTACHED INSTRUCTIONS****************************
AFFECTED DOCUMENT:
                              ***********PLEASE NOTE EFFECTIVE DATE***********
IP3 ITSIBASESITRM DOC#
J REV#
TITLE INSTRUCTIONS
**************** FOLLOW THE ATTACHED INSTRUCTIONS****************************
***********PLEASE NOTE EFFECTIVE DATE***********
RECEIPT OF THE ABOVE LISTED DOCUMENT(S) IS HEREBY ACKNOWLEDGED. I CERTIFY THAT ALL SUPERSEDED, VOID, OR INACTIVE COPIES OF THE ABOVE LISTED DOCUMENT(S) IN MY POSSESSION HAVE BEEN REMOVED FROM USE AND ALL UPDATES HAVE BEEN PERFORMED IN ACCORDANCE WITH EFFECTIVE DATE(S) (IF APPLICABLE) AS SHOWN ON THE DOCUMENT(S).
RECEIPT OF THE ABOVE LISTED DOCUMENT(S) IS HEREBY ACKNOWLEDGED. I CERTIFY THAT ALL SUPERSEDED, VOID, OR INACTIVE COPIES OF THE ABOVE LISTED DOCUMENT(S) IN MY POSSESSION HAVE BEEN REMOVED FROM USE AND ALL UPDATES HAVE BEEN PERFORMED IN ACCORDANCE WITH EFFECTIVE DATE(S) (IF APPLICABLE) AS SHOWN ON THE DOCUMENT(S).
NAME (PRINT)               SIGNATURE                           DATE                   CC#       5-f?
NAME (PRINT)
SIGNATURE DATE CC#
5-f?
A!
A!


--     Entergy Interoffice Correspondence June 13, 2006 MEMORANDUM TO: Mary Stauber Supervisor, Office Services FROM:                 ..Donna Tyner 7 2'x-v.         j  T l1 Sr. Coordinator, Licensing
-- Entergy Interoffice Correspondence June 13, 2006 MEMORANDUM TO:
Mary Stauber Supervisor, Office Services FROM:
..Donna Tyner 72'x-v.
Sr. Coordinator, Licensing j T l1


==SUBJECT:==
==SUBJECT:==
Technical Specification Update for Unit 3 Attached for distribution is the Amendment 231 update to the Unit 3
Technical Specification Update for Unit 3 Attached for distribution is the Amendment 231 update to the Unit 3
  ..Technical Specifications. Please update the Control Room and Shift
..Technical Specifications. Please update the Control Room and Shift
  .'Managers Controlled Copy Books ASAP and the rest of the distribution by June 19, 2006.
.'Managers Controlled Copy Books ASAP and the rest of the distribution by June 19, 2006.
If you have any questions, please call me on X6698.
If you have any questions, please call me on X6698.


Distribution of IP3 Technical Specification Amendment 231 (Approved by NRC June 7, 2006)
Distribution of IP3 Technical Specification Amendment 231 (Approved by NRC June 7, 2006)
Pages are to be inserted into your controlled copy of the Improved Technical Specifications following the instructions listed below. The TAB notation indicates which section the pages are located.
Pages are to be inserted into your controlled copy of the Improved Technical Specifications following the instructions listed below. The TAB notation indicates which section the pages are located.
REMOVE PAGES                                         INSERT PAGES' TAB - Facility Operating License Page 3, (Amendment 230)                                     Page 3, (Amendment 231)
REMOVE PAGES INSERT PAGES' TAB - Facility Operating License Page 3, (Amendment 230)
TAB -'List of Effective Pages Pages 1 through 3,                                           Pages 1 through 3, (Amendment 230)                                              (Amendment 231)
Page 3, (Amendment 231)
TAB - List of Amendments Page 13                                                     Page 13 TAB 3.3 - Instrumentation Page 3.3.5-2 (Amendment 205)                               Page 3.3.5-2 (Amendment 231)
TAB -'List of Effective Pages Pages 1 through 3, (Amendment 230)
Pages 1 through 3, (Amendment 231)
TAB - List of Amendments Page 13 Page 13 TAB 3.3 - Instrumentation Page 3.3.5-2 (Amendment 205)
Page 3.3.5-2 (Amendment 231)
Page 1 of I
Page 1 of I
 
