|
|
| (One intermediate revision by the same user not shown) |
| Line 2: |
Line 2: |
| | number = ML070430094 | | | number = ML070430094 |
| | issue date = 11/20/2006 | | | issue date = 11/20/2006 |
| | title = E. I. Hatch, Unit 2, Volume 2, Revision 1, Class 1, 2 and 3 Components Fourth Ten-Year Examination Plan. | | | title = E. I. Hatch, Unit 2, Volume 2, Revision 1, Class 1, 2 and 3 Components Fourth Ten-Year Examination Plan |
| | author name = | | | author name = |
| | author affiliation = Southern Nuclear Operating Co, Inc | | | author affiliation = Southern Nuclear Operating Co, Inc |
| Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:HATCH UNIT 2 FOURTH INTERVAL EXAMINATION PLANS CLASS, 1, 2, AND 3 COMPONENTS DISTRIBUTION Manual Manual Holder Number 1 Document Control QA Record H2 VOL2 DIST.doc Page 1 of 1 Rev. 1 | | {{#Wiki_filter:}} |
| | |
| Hatch Unit 2 Fourth Interval Examination Plan List of Effective Pages Volume 2 System Page Revision Distribution 1 1 List of Effective Pages 1-2 1 Table of Contents 1-2 1 Introduction 1 1 Class 1 Exam Schedule Bases 1-43 1 Class 1 Code Compliance Sheets 11 pages 1 Category B-A 1-4 1 Category B-D 1-6 1 Category B-F 1 1 Category B-G-1 1-27 1 Category B-G-2 1-7 1 Category B-J 1-30 1 Category NB-J 1-16 1 Category B-K 1-5 1 Category B-L-2 1 1 Category B-M-2 1-6 1 Category B-O 1-8 1 Class 2 Exam Schedule Bases 1-33 1 Class 2 Code Compliance Sheets 4 pages 1 Category C-A 1 1 Category C-B 1 1 Category C-C 1-17 1 Category C-F-2 1-118 1 Category C-G 1-3 1 Class 3 Exam Schedule Bases 1-4 1 Class 3 Code Compliance Sheets 1 page 1 Category D-A 1-14 1 Supports Exam Schedule Bases 1-13 1 Supports Code Compliance Sheets 1 page 1 Category F-A, Item F1.10 1-12 1 Category F-A, Item F1.10S 1-5 1 Category F-A, Item F1.20 1-33 1 Category F-A, Item F1.20S 1-11 1 Category F-A, Item F1.30 1-30 1 Category F-A, Item F1.30S 1-7 1 Category F-A, Item F1.40 1-7 1 Category F-A, Item F1.40S 1-2 1 Augmented Examinations H2 VOL2 EFFECTVE PAGES.DOC 1 of 2 Rev. 1
| |
| | |
| Hatch Unit 2 Fourth Interval Examination Plan List of Effective Pages System Page Revision VIP-075 Basis 1-40 1 VIP-075 Compliance Sheets 1-3 1 Category OL-1 1 1 Category XB-F 1-3 1 Category XB-J 1-10 1 Other Augmented Examinations Bases 1-6 1 Category C-0619 1 1 Category C-0803 1-4 1 Category CF-R 1-2 1 Category FA-R 1-3 1 Category CC-R 1 1 H2 VOL2 EFFECTVE PAGES.DOC 2 of 2 Rev. 1
| |
| | |
| Hatch Unit 2 Fourth Ten-Year Exam Plan TABLE OF CONTENTS VOLUME 2 - Vessel and Piping Weld Information Distribution List of Effective Pages Introduction ASME Class 1 Exam Schedule Bases Class 1 Code Compliance Sheets Category B-A RPV Welds Category B-D RPV Nozzles Category B-F Dissimilar Metal Welds (See Category XB-F for > NPS 4)
| |
| Category B-G-1 Pressure Retaining Bolting > 2 Diameter Category B-G-2 Pressure Retaining Bolting < 2 Diameter Category B-J Carbon Steel Piping Welds Category NB-J Previously Exempt Piping Welds Category B-K Welded Attachments Category B-L-2 Pump Casings Category B-M-2 Valve Bodies Category B-O Welds in CRD Housings ASME Class 2 Exam Schedule Bases Class 2 Code Compliance Sheets Category C-A RHR Heat Exchanger Shell Welds Category C-B RHR Heat Exchanger Nozzle Welds Category C-C Welded Attachments Category C-F-2 Piping Welds (Includes NRC Required Thin-Wall Exams)
| |
| Category C-G Pump Casing Welds ASME Class 3 Exam Schedule Bases Class 3 Code Compliance Sheets Category D-A Welded Attachments Component Support Exams Bases Class 1, 2, and 3 Component Support Code Compliance Sheets Category F-A (Item F1.10) Class 1 Piping Supports Category F-A (Item F1.10S) Class 1 Piping Snubbers Category F-A (Item F1.20) Class 2 Piping Supports Category F-A (Item F1.20S) Class 2 Piping Snubbers Category F-A (Item F1.30) Class 3 Piping Supports Category F-A (Item F1.30S) Class 3 Piping Snubbers Category F-A (Item F1.40) Class 1, 2, and 3 Equipment Supports Category F-A (Item F1.40S) Class 1, 2, and 3 Equipment Snubbers H2 VOL2-T OF C.doc Page 1 of 2 Rev. 1
| |
| | |
| Hatch Unit 2 Fourth Ten-Year Exam Plan TABLE OF CONTENTS Augmented Examinations VIP-075 Basis VIP-075 Compliance Sheets Category OL-1 Overlayed Welds Category XB-F Dissimilar Metal Welds Category XB-J Stainless Steel Welds Other Augmented Examinations Bases Category C-0619 CRD/RWCU Thermal Tee Welds Selected Per NUREG-0619 Category C-803 CRD Header Welds Selected per NUREG-0803 Category CF-R RCIC Class S Welds Category FA-R RCIC Class S Supports Category CC-R RCIC Class S Welded Attachments H2 VOL2-T OF C.doc Page 2 of 2 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN INTRODUCTION IWA-2420 of the 2001 Edition of Section XI with Addenda through 2003 specifies the contents of Inservice Inspection Plans and Schedules. HNP utilizes a two-part plan developed using industry standard Schedule Works software to develop applicable tables.
| |
| These are:
| |
| : 1. The Fourth Interval Inspection Plan. This plan was developed to provide scheduling for all of the Class 1,2, and 3 components for the Fourth Interval as defined by the applicable HNP Boundary Diagrams. This document is primarily used to determine if Code scheduling requirements are being met. This plan includes:
| |
| The Fourth Interval and period dates.
| |
| The Edition and Addenda that apply to the required examinations.
| |
| The Code classification and identification of all components subject to examination.
| |
| The identification of each of the components selected for examination and the successive exams from prior periods.
| |
| The identification of drawings showing the location of items requiring examination.
| |
| Code examination requirements (UT, MT, etc.) for each component selected for examination.
| |
| Code Cases proposed for use and the extent of their application.
| |
| NRC Alternatives that change Code examination requirements.
| |
| : 2. Outage Plans. These plans will be developed for each outage to provide information specific to each outage. These plans include:
| |
| The listing of components selected for examination during the outage.
| |
| The examination procedures for each component.
| |
| The description of alternative examinations and identification of components to be examined using alternative methods.
| |
| The identification of calibration blocks used for ultrasonic examination of components.
| |
| Note: Schedule Works also provides a column in the Fourth Interval Inspection Plan that lists procedures to be used. This information is only needed for outage related activities and is found in the Outage Plan. It is considered for information only in this plan because procedures are subject to change throughout the interval.
| |
| H2 Basis Doc - Introduction Page 1 of 1 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS SCOPE OF EXAMINATIONS Per IWA-1400 of the Section XI Code, the Owner is responsible for determining the appropriated Code Class, for identifying the system boundaries for each class of component subject to examination, and for identifying the components exempt from examination. This requirement is met by the following:
| |
| Appropriate Code Class The determination of the appropriate Code Class for each component is made by SNC Design Organization and designated on the ISI Boundary Diagrams. These Boundary Diagrams are controlled by SNC Design Organization.
| |
| System Boundaries The system boundaries for each Code Class are designated on the ISI Boundary Diagrams.
| |
| Exempt Components The components exempt from examination are shown below in this Bases Document.
| |
| EXAMINATION REQUIREMENTS The examination requirements for the Class 1 components identified on the Boundary Diagrams are defined in IWB-2500 for each examination category. Categories in the 2001 Edition of Section XI with Addenda through 2003 are:
| |
| * Category B-A Pressure Retaining Welds in the Reactor Vessel
| |
| * Category B-B Vessels other than the Reactor Vessel (Not Applicable)
| |
| * Category B-D Full Penetration Welds of Nozzles in Vessels
| |
| * Category B-F Pressure Retaining Dissimilar Metal Welds
| |
| * Category B-G-1 Pressure Retaining Bolting Greater than 2 Diameter
| |
| * Category B-G-2 Pressure Retaining Bolting 2 and Less in Diameter
| |
| * Category B-J Pressure Retaining Welds in Piping
| |
| * Category B-K Valves
| |
| * Category B-L-1 Pressure Retaining Welds in Pump Casings (Not Applicable)
| |
| * Category B-L-2 Pump Casings
| |
| * Category B-M-1 Pressure Retaining Welds in Valve Bodies (Not Applicable)
| |
| * Category B-M-2 Valve Bodies
| |
| * Category B-N-1 Interior of Reactor Vessel (See Volume 4)
| |
| * Category B-N-2 Integrally Welded Core Support Structures/Interior Attachments (See Volume 4)
| |
| * Category B-O Pressure Retaining Welds in Control Rod Housings
| |
| * Category B-P Pressure Testing (See Volume 6)
| |
| H2 Basis Doc - Class 1 Page 1 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS These examination requirements are not applicable to components exempt from examination per IWB-1220. Components exempt from examination are only subject to the pressure testing requirements. (See the Exemptions Section below for more detail).
| |
| Additionally, there are cases in which SNC deviates from the Code specified examinations; with NRC concurrence. (See the Deviations Section below for further detail). These deviations occur when:
| |
| : 1. Meeting the Code requirements are impractical due to configuration, accessibility, or other factors.
| |
| : 2. The use of later editions or addenda of the Section XI Code, Code Cases, etc., are more appropriate or more desirable for use than the existing requirements.
| |
| EXEMPTIONS IWB-1220 defines the components that are exempt from the examination requirements of IWB-2500. Per 10 CFR 50.55a(b)(2)(xi), licensees must use IWB-1220 of the 1989 Edition of Section XI, in lieu of the 2001 Edition of Section XI with Addenda through 2003. IWB-1220(a) of the 1989 Edition states that, components that are connected to the reactor coolant system and part of the reactor coolant pressure boundary and that of such size and shape so that upon postulated rupture the resulting flow of coolant from the reactor coolant system under normal plant operating conditions is within the capacity of makeup system which are operable from on-site emergency power. In determining the size of the liquid and steam lines excluded from NDE examination, liquid lines were defined as those that penetrate the RPV below the normal water level and steam lines as those which penetrate the RPV above the normal water level.
| |
| GE Nuclear Energy Report GE DRF Number B11-00788 was used for the 3rd Interval exemptions and its methodology will be used for the 4th Interval. The exception is that Condensate Make-up to the main condenser was eliminated as a make-up source because the condensate pumps are not supplied by the diesel generators. Without Condensate Make-up, the reactor coolant makeup is RCIC (360 GPM) and CRD (60 GPM) for a total of 420 GPM. The basic formula for a leak rate at 1050 psi (per GE DRF Number B11-00788) is:
| |
| Inside Diameter of a Water Line = (Square Root of the total makeup flow) 18.799 Inside Diameter of a Steam Line = 2 times the value of a water line H2 Basis Doc - Class 1 Page 2 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS The square root of 420 is 20.494. Therefore, for water the inside diameter exempted is 1.09 and for steam the inside diameter exempted is twice the value of water or 2.18.
| |
| Per Piping Specification (A-21000), there are three Class 1 piping specifications - DBA (Schedule 160), DCA (Schedule 80) and DLA (Schedule 160). After evaluation of the inside diameter for these Piping Specifications it was determined that the following exemptions may be applied.
| |
| IWB-1220(a) EXEMPTIONS NPS 1 and smaller for Schedule 80 and Schedule 160 water lines.
| |
| NPS 2 and smaller for Schedule 80 steam lines and NPS 2.5 for Schedule 160 steam lines.
| |
| Previously, per GE DRF Number B11-00788 (including Condensate Makeup to the condenser), the exemption was 2.5 for water lines and 5.0 for steam lines. The following P&IDs were reviewed to determine if there are lines that were previously exempted but that are not exempt per the new IWA-1220(a) exemptions.
| |
| H-26000 Nuclear Boiler System Sheet 1 H-26001 Nuclear Boiler System Sheet 2 H-26003 Recirculation System Sheet 1 H-26006 CRD System Sheet 1 H-26007 CRD System Sheet 2 H-26009 Standby Liquid Control (SLC) System H-26014 RHR System Sheet 1 H-26015 RHR System Sheet 2 H-26018 Core Spray System H-26020 HPCI System Sheet 1 H-26021 HPCI System Sheet 2 H-26023 RCIC System Sheet 1 H-26024 RCIC System Sheet 2 H-26036 Reactor Water Cleanup System Sheet 1 H-26037 Reactor Water Cleanup System Sheet 2 The review indicated that the following lines needed to be added to the 4th Interval scope:
| |
| The 2 socket-welded RPV bottom head drain to the RWCU system as shown on P&ID H-26003 (Reference isometric H-51221). These welds are shown on ISI Figure A-28A and are designated as 2B31-1RC-2DR-1 through 50.
| |
| H2 Basis Doc - Class 1 Page 3 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS The 2 socket-welded drain line on each of the two loops as shown on P&ID H-26003. (Reference isometrics S-30804 and S-30809). These welds are shown on ISI Figure A-16A and A-18a and are designated as 2B31-1RC-2A-1 through 10 and 2B31-1RC-2B-1 through 12.
| |
| The 1-1/2 socket-welded SLC line as shown on P&ID H-26009 (see isometrics S-30959, S-31455, S-31489, S-31435). These welds are shown on ISI Figures A-39 through A-41 and are designated as 1C41-1SB LC-1.5-1 through 85. The two butt welds on the safe-end are designated as 1C41-1SBLC-2-1 and 1C41-1SBLC-2-2 and are shown on Sketch 2-BE-3.
| |
| The 2N16A&B nozzles penetrate the RPV in water space. Per Sketch 2-BE-2, a dissimilar metal weld joins the 304 stainless steel safe-end to the Inconel nozzle.
| |
| These Category B-F welds are designated as 2B11-1INST-2A-1 (2N16A) and 1B11-1INST-2B-1 (2N16B) and they are non-exempt because the ID is greater than1.09.
| |
| Per Sketch 2-BE-2, the safe-end has a socket weld end prep for a 2 pipe. While no drawings could be found for the piping, a drawing was found for the 1N11A&B nozzles which is essentially the same as the 2N16A&B nozzles. This drawing (H16964) indicates that at there is a 2 X 1-1/2 coupling welded to the safe-end.
| |
| The 1-1/2 coupling then is further reduced in size by a 1-1/2 X 1 reducing insert.
| |
| These socket welds are designated 2B11-1INST-2A-2 and 3(2N16A) and 2B11-1INST-2B-2 and 3 (2N16B) and are not exempt. Per P&ID H-26001 the balance is exempt 1 DCA pipe (Schedule 80S with a 0.957 ID ).
| |
| The 2N11A&B and 2N12A&B nozzles are the same size as the 2N16A&B nozzles; however, they penetrate the RPV near the steam separator. Inventory lost as a result of a break in these welds would consist of steam; therefore, they are exempt since they are smaller than the IWB-1220(a) exemption for steam (2.18).
| |
| DEVIATIONS TO CLASS 1 ISI CODE REQUIREMENTS IWB-2500 provides the examination requirements for Class 1 components. As defined in Volume 1 of this ISI Plan, these Code requirements may be deviated from by:
| |
| * The use of NRC approved alternatives to Code requirements per 10 CFR 50.55a(a)(3).
| |
| * The use of NRC approved Relief Requests per 10 CFR 50.55a(g)(6) when an examination requirement by the Code is determined to be impractical.
| |
| * The use of Code Cases approved for use by the NRC through publication in Regulatory Guide 1.147.
| |
| H2 Basis Doc - Class 1 Page 4 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS Code Case N-663 Code Case N- 663 provides that ... in lieu of the surface examination requirements for piping welds of Examination Category B- F ( NPS 4 and larger), and B- J ( NPS 4 and larger),surface examinations may be limited to areas identified by the Owner as susceptible to outside surface attack. The susceptibility criteria are listed in Table 1 of Code Case N- 663 for two types of degradation mechanisms. No Class 1 welds have been identified as being susceptible to outside surface attack. The basis is discussed below:
| |
| External (O. D.) Chloride Stress Corrosion Cracking of Austenitic Stainless Steel For this cracking to be postulated per Code Case N-663, the:
| |
| Operating temperature must be greater than 1500F, and the piping outside surface is within 5 pipe diameters of a probable leak, and the piping outside surface is covered with nonmetallic insulation that is not in compliance with Regulatory Guide 1.36 or equivalent requirements.
| |
| Evaluation: All of the austenitic piping within the ISI scope is within the reactor coolant pressure boundary (RCPB). Per Section 5.2.3.3 of the FSAR, Compatibility With External Insulation and Environmental Atmosphere, the RCPB is insulated with an all-metal (stainless steel and aluminum) reflective-type insulation in compliance with Regulatory Guide 1.36 (February 1973). This type of insulation does not contain any silica, fluorides, or chlorides. It does not contribute to surface contamination, and it has no effect on the stainless steel components of the RCPB. The insulation is designed for a 40-year service life; however, this insulation is monitored so that actions are taken to provide reasonable assurance that the insulation is capable of fulfilling its intended function for 40 years and beyond.
| |
| Other Outside Surface Initiated Mechanisms Per Code Case N-663, items that are susceptible to an outside attack should be identified by a plant-specific service history review. This review should include plant-specific processes and programs that minimize chlorides and other contaminants.
| |
| Evaluation: Due to ID initiated IGSCC, numerous examinations of the austenitic welds and adjacent base material has been performed over the past 15+ years and no evidence of OD initiated stress corrosion cracking has been observed. (Note: All of the stainless steel piping was replaced to the extent practical with 316NG which is relatively immune to stress corrosion cracking). Additionally, ISI personnel associated with Hatch over the past 20 years have no knowledge of OD originated cracking in austenitic piping 4 diameter and over. (There has been OD originated cracking in some socket welds due to fatigue, but socket weld are not covered by Code Case N-663). Plant-specific processes and programs that minimize chlorides and other contaminants are:
| |
| H2 Basis Doc - Class 1 Page 5 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS The SNC purchase specification for thermal Insulation for stainless steel, require insulation suppliers to provide material that meets the criteria of Regulatory Guide 1.36.
| |
| Each Purchase Order imposes Reg. Guide 1.36 and ANSI N45.2 covering leach able properties and their acceptable levels for contact with Stainless Steel.
| |
| The SNC Chemical Product Control Program provides procedure guidance for control of contaminants from chemical products to be used on site. Reference Hatch procedure 60 AC HPX-008-0 E. I. Hatch Chemical Control.
| |
| H2 Basis Doc - Class 1 Page 6 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS ISI PLAN TABLES The ISI Plan Tables are generated by the industry standard ScheduleWorks ISI software using a standard format. It should be noted that the Scope/Method/Procedure field is for information only. This information may be changed during an outage by authorized IDDEAL software
| |
| `users at the site, but it will not be reflected in the ISI Plan until the plan is updated after the outage. When using these tables the user needs to understand the following symbols:
| |
| Scheduled "s" To schedule a component, place the identifier "s" in the required period/outage.
| |
| Completed "c" Upon exam completion for a scheduled component and by uploading the outage scope from IDDEAL back to ScheduleWorks, an "s" will be updated to completed "c".
| |
| Re- "r" Once a component has been scheduled, and you wish to reschedule to another outage, replace the scheduled scheduled "s" with a rescheduled "r" and enter an "s" in the new outage schedule.
| |
| Expanded "e" To increase a work scope without taking code credit in the percentage calculations, enter an Scope expanded "e".
| |
| Expanded "E" Upon exam completion of an expanded scope and by either uploading the outage scope from Scope IDDEAL or manually changing the letter to an upper case "E" the exam scope is completed.
| |
| Completed Additional "a" After an initial expanded work scope has been identified and you wish to add an increased Scheduled expanded work scope, enter an additional expanded scope "a".
| |
| Additional "A" Upon exam completion of an additional expanded scope and by either uploading the outage scope Completed from IDDEAL or manually changing the letter to an upper case "A" the exam scope is completed.
| |
| Partial "p" To track partially completed component examination requirements enter a partial "p".
| |
| Deferred "d" Once a component has been scheduled, and you wish to defer the inspection to another Outage, or Period, replace the scheduled "s" with a deferred "d" and enter an "s" in the new Outage.
| |
| Limited "l" To track limited component examinations or limited completions of requirements enter "l".
| |
| Multiple "b For multiple scheduling of the same component in successive Outages or Periods within an Interval Scheduled enter "b".
| |
| Multiple "B" Upon exam completion of a multiple scope in the same Interval and by either uploading the outage Completed scope from IDDEAL or manually changing the letter to an upper case "B" the exam scope is completed. This multiple scheduling scope will not count as completed for code calculations.
| |
| Tickler "t" To track exam scopes or use as reminder or identifier to confirm scheduling enter "t".
| |
| Successive "h" Successive examinations.
| |
| Exams Successive "H" Upon exam completion of a successive scope and by either uploading the outage scope from Exams IDDEAL or manually changing the letter to an upper case "H" the exam scope is completed.
| |
| Completed H2 Basis Doc - Class 1 Page 7 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS Category B-A - Class 1 RPV Item B1.11 and B1.12 Shell Welds Configuration The HNP-2 RPV shell has four Item B1.11 Circumferential welds - 2C-2, 2C-3, 2C-4, and 2C-5 and twelve Item B1.12 longitudinal welds - 2C-1-A, 2C-1-B, 2C-1-C, 2C-2-A, 2C-2-B, 2C-2-1C, 2C-3-A, 2C-3-B, 2C-3-1C, 2C-4-A, 2C-4-B, and 2C-4-C.
| |
| 1st Interval Examinations The 1st Interval began on 9/5/79; however, HNP-2 was early updated effective 12/31/85 prior to the examination of the shell welds. This update changed the HNP-2 interval and period dates so that they coincided with the interval and period dates for HNP-1. At the time of the update, the remaining examinations in the original 1st interval (all B1.11 and B1.12 exams) were required to be performed during the 1st period of the new 2nd interval (essentially where they had been originally scheduled).
| |
| These examinations were performed in Winter 1988 during the 1st Period of the 2nd Interval, as required. The scope was determined using the 1974 Code/Summer 1975 requirements, which was 5% of each circumferential weld and 10% of each longitudinal weld. Examinations were performed by SWRI to the 1980 Code requirements using mechanized equipment. These examinations completed the 1st Interval requirements.
| |
| 2nd Interval Examinations 1st Interval examinations were performed in 1988; therefore, 2nd Interval examinations were due by the 1998 outage. However, 10 CFR 50.55a(g)(6)(ii)(A) was issued by the NRC to require all licensees to augment their RPV examination by implementing once, as part of the inservice inspection interval in effect on September 8, 1992, the examination requirements for reactor vessel shell welds specified in Item B1.10 of Examination Category B - A, "Pressure Retaining Welds in Reactor Vessel," in Table IWB - 2500 - 1 of subsection IWB of the 1989 Edition of section XI, Division 1, of the ASME Boiler and Pressure Vessel Code.
| |
| GPC evaluated whether to perform these examinations from the ID or the OD of the RPV and it was determined that the OD examinations had significantly more coverage. These OD examinations were performed during the Fall 1995 refueling outage. All welds had greater than 90% coverage, except for Weld 2C-2. GPC letter HL-5250 dated October 29, 1996 requested relief for the limited examination coverage of weld 2C-2, which had only 83.7% coverage due to stabilizer brackets being welded directly onto 2C-2.
| |
| Approval was granted by the NRC Safety Evaluation dated February 21, 1997. These examinations completed the augmented examination requirements and the 2nd Interval examination requirements.
| |
| H2 Basis Doc - Class 1 Page 8 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS 3rd Interval Examinations Since 2nd Interval examinations were performed in the Fall 1995 during the last outage of the 2nd 10-year Interval, the next examinations are due at the end of the 3rd Interval.
| |
| HNP-2 changed to a 24 month operating cycle beginning after the February 2003 outage and the next outages are scheduled for February 2005 and February 2007. The February 2007 outage is 14 months past the end of the interval and cannot be used for 3rd Interval activities; therefore, the examinations were scheduled during the February 2005 outage.
| |
| Per Table IWB-2500-1, Category B-A of the 1989 Code all of the circumferential welds and the longitudinal welds require a volumetric examination. However, to support shorter outage windows, relief (see RR-38) has been requested, based on the technical basis provided in BWRVIP-05, to allow the volumetric examination of the four Item B1.11 circumferential welds to be deleted. RR-38 granted by NRC SE dated 1/28/05.
| |
| The twelve longitudinal weld examinations were examined in February 2005 (2R18) using the 1989 Edition of Section XI.
| |
| 4th Interval Examinations The twelve longitudinal weld examinations will be scheduled for examination in February 2015 (2R23). Relief will be required using BWRVIP-05 to allow the deletion of the volumetric examination of the four Item B1.11 circumferential welds.
| |
| H2 Basis Doc - Class 1 Page 9 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS Category B-A - Class 1 RPV Item B1.21 Bottom Head Circumferential Weld Configuration There is one circumferential weld located on the bottom head. Circumferential weld 2C-7 connects the dome to the torus. It is located inside the support skirt.
| |
| First and Second Interval Examinations HNP-2 was early updated effective January 1, 1986. This update changed the HNP-2 Code, interval dates, and period dates so that they coincided with HNP-1. (Therefore, the 3rd Period of the 1st Interval for HNP-2 became the 1st Period of the 2nd Interval). Per Relief Request 2.1 (submitted in the 2nd Interval Program) the required 1st Interval examinations were to be completed for 2C-7 (approximately 5% of the length per the 1974/Summer 1975 Code) in the 1st Period of the 2nd Interval. Additionally, weld 2C-7 was required to be 100% examined during the 2nd Interval to meet the 1980 Code requirements. Examinations were performed as follows:
| |
| * Per Note 2 in the 2nd Interval ISI Plan, 2C-7 was examined in 1986 to meet the 5%
| |
| requirement of the 1974 Code. From the data sheet, the weld was examined in excess of 5%, but the exact amount of coverage was indeterminate. This examination satisfied the 1st Interval requirements.
| |
| * Weld 2C-7 was re-examined during the Fall 1995 outage (3rd Period of the 2nd Interval) using GERIS to meet the 2nd Interval requirements using the 1980 Code with Addenda through Winter 1981. Ninety-three non-geometric indications were evaluated and found acceptable. Code coverage was in excess of 95%. This examination satisfied the 2nd Interval requirements.
| |
| Third Interval Examinations Scope: 2C-7 Since the 2nd Interval examination of 2C-7 was performed during 1995, the 3rd Interval examination of 2C-7 was performed in February 2005 (2R18) using the 1989 Code.
| |
| 4th Interval Examinations Scope: 2C-7 Since the 3rd Interval examination of 2C-7 was performed during 2005, the 4th Interval examination of 2C-7 will be scheduled for February 2015 (2R23).
| |
| H2 Basis Doc - Class 1 Page 10 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS Category B-A - Class 1 RPV Item B1.22 Bottom Head Meridional Welds Configuration The HNP-2 bottom head consists of a 4-piece dome welded together with four meridional welds 2BHD-A thru D and a 7-piece torus welded together with seven meridional welds 2BHT-A thru G. (There is a support skirt welded to the bottom head between circumferential welds 2C-7 and 2C-5 that covers a portion of each meridional torus weld).
| |
| First and Second Interval Examinations HNP-2 was early updated effective January 1, 1986. This update changed the HNP-2 Code, interval dates, and period dates so that they coincided with HNP-1. (Therefore, the 3rd Period of the 1st Interval for HNP-2 became the 1st Period of the 2nd Interval). Per Relief Request 2.1 (submitted in the 2nd Interval Program) original 1st Interval examinations were to be completed for the eleven meridional welds (approximately 10%
| |
| of the length of each of the eleven welds per the 1974/Summer 1975 Code) during the same time frame they were originally scheduled (originally the 3rd Period of the 1st Interval which changed to the 1st Period of the 2nd Interval). Additionally, one of the seven bottom head torus meridional weld was required to be 100% examined, to the extent practical, during the 2nd Interval per the 1980 Code.
| |
| Per information supplied in Note 3 of the 2nd Interval ISI Plan and as shown on the applicable data sheets:
| |
| * Each of the four dome meridional welds was examined in Fall 1986 (1st Period of the 2nd Interval) to the extent practical (28.5 to 30). The dome meridional welds were estimated to be approximately 60 long, with about half of each weld inaccessible due to the control rod drive penetrations.
| |
| * Each of the seven torus meridional welds was examined in Fall 1986 (1st Period of the 2nd Interval) to the extent practical (30). Limitations existed due to the RPV skirt weld.
| |
| More than 10% of each of the eleven meridional welds was examined; therefore, the original 1st Interval 1974 Section XI requirements were satisfied. Additionally, since each meridional weld had been examined to the extent practical, the 2nd Interval requirement per the 1980 Code to examine one meridional weld, to the extent practical, was also satisfied.
| |
| H2 Basis Doc - Class 1 Page 11 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS Third Interval Examinations Since the 2nd Interval examinations were completed in Fall 1986 (1st Period of the 2nd Interval), the 3rd Interval examinations were completed during the 2R13 Spring 1997 outage (1st Period of the 3rd Interval) per the requirements of the 1989 Code. The 1989 Code required that the accessible length of all the meridional welds be examined.
| |
| Examinations were pre-Appendix VIII and had the following limitations:
| |
| 2BHD-A, B, C, D Manual examinations limited to 31 of each of the four welds. Limitations were due to CRD interference.
| |
| 2BHT-A, B, C, D, E, F, G GERIS automated scans (GE procedure UT-HAT-702V0, Rev. 3) were used to examine 38 of each weld.
| |
| Supplemental manual scans were performed on 11 yielding a total of 49 of each weld being examined.
| |
| Composite coverage was 88.7%. Limitations were due to the skirt weld.
| |
| Upjohn Welds GE SIL 651 was subsequently issued on August 7, 2003, to notify the industry of flaws detected during Appendix VIII qualified ISI examinations at Fermi in RPV seams that were welded using the upjohn welding process. Pre-Appendix VIII UT examinations at Fermi did not report these flaws; however, review of the previous examination results showed that indications were present in the earlier data and were the same size as reported for the Appendix VIII examinations. GE indicated that these flaws were not reported in previous examinations because the indication did not require recording under the pre-Appendix VIII rules. Subsequent implementation of Appendix VIII has increased the sensitivity of ISI techniques and has resulted in more stringent data recording requirements.
| |
| Due to the CE work load during fabrication, there were times when all of the head positioners were in use and an upjohn weld process was used. Torus head segment plates were placed vertically on the floor end-to-end and a manual stick weld process was used. Welding started at the floor and the stringers were run from the plate ID to the plate OD in a horizontal position. After the first layer was made, subsequent layers would be added, continuing until the top of the plate was reached. The issue with this type of weld was that during the radiograph process, indications such as slag or cracks could have been missed, because only the end of the indication would be seen.
| |
| H2 Basis Doc - Class 1 Page 12 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS Per Volume 2, Section 10., page 3 of the GE prepared HNP-2 RPV Examination Plan, all weld seams welded to procedure MA-500-0 and MA-509-0 were welded using the Upjohn process. This included:
| |
| Unit 2 lower dome weld seams 2BHD-A thru D Unit 2 lower head torus weld seams 2BHT-A thru G The lower dome weld seams and the lower head torus weld seams were examined during 2R13. These examinations were all pre-Appendix VIII. Because the top head is examined on the refueling floor it was determined that during next Appendix VIII examinations, if there were indications, the dose would be low while resolving the indications. However, because of dose issues associated with resolving potential indications when performing Appendix VIII examination on the lower head welds, it was determined that they would be re-examined during 2R18 (while automated GERIS equipment was onsite for the RPV examinations). The rationale was that if a significant number of indications were found during the manual examinations, the automated GERIS equipment (which is to be onsite during the RPV examinations) could be used to better characterize the indications.
| |
| Manual type Appendix VIII qualified examinations were performed on each of the lower dome and lower head welds, to the extent practical, in February 2005 (2R18) using the 1989 Code. No reportable indications were detected.
| |
| 4th Interval Examinations Since the 3rd Interval examinations were completely redone in February 2005 (2R18) per Appendix VIII requirements, the 4th Interval examination will be scheduled for February 2015 (2R23).
| |
| H2 Basis Doc - Class 1 Page 13 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS Category B-A - Class 1 RPV Item B1.21 Closure Head Circumferential Weld Configuration The HNP-2 closure head has one B1.21 dollar plate circumferential weld (2HC-1).
| |
| First Interval Examinations 5% of the 2HC-1 was examined in Spring 1985 to meet the 1974 Section XI Code with Summer 1975 addenda requirements. This examination was prior to the early update and it completed the 1st Interval requirements.
| |
| Second Interval Examinations The weld was examined in 1992 to the extent practical per the 1980 Edition of Section XI. Coverage was 97% with limitations due to the lifting lugs. This examination satisfied the 2nd Interval requirements.
| |
| Third Interval Examinations Scope: 2HC-1 The 2nd Interval examinations were performed during the Spring 1992 outage (2nd Period of the 2nd Interval). For the 3rd Interval, the volumetric examination of 2HC-1 was examined in February 2005 (3rd Period of the 3rd Interval). Outside of the nominal successive inspection requirements of IWB-2420(a). No reportable indications were detected during the examination; therefore, the structural integrity of the weld was and continues to be assured.
| |
| 4th Interval Examinations Scope: 2HC-1 Since the 3rd Interval examination was performed during 2005, the 4th Interval examination of will be scheduled for February 2015 (2R23).
| |
| H2 Basis Doc - Class 1 Page 14 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS Category B-A - Class 1 RPV Item B1.22 Closure Head Meridional Welds Configuration The HNP-2 closure head has eight B1.22 meridional welds (HC-1-A, HC-1-B, HC-1-C, HC-1-D, HC-1-E, HC-1-F, HC-1-G, and HC-1-H).
| |
| First Interval Examinations Four of the welds - 2HC-1-A, 2HC-1-C, 2HC-1-E, and 2HC-1-G - were examined in 1985 (2nd Period of the 1st Interval) to the requirements of the1974 Edition of Section XI (with Addenda through Summer 1975) prior to the early Code update. Only 10% of each weld was required to be examined.
| |
| After the 1985 outage, HNP-2 was early updated effective January 1, 1986. This update changed the HNP-2 Code, interval dates, and period dates so that they coincided with HNP-1. (Therefore, the 3rd Period of the 1st Interval for HNP-2 became the 1st Period of the 2nd Interval). Per Relief Request 2.1 (submitted in the 2nd Interval Program) the remaining four 1st Interval examinations would be need to be completed to meet the 1974 Code requirements (approximately 10% of the length of each of the four welds per the 1974/Summer 1975 Code). In 1986 (new 2nd Interval, 1st Period) at least 10% of the length of the four remaining meridional welds (2HC-1-B, 2HC-1-D, 2HC-1-F, and 2HC-1-H) was examined. These examinations combined with the 1985 examinations completed the original 1st Interval examination requirements.
| |
| Second Interval Examinations Weld 2HC-1-A was 100% examined in Spring 1991 to meet the 2nd Interval 1980 Code requirements. This examination satisfied the 2nd Interval Code requirements.
| |
| Third Interval Examinations Per Volume 2, Section 10, page 3 of the GE prepared HNP-2 RPV Examination Plan, all weld seams welded to procedure MA-500-0 and MA-509-0 were welded using the Upjohn process. This included the top head meridional weld seams 2HC-1-A thru H.
| |
| The 1989 Code required that each weld be 100% examined to the extent practical. Welds 2HC-1-B, D, F, and H were examined during 2R13 and welds 2HC-1-A, C, E, and G were examined during 2R14. All of these examinations were pre-Appendix VIII; however, even though they are Upjohn welds, re-examination was not performed because there is not a dose issue associated with the potential evaluation of indications (as compared to the bottom head). Note: Since weld 2HC-1-A was the only weld examined during the 2nd interval, the successive examination requirements of IWB-2420(a) were not applicable for 3rd Interval scheduling purposes.
| |
| H2 Basis Doc - Class 1 Page 15 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS 4th Interval Examinations Welds 2HC-1-B, D, F, and H were examined during Period 1 and welds 2HC-1-A, C, E, and G were examined during Period 2. Table IWB-2500-1, Category B-A allows the deferral of these examinations; as a result, all welds will be examined during the 1st Period (2HC-1-A, C, E, and G will be examined about 3 years early).
| |
| H2 Basis Doc - Class 1 Page 16 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS Category B-A - Class 1 Item B1.30 RPV Shell To Flange Weld Configuration There is one RPV shell-to-flange weld (2C-1).
| |
| First Interval Examinations Segments of the weld were examined in 1982, 1985, and 1986 to meet the 1st interval 1974 Code requirements to examine the complete length of the weld.
| |
| Second Interval Examinations Segments of the weld were examined in 1991 and in 1994. Then, the entire length of the weld was examined in 1995 (3rd Period of 2nd Interval) using GERIS automated exams from the shell side (44.7% coverage) and manual supplemental exams (67.9% coverage) from the flange surface. This examination completed the 2nd Interval requirements and re-zeroed the examination, so that in future intervals 100% of the length could be examined at one time.
| |
| Third Interval Examinations Scope: 2C-1 Per Table IWB-2500-1, Category B-A of the 1989 Code the entire length of this weld is required to be volumetrically examined. 100% of the weld was examined during 2R18 (2/2005) which is the last outage of the 3rd Interval.
| |
| 4th Interval Examinations Scope: 2C-1 Per Table IWB-2500-1, Category B-A of the 2003 Addenda the entire length of this weld is required to be volumetrically examined. 100% of the weld was examined during 2R18 (2/2005) and it will be re-examined during 2R23 (2/2015).
| |
| H2 Basis Doc - Class 1 Page 17 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS Category B-A - Class 1 Item B1.40 RPV Closure Head to Flange Weld Configuration There is one RPV closure head-to-flange weld (2HC-2).
| |
| First Interval Examinations Examined 66% of the weld in 1985 prior to the early update; however, because of a reportable indication (See INF S85H2I003) the remaining 1/3rd was examined. This completed the first interval requirements.
| |
| Second Interval Examinations The 1/3rd of the weld containing the indications detected during the 1985 examination was re-examined in 1986, 1988, and 1989. Examinations were performed in Fall 1992 and Fall 1995 to complete the 2nd Interval requirements of the 1980 Code.
| |
| Third Interval Examinations Per Table IWB-2500-1, Category B-A of the 1989 Code the entire length of this weld is required to be volumetrically examined. 100% of the length of the weld was examined in the 1st Period of the 3rd Interval 2R13 (Spring 1997) to satisfy the 3rd Interval 1989 Code requirements. This examination completed the 3rd Interval requirements and re-zeroed the examination, such that, 100% of the weld length could be examined at one time, during future examinations.
| |
| 4th Interval Examinations Per Table IWB-2500-1, Category B-A of the 2003 Addenda the entire length of this weld is required to be volumetrically examined. 100% of the weld was examined during 2R13 (Spring 1997) and it will be re-examined during 2R19 (2/2007).
| |
| H2 Basis Doc - Class 1 Page 18 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS Category B-D - Class 1 Item B3.90 Full-Penetration Welds of Nozzles in Vessels Configuration The only Class 1 vessel at HNP is the reactor pressure vessel (RPV). There are 29 RPV nozzles installed on the RPV using full-penetration welds. Nozzle 2N15 (bottom head drain) is completely inaccessible due to the proximity of the CRDs. Relief similar to that submitted in the 3rd Interval via RR-3 will be needed.
| |
| First Interval Examinations Examinations were performed on the nozzles 2N1A&B, 2N2C, E, F, H, &J, 2N3A, B,
| |
| &D, 2N4C&D, 2N5A, 2N6A, 2N7, and 2N9 as shown in the 1st Interval column in Table 1-1. However, as discussed in the Introduction (effective December 31, 1985) the HNP-2 Code, interval dates, and period dates were updated so that they coincided with HNP-1.
| |
| The remaining 1st Interval nozzle examinations (nozzles 2N2A, 2N2B, 2N2D, 2N2G, 2N2K, 2N3C, 2N4A, 2N4B, 2N5B, 2N6B, 2N8A, and 2N8B) were examined from 1986 through 1989 during the 1st Period of the 2nd Interval (originally the 3rd Period of the 1st Interval). These examinations completed the 1st Interval requirements.