: f. (4)
f.
ENO pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (5)
(4)     ENO pursuant to the Act and 10 CFR Parts 30, 40 and 70,           Amdt. 203 to receive, possess, and use in amounts as required any           11/27/00 byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (5)     ENO pursuant to the Act and 10 CFR Parts 30 and 70, to           Amdt. 203 possess, but not separate, such byproduct and special             11/27/00 nuclear materials as may be produced by the operation of the facility.
ENO pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This amended license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter 1: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
Amdt. 203 11/27/00 Amdt. 203 11/27/00 C.
(1)   Maximum Power Level ENO is authorized to operate the facility at steady state reactor core power levels not in excess of 3216 megawatts thermal (100% of rated power).
This amended license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter 1: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(2)   Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 231 are hereby incorporated in the License. ENO shall operate the facility in accordance with the Technical Specifications.
(1)
I (3)   (DELETED)                                                           Amdt. 205 2-27-01 (4)    (DELETED)                                                          Amdt. 205 2-27-01 D. (DELETED)                                                                 Amdt.46 2-16-83 E. (DELETED)                                                                  Amdt.37 5-14-81 F. This amended license is also subject to appropriate conditions by the New York State Department of Environmental Conservation in its letter of May 2, 1975, to Consolidated Edison Company of New York, Inc., granting a Section 401 certification under the Federal Water Pollution Control Act Amendments of 1972.
Maximum Power Level ENO is authorized to operate the facility at steady state reactor core power levels not in excess of 3216 megawatts thermal (100% of rated power).
(2)
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 231 are hereby incorporated in the License. ENO shall operate the facility in accordance with the Technical Specifications.
I (3)
(DELETED)
(4)
(DELETED)
Amdt. 205 2-27-01 Amdt. 205 2-27-01 D.
(DELETED)
E.
(DELETED)
Amdt.46 2-16-83 Amdt.37 5-14-81 F.
This amended license is also subject to appropriate conditions by the New York State Department of Environmental Conservation in its letter of May 2, 1975, to Consolidated Edison Company of New York, Inc., granting a Section 401 certification under the Federal Water Pollution Control Act Amendments of 1972.
Amendment No. 231
Amendment No. 231


INDIAN POINT 3 TECHNICAL SPECIFICATIONS         - APPENDIX A LIST OF EFFECTIVE PAGES Page 1 of 3 Page       Amend               Section 3.0             2           205         8             225 1           229           3           205         9             213 Table of Contents         2           226               Section 3.2.3         10             205 i           227           3           229           1           205         11             225 ii           228           .4           212           2           205         12             205 iii         227           5           226           3           205         13             205 iv           227               Section 3.1.1           4           205           Section 3.3.3 Section 1.1             1           205               Section 3.2.4         1             226 1           205               Section 3.1.2           1           205         2             211 2           205           1           205           2           205         3             205 3           224           2           205           3           205         4             228 4           205               Section 3.1.3           4           205         5             228 5           225           1           205               Section 3.3.1           Section 3.3.4 6           205           2       J_205             1           205         1         1226 7           205               Section 3.1.4           2           205         2     .        205 8           205           1           205           3           205           Section 3.3.5 Section 1.2             2           205           4           205         1             205 1           205           3           205           5           205         2             231 2           205           4           205           6           205             Section 3.3.6 3           205           5           205           7           205         1             205 Section 1.3               Section 3.1.5           8           205         2             205 1           205           1           205           9           205         3             205 2           205           2           205           10           205         4             205 3           205               Section 3.1.6           11           205         5             205 4           205           1           205           12           205           Section 3.3.7 5           205           2           205           13           225         1             224 6           205           3           205           14           205         2             205 7           205               Section 3.1.7,           15           225         3             205 8           205           1           205           16           205             Section 3.3.8 9           205           2           205           17           205         1             215 10           205           3           205           18           205         2             205 11           205           4.           205           19           225             Section 3.4.1 12           205               Section 3.1.8           20           225         1 .          225 13           205           1           205               Section 3.3.2         2             225 Section 1.4             2           205           1           205             Section 3.4.2 1           205               Section 3.2.1           2           205         1         jT 205 2           205           1           205           3           205             Section 3.4.3 3           205           2           205           4           205         1             205 4           205           3           205           5           205         2             205 Section 2.0               Section 3.2.2           6           205         3             220 1           225           1           205           7           205         4             220 The latest amendment reflected in this list is: Amendment 231
INDIAN POINT 3 TECHNICAL SPECIFICATIONS - APPENDIX A LIST OF EFFECTIVE PAGES Page 1 of 3 Page Amend Section 3.0 2
205 8
225 1
229 3
205 9
213 Table of Contents 2
226 Section 3.2.3 10 205 i
227 3
229 1
205 11 225 ii 228  
.4 212 2
205 12 205 iii 227 5
226 3
205 13 205 iv 227 Section 3.1.1 4
205 Section 3.3.3 Section 1.1 1
205 Section 3.2.4 1
226 1
205 Section 3.1.2 1
205 2
211 2
205 1
205 2
205 3
205 3
224 2
205 3
205 4
228 4
205 Section 3.1.3 4
205 5
228 5
225 1
205 Section 3.3.1 Section 3.3.4 6
205 2
J_205 1
205 1
1226 7
205 Section 3.1.4 2
205 2
205 8
205 1
205 3
205 Section 3.3.5 Section 1.2 2
205 4
205 1
205 1
205 3
205 5
205 2
231 2
205 4
205 6
205 Section 3.3.6 3
205 5
205 7
205 1
205 Section 1.3 Section 3.1.5 8
205 2
205 1
205 1
205 9
205 3
205 2
205 2
205 10 205 4
205 3
205 Section 3.1.6 11 205 5
205 4
205 1
205 12 205 Section 3.3.7 5
205 2
205 13 225 1
224 6
205 3
205 14 205 2
205 7
205 Section 3.1.7, 15 225 3
205 8
205 1
205 16 205 Section 3.3.8 9
205 2
205 17 205 1
215 10 205 3
205 18 205 2
205 11 205
: 4.
205 19 225 Section 3.4.1 12 205 Section 3.1.8 20 225 1
225 13 205 1
205 Section 3.3.2 2
225 Section 1.4 2
205 1
205 Section 3.4.2 1
205 Section 3.2.1 2
205 1
jT 205 2
205 1
205 3
205 Section 3.4.3 3
205 2
205 4
205 1
205 4
205 3
205 5
205 2
205 Section 2.0 Section 3.2.2 6
205 3
220 1
225 1
205 7
205 4
220 The latest amendment reflected in this list is: Amendment 231


INDIAN POINT 3 ý TECHNICAL SPECIFICATIONS - APPENDIX A LIST OF EFFECTIVE PAGES Page 2 of 3 The latest amendment reflected in this list is: Amendment 231
INDIAN POINT 3 ý TECHNICAL SPECIFICATIONS - APPENDIX A LIST OF EFFECTIVE PAGES Page 2 of 3 The latest amendment reflected in this list is: Amendment 231


INDIAN POINT 3 TECHNICAL SPECIFICATIONS - APPENDIX A LIST OF EFFECTIVE PAGES Page 3 of 3 7             205 8            205 9            210 10            205 11            221 12            205 13            205 14            205 15            205 16            205 17            205 18            205 19            205 20            205 21            224 22            224 23            224 24            224 25            224 26            205 27            205 28            205 29            205 30            206 31            225 32            227 33            227 34            225 35            225 36            205 37            205 38            205*
INDIAN POINT 3 TECHNICAL SPECIFICATIONS - APPENDIX A LIST OF EFFECTIVE PAGES Page 3 of 3 7
8 9
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 205 205 210 205 221 205 205 205 205 205 205 205 205 205 224 224 224 224 224 205 205 205 205 206 225 227 227 225 225 205 205 205*
The latest amendment reflected in this list is: Amendment 231
The latest amendment reflected in this list is: Amendment 231