| |
| Second Interval Examinations The new 2nd Interval was scheduled from 1/1/86 through 12/31/95 to coincide with HNP-
| |
| : 1. (Note: Prior to the early update the 2nd Interval for HNP-2 was scheduled from 9/5/89 through 9/5/99).
| |
| As shown in Table 1-1, 2nd Interval examinations were performed from 1988 through 1994 for nozzles 2N1A, 2N1B, 2N2B, 2N2C, 2N2E, 2N2F, 2N2H, 2N2J, 2N3A, 2N3B, 2N3C, 2N3D, 2N4A, 2N4B, 2N4C, 2N4D, 2N5A, 2N6A, 2N6B, 2N7, and 2N9.
| |
| Second Interval examinations were also performed in 1997 for 2N2A, 2N2D, 2N2G, 2N2K, 2N8A, and 2N8B. While the 1997 outage was designated as the first outage in the new 3rd Interval, before the early update, this outage would have occurred during the 2nd Interval. Additionally, the 1st interval examination of these nozzles had been performed about 9 to 10+ years earlier. Therefore, the examination of these six nozzles in 1997 was appropriate.
| |
| The 2nd Interval examination of 2N5B was not performed until the Spring 2000 outage.
| |
| While this outage was designated as the first outage of the new 2nd Period of the 3rd Interval, before the early update, this outage would have occurred about 6 months past the end of the 2nd Interval (the old 2nd Interval would have ended on 9/4/99) which was acceptable per IWB-2412. Additionally, the 1st interval examination of these nozzles had been performed about 10+ years earlier. Therefore, the examination of this nozzle in 2000 was acceptable. These examinations closed out the 2nd Interval requirements.
| |
| H2 Basis Doc - Class 1 Page 19 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS Third Interval Examinations Per Table IWB-2500-1, Category B-D of the 1989 Code 100% of these welds are required to be volumetrically examined.
| |
| As discussed above, because of the early update, some 1st Interval examinations were performed in the new 2nd Interval and some 2nd Interval examinations were performed in the new 3rd Interval. This approach, while technically sound, leads to difficulties in reporting (e.g., was the examination a 1st Interval examination or was it a 2nd Interval examination). Therefore, a philosophical change was made for the 3rd Interval such that all of the 3rd Interval examinations would be completed by the end of the new 3rd Interval.
| |
| This change required that if a 2nd Interval examination was performed in the 1st or 2nd Period of the new 3rd Interval, that the weld would be re-examined in the 3rd Period for 3rd Interval credit. There were seven cases where welds were examined for 2nd Interval credit in the new 3rd Interval and then re-examined for 3rd Interval credit. Note: In several cases, additional welds were re-examined to establish a pattern for the 4th Interval such that automated equipment would only be needed during two outages.
| |
| This change is technically appropriate because the Section XI Code intent is to perform an examination of each nozzle in the 1st interval and then to re-examine each nozzle about every 10 years. As shown in Table 1-1 the philosophy of examining each weld every 10 years is maintained.
| |
| Table IWB-2500-1 of the 1989 Code requires that the Category B-D examinations be spread out during the 3rd interval such that 25% to 50% of the examinations are performed by the end of the 1st Period and the remainder by the end of the 3rd Interval.
| |
| This requirement was not specifically met for the examinations being credited for the 3rd Interval because per Table 1-1 only six welds were examined for 3rd Interval Code credit during the 1st Period, while at least seven would have been required. However, eleven total examinations (39% of the welds) were actually performed during the 1st Period of the 3rd Interval. It is believed that these percentages are consistent with the intent of the Table IWB-2500-1 requirement to examine 25% to 50% of the nozzle welds in the 1st period and to then examine the remainder by the end of the interval.
| |
| 4th Interval Examinations Examinations are required per the 2001 Edition of Section XI with Addenda through 2003. (Deferral of the examinations until the end of the Interval is not permitted because the deferral is for PWRs). Per Footnote 2 of Table IWB-2500-1, Category B-D, at least 25% but not more than 50% (credited) of the nozzle examinations shall be completed by the end of the first inspection period, and the remainder by the end of the inspection interval. Thirty-three percent of the examinations are scheduled in the 1st Period with the balance scheduled throughout the remainder of the 4th interval. Relief will be required for the 2N15 nozzle due to inaccessibility. (See Table 1-1).
| |
| H2 Basis Doc - Class 1 Page 20 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS TABLE 1-1 CATEGORY B-D, ITEM B 3.90 NOZZLE- INTERVAL DESCRIPTION 1ST 2ND 3RD 4th P1 P2 P3 P1 P2 P3 2N1A-RC Out F80 S91 S00 2R20(2/09) 2N1B-RC Out S85 S94 S05 2R23 (2/15) 2N2A-RC Inlet W88 S97 S05 2R23 (2/15) 2N2B-RC Inlet F89,S94 S05 2R23 (2/15) 2N2C-RC Inlet S85 92 S00 2R20 (2/09) 2N2D-RC Inlet W88 S97 S05 2R23 (2/15) 2N2E-RC Inlet S82 S91 S00 2R20 (2/09) 2N2F-RC Inlet S85 S94 S05 2R23 (2/15) 2N2G-RC Inlet W88 S97 S05 2R23 (2/15) 2N2H-RC Inlet F80 S91 S00 2R20 (2/09) 2N2J-RC Inlet S85 S94 S05 2R23 (2/15) 2N2K-RC Inlet W88 S97 S05 2R23 (2/15) 2N3A-MS S82 S91 S97 S05 2R23 (2/15) 2N3B-MS S85 S94 S97 S05 2R23 (2/15) 2N3C-MS F89,92 S00 2R20 (2/09) 2N3D-MS S80 S91 S00 2R20 (2/09) 2N4A FW F86,S94 S97 S05 2R23 (2/15) 2N4B FW F86,S94 S97 S05 2R23 (2/15) 2N4C FW S84 S94 S05 2R23 (2/15) 2N4D FW F80 W88,S91 S05 2R23 (2/15)
| |
| S94 2N5A-CS S85 S94 S05 2R23 (2/15) 2N5B-CS F89 S00 S05 2R23 (2/15) 2N6A-Spray 82 S91 S00 2R20 (2/09) 2N6B-Spray 89 S00 2R20 (2/09) 92 2N7-Vent 82 S91 S00 2R20 (2/09) 2N8A-JP Instr F86 S97 S05 2R23 (2/15) 2N8B-JP Instr F86 S97 S05 2R23 (2/15) 2N9 CRD F80 S91 S97 S05 2R23 (2/15) 2N15 Drain (1) (1) (1) (1) 1st Interval Credit 2nd Interval Credit 3rd Interval Credit Re-zero exams Notes:
| |
| : 1. The 2N15 RPV drain nozzle is inaccessible because it is located in the center of the bottom head and is surrounded by the CRDs. The SE for RR-3 granted 3rd interval approval to not perform the required examinations. Similar approval will be required for the 4th Interval.
| |
| H2 Basis Doc - Class 1 Page 21 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS Category B-D - Class 1 Item B 3.100 - Inside Radius Area in Nozzles Welded to Vessels Using Full-Penetration Welds Configuration The only Class 1 vessel at HNP is the reactor pressure vessel (RPV). There are 29 RPV nozzles installed on the RPV using full-penetration welds. Nozzle 2N15 (bottom head drain) is completely inaccessible due to the proximity of the CRDs. (See RR-3).
| |
| First Interval Examinations As shown in Table 1-2, 1st Interval examinations were performed from 1980 through 1985 for the nozzle inner radii for nozzles 2N1A, 2N1B, 2N2B, 2N2C, 2N2E, 2N2F, 2N2H, 2N2J, 2N3A, 2N3B, 2N3D, 2N4A, 2N4B, 2N4C, 2N4D, 2N5A, 2N6A, 2N7, 2N8A and 2N9.
| |
| Effective December 31, 1985 the HNP-2 Code, interval dates, and period dates were updated so that they coincided with HNP-1. Examinations were subsequently performed on nozzles 2N2A, 2N2D, 2N2G, 2N2K, 2N3C, 2N5B, 2N6B, and 2N8B from 1986 through 1989 during the 1st Period of the 2nd Interval (originally the 3rd Period of the 1st Interval). These examinations completed the 1st Interval requirements.
| |
| Note: Examination of the 2N4A-D Feedwater nozzle inner radius and bore were performed numerous times to meet NUREG-0619 requirements. Only one examination per nozzle was credited for Code purposes. See Feedwater Nozzles in the Augmented Section for additional information.
| |
| Second Interval Examinations The new 2nd Interval was scheduled from 1/1/86 through 12/31/95 to coincide with HNP-
| |
| : 1. (Prior to the early update, the HNP-2 2nd Interval was scheduled from 9/5/89 through 9/5/99).
| |
| As shown in Table 1-2, 2nd Interval examinations were performed from 1989 through 1994 for nozzles 2N1A, 2N1B, 2N2B, 2N2C, 2N2E, 2N2F, 2N2H, 2N2J, 2N3A, 2N3B, 2N3C, 2N3D, 2N4A, 2N4B, 2N4C, 2N4D, 2N5A, 2N6A, 2N6B, 2N7, 2N8A, and 2N9.
| |
| Second Interval examinations were also performed in 1997 for 2N2A, 2N2D, 2N2G, 2N2K, and 2N8B. While the 1997 outage was designated as the first outage in the 3rd Interval, before the early update this outage would have occurred during the 2nd Interval.
| |
| Additionally, the 1st interval examination of these nozzles had been performed about 9 to 10 years earlier or less. Therefore, the examination of these six nozzles in 1997 was appropriate.
| |
| The 2nd Interval examination of 2N5B was not performed until the Spring 2000 outage.
| |
| While this outage was designated as the first outage of the new 2nd Period of the 3rd Interval, before the early update, this outage would have occurred about 6 months past H2 Basis Doc - Class 1 Page 22 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS the end of the 2nd Interval (the old 2nd Interval would have ended on 9/4/99) which was acceptable per IWB-2412. Additionally, the 1st interval examination of these nozzles had been performed about 10+ years earlier. Therefore, the examination of this nozzle in 2000 was acceptable. These examinations closed out the 2nd Interval requirements.
| |
| Note: Examination of the 2N4A-D Feedwater nozzle inner radius and bore were performed numerous times to meet NUREG-0619 requirements. Only one examination per each nozzle was credited for Code examination purposes. See Revised Feedwater Nozzle Inner Radius Inspection Criteria in this document for further information on these examinations.
| |
| Third Interval Examinations Per Table IWB-2500-1, Category B-D of the 1989 Code 100% of the nozzles must have their inner radius volumetrically examined.
| |
| NOTE Beginning in 2000, Relief Request RR-34, Revision 2 was used to perform an enhanced visual examination of the nozzle inner radius in lieu of the required volumetric examination of closure head nozzles 2N6A&B, 2N7, and 2N9 in lieu of the required volumetric examination.
| |
| It could have also been used for RPV nozzles 2N1A&B and 2N3A-D, but was not.
| |
| Relief Request RR-37, Revision 1 may have been used to perform an enhanced visual examination of the nozzle inner radius in lieu of the required volumetric examination for RPV nozzles 2N2A-H, 2N2J&K, 2N5A&B, and 2N8A&B. It was not used.
| |
| As discussed above, because of the early update, some 1st Interval examinations were performed in the new 2nd Interval and some 2nd Interval examinations were performed in the new 3rd Interval. This approach, while technically sound, leads to difficulties in reporting (e.g., was the examination a 1st Interval examination or was it a 2nd Interval examination?). Therefore, a philosophical change was made for the 3rd Interval such that all of the 3rd Interval examinations would be completed by the end of the new 3rd Interval.
| |
| This change required that if a 2nd Interval examination was performed in the 1st or 2nd Period of the new 3rd Interval, that the weld would be re-examined in the 3rd Period for 3rd Interval credit. There were six cases where the nozzle inner radius was examined for 2nd Interval credit in the new 3rd Interval and then re-examined for 3rd Interval credit. Note:
| |
| In several cases, additional nozzle inner radii were re-examined to establish a pattern for the 4th Interval such that automated equipment would only be needed during two outages.
| |
| This change is technically appropriate because the Section XI Code intent is to perform an examination of each nozzle in the 1st interval and then to re-examine each nozzle H2 Basis Doc - Class 1 Page 23 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS about every 10 years. As shown in Table 1-2 the philosophy of examining each nozzle inner radius every 10 years is maintained.
| |
| Table IWB-2500-1 of the 1989 Code requires that the Category B-D examinations be spread out during the 3rd interval such that 25% to 50% of the examinations are performed by the end of the 1st Period and the remainder by the end of the 3rd Interval.
| |
| This requirement was not specifically met for the exams being credited for the 3rd Interval because per Table 1-2 only six nozzle inner radii were examined for 3rd Interval Code credit during the 1st Period, while at least seven would have been required. However, eleven total examinations (43% of the total welds) were actually performed during the 1st Period of the 3rd Interval. It is believed that these percentages are consistent with the intent of the Table IWB-2500-1 requirement to examine 25% to 50% of the nozzle inner radii in the 1st period and to then examine the remainder by the end of the interval.
| |
| Examinations of the 2N4A-D Feedwater nozzle inner radius and bore were performed once during the 10-year interval to meet Alternate BWR Feedwater Nozzle Inspection Requirements. See Revised Feedwater Nozzle Inner Radius Inspection Criteria in this document.
| |
| 4th Interval Examinations Examinations are required per the 2001 Edition of Section XI with Addenda through 2003. (Deferral of the examinations until the end of the Interval is not permitted because the deferral is for PWRs). Per Footnote 2 of Table IWB-2500-1, Category B-D, at least 25% but not more than 50% (credited) of the nozzle examinations shall be completed by the end of the first inspection period, and the remainder by the end of the inspection interval. Thirty-three percent of the examinations are scheduled in the 1st Period with the balance scheduled throughout the remainder of the 4th interval. Relief will be required for the 2N15 nozzle due to inaccessibility. (See Table 1-2).
| |
| In place of a UT examination, SNC may perform a visual examination of the RPV nozzles (except for the Feedwater Nozzles) per Code Case N648-1, with enhanced magnification that has a resolution sensitivity to detect a 1-mil width wire or crack, utilizing the allowable flaw length criteria of Table IWB-3512-1 with limiting assumptions on the flaw aspect ratio. The provisions of Table IWB-2500-1, Examination Category B-D, continue to apply except that, in place of examination volumes, the surfaces to be examined are the external surfaces shown in the figures applicable to this table.
| |
| Note: Per NUREG-0619 augmented examinations of the feedwater nozzle inner radius (and bore) for a welded in thermal sleeve configuration are required every 2nd refueling outage. However, due to improved automated UT examination technology and lack of cracking in the newer thermal sleeve configurations, the frequency is now Code frequency (see Feedwater Nozzle Augmented Requirements later in this document for detailed discussion).
| |
| H2 Basis Doc - Class 1 Page 24 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS TABLE 1-2 CATEGORY B-D, ITEM B 3.100 NOZZLE- INTERVAL DESCRIPTION 1ST 2ND 3RD 4th P1 P2 P3 P1 P2 P3 2N1A-RC Out F80 89 S00 2R20(2/09) 2N1B-RC Out S85 S94 S05 2R23 (2/15) 2N2A-RC Inlet W88 S97 S05 2R23 (2/15) 2N2B-RC Inlet F80 S94 S05 2R23 (2/15) 2N2C-RC Inlet S85 92 S00 2R20 (2/09) 2N2D-RC Inlet W88 S97 S05 2R23 (2/15) 2N2E-RC Inlet S82 S91 S00 2R20 (2/09) 2N2F-RC Inlet S85 S94 S05 2R23 (2/15) 2N2G-RC Inlet W88 S97 S05 2R23 (2/15) 2N2H-RC Inlet F80 S91 S00 2R20 (2/09) 2N2J-RC Inlet S85 S94 S05 2R23 (2/15) 2N2K-RC Inlet W88 S97 S05 2R23 (2/15) 2N3A-MS F80 S91 S97 S05 2R23 (2/15) 2N3B-MS S85 S94 S97 S05 2R23 (2/15) 2N3C-MS F89,92 S00 2R20 (2/09) 2N3D-MS S80 S91 S00 2R20 (2/09) 2N4A(2) FW S80 F86,F89 S97 S05 2R23 (2/15)
| |
| S82 92,S94 2N4B(2) FW S80 F86,F89 S97 S05 2R23 (2/15)
| |
| S82 92,S94 2N4C(2) FW S80 F86,F89 S05 2R23 (2/15)
| |
| S82 92,S94 2N4D(2) FW S80 F86,F89 S05 2R23 (2/15)
| |
| S82 92,S94 2N5A-CS S85 S94 S05 2R23 (2/15) 2N5B-CS F89 S00 S05 2R23 (2/15) 2N6A-Spray 80 89,S91 S003 2R20 (2/09)3 2N6B-Spray F89,92 S003 2R20 (2/09)3 2N7-Head Vent 82 F89 S003 2R20 (2/09)3 2N8A-JP Instr F80 F89 S97 S05 2R23 (2/15) 2N8B-JP Instr F86 S97 S05 2R23 (2/15) 2N9 CRD 82 S91 S97 S05 2R23 (2/15) 2N15 Drain (1) (1) (1) (1) st nd 1 Interval Credit 2 Interval Credit 3rd Interval Credit Re-zero exams Notes:
| |
| : 1. The 2N15 RPV drain nozzle is inaccessible because it is located in the center of the bottom head and is surrounded by the CRDs. The SE for RR-3 granted 3rd interval approval to not perform the required examinations. Similar approval will be required for the 4th Interval.
| |
| : 2. Multiple examinations due to previous NUREG-0619 requirements.
| |
| : 3. Starting in 2000, 3rd Interval examinations were enhanced VT-1 per RR-34, Rev.2.
| |
| H2 Basis Doc - Class 1 Page 25 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS Category B-E - Class 1 Partial Penetration RPV Welds Category B-E consists of seven partial penetration welds to the RPV. These are:
| |
| 2N10 SLC Nozzle (See Sketch 2-BE-3 in Volume 4 of the Ten-Year Exam Plan) 2N11A, B Instrument Nozzles (See Sketch 2-BE-1) 2N12A, B Instrument Nozzles (See Sketch 2-BE-2) 2N16A,B Instrument Nozzles (See Sketch 2-BE-2)
| |
| CRD Penetrations - Partial penetration weld is on the inside of the RPV.
| |
| 1st and 2nd Interval An evaluation was not performed for these intervals.
| |
| 3rd Interval Table IWB-2500-1 of the 1989 Edition of Section XI requires that 25% of the welds be VT-2, visually examined during the 3rd Interval; however, examinations may be deferred until the end of the interval. Due to limited access, VT-2 examinations are performed indirectly each refueling outage (as allowed by IWA-5240) during the leakage and hydrostatic tests (Code Case N-498-1).
| |
| 4th Interval Not a Code Category in the 2001 Edition through the 2003 Addenda; therefore there are no code requirements.
| |
| H2 Basis Doc - Class 1 Page 26 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS Category B-F - Class 1 Dissimilar Metal Piping Welds LESS THAN 4 NPS (B5.20)
| |
| Nozzle Requirement Evaluation 2B11\N10 Surface examination This nozzle is located below the core support plate; therefore, any loss of Standby Liquid of Inconel Nozzle- inventory, as a result of a safe-end weld break, would consist of water. Per Control To-304SS Safe End the 4th Interval IWB-1220(a) exemption criteria, lines containing water that Inconel 182 weld and have an ID of 1.09 are exempt; however, per Sketch 2-BE-3 this line butter designated as: containing weld 2C41-1SBLC-2-1 has an inside diameter of 1.938 and is not exempt from NDE requirements and a Section XI surface examination 2C41-1SBLC-2-1 is required. The safe-end to nozzle was fabricated by welding two solid materials together and boring them out. (ID cold working was introduced; therefore, BWRVIP-27 recommends a complete UT exam of the dissimilar metal weld, the safe-end, and stainless weld from the safe-end side.
| |
| 2B11\N11A&B No examination These instrument nozzles penetrate the RPV at Elevation 509 opposite the Instrument Nozzles requirement for the steam separator. Therefore, any inventory lost as a result of a safe-end Inconel Nozzle-To- weld break would consist of steam. Per the 4th Interval IWA-1220(a) 304SS Safe End exemption criteria, lines containing steam that have an ID of 2.18 or less Inconel 182 weld and may be considered exempt. Per Sketch 2-BE-1 the piping on each of these butter because all safe-ends has an inside diameter of 1.938; therefore these welds are welds are exempt on exempt. [Per BWRVIP-49, no additional exams are required; therefore no size. examinations will be performed except for a VT-2 examination during pressure testing].
| |
| 2B11\N12A&B No examination These instrument nozzles penetrate the RPV at Elevation 586 opposite the Instrument Nozzles requirement for the top of the steam separator. Therefore, any inventory lost as a result of a Inconel Nozzle-To- safe-end weld break would consist of steam. Per the 4th Interval IWA-304SS Safe End 1220(a) exemption criteria, lines containing steam that have an ID of 2.18 Inconel 182 weld and or less may be considered exempt. Per Sketch 2-BE-2 this weld has an butter because all inside diameter of 1.938; therefore these welds are exempt. [Per welds are exempt on BWRVIP-49, no additional exams are required; therefore no examinations size. will be performed except for a VT-2 examination during pressure testing].
| |
| 2B11\N15 No examination Bottom Head Drain. Inaccessible due to location inside support skirt.
| |
| because the Inconel During the 3rd Interval, this weld received a VT-2 examination instead of Bottom Head Drain Nozzle-To-304SS the Code required examination per NRC approved RR-6. A similar Relief Safe End Inconel 182 request will be needed for the 4th Interval.
| |
| weld and butter is inaccessible.
| |
| 2B11\N16A&B Surface exam of Each of the two instrument nozzles penetrate the RPV in the shroud Instrument Nozzles Inconel Nozzle-To- annulus; therefore, any inventory lost as a result of a safe-end weld break 304SS Safe End would consist of water. Per the 4th Interval IWA-1220(a) exemption Inconel 182 weld and criteria, lines containing water that have an ID of 1.09 or less may be butter designated as: considered exempt; however per Sketch 2-BE-2, the dissimilar metal joint has an inside diameter of 1.938; therefore it is not exempt and a Section XI 2B11-1INST-2A-1 surface examination is required. Per BWRVIP-49, no additional exams are 2B11-1INST-2B-1 required beyond those required by ASME XI.
| |
| H2 Basis Doc - Class 1 Page 27 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS NPS 4 AND LARGER (B5.10)
| |
| Scope: 10 - Recirc. Inlet Safe-End to Nozzle Welds 2 - Recirc. Outlet Nozzle to Safe End Welds 2 - Jet Pump Instrument Nozzle to Safe End Welds 2 - Core Spray Safe-End to Nozzle Welds 3 - RHR stainless steel to carbon steel welds 1 - CRD Return Line Nozzle to Cap 8 - Feedwater Nozzle Safe-End Welds The Section XI Code requires that 100% of the above dissimilar metal piping welds be examined each interval. Deferral of the examinations until the end of the interval is not permitted.
| |
| The weld configuration generally consists of Inconel buttered carbon steel to 304 stainless steel with Inconel 182/82 filler metal. Stress improvement to reduce the residual welding stresses has been performed on each of these welds using either Induction Heating Stress Improvement (IHSI) or Mechanical Stress Improvement (MSIP). Generic Letter 88-01 and NUREG-0313 classify these welds as Category C welds. Based on BWRVIP-075, if: (1) an effective stress improvement has been performed, (2)there is a second crack mitigator (e/g. hydrogen water chemistry) and qualified examinations have been performed, then only 10% of Category C welds need to be examined. The implementation of BWRVIP-075 is described in detail in the BWRVIP-075 section of this bases document. Because only 10% of Category C welds is required, the 100%
| |
| ASME Section XI examination requirement is not being met. Relief was obtained from the NRC via ALT-3 to eliminate the B-F welds from Code required percentages and frequency.
| |
| H2 Basis Doc - Class 1 Page 28 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS Category B-G Class 1 Pressure Retaining Bolting Greater Than 2 in Diameter The scope consists of RPV and Reactor Recirc. Pump bolting as addressed below.
| |
| Configuration The HNP-2 B-G-1 scope consists of:
| |
| RPV Bolting 56 RPV Nuts (Item B6.10) - For the 4th Interval, the 2001 Edition of the Section XI Code through the 2003 addenda requires a visual (VT-1) of the nuts. The Code allows deferral of these examinations until the end of the interval; however, this was not used. Instead, during the 3rd Interval scheduling was performed per Code Case N-598. Continuing the pre-established pattern, 22 nuts (40%) are scheduled for the 1st Period, 14 nuts (cumulative percentage of 65%) are scheduled for the 2nd Period, and 20 nuts are scheduled for the 3rd Period (cumulative percentage of 100%).
| |
| * 56 RPV Studs (Item B6.20) - During the 4th Interval, examinations will be performed per Code Case N-307-3 and the 2001 Edition of the Section XI Code through the 2003 addenda. Code Case N-307-3 defines the examination volume. The Code allows deferral of these examinations until the end of the interval; however, this was provision was not used because the 3rd Interval examinations were distributed into each of the three periods. Continuing the 3rd Interval established pattern, 22 (40%)
| |
| are scheduled for the 1st Period, 14 (cumulative percentage of 65%) are scheduled for the 2nd Period, and 20 are scheduled for the 3rd Period (cumulative percentage of 100%).
| |
| * 56 RPV Threads in Flange (Item B6.40) - During the 4th Interval, examinations will be performed per the 2001 Edition of the Section XI Code through the 2003 addenda.
| |
| The Code allows deferral of these examinations until the end of the interval; however, this was provision was not used because the 3rd Interval examinations were distributed into each of the three periods. Continuing the 3rd Interval established pattern, 22 (40%) are scheduled for the 1st Period, 14 (cumulative percentage of 65%)
| |
| are scheduled for the 2nd Period, and 20 are scheduled for the 3rd Period (cumulative percentage of 100%).
| |
| H2 Basis Doc - Class 1 Page 29 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS
| |
| * 56 RPV Washers (Item B6.50) - For the 4th Interval, the 2001 Edition of the Section XI Code through the 2003 addenda requires a visual (VT-1) of the washers. The Code allows deferral of these examinations until the end of the interval; however, this was provision was not used because the 3rd Interval examinations were distributed into each of the three periods. Continuing the 3rd Interval established pattern, 22 (40%) are scheduled for the 1st Period, 14 (cumulative percentage of 65%) are scheduled for the 2nd Period, and 20 are scheduled for the 3rd Period (cumulative percentage of 100%).
| |
| Examinations are scheduled as shown in the attached Hatch Unit No.2 Code 4th Interval Compliance Scheduling Summary.
| |
| RC Pumps
| |
| * 32 RC Pump Bolts (Item B6.180 - 16 per pump) - During the 4th Interval, examinations will be performed per the 2001 Edition of the Section XI Code through the 2003 addenda. The Code requires that the bolts on one of the two pumps be volumetrically examined during the 10-year interval. Deferral until the end of the interval is permitted. During 2R16 (2nd period 3rd interval), the 16 studs on Pump B were volumetrically examined; therefore, 4th Interval examinations will be scheduled for the 2nd Period on Pump B. Note: If disassembled, Footnote 7 allows a surface examination meeting the acceptance standards of IWB-3515 to be used in lieu of the volumetric examination.
| |
| * Flange Surfaces, when disassembled (Item B6.190) - During the 4th Interval, examinations will be performed per the 2001 Edition of the Section XI Code through the 2003 addenda. Per Table IWB-2500-1 category B-G-1 footnote 4, visual examinations are only required if a pump is disassembled and subsequently examined per Category B-L-2 requirements. Examination is required only once during the interval.
| |
| * 32 RC Pump Nuts (Item B6.200 - 16 per pump) - During the 4th Interval, examinations will be performed per the 2001 Edition of the Section XI Code through the 2003 addenda. Per Footnote 4, visual examinations are only required if a pump is disassembled and subsequently examined per Category B-L-2 requirements.
| |
| Examination is required only once during the interval.
| |
| H2 Basis Doc - Class 1 Page 30 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS Interpretation Number: XI-1-98-22 Codebook: Section XI Volume: 0 Date: 03-JUN-98
| |
| | |
| ==Subject:==
| |
| Table IWB-2500-1 (1989 Edition)
| |
| Question (1): For those Class 1 pumps not being disassembled during the interval for maintenance, repair, or volumetric examination, is it a requirement of Table IWB-2500-1 to perform B-G-1 bolting examinations on at least one pump in each group of pumps?
| |
| Question (2): For those Class 1 valves not being disassembled during the interval for maintenance, repair, or volumetric examination, is it a requirement of Table IWB-2500-1 to perform B-G-2 bolting examinations on at least one valve in each group of valves?
| |
| Reply (1): No.
| |
| Reply (2): No.
| |
| H2 Basis Doc - Class 1 Page 31 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS Category B-G Class 1 Pressure Retaining Bolting Less Than or Equal to 2 in Diameter Code Percentages The B-G-2 scope consists of the following bolting. Details are provided below.
| |
| : 1. CRD Flange Bolting
| |
| : 2. Piping Flange Bolting
| |
| : 3. Valve Bolting
| |
| : 1. CRD Flange Bolting (Item B7.80) - The 2001 Edition of the Section XI Code through the 2003 addenda eliminated this Code Item. However, per 10 CFR 50.55a(b)(2)(xxi)(B) the NRC requires that reused bolting be examined whenever the CRD housing is disassembled.
| |
| : 2. Piping Flange Bolting (Item B7.50) - During the 4th Interval, examinations will be performed per the 2001 Edition of the Section XI Code through the 2003 addenda. Per Footnote 3, the examination is required only when a flange is disassembled. Additionally, examinations may be limited to one bolted connection among a group of bolted connections that are similar in design, size, function, and service. Examination of a bolted connection is required only once during the interval, regardless of the number of times the bolted connection is disassembled. Groups are listed below.
| |
| Component ID Associated Component Group Number 2B21\1CHSV-1FB 2N7 NOZZLE 1 2B21-1MS-8A-ASR-2FB 2B21-F013B 2 2B21-1MS-8A-BSR-2FB 2B21-F013A 2 2B21-1MS-8B-ASR-2FB 2B21-F013K 2 2B21-1MS-8B-BSR-2FB 2B21-F013D 2 2B21-1MS-8B-CSR-2FB 2B21-F013C 2 2B21-1MS-8B-DSR-2FB 2B21-F013E 2 2B21-1MS-8C-ASR-2FB 2B21-F013L 2 2B21-1MS-8C-BSR-2FB 2B21-F013G 2 2B21-1MS-8C-CSR-2FB 2B21-F013F 2 2B21-1MS-8D-ASR-2FB 2B21-F013J 2 2B21-1MS-8D-BSR-2FB 2B21-F013H 2 2B31-1RCM-28AS-9BC-4FB CLEANOUT 3 2B31-1RCM-28BS-8BC-4FB CLEANOUT 3 2E11-1RHR-9A-HS-1FB 2N6A NOZZLE 4 2E11-1RHR-9B-HS-1FB 2N6B NOZZLE 4 H2 Basis Doc - Class 1 Page 32 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS
| |
| : 3. B-G-2 Valve Bolting (Item B7.70) - (Does not include any flange bolting used to connect the valve to the piping). During the 4th Interval, examinations will be performed per the 2001 Edition of the Section XI Code through the 2003 addenda. Per Footnote 2, examination of pressure-retaining valve bolting is required only when Category B-M-2 visual exams are performed on the inside surface of the valve (see Interpretation XI-1-98-22). B-M-2 examinations are only required at HNP when a valve is disassembled for maintenance or repair, and only one valve in a like group of valves requires examination, regardless of how many valves are dissembled during the interval. Therefore, scheduling of valve bolting is not required. Valve bolting and the associated valve group are listed below:
| |
| Valve Bolting Valve Group Number 2B21-F010A&B and F077A&B VB 1 2B21-F011A&B VB 2 2B21-F013A, B, C, D, E, F, G, H, K, L, M VB 3 2B21-F022A thru D and F028A thru D VB 4 2B31-F023A&B and F031A&B VB 5 2E11-F008 and F009 VB 6 2E11-F015A&B VB 7 2E11-F067 VB 8 2E11-F050A&B VB 9 2E11-F060A&B VB 10 2E21-F004A&B and F005A&B VB 11 2E21-F006A&B VB 12 2E21-F007A&B VB 13 2E41-F006 VB 14 2E41-F002 and F003 VB 15 2G31-F001 and F004 VB 16 2G31-F027 VB 17 H2 Basis Doc - Class 1 Page 33 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS Category B-J - Class 1 Piping Welds
| |
| | |
| ===Background===
| |
| 10 CFR 50.55a(b)(2)(ii) states, Pressure-retaining welds in ASME Code Class 1 piping (applies to Table IWB - 2500 and IWB - 2500 - 1 and Category B - J). If the facility's application for a construction permit was docketed prior to July 1, 1978, the extent of examination for Code Class 1 pipe welds may be determined by the requirements of Table IWB - 2500 and Table IWB - 2600 Category B - J of Section XI of the ASME Code in the 1974 Edition and addenda through the Summer 1975 Addenda or other requirements the Commission may adopt.
| |
| The construction permit for HNP-2 was docketed on 12/27/72 which allowed the use of 10 CFR 50.55a(b)(2)(ii); therefore, during the 2nd and 3rd Interval updates, HNP-2 elected to use the provisions 10 CFR 50.55a(b)(2)(ii). HNP-2 used the 1974 Edition and addenda through the Summer 1975 Addenda during the 1st Interval; therefore, the use of the above provision essentially allowed the same non-exempt Category B-J welds to be selected for the 2nd and 3rd Intervals with the following caveats.
| |
| The 1974 Edition and addenda through the Summer 1975 actually requires a different 25% sampling of welds be performed each 10-year interval. Subsequent Code editions had a philosophical change - determine a sample to examined and then repeat the examination each 10-year interval. This later philosophy was utilized.
| |
| Terminal ends and high stress welds were chosen as practical to upgrade the overall selection criteria. All other requirements for B-J piping are from the 1989 Edition of Section XI.
| |
| Relief was obtained (RR-39) during the 3rd Interval to not meet two Code requirements for stainless steel and dissimilar metal welds because they are examined per the BWRVIP-75 augmented program. These requirements are:
| |
| : 1. IWB-2412 requires that except for the examinations that may be deferred until the end of the inspection interval, examinations shall be completed in accordance with Table IWB-2412-1. Table IWB-2412-1 defines a minimum and maximum number of examinations to be performed each inspection period.
| |
| : 2. IWB-2500 requires components to be examined as specified in Table IWB-2500-1.
| |
| The Extent and Frequency of Examination requires that all Category B-F welds be examined and that a minimum of 25% of Category B-J welds be examined over the ten-year ISI interval.
| |
| In lieu of the above Code requirements, the schedules and frequencies specified in the BWRVIP-75 will be used.
| |
| H2 Basis Doc - Class 1 Page 34 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS 4th Interval ISI-ALT-3 was submitted to the NRC (and approved) to continue the process initiated by RR-39; therefore, those welds covered by the provisions of BWRVIP-075 are not included as Category B-J. (See Category XB-J).
| |
| As allowed by 10CFR50.55a(b)(2)(ii), Category B-J welds to be examined in Interval 4 will be those selected during Interval 3. However, the scope will again be slightly adjusted to enhance the examination population based on guidance from Code Case N-609. Code Case N-609 provides an alternative to Code stress-based criteria for the selection of welds and was approved for use by the NRC in Revision 14 to Regulatory Guide 1.147. This code case has three features that were considered as possible enhancements. These features and any changes to 3rd Interval scope are addressed below:
| |
| : 1. Select all terminal ends. (Note: Terminal ends are the extremities of piping runs that connect to vessels, pumps, valves, piping systems, structures, or pipe anchors, each which acts as a rigid restraint or provides at least 2 degrees of restraint to piping thermal expansion. (The problem with examining all of the terminal ends is that, in many cases, there are severe coverage restrictions). The HNP terminal ends are evaluated below and any changes to the scope were identified.
| |
| There are four feedwater nozzles and four main steam nozzles where the weld to the nozzle is a terminal end. All eight are scheduled for the 4th Interval.
| |
| There are containment penetrations with a weld to the flued head located outside the penetration. This is an anchor point for stress analysis, but is not the extremity of the piping run; therefore, it is not considered a terminal end. Six were examined in the 3rd Interval. No change will be made for the 4th Interval.
| |
| There are 13 cases where a smaller line terminates at a branch connection on a larger line. For the connection of a piping run to a piping run, there is a rule-of-thumb for coupling or de-coupling piping runs when performing a stress analysis.
| |
| This is, when the ratio of the piping diameters is 10 to 1 or greater, the connection is considered to be a terminal end. None of the 13 cases had a 10/1 or greater ratio; therefore, there are no terminal ends in this population. A total of 3 of the 13 were examined during the 3rd Interval. For the 4th Interval, no additional welds were selected.
| |
| : 2. Select dissimilar metal welds not covered under Category B-F. There are no Category B-J dissimilar metal welds. Dissimilar metal welds greater than or equal to 4 in diameter are designated as Category XB-F and are examined per VIP-075 (see VIP-075 section). Those under 4 are designated as Category B-F.
| |
| : 3. Select additional piping welds, such that the total number of circumferential butt welds (or branch connection or socket welds) selected for examination equals 25% of the total number of nonexempt circumferential butt welds (or branch connection or H2 Basis Doc - Class 1 Page 35 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS socket welds) in the reactor coolant piping system. The examinations were prorated among the Class 1 systems on the number of nonexempt welds in each system.
| |
| Additionally, within each system, examinations were distributed between line sizes prorated, on the number of nonexempt welds in each line size. Because this was an enhancement, actual proration was not met; however, as shown in the below table, welds selected are spread throughout the systems and different line sizes.
| |
| Size System No. of Welds Welds Selected For Percentage Examination 12 FW 45 11 24%
| |
| 18 FW 20 4 20%
| |
| 4 MS 1 0 0%
| |
| 24 MS 89 25 28%
| |
| 8 MS 22 6 27%
| |
| 20 RHR 10 3 30%
| |
| 24 RHR 24 6 25%
| |
| 9 RHR 2 1 50%
| |
| 10 CS 41 10 24%
| |
| 10 HPCI 22 7 32%
| |
| 4 RCIC 19 6 32%
| |
| TOTAL 295 79 27%
| |
| As discussed above in the Exemptions Section, the IWB-1220(a) exemption criteria changed which required adding numerous small diameter welds to the 4th Interval examination population. A summary of theses welds is shown below.
| |
| SMALL DIAMETER CATEGORY B-J WELDS ADDED FOR THE 4TH INTERVAL (Shown as Category NB-J in Schedule Works)
| |
| Size System No. of Welds Welds Examined Percentage 1.5 SBLC 84 23 14%
| |
| 2 SBLC 75 17 11%
| |
| TOTAL 159 40 25%
| |
| These examinations are not deferrable until the end of the interval per the 2003 Addenda; therefore, the scheduling requirements of IWB-2412-1 are required.
| |
| H2 Basis Doc - Class 1 Page 36 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS Category B-K - Class 1 Welded Attachments
| |
| | |
| ===Background===
| |
| In lieu of the 3rd Interval 1989 Code requirements for welded attachments, HNP examined Class 1 welded attachments per the requirements of Code Case N-509, which was originally adopted for use at HNP through relief request RR-4. Relief Request RR-4 was superseded via the endorsement of Code Case N-509 in Revision 12 to Regulatory Guide 1.147. Revision 13 subsequently annulled the Code Case; however, it was used until the end of the 3rd Interval. Revision 12 had a condition for use, in that, at least 10%
| |
| of each Item No. was required to be examined (for those items not already requiring 100%).
| |
| Beyond those requirements established below, examination of an integrally welded attachment is required if the associated component support member has deformation identified during operation, refueling, maintenance, examination, inservice inspection, or testing. An example of component support deformation is broken parts, bent parts, or pulled out parts.
| |
| Additionally, Relief Request RR-41 which adopted Code Case N-700 was submitted (and approved by the NRC) during the 3rd Interval to effectively eliminate the examination of the stabilizer brackets (for Unit 1).
| |
| 4th Interval Examinations are required per the 2001 Edition of Section XI with Addenda through 2003, as modified by 10 CFR 50.55a(b)(2)(xxi)(C). Deferral of the examinations until the end of the Interval is not permitted.
| |
| Item B10.10 - Pressure Vessels: The only Class 1 pressure vessel is the reactor pressure vessel (RPV). With a single vessel, the Code requires the examination of all welded attachments. The HNP-2 RPV is supported by a reactor skirt (Weld C-6) and has six stabilizer brackets (SB1 - SB6) welded to the shell to prevent the RPV from tilting during a seismic event. The inside surface of the support skirt weld (C-
| |
| : 6) is totally inaccessible for examination. Note: The RPV head has lifting lugs which are not considered to be in the Examination Category B-K scope. The basis for this determination is that Examination Category B-K, Table 2500-1, Footnote 1 indicates that examination is limited to those attachments providing component support per NF-1110. NF-1110 indicates that this applies only to metal elements which transmit loads between components and the building structure.
| |
| Per 10 CFR 50.55a(b)(2)(xxi)(C), the provisions of Table IWB-2500-1, 1995 Addenda must be applied to Item B10.10. The 1995 addenda allows a volumetric examination of the skirt weld if the skirt weld configuration is that shown in Figure IWB-2500-14. For HNP-2, the configuration does not match Figure 14; therefore, HNP will use Code Case H2 Basis Doc - Class 1 Page 37 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS N-323-1 for the examination of the support skirt weld. Code Case N-323-1 allows a surface examination from the accessible surface (outside) as an alternative if the inside surface is inaccessible.
| |
| Per footnote 4 of the Code, when there are multiple vessels, only one welded attachment weld on one of the vessels requires examination. However, when there is a single vessel (such as the RPV), footnote 4 does not apply and all of the welded attachment welds require examination. Code Case N-700 was developed to align the examination requirements for single vessels with those for multiple vessels. SNC proposes using Code Case N-700 to select RPV welded attachments for examination in lieu of using the Code Case N-509 footnote 4 requirements.
| |
| Code Case N-700 states that, For single vessels, only one welded attachment shall be selected for examination. The attachment selected for examination on one of the multiple vessels or the single vessel, as applicable, shall be an attachment under continuous load during normal system operation, or an attachment subject to a potential intermittent load (seismic, water hammer, etc.) during normal system operation if an attachment under continuous load does not exist. The examination of the HNP-2 RPV skirt weld will satisfy Code Case N-700 examination requirements because this weld is under a continuous load during normal system operation, while the stabilizer bracket welds are potentially loaded only during a major seismic event.
| |
| MONITOR THE INCLUSION OF N-700 INTO REGULATORY GUIDE 1.147 OR DEVELOP AN ALTERNATIVE (SEE 3rd INTERVAL RR-41)
| |
| Item B10.20 - Piping: Per the Code, 10% of the piping welded attachments must be examined. There are 28 sets of welded attachments in the Class 1 scope. For the purpose of this discussion, a set is a group of welded attachments associated with a specific location. For instance, a hanger clamp may have four welded lugs but it is considered one set. When a set of welded attachments is selected for examination all of the welded attachments in that set should be examined.
| |
| 10% of 28 sets would require the examination of 3 sets of welded attachments.
| |
| Note: Containment penetrations are shown on FSAR Figure 3.8-2, sheets 1, 2 , and 3.
| |
| Sheets 1 and 2 are for flued head type penetrations; therefore, there are no attachments welded to the piping pressure boundary. Sheet 2, which applies to the Main Steam penetrations shows a welded attachment to the pressure boundary. These welded attachments are designated as 18PS on Figures A-6 and A-9 and are designated as 16PS on Figures A-7 and A-8. These four welded attachments are included in the total of 28.
| |
| Item B10.30 - Pumps: Per the Code, 10% of the welded attachments must be examined.
| |
| There are 3 Class 1 attachments on each of the two pumps requiring a total of one examination to be performed.
| |
| H2 Basis Doc - Class 1 Page 38 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS Category B-L Pressure Retaining Welds in Pump Casings NA to Hatch.
| |
| Category B-L Pump Casings There are two Class 1 pumps at Hatch - the Recirculation System Pumps. The following 2001 Edition through the 2003 Addenda Code requirements apply.
| |
| : 1. If one of the two pumps is disassembled for maintenance or repair, a VT-3 examination of the accessible internal pressure boundary should be performed to the extent practical. Examinations are limited to one pump in the 10-year interval; therefore, if one of the two pumps is examined there are no other examination requirements for the 10-year interval.
| |
| : 2. There is not a requirement to disassemble a pump in order to perform the VT-3 examination.
| |
| : 3. There is not a requirement to completely disassemble a pump that has been partially disassembled for maintenance or repair. For a partially disassembled pump, examine the accessible portion of the internal pressure boundary.
| |
| : 4. If a pump has been partially disassembled and VT-3 examined and subsequently one of the pumps is disassembled such that a more extensive examination is allowed, re-perform a VT-3 examination on the disassembled pump.
| |
| H2 Basis Doc - Class 1 Page 39 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS Category B-M Pressure Retaining Welds in Valves NA to Hatch.
| |
| Category B-M Valve Body Greater Than 4 NPS Examinations (VT-3) are limited to one valve in each group of valves that are of the same size, constructional detail (e.g. globe), manufacturing method, and that perform similar functions in the system. The groupings are shown in Table 1-10.
| |
| : 1. If one of the valves in Table 1-5 is disassembled for maintenance or repair, a VT-3 examination of the accessible internal pressure boundary should be performed to the extent practical. Examinations are limited to one valve in the group in the 10-year interval; therefore, if one of the valves in a group is examined there are no other examination requirements for that group during the 10-year interval. Third Interval examinations are shown in Table 1-5.
| |
| : 2. There is not a requirement to disassemble a valve in order to perform the VT-3 examination.
| |
| : 3. There is not a requirement to completely disassemble a valve that has been partially disassembled for maintenance or repair. For a partially disassembled valve, examine the accessible portion of the internal pressure boundary (see Interpretation XI-1-01-12 below).
| |
| : 4. If a valve has been partially disassembled and VT-3 examined and later one of the valves in the same group is disassembled such that the coverage is significantly greater, perform a VT-3 examination on the recently disassembled valve.
| |
| Interpretation Number: XI-1-01-12 Codebook: Section XI Volume: 48 Date: 13-DEC-00
| |
| | |
| ==Subject:==
| |
| Table IWB-2500-1 (1986 Edition with 1986 Addenda through 1992 Edition with 1993 Addenda)
| |
| Is it a requirement of Table IWB-2500-1 to disassemble all internal components of a valve at least once in an inspection interval, in order to perform the VT-3 required by Category B-M-2, Item Number B12.50, even though the maintenance activity, repair, or volumetric examination may not require disassembly of some of the internal components?
| |
| No. Examination of the internal pressure boundary is required to the extent practicable.
| |
| H2 Basis Doc - Class 1 Page 40 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS Category B-N RPV Interior See Vessel Internals Notebooks Category B-N RPV Core Support Structure and Attachments See Vessel Internals Notebooks H2 Basis Doc - Class 1 Page 41 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS Category B-O - Pressure Retaining Welds in Control Rod Drive (CRD) Housings The bottom head of the RPV has a penetration for each CRD location. Each penetration has an Inconel SB-167 stub tube welded to the inside surface of the RPV bottom head with an Inconel 182 weld. Each CRD housing was raised into position inside the stub tube and fastened with a J-Groove weld to the stub tube. The J-Groove weld had an Inconel 82 root with the remainder Inconel 182. Outside of the RPV, there is a housing to flange weld and an intermediate housing to housing weld between the flange weld and the bottom of the vessel. (See Figure 2-BN-14-1 and A-29). The 2001 Edition with 2003 Addenda Code requirement is to perform a volumetric or surface examination of 10% of the welds located in the peripheral CRD housings. However, the examination is not required if the makeup flow specified in IWB-1220(a) is greater than the postulated loss of inventory caused by the failure of the weld. Per the Exemption Section of this document the makeup flow is 420 gpm and per Section 4.2.3.2.3.1 of the HNP UFSAR (shown below), the leak rate from the housing to flange weld failing in tension would be limited to ~ 840 gpm and the leak rate from a housing rupture would be ~ 1030 gpm.
| |
| Therefore, the examination is not exempt per Section XI because the makeup flow is insufficient. There are 36 peripheral CRD housings per Figure 2-BN-15-1; therefore two welds on four housings require examination. Each of the two welds outside of the RPV are stainless to stainless welds and may have some susceptibility to IGSCC dependent upon the degree of hydrogen water chemistry protection.
| |
| Weld Joining Flange to Housing Fails in Tension The failure considered is a crack in or near the weld that joins the flange to the housing.
| |
| This crack will extend through the wall and completely around the housing. The flange material is forged, Type 304 stainless steel, with a minimum tensile strength of 75,000 psi.
| |
| The housing material is seamless, Type 304 stainless-steel pipe, with a minimum tensile strength of 75,000 psi. The conventional full-penetration weld of Type 308 stainless steel has a minimum tensile strength approximately the same as that for the parent metal. The design pressure and temperature are 1250 psig and 575 0F, respectively. RPV pressure acting on the cross-sectional area of the CRD; the weight of the control rod, CRD, and flange; and the dynamic reaction force during CRD operation result in a maximum tensile stress at the weld of ~ 6000 psi. If the basic flange-to-housing joint failure occurs, the flange and the attached CRD are blown downward against the support structure. The support structure loading is slightly less than that for CRD housing failure because RPV pressure acts only on the CRD cross-sectional area. Lack of differential pressure across the collet piston causes the collet to remain latched and limit control rod motion to ~ 3 in.
| |
| Downward CRD movement is small; therefore, most of the CRD remains inside the housing. The pressure-under and pressure-over lines are flexible enough to withstand the small displacement and remain attached to the flange. RPV water follows the same leakage path described for the flange-bolt failure, except that exit to the atmosphere will be through the gap between the lower end of the housing and the top of the flange. Water flashes to steam in the annulus surrounding the CRD. The leakage rate is ~ 840 gal/min.
| |
| H2 Basis Doc - Class 1 Page 42 of 43 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 1 COMPONENTS Class 1 Augmented Examinations The NRCs safety evaluation dated 6/16/97 of the 3rd Interval ISI Program indicated, that in addition to the 1989 Code required examinations, certain Class 1 augmented examinations would be performed per GPC commitment. The commitments along with the current implementation methodology are listed below.
| |
| : 1. Augmented examinations on the Unit 2 main steam, feedwater, HPCI (steam),
| |
| RCIC (steam) and RWCU high energy piping outside containment (where pipe breaks were not postulated) in compliance with Branch Technical Position MEB 3-1. Per Section 3.6.2.2.3 of the HNP-2 UFSAR, pipe breaks were not postulated in portions of high-energy piping extending from the containment penetration to the first inside and/or outside isolation valve for specified conditions. Therefore, for the above mentioned systems, volumetric exams are required on the welds between the inboard and outboard isolation valves to the extent practical. These examinations will be performed during the 4th Interval, to the extent practical.
| |
| HIGH ENERGY NO-BREAK ZONE WELDS Weld Fig Weld Fig 2B21-1FW-18A-1 A-12 2B21-1MS-24D-18 A-9 2B21-1FW-18A-1A A-12 2B21-1MS-24D-19 A-9 2B21-1FW-18A-2 A-12 2B21-1MS-24D-20 A-9 2B21-1FW-18B-1 A-13 2E41-1HPCI-10-D-19 A-26 2B21-1FW-18B-1A A-13 2E41-1HPCI-10-D-20 A-26 2B21-1FW-18B-2A A-13 2E41-1HPCI-10-D-21 A-26 2B21-1MS-24A-18 A-6 2E41-1HPCI-10-D-22 A-26 2B21-1MS-24A-19 A-6 2E51-1RCIC-4-D-16A A-27 2B21-1MS-24A-20 A-6 2E51-1RCIC-4-D-17 A-27 2B21-1MS-24B-16 A-7 2E51-1RCIC-4-D-18 A-27 2B21-1MS-24B-17 A-7 2E51-1RCIC-4-D-19A A-27 2B21-1MS-24B-18 A-7 2G31-1RWCU-6-D-17 A-28 2B21-1MS-24C-16 A-8 2G31-1RWCUM-6-D-15 A-28 2B21-1MS-24C-17 A-8 2G31-1RWCUM-6-D-16 A-28 2B21-1MS-24C-18 A-8
| |
| : 2. Augmented examination of welds susceptible to IGSCC as specified in NUREG-0313 as modified by Generic Letter 88-01. These examinations are currently performed per BWRVIP-075. See the BWRVIP-75 Section of this document.
| |
| : 3. Augmented exams of the feedwater nozzles as specified by NUREG-0619 as modified by Generic Letter 81-11. These exams were originally performed as required. They are currently performed per Alternate BWR Feedwater Nozzle Inspection Requirements, GE-NE-523-A71-0594-A, Revision 1, May 2000.
| |
| H2 Basis Doc - Class 1 Page 43 of 43 Rev. 1
| |
| | |
| 3 Southern Nuclear Operating Company Page 1 - 11/9/2006 Code Compliance Scheduling Summary - 4th Interval IS1 - Code Edition - 2001 Edition with 2003 Addenda PERIOD 1 PERIOD 2 PERIOD 3 PERCENT ACTUAL ROUND TOTAL ACTUAL ROUND ACTUAL ROUND ACTUAL ROUND CAT ITEM CODECASE POPULATION REQUIRED REQUIRED UP EXAMS COUNT PERIOD UP COUNT PERIOD UP COUNT PERIOD UP 8-D 83.100 29 96.55% 28 28 28 9 32.14% 33% 0 32.14% 33% 19 100.00% 100%
| |
| 8-D 83.90 29 96.55% 28 28 28 9 32.14% 33% 0 32.14% 33% 19 100.00% 100%
| |
| Total: 58 56 56 56 18 32.10% 33% 0 32.10% 33% 38 100% 100%
| |
| Table IWB-2500-1, Footnote 2 allows 25% to 50% to be examined during Period 1 and the balance by the end of the Interval.
| |
| I I I Rev. 1.0
| |
| | |
| Southern Nuclear Operating Company Page I - 11/9/2006 Code Compliance Scheduling Summary - 4th Interval IS1 - Code Edition - 2001 Edition with 2003 Addenda PERIOD 1 PERIOD 2 PERIOD 3 PERCENT ACTUAL ROUND TOTAL 1 ACTUAL ROUND 1 ACTUAL ROUND ACTUAL ROUNI CAT ITEM CODECASE POPULATION REQUIRED REQUIRED UP EXAMS COUNT PERIOD UP COUNT PERIOD UP COUNT PERIOD UP B-G-1 B6.10 57 100% 57 57 57 23 40.35% 41% 14 64.91% 65%
| |
| B-G-1 B6.180 16 100.00% 100%
| |
| B-G-1 B6.190 0 0% 0%
| |
| B-G-1 B6.20 14 65.52% 66%
| |
| B-G-1 86.200 0 0% 0%
| |
| B-G-1 86.40 14 64.91% 65%
| |
| B-G-1 B6.50 14 64.91% 65%
| |
| Total: 72 67.30% 68%
| |
| B6.190 and B6.200 exams are not required unless a pump is disassembled. Then, only one pump is required to be examined.
| |
| I I I I Rev. 1.0
| |
| | |
| Southern Nuclear Operating Company Page I - 111912006 Code Compliance Scheduling Summary - 4th Interval IS1 - Code Edition - 2001 Edition with 2003 Addenda PERIOD 1 PERIOD 2 PERIOD 3 PERCENT ACTUAL ROUND TOTAL 1 ACTUAL ROUND 1 ACTUAL ROUND 1 ACTUAL ROUND CAT ITEM CODECASE POPULATION REQUIRED REQUIRED UP EXAMS COUNT PERIOD UP COUNT PERIOD UP COUNT PERIOD UP B-G-2 B7.50 16 0% 0 0 0 0 0% 0% 0 0% 0% 0 0% 0%
| |
| B-G-2 87 70 52 0% 0 0 0 0 0% 0% 0 0% 0% 0 0% 0%
| |
| Total. 68 0 0 0 0 0% 0% 0 0% 0% 0 0% 0%
| |
| Examinations are not required unless a component is d i s a s s e m b l e d . Then, only one in a group requires e x a m i n a t i o n .
| |
| Rev. 1.0
| |
| | |
| Southern Nuclear Operating Company Page 1 - 1119l2006 Code Compliance Scheduling Summary - 4th Interval IS1 - Code Edition - 2001 Edition with 2003 Addenda PERIOD 1 PERIOD 2 PERIOD 3 PERCENT ACTUAL ROUND TOTAL ACTUAL ROUND ACTUAL ROUND ACTUAL ROUND CAT ITEM CODECASE POPULATION REQUIRED REQUIRED UP EXAMS COUNT PERIOD UP COUNT PERIOD UP COUNT PERIOD UP B-J 89.11 282 25% 70.5 71 97 23 32.62% 33% 24 66.67% 67% 50 137.59% 137%
| |
| B-J 89.31 13 25% 3.25 4 4 2 61.54% 50% 0 61.54% 50% 2 123.08% 100%
| |
| Total: 295 73 75 101 25 34.20% 34% 24 67.10% 66% 52 138.00% 134%
| |
| The required percentage is based on Table IWB-2412-1 and applies only to the t o t a l , not each item number.
| |
| Rev. 1.0
| |
| | |
| Southern Nuclear Operating Company Page I - 111912006 Code Compliance Scheduling Summary - 4th Interval IS1 - Code Edition - 2001 Edition with 2003 Addenda PERIOD 1 PERIOD 2 PERIOD 3 PERCENT ACTUAL ROUND TOTAL ACTUAL ROUND ACTUAL ROUND ACTUAL ROUND CAT ITEM CODECASE POPULATION REQUIRED REQUIRED UP EXAMS COUNT PERIOD UP COUNT PERIOD UP NB-J 89.21 3 25% 0.75 1 1 1 133.33% 100% 0 133.33% 100% 133.33% 100%
| |
| NB-J 89.40 156 25% 39 39 39 8 20.51% 21% 15 58.97% 59%
| |
| Total: 159 40 40 40 9 22.50% 23% 15 60% 60% 100% 100%
| |
| The required percentage is based on Table IWB-2412-1 and applies only to the t o t a l , not each item number, Rev. 1.0
| |
| | |
| Southern Nuclear Operating Company Page 1 - 1111012006 Code Compliance Scheduling Summary - 4th Interval IS1 - Code Edition - 2001 Edition with 2003 Addenda PERIOD 1 PERIOD 2 PERIOD 3 PERCENT ACTUAL ROUND TOTAL ACTUAL ROUND ACTUAL ROUND ACTUAL ROUND CAT ITEM CODECASE POPULATION REQUIRED REQUIRED UP EXAMS COUNT PERIOD UP COUNT PERIOD UP COUNT PERIOD UP B-K 810.10 N-323-1 1 100% 1 1 1 0 0% 0% 1 100.00% 100% 0 100.00% 100%
| |
| B-K 810.10 6 100% 6 6 6 0 0% 0% 1 16.67% 17% 5 100.00% 100%
| |
| B-K 810.20 28 10% 2.8 3 4 1 35.71% 34% 1 71.43% 67% 2 142.86% 134%
| |
| 8-K 810.30 6 10% 0.6 1 1 1 166.67% 100% 0 166.67% 100% 0 166.67% 100%
| |
| Total: 41 11 11 12 2 18.10% 19% 3 45.40% 46% 7 109.00% 109%
| |
| When Code Case N-700 is approved in RG 1.47lR15, the B1O.10 population will drop to 1 ( o n l y the support skirt will be e x a m i n e d ) .
| |
| At that t i m e , 2 e x a m s will be p e r f o r m e d during each period.
| |
| Rev. 1.0
| |
| | |
| Southern Nuclear Operating Company Page 1 - 1 111012006 Code Compliance Scheduling Summary - 4th Interval IS1 - Code Edition - 2001 Edition with 2003 Addenda PERIOD 1 PERIOD 2 PERIOD 3 PERCENT ACTUAL ROUND TOTAL ACTUAL ROUND ACTUAL ROUND ACTUAL ROUND CAT ITEM CODECASE POPULATION REQUIRED REQUIRED UP EXAMS COUNT PERIOD UP COUNT PERIOD UP COUNT PERIOD UP B-L-2 B12.20 2 0% 0 0 0 0 0% 0% 0 0% 0% 0 0% 0%
| |
| Total: 2 0 0 0 0 0% 0% 0 0% 0% 0 0% 0%
| |
| E x a m i n a t i o n of the pump c a s i n g s are not required unless a pump is d i s a s s e m b l e d . Then, o n l y one pump n e e d s examination.
| |
| Rev. 1.0
| |
| | |
| 3 Southern Nuclear Operating Company Page 1 - 1111012006 Code Compliance Scheduling Summary 4th Interval -
| |
| IS1 - Code Edition - 2001 Edition with 2003 Addenda 1 ;: 1 PERIOD 1 PERIOD 2 PERIOD 3 PERCENT ACTUAL ROUND TOTAL ACTUAL ROUND ACTUAL ROUND ACTUAL ROUND CAT ITEM CODECASE POPULATION REQUIRED REQUIRED UP EXAMS COUNT PERIOD UP COUNT PERIOD UP C0;NT PEED 8-M-2 812.50 51 0% 0 0 0 0 0% 0% 0 0% 0%
| |
| Total: 51 0 0 0 0 0% 0% 0 0% 0%
| |
| Examinations are not required unless a valve is dissassembled. Then, only one in a group requires examination.
| |
| Rev. 1.0
| |
| | |
| Southern Nuclear Operating Company Page 1 - 1111012006 Code Compliance Scheduling Summary - 4th Interval IS1 - Code Edition - 2001 Edition with 2003 Addenda PERIOD 1 PERIOD 2 PERIOD 3 PERCENT ACTUAL ROUND TOTAL ACTUAL ROUND ACTUAL ROUND ACTUAL ROUND CAT ITEM CODECASE POPULATION REQUIRED REQUIRED UP EXAMS COUNT PERIOD UP COUNT PERIOD UP COUNT PERIOD UP 6-0 614.10 72 10% 7.2 8 8 2 27.78% 25% 4 83.33% 75% 2 111.11% 100%
| |
| Total: 72 7 8 8 2 28.50% 25% 4 85.70% 75% 2 114.00% 100%
| |
| Rev. 1.0
| |
| | |
| 3 Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Page 1 - 4 711 212006 I Period 1 Period 2 Period 3 Category, lso No. m o F N t 9 ItemNO, Comp. Desc. 2 2 2 2 2 Class Summary 1 ComplD 1System Scope 1 Method 1 Procedure Code Case 5 5 5 5 5 B-A H2 281 1QC-2 RPV lSllUT1 A-1 IS1 - - - - - - - - - S - -
| |
| Blll(2) 2811QC-2RPV SHELL AUG - - - - - - - - - - - -
| |
| 1 811 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BA H2 281 1QC-3 RPV ISIIUTI A-1 IS1 - - - - - - - - - S - -
| |
| 81 11(2) 281 1QC-3 RPV MIDDLE SHELL AUG - - - - - - - - - - - -
| |
| 1 811 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BA H2 281 1QC-4 RPV ISIIUTI A-1 IS1 - - - - - - - - - s - -
| |
| 81.11(2) 281 1QC-4 RPV SHELL WELD AuG - - - - - - - - - - - -
| |
| 1 811 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-A H2 281 1QC-5 RPV ISIIUTI A- 1 IS1 - - - - - - - - - s - -
| |
| Blll(2) 2811QC-5RPV TORUS AUG - - - - - - - - - - - -
| |
| 1 811 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-A H2 281 1QC-1 -A ISIIUTI A-1 IS1 - - - - - - - - - s - -
| |
| 81.12(2) 281 1QC-1-A LONGITUDINALWELDONUPPERSHELL AUG - - - - - - - - - - - -
| |
| 1 Bll o w - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-A H2 281 1QC-1-8 ISIIUTI A- I IS1 - - - - - - - - - s - -
| |
| B l 12(2) 2811QC-1-8 LONGITUDINALWELDONUPPERSHELL AUG - - - - - - - - - - - -
| |
| 1 811 om - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| B-A H2 281 1QC-1-C lSllUT1 A- 1 IS1 - - - - - - - - - s - .
| |
| B1.12(2) 281 1QC-1-C LONGITUDINALWELDONUPPERSHELL AUG - - - - - - - - - - - -
| |
| 1 Bll om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-A H2 281 1PC-2-A ISIIUTI A- 1 IS1 - - - - - - - - - s - -
| |
| 81.12(2) 281 1QC-2-A SHELL AUG - - - - - - - - - - - -
| |
| 1 811 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BA H2 281 1QC-2-8 lSllUT1 A- 1 IS1 - - - - - - - - - s - -
| |
| 81 12(2) 281 1QC-2-8 SHELL AUG - - - - - - - - - - - -
| |
| 1 811 OWN - - - - - - - - - - - -
| |
| PRE - . - - - - - - - - - -
| |
| BA H2 281 1QC-2-C ISIIUTI A- 1 IS1 - - - - - - - - - s - -
| |
| 81 12(2) 281 1QC-2-C SHELL AUG - - - - - - - - - - - -
| |
| 1 811 o w - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| 3 Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Page 2 - 4 711212006 (
| |
| Period 1 Period 2 Period 3 Category, Iso No. m o r N rn IternNO, Cornp. Desc. & 2 2 2 2 Class Summary 1CornplD 1System Scope 1 Method 1 Procedure Code Case 5 5 5 5 5 B-A H2 281 1PC-3-A ISIIUTI A-1 IS1 - - - - - - - - - S - -
| |
| B1.12(2) 281 1PC-3-A SHELL AUG - - - - - - - - - - - -
| |
| 1 B11 ow - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BA H2 281 1PC-3-8 ISIIUTI A-1 IS1 - - - - - - - - - S - -
| |
| B1.12(2) 2B11PC-3-8 SHELL AUG - - - - - - - - - - - -
| |
| 1 B11 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-A H2 281 1PC-3-C ISIIUTI A-1 IS1 - - - - - - - - - s - -
| |
| B1.12(2) 281 1PC-3-C SHELL AUG - - - - - - - - - - - -
| |
| 1 B11 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 6-A H2 281 1'2C-4-A ISIIUTI A-1 IS1 - - - - - - - - - s - -
| |
| B1.12(2) 2B11PC-4-A SHELL AUG - - - - - - - - - - - -
| |
| 1 Bll OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-A H2 281 1PC-4-8 ISllUTl A- 1 IS1 - - - - - - - - - S - -
| |
| B l .l2(2) 281 1PC-4-8 SHELL AUG - - - - - - - - - - - -
| |
| 1 B11 ow - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-A H2 281 1'2C-4-C ISllUTl A-1 IS1 - - - - - - - - - S - -
| |
| B1.12(2) 2B11PC-4-C SHELL AUG - - - - - - - - - - - -
| |
| 1 Bll OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-A H2 281 1PC-7 RPV ISIIUTI A-1 A IS1 - - - - - - - - - S - -
| |
| B1.21(2) 281 1\2C-7 RPV HEAD DOME AUG - - - - - - - - - - - -
| |
| 1 B11 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-A H2 281 1PHC-1 ISIIUTI A-3 IS1 - - - - - - - - - S - -
| |
| B1.21(2) 281 1\2HC-1 DOLLAR PLATE WELD CLOSURE HEAD AUG - - - - - - - - - - - -
| |
| 1 B11 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-A H2 281 1PBHD-A ISIIUTI A-1 A IS1 - - - - - - - - - s - -
| |
| B1.22(2) 2BllPBHD-A WELD AUG - - - - - - - - - - - -
| |
| 1 B11 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| IS1 - - - - - - - - - S - -
| |
| B-A H2 281 1PBHD-B ISIIUTI A-1 A B1.22(2) 281 1PBHD-B WELD AUG - - - - - - - - - - - -
| |
| 1 Bll OWN - - - - - - - . - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Page 3 - 4 Southern Nuclear Operating Company Period 1 Period 2 Period 3 Category, Iso No. 0) 0 ItemNO, Comp. Desc. E 2 Class Summary 1 ComplD ISystem Scope 1 Method 1 Procedure Code Case 5 5 BA H2 281 1UBHD-C ISIIUTI A-1 A IS1 B1.22(2) 2BllUBHD-C WELD AUG 1 B11 OWN PRE BA H2 281 1UBHD-D ISIIUTI A-1 A IS1 B1.22(2) 2BllUBHD-D WELD AUG 1 B11 OWN PRE BA H2 281 1UBHT-A ISIIUTI A-1 A IS1 B1 22(2) 2BllUBHT-A WELD AUG 1 B11 OWN PRE 6A H2 281 1UBHT-B ISIIUTI A-1 A IS1 B1.22(2) 2BllQBHT-B WELD AUG 1 B11 OWN PRE BA H2 281 1UBHT-C ISllUTl A-1 A IS1 B1.22(2) 281 1UBHT-C WELD AUG 1 B11 OWN PRE B-A H2 281 1UBHT-D ISIIRTI A-1A IS1 B1.22(2) 281 1UBHT-D WELD AUG 1 Bll OWN PRE BA H2 281 1QBHT-E ISIIUTI A-1A IS1 B1.22(2) 281 1UBHT-E WELD AUG 1 B11 OWN PRE B-A H2 281 1UBHT-F ISIIRTI A-1 A IS1 B1.22(2) 281 1UBHT-F WELD AUG 1 B11 OWN PRE BA H2 281 1UBHT-G ISIIUTI A-1 A IS1 B1.22(2) 2BllUBHT-G WELD AUG 1 B11 OWN PRE B-A H2 281 1UHC-1 -A ISIIUTINMP-ES-024-503 A-3 IS1 B1.22(2) 281 1UHC-1-A MERlDlONAL WELD CLOSURE HEAD AUG 1 Bll OWN PRE
| |
| | |
| 3 3 Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Page 4 - 4 Southern Nuclear Operating Company Period 1 Period 2 Period 3 Category, Iso No. m 0 ItemNO, Cornp. Desc. 2 2 Class Summary 1 ComplD 1 System Scope 1 Method 1 Procedure Code Case 5 5 8 -A H2 281 1PHC-1-B ISIIUTINMP-ES-024-503 A-3 IS1 B1.22(2) 2B11 PHC-1 -B MERlDlONAL WELD CLOSURE HEAD AUG 1 B11 OWN PRE BA H2 281 1PHC-1-C ISIIUTINMP-ES-024-503 A-3 IS1 B1.22(2) 281 1PHC-1-C MERlDlONAL WELD CLOSURE HEAD AUG 1 B11 OWN PRE BA H2 281 1PHC-1 -D ISIIUTINMP-ES-024-503 A-3 IS1 B1.22(2) 281 1PHC-1-D MERlDlONAL WELD CLOSURE HEAD AUG 1 B11 OWN PRE BA H2 281 1PHC-1 -E ISllUTINMP-ES-024-503 A-3 IS1 B1.22(2) 2811 PHC-1-E MERlDlONAL WELD CLOSURE HEAD AUG 1 B11 OWN PRE 8 -A H2 281 1PHC-1 -F ISIIUTINMP-ES-024-503 A-3 IS1 B1.22(2) 281 1PHC-1-F MERlDlONAL WELD CLOSURE HEAD AUG 1 B11 OWN PRE BA H2 281 1PHC-1 -G ISIIUTINMP-ES-024-503 A-3 IS1 B1.22(2) 281 1PHC-1-G MERlDlONAL WELD CLOSURE HEAD AUG 1 B11 OWN PRE 8 -A H2 281 1PHC-1 -H ISIIUTINMP-ES-024-503 A-3 IS1 B1.22(2) 281 1PHC-1 -H MERlDlONAL WELD CLOSURE HEAD AUG 1 Bl1 OWN PRE BA H2 281 1PC-1 ISIIUTI A-1 IS1 B1.30(2) 281 1PC-1 VESSEL-TO-FLANGE AUG 1 B11 OWN PRE BA H2 281 1PHC-2 ISIIMTINMP-ES-024-401 A-3 IS1 B1.40(2) 2B11 PHC-2 ISIIUTINMP-ES-024-503 CLOSURE HEAD-TO-FLG AUG 1 B11 OWN PRE
| |
| | |
| Revision: 1 HNP-2 Fourth Interval class I IS1 Plan Page 1 - 6 Southern Nuclear Operating Company Period 1 Period 2 Period 3 Category, Iso No.
| |
| ItemNO, Comp. Desc.
| |
| Class Summary IComplD ISystem Scope 1 Method IProcedure Code Case B-D H2 281 1PN15 (IR) 83.100 2B11QN15 (IR) BOTfOM HEAD DRAIN-RR REQUIRED AUG 1 61 1 OWN PRE B-D H2 2BllQN15 (SH-N) A-I A IS1 83.90 2811 QN15 (SH-N) BOTfOM HEAD DRAIN-RR REQUIRED AUG 1 B11 OWN PRE B -D H2 2011PNlA (IR) ISIIUTI A- 1 IS1 63.100 2B11PNlA (IR) A LOOP RC OUTLET NOZZLE IR AUG 1 B11 OWN PRE B-D H2 281 1QNlA (SH-N) ISIIUTI A-1 IS1 83.90 281 1P N 1A (SH-N) A LOOP RC OUTLET SHELL TO NOZ AUG 1 B11 OWN PRE B-D H2 281 1P N 1B (IR) ISllUTl A-1 IS1 83.1 00 281 1QN1 B (IR) B LOOP RC OUTLET NOZZLE IR AUG 1 BlI OWN PRE B-D H2 281 1P N 1B (SH-N) ISllUTl A-I IS1 63.90 2B11QNI B (SH-N) 6 LOOP RC OUTLET SHELL TO NOZ AUG 1 61 1 OWN PRE B-D H2 281 1PN2A (IR) ISllUTl A-1 IS1 83.100 2B11QN2A (IR) B LOOP RC INLET NOZZLE IR AUG 1 BlI OWN PRE B-D H2 281 1PN2A (N-SH) lSllUT1 A-I IS1 83.90 261 1PN2A (N-SH) B LOOP RC INLET NOZZ TO SHELL AUG 1 B11 OWN PRE B-D H2 281 1\2N2B (IR) ISIIUTI A-I IS1 83.100 281 1QN2B (IR) B LOOP RC INLET NOZZLE IR AUG 1 61 1 OWN PRE B-D H2 281 1PN2B (N-SH) ISllUTl A-I IS1 83.90 261 1QN26 (N-SH) B LOOP RC INLET NOZZ TO SHELL AUG 1 61 I OWN PRE
| |
| | |
| Revision: 1 HNP-2 Fourth Interval class 1 IS1 Plan Southern Nuclear Operating Company Page 2 - 6 711212006 1 Period 1 Period 2 Period 3 Category, Iso No. Q) o r N e-2 ItemNO, Comp. Desc. 2 2 2 2 2 Class Summary / ComplD / System Scope / Method / Procedure Code Case 5 5 5 5 5 B-D H2 281 1PN2C (IR) ISI/UT/ A-1 IS1 - s - - - - - - - - - -
| |
| 83.100 281 1PN2C (IR) B LOOP RC INLET NOZZLE IR AUG - - - - - - - - - - - -
| |
| 1 Bll o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-D HZ 281 1PN2C (N-SH) ISIIUTI A-1 IS1 - s - - - - - - - - - -
| |
| 83.90 281 1PN2C (N-SH) B LOOP RC INLET NOZZ TO SHELL AUG - - - - - - - - - - - -
| |
| 1 Bl1 o m - - - - - - - - - - - -
| |
| PRE - ~- - - - - - - - - - -
| |
| B -D H2 281 1PN2D (IR) ISI/UT/ A-1 IS1 - - - - - - - - - S - -
| |
| 83.100 2B11 PN2D (IR) B LOOP RC INLET NOZZLE IR AUG - - - - - - - - - - - -
| |
| 1 Bll om - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| B-D H2 281 1PN2D (N-SH) ISI/UT/ A-1 IS1 - - - - - - - - - s - -
| |
| 83.90 281 1PN2D (N-SH) B LOOP RC INLET NOZZ TO SHELL AUG - - - - - - - - - - - -
| |
| 1 Bll o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-D H2 281 1PN2E (IR) ISI/UT/ A-I IS1 - s - - - - - - - - - -
| |
| 83.100 2BllPN2E(IR) B LOOP RC INLET NOZZLE IR AUG - - - - - - - - - - - -
| |
| 1 Bll o w - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-D H2 281 1PN2E (N-SH) ISI/UT/ A-1 IS1 - s - - - - - - - - - -
| |
| 83.90 281 1PN2E (N-SH) B LOOP RC INLET NOZZ TO SHELL AUG - - - - - - - - - - - -
| |
| 1 Bll OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-D HZ 281 1\2N2F (IR) ISIIUTI A-1 IS1 - - - - - - - - - S - -
| |
| 83.100 2B11PN2F (IR) A LOOP RC INLET NOZZLE IR AUG - - - - - - - - - - - -
| |
| 1 B11 o w - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B -D H2 281 1PN2F (N-SH) ISI/UT/ A-1 IS1 - - - - - - - - - s - -
| |
| 83.90 281 1PN2F (N-SH) A LOOP RC INLET NOZZ TO SHELL AUG - - - - - - - - - - - -
| |
| 1 Bll o w - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-D H2 281 1PN2G (IR) ISllUTl A-I IS1 - - - - - - - - - S - -
| |
| 83.100 281 1PN2G (IR) A LOOP RC INLET NOZZLE IR AUG - - - - - - - - - - - -
| |
| 1 B11 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-D H2 281 1PN2G (N-SH) ISI/UT/ A-1 IS1 - - - - - - - - - S - -
| |
| 83.90 281 1PN2G (N-SH) A LOOP RC INLET NOZZ TO SHELL AUG - - - - - - - - - - - -
| |
| 1 Bll OWN - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| | |
| Revision: 1 HNP-2 F o u r t h Interval c l a s s 1 IS1 P l a n S o u t h e r n Nuclear O p e r a t i n g C o m p a n y Page 3 - 6 7H2R006 1 Period 1 Period 2 Period 3
| |
| : Category, ItemNO, Class B -D Summary IComplD ISystem H2 261 1PN2H (IR)
| |
| Scope IMethod IProcedure ISIIUTI Iso No.
| |
| Comp. Desc.