Entergy Nuclear Operations, Inc Indian Point 3 Nuclear Power Plant License Amendments                 Page 13 AMENDMENT   SUBJECT                                       LETTER DATE 217     Use of Best-Estimate Large-Break Loss of       05/06/2003 Coolant Accident analysis methodology (WCAP 12945) 218    Revise City Water surveillance to reflect     08/04/2003 addition of (backflow preventer) valves
Entergy Nuclear Operations, Inc Indian Point 3 Nuclear Power Plant License Amendments Page 13 AMENDMENT SUBJECT 217 218
      .219      Revise Ventilation Filter Testing Program     10/30/2003 to adopt ASTM D3803 charcoal filter   testing requirements per GL 99-02.
.219 220 221 222 t223 224 225 226 227 Use of Best-Estimate Large-Break Loss of Coolant Accident analysis methodology (WCAP 12945)
220      Extension of the RCS pressure/temperature     12/03/2003
Revise City Water surveillance to reflect addition of (backflow preventer) valves Revise Ventilation Filter Testing Program to adopt ASTM D3803 charcoal filter testing requirements per GL 99-02.
                .limits and corresponding OPS limits from 16.17 to 20 EFPY.
Extension of the RCS pressure/temperature
221      Extension of RCP flywheel inspection interval 07/02/2004 (from 10 years to 20 years) per TSTF 421.
.limits and corresponding OPS limits from 16.17 to 20 EFPY.
222      Inoperable accumulator time extended from     08/18/2004 1 hour to 24 hours per TSFT-370.
Extension of RCP flywheel inspection interval (from 10 years to 20 years) per TSTF 421.
t223            Extension-of the allowed outage time to       01/19/2005 support the placement of the CRVS in an alternate configuration for tracer gas testing.
Inoperable accumulator time extended from 1 hour to 24 hours per TSFT-370.
224    Full-scope adoption of alternate source term   03/22/2005 for dose consequence analysis of DBAs.
Extension-of the allowed outage time to support the placement of the CRVS in an alternate configuration for tracer gas testing.
225      Stretch Power Uprate .(4.85%) from 3067.4 MWt   03/24/2005 to 3216 MWt, and adoption'of TSTF-339.
Full-scope adoption of alternate source term for dose consequence analysis of DBAs.
226      Adopt TSTF-359; Increased.Flexibility   in     04/06/2005 Mode Restraints.
Stretch Power Uprate.(4.85%)
227      Remove Monthly Operating Report and             04/14/2005 Occupational Radiation.Exposure Report per TSTF-369.
from 3067.4 MWt to 3216 MWt, and adoption'of TSTF-339.
228      Hydrogen Recombiner Elimination and Relaxation 04/14/2005 of Hydrogen Monitor Requirements per TSTF-447.
Adopt TSTF-359; Increased.Flexibility in Mode Restraints.
229      Inoperability of Snubbers per TSTF-372.         02/13/2006 230      Revise Emergency Core Cooling System Throttle   03/23/2006 Valve Surveillance Requirements.
Remove Monthly Operating Report and Occupational Radiation.Exposure Report per TSTF-369.
231     Setpoint Verification of Trip Actuating Devices 06/07/2006
Hydrogen Recombiner Elimination and Relaxation of Hydrogen Monitor Requirements per TSTF-447.
Inoperability of Snubbers per TSTF-372.
Revise Emergency Core Cooling System Throttle Valve Surveillance Requirements.
LETTER DATE 05/06/2003 08/04/2003 10/30/2003 12/03/2003 07/02/2004 08/18/2004 01/19/2005 03/22/2005 03/24/2005 04/06/2005 04/14/2005 228 229 230 231 04/14/2005 02/13/2006 03/23/2006 Setpoint Verification of Trip Actuating Devices 06/07/2006


LOP DG Start Instrumentation 3.3.5 ACTIONS (continued)
LOP DG Start Instrumentation 3.3.5 ACTIONS (continued)
CONDITION                         REQUIRED ACTION             COMPLETION TIME C. Required Action and           C.1       Enter applicable           Immediately associated Completion                   Condition(s) and Required Time not met.                           Action(s) for the associated DG made OR                                       inoperable by LOP DG start instrumentation.
CONDITION REQUIRED ACTION COMPLETION TIME C.
Required Action and C.1 Enter applicable Immediately associated Completion Condition(s) and Required Time not met.
Action(s) for the associated DG made OR inoperable by LOP DG start instrumentation.
Two channels of Degraded Voltage Function inoperable in one or more buses.
Two channels of Degraded Voltage Function inoperable in one or more buses.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                   FREQUENCY
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY
                    ----------------------NOTE-,----------------
----------------------NOTE-,----------------
Verification of setpoint not required SR 3.3.5.1         Perform TADOT.                                           31 days SR 3.3.5.2         Perform CHANNEL CALIBRATION with Allowable Value as follows:
Verification of setpoint not required SR 3.3.5.1 Perform TADOT.
: a. Undervoltage (480 V bus) Relay Allowable Value     24 months 200 V.
31 days SR 3.3.5.2 Perform CHANNEL CALIBRATION with Allowable Value as follows:
: b. Degraded Voltage (480 V bus) Relay (Non-SI)         18 months Allowable Value Ž 414 V with a time delay
: a.
Undervoltage (480 V bus) Relay Allowable Value 24 months 200 V.
: b. Degraded Voltage (480 V bus) Relay (Non-SI) 18 months Allowable Value Ž 414 V with a time delay
* 45 seconds.
* 45 seconds.
: c. Degraded.Voltage (480 V bus) Relay (Coincident     18 months SI) Allowable Value Ž 414 V with a time delay
: c.
                          <5 10 seconds.
Degraded.Voltage (480 V bus) Relay (Coincident 18 months SI) Allowable Value &#x17d; 414 V with a time delay
INDIAN POINT 3                               3.3.5-2                           Amendment 231}}
<5 10 seconds.
INDIAN POINT 3 3.3.5-2 Amendment 231}}

Latest revision as of 08:17, 15 January 2025

Technical Specification Update for Unit 3
ML061780183
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 06/15/2006
From:
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
IP-SMM-AD-103, Rev 0
Download: ML061780183 (10)


Text

J~

Page:

67 19-APR-06 DISTRIBUTION CONTROL LIST

'cument Name:

ITS/BASES/TRM CC-NAME NAME DEPT I OPS PROCEDURE GROUP SUPV.

OPS PROCEDURE GROUP 3 PLANT MANAGER'S OFFICE UNIT 3(UNIT 3/IPEC ONLY) 5 CONTROL ROOM (FL)

OPS (--T-+/-0t7'(IP3/IPEC)

  • 11 RES DEPARTMENT MANAGER RES (UNIT 3/IPEC ONLY) 19 STEWART ANN LICENSING

.20 CHEMISTRY SUPERVISOR CHEMISTRY DEPARTMENT 21 TSC(IP3)

EEC BUILDING 22 SHIFT MGR.(ELUD 88+/-1 3Ei)

OPERATIONS (UNIT 3) 23 LIS LICENSING & INFO SERV 25 SIMULATOR TRAIN(UNIT 3/IPEC ONLY) 28 RESIDENT INSPECTOR US NRC 88' ELEVATION 32 EOF E-PLAN (ALL EP'S) 47 CHAPMAN N BECHTEL 50 HAAS, CHERYL A.

WESTINGHOUSE ELECTRIC 61 SIMULATOR TRAIN(UNIT 3/IPEC ONLY) 69 CONROY PAT LICENSING/ROOM 205 99 BARANSKI J (ALL)

ST.

EMERG.

MGMT.