| |
| Code Case A-1 IS1 r
| |
| 2
| |
| : I:'s 2 2 P9 63.100 2811PN2H (IR) A LOOP RC INLET NOZZLE IR AUG 1 811 OWN PRE B -D H2 261 1UN2H (N-SH) ISIIUTI A-1 IS1 83.90 281 1PN2H (N-SH) A LOOP RC INLET NOZZ TO SHELL AUG 1 61 1 OWN PRE - - - -
| |
| B -D H2 281 1UN2J (IR) ISIIUTI A-1 IS1 - - - -
| |
| 83.100 281 1UN2J (IR) A LOOP RC INLET NOZZLE IR AUG - - - -
| |
| 1 811 OWN - - - -
| |
| PRE - - - -
| |
| B-D H2 281 1PN2J (N-SH) ISIIUTI A-1 IS1 - - - -
| |
| 83.90 281 1UN2J (N-SH) A LOOP RC INLET NOZZ TO SHELL AUG - - - -
| |
| 1 811 OWN - - - -
| |
| PRE - - - -
| |
| B-D H2 261 1UN2K (IR) ISIIUTI A- 1 IS1 - - - -
| |
| 83.100 261 1UN2K (IR) A LOOP RC INLET NOZZ IR AUG - - - -
| |
| 1 811 OWN - - - -
| |
| PRE - - - -
| |
| B-D H2 281 1PN2K (N-SH) ISIIUTI A-1 IS1 - - - -
| |
| 83.90 2811PN2K (N-SH) A LOOP RC INLET NOZZ TO SHELL AUG - - - -
| |
| 1 811 OWN - - - -
| |
| PRE - - - -
| |
| B-D H2 281 1PN3A (IR) ISllUTl A-1 IS1 - - - -
| |
| 63.100 2811PN3A(IR) A LOOP MS OUTLET NOZZLE IR AUG - - - -
| |
| 1 811 OWN - - - -
| |
| PRE - - - -
| |
| B-D H2 281 1UN3A (SH-N) ISIIUTI A-1 IS1 - - - -
| |
| 83.90 2811 UN3A (SH-N) A LOOP MS OUTLETSHELLTO NOZZ AUG - - - -
| |
| 1 811 OWN - - - -
| |
| PRE B-D H2 281 1PN38 (IR) ISIIUTI A-1 IS1 83.100 2811PN3B (IR) 8 LOOP MS OUTLET NOZZLE IR AUG 1 61 1 OWN PRE -
| |
| B -D H2 261 1UN38 (SH-N) ISIIUTI A- 1 IS I 63.90 261 1PN3B (SH-N) 6 LOOP MS OUTLET SHELL TO NOZZ AUG 1 61 1 OWN PRE
| |
| | |
| d Revision: 1 HNP-2 F o u r t h Interval c l a s s 1 IS1 P l a n Southern Nuclear Operating Company Page 4 - 6 7112R006 1 Period 1 Period 2 Period 3 Category, Iso No. m o F (Y C)
| |
| IternNO, Cornp. Desc. E 2 2 2 2 Class Summary 1CornplD 1System Scope IMethod 1Procedure Code Case 5 5 5 5 5 B-D H2 281 1QN3C (IR) ISIIUTI A-1 IS1 - s - - - - - - - - - -
| |
| B3.100 281 1QN3C (IR) C LOOP MS OUTLET NOZZLE IR AUG - - - - - - - - - - - -
| |
| 1 B11 OWN - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| B-D H2 261 1QN3C (SH-N) ISIIUTI A-1 IS1 - s - - - - - - - - - -
| |
| 83.90 281 1QN3C (SH-N) CLOOPMSOUTLETSHELLTONOZZ AUG - - - - - - - - - - - -
| |
| 1 Bll om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-D H2 281 1QN3D (IR) ISIIUTI A-1 IS1 - s - - - - - - - - - -
| |
| 83.1 00 281 1QN3D (IR) D LOOP MS OUTLET NOZZLE IR AUG - - - - - - - - - - - -
| |
| 1 B11 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B -D H2 281 1QN3D (SH-N) ISllUTl A-1 IS1 - s - - - - - - - - - -
| |
| B3.90 281 1QN3D (SH-N) DLOOPMSOUTLETSHELLTONOZZ AUG - - - - - - - - - - - -
| |
| 1 B11 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-D H2 2BllQN4A (IR) ISllUTl A-1 IS1 - - - - - - - - - S - -
| |
| B3.100 2BllQN4A (IR) A-A LOOP FW INLET NOZZLE IR AUG - - - - - - - - - - - -
| |
| 1 B11 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-D H2 2B11QN4A (N-SH) ISllUTl A-1 IS1 - - - - - - - - - S - -
| |
| 83.90 281 1QN4A (N-SH) A-ALOOPFWINLETNOZZTOSHELL AUG - - - - - - - - - - - -
| |
| 1 B11 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-D H2 281 1QN4B (IR) ISllUTl A-1 IS1 - - - - - - - - - 5 - -
| |
| B3.100 261 1QN4B (IR) A-B LOOP FW INLET NOZZLE IR AUG - - - - - - - - - - - -
| |
| 1 B11 om - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| B-D H2 281 1QN4B (N-SH) ISlIUTl A-1 IS1 - - - - - - - - - S - -
| |
| B3.90 281 1QN4B (N-SH) A-8 LOOP FWINLETNOZZTOSHELL AUG - - - - - - - - - - - -
| |
| 1 Bll om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-D H2 281 1QN4C (IR) ISllUTl A-1 IS1 - - - - - - - - - 5 - -
| |
| 83.1 00 2B11QN4C (IR) B-C LOOP FW INLET NOZZLE IR AUG - - - - - - - - - - - -
| |
| 1 B11 OWN - - - - - - - - - - - -
| |
| pRE - . - - - - - - - - - -
| |
| B-D H2 281 1\2N4C (N-SH) ISllUTl A-1 IS1 - - - - - - - - - s - -
| |
| 83.90 281 1QN4C (N-SH) B-C LOOP FWINLETNOZZTOSHELL AUG - - - - - - - - - - - -
| |
| 1 B11 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| J Revision: 1 HNP-2 Fourth Interval class 1 IS1 Plan Southern Nuclear Operating Company Page 5 - 6 711212006 1 Period 1 Period 2 Period 3 Category, Iso No. Q) o r N -
| |
| ItemNO, Comp. Desc. 2 2 2 2 2 Class Summary IComplD ISystem Scope IMethod 1Procedure Code Case 5 5 5 5 5 B-D H2 281 1UN4D (IR) ISIIUTI A-I IS1 - - - - - - - - - s - -
| |
| 83.100 281 1UN4D (IR) B-D LOOP FW INLET NOZZLE IR AUG - - - - - - - - - - - -
| |
| 1 Bll om - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| B-D H2 281 1UN4D (N-SH) ISIIUTI A-1 IS1 - - - - - - - - - S - -
| |
| 83.90 281 1UN4D (N-SH) 8-DLOOPFWINLETNOUTOSHELL AUG - - - - - - - - - - - -
| |
| 1 Bll om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-D H2 2B11PNSA (IR) lSllUT1 A-1 IS1 - - - - - - - - - S - -
| |
| 83 100 281 1UNSA (IR) A LOOP CS INLET NOZZLE IR AUG - - - - - - - - - - - -
| |
| 1 Bll om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-D H2 281 1UNSA (N-SH) ISIIUTI A-I IS1 - - - - - - - - - S - -
| |
| 83.90 281 1UNSA (N-SH) A LOOP CS INLET N O U TO SHELL AUG - - - - - - - - - - - -
| |
| 1 Bll om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-D H2 281 1UNSB (IR) ISIIUTI A-1 IS1 - - - - - - - - - S - -
| |
| 83 100 281 1UNSB (IR) B LOOP CS INLET NOZZLE IR AUG - - - - - - - - - - - -
| |
| 1 Bll om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-D H2 281 1UNSB (N-SH) ISIIUTI A-1 IS1 - - - - - - - - - S - -
| |
| 83.90 281 1UNSB (N-SH) B LOOP CS INLET NOZZ TO SHELL AUG - - - - - - - - - - - -
| |
| 1 Bll om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-D H2 281 1UN6A (IR) ISINTI A-3 IS1 - s - - - - - - - - - -
| |
| 83.100 281 1UN6A (IR) A LOOP RHR HS NOZZLE IR AUG - - - - - - - - - - - -
| |
| 1 Bll o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-D H2 281 1UN6A (N-HEAD) ISIIUTI A-3 IS1 - s - - - - - - - - - -
| |
| 83 90 281 1UN6A (N-HEAD) A LOOP RHR HS NOZZLTO HEAD AUG - - - - - - - - - - - -
| |
| 1 Bll o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B -D H2 281 1UN6B (IR) ISINTI A-3 IS1 - s - - - - - - - - - -
| |
| 83 I 0 0 281 1UN6B (IR) B LOOP RHR HS NOZZLE IR AUG - - - - - - - - - - - -
| |
| 1 Bll o m - - - - - - - - - - - +
| |
| PRE - - - - - - - - - - - -
| |
| B-D H2 281 1UN6B (N-HEAD) ISIIUTI A-3 IS1 - s - - - - - - - - - -
| |
| 83 90 281 1PN6B (N-HEAD) B LOOP RHR HS NOZZ TO HEAD AUG - - - - - - - - - - - -
| |
| 1 811 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| Revision: 1 HNP-2 Fourth Interval class 1 IS1 Plan Southern Nuclear Operating Company Page 6 - 6 711212006 1 Period 1 Period 2 Period 3 Category, Iso No.
| |
| ItemNO, Comp. Desc.
| |
| Class Summary IComplD ISystem Scope 1 Method IProcedure Code Case B -D H2 281 1QN7 (IR) ISlMI A-3 IS1 83.100 281 1QN7 (IR) MS VENT NOZZLE IR AUG 1 B11 OWN PRE B -D H2 281 1QN7 (N) ISIIUTI A-3 IS1 83.90 281 1QN7 (N) MS VENT NOZZLE AUG 1 81 1 OWN PRE B -D HZ 281 1QN8A (IR) ISllUTl A-1 IS1 83.100 2BllQN8A (IR) A LOOP JP INSTR NOZZLE IR AUG 1 B11 OWN PRE B-D H2 281 1QN8A (N-SH) lSllUT1 A-1 IS1 83.90 281 1QN8A (N-SH) A LOOP JP INSTR NOZZ TO SHELL AUG 1 811 OWN PRE B-D H2 281 1QN8B (IR) ISIIUTI A-1 IS1 83.100 281 1QN8B (IR) B LOOP JP INSTR NOZZLE IR AUG 1 B11 OWN PRE B-D H2 281 1QN88 (N-SH) ISIIUTI A-1 IS1 83.90 2B11QN8B (N-SH) B LOOP JP INSTR NOZZ TO SHELL AUG 1 B11 OWN PRE B -D H2 281 1QN9 (IR) ISIIUTI A-1 IS1 83.100 2811QN9 (IR) CRD INLET NOZZLE IR AUG 1 811 OWN PRE B -D H2 281 1QN9 (N-SH) ISIIUTI A-1 IS1 83.90 2B11 QN9 (N-SH) CRD INLET NOZZ TO SHELL AUG 1 811 OWN
| |
| | |
| d d Revision: 1 HNP-2 Fourth Interval Class I IS1 Plan Southern Nuclear Operating Company Page 1 - 1 711 712006 (
| |
| Period 1 Period 2 Period 3 Category, Iso No. m o .? N P )
| |
| ItemNO, Comp. Desc. 2 2 2 2 2 Class Summary 1ComplD /System Scope 1 Method IProcedure Code Case Fi Fi 5 Fi Fi B-F H2 281 1\1 INST-2A-1 ISIIPTI 2-BE-2 IS1 - - - - - - - - s - - -
| |
| 85.20 2B11\1INST-2A-1 2N16A NOZZLE TO SAFE-END AIJG - - - - - - - - - - - -
| |
| 1 B11 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-F H2 281 1\1 INST-26-1 ISIIPTI 2-BE-2 IS1 - - - - s - - - - - - -
| |
| 85.20 261 1\1 INST-2B-1 2N16B NOZZLE TO SAFE-END AIJG - - - - - - - - - - - -
| |
| 1 Bl1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-F H2 2C41-1 SBLC-2-1 ISIIPTI 2-BE-3 IS1 - s - - - - - - - - - -
| |
| 85.20 2C41-1SBLC-2-1 2N10 NOZZLE TO SAFE-END AIJG - - - - - - - - - - - -
| |
| 1 C41 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan 'age 1 - 2 7 Southern Nuclear Operating Company Period 1 Period 2 Period 3 I
| |
| Category, Iso No.
| |
| ItemNO, Comp. Desc.
| |
| Class Summary IComplD /System Scope 1 Method 1 Procedure Code Case B-G-1 H2 281 IPNUT-1 ISINTINMP-ES-024201 A-33 IS1 B6 10 281 1PNUT-1 CLOSURE HEAD NUTS AUG 1 Bll OWN PRE.- I::::
| |
| B-G-1 H2 281 1PNUT-10 ISIIVTINMP-ES-024-201 A-33 IS1 B6.10 281 1PNUT-10 CLOSURE HEAD NUTS AUG 1 B11 OWN PRE B-G-1 H2 281 IPNUT-11 ISINTI A-33 IS1 B6.10 281 1PNUT-11 CLOSUREHEADNUTS AUG 1 B11 OWN PRE -
| |
| B-G-1 H2 281 1PNUT-12 ISIIVTI A-33 IS1 B6 10 2BllPNUT-12 CLOSUREHEADNUTS AUG 1 Bl 1 OWN PRE B-G-1 H2 2B11PNUT-13 ISIIVTI A-33 IS1 B6 10 2BllPNUT-13 CLOSURE HEAD NUTS AUG 1 811 OWN PRE B-G-1 H2 281 1QNUT-14 ISIIVTI A-33 IS1 B6 10 281 1PNUT-14 CLOSURE HEAD NUTS AUG 1 B11 OWN PRE B-G-1 H2 281 1PNUT-15 ISIIVTI A-33 IS1 B6 10 281 1PNUT-15 CLOSURE HEAD NUTS AUG 1 B11 OWN PRE 6-G-1 H2 281 1PNUT-16 ISliVTl A-33 IS1 B6 10 281 1PNUT-16 CLOSUREHEADNUTS AUG 1 B11 OWN PRE B-G-1 H2 281 1PNUT-17 ISIIVTI A-33 IS1 86 10 2BllPNUT-17 CLOSURE HEAD NUTS AUG 1 B11 OWN PRE B-G-1 H2 281 1PNUT-18 ISIIVTI A-33 IS1 B6.10 2B1 IPNUT-18 CLOSURE HEAD NUTS AUG 1 811 OWN PRE
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Page 3 - 27 711 312006 (
| |
| Period 1 Period 2 Period 3 Category, Iso No. O) o r N r9 ItemNO, Comp. Desc. z 2 2 g 2 Class Summary 1 ComplD ISystem Scope 1 Method 1 Procedure Code Case 5 5 5 5 5 B-G-1 H2 281 IQNUT-28 ISIMI A-33 IS1 - - - - - - - - s - - -
| |
| B6 10 281 1QNUT-28 CLOSURE HEAD NUTS AUG - - - - - - - - - - - -
| |
| 1 Bll o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1QNUT-29 ISINTI A-33 ISI - - - - - - - - s - - -
| |
| B6.10 281 'IDNUT-29 CLOSURE HEAD NUTS AUG - - - - - - - - - - - -
| |
| 1 B11 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1QNUT-3 ISIMINMP-ES-024-201 A-33 IS1 s - - - - - - - - - - -
| |
| B6.10 2B11 QNUT-3 CLOSURE HEAD NUTS AUG - - - - - - - - - - - -
| |
| 1 B11 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1QNUT-30 ISINTI A-33 IS1 - - - - - - - - s - - -
| |
| B6.10 281 1QNUT-30 CLOSURE HEAD NUTS AUG - - - - - - - - - - - -
| |
| 1 B11 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1QNUT-31 ISIIVTI A-33 IS1 - - - - - - - - s - - -
| |
| B6.10 281 1QNUT-31 CLOSURE HEAD NUTS AUG - - - - - - - - - - - -
| |
| 1 B11 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BC-1 H2 281 1QNUT-32 ISIMI A-33 IS1 - - - - - - - - s - - -
| |
| B6.10 281 1QNUT-32 CLOSURE HEAD NUTS AUG - - - - - - - - - - - -
| |
| 1 Bll OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1 \2NUT-33 ISINTI A-33 IS1 - - - - - - - - s - - -
| |
| B6.10 281 1QNUT-33 CLOSURE HEAD NUTS AUG - - - - - - - - - - - -
| |
| 1 B11 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1QNUT-34 ISINTI A-33 IS1 - - - - - - - - s - - -
| |
| B6.10 281 1QNUT-34 CLOSURE HEAD NUTS AUG - - - - - - - - - - - -
| |
| 1 B11 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 IQNUT-35 ISIIVTI A-33 IS1 - - - - - - - - s - - -
| |
| B6.10 281 1QNUT-35 CLOSUREHEADNUTS AUG - - - - - - - - - - - -
| |
| 1 B11 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - .
| |
| B-G-1 H2 281 1QNUT-36 ISIMI A-33 IS1 - - - - - - - - s - - -
| |
| B6.10 2811 QNUT-36 CLOSURE HEAD NUTS AUG - - - - - - - - - - - -
| |
| 1 B11 om - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class I IS1 Plan Page 4 - 27 Southern Nuclear Operating Company Period 1 Period 2 Period 3 I
| |
| Category, lso No.
| |
| ItemNO, Comp. Desc.
| |
| Class Summary ICornplD ISystem Scope IMethod IProcedure cod; case B-G-1 H2 281 1PNUT-37 ISIIVTI A-33 IS1 B6.10 261 1PNUT-37 CLOSUREHEADNUTS AUG 1 a1 1 OWN PRE B-G-1 H2 281 1PNUT-38 ISllVTl A-33 IS1 B6.10 2BllPNUT-38 CLOSURE HEAD NUTS AUG 1 B1 1 OWN PRE B-G-1 H2 281 1PNUT-39 ISllVTl A-33 IS1 66.10 2BllPNUT-39 CLOSURE HEAD NUTS AUG 1 B1 1 OWN PRE B-G-1 H2 281 1PNUT-4 ISIIVTINMP-ES-024-201 A-33 IS1 B6.10 2B11 PNUT-4 CLOSURE HEAD NUTS AUG 1 B11 OWN PRE B-G-1 H2 201 1PNUT-40 ISllVTl A-33 IS1 B6 10 281 1PNUT-40 CLOSURE HEAD NUTS AUG 1 81 1 OWN PRE B-G-1 H2 281 1PNUT-41 ISINTINMP-ES-024-201 A-33 IS1 B6 10 2B11 PNUT-41 CLOSURE HEAD NUTS AUG 1 01 1 OWN PRE B-G-1 H2 281 1PNUT-42 ISllVTINMP-ES-024-201 A-33 1st B6.10 2B11PNUT-42 CLOSURE HEAD NUTS AUG 1 a1 1 OWN PRE B-G-1 H2 261 1PNUT-43 ISINTINMP-ES-024-201 A-33 IS1 06.10 281 1PNUT-43 CLOSURE HEAD NUTS AUG 1 Bll OWN PRE B-G-1 H2 281 1PNUT-44 ISIIVTINMP-ES-024-201 A-33 IS1 B6.10 2B11PNUT-44 CLOSURE HEAD NUTS AUG 1 a1 1 OWN PRE B-G-1 H2 281 1PNUT-45 ISINTINMP-ES-024-201 A-33 IS1 B6 10 281 1PNUT-45 CLOSURE HEAD NUTS AUG 1 81 1 OWN PRE
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Page 5 - 27 711 312006 1 Period 1 Period 2 Period 3 Category, Iso No. Q) o r N ~3 ItemNO, Comp. Desc. 2 2 2 2 2 Class Summary 1ComplD 1System Scope 1 Method 1Procedure Code Case 5 5 5 5 5 B-G-1 H2 2BllPNUT-46 ISllVTINMP-ES-024201 A-33 IS1 s - - - - - - - - - - -
| |
| B6.10 281 1PNUT-46 CLOSURE HEAD NUTS AUG - - - - - - - - - - - -
| |
| 1 Bll om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1PNUT-47 ISllVTINMP-ES-024201 A-33 IS1 s - - - - - - - - - - -
| |
| B6.10 281 1PNUT-47 CLOSURE HEAD NUTS AUG - - - - - - - - - - - -
| |
| 1 B11 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-I H2 281 1PNUT-48 ISllVTINMP-ES-024-201 A-33 IS1 s - - - - - - - - - - -
| |
| B6.10 281 1PNUT-48 CLOSURE HEAD NUTS AUG - - - - - - - - - - - -
| |
| 1 Bll o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1PNUT-49 ISllVTINMP-ES-024201 A-33 IS1 s - - - - - - - - - - -
| |
| B6.10 281 1PNUT-49 CLOSURE HEAD NUTS AUG - - - - - - - - - - - -
| |
| 1 Bll om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1PNUT-5 ISllVTINMP-ES-024-201 A-33 IS1 s - - - - - - - - - - -
| |
| B6.10 281 1PNUT-5 CLOSURE HEAD NUTS AUG - - - - - - - - - - - -
| |
| 1 BlI om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1PNUT-50 ISllVTINMP-ES-024201 A-33 IS1 s - - - - - - - - - - -
| |
| B6.10 2811 PNUT-50 CLOSURE HEAD NUTS AUG - - - - - - - - - - - -
| |
| 1 Bll om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-I H2 281 1PNUT-51 ISllVTINMP-ES-024-201 A-33 IS1 s - - - - - - - - - - -
| |
| B6.10 281 1PNUT-51 CLOSURE HEAD NUTS AUG - - - - - - - - - - - -
| |
| 1 81 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1PNUT-52 ISINTINMP-ES-024201 A-33 IS1 s - - - - - - - - - - -
| |
| B6.10 281 1PNUT-52 CLOSURE HEAD NUTS AUG - - - - - - - - - - - -
| |
| 1 Bll om - - - - - - - - - - - -
| |
| PRE - - - - - - - . - - - -
| |
| B-G-1 H2 2B11PNUT-53 ISllVTINMP-ES-024201 A-33 IS1 s - - - - - - - - - - -
| |
| B6.10 2BllPNUT-53 CLOSURE HEAD NUTS AUG - - - - - - - - - - - -
| |
| 1 B11 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1PNUT-54 ISINTINMP-ES-024201 A-33 IS1 s - - - - - - - - - - -
| |
| B6.10 281 1PNUT-54 CLOSURE HEAD NUTS AUG - - - - - - - - - - - -
| |
| 1 Bll om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan 'age 6 - 27 Southern Nuclear Operating Company Period 1 Period 2 Period 3 I I Category, lso No.
| |
| ItemNO, Comp. Desc.
| |
| Class Summary I ComplD 1 System Scope IMethod I Procedure Code Case B-G-1 HZ 281 1PNUT-55 ISIMINMP-ES-024-201 A-33 IS1 86 10 281 1PNUT-55 CLOSURE HEAD NUTS AUG 1 Bll OWN PRE B-G-1 HZ 281 1PNUT-56 ISIMINMP-ES-024-201 A-33 IS1 B6 10 281 1PNUT-56 CLOSURE HEAD NUTS AUG 1 81 1 OWN PRE B-G-1 HZ 281 1PNUT-6 ISINTINMP-ES-024-201 A-33 IS1 86 10 2BllPNUT-6 CLOSURE HEAD NUTS AUG 1 B11 OWN PRE B-G-1 HZ 281 1PNUT-7 lS IlVTl A-33 IS1 86 10 281 1PNUT-7 CLOSURE HEAD NUTS AUG 1 B11 OWN PRE B-G-I HZ 281 1PNUT-8 ISIIVTI A-33 IS1 B6 10 2BllPNUT-8 CLOSURE HEAD NUTS AUG 1 Bll OWN PRE B-G-1 HZ 281 1PNUT-9 ISIMI A-33 IS1 86 10 2BllPNUT-9 CLOSUREHEADNUTS AUG 1 81 1 OWN PRE B-G-1 HZ 2B31PRC-A PUMP BOLT-1 IS1 86 180 2B31PRC-A PUMP BOLT-1 PUMP BOLTING AUG 1 831 OWN PRE B-G-1 HZ 2B31PRC-A PUMP BOLT-10 IS1 86 180 2B31PRC-A PUMP BOLT-10 PUMP BOLTING AUG 1 831 OWN PRE B-G-1 H2 2831PRC-A PUMP BOLT-11 IS1 86 180 2831 PRC-A PUMP BOLT-11 PUMP BOLTING AUG 1 831 OWN PRE B-G-1 HZ 2831PRC-A PUMP BOLT-12 IS1 86 180 2831 PRC-A PUMP BOLT-12 PUMP BOLTING AUG 1 83 1 OWN PRE
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Page 7 - 27 7/13/2006 1 Period 1 Period 2 Period 3 Category, Iso NO. m o F C( D ItemNO, Comp. Desc. 2 2 2 2 2 Class ~ u r n n i a r yI ComplD I System Scope I Method I Procedure Code Case 5 5 5 5 5 B-G-1 H2 2B31PRC-A PUMP BOLT-13 IS1 - - - - - - - - - - - -
| |
| 86 180 2831 PRC-A PUMP BOLT-13 PUMP BOLTING AUG - - - - - - - - - - -
| |
| 1 831 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 2B31PRC-A PUMP BOLT-14 IS1 - - - - - - - - - - - -
| |
| 86.180 2B31PRC-A PUMP BOLT-14 PUMP BOLTING AUG - - - - - - - - - - - -
| |
| 1 831 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 2B31PRC-A PUMP BOLT-15 IS1 - - - - - - - - - - - -
| |
| 86.180 2B31PRC-A PUMP BOLT-15 PUMP BOLTING AUG - - - - - - - - - - - -
| |
| 1 83 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BC-1 H2 2B31PRC-A PUMP BOLT-16 IS1 - - - - - - - - - - - -
| |
| 86.180 2B31PRC-A PUMP BOLT-16 PUMP BOLTING AUG - - - - - - - - - - - -
| |
| 1 831 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 2B31PRC-A PUMP BOLT-2 IS1 - - - - - - - - - - - -
| |
| B6.180 2B31PRC-A PUMP BOLT-2 PUMP BOLTING AUG - - - - - - - - - - - -
| |
| 1 B3 1 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 2B31PRC-A PUMP BOLT-3 IS1 - - - - - - - - - - - -
| |
| 86.180 2B31PRC-A PUMP BOLT-3 PUMP BOLTING AUG - - - - - - - - - - - -
| |
| 1 831 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 2B31PRC-A PUMP BOLT-4 IS1 - - - - - - - - - - - -
| |
| B6.180 2B31PRC-A PUMP BOLT-4 PUMP BOLTING AUG - - - - - - - - - - - -
| |
| 1 B3 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BC-1 H2 2B31PRC-A PUMP BOLT-5 IS1 - - - - - - - - - - - -
| |
| 86.180 2B31PRC-A PUMP BOLT-5 PUMP BOLTING AUG - - - - - - - - - - - -
| |
| 1 831 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 2B31PRC-A PUMP BOLT-6 IS1 - - - - - . . - - - - - -
| |
| B6.180 2B31PRC-A PUMP BOLT-6 PUMP BOLTING AUG - - - - - - - - - - - -
| |
| 1 83 1 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| IS1 - - - - - - - - - - - -
| |
| B-G-1 H2 2B31PRC-A PUMP BOLT-7 B6.180 2B31PRC-A PUMP BOLT-7 PUMP BOLTING AUG - - - - - - - - - - - -
| |
| o m - - - - - - - - - - - -
| |
| 1 B3 1 PRE - - - - - - - - - - - -
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Page 8 - 27 711312006 1 Period 1 Period 2 Period 3 Category, Iso No. m o r N P)
| |
| ItemNO, Cornp. Desc. 2 2 2 2 2 Class Summary 1 CornplD 1 System Scope IMethod IProcedure Code Case 5 5 5 ?i 5 B-G-1 H2 2B31PRC-A PUMP BOLT-8 IS1 - - - - - - - - - - - -
| |
| 8 6 180 2B31PRC-A PUMP BOLT-8 PUMP BOLTING AUG - - - - - - - - - - - -
| |
| 1 831 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BC-1 H2 2B31PRC-A PUMP BOLT-9 IS1 - - - - - - - - - - - -
| |
| 86.180 2B31PRC-A PUMP BOLT-9 PUMP BOLTING AUG - - - - - - - - - - - -
| |
| 1 831 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 6-G-1 H2 2B31PRC-B PUMP BOLT-1 ISllUTl IS1 - - - - s - - - - - - -
| |
| 86.180 2B31PRC-B PUMP BOLT-1 PUMP BOLTING AUG - - - - - - - - - - - -
| |
| 1 831 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 2B31PRC-B PUMP BOLT-10 ISIIUTI IS1 - - - - S - - - - - - -
| |
| B6.180 2B31 PRC-B PUMP BOLT-10 PUMP BOLTING AUG - - - - - - - - - - - -
| |
| 1 83 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 2B31PRC-B PUMP BOLT-1 1 ISIIUTI IS1 - - - - s - - - - - - -
| |
| 86.180 2B31PRC-B PUMP BOLT-11 PUMP BOLTING AUG - - - - - - - - - - - -
| |
| 1 831 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 2B31PRC-B PUMP BOLT-12 ISIIUTI IS1 - - - - s - - - - - - -
| |
| 86.180 2B31PRC-B PUMP BOLT-12 PUMP BOLTING AUG - - - - - - - - - - - -
| |
| 1 83 1 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 2831 PRC-B PUMP BOLT-13 ISIIUTI IS1 - - - - s - - - - - - -
| |
| B6.180 2B31PRC-B PUMP BOLT-13 PUMP BOLTING AUG - - - - - - - - - - - -
| |
| 1 83 1 om - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| BC-1 H2 2B31PRC-B PUMP BOLT-14 ISIIUTI IS1 - - - - S - - - - - - -
| |
| 86.180 2B31PRC-B PUMP BOLT-14 PUMP BOLTING AUG - - - - - - - - - - - -
| |
| 1 B31 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 2831 PRC-B PUMP BOLT-15 ISIIUTI IS1 - - - - s - - - - - - -
| |
| 86.180 2B31PRC-B PUMP BOLT-15 PUMP BOLTING AUG - - - - - - - - - - - -
| |
| 1 831 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| - - - - s - - - - - - -
| |
| B-G-1 H2 2831 PRC-B PUMP BOLT-16 ISIIUTI IS1 86 180 2B31PRC-B PUMP BOLT-16 PUMP BOLTING AUG - - - - - - - - - - - -
| |
| 1 831 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Page 9 - 27 711 312006 1 Period 1 Period 2 Period 3 Category, Iso No. o y (Y m ItemNO, Comp. Desc. E 2 2 2 2 Class Summary 1ComplD 1 System Scope 1 Method I Procedure Code Case 5 5 5 5 5 0-G-1 H2 2B31PRC-B PUMP BOLT-2 ISIIUTI IS1 - - - - s - - - - - - -
| |
| 86 180 2831 PRC-B PUMP BOLT-2 PUMP BOLTING AUG - - - - - - - - - - - -
| |
| 1 83 1 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-I H2 2B31PRC-B PUMP BOLT-3 ISIIUTI IS1 - - - - s - - - - - - -
| |
| 86 180 2831 PRC-B PUMP BOLT-3 PUMP BOLTING AUG - - - - - - - - - - - -
| |
| 1 83 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 6-G-I H2 2B31PRC-B PUMP BOLT-4 ISIIUTI IS1 - - - - s - - - - - - -
| |
| 86 180 2831 PRC-B PUMP BOLT-4 PUMP BOLTING AUG - - - - - - - - - - - -
| |
| 1 831 OWN - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| 6-G-1 H2 2B31PRC-B PUMP BOLT-5 ISIIUTI IS1 - - - - s - - - - - - -
| |
| 86 180 2B31PRC-B PUMP BOLT-5 PUMP BOLTING AUG - - - - - - - - - - - -
| |
| 1 83 1 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 0-G-1 H2 2B31PRC-B PUMP BOLT-6 ISIIUTI IS1 - - - - s - - - - - - -
| |
| 86 180 2831 PRC-B PUMP BOLT-6 PUMP BOLTING AUG - - - - - - - - - - - -
| |
| 1 83 1 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 6-G-I H2 2B31PRC-B PUMP BOLT-7 ISIIUTI IS1 - - - - s - - - - - - -
| |
| B6.180 2831 PRC-B PUMP BOLT-7 PUMP BOLTING AUG - - - - - - - - - - - -
| |
| 1 831 OWN - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| 6-G-I H2 2B31PRC-B PUMP BOLT8 ISIIUTI IS1 - - - - s - - - - - - -
| |
| 86 180 2B31QRC-B PUMP BOLT-8 PUMP BOLTING AUG - - - - - - - - - - - -
| |
| 1 83 1 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 0-G-1 H2 2B31PRC-B PUMP BOLT-9 ISIIUTI IS1 - - - - s - - - - - - -
| |
| 86 180 2831PRC-B PUMP BOLT-9 PUMP BOLTING AUG - - - - - - - - - - - -
| |
| 1 83 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 6-G-1 H2 2B31PRC-A PUMP-FLANGE IS1 t t - - t - - - t t - -
| |
| 86 190 2B31PRC-A PUMP-FLANGE FLANGE SURFACE AUG - - - - - - - - - - - -
| |
| 1 83 1 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 6-G-1 H2 2B31PRC-B PUMP-FLANGE IS1 t t - - t - - - t t - -
| |
| 86 190 2B31PRC-B PUMP-FLANGE FLANGE SURFACE AUG - - - - - - - - - - - -
| |
| 1 83 1 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| Revision: 1 HNP-2 F o u r t h Interval C l a s s 1 IS1 P l a n Page 10 - 27 S o u t h e r n Nuclear O p e r a t i n g C o m p a n y Period 1 Period 2 Period 3 Category, lso No.
| |
| ItemNO, Comp. Desc.
| |
| Class Summary IComplD ISystem Scope IMethod IProcedure Code Case B-G-1 H2 281 1PSTUD-1 ISllUTlNMP-ES-024504 A-33 IS1 86.20 281 1PSTUD-1 CLOSURE HEAD STUDS AUG 1 81 1 OWN PRE B-G-1 H2 281 1PSTUD-10 ISIIUTI A-33 IS1 86.20 281 1PSTUD-1 0 CLOSURE HEAD STUDS AUG 1 81 1 OWN PRE B-G-1 H2 281 1PSTUD-11 ISIIUTI A-33 IS1 86.20 281 1PSTUD-11 CLOSURE HEAD STUDS AUG 1 81 1 OWN PRE B-G-1 H2 281 1QSTUD-12 lSllUT1 A-33 IS1 86.20 281 1PSTUD-12 CLOSURE HEAD STUDS AUG 1 811 OWN PRE B-G-1 H2 281 1PSTUD-13 ISIIUTI A-33 IS1 86.20 281 1PSTUD-13 CLOSURE HEAD STUDS AUG 1 811 OWN PRE B-G-1 H2 281 1PSTUD-14 ISIIUTI A-33 IS1 86.20 281 1PSTUD-14 CLOSURE HEAD STUDS AUG 1 81 1 OWN PRE B-G-1 H2 281 1PSTUD-15 ISllUTl A-33 IS1 86.20 281 1PSTUD-15 CLOSURE HEAD STUDS AUG 1 Bll OWN PRE B-G-1 H2 281 1PSTUD-16 ISIIUTI A-33 IS1 86.20 281 1PSTUD-16 CLOSURE HEAD STUDS AUG 1 81 1 OWN PRE B-G-1 H2 281 1PSTUD-17 lSllUT1 A-33 IS1 86.20 281 1PSTUD-17 CLOSURE HEAD STUDS AUG 1 81 1 OWN PRE B-G-1 H2 281 1PSTUD-18 ISIIUTI A-33 IS1 86.20 281 IQSTUD-18 CLOSURE HEAD STUDS AUG 1 81 1 OWN PRE
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Page 11 - 27 7/13/2006 1 Period 1 Period 2 Period 3 Category, Iso No. m o r e4 m ItemNO, Comp. Desc. 5 2 2 2 2 Class Summary IComplD ISystem Scope IMethod IProcedure Code Case 5 5 5 5 %
| |
| 0-G-1 H2 281 IDSTUD-19 lSllUT1 A-33 IS1 - - - - s - - - - - - -
| |
| 86.20 281 1PSTUD-19 CLOSURE HEAD STUDS AUG - - - - - - - - - - - -
| |
| 1 811 o w - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 0-G-1 H2 281 1DSTUD-2 ISllUTlNMP-ES-024504 A-33 IS1 s - - - - - - - - - - -
| |
| 86.20 281 1DSTUD-2 CLOSUREHEADSTUDS AUG - - - - - - - - - - - -
| |
| 1 B11 o w - - - - - - - - - - - -
| |
| PRE - ~- - - - - - - - - - -
| |
| 0-G-1 H2 281 1DSTUD-20 lSllUT1 A-33 IS1 - - - - s - - - - - - -
| |
| 86.20 281 1DSTUD-20 CLOSURE HEAD STUDS AUG - - - - - - - - - - - -
| |
| 1 81 1 o w - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 0-G-I H2 281 IDSTUD-21 ISllUTl A-33 IS1 - - - - - - - - s - - -
| |
| 86.20 281 1DSTUD-21 CLOSUREHEADSTUDS AUG - - - - - - - - - - - -
| |
| 1 B11 o w - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 0-G-I H2 281 IDSTUD-22 ISIIUTI A-33 IS1 - - - - - - - - s - - -
| |
| 86.20 281 IDSTUD-22 CLOSUREHEADSTUDS AUG - - - - - - - - - - - -
| |
| 1 81 1 o w - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 04-1 H2 281 IDSTUD-23 ISllUTl A-33 IS1 - - - - - - - - s - - -
| |
| 86.20 281 IDSTUD-23 CLOSURE HEAD STUDS AUG - - - - - - - - - - - -
| |
| 1 81 1 o w - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 0-G-1 H2 281 IDSTUD-24 ISIIUTI A-33 IS1 - - - - - - - - s - - -
| |
| 86.20 281 1PSTUD-24 CLOSURE HEAD STUDS AUG - - - - - - - - - - - -
| |
| 1 81 1 o w - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 0-G-I H2 281 1DSTUD-25 ISIIUTI A-33 IS1 - - - - - - - - s - - -
| |
| 86.20 281 1PSTUD-25 CLOSURE HEAD STUDS AUG - - - - - - - - - - - -
| |
| 1 Bl 1 o w - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 04-1 H2 281 IDSTUD-26 lSllUT1 A-33 IS1 - - - - - - - - s - - -
| |
| 86.20 281 1DSTUD-26 CLOSURE HEAD STUDS AUG - - - - - - - - - - - -
| |
| OWN - - - - - - - - - - - -
| |
| 1 Bll PRE - - - - - - - - - - - -
| |
| 0-G-1 H2 281 1DSTUD-27 lSllUT1 A-33 IS1 - - - - - - - - s - - -
| |
| 66.20 281 1PSTUD-27 CLOSURE HEAD STUDS AUG - - - - - - - - - - - -
| |
| o w - - - - - - - - - - - -
| |
| 1 B11 PRE - - - - - - - - - - - -
| |
| | |
| J Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Period I Page 1 2 - 27 Period 2 7H312006 Period 3 1
| |
| Category, Iso No. a o F N o ItemNO, Comp. Desc. 2 2 2 2 2 Class Summary 1ComplD 1System Scope I Method I Procedure Code Case 5 5 5 5 5 B-G-1 H2 281 IDSTUD-28 ISllUTl A-33 IS1 - - - . - - - - s - - -
| |
| 86.20 281 1DSTUD-28 CLOSURE HEAD STUDS AUG - - - - - - - - - - - -
| |
| 1 811 om - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1DSTUD-29 ISIIUTI A-33 IS1 - - - - - - - - s - - -
| |
| B6 20 281 1PSTUD-29 CLOSURE HEAD STUDS AUG - - - - - - - - - - - -
| |
| 1 Bl 1 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 2B1 IDSTUD-3 ISllUTlNMP-ES-024-504 A-33 IS1 s - - - - - - - - - - -
| |
| 86.20 281 1DSTUD-3 CLOSURE HEAD STUDS AUG - - - - - - - - - - - -
| |
| 1 811 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 IDSTUD-30 ISIIUTI A-33 IS1 - - - - - - - - s - - -
| |
| 86.20 281 1DSTUD-30 CLOSURE HEAD STUDS AUG - - - - - - - - - - - -
| |
| 1 Bll o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 IDSTUD-31 ISIIUTI A-33 IS1 < - - - - - - - s - - -
| |
| 86.20 2811 DSTUD-31 CLOSURE HEAD STUDS AUG - - - - - - - - - - - -
| |
| 1 811 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1DSTUD-32 ISIIUTI A-33 IS1 - - - - - - - - s - - -
| |
| 86.20 2811 DSTUD-32 CLOSURE HEAD STUDS AUG - - - - - - - - - - - -
| |
| 1 811 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1DSTUD-33 lSllUT1 A-33 IS1 - - - - - - - - s - - -
| |
| 86.20 2811 DSTUD-33 CLOSURE HEAD STUDS AUG - - - - - - - - - - - -
| |
| 1 811 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1DSTUD-34 lSllUT1 A-33 IS1 - - - - - - - - s - - -
| |
| 86.20 281 1DSTUD-34 CLOSURE HEAD STUDS AUG - - - - - - - - - - - -
| |
| 1 B11 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 IDSTUD-35 lSllUT1 A-33 IS1 - - - - - - - - s - - -
| |
| 86.20 281 IDSTUD-35 CLOSURE HEAD STUDS AUG - - - - - - - - - - - -
| |
| 1 811 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1DSTUD-36 lSllUT1 A-33 IS1 - - - - - - - - s - - -
| |
| 86.20 281 1PSTUD-36 CLOSURE HEAD STUDS AUG - - - - - - - - - - - -
| |
| 1 811 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Page 13 - 27 711312006 1 Period 1 Period 2 Period 3 Category, Iso No. Q) o r N -
| |
| ItemNO, Comp. Desc. 2 2 2 2 2 Class Summary IComplD 1System Scope 1 Method 1Procedure Code Case 5 5 i5 5 5 B-G-I H2 281 1USTUD-37 ISIIUTI A-33 IS1 - - - - - - - - s - - -
| |
| B6 20 281 1USTUD-37 CLOSURE HEAD STUDS AUG - - - - - - - - - - - -
| |
| 1 B11 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1USTUD-38 ISIIUTI A-33 IS1 - - - - - - - - s - - -
| |
| 86.20 2B11 USTUD-38 CLOSURE HEAD STUDS AUG - - - - - - - - - - - -
| |
| 1 Bll om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1\2STUD-39 ISIIUTI A33 IS1 - - - - - - - - s - - -
| |
| 86.20 2B11USTUD-39 CLOSURE HEAD STUDS AUG - - - - - - - - - - - -
| |
| 1 81 1 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1USTUD-4 ISllUTINMP-ES-024-504 A-33 IS1 s - - - - - - - - - - -
| |
| 86.20 2B11USTUD-4 CLOSURE HEAD STUDS AUG - - - - - - - - - - - -
| |
| 1 Bll om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1USTUD-40 ISIIUTI A-33 IS1 - - - - - - - - S - - -
| |
| 86.20 281 1USTUD-40 CLOSUREHEADSTUDS AUG - - - - - - - - - - - -
| |
| 1 Bll om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-I H2 281 1USTUD-41 ISIIUTINMP-ES-024-504 A-33 IS1 s - - - - - - - - - - -
| |
| B6 20 2B11USTUD-41 CLOSUREHEADSTUDS AUG - - - - - - - - - - - -
| |
| 1 Bll om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| S - - - - - - - - - - -
| |
| B-G-1 H2 281 1USTUD-42 ISIIUTINMP-ES-024-504 A-33 IS1 86.20 2B11USTUD-42 CLOSURE HEAD STUDS AUG - - - - - - - - - - - -
| |
| 1 Bll o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1USTUD-43 ISIIUTINMP-ES-024-504 A-33 IS1 s - - - - - - - - - - -
| |
| 86.20 281 1USTUD-43 CLOSURE HEAD STUDS AUG - - - - - - - - - - - -
| |
| 1 Bl1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-I H2 281 1 USTUD-44 ISIIUTINMP-ES-024-504 A-33 IS1 s - - - - - - - - - - -
| |
| 86 20 2 B11USTUD-44 CLOSUREHEADSTUDS AUG - - - - - - - - - - - -
| |
| 1 B11 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1USTUD-45 ISllUTlNMP-ES-024-504 A-33 IS1 s - - - - - - - - - - -
| |
| B6 20 281 1USTUD-45 CLOSURE HEAD STUDS AUG - - - - - - - - - - - -
| |
| 1 B11 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Page 1 4 - 27 Southern Nuclear Operating Company Period 1 Period 2 Period 3 Category, Iso No.
| |
| ItemNO, Comp. Desc.