OFFICE 106 SIMULATOR INSTRUCT AREA TRG/9PT-D001 DOOG ONLY) 164 CONTROL ROOM (FL)

OPS(BPT-

-E-e4./7&(IP3/IPEC) 273 FAISON CHARLENE NUCLEAR LICENSING 319 L.GRANT (LRQ-OPS TRAIN)

LRQ (UNIT 3/IPEC ONLY) 354 L.GRANT(LRQ-OPS/TRAIN)

LRQ (UNIT 3/IPEC ONLY) 357 L.GRANT(ITS/INFO ONLY)

TRAINING -

ILO CLASSES 424 GRANT LEAH (UNIT 3/IPEC ONLY) 474 OUELLETTE P ENG.,

PLAN & MGMT INC 489 CLOUGHNESSY PAT PLANT SUPPORT TEAM 492 WORK CONTROL OPERATIONS 72' ELEV 493 OPERATIONS FIN TEAM 33 TURBIN DECK 494 AEOF/A.GROSJEAN(ALL EP'S) E-PLAN (EOP'S ONLY) 496 L.GRANT(LRQ-OPS/TRAIN)

LRQ (UNIT 3/IPEC ONLY) 497 L.GRANT(LRQ-OPS/TRAIN)

LRQ (UNIT 3/IPEC ONLY) 500 L.GRANT (LRQ-OPS TRAIN)

LRQ (UNIT 3/IPEC ONLY) 501 L.GRANT (LRQ-OPS TRAIN)

LRQ (UNIT 3/IPEC ONLY) 512"L.GRANT (LRQ-OPS TRAIN)

LRQ (UNIT 3/IPEC ONLY) 513 L.GRANT (LRQ-OPS TRAIN)

LRQ (UNIT 3/IPEC ONLY)

ý518-DOCUMENT. CONTROL DESK NRC (ALL EP'S)

LOCATION IP2 IP2 IP3 45-4-A GSB-2D 45-4-A IP2 IP3 OFFSITE 48-2-A IP2 EOF OFFSITE OFFSITE 48-2-A GSB-2D OFFSITE

  1. 48 IP3 WPO-12
  1. 48
  1. 48 48-2-A
  1. 48 OFFSITE GSB-3B IP2 45-1-A WPO-12D
  1. 48
  1. 48
  1. 48
  1. 48
  1. 48
  1. 48*

OFFSITE

.. iv.

IPEC SITE

-QUALITY RELATED IP-SMM-AD-103 Revision 0 E17Etergy MANAGEMENT ADMINISTRATIVE PROCEDURE MANUAL INFORMATIONAL USE Page 13 of 21 ATTACHMENT 10.1 SMM CONTROLLED DOCUMENT TRANSMITTAL FORM SITE MANAGEMENT MANUAL CONTROLLED DOCUMENT TRANSMITTAL FORM - PROCEDURES Page 1 of 1 Zý-Entergy CONTROLLED DOCUMENT TRANSMITTAL FORM - PROCEDURES TO: DISTRIBUTION DATE:

6/15/06 PHONE NUMBER: 271-7057 FROM: IPEC DOCUMENT CONTROL The Document(s) identified below are forwarded for use. In accordance with IP-SMM-AD-103, please review to verify receipt, incorporate the document(s) into your controlled document file, properly disposition superseded, void, or inactive document(s). Sign and return the receipt acknowledgement below within fifteen (15) working days.

AFFECTED DOCUMENT:

IP3 ITSIBASESITRM DOC#

J REV#

TITLE INSTRUCTIONS

                                • FOLLOW THE ATTACHED INSTRUCTIONS****************************
                      • PLEASE NOTE EFFECTIVE DATE***********

RECEIPT OF THE ABOVE LISTED DOCUMENT(S) IS HEREBY ACKNOWLEDGED. I CERTIFY THAT ALL SUPERSEDED, VOID, OR INACTIVE COPIES OF THE ABOVE LISTED DOCUMENT(S) IN MY POSSESSION HAVE BEEN REMOVED FROM USE AND ALL UPDATES HAVE BEEN PERFORMED IN ACCORDANCE WITH EFFECTIVE DATE(S) (IF APPLICABLE) AS SHOWN ON THE DOCUMENT(S).

NAME (PRINT)

SIGNATURE DATE CC#

5-f?

A!

-- Entergy Interoffice Correspondence June 13, 2006 MEMORANDUM TO:

Mary Stauber Supervisor, Office Services FROM:

..Donna Tyner 72'x-v.

Sr. Coordinator, Licensing j T l1

SUBJECT:

Technical Specification Update for Unit 3 Attached for distribution is the Amendment 231 update to the Unit 3

..Technical Specifications. Please update the Control Room and Shift

.'Managers Controlled Copy Books ASAP and the rest of the distribution by June 19, 2006.

If you have any questions, please call me on X6698.

Distribution of IP3 Technical Specification Amendment 231 (Approved by NRC June 7, 2006)

Pages are to be inserted into your controlled copy of the Improved Technical Specifications following the instructions listed below. The TAB notation indicates which section the pages are located.

REMOVE PAGES INSERT PAGES' TAB - Facility Operating License Page 3, (Amendment 230)

Page 3, (Amendment 231)

TAB -'List of Effective Pages Pages 1 through 3, (Amendment 230)

Pages 1 through 3, (Amendment 231)

TAB - List of Amendments Page 13 Page 13 TAB 3.3 - Instrumentation Page 3.3.5-2 (Amendment 205)

Page 3.3.5-2 (Amendment 231)

Page 1 of I

f. (4)

ENO pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (5)

ENO pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

Amdt. 203 11/27/00 Amdt. 203 11/27/00 C.

This amended license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter 1: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1)

Maximum Power Level ENO is authorized to operate the facility at steady state reactor core power levels not in excess of 3216 megawatts thermal (100% of rated power).

(2)

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 231 are hereby incorporated in the License. ENO shall operate the facility in accordance with the Technical Specifications.

I (3)

(DELETED)

(4)

(DELETED)

Amdt. 205 2-27-01 Amdt. 205 2-27-01 D.

(DELETED)

E.

(DELETED)

Amdt.46 2-16-83 Amdt.37 5-14-81 F.

This amended license is also subject to appropriate conditions by the New York State Department of Environmental Conservation in its letter of May 2, 1975, to Consolidated Edison Company of New York, Inc., granting a Section 401 certification under the Federal Water Pollution Control Act Amendments of 1972.

Amendment No. 231

INDIAN POINT 3 TECHNICAL SPECIFICATIONS - APPENDIX A LIST OF EFFECTIVE PAGES Page 1 of 3 Page Amend Section 3.0 2

205 8

225 1

229 3

205 9

213 Table of Contents 2

226 Section 3.2.3 10 205 i

227 3

229 1

205 11 225 ii 228

.4 212 2

205 12 205 iii 227 5

226 3

205 13 205 iv 227 Section 3.1.1 4

205 Section 3.3.3 Section 1.1 1

205 Section 3.2.4 1

226 1

205 Section 3.1.2 1

205 2

211 2

205 1

205 2

205 3

205 3

224 2

205 3

205 4

228 4

205 Section 3.1.3 4

205 5

228 5

225 1

205 Section 3.3.1 Section 3.3.4 6

205 2

J_205 1

205 1

1226 7

205 Section 3.1.4 2

205 2

205 8

205 1

205 3

205 Section 3.3.5 Section 1.2 2

205 4

205 1

205 1

205 3

205 5

205 2

231 2

205 4

205 6

205 Section 3.3.6 3

205 5

205 7

205 1

205 Section 1.3 Section 3.1.5 8

205 2

205 1

205 1

205 9

205 3

205 2

205 2

205 10 205 4

205 3

205 Section 3.1.6 11 205 5

205 4

205 1

205 12 205 Section 3.3.7 5

205 2

205 13 225 1

224 6

205 3

205 14 205 2

205 7

205 Section 3.1.7, 15 225 3

205 8

205 1

205 16 205 Section 3.3.8 9

205 2

205 17 205 1

215 10 205 3

205 18 205 2

205 11 205

4.