| |
| Class Summary IComplD 1System Scope 1Method IProcedure Code Case B-G-1 H2 281 IPSTUD-46 ISIIUTINMP-ES-024504 A-33 IS1 86 20 2B11PSTUD-46 CLOSURE HEAD STUDS AUG 1 B11 OWN PRE B-G-1 H2 281 IPSTUD-47 ISIIUTINMP-ES-024-504 A-33 IS1 86.20 281 1PSTUD-47 CLOSURE HEAD STUDS AUG 1 81 I OWN PRE B-G-1 H2 281 1PSTUD-48 ISllUTINMP-ES-024504 A-33 IS1 86.20 281 1PSTUD-48 CLOSURE HEAD STUDS AUG 1 BlI OWN PRE B-G-1 H2 281 1PSTUD-49 ISIIUTINMP-ES-024-504 A-33 IS1 B6 20 281 1PSTUD-49 CLOSURE HEAD STUDS AUG 1 811 OWN PRE B-G-1 H2 281 1PSTUD-5 ISIIUTINMP-ES-024-504 A-33 IS1 86.20 281 1PSTUD-5 CLOSUREHEADSTUDS AUG 1 B11 OWN PRE B-G-1 H2 281 1PSTUD-50 ISIIUTINMP-ES-024504 A-33 IS1 86.20 281 IPSTUD-50 CLOSURE HEAD STUDS AUG 1 811 OWN PRE B-G-1 H2 281 1PSTUD-51 ISIIUTINMP-ES-024504 A-33 IS1 86 20 281 IPSTUD-51 CLOSURE HEAD STUDS AUG 1 BlI OWN PRE B-G-1 H2 281 IPSTUD-52 ISIIUTINMP-ES-024504 A-33 IS1 86.20 281 1PSTUD-52 CLOSURE HEAD STUDS AUG 1 B11 OWN PRE B-G-1 H2 281 1QSTUD-53 ISIIUTINMP-ES-024-504 A-33 IS1 86 20 281 1PSTUD-53 CLOSURE HEAD STUDS AUG 1 Bll OWN PRE B-G-1 H2 281 1PSTUD-54 ISIIUTINMP-ES-024504 A-33 IS1 86.20 281 1PSTUD-54 CLOSURE HEAD STUDS AUG 1 81 I OWN PRE
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Page 15 - 27 711312006 1 Period 1 Period 2 Period 3 Category, Iso No. o F N ~3 ItemNO, Comp. Desc. 2 2 2 2 2 Class Summary IComplD 1System Scope 1 Method 1Procedure Code Case 5 5 5 5 5 B-G-1 H2 281 1PSTUD-55 ISllUTINMP-ES-024504 A-33 IS1 s - - - - - - - - - - -
| |
| 86.20 281 1 PSTUD-55 CLOSURE HEAD STUDS AUG - - - - - - - - - - - -
| |
| 1 81 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1PSTUD-56 ISllUTlNMP-ES-024504 A-33 IS1 s - - - - - - - - - - -
| |
| 86.20 281 1PSTUD-56 CLOSURE HEAD STUDS AUG - - - - - - - - - - - -
| |
| 1 81 1 om - - - - - - - - - - - -
| |
| PRE - -- - - - - - - - - - -
| |
| B-G-1 H2 281 1PSTUD-6 ISllUTINMP-ES-024504 A-33 IS1 s - - - - - - - - - - -
| |
| 86.20 281 1PSTUD-6 CLOSUREHEADSTUDS AUG - - - - - - - - - - - -
| |
| 1 811 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1PSTUD-7 ISllUTl A-33 IS1 - - - - s - - - - - - -
| |
| 86.20 2811PSTUD-7 CLOSURE HEAD STUDS AUG - - - - - - - - - - - -
| |
| 1 811 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1PSTUD-8 ISIIUTI A-33 IS1 - - - - s - - - - - - -
| |
| 86.20 281 1PSTUD-8 CLOSURE HEAD STUDS AUG - - - - - - - - - - - -
| |
| 1 81 1 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1PSTUD-9 ISIIUTI A-33 IS1 - - - - s - - - - - - -
| |
| 86.20 281 1PSTUD-9 CLOSUREHEADSTUDS AUG - - - - - - - - - - - -
| |
| 1 81 1 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 2831PRC-A PUMP-NUTS IS1 t t - - t - - - t t - -
| |
| 86.200 2831 PRC-A PUMP-NUTS RC PUMP A NUTS AUG - - - - - - - - - - - -
| |
| 1 831 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 2831PRC-8 PUMP-NUTS IS1 t t - - t - - - t t - -
| |
| 86.200 2831PRC-8 PUMP-NUTS RC PUMP 8 NUTS AUG - - - - - - - - - - - -
| |
| 1 83 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1PLIG-1 ISllUTINMP-ES-024504 A-33 IS1 s - - - - - - - - . - -
| |
| 86.40 281 1PLIG-1 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 81 1 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - . - - -
| |
| B-G-1 H2 281 1PLIG-10 ISIIUTI A-33 IS1 - - - - s - - - - - - -
| |
| 86 40 281 IPLIG-10 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 81 1 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - . - -
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Page 16 - 27 Southern Nuclear Operating Company Period 1 Period 2 Period 3 I
| |
| Category, Iso No.
| |
| IternNO, Cornp. Desc.
| |
| Class Surnrnarv IC o r n ~ l DISvstern Sco~e IMethod IProcedure Code Case B-G-1 H2 281 1PLIG-11 ISIIUTI A-33 IS1 86.40 2BllQLIG-11 FLANGE LIGAMENTS AUG 1 81 1 OWN PRE B-G-1 H2 281 1QLIG-12 ISIIUTI A-33 IS1 B6.40 2B11PLIG-12 FLANGE LIGAMENTS AUG 1 B11 OWN PRE B-G-1 H2 2B11QLIG-13 lSllUT1 A-33 IS1 86.40 2B11 PLIG-13 FLANGE LIGAMENTS AUG 1 B11 OWN PRE B-G-I H2 281 1QLIG-14 ISIIUTI A-33 IS1 86.40 281 1QLIG-14 FLANGE LIGAMENTS AUG 1 Bll OWN PRE B-G-1 H2 281 1QLIG-15 ISIIUTI A-33 IS1 86.40 2B1 IQLIG-15 FLANGE LIGAMENTS AUG 1 B11 OWN PRE B-G-I H2 281 1QLIG-16 ISllUTl A-33 IS1 B6.40 2B1 IPLIG-16 FLANGE LIGAMENTS AUG 1 81 1 OWN PRE B-G-I H2 281 1QLIG-17 ISIIUTI A-33 IS1 86.40 2B11 QLIG-17 FLANGE LIGAMENTS AUG 1 BlI OWN PRE B-G-I H2 281 1QLIG-18 ISIIUTI A-33 IS1 86.40 2B11 QLIG-18 FLANGE LIGAMENTS AUG 1 Bl1 OWN PRE B-G-I H2 281 1QLIG-19 lSllUT1 A-33 IS1 86.40 2BllQLIG-19 FLANGE LIGAMENTS AUG 1 B11 OWN PRE B-G-I H2 2B11QLIG-2 ISIIUTINMP-ES-024504 A-33 IS1 B6.40 281 1PLIG-2 FLANGE LIGAMENTS AUG 1 B11 OWN PRE
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Period 1 Page 17 - 27 Period 2 711312006 Period 3 1
| |
| Category, Iso No. a, o -? (Y P?
| |
| ItemNO, Comp. Desc. E 2 2 2 2 Class Summary 1ComplD 1System Scope IMethod I Procedure Code Case 5 5 I, 5 I, B-G-1 H2 281 1PLIG-20 ISIIUTI A-33 IS1 - - - - s - - - - - - -
| |
| B6 40 2B11 ULIG-20 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 Bll o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1ULIG-21 ISIIUTI A-33 IS1 - - - - - - - - s - - -
| |
| B6 40 2B11 PLIG-21 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 B11 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 IPLIG-22 lSllUT1 A-33 IS1 - - - - - - - - s - - -
| |
| B6 40 2B11 PLIG-22 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 B11 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1PLIG-23 lSllUT1 A-33 1SI - - - - - - - - s - - -
| |
| B6 40 2B11PLIG-23 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 BlI o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1ULIG-24 ISIIUTI A-33 IS1 - - - - - - - - s - - -
| |
| 86.40 2B1 IPLIG-24 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 Bl I o m - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1PLIG-25 ISIIUTI A-33 IS1 - - - - - - - - s - - -
| |
| B6 40 281 1PLIG-25 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 B11 o m - - - - - - - - - - - -
| |
| PRE - - . - - - - - - - - -
| |
| B-G-1 H2 281 1ULIG-26 ISIIUTI A-33 IS1 - - - - - - - - S - - -
| |
| B6 40 201 1PLIG-26 FLANGE LIGAMENTS AUG - - . - - - - - - - - -
| |
| 1 B11 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1PLIG-27 lSllUT1 A-33 IS1 - - - - - - - - s - - -
| |
| 66 40 201 IPLIG-27 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 81 1 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1PLIG-28 ISIIUTI A-33 IS1 - - - - - - - - s - - -
| |
| B6.40 2B11PLIG-28 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 81 1 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1ULIG-29 lSllUT1 A-33 IS1 - - - - - - - - s - - -
| |
| B6 40 201 IDLIG-29 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 Bll o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| Revision: 1 HNP-2 F o u r t h Interval C l a s s 1 IS1 P l a n S o u t h e r n Nuclear O p e r a t i n g C o m p a n y Page 18 - 27 711 312006 1 Period 1 Period 2 Period 3 Category, Iso No. m o F N P)
| |
| ItemNO, Comp. Desc. z 2 2 2 2 Class Summary 1ComplD 1System Scope 1 Method 1 Procedure Code Case F4 5 2 5 5 B-G-I H2 2BllQLIG-3 ISllUTINMP-ES-024-504 A-33 IS1 s - - - - - - - - - - -
| |
| 86 40 281 1QLIG-3 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 81 1 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-I H2 281 1QLIG-30 ISIIUTI A-33 IS1 - - - - - - - - s - - -
| |
| B6.40 2B1 1QLIG-30 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 B11 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-I H2 281 1QLIG-31 lSllUT1 A-33 IS1 - - - - - - - - s - - -
| |
| 86 40 2B1 IQLIG-31 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 BlI o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-I H2 281 IQLIG-32 ISIIUTI A-33 IS1 - - - - - - - - s - - -
| |
| 86.40 2B1 IQLIG-32 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 B11 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-I H2 281 1QLIG-33 lSllUT1 A-33 IS1 - - - - - - - - s - - -
| |
| B6.40 2B11QLIG-33 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 B11 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1QLIG-34 ISIIUTI A-33 IS1 - - - - - - - - s - - -
| |
| 86.40 2B11 QLIG-34 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 B11 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-I H2 281 1QLIG-35 ISllUTl A-33 IS1 - - - - - - - - s - - -
| |
| 86.40 2B11QLIG-35 FLANGE LIGAMENTS AIJG - - - - - - - - - - - -
| |
| 1 B11 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-I H2 281 1QLIG-36 ISIIUTI A-33 IS1 - - - - - - - - s - - -
| |
| 86.40 2B1 IQLIG-36 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 B11 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-I H2 281 1QLIG-37 ISIIUTI A-33 IS1 - - - - - - - - s - - -
| |
| 86.40 2B11QLIG-37 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 B11 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 2B1 IQLIG-38 ISllUTl A-33 ISI - - - - - - - - S - - -
| |
| 86.40 2B11\2LIG-38 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 B11 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Period 1 Page 19 - 27 Period 2 711312006 Period 3 1
| |
| Category, Iso No. m o r CY P)
| |
| ItemNO, Cornp. Desc. 2 2 2 2 2 Class Summary I CornplD I System Scope I Method IProcedure Code Case 5 5 5 5 z B-G-1 H2 281 1ULIG-39 ISIIUTI A-33 IS1 - - - - - - - - s - - -
| |
| B6 40 2BllQLIG-39 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 B11 o w - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1ULIG-4 ISIIUTINMP-ES-024-504 A-33 IS1 s - - - - - - - - - - -
| |
| B6 40 281 1QLIG-4 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 B11 o w - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1ULIG-40 ISIIUTI A-33 IS1 - - - - - - - - s - - -
| |
| B6 40 2B11ULIG-40 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 B11 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1ULIG-41 ISIIUTINMP-ES-024-504 A-33 IS1 s - - - - - - - - - - -
| |
| B6 40 2B11ULIG-41 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 B11 o w - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1ULIG-42 ISIIUTINMP-ES-024-504 A-33 IS1 s - - - - - - - - - - -
| |
| B6 40 2B11ULIG-42 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 B11 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1ULIG-43 ISIIUTINMP-ES-024-504 A-33 IS1 s - - - - - - - - - - -
| |
| B6 40 281 1ULIG-43 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 Bll om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1ULIG-44 ISllUTINMP-ES-024-504 A-33 IS1 s - - - - - - - - - - -
| |
| B6 40 2BllULIG-44 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 Bll o w - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1ULIG-45 ISIIUTINMP-ES-024-504 A-33 IS1 s - - - - - - - - - - -
| |
| B6 40 281 1ULIG-45 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 B11 o w - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1ULIG-46 ISIIUTINMP-ES-024-504 A-33 IS1 s - - - - - - - - - - -
| |
| B6 40 2B11ULIG-46 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 B11 o w - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 6-G-1 H2 281 1ULIG-47 ISIIUTINMP-ES-024-504 A-33 IS1 s - - - - - - - - - - -
| |
| B6 40 2BllULIG-47 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 B11 o w - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Page 20 - 27 7/13/2006 1 Period 1 Period 2 Period 3 Category, lso No. m o r N P)
| |
| IternNO, ~ o m pDesc.
| |
| . E 2 2 2 2 Class Summary I ComplD I System Scope 1 Method 1 Procedure Code Case 5 5 5 I, 5 B-G-1 H2 281 1QLIG-48 ISllUTINMP-ES-024504 A-33 IS1 s - - - - - - - - - - -
| |
| B6 40 2B11 VLIG-48 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 B1 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1QLIG-49 ISllUTINMP-ES-024504 A-33 IS1 s - - - - - - - - - - -
| |
| B6 40 2B11 QLIG-49 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 B1 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 IQLIG-5 ISllUTINMP-ES-024-504 A-33 IS1 s - - - - - - - - - - -
| |
| B6 40 2B11 QLIG-5 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 B1 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1QLIG-50 ISIIUTINMP-ES-024-504 A-33 IS1 s - - - - - - - - - - -
| |
| B6 40 201 1QLIG-50 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 B1 1 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1QLIG-51 ISIIUTINMP-ES-024504 A-33 IS1 s - - - - - - - - - - -
| |
| B6 40 2B11 QLIG-51 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 B1 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 IQLIG-52 ISllUTlNMP-ES-024504 A-33 IS1 s - - - - - - - - - - -
| |
| B6 40 2B11 QLIG-52 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 B1 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1QLIG-53 ISIIUTINMP-ES-024-504 A-33 IS1 s - - - - - - - - - - -
| |
| B6 40 2B11 QLIG-53 FLANGE LIGAMENTS AIJG - - - - - - - - - - - -
| |
| 1 B1 1 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1QLIG-54 ISllUTlNMP-ES-024504 A-33 IS1 s - - - - - - - - - - -
| |
| B6 40 2B11 QLIG-54 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 B1 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1QLIG-55 ISIIUTINMP-ES-024504 A-33 IS1 s - - - - - - - - - - -
| |
| B6 40 2B11 QLIG-55 FLANGE LIGAMENTS AIJG - - - - - - - - - - - -
| |
| 1 B1 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1QLIG-56 ISllUTINMP-ES-024-504 A-33 IS1 s - - - - - - - - - - -
| |
| B6 40 2B11 QLIG-56 FLANGE LIGAMENTS AIJG - - - - - - - - - - - -
| |
| 1 BlI om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| 4 Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Page 21 - 27 711 312006 1 Period 1 Period 2 Period 3 Category, Iso No. m o v- N P)
| |
| ItemNO, Comp. Desc. 2 2 2 2 2 Class Summary 1 ComplD 1 System Scope IMethod IProcedure Code Case 5 5 5 5 5 B-G-1 H2 281 1PLIG-6 ISllUTINMP-ES-024-504 A-33 IS1 s - - - - - - - - - - -
| |
| 86 40 281 1QLIG-6 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 B1 1 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1PLIG-7 ISIIUTI A-33 IS1 - - - - s - - - - - - -
| |
| 86 40 281 1QLIG-7 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 81 1 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1\2LIG-8 ISIIUTI A-33 IS1 - - - - s - - - - - - -
| |
| 86.40 281 1PLIG-8 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 81 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 IPLIG-9 ISIIUTI A-33 IS1 - - - - s - - - - - - -
| |
| 86 40 281 1QLIG-9 FLANGE LIGAMENTS AUG - - - - - - - - - - - -
| |
| 1 B11 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1PWASHER-1 ISllVTINMP-ES-024-201 A-33 IS1 s - - - - - - - - - - -
| |
| 86 50 281 1QWASHER-1 CLOSURE HEAD WASHERS AUG - - - - - - - - - - - -
| |
| 1 81 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BG-1 H2 281 1PWASHER-10 ISIIVTI A-33 IS1 - - - - s - - - - - - -
| |
| 86 50 281 1QWASHER-10 CLOSURE HEAD WASHERS AUG - - - - - - - - - - - -
| |
| 1 81 1 ow - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1PWASHER-11 ISIIVTI A-33 IS1 - - - - s - - - - - - -
| |
| B6 50 281 1QWASHER-11 CLOSURE HEAD WASHERS AUG - - - - - - - - - - - -
| |
| 1 81 1 om - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1PWASHER-12 ISINTI A-33 IS1 - - - - = - - - - - - -
| |
| 86 50 281 1QWASHER-12 CLOSURE HEAD WASHERS AUG - - - - - - - - - - - -
| |
| 1 81 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1PWASHER-13 ISIIVTI A-33 IS1 - - - - s - - - - - - -
| |
| 86 50 281 1PWASHER-13 CLOSURE HEAD WASHERS AUG - - - - - - - - - - - -
| |
| 1 81 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1QWASHER-14 ISIIVTI A-33 IS1 - - - - s - - - - - - -
| |
| 86 50 281 IPWASHER-14 CLOSURE HEAD WASHERS AUG - - - - - - - - - - - -
| |
| 1 81 1 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Page 22 - 27 711312006 /
| |
| Period 1 Period 2 Period 3 Category, Iso No. O) o r N rn ItemNO, Comp. Desc. 2 2 2 2 2 Class Summary 1ComplD 1System Scope 1 Method 1 Procedure Code Case 5 5 5 5 5 B-G-I H2 281 IDWASHER-15 ISIIVTI A-33 IS1 - - - - s - - - - - - -
| |
| 86.50 281 1UWASHER-15 CLOSURE HEAD WASHERS AUG - - - - - - - - - - - -
| |
| 1 81 1 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-I H2 281 112WASHER-16 ISIMI A-33 IS1 - - - - S - - - - - - -
| |
| 86.50 281 1UWASHER-16 CLOSURE HEAD WASHERS AUG - - - - - - - - - - - -
| |
| 1 B11 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 HZ 281 IDWASHER-17 ISIMI A-33 IS1 - - - - s - - - - - - -
| |
| 86.50 281 1UWASHER-17 CLOSURE HEAD WASHERS AUG - - - - - - - - - - - -
| |
| 1 B11 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-I H2 281 IDWASHER-18 ISIIVTI A-33 IS1 - - - - s - - - - - - -
| |
| 86.50 281 IUWASHER-18 CLOSURE HEAD WASHERS A ~ G - - - - - - - - - - - -
| |
| 1 B11 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-I H2 281 1UWASHER-19 ISIIVTI A-33 IS1 - - - - s - - - - - - -
| |
| 86.50 281 1WASHER-1 9 CLOSURE HEAD WASHERS AUG - - - - - - - - - - - -
| |
| 1 B11 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BG-I H2 281 1UWASHER-2 ISIMINMP-ES-024-201 A-33 IS1 s - - - - - - - - - - -
| |
| 86.50 281 1UWASHER-2 CLOSURE HEAD WASHERS AUG - - - - - - - - - - - -
| |
| 1 BlI o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-I H2 281 IDWASHER-20 ISIMI A-33 IS1 - - - - S - - - - - - -
| |
| 86.50 281 1UWASHER-20 CLOSURE HEAD WASHERS AUG - - - - - - - - - - - -
| |
| 1 811 om - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| B-G-I H2 281 IUWASHER-21 ISIIVTI A-33 IS1 - - - - - - - - s - - -
| |
| 86.50 281 1UWASHER-21 CLOSURE HEAD WASHERS AUG - - - - - - - - - - - -
| |
| 1 B11 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-I H2 281 1UWASHER-22 ISIIVTI A-33 IS1 - - - - - - - - s - - -
| |
| B6.50 281 1UWASHER-22 CLOSURE HEAD WASHERS AUG - - - - - - - - - - - -
| |
| 1 B11 o w - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| - - - - - - - - s - - -
| |
| B-G-I H2 281 1UWASHER-23 ISIIVTI A-33 IS1 86.50 281 1UWASHER-23 CLOSURE HEAD WASHERS AUG - - - - - - - - - - - -
| |
| 1 811 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Period 1 Page 23 - 27 Period 2 7'1312006 Period 3 I
| |
| Category, Iso No. m o r N C ?
| |
| ItemNO, Comp. Desc. 2 2 E E 2 Class Summary ICornplD ISystem Scope IMethod IProcedure Code Case 5 5 5 5 5 B-G-1 H2 281 IDWASHER-24 ISlMl A-33 IS1 - - - - - - - - s - - -
| |
| 86.50 281 1DWASHER-24 CLOSURE HEAD WASHERS AUG - - - - - - - - - - - -
| |
| 1 81 1 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 IDWASHER-25 ISllVTl A-33 IS1 - - - - - - - - s - - -
| |
| 86.50 281 1DWASHER-25 CLOSURE HEAD WASHERS AUG - - - - - - - - - - - -
| |
| 1 81 1 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 IDWASHER-26 ISllVTl A-33 IS1 - - - - - - - - s - - -
| |
| 86.50 281 IDWASHER-26 CLOSURE HEAD WASHERS AUG - - - - - - - - - - - -
| |
| 1 81 1 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-I H2 281 1DWASHER-27 ISllVTl A-33 IS1 - - - - - - - - s - - -
| |
| 86.50 281 IDWASHER-27 CLOSURE HEAD WASHERS AUG - - - - - - - - - - - -
| |
| 1 81 I o w - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 IDWASHER-28 ISlIVTl A-33 IS1 - - - - - - - - s - - -
| |
| 86.50 281 1PWASHER-28 CLOSURE HEAD WASHERS AUG - - - - - - - - - - - -
| |
| 1 81 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 IDWASHER-29 ISllUTl A-33 IS1 - - - - - - - - s - - -
| |
| 86.50 281 1PWASHER-29 CLOSURE HEAD WASHERS AUG - - - - - - - - - - - -
| |
| 1 81 I om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-I H2 281 IDWASHER-3 ISIMINMP-ES-024-201 A-33 IS1 s - - - - - - - - - - -
| |
| 86.50 281 IDWASHER-3 CLOSURE HEAD WASHERS AUG - - - - - - - - - - - -
| |
| 1 81 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 IDWASHER-30 lSlMl A-33 IS1 - - - - - - - - S - - -
| |
| 86.50 281 IDWASHER-30 CLOSUREHEADWASHERS AUG - - - - - - - - - - - -
| |
| 1 81 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 IDWASHER-31 ISliWl A-33 IS1 - - - - - - - - s - - -
| |
| 86.50 281 1DWASHER-31 CLOSURE HEAD WASHERS AUG - - - - - - - - - - - -
| |
| 1 81 1 o w - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 IDWASHER-32 ISliWl A-33 IS1 - - - - - - - - s - - -
| |
| 86.50 281 1DWASHER-32 CLOSURE HEAD WASHERS AUG - - - - - - - - - - - -
| |
| 1 81 1 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Page 24 - 27 711312006 1 Period 1 Period 2 Period 3
| |
| : Category, IternNO, Iso No.
| |
| Comp. Desc.
| |
| $ z P! P!
| |
| r 2
| |
| (Y 2 2 m
| |
| Class Summary 1 ComplD 1 System Scope 1 Method 1 Procedure Code Case 5 5 5 5 5 B-G-1 H2 281 1UWASHER-33 ISIIVTI A-33 IS1 - - - - - - - - s - - -
| |
| B6.50 281 1QWASHER-33 CLOSURE HEAD WASHERS AUG - - - - - - - - - - - -
| |
| 1 B11 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-I H2 281 1UWASHER-34 ISllVTI A-33 IS1 - - - - - - - - s - - -
| |
| B6 50 281 1QWASHER-34 CLOSURE HEAD WASHERS AUG - - - - - - - - - - - -
| |
| 1 B11 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-I H2 2B1 IUWASHER-35 ISIIVTI A-33 IS1 - - - - - - - - s - - -
| |
| B6 50 281 1QWASHER-35 CLOSURE HEAD WASHERS AUG - - - - - - - - - - - -
| |
| 1 Ell om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 IDWASHER-36 ISIIVTI A-33 IS1 - - - - - - - - s - - -
| |
| B6 50 281 1UWASHER-36 CLOSURE HEAD WASHERS AUG - - - - - - - - - - - -
| |
| 1 81 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 IDWASHER-37 ISIIVTI A-33 IS1 - - - - - - - - s - - -
| |
| B6 50 281 1QWASHER-37 CLOSURE HEAD WASHERS AUG - - - - - - - - - - - -
| |
| 1 B11 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-I H2 281 IQWASHER-38 ISIIVTI A-33 IS1 - - - - - - - - s - - -
| |
| B6 50 281 1QWASHER-38 CLOSURE HEAD WASHERS AUG - - - - - - - - - - - -
| |
| 1 B11 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1QWASHER-39 ISIIVTI A-33 IS1 - - - - - - - - s - - -
| |
| B6 50 2B11 QWASHER-39 CLOSURE HEAD WASHERS AUG - - - - - - - - - - - -
| |
| 1 Bll om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 IUWASHER-4 ISIMINMP-ES-024-201 A-33 IS1 s - - - - - - - - - - -
| |
| B6 50 281 1QWASHER-4 CLOSURE HEAD WASHERS AUG - - - - - - - - - - - -
| |
| 1 B11 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-1 H2 281 1QWASHER-40 lSllVT1 A-33 IS1 - - - - - - - - s - - -
| |
| 8 6 50 281 1QWASHER-40 CLOSURE HEAD WASHERS AUG - - - - - - - - - - - -
| |
| 1 B11 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-I H2 281 1QWASHER-41 ISIMINMP-ES-024-201 A-33 IS1 s - - - - - - - - - - -
| |
| B6 50 281 IDWASHER-41 CLOSURE HEAD WASHERS AUG - - - - - - - - - - - -
| |
| 1 B11 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| Revision: 1 HNP-2 Fourth lnterval Class 1 IS1 Plan Page 25 - 27 Southern Nuclear Operating Company Period 1 Period 2 Period 3 Category, Iso No.
| |
| ItemNO, Comp. Desc.
| |
| Class Summary IComplD 1 System Scope IMethod IProcedure Code Case 6-G-1 H2 281 IDWASHER-42 ISIIVTINMP-ES-024201 A-33 IS1 B6 50 281 1UWASHER-42 CLOSURE HEAD WASHERS AUG 1 Bll OWN PRE 6-G-1 H2 281 1DWASHER-43 ISIIVTINMP-ES-024201 A-33 IS1 B6 50 281 IDWASHER-43 CLOSURE HEAD WASHERS AUG 1 81 1 OWN PRE 6-G-1 H2 281 IDWASHER-44 ISINTINMP-ES-024201 A-33 IS1 86 50 281 IDWASHER-44 CLOSURE HEAD WASHERS AUG 1 81 1 OWN PRE 6-G-1 H2 281 1DWASHER-45 ISIIVTINMP-ES-024201 A-33 IS1 86 50 281 IDWASHER-45 CLOSURE HEAD WASHERS AUG 1 B11 OWN PRE 6-G-1 H2 281 IDWASHER-46 ISIIVTINMP-ES-024201 A-33 IS1 86 50 281 1UWASHER-46 CLOSURE HEAD WASHERS AUG 1 81 1 OWN PRE 6-G-1 H2 281 IDWASHER-47 ISI/VT/NM~~-ES-024201 A-33 IS1 8 6 50 281 1UWASHER-47 CLOSURE HEAD WASHERS AUG 1 Bll OWN PRE 6-G-1 H2 281 IDWASHER-48 ISIIVTINMP-ES-024201 A-33 IS1 8 6 50 281 IDWASHER-48 CLOSURE HEAD WASHERS AUG 1 81 1 OWN PRE 64-1 H2 281 IDWASHER-49 ISIIVTINMP-ES-024-201 A-33 IS1 86 50 281 1\2WASHER-49 CLOSURE HEAD WASHERS AUG 1 81 1 OWN PRE B -G-1 H2 281 1DWASHER-5 ISIMINMP-ES-024201 A-33 IS1 86 50 281 1UWASHER-5 CLOSURE HEAD WASHERS AUG 1 81 1 OWN PRE B-G-1 H2 281 IDWASHER-50 ISllVTINMP-ES-024-201 A-33 IS1 86 50 281 1UWASHER-50 CLOSURE HEAD WASHERS AUG 1 B11 OWN PRE
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Page 26 - 27 Southern Nuclear Operating Company Period 1 Period 2 Period 3 Category, Iso No.
| |
| ItemNO, Comp. Desc.
| |
| Class Summary / ComplD / System Scope IMethod IProcedure Code Case B-G-1 H2 281 IDWASHER-51 ISINTINMP-ES-024-201 A-33 IS1 B6 50 281 1PWASHER-51 CLOSURE HEAD WASHERS AUG 1 Bll OWN PRE B-G-1 H2 281 1PWASHER-52 ISllVTINMP-ES-024-201 A-33 IS1 B6 50 281 1PWASHER-52 CLOSURE HEAD WASHERS AUG 1 Bl 1 OWN PRE B-G-I H2 281 1PWASHER-53 ISllVTINMP-ES-024-201 A-33 IS1 B6 50 281 1PWASHER-53 CLOSURE HEAD WASHERS AUG 1 Bl I OWN PRE B-G-1 H2 281 IDWASHER-54 ISllVTINMP-ES-024-201 A-33 IS1 B6 50 281 1PWASHER-54 CLOSURE HEAD WASHERS AUG 1 Bll OWN PRE B-G-1 H2 281 IDWASHER-55 ISINT/NMP-ES-O~~-~O~ A-33 IS1 B6 50 281 1PWASHER-55 CLOSURE HEAD WASHERS AUG 1 Bll OWN PRE B-G-I H2 281 IPWASHER-56 ISINTINMP-ES-024-201 A-33 IS1 B6 50 281 1PWASHER-56 CLOSURE HEAD WASHERS AUG 1 Bll OWN PRE 943-1 H2 281 IDWASHER-6 ISIIVTINMP-ES-024-201 A-33 IS1 86.50 281 1PWASHER-6 CLOSURE HEAD WASHERS AUG 1 Bll OWN PR E B-G-I H2 281 1PWASHER-7 ISIIVTI A-33 IS1 B6 50 281 1PWASHER-7 CLOSURE HEAD WASHERS AUG 1 Bll OWN PRE B-G-I H2 281 1PWASHER-8 ISIIVTI A-33 IS1 B6 50 281 1PWASHER-8 CLOSURE HEAD WASHERS AUG 1 Bll OWN PRE B-G-I H2 281 IDWASHER-9 ISlMl A-33 IS1 86 50 2B11DWASHER-9 CLOSURE HEAD WASHERS AUG 1 Bll OWN PRE
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Page 1 - 7 Southern Nuclear Operating Company Period 1 Period 2 Period 3 I
| |
| Category, Iso No.
| |
| ItemNO, Comp. Desc.
| |
| Class Summary 1 ComplD 1 System Scope 1 Method 1 Procedure Code Case B-G-2 H2 2B21\1 CHSV-1 FB A-3 IS1 87.50 2B21\1CHSV-1FB GR 1 FLANGE BOLTING AUG 1 82 1 OWN PRE B-G-2 H2 2821-1 MS-8A-ASR-2FB A-5 IS1 87.50 2821-1 MS-8A-ASR-2FB 2821-F013B GR 2 FLANGE BOLTING AUG 1 821 OWN PRE B-G-2 H2 2821-1 MS-8A-BSR-2FB A-5 IS1 87.50 2821 -1MS-8A-BSR-2FB 2821-F013A GR 2 FLANGE BOLTING AUG 1 OWN PRE B-G-2 H2 2821-1 MS-8B-ASR-2FB A-5 IS1 87.50 2821 -1 MS-8B-ASR-2FB 2821-F013K GR 2 FLANGE BOLTING AUG 1 821 OWN PRE B-G-2 H2 2B21-1MS-8B-BSR-2FB A-5 IS1 87.50 2821 -1MS-8B-BSR-2FB 2821 -F013D GR 2 FLANGE BOLTING AUG 1 82 1 OWN PRE B-G-2 H2 2B21-1 MS-8B-CSR-2FB A-5 IS1 87.50 2821 -1MS-8B-CSR-2FB 2821 -F013C GR 2 FLANGE BOLTING AUG 1 821 OWN PRE B-G-2 H2 2821-1MS-8B-DSR-2FB A-5 IS1 87.50 2821-1 MS-88-DSR-2FB 2821-F013E GR 2 FLANGE BOLTING AUG 1 821 OWN PRE B-G-2 H2 2821-1 MS-8C-ASR-2FB A-5 IS1 87.50 2821 -1 MS-8C-ASR-2FB 2821-F013L GR 2 FLANGE BOLTING AUG 1 82 1 OWN PRE B-G-2 H2 2821 -1 MS-8C-BSR-2FB A-5 IS1 87.50 2821 -1 MS-8C-BSR-2FB 2821 -F013G GR 2 FLANGE BOLTING AUG 1 821 OWN PRE B-G -2 H2 2821-1 MS-8C-CSR-2FB A-5 IS1 87.50 2B21-1MS-8C-CSR-2FB 2821-F013F GR 2 FLANGE BOLTING AUG 1 821 OWN PRE
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Page 2 - 7 Southern Nuclear Operating Company Period 1 Period 2 Period 3 Category, Iso No.
| |
| ItemNO, Comp. Desc.
| |
| Class Summary IComplD ISystem Scope IMethod IProcedure Code Case B-G-2 H2 2821-1 MS-8D-ASR-2FB A-5 IS1 87.50 2821 -1MS-8D-ASR-2FB 2821 -F013J GR 2 FLANGE BOLTING AUG 1 821 OWN PRE B-G-2 H2 2821-1 MS-8D-BSR-2FB A-5 IS1 87.50 2821 -1 MS-8D-BSR-2FB 2821-F013H GR 2 FLANGE BOLTING AUG 1 821 OWN PRE B-G-2 H2 2831 -1 RCM-28AS-9BC-4FB A-16 IS1 87 50 2831 -1 RCM-28AS-9BC-4FB 4 GR 3 FLANGE BOLTING AUG 1 831 OWN PRE B-G-2 H2 2831-1 RCM-28BS-8BC-4FB A-18 IS1 87.50 2831 -1 RCM-28BS-8BC-4FB 4" GR 3 FLANGE BOLTING AUG 1 831 OWN PRE B-G-2 H2 2E11-1 RHR-9A-HS-1FB A-20 IS1 87 50 2E11-1 RHR-9A-HS-1FB 2N6A GR 4 FLANGE BOLTING AUG 1 ElI OWN PRE B-G-2 H2 2E11-1 RHR-9B-HS-1FB A-20 IS1 87.50 2E11-1 RHR-9B-HS-1FB 2N6B GR 4 FLANGE BOLTING AUG 1 El1 OWN PRE B-G-2 H2 2821-F010A BOLTING A-12 IS1 87.70 2821 -F010A BOLTING GROUP 1 VALVE BOLTING AUG 1 821 OWN PRE B-G -2 H2 2821-F01OB BOLTING A-13 IS1 87.70 2821 -FOlOB BOLTING GROUP 1 VALVE BOLTING AUG 1 821 OWN PRE B-G-2 H2 2821-F011A BOLTING A-I 2 IS1 87.70 2821-F011A BOLTING GROUP 2 VALVE BOLTING AUG 1 821 OWN PRE B-G-2 H2 2821-F011 B BOLTING A-13 IS1 87.70 2821-F011 B BOLTING GROUP 2 VALVE BOLTING AUG 1 821 OWN PRE
| |
| | |
| 4 Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Page 3 - 7 7/13/2006 1 Period 1 Period 2 Period 3 Category, Iso No. m o F N P)
| |
| ItemNO, Comp. Desc. 2 2 2 2 2 Class Summary IComplD ISystem Scope IMethod / Procedure Code Case 5 5 5 $5 $5 B-G-2 H2 2821-F013A BOLTING A-5 IS1 t t - - t - - - t t - -
| |
| 87.70 2821-F013A BOLTING GROUP 3 VALVE BOLTING AUG - - - - - - - - - - - -
| |
| 1 82 1 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-2 H2 2821-F013B BOLTING A-5 IS1 t t - - t - - - t t - -
| |
| 87.70 2821 -F013B BOLTING GROUP 3 VALVE BOLTING AUG - - - - - - - - - - - -
| |
| 1 82 1 o w - - - - - - - - - - - -
| |
| pRE - -- - - - - - - - - - -
| |
| B-G-2 H2 2821-F013C BOLTING A-5 IS1 t t - - t - - - t t - -
| |
| 87.70 2821 -F013C BOLTING GROUP 3 VALVE BOLTING AUG - - - - - - - - - - - -
| |
| 1 82 1 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-2 H2 2B21-F013D BOLTING A-5 IS1 t t - - t - - - t t - -
| |
| 87.70 2821 -F013D BOLTING GROUP 3 VALVE BOLTING AUG - - - - - - - - - - - -
| |
| 1 82 1 ow - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-2 H2 2821-F013E BOLTING A-5 IS1 t t - - t - - - t t - -
| |
| 8 7 70 2821 -F013E BOLTING GROUP 3 VALVE BOLTING AUG - - - - - - - - - - - -
| |
| 1 82 1 o w - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-2 H2 2B21-F013F BOLTING A-5 IS1 t t - - t - - - t t - -
| |
| 87.70 2821 -F013F BOLTING GROUP 3 VALVE BOLTING AUG - - - - - - - - - - - -
| |
| 1 821 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-2 H2 2821-F013G BOLTING A-5 IS1 t t - - t - - - t t - -
| |
| 87.70 2821 -F013G BOLTING GROUP 3 VALVE BOLTING AUG - - - - - - - - - - - -
| |
| 1 821 ow - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-2 H2 2821-F013H BOLTING A-5 IS1 t t - - 1 - - - t t - -
| |
| 87.70 2821-F013H BOLTING GROUP 3 VALVE BOLTING AUG - - - - - - - - - - - -
| |
| 1 82 1 o w - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-2 H2 2821 -F013K BOLTING A-5 IS1 I t - - t - - - t t - -
| |
| 87 70 2821-F013K BOLTING GROUP 3 VALVE BOLTING AIJG - - - - - - - - - - - -
| |
| 1 82 1 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-2 H2 2821-F013L BOLTING A-5 IS1 t t - - t - - - t t - -
| |
| 87 70 2821-F013L BOLTING GROUP 3 VALVE BOLTING AUG - - - - - - - - - - - -
| |
| 1 82 1 ow - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Page 4 - 7 711 312006 1 Period i Period 2 Period 3 Category, Iso No.
| |
| IternNO, Cornp. Desc.