205 19 225 Section 3.4.1 12 205 Section 3.1.8 20 225 1

225 13 205 1

205 Section 3.3.2 2

225 Section 1.4 2

205 1

205 Section 3.4.2 1

205 Section 3.2.1 2

205 1

jT 205 2

205 1

205 3

205 Section 3.4.3 3

205 2

205 4

205 1

205 4

205 3

205 5

205 2

205 Section 2.0 Section 3.2.2 6

205 3

220 1

225 1

205 7

205 4

220 The latest amendment reflected in this list is: Amendment 231

INDIAN POINT 3 ý TECHNICAL SPECIFICATIONS - APPENDIX A LIST OF EFFECTIVE PAGES Page 2 of 3 The latest amendment reflected in this list is: Amendment 231

INDIAN POINT 3 TECHNICAL SPECIFICATIONS - APPENDIX A LIST OF EFFECTIVE PAGES Page 3 of 3 7

8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 205 205 210 205 221 205 205 205 205 205 205 205 205 205 224 224 224 224 224 205 205 205 205 206 225 227 227 225 225 205 205 205*

The latest amendment reflected in this list is: Amendment 231

Entergy Nuclear Operations, Inc Indian Point 3 Nuclear Power Plant License Amendments Page 13 AMENDMENT SUBJECT 217 218

.219 220 221 222 t223 224 225 226 227 Use of Best-Estimate Large-Break Loss of Coolant Accident analysis methodology (WCAP 12945)

Revise City Water surveillance to reflect addition of (backflow preventer) valves Revise Ventilation Filter Testing Program to adopt ASTM D3803 charcoal filter testing requirements per GL 99-02.

Extension of the RCS pressure/temperature

.limits and corresponding OPS limits from 16.17 to 20 EFPY.

Extension of RCP flywheel inspection interval (from 10 years to 20 years) per TSTF 421.

Inoperable accumulator time extended from 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per TSFT-370.

Extension-of the allowed outage time to support the placement of the CRVS in an alternate configuration for tracer gas testing.

Full-scope adoption of alternate source term for dose consequence analysis of DBAs.

Stretch Power Uprate.(4.85%)

from 3067.4 MWt to 3216 MWt, and adoption'of TSTF-339.

Adopt TSTF-359; Increased.Flexibility in Mode Restraints.

Remove Monthly Operating Report and Occupational Radiation.Exposure Report per TSTF-369.

Hydrogen Recombiner Elimination and Relaxation of Hydrogen Monitor Requirements per TSTF-447.

Inoperability of Snubbers per TSTF-372.

Revise Emergency Core Cooling System Throttle Valve Surveillance Requirements.

LETTER DATE 05/06/2003 08/04/2003 10/30/2003 12/03/2003 07/02/2004 08/18/2004 01/19/2005 03/22/2005 03/24/2005 04/06/2005 04/14/2005 228 229 230 231 04/14/2005 02/13/2006 03/23/2006 Setpoint Verification of Trip Actuating Devices 06/07/2006

LOP DG Start Instrumentation 3.3.5 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C.

Required Action and C.1 Enter applicable Immediately associated Completion Condition(s) and Required Time not met.

Action(s) for the associated DG made OR inoperable by LOP DG start instrumentation.

Two channels of Degraded Voltage Function inoperable in one or more buses.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY


NOTE-,----------------

Verification of setpoint not required SR 3.3.5.1 Perform TADOT.

31 days SR 3.3.5.2 Perform CHANNEL CALIBRATION with Allowable Value as follows:

a.

Undervoltage (480 V bus) Relay Allowable Value 24 months 200 V.

b. Degraded Voltage (480 V bus) Relay (Non-SI) 18 months Allowable Value Ž 414 V with a time delay
  • 45 seconds.
c.

Degraded.Voltage (480 V bus) Relay (Coincident 18 months SI) Allowable Value Ž 414 V with a time delay

<5 10 seconds.

INDIAN POINT 3 3.3.5-2 Amendment 231