| |
| Class Summary IComplD ISystem Scope IMethod IProcedure Code Case B-G-2 H2 2821-F013M BOLTING A-5 IS1 87 70 2821 -F013M BOLTING GROUP 3 VALVE BOLTING AUG 1 82 1 OWN PRE B-G-2 H2 2B21-F022A BOLTING A-6 IS1 87 70 2821 -F022A BOLTING GROUP 4 VALVE BOLTING AUG 1 82 1 OWN PRE B-G-2 H2 2821 -F022B BOLTING A-7 IS1 87 70 2821 -F022B BOLTING GROUP 4 VALVE BOLTING AUG 1 821 OWN PRE B-G-2 H2 2821-F022C BOLTING A-8 IS1 87.70 2821 -F022C BOLTING GROUP 4 VALVE BOLTING AUG 1 821 OWN PRE B-G-2 H2 2821-F022D BOLTING A-9 IS1 87 70 2821 -F022D BOLTING GROUP 4 VALVE BOLTING AUG 1 821 OWN PRE B-G-2 H2 2821 -F028A BOLTING A-6 IS1 87.70 2821-F028A BOLTING GROUP 4 VALVE BOLTING AUG 1 821 OWN PRE B-G-2 H2 2821 -F028B BOLTING A-7 IS1 87.70 2821-F028B BOLTING GROUP 4 VALVE BOLTING AUG 1 821 OWN PRE 8-6-2 H2 2821-F028C BOLTING A-8 IS1 87 70 2821 -F028C BOLTING GROUP 4 VALVE BOLTING AUG 1 821 OWN PRE B-G-2 H2 2821-F028D BOLTING A-9 IS1 87 70 2B21-F028D BOLTING GROUP 4 VALVE BOLTING AUG 1 821 OWN PRE B-G-2 H2 2821-F077A BOLTING A-12 IS1 87 70 2821 -F077A BOLTING GROUP 1 VALVE BOLTING AUG 1 821 OWN PRE
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Period 1 Page 5 - 7 Period 2 711312006 Period 3 1
| |
| Category, Iso No. a ItemNO, Comp. Desc. E 2 2 5 0
| |
| E I
| |
| (Y l2 2 IN 5 0
| |
| Class Summary I ComplD I System Scope I Method I Procedure Code Case I
| |
| * B-G-2 H2 2821-F077B BOLTING A-13 IS1 87.70 2821 -F077B BOLTING GROUP 1 VALVE BOLTING AUG 1 821 OWN PRE B-G-2 H2 2831-F023A BOLTING A-16 IS1 87.70 2831 -F023A BOLTING GROUP 5 VALVE BOLTING AUG 1 831 OWN PRE B-G-2 H2 2831-F023B BOLTING A-18 IS1 87.70 2831 -F023B BOLTING GROUP 5 VALVE BOLTING AUG 1 831 OWN PRE B-G-2 H2 2831-F031 A BOLTING A-17 IS1 87.70 2831-F031A BOLTING GROUP 5 VALVE BOLTING AUG 1 831 OWN PRE B-G-2 H2 2831-F031B BOLTING A-19 IS1 87.70 2831 -F031 B BOLTING GROUP 5 VALVE BOLTING AUG 1 831 OWN PRE B-G-2 H2 2E11-F008 BOLTING A-21 IS1 87.70 2E11 -F008 BOLTING GROUP 6 VALVE BOLTING AUG 1 El1 OWN PRE B-G-2 H2 2E11-F009 BOLTING A-21 IS1 87.70 2E11 -F009 BOLTING GROUP 6 VALVE BOLTING AUG 1 El1 OWN PRE 6-G-2 H2 2E11 -F015A BOLTING A-22 IS1 87.70 2E11 -F015A BOLTING GROUP 7 VALVE BOLTING AUG 1 El1 OWN PRE B-G-2 H2 2E11 -F015B BOLTING A-23 IS1 87.70 2E11 -F015B BOLTING GROUP 7 VALVE BOLTING AUG 1 El1 OWN PRE B-G-2 H2 2E11-F050A BOLTING A-22 IS1 87.70 2E11-F050A BOLTING GROUP 9 VALVE BOLTING AUG 1 El1 OWN PRE
| |
| | |
| 4 Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Page 6 - 7 711 312006 1 Period 1 Period 2 Period 3 Category, Iso No. 0) o r N P)
| |
| ItemNO, Comp. Desc. 2 2 2 2 2 Class Summary I ComplD I System Scope I Method I Procedure Code Case 5 5 5 5 5 B-G-2 HZ 2E11-F050B BOLTING A-23 ISI t t - - t - - - t t - -
| |
| 87.70 2E11-F050B BOLTING GROUP 9 VALVE BOLTING AuG - - - - - - - - - - - -
| |
| 1 El 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-2 H2 2E11-F060A BOLTING A-22 IS1 t t - - t - - - t t - -
| |
| 87.70 2E11-F060A BOLTING GROUP 10 VALVE BOLTING AUG - - - - - - - - - - - -
| |
| 1 El1 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-2 H2 2E11-F060B BOLTING A-23 IS1 t t - - t - - - t t - -
| |
| 87 70 2E11-F060B BOLTING GROUP 10 VALVE BOLTING AUG - - - - - - - - - - - -
| |
| 1 El 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-2 H2 2E11-F067 BOLTING A-21 IS1 t t - - t - - - t t - -
| |
| 87.70 2E11 -F067 BOLTING GROUP 8 VALVE BOLTING AUG - - - - - - - - - - - -
| |
| 1 El 1 om - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| B-G-2 H2 2E21-F004A BOLTING A-24 IS1 t t - - t - - - t t - -
| |
| 87 70 2E21-F004A BOLTING GROUP 11 VALVE BOLTING AUG - - - - - - - - - - - -
| |
| 1 E21 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-2 H2 2E21-F004B BOLTING A-25 IS1 t t - - t - - - t t - -
| |
| 87 70 2E21-F004B BOLTING GROUP 11 VALVE BOLTING AUG - - - - - - - - - - - -
| |
| 1 E21 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-2 H2 2E21-F005A BOLTING A-24 IS1 t t - - t - - - t t - -
| |
| 87.70 2E21-F005A BOLTING GROUP 11 VALVE BOLTING AUG - - - - - - - - - - - -
| |
| 1 E21 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-2 H2 2E21-F005B BOLTING A-25 IS1 t t - - t - - - t t - -
| |
| 87.70 2E21-F005B BOLTING GROUP 11 VALVE BOLTING AUG - - - - - - - - - - - -
| |
| 1 E21 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-2 H2 2E21-F006A BOLTING A-24 IS1 t t - - t - - - t t - -
| |
| 87.70 2E21-F006A BOLTING GROUP 12 VALVE BOLTING AUG - - - - - - - - - - - -
| |
| 1 E21 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-G-2 HZ 2E21-F006B BOLTING A-25 IS1 t t - - t - - - t t - -
| |
| 87 70 2E21-F006B BOLTING GROUP 12 VALVE BOLTING AUG - - - - - - - - - - - -
| |
| 1 E21 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| 4 Revision: 1 HNP-2 F o u r t h I n t e r v a l C l a s s 1 IS1 P l a n Southern Nuclear Operating Company Page 7 - 7 711 312006 (
| |
| Period 1 Period 2 Period 3 Category, Iso No. m o F CY o ItemNO, Comp. Desc. 2 2 2 2 2 Class Summary I ComplD I System Scope I Method I Procedure Code Case 5 5 5 5 I, 86-2 H2 2E21-F007A BOLTING A-24 IS1 t t - - t - - - t t - -
| |
| 87.70 2E21-F007A BOLTING GROUP 13 VALVE BOLTING AIJG - - - - - - - - - - - -
| |
| 1 E21 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B -G -2 H2 2E21-F007B BOLTING A-25 IS1 t t - - t - - - t t - -
| |
| 87.70 2E21-F007B BOLTING GROUP 13 VALVE BOLTING AUG - - - - - - - - - - - -
| |
| 1 E2 1 om - - - - - - - - - - - -
| |
| PRE - ; - - - - - - - - - -
| |
| 6-G-2 H2 2E41-F002 BOLTING A-26 IS1 t t - - t - - - t t - -
| |
| 87.70 2E41-F002 BOLTING GROUP 15 VALVE BOLTING AIJG - - - - - - - - - - - -
| |
| 1 E41 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - -
| |
| 6-G -2 H2 2E41-F003 BOLTING A-26 IS1 t t - - t - - - t t - -
| |
| 87.70 2E41-F003 BOLTING GROUP 15 VALVE BOLTING AUG - - - - - - - - - - - -
| |
| 1 E41 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B -G -2 H2 2E41-F006 BOLTING A-26 IS1 t t - - t - - - t t - -
| |
| 87.70 2E41 -F006 BOLTING GROUP 14 VALVE BOLTING AUG - - - - - - - - - - - -
| |
| 1 E41 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B -G -2 H2 2G31 -Fool BOLTING A-28 IS1 t t - - t - - - t t - -
| |
| 87.70 2G31-F001 BOLTING GROUP 16 VALVE BOLTING AUG - - - - - - - - - - - -
| |
| 1 G31 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B -G -2 H2 2G31-F004 BOLTING A-28 IS1 t t - - t - - - t t - -
| |
| 87.70 2G31-F004 BOLTING GROUP 16 VALVE BOLTING AUG - - - - - - - - - - - -
| |
| 1 G31 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B -G -2 H2 2G31-F027 BOLTING A-28 IS1 t t - - t - - - t t - -
| |
| 87.70 2G31-F027 BOLTING GROUP 17 VALVE BOLTING AUG - - - - - - - - - - - -
| |
| 1 G31 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company P a g e 1 - 30 711312006 1 Period 1 Period 2 Period 3 Category, Iso No.
| |
| ItemNO, Comp. Desc.
| |
| Class Summary IComplD ISystem Scope IMethod IProcedure Code Case BJ H2 2821 -1 CHSV-4-1 A-3 IS1 4' DIA. NOZZLE TO FLANGE AUG - - - -
| |
| PRE BJ H2 2821-1 FW-12AA-1 A-10 IS1 89.1 1 2821 -1FW-12AA-1 REDUCER TO PIPE AUG 1 821 OWN PRE - - - -
| |
| B-J H2 2821-1 FW-12AA-11 lSllUT1 A-1 0 IS1 - s - -
| |
| 89.1 1 2821-1 FW-12AA-11 CS TRANS PIECETO CSTRANS PIECE AUG - - - -
| |
| CS TRANS PIECE TO NOZZLE AUG - - - -
| |
| PRE - - - - - - - -
| |
| B-J H2 2821-1 FW-12AA-2 A-10 IS1 - - - - - - - -
| |
| PlPE TO PlPE AUG - - - -
| |
| PRE - - - -
| |
| BJ H2 2821-1 FW-12AA-3 A-10 IS1 - - - -
| |
| 89.11 2821 -1 FW-12AA-3 PIPE TO PIPE AUG - - - -
| |
| 1 821 OWN - - - -
| |
| PRE BJ H2 2821-1 FW-12AA-4 A-1 0 IS1 89.1 1 2821 -1 FW-12AA-4 PIPE TO PIPE AUG 1 821 OWN PRE BJ H2 2821 -1 FW-12AA-5 A-1 0 ISI 89.1 1 2821 -1 FW-l2AA-5 PIPE TO ELBOW AUG 1 82 1 OWN PRE BJ H2 2821-1 FW-12AA-6 A-1 0 IS1 89.1 1 2821 -1FW-12AA-6 ELBOW TO PIPE AUG 1 821 OWN PRE BJ H2 2821 -1 FW-12AA-7 lSllUT1 A-1 0 IS1 89.1 1 2821 -1 FW-12AA-7 PIPE TO TRANSITION PIECE AUG 1 821 OWN PRE
| |
| | |
| 4 Revision: 1 HNP-2 Fourth Interval Class I IS1 Plan Southern Nuclear Operating Company Page 2 - 30 711 312006 1 Period 1 Period 2 Period 3 Category, Iso No. m o r N (3 ItemNO, Comp. Desc. z 2 2 2 2 Class Summary IComplD ISystem Scope IMethod IProcedure Code Case 5 5 5 5 BJ H2 2821-1 FW-12AB-1 A-1 0 IS1 - - - - - - - - - - - -
| |
| 89.11 2821-1 FW-12AB-1 REDUCER TO PIPE AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-J H2 2821-1 FW-12AB-10 A-1 0 IS1 - - - - - - - - - - - -
| |
| 89.1 1 2821 -1 FW-12AB-10 PIPE TO TRANSITION PIECE AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - -- - - - - - - - - - -
| |
| BJ H2 2821 -1 FW-12AB-14 ISIIUTI A-1 0 IS1 - s - - - - - - - - - -
| |
| 89.1 1 2821 -1 FW-12AB-14 PIECE AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2821-1 FW-12AB-15 ISI/UTl A-1 0 IS1 - s - - s - - - - - - -
| |
| 89.1 1 2821 -1 F W - 1 x 8 - 1 5 TRANSITION PIECE TO NOZZLE AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-J H2 2821 -1 FW-12AB-1A A-1 0 IS1 - - - - - - - - - - - -
| |
| 89.1 1 2821 -1 FW-12AB-1A PIPE TO ELBOW AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2821-1 FW-12AB-2 A-1 0 IS1 - - - - - - - - - - - -
| |
| 89.1 1 2821 -1FW-12AB-2 ELBOW TO PIPE AUG - - - - - - - - - - - -
| |
| 1 82 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-J H2 2821-1 FW-12AB-3 A-1 0 IS1 - - - - - - - - - - - -
| |
| 89.1 1 2821 -1 FW-12AB-3 PIPE TO ELBOW AUG - - - - - - - - - - - -
| |
| 1 82 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2821 -1 FW-12AB-4 A-1 0 IS1 - - - - - - - - - - - -
| |
| 89.1 1 2821 -1 F W - 1 x 8 - 4 ELBOW TO PIPE AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2821-1 FW-12AB-5 A-1 0 IS1 - - - - - - - - - - - -
| |
| 89.1 1 2821 -1 FW-12AB-5 PIPE TO ELBOW AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ HZ 2821 -1 FW-12AB-6 A-1 O IS1 - - - - - - - - - - - -
| |
| 89.1 1 2821 -1 FW-12AB-6 ELBOWTO PIPE AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| Revision: 1 HNP-2 F o u r t h I n t e r v a l C l a s s 1 IS1 Plan Southern Nuclear Operating Company Page 3 - 30 711 312006 1 Period 1 Period 2 Period 3 Category, Iso No. r N o ItemNO, Comp. Desc. 2 2 2 Class Summary 1 ComplD 1System Scope IMethod I IProcedure Code Case 5 5 5 5 i4 BJ H2 2821-1 FW-12AB-7 A-1 0 IS1 - - - - - - - - - - - -
| |
| B9 11 2B21-1FW-12AB-7 PIPE TO PIPE AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2821-1 FW-12AB-8 A-1 0 IS1 - - - - - - - - - - - -
| |
| 89 11 2B21-1 FW-12AB-8 PIPE TO ELBOW AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| I PRE - - - - - - - - - - - -
| |
| BJ H2 2821-1 FW-12AB-9 ISIIUTI A-1 0 IS1 - - - - - - - - - s - -
| |
| B9 11 2821 -1 FW-12AB-9 ELBOWTO PIPE AUG - - - - - - - - - - - -
| |
| 1 82 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2821-1 FW-12BC-1 A-1 1 IS1 - - - - - - - - - - - -
| |
| 89 11 2B21-1 FW-12BC-1 REDUCER TO ELBOW AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - -
| |
| B-J H2 2821-1 FW-12BC-10 ISllUTl A-1 1 IS1 - - - - s - - - - - - -
| |
| 89 11 2B21-1FW-12BC-10 PIPE TO TRANSITION PIECE AUG - - - - - - - - - - - -
| |
| 1 821 I om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2821-1 FW-12BC-14 A-1 1 IS1 - - - - - - - - - - - -
| |
| B9 11 2B21-1FW-12BC-14 PIECE AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2821-1 FW-12BC-15 lSllUT1 A-1 1 IS1 - - - - s - - - - - - -
| |
| 89 11 2821 -1 FW-12BC-15 TRANSITION PIECE TO NOZZLE AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2821-1 FW-12BC-1A A-1 1 IS1 - - - - - - - - - - - -
| |
| 89 11 2821 -1 FW-12BC-1A PIPE TO ELBOW AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2821-1 FW-12BC-2 A-1 1 IS1 - - - - - - - - - - - -
| |
| 89 11 2821 -1 FW-12BC-2 ELBOW TO PIPE AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2821-1 FW-12BC-3 A-1 1 IS1 - - - - - - - - - - - -
| |
| 89 11 2B21-1FW-12BC-3 PIPE TO ELBOW AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - . - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| Revision: 1 HNP-2 F o u r t h Interval C l a s s IIS1 P l a n 'age 4 - 30 Southern Nuclear Operating Company Period 1 Period 2 Period 3 Category, Iso No. Y ItemNO, Comp. Desc. 2 Class Summary IComplD ISystem Scope IMethod 1Procedure Code Case 5 BJ H2 2821-1 FW-12BC-4 ISllUTl A-I 1 IS1 B9 11 2821 -1 FW-12BC-4 ELBOWTO PIPE AUG 1 821 OWN PRE BJ H2 2821-1 FW-12BC-5 A-1 I IS1 89 11 2821 -1 FW-12BC-5 PIPE TO ELBOW AUG 1 82 1 OWN PRE BJ H2 2821-1 FW-12BC-6 A-I 1 IS1 89 11 2821 -1 FW-12BC-6 ELBOW TO PIPE AUG 1 821 OWN PRE BJ H2 2821 -1 FW-128C-7 A-1 1 IS1 89 11 2821 -1 FW-12BC-7 PIPE TO PIPE AUG 1 821 OWN PRE BJ H2 2821 -1 FW-12BC-8 A-1 1 IS1 89 11 2821 -1 FW-12BC-8 PIPE TO ELBOW AUG 1 821 OWN PRE BJ H2 2821-1 FW-12BC-9 A-1 I IS1 B9 11 2821-1 FW-12BC-9 ELBOW TO PIPE AUG 1 821 OWN PRE BJ H2 2821-1 FW-128D-1 A-1 1 IS1 89 11 2821 -1 FW-12BD-1 REDUCER TO PIPE AUG 1 82 1 OWN PRE BJ H2 2821-1 FW-1280-11 ISllUTl A-l I IS\
| |
| 89 11 2821 -1 FW-12BD-I1 PIECE AUG 1 821 OWN I
| |
| I PRE 6J H2 2821-1 FW-12BD-12 ISIIUTI A-1 I IS1 89 11 2821 -1 FW-12BD-12 TRANSITION PIECE TO NOZZLE AUG 1 821 OWN PRE BJ H2 2821-1 FW-128D-1A A-1 1 IS1 89 11 2821 -1 FW-12BD-1A PIPE TO PIPE AUG 1 82 1 OWN PRE
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Page 5 - 30 711 312006 1 Period 1 Period 2 Period 3 Category, Iso No.
| |
| IternNO, Comp. Desc.
| |
| Class Summary 1 CornplD ISystem Scope 1 Mdthod 1 Procedure Code Case BJ H2 2821 -1 FW-12BD-2 A-1 1 IS1 PlPE TO PlPE AUG OWN PRE B-J H2 2821 -1 FW-12BD-3 A-1 1 IS1 89.1 1 2821-1 FW-12BD-3 PIPE TO PIPE AUG 1 821 OWN PRE B-J H2 2821 -1 FW-12BD-4 A-1 1 IS1 89.1 1 2821-1 FW-12BD-4 PIPE TO PIPE AUG 1 821 OWN PRE B-J H2 2821 -1 FW-12BD-5 A-1 1 IS1 89.1 1 2821-1 FW-12BD-5 PIPE TO ELBOW AUG 1 821 OWN PRE B-J H2 2821 -1 FW-12BD-6 A-1 1 IS1 89.1 1 2821-1 FW-12BD-6 ELBOW TO PIPE AUG 1 821 OWN PRE BJ H2 2821 -1 FW-12BD-7 A-1 1 IS1 PIPE TO TRANSITION PIECE AUG OWN PRE B-J H2 2821 -1 FW-18A-1 lSllUT1 A-12 IS1 89.1 1 2821 -1 FW-18A-1 AUGIUTI VALVE TO PIPE AUG 1 821 OWN PRE BJ H 2 2821 -1 FW-18A-I A ISIIUTI A-I 2 IS1 89.1 1 2821-1 FW-18A-1 A AUGIUTI PIPE TO PENETRATION AUG 1 821 OWN PRE B-J H2 2821-1 FW-18A-2 AUGIUTINMP-ES-024-502 A-12 IS1 89.1 1 2821-1 FW-18A-2 PENETRATION TO VALVE AUG 1 821 OWN PRE B-J H2 2821 -1 FW-18A-3 A-12 IS1 VALVE TO PlPE AUG OWN PRE
| |
| | |
| d 3 Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Page 6 - 30 Southern Nuclear Operating Company Period 1 Period 2 Period 3 Category, Iso No.
| |
| IternNO, Comp. Desc.
| |
| Class Summary ICornplD ISystem Scope IMethod IProcedure Code Case BJ H2 2821-1 FW-18A-4 A-12 IS1 89.1 1 2821 -1 FW-18A-4 PIPE TO ELBOW AUG 1 821 OWN PRE BJ H2 2821 -1 FW-18A-5 A-12 IS1 89.1 1 2821 -1 FW-18A-5 ELBOW TO VALVE AUG 1 821 OWN PRE BJ H2 2821-1 FW-18A-6 A-12 IS1 89.1 1 2821 -1FW-18A-6 VALVE TO PIPE AUG 1 82 1 OWN PRE BJ H2 2821-1 FW-18A-7 A-12 IS1 89.1 1 2821-1 FW-18A-7 PIPE TO TEE AUG 1 821 OWN PRE BJ H2 2821-1 FW-18A-8 A-12 IS1 89.1 1 2821 -1FW-18A-8 TEE TO REDUCER AUG 1 82 1 OWN PRE BJ H2 2821-1 FW-18A-9 A-12 IS1 89.1 1 2821 -1FW-18A-9 TEE TO REDUCER AU G 1 821 OWN PRE BJ H2 2821-1 FW-188-1 AUGIUTINMP-ES-024-502 A-13 IS1 89.11 2821 -1 FW-188-1 VALVE TO PIPE AUG 1 82 1 OWN PRE BJ H2 2821-1 FW-188-1A ISIIUTI A-13 IS1 89.11 2821 -1 FW-188-1A AUGlUTl PIPE TO PENETRATION AUG 1 821 OWN PRE B-J H2 2821-1 FW-188-2A lSllUT1 A-13 IS1 89.1 1 2821 -1FW-188-2A AUGII PENETRATION TO VALVE AUG 1 82 1 OWN PRE B-J H2 2821-1 FW-188-3A A-13 IS1 89.1 1 2821 -1FW-188-3A VALVE TO PIPE AUG 1 821 OWN PRE
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Page 7 - 30 Southern Nuclear Operating Company Period 1 Period 2 Period 3 Category, Iso No.
| |
| ItemNO, Comp. Desc.
| |
| Class Summary 1 ComplD 1 System Scope 1 Method 1 Procedure Code Case BJ H2 2821-1 FW-188-4 A-1 3 IS1 PlPE TO ELBOW AUG OWN PRE BJ H2 2821-1 FW-188-5 A-1 3 IS1 89.1 1 2821 -1 FW-188-5 ELBOW TO VALVE AUG 1 821 OWN PRE BJ H2 2821-1 FW-188-6 A-1 3 IS1 89.1 1 2821 -1 FW-188-6 VALVE TO PIPE AUG 1 821 OWN PRE B-J H2 2821-1 FW-188-7 A-1 3 IS1 89.1 1 2821 -1 FW-188-7 PIPE TO TEE AUG 1 821 OWN PRE BJ H2 2821-1 FW-188-8 A-1 3 IS1 89.1 1 2021-1 FW-188-8 TEE TO REDUCER AUG 1 821 OWN PRE BJ H2 2821-1 FW-188-9 A-1 3 IS1 89.1 1 2021-1 FW-188-9 TEE TO REDUCER AUG 1 821 OWN PRE BJ H2 2821-1 MS-24A-1 ISIII A-6 IS1 89.1 1 2021-1 MS-24A-1 NOZZLE TO TRANSITION PIECE AUG 1 821 OWN PRE BJ H2 2821-1 MS-24A-10 A-6 IS1 89.1 1 2821-1 MS-24A-10 PIPE TO ELBOW AUG 1 821 OWN PRE BJ H2 2821-1 MS-24A-11 A-6 IS1 89.1 1 2821 -1 MS-24A-11 ELBOW TO PIPE AUG 1 821 OWN PRE BJ H2 2821 -1 MS-24A-12 A-6 IS1 PlPE TO PlPE AUG OWN PRE
| |
| | |
| 4 3 3 Revision: 1 HNP-2 F o u r t h Interval Class IIS1 Plan S o u t h e r n N u c l e a r Operating C o m p a n y Page 8 - 30 711 312006 1 Period 1 Period 2 Period 3 Category, Iso No. O) o r (Y C)
| |
| ItemNO, Comp. Desc. 2 $ 2 2 Class Summary IComplD ISystem Scope IMethod IProcedure Code Case 5 5 5 5 5 B-J H2 2821-1 MS-24A-13 A-6 IS1 - - - - - - - - - - - -
| |
| 89 11 2821 -lMS-24A-13 PIPE TO ELBOW AUG - - - - - - - - - - - -
| |
| 1 821 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 6-J H2 2821 -1 MS-24A-14 A-6 IS1 - - - - - - - - - - - -
| |
| 89 11 2821 -1MS-24A-14 ELBOW TO PIPE AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-J H2 2821-1MS-24A-15 A-6 IS1 - - - - - - - - - - - -
| |
| 89 11 2821 -1MS-24A-15 PIPE TO 45-DEGREE ELBOW AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 6J H2 2821-1 MS-24A-16 A-6 IS1 - - - - - - - - - - - -
| |
| 89 11 2821 -1 MS-24A-16 45-DEGREE ELBOW TO PIPE AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 6-J H2 2821-1 MS-24A-17 A-6 IS1 - - - - - - - - * - - -
| |
| 89 11 2821-1 MS-24A-17 PIPE TO VALVE AUG - - - - - - - - - - - -
| |
| 1 821 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 6J H2 2821-1 MS-24A-18 ISIIUTI A-6 IS1 - - - - - - - - s - - -
| |
| 89 11 2821 -1MS-24A-18 AUGIUTI VALVE TO PIPE AUG - - - - - - - - s - - -
| |
| 1 821 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 6-J H2 2821-1 MS-24A-19 ISllUTINMP-ES-024-502 A-6 IS1 s - - - - - - - - - - -
| |
| 89 11 2821 -1MS-24A-19 AUGIUTINMP-ES-024-502 PIPE TO PIPE AUG s - - - - - - - - - - -
| |
| 1 82 1 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2821-1 MS-24A-2 ISIIUTI A-6 IS1 - - - - s - - - - - - -
| |
| 89 11 2821 -1MS-24A-2 TRANSITION PIECE TO PIPE AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 6-J H2 2821-1 MS-24A-20 ISIIUTI A-6 IS1 - - - - - - - - s - - -
| |
| 89 11 2821 -1MS-24A-20 AUGlUTl PIPE TO VALVE AUG - - - - - - - - s - - -
| |
| 1 821 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-J H2 2821-1 MS-24A-3 ISIIUTI A-6 IS1 - - - - S - - - - - - -
| |
| 89 11 2821 -1MS-24A-3 PIPE TO ELBOW AUG - - - - - - - - - - - -
| |
| 1 82 1 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| Revision: 1 HNP-2 F o u r t h I n t e r v a l C l a s s 1 IS1 P l a n Page 9 - 30 Southern Nuclear Operating Company Period 1 Period 2 Period 3 Category, Iso No.
| |
| IternNO, Cornp. Desc.
| |
| Class Summary IComplD ISystem Scope IMethod IProcedure Code Case BJ H2 2821-1 MS-24A-4 A-6 IS1 89 11 2821 -1 MS-24A-4 ELBOW TO PIPE AUG 1 821 OWN PRE BJ H2 2821-1 MS-24A-5 A-6 IS1 89 11 2821 -1 MS-24A-5 PIPE TO PIPE AUG 1 821 OWN PRE BJ H2 2821 -1 MS-24A-6 A-6 IS1 89 11 2821 -1MS-24A-6 PIPE TO PIPE AUG 1 821 OWN PRE BJ H2 2821 -1 MS-24A-7 A-6 IS1 89 11 2821-1 MS-24A-7 PIPE TO PIPE AUG 1 821 OWN PRE BJ H2 2821 -1 MS-24A-8 ISIIUTI A-6 IS1 89.1 1 2821 -1 MS-24A-8 PIPE TO ELBOW AUG 1 821 OWN PRE BJ H2 2821 -1 MS-24A-9 A-6 IS1 89.1 1 2821-1MS-24A-9 ELBOW TO PIPE AUG 1 821 OWN PRE B-J ASR A-6 IS1 89.31 2821-1 MS-24A-9BC-112821- 1MS-8A-ASR PIPE TO BRANCH CONNECTION AUG 1 821 OWN PRE B J BSR A-6 IS1 89.31 2821-1 MS-24A-9BC-212821- 1MS-8A-BSR PIPE TO BRANCH CONNECTION AUG 1 821 OWN PRE BJ D ISIIUTINMP-ES-024-502 A-6 IS1 89.31 2821 -1MS-24A-9BC-312E51- 1 RCIC-CD PIPE TO BRANCH CONNECTION AUG 1 821 OWN PRE BJ H2 2821-1 MS-248-1 ISIIUTI A-7 IS1 89.1 1 2821 -1 MS-240-1 NOZZLE TO TRANSITION PIECE AUG 1 821 OWN PRE
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Page 10 - 30 711 312006 1
| |
| : Category, ItemNO, Iso No.
| |
| Comp. Desc.
| |
| OY 5 2 Period 1 o .-
| |
| 2 Period 2 N
| |
| 2 2 Period 3 P)
| |
| Class Summary 1ComplD 1System Scope 1 Method 1 Procedure Code Case 5 5 5 5 5 BJ H2 2821-1 MS-24B-10 ISIIUTI A-7 IS1 - - - - - - - - s - - -
| |
| 89.11 2821 -1MS-24B-10 PIPE TO ELBOW AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2821-1 MS-24B-11 A-7 IS1 - - - - - - - - - - - -
| |
| 89.11 2821 -1MS-24B-11 ELBOW TO PIPE AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - ~ - - - - - - - - - - -
| |
| BJ H2 2B21-1MS-24B-12 A-7 1SI - - - - - - - - - - - -
| |
| 89.11 2821 -1 MS-24B-12 PIPE TO PIPE AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2821 -1 MS-24B-13 A-7 IS1 - - - - - - - - - - - -
| |
| 89.11 2821 -1 MS-24B-13 PIPE TO ELBOW AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2821-1MS-248-14 A-7 IS1 - . . - - - - - - - - - -
| |
| 89.1 1 2821 -1 MS-24B-14 ELBOW TO PIPE AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2821-1 MS-248-15 A-7 IS1 - - - - - - - - - - - -
| |
| 89.11 2821 -lMS-24B-15 PIPE TO VALVE AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2821-1 MS-24B-16 AUGIUTINMP-ES-024-502 A-7 IS1 - - - - - - - - - - - -
| |
| 89.11 2821 -1MS-246-16 VALVE TO PIPE AUG s - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2821 -1 MS-248-17 AUGIUTINMP-ES-024-502 A-7 IS1 - - - - - - - - - - - -
| |
| 89.11 2821 -1 MS-248-17 PIPE TO PIPE AuG s - - - - - - - - - - -
| |
| 1 B21 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2821-1 MS-24B-18 AUGIUTINMP-ES-024-502 A-7 IS1 - - - - - - - - - - - -
| |
| 89.1 1 2821-1MS-24B-18 PIPE TO VALVE AUG s - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2821-1 MS-24B-2 ISIIUTI A-7 IS1 - - - - s - - - - - - -
| |
| 89.11 2821 -1MS-248-2 TRANSITION PIECE TO PIPE AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| 3 Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Page 12 - 30 711 312006 1 Period 1 Period 2 Period 3 Category, lso No. m o r I?
| |
| ItemNO, ~ o m pDesc.
| |
| . Z 2 2 2 2 Class Summary IComplD 1System Scope IMethod IProcedure Code Case 5 5 5 5 5 6J H2 2821-1 MS-248-9 A-7 IS1 - - - - - - - - - - - -
| |
| 89.1 1 2821 -1MS-248-9 PIPE TO PIPE AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 6J H2 2821-1 MS-24C-1 ISllUTlNMP-ES-024-502 A-8 IS1 s - - - - - - - - - - -
| |
| 89.1 1 2821 -1 MS-24C-1 NOZZLE TO TRANSITION PIECE AUG - - - - - - - - - - - -
| |
| 1 82 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2821 -1 MS-24C-10 A-8 IS1 - - - - - - - - - - - -
| |
| 89.1 1 2821 -1MS-24C-10 PIPE TO ELBOW AUG - - - - - - - - - - - -
| |
| 1 821 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 6J H2 2821 -1 MS-24C-11 A-8 IS1 - - - - - - - - - - - -
| |
| 89.1 1 2821 -1 MS-24C-11 ELBOW TO PIPE AUG - - - - - - - - - - - -
| |
| 1 82 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 6J H2 2821 -1 MS-24C-12 A-8 IS1 - - - - - - - - - - - -
| |
| 89.1 1 2821 -1MS-24C-12 PIPE TO PIPE AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 6J H2 2821-1 MS-24C-13 ISllUTl A-8 IS1 - - - - s - - - - - - -
| |
| 89.1 1 2821 -1 MS-24C-13 PIPE TO ELBOW AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2821 -1 MS-24C-14 A-8 IS1 - - - - - - - - - - - -
| |
| 89.1 1 2821 -1MS-24C-14 ELBOW TO PIPE AUG - - - - - - - - - - - -
| |
| 1 82 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 6J H2 2821-1 MS-24C-15 A-8 IS1 - - - - - - - - - - - -
| |
| 89.1 1 2821 -1MS-24C-15 PIPE TO VALVE AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| 6J H2 2821 -1 MS-24C-16 lSllUT1 A-8 IS1 - - - - - - - - s - - -
| |
| 89.1 1 2821 -1MS-24C-16 AUGIUTI VALVE TO PIPE AUG - - - - - - - - s - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 6J H2 2821-1 MS-24C-17 AUGIUTINMP-ES-024-502 A-8 IS1 - - - - - - - - - - - -
| |
| 89.1 1 2821-1MS-24C-17 PIPE TO PIPE AUG s - - - - - - - - - - -
| |
| 1 821 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Page 13 - 30 Southern Nuclear Operating Company Period 1 Period 2 Period 3 Category, Iso No.
| |
| ItemNO, Comp. Desc.
| |
| Class Summary IComplD ISystem Scope IMethod IProcedure Code Case BJ H2 2821 -1 MS-24C-18 AUGIUTINMP-ES-024-502 A-8 IS1 89 11 2821 -1 MS-24C-18 PIPE TO VALVE AUG 1 82 1 OWN PRE BJ H2 2821-1 MS-24C-2 ISIIUTINMP-ES-024502 A-8 IS1 89 11 2821 -1 MS-24C-2 TRANSITION PIECE TO PIPE AUG 1 821 OWN PRE BJ H2 2821 -1 MS-24C-3 ISIIUTINMP-ES-024-502 A8 IS1 89 11 2821-1 MS-24C-3 PIPE TO ELBOW AUG 1 821 OWN PRE B-J H2 2821-1 MS-24C-4 A-8 IS1 89 11 2821 -1 MS-24C-4 ELBOW TO PIPE AUG 1 821 OWN PRE BJ H2 2821 -1 MS-24C-5 A-8 IS1 8911 2821 -1 MS-24C-5 PIPE TO PIPE AUG 1 821 OWN PRE BJ H2 2821-1 MS-24C-6 A-8 IS1 8911 2821-1 MS-24C-6 PIPE TO PIPE AUG 1 821 OWN PRE BJ D A-8 IS1 B9 31 2821 -1 MS-24C-6BC-112E41- 1HPCI-10-D PIPE TO BRANCH CONNECTION AUG 1 821 OWN PRE BJ H2 2821-1 MS-24C-7 A-8 IS1 89 11 2821-1 MS-24C-7 PIPE TO ELBOW AUG 1 821 OWN PRE BJ H2 2821-1 MS-24C-8 A-8 IS1 89 11 2821 -1MS-24C-8 ELBOW TO PIPE AUG 1 821 OWN PRE-BJ ASR A-8 IS1 89 31 2821 -1MS-24C-8BC-112821- 1MS-8C-ASR PIPE TO BRANCH CONNECTION AUG 1 821 OWN PRE
| |
| | |
| V w u Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Page 14 - 30 711312006 /
| |
| Period 1 Period 2 Period 3 Category, Iso No. O) o r N VJ ItemNO, Comp. Desc. 2 2 2 2 2 Class Summary I ComplD 1 System Scope I Method I Procedure Code Case I, I, I, I, 5 BJ BSR A-8 IS1 - - - - - - - - - - - -
| |
| 89 31 2821 -1MS-24C-8BC-212821- 1MS-8C-BSR PIPE TO BRANCH CONNECTION AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ CSR A-8 IS1 - - - - - - - - - - - -
| |
| 89 31 2821-1MS-24C-8BC-312821- 1MS-8C-CSR PIPE TO BRANCH CONNECTION AUG - - - - - - - - - - - -
| |
| 1 821 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-J H2 2821-1 MS-24C-9 A-8 IS1 - - - - - - - - - - - -
| |
| 89 11 2821-1MS-24C-9 PIPE TO PIPE AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2821 -1 MS-24D-1 ISIIUTINMP-ES-024-502 A-9 IS1 S - - - - - - - - - - -
| |
| 89.1 1 2821 -1MS-24D-1 NOZZLE TO TRANSITION PIECE AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-J H2 2821 -1 MS-24D-10 A-9 IS1 . . - - - - - - - - - - -
| |
| 89.1 1 2821 -1 MS-24D-10 PIPE TO ELBOW AUG - - - - - - - - - - - -
| |
| 1 82 1 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2821-1 MS-24D-11 A-9 IS1 - - - - - - - - - - - -
| |
| 89.1 1 2B21-1 MS-24D-11 ELBOW TO PIPE AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-J H2 2821 -1 MS-24D-12 A-9 IS1 - - - - - - - - - - - -
| |
| 89.1 1 2821 -1MS-24D-12 PIPE TO PIPE AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-J H2 2821 -1 MS-240-13 A-9 IS1 - - - - - . . - - - - - -
| |
| 89.1 1 2821 -1MS-24D-13 PIPE TO ELBOW AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-J H2 2821-1 MS-24D-14 A-9 IS1 - - - - - - - - - - - -
| |
| 89.1 1 2821 -lMS-24D-14 ELBOW TO PIPE AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-J H2 2821 -1 MS-24D-15 A-9 IS1
| |
| - - - - - - - - - - - -
| |
| 89 11 2821-1 MS-24D-15 PIPE TO 45-DEGREE ELBOW AUG - - - - - - - - - - - -
| |
| 1 821 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Page 15 - 30 Southern Nuclear Operating Company Period 1 Period 2 Period 3 Category, lso No.
| |
| ItemNO, Comp. Desc.
| |
| Class Summary IComplD ISystem Scope 1 Method IProcedure Code Case BJ H2 2821 -1MS-24D-16 A-9 IS1 89.1 1 2821-1 MS-24D-16 45-DEGREE ELBOW TO PIPE AUG 1 821 OWN PRE BJ H2 2821-1 MS-24D-17 A-9 IS1 89.1 1 2821 -1MS-24D-17 PIPE TO VALVE AUG 1 821 OWN PRE BJ H2 2821-1 MS-24D-18 AUGIUTINMP-ES-024-502 A-9 IS1 89.11 2821 -1 MS-24D-18 VALVE TO PIPE AUG 1 821 OWN PRE BJ H2 2821 -1 MS-24D-19 ISllUTlNMP-ES-024502 A-9 IS1 89.1 1 2821 -1MS-24D-19 AUGIUTINMP-ES-024-502 PIPE TO PIPE AUG 1 821 OWN PRE BJ H2 2821 -1 MS-24D-2 ISllUTlNMP-ES-024502 A-9 IS1 89.1 1 2821 -1 MS-24D-2 TRANSITION PIECE TO PIPE AUG 1 821 OWN PRE BJ H2 2821 -1 MS-24D-20 AUGIUTINMP-E S-024-502 A-9 IS1 89.1 1 2821 -1MS-24D-20 PIPE TO VALVE AUG 1 821 OWN PRE 6J H2 2821-1MS-24D-3 ISllUTINMP-ES-024502 A-9 IS1 89.1 1 2821 -1MS-24D-3 PIPE TO ELBOW AUG 1 821 OWN PRE BJ H2 2821-1 MS-24D-4 A-9 IS1 89.11 2821 -1MS-24D-4 ELBOW TO PIPE AUG 1 821 OWN PRE 6J H2 2821-1 MS-24D-5 A-9 IS1 89.11 2821 -lMS-24D-5 PIPE TO PIPE AUG 1 821 OWN PRE BJ H2 2821 -1 MS-24D-6 A-9 IS1 89.1 1 2821 -1MS-24D-6 PIPE TO PIPE AUG 1 82 1 OWN PRE
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Page 16 - 30 Southern Nuclear Operating Company Period 1 Period 2 Period 3 Category, Iso No. m o F ItemNO, Comp. Desc. 2 2 2 Class Summary IComplD ISystem Scope IMethod IProcedure Code Case Fi Fi 5 BJ H2 2821-1 MS-24D-7 A-9 IS1 - - - - - - - -
| |
| 89.1 1 2821 -1MS-24D-7 PIPE TO PIPE AUG - - - - - - - -
| |
| 1 821 OWN - - - - - - - -
| |
| PRE - - - - - - - -
| |
| B-J H2 2821-1 MS-24D-8 ISIII A-9 IS1 - - - - s - - -
| |
| 89.1 1 2821 -1MS-240-8 PIPE TO ELBOW AUG - - - - - - - -
| |
| 1 82 1 OWN - - - - - - - -
| |
| PRE - -- - - - - - -
| |
| BJ H2 2821-1 MS-24D-9 ISllUTl A-9 IS1 - - - - s - - -
| |
| 89.11 2821 -1 MS-24D-9 ELBOW TO PIPE AUG - - - - - - - -
| |
| 1 82 1 OWN - - - - - - - -
| |
| PRE - - - - - - - -
| |
| BJ AS R A-9 IS1 - . - - - - - -
| |
| 89.31 2821 -1MS-24D-9BC-112821- 1MS-8D-ASR PIPE TO BRANCH CONNECTION AUG - - - - - - - -
| |
| 1 82 1 OWN - - - - - - - -
| |
| PRE - - - - - - - -
| |
| BJ BSR A-9 IS1 - - - - - - - -
| |
| 89.31 2821 -1 MS-24D-9BC-212821- 1MS-8D-BSR PIPE TO BRANCH CONNECTION AUG - - - - - - - -
| |
| 1 82 1 OWN - - - - - - - -
| |
| PRE - - - - - - - -
| |
| BJ H2 2821-1 MS-8A-ASR-1 ISIII A-5 IS1 - - - - s - - -
| |
| 89.1 1 2821-1MS-8A-ASR-1 BRANCH CONNECTION TO PIPE AUG - - - - - - - -
| |
| 1 821 OWN - - - - - - - -
| |
| PRE - - - - - - - -
| |
| B-J H2 2821 -1 MS-8A-ASR-2 IS111 A-5 IS1 - - - - s - - -
| |
| 89.1 1 2821 -1MS-8A-ASR-2 PIPE TO FLANGE AUG - - - - - - - -
| |
| 1 821 OWN - - - - - - - -
| |
| PRE - - - - - - - -
| |
| BJ H2 2821-1 MS-8A-BSR-1 A-5 IS1 - - - - - - - -
| |
| 89.1 1 2821 -1MS-BA-BSR-1 BRANCH CONNECTION TO PIPE AUG - - - - - - - -
| |
| 1 821 OWN - - - - - - - -
| |
| PRE - - - - - - - -
| |
| BJ H2 2821-1 MS-8A-BSR-2 A-5 IS1 - - - - - - - -
| |
| 89.1 1 2821 -1MS-8A-BSR-2 PIPE TO FLANGE AUG - - - - - - - -
| |
| 1 821 OWN - - - - - - - -
| |
| PRE - - - - - - - -
| |
| B-J H2 2821-1 MS-88-ASR-1 ISIIUTI A-5 IS1 - - - - - - - -
| |
| 69.11 2821 -1MS-80-ASR-1 BRANCH CONNECTlON TO PIPE AUG - - - - - - - -
| |
| 1 821 OWN - - - - - - - -
| |
| PRE I- - - - I- - - -
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Page 17 - 30 711 312006 1 Period 1 Period 2 Period 3 Category, Iso No. Q) o r N -
| |
| IternNO, Comp. Desc. 2 2 2 2 2 Class Summary 1CornplD 1System Scope 1 Method 1Procedure Code Case 5 5 i5 z 5 BJ H2 2821-1 MS-8B-ASR-2 A-5 IS1 - - - - - - - - - - - -
| |
| 89.11 2821 -1 MS-8B-ASR-2 PIPE TO FLANGE AUG 1 821 OWN PRE BJ H2 2821-1 MS-88-BSR-1 ISllUTINMP-ES-024-502 A-5 IS1 89.1 1 2821 -1 MS-8B-BSR-1 BRANCH CONNECTION TO PIPE AUG 1 82 1 OWN PRE BJ H2 2B21-1MS-88-BSR-2 A-5 IS1 89.11 2821 -1 MS-8B-BSR-2 PIPE TO FLANGE AUG 1 82 1 OWN PRE B-J H2 2821-1 MS-8B-CSR-1 A-5 IS1 89.1 1 2821 -1 MS-8B-CSR-1 BRANCH CONNECTION TO PIPE AUG 1 821 OWN PRE BJ H2 2821-1 MS-8B-CSR-2 A-5 IS1 89.1 1 2821 -1 MS-8B-CSR-2 PIPE TO FLANGE AUG 1 821 OWN PRE BJ H2 2821-1 MS-8B-DSR-1 A-5 IS1 89.1 1 2821 -1 MS-8B-DSR-1 BRANCH CONNECTION TO PIPE AUG 1 821 OWN PRE B-J H2 2821 -1 MS-88-DSR-2 A-5 IS1 89.1 1 2821 -1 MS-8B-DSR-2 PIPE TO FLANGE AUG 1 821 OWN PRE BJ H2 2821 -1 MS-8C-ASR-1 ISllUTINMP-ES-024-502 A-5 IS1 89.1 1 2821 -1 MS-8C-ASR-1 BRANCH CONNECTION TO PIPE AUG 1 B21 OWN PRE BJ H2 2821-1 MS-8C-ASR-2 A-5 IS1 89.1 1 2B21-1 MS-8C-ASR-2 PIPE TO FLANGE AUG - - - - - - - -
| |
| 1 82 1 OWN - - - - - - - -
| |
| PRE - - - - - - - -
| |
| BJ H2 2821 -1MS-8C-BSR-1 ISIIUTI A-5 IS1 - - - - - - - -
| |
| 89.11 2821 -1MS-8C-BSR-1 BRANCH CONNECTION TO PIPE AUG - - - - - - - -
| |
| 1 82 1 OWN - - - - - - -
| |
| PRE - - - - - - - -
| |
| | |
| A Revision: 1 HNP-2 F o u r t h Interval C l a s s 1 IS1 P l a n S o u t h e r n Nuclear O p e r a t i n g C o m p a n y Page 1 8 - 30 7H 3R006 (
| |
| : Category, ItemNO, lso No.
| |
| Comp. Desc.
| |
| m 2 2 Period 1 o .-2 Period 2 CY 2 2 Period 3 o
| |
| Class Summary I ComplD 1System Scope 1 Method 1 Procedure Code Case 5 5 5 5 5 BJ H2 2821-1 MS-8C-BSR-2 A-5 IS1 - - - - - - - - - - - -
| |
| 89 11 2821 -1 MS-8C-BSR-2 PIPE TO FLANGE AUG - - - - - - - - - - - -
| |
| 1 821 o m - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| BJ H2 2821-1 MS-8C-CSR-1 A-5 ISI - - - - - - - - - - - -
| |
| 89 11 2821 -1MS-8C-CSR-1 BRANCH CONNECTION TO PIPE AUG - - - - - - - - - - - -
| |
| 1 B2 1 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2821 -1 MS-8C-CSR-2 A-5 IS1 - - - - - - - - - - - -
| |
| 89 11 2B21-1 MS-8C-CSR-2 PIPE TO FLANGE AUG - - - - - - - - - - - -
| |
| 1 621 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2821-1 MS-8D-ASR-1 A-5 IS1 - - - - - - - - - - - -
| |
| 89 11 2821 -1MS-8D-ASR-1 BRANCH CONNECTION TO PIPE AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-J H2 2821-1 MS-8D-ASR-2 A-5 IS1 - - - - - - - - - - - -
| |
| 89 11 2821 -1 MS-8D-ASR-2 PIPE TO FLANGE AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2821 -1 MS-8D-BSR-1 A-5 ISI - - - - - - - - - - - -
| |
| 89 11 2821-1 MS-8D-BSR-1 BRANCH CONNECTION TO PIPE AUG - - - - - - - - - - - -
| |
| 1 82 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-J H2 2821-1 MS-8D-BSR-2 A-5 IS1 - . . - - - - - - - - - -
| |
| 89 11 2821 -1 MS-8D-BSR-2 PIPE TO FLANGE AUG - - - - - - - - - - - -
| |
| 1 821 o m - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| BJ H2 2E11-1 RHR-20-RS-10 A-2 1 IS1 - - - - - - - - - - - -
| |
| 89 11 2E11-1 RHR-20-RS-10 VALVE TO ELBOW AUG - - - - - - - - - - - -
| |
| 1 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2E11-1 RHR-20-RS-11 A-21 IS1 - - - - - - - - - - - -
| |
| 89 11 2E11-1 RHR-20-RS-11 ELBOW TO PIPE AUG - - - - - - - - - - - -
| |
| 1 El1 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2E11-1 RHR-20-RS-11A ISllUTINMP-ES-024-502 A-21 IS\ s - - - - - - - - - - -
| |
| 89 11 2E11-1 RHR-20-RS-11A PENETRATION TO PIPE AUG - - - - - - - - - - - -
| |
| 1 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Page 1 9 - 30 7H 312006 1 Period 1 Period 2 Period 3 Category, Iso No. Q, o r N P)
| |
| IternNO, Comp. Desc. 2 2 2 2 2 Class Summary IComplD 1System Scope IMethod IProcedure Code Case 5 5 . 5 5 5 6J H2 2E11-1 RHR-20-RS-12 A-21 IS1 - - - - - - - - - - - -
| |
| 89.1 1 2E11-1 RHR-20-RS-12 PIPE TO VALVE AUG - - - - - - - - - - - -
| |
| 1 El1 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 6J H2 2E11-1 RHR-20-RS-4 ISIIUTINMP-ES-024502 A-21 IS1 s - - - - - - - - - - -
| |
| 89.1 1 2E11-1 RHR-20-RS-4 PIPE TO VALVE AUG - - - - - - - - - - - -
| |
| 1 E l1 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 6J H2 2E11-1 RHR-20-RS-5 ISIIUTI A-21 IS1 - - - - - - - - s - - -
| |
| 89.1 1 2E11-1 RHR-20-RS-5 VALVE TO ELBOW AUG - - - - - - - - - - - -
| |
| 1 El1 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 6-J H2 2E11-1 RHR-20-RS-6 A-21 IS1 - - - - - - - - - - - -
| |
| 89.11 2E11-1 RHR-20-RS-6 ELBOW TO PIPE AUG - - - - - - - - - - - -
| |
| 1 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 6J H2 2E11-1 RHR-20-RS-7 A-21 IS1 - - - - - - - - - - - -
| |
| 89.1 1 2E11-1 RHR-20-RS-7 PIPE TO ELBOW AUG - - - - - - - - - - - -
| |
| 1 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 6J H2 2E11-1 RHR-20-RS-8 A-21 IS1 - - - - - - - - - - - -
| |
| 89.1 1 2E11-1 RHR-20-RS-8 ELBOW TO PIPE AUG - - - - - - - - - - - -
| |
| 1 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2E11-1 RHR-20-RS-9 A-21 IS1 - - - - - - - - - - - -
| |
| 89.1 1 2E11-1 RHR-20-RS-9 PIPE TO VALVE AUG - - - - - - - - - - - -
| |
| 1 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2E11-1 RHR-24A-R-1 A-22 IS1 - - - - - - - - - - - -
| |
| 89.1 1 2E11-1 RHR-24A-R-1 VALVE TO VALVE AUG - - - - - - - - - - - -
| |
| 1 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 6J H2 2E11-1 RHR-24A-R-1A A-22 IS1 - - - - - - - - - - - -
| |
| 89.11 2E11-1 RHR-24A-R-1A VALVE TO PENETRATION AUG - - - - - - - - - - - -
| |
| 1 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 6-J H2 2E11-1 RHR-24A-R-2 ISlll A-22 IS1 - - - - s - - - - - - -
| |
| 89.11 2E11-1 RHR-24A-R-2 PIPE TO ELBOW AUG - - - - - - - - - - - -
| |
| 1 El1 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| I , ,
| |
| I , ,
| |
| t o , ,
| |
| I , ,
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Period 1 Page 21 - 30 Period 2 711312006 Period 3 1
| |
| Category, Iso No. r N D ItemNO, Comp. Desc. 2 2 2 2 Class Summary IComplD 1 System Scope IM i t h o d 1 Procedure Code Case 5 5 5 5 5 BJ H2 2E11-1 RHR-24B-R-1A A-23 IS1 - - - - - - - - - - - -
| |
| 89.1 1 2 E l l - 1 RHR-240-R-1 A VALVE TO PENETRATION AUG - - - - - - - - - - - -
| |
| 1 El1 om - - - - - - - - - - - -
| |
| I PRE - - - - - - - - - - - -
| |
| BJ H2 2E11-1 RHR-24B-R-2 ISIIUTI A-23 IS1 - - - - - - - - - s - -
| |
| B9 11 2 E l l - 1 RHR-240-R-2 PIPE TO ELBOW AUG - - - - - - - - - - - -
| |
| 1 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2E11-1 RHR-24B-R-3 ISIIUTI A-23 IS1 - - - - - - - - - S - -
| |
| 8 9 11 2 E l l - 1 RHR-24B-R-3 ELBOW TO PIPE AIJG - - - - - - - - - - - -
| |
| 1 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2E11-1 RHR-240-R-4 A-23 IS1 - - - - - - - - - - - -
| |
| 89.1 1 2E11-1 RHR-240-R-4 PIPE TO ELBOW AUG - - - - - - - - - - - -
| |
| 1 ElI om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2E11-1 RHR-24B-R-5 ISIIUTI A-23 IS1 - - - - s - - - - - - -
| |
| 89.1 1 2 E l l - 1 RHR-240-R-5 ELBOW TO PIPE AIJG - - - - - - - - - - - -
| |
| 1 ElI om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2E11-1 RHR-248-R-6A A-23 IS1 - - - - - - - - - - - -
| |
| 89.1 1 2 E l l - 1 RHR-240-R-6A PIPE TO RED AIJG - - - - - - - - - - - -
| |
| 1 ElI om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2E11-1 RHR-24B-R-60 A-23 IS1 - - - - - - - - - - - -
| |
| 89.1 1 2 E l I-1 RHR-24B-R-60 RED TO VALVE AIJG - - - - - - - - - - - -
| |
| 1 El1 I
| |
| om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-J H2 2E11-1 RHR-248-R-7A A-23 IS1 - - - - - - - - - - - -
| |
| 89.1 1 2 E l l - 1 RHR-240-R-7A VALVE TO RED AIJG - - - - - - - - - - - -
| |
| 1 ElI om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-J H2 2E11-1 RHR-240-R-70 A-23 IS1 - - - - - - - - - - - -
| |
| 8 9 11 2 E l l - 1 RHR-240-R-70 RED TO PIPE AUG - - - - - - - - - - - -
| |
| 1 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B J H2 2E11-1 RHR-24B-R-8 A-23 IS1 - - - - - - - - - - - -
| |
| 89.1 1 2 E l l - 1 RHR-240-R-8 PIPE TO VALVE AIJG - - - - - - - - - - - -
| |
| 1 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Page 22 - 30 Southern Nuclear Operating Company Period 1 Period 2 Period 3 Category, Iso No. m o 7 ItemNO, Comp. Desc. 2 &? 2I Class Summary 1 ComplD 1 System Scope 1 Method 1 Procedure Code Case 5 5 CY BJ H2 2E11-1 RHR-24B-R-9 ISIIUTINMP-ES-024-502 A-23 IS1 s - - - - - - -
| |
| 89.1 1 2E11-1 RHR-24B-R-9 VALVE TO PIPE AUG - - - - - - - -
| |
| 1 E l1 o w - - - - - - - -
| |
| PRE - - - - - - - -
| |
| BJ H2 2E11-1 RHR-9A-HS-1 ISIIUTI A-20 IS1 - - - - s - - -
| |
| 89.1 1 2 E l l - 1 RHR-9A-HS-1 2N6A AUG - - - - - - - -
| |
| 1 El1 o w - - - - - - - -
| |
| PRE - -- - - - - - -
| |
| BJ H2 2E11-1 RHR-9B-HS-1 A-20 IS1 - - - - - - - -
| |
| B9.11 2 E l l - 1 RHR-9B-HS-1 2N6B AUG - - - - - - - -
| |
| 1 E l1 OWN - - - - - - - -
| |
| PRE - - - - - - - -
| |
| BJ H2 2E21-1 CS-IOA-1 ISIIRTI A-24 IS1 - - - - s - - -
| |
| 89.1 1 2E21-1 CS-10A-1 VALVE TO PIPE AUG - - - - - - - -
| |
| 1 E21 o w - - - - - - - -
| |
| PRE - - - - - - - -
| |
| B-J H2 2E21-1 CS-IOA-10 ISIIUTI A-24 IS1 - - - - - - - -
| |
| 89.1 1 2E21-1 CS-10A-10 ELBOW TO PIPE AUG - - - - - - - -
| |
| 1 E21 o w - - - - - - - -
| |
| PRE - - - - - - - -
| |
| BJ H2 2E21-1 CS-IOA-11 A-24 IS1 - - - - - - - -
| |
| 89.1 1 2E21-1 CS-10A-11 PIPE TO VALVE AUG - - - - - - - -
| |
| 1 E21 o w - - - - - - - -
| |
| PRE - - - - - - - -
| |
| BJ H2 2E21-1 CS-1OA-12 A-24 IS1
| |
| - - - - - - - -
| |
| B9.11 2E21-1 CS-10A-12 VALVE TO PIPE AUG - - - - - - - -
| |
| 1 E21 o w - - - - - - - -
| |
| PRE - - - - - - - -
| |
| BJ H2 2E21-1 CS-IOA-13 ISIIUTI A-24 IS1 - - - - - - - -
| |
| 89.1 1 2E21-1 CS-10A-13 PIPE TO ELBOW AUG - - - - - - - -
| |
| 1 E21 o w - - - - - - - -
| |
| PRE - - - - - - - -
| |
| IS1 - - - - - - - -
| |
| B-J H2 2E21-1 CS-1OA-14 A-24 89.1 1 2E21-1 CS-10A-14 ELBOW TO PIPE AUG - - - - - - - -
| |
| 1 E21 o w - - - - - - - -
| |
| PRE - - - - - - - -
| |
| H2 2E21-1 CS-10A-15 A-24 IS1
| |
| - - - - - - - -
| |
| B-J 89.1 1 2E21-1 CS-10A-15 PIPE TO ELBOW AUG - - - - - - - -
| |
| o w - - - - - - - -
| |
| 1 E21 PRE 1- - - - - -
| |
| | |
| 4 Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Page 23 - 30 711 312006 1 Period 1 Period 2 Period 3 Category, Iso No. O) o r (Y C)
| |
| IternNO, Cornp. Desc. ? 2i 2 2 2 Class Summary IComplD ISystem Scope IMethod IProcedure Code Case 5 5 5 5 5 6J H 2 2E21-1 CS-10A-16 A-24 IS1 - - - - - - - - - - - .
| |
| 8911 2E21-1 CS-10A-16 ELBOW TO PIPE AUG - - - - - - - - - - - -
| |
| 1 E21 om - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| B-J H 2 2E21-1 CS-1OA-17 A-24 IS1 - - - - - - - - - - - -
| |
| 89 11 2E21-1 CS-10A-17 PIPE TO ELBOW AUG - - - - - - - - - - - -
| |
| 1 E21 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-J H2 2E21-1 CS-IOA-18 ISIIUTINMP-ES-024502 A-24 IS1 s - - - - - - - - - - -
| |
| 89.1 1 2E21-1 CS-10A-18 ELBOW TO ELBOW AUG - - - - - - - - - - - -
| |
| 1 E2 1 - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-J H2 2E21-1CS-10A-19 A-24 IS1 - - - - - - - - - - - -
| |
| 89.1 1 2E21-1 CS-10A-19 ELBOW TO PIPE AUG - - - - - - - - - - - -
| |
| 1 E21 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-J H 2 2E21-1 CS-1OA-2 A-24 IS1 - - - - - - - - - - - -
| |
| 89.1 1 2E21-1 CS-10A-2 PIPE TO ELBOW AUG - - - - - - - - - - - -
| |
| 1 E21 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-J H2 2E21-1 CS-10A-20 ISIIUTI A-24 IS1 - - - - - - - - s - - -
| |
| 89.1 1 2E21-1 CS-10A-20 END AUG - - - - - - - - - - - -
| |
| 1 E21 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-J H2 2E21-1 CS-1OA-3 A-24 IS1 - - - - - - - - - - - -
| |
| 89.1 1 2E21-1 CS-10A-3 ELBOWTO VALVE AUG - - - - - - - - - - - -
| |
| 1 E21 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 6-J H 2 2E21-1 CS-IOA-4 A-24 IS1 - - - - - - - - - - - -
| |
| 89.1 1 2E21-1 CS-10A-4 VALVE TO PIPE AUG - - - - - - - - - - - -
| |
| 1 E21 ow - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 6-J H 2 2E21-1 CS-1OA-4A A-24 IS1 - - - - - - - - - - - -
| |
| 8911 2E21-1CS-10A-4A PIPE TO ELBOW AUG - - - - - - - - - - - -
| |
| 1 E21 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-J H2 2E21-1 CS-1OA-5 ISIIUTINMP-ES-024502 A-24 IS1 s - - - - - - - - - - -
| |
| 8911 2E21-1 CS-10A-5 ELBOW TO PIPE AUG - - - - - - - - - - - -
| |
| 1 E21 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Page 24 - 30 Southern Nuclear Operating Company Period 1 Period 2 Period 3 Category, Iso No.
| |
| ItemNO, Comp. Desc.
| |
| Class Summary IComplD ISystem Scope IMethod IProcedure Code Case BJ H 2 2E21-1 CS-1 0A-5A A-24 IS1 89.11 2E21-1 CS-1 0A-5A PIPE TO PENETRATION AUG 1 E2 1 OWN PRE BJ H2 2E21-1 CS-1OA-6 A-24 IS1 89.11 2E21-1 CS-10A-6 PIPE TO ELBOW AUG 1 E2 1 OWN PRE BJ H2 2E21-1 CS-1 OA-7 A-24 ISI 89.1 1 2E21-1 CS-10A-7 ELBOW TO PIPE AUG 1 E21 OWN PRE BJ H2 2E21-1 CS-10A-8 A-24 IS1 B9.11 2E21-1 CS-10A-8 PIPE TO VALVE AUG 1 E2 1 OWN PRE BJ H2 2E21-1 CS-1 OA-9 A-24 IS1 89.11 2E21-1 CS-10A-9 VALVE TO ELBOW AUG 1 E2 1 OWN PRE BJ H2 2E21-1 CS-108-1 A-25 IS1 89.11 2E21-1 CS-10B-1 VALVE TO PIPE AU G 1 E21 OWN PRE BJ H2 2E21-1 CS-1 OB-10 A-25 IS1 PlPE TO VALVE AUG OWN PRE BJ H2 2E21-1 CS-100-11 A-25 IS1 VALVE TO PlPE AU G OWN PRE BJ H2 2E21-1 CS-IOB-12 A-25 IS1 89.1 1 2E21-1 CS-10B-12 PIPE TO ELBOW AUG 1 E21 OWN PRE B-J H2 2E21-1 CS-1OB-13 A-25 IS1 B9.11 2E21-1 CS-10B-13 ELBOW TO PIPE AUG 1 E21 OWN PRE
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan F Southern Nuclear Operating Company Period 1 Period 2 Period 3 Category, Iso No.
| |
| ItemNO, Comp. Desc.
| |
| Class Summary IComplD ISystem Scope IMethod IProcedure Code Case BJ H2 2E21-1 CS-100-14 lSllUT1 A-25 IS1 89.1 1 2E21-1 CS-108-14 PIPE TO ELBOW AUG 1 E21 OWN PRE BJ H2 2E21-1 CS-100-15 A-25 IS1 - - - -
| |
| 89.1 1 2E21-1 CS-100-15 ELBOW TO PIPE AUG - - - -
| |
| 1 E21 OWN - - - -
| |
| PRE - - - -
| |
| BJ H2 2E21-1 CS-100-16 A-25 IS1 - - - -
| |
| 89.1 1 2E21-1 CS-108-16 PIPE TO ELBOW AUG - - - -
| |
| 1 E21 OWN - - - -
| |
| PRE - - - -
| |
| BJ H2 2E21-1 CS-100-17 A-25 IS1 - - - -
| |
| 89 11 2E21-1 CS-108-17 ELBOW TO ELBOW AUG - - - -
| |
| 1 E21 OWN - - - -
| |
| PRE - - - -
| |
| B-J H2 2E21-1 CS-100-18 A-25 IS1 - - - -
| |
| 89 11 2E21-1 CS-108-18 ELBOW TO PIPE AUG - - - -
| |
| 1 E21 OWN - - - -
| |
| PRE - - - -
| |
| BJ H2 2E21-1 CS-100-19 ISIIUTI A-25 IS1 - - - -
| |
| 89.1 1 2E21-1 CS-108-19 END AUG - - - -
| |
| 1 E21 OWN - - - -
| |
| PRE - - - -
| |
| BJ H 2 2E21-1 CS-100-2 ISllUTl A-25 IS1 - - - -
| |
| 89.1 1 2E21-1 CS-108-2 PIPE TO VALVE AUG - - - -
| |
| 1 E21 OWN - - - -
| |
| PRE - - - -
| |
| BJ H2 2E21-1 CS-100-3 A-25 IS1 - - - -
| |
| 89.1 1 2E21-1 CS-108-3 VALVE TO PIPE AUG - - - -
| |
| 1 E21 OWN - - - -
| |
| PRE - - - -
| |
| BJ H2 2E21-1 CS-100-4 lSllUT1 A-25 IS1 - - - -
| |
| 89.1 1 2E21-1 CS-108-4 PIPE TO PENETRATION AUG - - - -
| |
| 1 E21 OWN - - - -
| |
| PRE - - - -
| |
| BJ H2 2E21-1 CS-100-5 A-25 IS1 - - - -
| |
| 89.1 1 2E21-1 CS-108-5 PIPE TO ELBOW AUG - - - -
| |
| 1 E21 OWN - - - -
| |
| PRE - - - -
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 P l a n Page 26 - 30 Southern Nuclear Operating C o m p a n y Period 1 Period 2 Period 3 Category, Iso No.
| |
| ItemNO, Comp. Desc.
| |
| Class Summary I ComplD ISystem Scope IMethod I Procedure Code Case BJ H2 2E21-1 CS-1OB-6 A-25 IS1 89.1 1 2E21-1 CS-10B-6 ELBOW TO PIPE AUG 1 E21 OWN PRE BJ H2 2E21-1 CS-1OB-7 A-25 IS1 89.11 2E21-1 CS-10B-7 PIPE TO VALVE AUG 1 E21 OWN PRE BJ H2 2E21-1 CS-1OB-8 A-25 IS1 89.1 1 2E21-1 CS-10B-8 VALVE TO ELBOW AUG 1 E21 OWN PRE BJ H2 2E21-1 CS-1OB-9 A-25 IS1 89.11 2E21-1 CS-10B-9 ELBOW TO PIPE AUG 1 E21 OWN PRE BJ H2 2E41-1 HPCI-10-D-1 lSllUT1 A-26 IS1 89.1 1 2E41-1 HPCI-10-0-1 BRANCH CONNECTION TO ELBOW AUG 1 E41 OWN PRE BJ H2 2E41-1 HPCI-10-D-10 A-26 IS1 89.1 1 2E41-1 HPCI-10-D-10 ELBOW TO PIPE AUG 1 E41 OWN PRE BJ H2 2E41-1 HPCI-10-D-11 A-26 IS1 89.1 1 2E41-1 HPCI-10-0-11 PIPE TO PIPE AUG 1 E41 OWN PRE BJ H2 2E41-1 HPCI-10-D-12 A-26 IS1 89.1 1 2E41-1 HPCI-10-D-12 PIPE TO ELBOW AUG 1 E41 OWN PRE BJ H2 2E41-1 HPCI-10-D-13 A-26 IS1 89.1 1 2E41-1 HPCI-10-D-13 ELBOW TO PIPE AUG 1 E41 OWN PRE BJ H2 2E41-1 HPCI-10-D-14 A-26 IS1 89.1 1 2E41-1 HPCI-10-D-14 PIPE TO TEE AU G 1 E41 OWN PRE
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company age 27 - 30 711312006 1 Period 1 Period 2 Period 3 Category, Iso No. N O ItemNO, Comp. Desc.
| |
| Class Summary IComplD ISystem Scope IMethod 1 Procedure Code Case I, A BJ H2 2E41-1 HPCI-10-D-15 lSllUT1 A-26 IS1 89 11 2E41-1 HPCI-10-D-15 TEE TO PIPE AUG 1 E41 OWN PRE BJ H2 2E41-1 HPCI-10-D-16 A-26 IS1 89.1 1 2E41-1 HPCI-10-D-16 PIPE TO CAP AUG 1 E41 OWN PRE BJ H2 2E41-1 HPCI-10-D-17 A-26 IS1 89.1 1 2E41-1 HPCI-10-D-17 TEE TO PIPE AUG 1 E41 OWN PRE BJ H2 2E41-1 HPCI-10-D-18 A-26 IS1 89.1 1 2E41-1 HPCI-10-D-18 PIPE TO VALVE AUG 1 E41 OWN PRE BJ H2 2E41-1 HPCI-10-D-19 ISIIUTI A-26 IS1 89.1 1 2E41-1 HPCI-10-D-19 AUGIUTI VALVE TO PIPE AUG 1 E41 OWN PRE BJ H2 2E41-1 HPCI-10-D-2 A-26 IS1 89.1 1 2E41-1 HPCI-10-D-2 ELBOW TO PIPE AUG 1 E41 OWN PRE BJ H2 2E41-1 HPCI-10-D-20 ISIIUTI A-26 IS1 89.1 1 2E41-1 HPCI-10-D-20 AUGIUTI PIPE TO PENETRATION AUG 1 E41 OWN PRE BJ H2 2E41-1 HPCI-10-D-21 ISIIUTI A-26 IS1 89.11 2E41-1 HPCI-10-D-21 AUGIUTI PENETRATION TO PIPE AUG 1 E41 OWN PRE BJ H2 2E41-1 HPCI-10-D-22 ISllUTlNMP-ES-024-502 A-26 IS1 89.11 2E41-1 HPCI-10-D-22 AUGIUTINMP-ES-024-502 PIPE TO VALVE AUG 1 E41 OWN PRE BJ H2 2E41-1 HPCI-10-D-3 A-26 IS1 89.1 1 2E41-1 HPCI-10-D-3 PIPE TO ELBOW AUG 1 E41 OWN PRE
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Period 1 Period 2 Period 3 Category, Iso No. .?
| |
| ItemNO, Comp. Desc. 2 Class Summary IComplD ISystem Scope IMethod IProcedure Code Case 5 B-J H2 2E41-1 HPCI-10-D-4 A-26 IS1 89.1 1 2E41-1 HPCI-10-D-4 ELBOW TO PIPE AUG 1 E41 OWN PRE B-J H2 2E41-1 HPCI-1 O-D-5 A-26 IS1 89.1 1 2E41-1 HPCI-10-D-5 PIPE TO ELBOW AUG 1 E41 OWN PRE BJ H2 2E41-1 HPCI-10-D-6 A-26 IS1 89.1 1 2E41-1HPCI-10-D-6 ELBOW TO PIPE AUG 1 E41 OWN PRE B4 H2 2E41-1 HPCI-10-D-7 A-26 IS1 89.1 1 2E41-1 HPCI-10-D-7 PIPE TO ELBOW AUG 1 E41 OWN PRE B-J H2 2E41-1 HPCI-1 O-D-8 A-26 IS1 89.1 1 2E41-1 HPCI-10-D-8 ELBOW TO PIPE AUG 1 E41 OWN PRE BJ H2 2E41-1 HPCI-10-D-9 lSllUT1 A-26 IS1 89.11 2E41-1 HPCI-10-D-9 PIPE TO ELBOW AUG 1 E41 OWN PRE B-J H2 2E51-1 RCIC-4D-1 ISllUTi A-27 IS1 89.1 1 2E51-1 RCIC-4-D-1 BRANCH CONNECTION TO PIPE AUG 1 E51 OWN PRE BJ H2 2E51-1 RCIC-4-D-10 A-27 IS1 89.1 1 2E51-1 RCIC-4-D-10 PIPE TO TEE AUG 1 E51 OWN PRE B-J H2 2E51-1 RCIC-CD-11 A-27 IS1 89.1 1 2E51-1RCIC-4-D-11 TEE TO PIPE AUG 1 E5 1 OWN PRE BJ H2 2E51-1 RCIC-4-D-12 A-27 IS1 89.1 1 2E51-1 RCIC-4-D-12 PIPE TO CAP AUG 1 E51 OWN PRE
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company P jge 29 - 30 711312006 1 1
| |
| Period 1 Period 2 Period 3 Category, Iso No. m o ICY (3 ItemNO, Comp. Desc. & 2 2 2 Class Summary IComplD ISystem Scope IMethod IProcedure Code Case 5 5 5 5 BJ H2 2E51-1 RCIC-4-D-13 A-27 IS1 - - - - - - - - - -
| |
| 89.1 1 2E51-1 RCIC-4-0-13 TEE TO PIPE AUG - - - - - - - - - - - -
| |
| 1 E5 1 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2E51-1 RCIC-4-D-14 A-27 IS1 - - - -
| |
| B9 11 2E51-1 RCIC-4-D-14 PIPE TO PIPE AUG - - - -
| |
| 1 E5 1 OWN - - - -
| |
| PRE - - - -
| |
| B-J H2 2E51-1 RCIC-4D-15A A-27 IS1 89.1 1 2E51-1 RCIC-4-D-15A PIPE TO VALVE AUG 1 E51 OWN PRE BJ H2 2E51-1 RCIC-4-D-16A ISllUTlNMP-ES-024502 A-27 IS1 89.1 1 2E51-1 RCIC-4-D-16A AUGIUTINMP-ES-024-502 VALVE TO PENETRATION AUG 1 E51 OWN PRE BJ H2 2E51-1 RCIC-4D-17 ISIIUTI A-27 IS1 89.1 1 2E51-1 RCIC-4-D-17 AUGIUTI PENETRATION TO ELBOW AUG 1 E5 1 OWN PRE BJ H2 2E51-1 RCIC-4D-18 AUGIUTI A-27 IS1 89.1 1 2E51-1 RCIC-4-D-18 ELBOW TO PIPE AUG 1 E5 1 OWN PRE BJ H2 2E51-1 RCIC-4-D-19A ISIIUTI A-27 IS1 89.1 1 2E51-1 RCIC-4-D-19A AUGIUTI PIPE TO VALVE AUG 1 E51 OWN PRE BJ H2 2E51-1 RCIC-4D-2 A-27 IS1 89.1 1 2E51-1 RCIC-4-D-2 PIPE TO ELBOW AUG 1 E5 1 OWN PRE BJ H2 2E51-1 RCIC-4D-3 A-27 IS1 89.1 1 2E51-1 RCIC-4-D-3 ELBOW TO PIPE AUG 1 E5 1 OWN PRE B-J H2 2E51-1 RCIC-4-D-4 A-27 IS1 89.1 1 2E51-1 RCIC-4-D-4 PIPE TO ELBOW AUG 1 E5 1 OWN PRE
| |
| | |
| 3 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Page 30 - 30 711312006 1 Period 1 Period 2 Period 3 Category, Iso No. m o r N o IternNO, Comp. Desc. z 2 2 2 2 Class Summary I ComplD I System Scope 1 Method 1 Procedure Code Case I, 5 I, I, I, BJ H2 2E51-1 RCIC-4-D-5 A-27 IS1 - - - - - - - - - - - -
| |
| 89.1 1 2E51-1 RCIC-4-D-5 ELBOW TO PIPE AUG - - - - - - - - - - - -
| |
| 1 E51 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| BJ H2 2E51-1 RCIC-4-D-6 lSllUT1 A-27 IS1 - - - - s - - - - - - -
| |
| 69.1 1 2E51-1 RCIC-4-D-6 PIPE TO ELBOW AUG - - - - - - - - - - - -
| |
| 1 E5 1 om - - - - - - - - - - - -
| |
| PRE - -- - - - - - - - - - -
| |
| 6J H2 2E51-1 RCIC-4-D-7 A-2 7 IS1 - - - - - - - - - - - -
| |
| 89.1 1 2E51-1 RCIC-4-D-7 ELBOW TO PIPE AUG - - - - - - - - - - - -
| |
| 1 E51 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-J H2 2E51-1 RCIC-4-D-8 A-27 IS1 - - - - - - - - - - - -
| |
| 89.1 1 2E51-1 RCIC-4-D-8 PIPE TO ELBOW AuG - - - - - - - - - - - -
| |
| 1 E51 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-J H2 2E51-1 RCIC-4-D-9 A-27 IS1 - - - - - - - - - - - -
| |
| 8 9 11 2E51-1 RCIC-4-D-9 ELBOW TO PIPE AUG - - - - - - - - - - - -
| |
| 1 E51 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| Y Revision: 1 w
| |
| HNP-2 Fourth Interval Class 1 IS1 Plan Page 1 - 16 Southern Nuclear Operating Company Period 1 Period 2 Period 3 Category, Iso No.
| |
| ItemNO, Cornp. Desc.
| |
| Class Summarv IComalD ISvstem Scope / Method IProcedure Code Case B9 40 2B31-1 RC-2A-1 - BC TO PIPE AUG 1 831 OWN PRE NB-J H2 2831 -1 RC-2A-10 A-16A IS1 B9 40 2B31-1 RC-2A-10 PIPE TO VALVE AUG 1 831 OWN PRE N BJ H2 2831-1 RC-2A-2 ISIIPTI A-16A IS1 B9 40 2B31-1 RC-2A-2 PIPE TO ELBOW AUG 1 831 OWN PRE NB-J H2 2831 -1 RC-2A-3 ISIIPTI A-16A IS1 B9 40 2B31-1 RC-2A-3 ELBOW TO PIPE AUG 1 831 OWN PRE N BJ H2 2831 -1 RC-2A-4 A-16A IS1 B9 40 2B31-1 RC-2A-4 PIPE TO ELBOW AUG 1 831 OWN PRE N BJ H2 2831-1 RC-2A-5 A-16A IS1 B9 40 2B31-1 RC-2A-5 ELBOW TO PIPE AUG 1 831 OWN PRE NB-J H2 2B31-1 RC-2A-6 A-16A IS1 B9 40 2B31-1 RC-2A-6 PIPE TO ELBOW AUG 1 831 OWN PRE N BJ H2 2B31-1 RC-2A-7 A-I 6A IS1 B9 40 2B31-1 RC-2A-7 ELBOW TO PIPE AUG 1 831 OWN PRE N BJ H2 2831-1 RC-2A-8 A-16A IS1 8 9 40 2B31-1 RC-2A-8 PIPE TO VALVE AUG 1 831 OWN PRE
| |
| . . .-
| |
| N BJ H2 2831-1 RC-2A-9 A-16A IS1 89.40 2B31-1 RC-2A-9 VALVE TO PIPE AUG 1 831 OWN PRE
| |
| | |
| 3 Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Page 2 - 16 711 712006 (
| |
| Period 1 Period 2 Period 3 Category, lso No.
| |
| ItemNO, Comp. Desc.
| |
| Class Summary 1 ComplD 1 System Scope 1 Method 1 Procedure Code Case NBJ H2 2831 -1 RC-2B-1 A-1 6A IS1 BC TO PIPE AUG OWN PRE NB J H2 2831 -1 RC-28-10 A-1 8A IS1 89.40 2831 -1 RC-28-10 PIPE TO VALVE AUG 1 83 1 OWN PRE NBJ H2 2B31-1 RC-2B-11 A-1 8A IS1 89.40 2831 -1 RC-28-11 VALVE TO PIPE AUG 1 83 1 OWN PRE NBJ H2 2831-1 RC-2B-12 A-1 8A IS1 89.40 2B31-1 RC-2B-12 PIPE TO VALVE AUG 1 83 1 OWN PRE NBJ H2 2831 -1 RC-2B-2 A-1 8A IS1 89.40 2B31-1 RC-28-2 PIPE TO ELBOW AUG 1 831 OWN PRE NBJ H2 2831-1 RC-2B-3 A-1 8A IS1 89.40 2831 -1 RC-28-3 ELBOW TO PIPE AUG 1 831 OWN PRE NB-J H2 2831 -1 RC-2B-4 A-1 8A IS1 89.40 2B31-1 RC-28-4 PIPE TO ELBOW AUG 1 831 OWN PRE NB J H2 2831 -1 RC-2B-5 ISIIPTI A-1 8A IS1 89.40 2831-1 RC-2B-5 ELBOW TO PIPE AUG 1 83 1 OWN PRE NBJ H2 2831-1 RC-28-6 ISIIPTI A-1 8A IS1 89.40 2B31-1 RC-2B-6 PIPE TO ELBOW AUG 1 83 1 OWN PRE NB J H2 2831-1 RC-2B-7 A-1 8A IS1 89.40 2B31-1 RC-2B-7 ELBOW TO PIPE AUG 1 831 OWN PRE
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Page 3 - 16 Southern Nuclear Operating Company Period 1 Period 2 Period 3 Category, Iso No.
| |
| ItemNO, Comp. Desc.
| |
| Class Summary IComplD ISystem Scope IMethod IProcedure Code Case NBJ H2 2831 -1 RC-2B-8 A-18A IS1 89.40 2B31-1 RC-28-8 PIPE TO ELBOW AUG 1 831 OWN PRE NB-J H2 2831 -1 RC-2B-9 A-18A IS1 89.40 2831-1 RC-2B-9 ELBOW TO PIPE AUG 1 831 OWN PRE NBJ H2 2831-1 RC-2DR-1 A-28A IS1 89.21 2831-1 RC-2DR-1 SAFE-END TO NOZZLE AUG 1 831 OWN PRE NB-J H2 2831 -1 RC-2DR-10 ISIIPTI A-28A IS1 89.40 2B31-1 RC-2DR-10 PIPE TO ELBOW AUG 1 831 OWN PRE NBJ HZ 2831-1 RC-2DR-11 lSllPT1 A-28A IS1 89.40 2831-1 RC-2DR-11 ELBOW TO PIPE AUG 1 831 OWN PRE NBJ H2 2831 -1 RC-2DR-12 A-28A IS1 89.40 2B31-1 RC-2DR-12 PIPE TO ELBOW AUG 1 831 OWN PRE NBJ H2 2831-1 RC-2DR-13 A-28A IS1 89.40 2B31-1 RC-2DR-13 ELBOW TO PIPE AUG 1 831 OWN PRE NBJ H2 2831-1 RC-2DR-14 A-28A IS1 89.40 2B31-1 RC-2DR-14 PIPE TO ELBOW AUG 1 831 OWN PRE NBJ H2 2831 -1 RC-2DR-15 ISIIPTI A-28A IS1 89.40 2B31-1 RC-2DR-15 ELBOW TO PIPE AUG 1 831 OWN PRE NBJ HZ 2831-1 RC-2DR-16 ISllPTl A-28A IS1 89.40 2B31-1 RC-2DR-16 PIPE TO TEE AUG 1 831 OWN PRE
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Period 1 Period 2 Period 3 I
| |
| Category, Iso No.
| |
| ItemNO, Comp. Desc.
| |
| Class Summary IComplD ISystem Scope 1 Method IProcedure Code Case NBJ H2 2831-1 RC-2DR-17 A-28A IS1 89.40 2B31-1RC-2DR-17 TEE TO PIPE AUG 1 831 OWN PRE NBJ HZ 2831-1 RC-2DR-18 A-28A IS1 89.40 2831 -1RC-2DR-18 PIPE TO VALVE AUG 1 831 OWN PRE NBJ H2 2831-1 RC-2DR-19 A-28A IS1 89.40 2B31-1 RC-2DR-19 VALVE TO PIPE AU G 1 831 OWN PRE NB-J H2 2B31-1 RC-2DR-1A A-28A IS1 89.21 2B31-1 RC-2DR-1A NOZZLE TO SAFE-END AUG 1 83 1 OWN PRE NBJ H2 2831-1 RC-2DR-2 A-28A IS1 89.40 2831 -1 RC-2DR-2 PIPE TO ELBOW AUG 1 831 OWN PRE NB-J H2 2831-1 RC-2DR-20 A-28A IS1 B9.40 2B31-1RC-2DR-20 PIPE TO VALVE AUG 1 B3 1 OWN PRE NBJ HZ 2831-1 RC-2DR-21 A-28A IS1 B9.40 2B31-1RC-2DR-21 TEE TO PIPE AUG 1 831 OWN PRE NBJ HZ 2831-1 RC-2DR-3 A-28A IS1 B9.40 2B31-1RC-2DR-3 ELBOW TO PIPE AUG 1 831 OWN PRE NBJ H2 2B31-1 RC-2DR-4 ISIIPTI A-28A IS1 89.40 2831 -1 RC-2DR-4 PIPE TO PIPE AUG 1 831 OWN PRE NBJ H2 2B31-1 RC-2DR-5 A-28A IS1 PlPE TO ELBOW AUG OWN PRE
| |
| | |
| Revision: 1 HNP-2 Fourth I n t e r v a l C l a s s 1 IS1 P l a n Southern Nuclear Operating Company Page 5 - 16 711 712006 1
| |
| : Category, IternNO, Iso No.
| |
| Cornp. Desc.
| |
| Period 1 w w
| |
| % .-2 Period 2 CY 2 2 Period 3 rn Class Summary ICornplD ISystem Scope IMethod IProcedure Code Case ? i? i 5 5 5 NBJ H2 2831 -1 RC-2DR-6 A-28A IS1 - - - - - - - - - - - -
| |
| 89.40 2B31-1 RC-2DR-6 ELBOW TO PIPE AUG - - - - - - - - - - - -
| |
| 1 83 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| NBJ H2 2831 -1 RC-2DR-7 A-28A IS1 - - - - - - - - - - - -
| |
| 89.40 2831 -1 RC-2DR-7 PIPE TO TEE AUG - - - - - - - - - - - -
| |
| 1 831 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| N BJ H2 2B31-1 RC-2DR-8 A-28A IS1 - - - - - - - - - - - -
| |
| 89.40 2B31-1 RC-2DR-8 TEE TO REDUCING INSERT AUG - - - - - - - - - - - -
| |
| 1 831 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| NBJ H2 2831-1 RC-2DR-8A A-28A IS1 - - - - - - - - - - - -
| |
| 89.40 2B31-1 RC-2DR-8A REDUCING INSERT TO TUBING AUG - - - - - - - - - - - -
| |
| 1 83 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| NB-J H2 2831-1 RC-2DR-9 A-28A IS1 - - - - - - - - - - - -
| |
| 89.40 2831-1 RC-2DR-9 '4 4 TEE TO PIPE AUG - - - - - - - - - - - -
| |
| 1 83 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| NBJ H2 2C41-1 SBLC-1.5-1 lSllPT1 A-39 IS1 - s - - - - - - - - - -
| |
| 89.40 2C41-1 SBLC-1.5-1 VALVE TO PIPE AUG - - - - - - - - - - - -
| |
| 1 C41 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| NBJ H2 2C41-1SBLC-1.5-10 ISllPTl A-39 IS1 - - - - s - - - - - - -
| |
| 89.40 2C41-1 SBLC-1.5-10 PIPE TO ELBOW AUG - - - - - - - - - - - -
| |
| 1 C41 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| NBJ H2 2C41-1 SBLC-1.5-11 ISIIPTI A-39 IS1 - - - - s - - - - - - -
| |
| 89.40 2C41-1 SBLC-1.5-11 ELBOW TO PIPE AUG - - - - - - - - - - - -
| |
| 1 C41 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| NBJ H2 2C41-1 SBLC-1.5-12 A-39 IS1 - - - - - - - - - - - -
| |
| 89.40 2C41-1 SBLC-1.5-12 PIPE TO ELBOW AUG - - - - - - - - - - - -
| |
| om - - - - - - - - - - - -
| |
| 1 C41 PRE - - - - - - - - - - - -
| |
| NB-J H2 2C41-1 SBLC-1.5-13 A-39 IS1 - - - - - - - - - - - -
| |
| 89.40 2C41-1SBLC-1 5-13 ELBOW TO PIPE AUG - - - - - - - - - - - -
| |
| OWN - - - - - - - - - - - -
| |
| 1 C41 PRE - - - - - - - - - - - -
| |
| | |
| V C u Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Page 6 - 16 711 712006 1 Period 1 Period 2 Period 3 Category, lso No. O) o F N W ItemNO, Comp. Desc. z 2 2 2 2 Class Summary IComplD ISystem Scope IMethod IProcedure Code Case 5 5 5 i5 5 NBJ H2 2C41-1 SBLC-1.5-14 A-39 IS1 - - - - - - - - - - - -
| |
| 89.40 2C41-1 SBLC-1.5-14 PIPE TO VALVE AUG - - - - - - - - - - - -
| |
| 1 C41 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| N BJ H2 2C41-1 SBLC-1.5-15 A-39 IS1 - - - - - - - - - - - -
| |
| 89.40 2C41-1 SBLC-1.5-15 VALVE TO ELBOW AUG - - - - - - - - - - - -
| |
| 1 C41 om - - - - - - - - - - - -
| |
| PRE - ; - - - - - - - - - -
| |
| N BJ H2 2C41-1 SBLC-1.5-16 A-39 IS1 - - - - - - - - - - - -
| |
| 89.40 2C41-1SBLC-1.5-16 ELBOW TO PIPE AUG - - - - - - - - - - - -
| |
| 1 C41 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| N BJ H2 2C41-1 SBLC-1.5-17 A-39 IS1 - - - - - - - - - - - -
| |
| 89.40 2C41-1 SBLC-1.5-17 PIPE TO TEE AUG - - - - - - - - - - - -
| |
| 1 C41 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| N BJ H2 2C41-1 SBLC-1.5-18 A-39 IS1 - - - - - - - - - - - -
| |
| 89.40 2C41-1 SBLC-1.5-18 TEE TO PIPE AUG - - - - - - - - - - - -
| |
| 1 C41 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| N BJ H2 2C41-1 SBLC-1.5-19 A-39 IS1 - - - - - - - - - - - -
| |
| 89.40 2C41-1 SBLC-1.5-19 PIPE TO PIPE AUG - - - - - - - - - - - -
| |
| 1 C41 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| NB-J H2 2C41-1 SBLC-1.5-2 ISIIPTI A-39 IS1 - s - - - - - - - - - -
| |
| 89.40 2C41-1SBLC-1.5-2 PIPE TO TEE AUG - - - - - - - - - - - -
| |
| 1 C41 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| N BJ H2 2C41-1 SBLC-1.5-20 A-39 IS1 - - - - - - - - - - - -
| |
| 89.40 2C41-1 SBLC-1.5-20 PIPE TO VALVE AUG - - - - - - - - - - - -
| |
| 1 C41 om - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| N BJ H2 2C41-1 SBLC-1.5-21 A-39 IS1 - - - - - - - - - - - -
| |
| 89.40 2C41-1 SBLC-1.5-21 VALVE TO PIPE AUG - - - - - - - - - - - -
| |
| 1 C41 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| A-39 IS1 _ _ _ _ _ _ _ _ _ - - -
| |
| N BJ H2 2C41-1 SBLC-1.5-22 89.40 2C41-1 SBLC-1.5-22 PIPE TO ELBOW AUG - - - - - - - - - - - -
| |
| 1 C41 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 1SI Plan Southern Nuclear Operating Company
| |
| : Category, ItemNO, Iso No.
| |
| Comp. Desc.
| |
| Period 1
| |
| .-
| |
| 2 Period 2 I
| |
| Period 3 Class Summary IComplD ISystem Scope IMethod IProcedure Code Case 5 NBJ H2 2C41-1 SBLC-1.5-23 A-39 IS1 89.40 2C41-1SBLC-1.5-23 ELBOW TO PIPE AUG 1 C41 OWN PRE NBJ H2 2C41-1 SBLC-1.5-24 lSllPT1 A-39 IS1 89.40 2C41-1 SBLC-1.5-24 PIPE TO ELBOW AUG 1 C41 OWN PRE NB-J H2 2C41-1SBLC-1.5-25 ISIIPTI A-39 IS1 09.40 2C41-1 SBLC-1.5-25 ELBOW TO PIPE AUG 1 C41 OWN PRE NBJ H2 2C41-1 SBLC-1.5-26 A-39 IS1 89.40 2C41-1 SBLC-1.5-26 PIPE TO ELBOW AU G 1 C41 OWN PRE NBJ H2 2C41-1 SBLC-1.5-27 A-39 IS1 89.40 2C41-1 SBLC-1.5-27 ELBOW TO PIPE AUG 1 C41 OWN PRE NBJ H2 2C41-1 SBLC-1.5-28 lSllPT1 A-39 IS1 89.40 2C41-1 SBLC-1.5-28 PIPE TO ELBOW AUG 1 C41 OWN PRE NBJ H2 2C41-1 SBLC-1.5-29 ISIIPTI A-39 IS1 89.40 2C41-1 SBLC-1.5-29 ELBOWTO PIPE AUG 1 C41 OWN PRE NBJ H2 2C41-1 SBLC-1.5-3 A-39 IS1 TEE TO PlPE AUG OWN PRE NB J H2 2C41-1 SBLC-1.5-30 A-39 IS1 89.40 2C41-1SBLC-1.5-30 PIPE TO ELBOW AUG 1 C41 OWN PRE NBJ H2 2C41-1 SBLC-1.5-31 A-39 IS1 89.40 2C41-1SBLC-1.5-31 ELBOW TO PIPE AUG 1 C41 OWN PRE
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan 'age 8 - 16 Southern Nuclear Operating Company Period 1 Period 2 Period 3 Category, Iso No.
| |
| ItemNO, Comp. Desc.
| |
| Class Summary 1 ComplD ISystem Scope IMethod IProcedure code Case NB-J HZ 2C41-1 SBLC-1.5-32 A-39 IS1 89.40 2C41-1 SBLC-1.5-32 PIPE TO INSERT AUG 1 C41 OWN PRE NBJ HZ 2C41-1 SBLC-1.5-33 A-39 IS1 89.40 2C41-1 SBLC-1.5-33 INSERT TO PIPE AUG 1 C41 OWN PRE NBJ HZ 2C41-1SBLC-1.5-34 A-39 IS1 89.40 2C41-1 SBLC-1.5-34 PIPE TO ELBOW AUG 1 C41 OWN PRE NB-J HZ 2C41-1 SBLC-1.5-35 A-39 IS1 89.40 2C41-1 SBLC-1.5-35 ELBOW TO PIPE AUG 1 C41 OWN PRE NBJ H2 2C41-1 SBLC-1.5-36 A-39 IS1 89.40 2C41-1 SBLC-1.5-36 PIPE TO ELBOW AUG 1 C41 OWN PRE NBJ H2 2C41-1 SBLC-1.5-37 A-39 IS1 ELBOWTO PlPE AUG OWN PRE PlPE TO ELBOW AUG OWN PRE NBJ HZ 2C41-1 SBLC-1.5-39 A-39 IS1 89.40 2C41-1SBLC-1.5-39 ELBOWTO PIPE AUG 1 C41 OWN PRE NBJ H2 2C41-1 SBLC-1.5-4 A-39 IS1 89.40 2C41-1 SBLC-1.5-4 PIPE TO PIPE AUG 1 C41 OWN
| |
| .PRF
| |
| . .-
| |
| NBJ H2 2C41-1 SBLC-1.5-40 ISlIPTl A-39 IS1 89.40 2C41-1 SBLC-1.5-40 PIPE TO ELBOW AUG 1 C41 OWN PRE
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Period 1 Period 2 Period 3 Category, Iso No.
| |
| ItemNO, Comp. Desc.
| |
| Class Summary I ComplD I System Scope I Method I Procedure Code Case NBJ H2 2C41-1 SBLC-1.5-41 ISIIPTI A-39 IS1 89.40 2C41-1SBLC-1.5-41 ELBOW TO PIPE AUG 1 C41 OWN PRE NBJ H2 2C41-1 SBLC-1.5-42 A-39 IS1 89.40 2C41-1 SBLC-1.5-42 PIPE TO INSERT AUG 1 C41 OWN PRE NBJ H2 2C41-1 SBLC-1.5-43 A-39 IS1 89.40 2C41-1SBLC-1.5-43 INSERT TO PIPE AUG 1 C41 OWN PRE NBJ H2 2C41-1 SBLC-1.5-44 A-40 IS1 B9.40 2C41-1 SBLC-1.5-44 PIPE TO ELBOW AUG 1 C4 1 OWN PRE NBJ H2 2C41-1 SBLC-1.5-45 A-40 IS1 89.40 2C41-1SBLC-1.5-45 ELBOW TO PIPE AUG 1 C41 OWN PRE NBJ H2 2C41-1 SBLC-1.5-46 A-40 IS1 89.40 2C41-1SBLC-1.5-46 PIPE TO ELBOW AUG 1 C41 OWN PRE NBJ H2 2C41-1 SBLC-1.5-47 A-40 IS1 89.40 2C41-1 SBLC-1.5-47 ELBOW TO PIPE AUG 1 C41 OWN PRE NBJ H2 2C41-1 SBLC-1.5-48 A-40 IS1 89.40 2C41-1 SBLC-1.5-48 PIPE TO ELBOW AUG 1 C41 OWN PRE NBJ H2 2C41-1 SBLC-1.5-49 A-40 IS1 89.40 2C41-1 SBLC-1.5-49 ELBOW TO PIPE AUG 1 C41 OWN PRE NBJ H2 2C41-1 SBLC-1.5-5 A-39 IS1 89.40 2C41-1 SBLC-1.5-5 PIPE TO ELBOW AUG OWN PRE
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Page 10 - 16 711712006 1 Period 1 Period 2 Period 3 Category, Iso No. o r N VI ItemNO, Comp. Desc. 2 2 2 2 Class Summary IComplD ISystem Scope IMethod IProcedure Code Case 5 5 5 5 5 NBJ H2 2C41-1 SBLC-1.5-50 ISIIPTI A-40 IS1 - - - - s - - - - - - -
| |
| 89.40 2C41-1 SBLC-1.5-50 PlPE TO ELBOW AUG - - - - - - - - - - - -
| |
| 1 C41 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| NB-J H2 2C41-1 SBLC-1.5-51 ISIIPTI A-40 IS1 - - - - s - - - - - - -
| |
| 89.40 2C41-1 SBLC-1.5-51 ELBOW TO PIPE AUG - - - - - - - - - - - -
| |
| 1 C41 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| NBJ H2 2C41-1 SBLC-1.5-52 A-40 IS1 - - - - - - - - - - - -
| |
| 89.40 2C41-1 SBLC-1.5-52 PIPE TO TEE AUG - - - - - - - - - - - -
| |
| 1 C41 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| NBJ H2 2C41-1 SBLC-1.5-53 A-40 IS1 - - - - - - - - - - - -
| |
| 89.40 2C41-1 SBLC-1.5-53 TEE TO PIPE AUG - - - - - - - - - - - -
| |
| 1 C41 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| NBJ H2 2C41-1 SBLC-1.5-54 A-40 IS1 - - - - - - - - - - - -
| |
| 89.40 2C41-1SBLC-1.5-54 PIPE TO ELBOW AUG - - - - - - - - - - - -
| |
| 1 C41 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| NBJ H2 2C41-1 SBLC-1.5-55 A-40 IS1 - - - - - - - - - - - -
| |
| 89.40 2C41-1 SBLC-1.5-55 ELBOWTO PIPE AUG - - - - - - - - - - - -
| |
| 1 C41 om - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| NBJ H2 2C41-1 SBLC-1.5-56 lSllPT1 A-40 IS1 89.40 2C41-1 SBLC-1.5-56 PIPE TO ELBOW AUG - - - - - - - - - - - -
| |
| 1 C41 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| NBJ H2 2C41-1 SBLC-1.5-57 ISllPTl A-40 IS1 - s - - - - - - - - - -
| |
| 89.40 2C41-1 SBLC-1.5-57 ELBOWTO PIPE AUG - - - - - - - - - - - -
| |
| 1 C41 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| NBJ H2 2C41-1 SBLC-1.5-58 A-40 IS1 89.40 2C41-1SBLC-1.5-58 PIPE TO ELBOW AUG - - - - - - - - - - - -
| |
| 1 C41 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| NBJ H2 2C41-1 SBLC-1.5-59 A-40 IS1 - - - - - - - - - - - -
| |
| 89.40 2C41-1SBLC-1.5-59 ELBOW TO PIPE AUG - - - - - - - - - - - -
| |
| 1 C41 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| Revision: 1 HNP-2 F o u r t h I n t e r v a l C l a s s 1 IS1 P l a n Southern Nuclear Operating Company Page 11 - 16 711712006 1 Period 1 Period 2 Period 3 Category, Iso No.
| |
| ItemNO, Comp. Desc.
| |
| Class Summary IComplD ISystem Scope IMethod IProcedure Code Case NBJ H2 2C41-1 SBLC-1.5-6 A-39 IS1 89.40 2C41-1SBLC-1.5-6 ELBOW TO PIPE AUG 1 C41 OWN PRE NBJ H2 2C41-1 SBLC-1.5-60 A-40 IS1 89.40 2C41-1 SBLC-1.5-60 PIPE TO ELBOW AUG 1 C41 OWN PRE NBJ H2 2C41-1 SBLC-1.5-61 A-40 IS1 89.40 2C41-1 SBLC-1.5-61 ELBOW TO PIPE AUG 1 C41 OWN PRE NBJ H2 2C41-1 SBLC-1.5-62 lSllPT1 A-40 IS1 89.40 2C41-1 SBLC-1.5-62 PIPE TO ELBOW AUG 1 C41 OWN PRE NB-J H2 2C41-1 SBLC-1.5-63 ISIIPTI A-40 IS1 89.40 2C41-1 SBLC-1.5-63 ELBOW TO PIPE AUG 1 C41 OWN PRE NB-J H2 2C41-1 SBLC-1.5-64 ISIIPTI A-40 IS1 89.40 2C41-1 SBLC-1.5-64 PIPE TO ELBOW AUG 1 C41 OWN PRE NB-J H2 2C41-1 SBLC-1.5-65 A-40 IS1 89.40 2C41-1 SBLC-1.5-65 ELBOW TO PIPE AUG 1 C41 OWN PRE NBJ H2 2C41-1 SBLC-1.5-66 A-41 IS1 89.40 2C41-1 SBLC-1.5-66 PIPE TO ELBOW AUG 1 C41 OWN PRE NB-J H2 2C41-1 SBLC-1.5-67 A-41 IS1 89.40 2C41-1 SBLC-1.5-67 ELBOW TO PIPE AUG 1 C41 OWN PRE NBJ H2 2C41-1 SBLC-1.5-68 A-41 IS1 89.40 2C41-1SBLC-1.5-68 PIPE TO ELBOW AUG 1 C41 OWN PRE
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Period 1 Page 1 2 - 16 Period 2 711712006 Period 3 1
| |
| Category, Iso No.
| |
| ItemNO, Comp. Desc.
| |
| Class Summary 1ComplD 1 System Scope 1 Method 1 Procedure Code Case NBJ H2 2C41-1 SBLC-1.5-69 A-41 IS1 89.40 2C41-1 SBLC-1.5-69 ELBOW TO PIPE AUG 1 C41 OWN PRE NB-J H2 2C41-1 SBLC-1.5-7 A-39 IS1 89.40 2C41-1 SBLC-1.5-7 PIPE TO PENETRATION AUG 1 C41 OWN PRE NBJ H2 2C41-1 SBLC-1.5-70 ISllPTl A-41 IS1 89.40 2C41-1 SBLC-1.5-70 PIPE TO ELBOW AUG 1 C41 OWN PRE NBJ H2 2C41-1 SBLC-1.5-71 ISIIPTI A-41 IS1 89.40 2C41-1 SBLC-1.5-71 ELBOW TO PIPE AUG 1 C41 OWN PRE NBJ H2 2C41-1 SBLC-1.5-72 A-41 IS1 89.40 2C41-1 SBLC-1.5-72 PIPE TO ELBOW AUG 1 C41 OWN PRE NBJ H2 2C41-1 SBLC-1.5-73 A-41 IS1 89.40 2C41-1 SBLC-1.5-73 ELBOW TO PIPE AUG 1 C41 OWN PRE NBJ H2 2C41-1 SBLC-1.5-74 ISIIPTI A-41 IS1 89.40 2C41-1 SBLC-1.5-74 PIPE TO ELBOW AUG 1 C41 OWN PRE NBJ H2 2C41-1 SBLC-1.5-75 ISIIPTI A-41 IS1 89.40 2C41-1 SBLC-1.5-75 ELBOW TO PIPE AUG 1 C41 OWN PRE NBJ H2 2C41-1 SBLC-1.5-76 lSllPT1 A-41 IS1 89.40 2C41-1 SBLC-1.5-76 PIPE TO ELBOW AUG 1 C41 OWN PRE NBJ H2 2C41-1 SBLC-1.5-77 ISIIPTI A-41 IS1 89.40 2C41-1 SBLC-1.5-77 ELBOW TO PIPE AUG 1 C41 OWN PRE
| |
| | |
| 3 Y 3 Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Page 13 - 16 711712006 1
| |
| : Category, ItemNO, Iso No.
| |
| Comp. Desc.
| |
| O)
| |
| E 2 Period 1 o .-
| |
| 2 Period 2 (Y
| |
| 2 2 Period 3 o
| |
| Class Summary IComplD ISystem Scope IMethod IProcedure Code Case 5 5 I, I, ?i NB-J H2 2C41-1 SBLC-1.5-78 A-41 IS1 - - - - - - - - - - - -
| |
| 89.40 2C41 -lSBLC-1.5-78 PIPE TO ELBOW AIJG - - - - - - - - - - - -
| |
| 1 C41 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| NB-J H2 2C41-1 SBLC-1.5-79 A-41 IS1 - - - - - - - - - - - -
| |
| 89.40 2C41-1SBLC-1.5-79 ELBOW TO PIPE AUG - - - - - - - - - - - -
| |
| 1 C41 o m - - - - - - - - - - - -
| |
| PRE - : - - - - - - - - - -
| |
| NB-J H2 2C41-1 SBLC-1.5-8 A-39 IS\ - - - - - - - - - - - -
| |
| 89.40 2C41 -lSBLC-1.5-8 PENETRATION TO PIPE AIJG - - - - - - - - - - - -
| |
| 1 C41 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| NBJ H2 2C41-1 SBLC-1.5-80 A-41 IS1 - - - - - - - - - - - -
| |
| B9.40 2C41-1 SBLC-1.5-80 PIPE TO ELBOW AUG - - - - - - - - - - - -
| |
| 1 C41 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| NBJ HZ 2C41-1 SBLC-1.5-81 A-41 IS1 - - - - - - - - - - - -
| |
| 89.40 2C41-1 SBLC-1.5-81 ELBOW TO PIPE AUG - - - - - - - - - - - -
| |
| 1 C41 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| NBJ H2 2C41-1SBLC-1.5-82 A-41 IS1 - - - - - - - - - - - -
| |
| 89.40 2'31-1 SBLC-1.5-82 PIPE TO ELBOW AUG - - - - - - - - - - - -
| |
| 1 C4 1 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| NBJ H2 2C41-1 SBLC-1.5-83 A-41 IS1 - - - - - - - - - - - -
| |
| 89.40 2C41-1 SBLC-1.5-83 ELBOW TO PIPE AIJG - - - - - - - - - - - -
| |
| 1 C41 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| NBJ H2 2C41-1 SBLC-1.5-84 A-41 IS1 - - - - - - - - - - - -
| |
| 89.40 2C41-1 SBLC-1.5-84 PIPE TO SAFE-END AUG - - - - - - - - - - - -
| |
| 1 C41 o m - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| NBJ H2 2C41-1 SBLC-1.5-9 A-39 IS1 - - - - - - - - - - - -
| |
| 89.40 2C41-1 SBLC-1.5-9 PIPE TO PIPE AIJG - - - - - - - - - - - -
| |
| 1 C41 o m - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| NBJ H2 2C41-1 SBLC-2-2 ISllPTl 2-BE-3 IS1 - s - - - - - - - - - -
| |
| 89.21 2C41-1SBLC-2-2 SAFE-END TO TEE AUG - - - - - - - - - - - -
| |
| C41 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Page 1 4 - 16 Southern Nuclear Operating Company Period 1 Period 2 Period 3 Category, Iso No. ? g .?
| |
| ItemNO, Comp. Desc. K W 2 Class Summary IComplD ISystem Scope IMethod IProcedure Code Case 5 5 5 NBJ H2 2G31-1 RWCU-2DR-1 lSllPT1 A-28A IS1 - - - - - - - -
| |
| 89.40 2G31-1 RWCU-2DR-1 PIPE TO ELBOW AUG - - - - - - - -
| |
| 1 G3 1 OWN - - - - - - - -
| |
| PRE - - - - - - - -
| |
| NB-J H2 2G31-1 RWCU-2DR-10 ISllPTl A-28A IS1 - S - - - - - -
| |
| 89.40 2G31-1 RWCU-2DR-10 ELBOW TO PIPE AUG - - - - - - - -
| |
| 1 G3 1 OWN - - - - - - - -
| |
| PRE - - - - - - - -
| |
| NB-J H2 2G31-1 RWCU-2DR-11 A-28A IS1 - - - - - - - -
| |
| 89.40 2G31-1RWCU-2DR-11 PIPE TO ELBOW AUG - - - - - - - -
| |
| 1 G31 OWN - - - - - - - -
| |
| PRE - - - - - - - -
| |
| NB-J H2 2G31-1 RWCU-2DR-12 A-28A IS1 - - - - - - - -
| |
| 89.40 2G31-1 RWCU-2DR-12 ELBOW TO PIPE AUG - - - - - - - -
| |
| 1 G31 OWN - - - - - - - -
| |
| PRE - - - - - - - -
| |
| NB-J H2 2G31-1 RWCU-2DR-13 A-28A IS1 - - - - - - - -
| |
| 89.40 2G31-1 RWCU-2DR-13 PIPE TO ELBOW AU'G - - - - - - - -
| |
| 1 G3 1 OWN - - - - - - - -
| |
| PRE - - - - - - - -
| |
| NBJ H2 2G31-1 RWCU-2DR-14 A-28A IS1 - - - - - - - -
| |
| 89.40 2G31-1 RWCU-2DR-14 ELBOW TO PIPE AUG - - - - - - - -
| |
| 1 G3 1 OWN - - - - - - - -
| |
| PRE - - - - - - - -
| |
| NBJ H2 2G31-1 RWCU-2DR-15 A-28A IS1 - - - - - - - -
| |
| 89.40 2G31-1 RWCU-2DR-15 PIPE TO VALVE AUG - - - - - - - -
| |
| 1 G31 OWN - - - - - - - -
| |
| PRE - - - - - - - -
| |
| NBJ H2 2G31-1 RWCU-2DR-16 A-28A IS1 - - - - - - - -
| |
| 89.40 2G31-1 RWCU-2DR-16 VALVE TO PIPE AUG - - - - - - - -
| |
| 1 G31 OWN - - - - - - - -
| |
| PRE - - - - - - - -
| |
| NBJ H2 2G31-1 RWCU-2DR-17 A-28A IS1 - - - - - - - -
| |
| 89.40 2G31-1 RWCU-2DR-17 PIPE TO TEE AUG - - - - - - - -
| |
| 1 G31 OWN - - - - - - - -
| |
| PRE - - - - - - - -
| |
| NBJ H2 2G31-1 RWCU-2DR-18 A-28A IS1 - - - - - - - -
| |
| 89.40 2G31-1 RWCU-2DR-18 TEE TO PIPE AUG - - - - - - - -
| |
| 1 G31 OWN - - - - - - - -
| |
| PRE I- - - - I - - - -
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Period 1 Period 2 Period 3 Category, Iso No.
| |
| ItemNO, Comp. Desc.
| |
| Class Summary IComplD ISystem Scope IMethod IProcedure Code Case NBJ H2 2G31-1 RWCU-2DR-19 A-28A IS1 89.40 2G31-1 RWCU-2DR-19 PIPE TO REDUCER AUG 1 G31 OWN PRE NB-J H2 2G31-1 RWCU-2DR-2 ISllPTl A-28A IS1 89.40 2G31-1 RWCU-2DR-2 ELBOW TO PIPE AUG 1 G31 OWN PRE NB-J H2 2G31-1 RWCU-2DR-20 A-28A IS1 89.40 2G31-1 RWCU-2DR-20 REDUCER TO PIPE AUG OWN PRE PlPE TO TEE AUG OWN PRE NB-J H2 2G31-1 RWCU-2DR-22 A-28A IS1 89.40 2G31-1 RWCU-2DR-22 TEE TO PIPE AUG 1 G31 OWN PRE NBJ H2 2G31-1 RWCU-2DR-23 A-28A IS1 89.40 2G31-1 RWCU-2DR-23 PIPE TO REDUCER AUG 1 G31 OWN PRE NB-J H2 2G31-1 RWCU-2DR-24 A-28A IS1 89.40 2G31-1 RWCU-2DR-24 REDUCER TO PIPE AUG 1 G31 OWN PRE NB J H2 2G31-1 RWCU-2DR-25 ISIIPTI A-28A IS1 89.40 2G31-1 RWCU-2DR-25 PIPE TO ELBOW AUG 1 G31 OWN PRE NBJ h2 2G31-1 RWCU-2DR-26 ISIIPTI A-28A IS1 89.40 2G31-1 RWCU-2DR-26 ELBOW TO PIPE AUG 1 G31 OWN PRE PlPE TO VALVE AUG OWN PRE
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Page 16 - 16 Southern Nuclear Operating Company Period 1 Period 2 Period 3 Category, Iso No.
| |
| IternNO, Cornp. Desc.
| |
| Class Summary I CornplD ISystem Scope 1 Method IProcedure Code Case NBJ H2 2G31-1 RWCU-2DR-28 A-28A IS1 89.40 2G31-1 RWCU-2DR-28 VALVE TO PIPE AUG 1 G31 OWN PRE NBJ H2 2G31-1 RWCU-2DR-29 ISIIPTI A-28A 1st 89.40 2G31-1 RWCU-2DR-29 PIPE TO TEE AUG 1 G31 OWN PRE NB-J H2 2G31-1 RWCU-2DR-3 A-28A IS1 89.40 2G31-1 RWCU-2DR-3 PIPE TO ELBOW AUG 1 G31 OWN PRE 89.40 2G31-1 RWCU-2DR-4 ELBOW TO PIPE AUG 1 G31 OWN PRE NB-J H2 2G31-1 RWCU-2DR-5 A-28A IS1 89.40 2G31-1 RWCU-2DR-5 PIPE TO ELBOW AUG 1 G31 OWN PRE NBJ H2 2G31-1 RWCU-2DR-6 A-28A IS1 89.40 2G31-1 RWCU-2DR-6 ELBOW TO PIPE AUG 1 G31 OWN PRE NBJ H2 2G31-1 RWCU-2DR-7 A-28A IS1 89.40 2G31-1 RWCU-2DR-7 PIPE TO ELBOW AUG 1 G3 1 OWN PRE 89.40 2G31-1 RWCU-2DR-8 ELBOW TO PIPE AUG 1 G31 OWN PRE NBJ H2 2G31-1 RWCU-2DR-9 lSllPT1 A-28A IS1 89.40 2G31-1 RWCU-2DR-9 PIPE TO ELBOW AUG 1 G31 OWN
| |
| | |
| Revision: 1 HNP-2 F o u r t h I n t e r v a l C l a s s 1 IS1 P l a n Page 1 - 5 Southern Nuclear Operating Company Period 1 Period 2 Period 3 Category, Iso No.
| |
| ItemNO, Comp. Desc.
| |
| Class Summary 1 ComplD 1 System Scope 1 Method 1 Procedure Code Case B-K H2 281 1UC-6 ISIIMTI A-1 A IS1 81 0.1 0 281 1UC-6 SUPPORT SKIRT AUG 1 Bl1 N-323-1 OWN PRE B-K H2 281 1\SB1 ISIIMTI A-32 IS1 81 0.1 0 2B11 \SB1 STABILIZER BRACKET NO. 1 AUG 1 Bll OWN PRE B-K H2 281 1\SB2 ISIIMTI A-32 IS1 B1O.10 2Bll\SB2 STABILIZER BRACKET NO. 2 AUG 1 B11 OWN PRE B-K H2 281 1\SB3 ISIIMTI A-32 IS1 81 0.1 0 2 B l l \SB3 STABILIZER BRACKET NO. 3 AUG 1 B11 OWN PRE B-K H2 281 1\SB4 ISIIMTI A-32 IS1 81 0.1 0 281 1\SB4 STABILIZER BRACKET NO. 4 AUG 1 B11 OWN PRE B-K H2 281 1\SB5 ISIIMTI A-32 IS1 810.1 0 2 B l l\SB5 STABILIZER BRACKET NO. 5 AUG 1 B11 OWN PRE B-K H2 281 1\SB6 ISIIMTI A-32 IS1 81 0.1 0 2B11 \SB6 STABILIZER BRACKET NO. 6 AUG 1 Bl1 OWN PRE B-K H2 2821-1 FW-12AA-IAPL-1 THRU 8 A-10 IS1 810.20 2821-1FW-12AA-1APL-1 THRU 8 2B21 -RFW-R31 AU G 1 821 OWN PRE B-K H2 2821-1 FW-12AA-3PL-1 THRU 8 ISIIMTI A-1 0 IS1 81 0.20 2821 -1 FW-12AA-3PL-1 THRU 8 2821 -RFW-R3O AUG 1 821 OWN PRE B-K H2 2821-1 FW-12AA-4PL-1 THRU 4 A-1 0 IS1 81 0.20 2821 -1 FW-12AA-4PL-1 THRU 4 AUG 1 821 OWN PRE
| |
| | |
| 3 Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Page 2 - 5 7/14/2006 1 Period 1 Period 2 Period 3 Category, Iso No.
| |
| ItemNO, Cornp. Desc.
| |
| Class Summary IComplD ISystem Scope IMethod IProcedure Code Case B-K H2 2821-1 FW-12AB-7PL-1 THRU 4 A-1 0 IS1 810.20 2821-1 FW-12AB-7PL-1 THRU 4 2821 -RFW-HI3 AUG 1 821 OWN PRE B-K H2 2821-1 FW-12BC-7PL-1 THRU 4 A-1 1 IS1 81 0.20 2821 -1FW-12BC-7PL-1 THRU 4 2821 -RFW-H5 AUG 1 821 OWN PRE B-K H2 2821-1 FW-12BD-IAPL-1 THRU 8 A-1 1 IS1 81 0.20 2821 -1 FW-12BD-1APL-1 THRU 8 2821 -RFW-R20 AUG 1 821 OWN PRE B-K H2 2821-1 FW-12BD-3PL-1 THRU 8 A-1 1 IS1 81 0.20 2821 -1 FW-12BD-3PL-1 THRU 8 2821 -RFW-R19 AUG 1 82 1 OWN PRE B-K H2 2821-1 FW-12BD-4PL-1 THRU 4 A-1 1 IS1 810.20 2821-1FW-12BD-4PL-1 THRU 4 2821 -RFW-HI AUG 1 821 OWN PRE B-K H2 2821 -1 MS-24A-16PL-1 THRU 4 A-6 IS1 810.20 2821 -1MS-24A-16PL-1 THRU 4 T & L RESTRAINT AUG 1 821 OWN PRE B-K H2 2821 -1 MS-24A-18PS A-6 IS1 810.20 2821 -1MS-24A-18PS BELLOWS AlTACHMENT AUG 1 821 OWN PRE 8-K H2 2821-1MS-24A-5PL-1 THRU 4 ISIIMTI A-6 IS1 810.20 2821-1MS-24A-5PL-1 THRU 4 2821 -MS-HI AUG 1 821 OWN PRE B-K H2 2821-1 MS-248-14PL-1 THRU 4 A-7 IS1 810.20 2821 -1MS-248-14PL-1 THRU 4 T & L RESTRAINT AUG 1 821 OWN PRE B-K H2 2821-1 MS-248-16PS A-7 IS1 81 0.20 2821 -1 MS-248-16PS BELLOWS AlTACHMENT AUG 1 821 OWN PRE
| |
| | |
| 3 3 Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Page 3 - 5 Southern Nuclear Operating Company Period 1 Period 2 Period 3 Category, lso No.
| |
| ItemNO, Cornp. Desc.
| |
| Class Summary I CornplD I System Scope I Method l Procedure Code Case B-K H2 2821-1MS-24B-5PL-1 THRU 4 A-7 IS1 810.20 2821-1MS-24B-5PL-1 THRU 4 2821 -MS-H4 AUG 1 82 1 OWN PRE B-K H2 2821-1 MS-248-8PL-1 THRU 8 A-7 IS1 81 0.20 2821 -1MS-248-8PL-1 THRU 8 2821-MS-R53 AUG 1 821 OWN PRE B-K H2 2821-1 MS-24C-14PL-1 THRU 4 A-8 IS1 81 0.20 2821 -1MS-24C-14PL-1 THRU 4 T 8 L RESTRAINT AUG 1 82 1 OWN PRE 8-K H2 2821-1 MS-24C-16PS A-8 IS1 81 0.20 2821 -1 MS-24C-16PS BELLOWS ATACHMENT AUG 1 82 1 OWN PRE B-K H2 2821-1 MS-24C-5PL-1 THRU 4 A-8 IS1 81 0.20 2821-1MS-24C-5PL-1 THRU 4 2821-MS-H7 AUG 1 821 OWN PRE B-K H2 2821-1 MS-24C-9PL-1 THRU 8 A-8 IS1 81 0.20 2821 -1MS-24C-9PL-1 THRU 8 2B21-MS-R44 AUG 1 821 OWN PRF. .-
| |
| B-K H2 2821-1 MS-24D-16PL-1 THRU 4 A-9 IS1 81 0.20 2821-1MS-24D-16PL-1 THRU 4 T & L RESTRAINT AUG 1 82 1 OWN PRE -
| |
| B-K H2 2821-1MS-24D-18PS A-9 IS1 810.20 2821-1 MS-24D-18PS BELLOWS AUACHMENT AUG 1 821 OWN PRE B-K H2 2821-1 MS-24D-5PL-1 THRU 4 A-9 IS1 810.20 2821-1MS-24D-5PL-1 THRU 4 2821-MS-HI 0 AUG 1 821 OWN PRE B-K H2 2821-1 MS-24D-9PL-1 THRU 8 A-9 IS1 81 0.20 2821-1MS-24D-9PL-1 THRU 8 2821 -MS-R37 AU G 1 821 OWN PRE
| |
| | |
| Revision: 1 HNP-2 F o u r t h Interval C l a s s 1 IS1 Plan Page 4 - 5 S o u t h e r n Nuclear Operating C o m p a n y Period 1 Period 2 Period 3 I
| |
| Category, Iso No. T ItemNO, Comp. Desc. 2I Class Summary IComplD ISystem Scope IMethod IProcedure Code Case I N B-K H2 2831-1 RCM-28AS-5HL-1 THRU 4 A-16 IS1 810.20 2831-1 RCM-28AS-5HL-1 THRU 4 2831 -SSA-22 AUG 1 83 1 OWN PRE B-K H2 2E51-1 RCIC-4-D-7PL-1 THRU 8 ISllMTl A-27 IS1 81 0.20 2E51-1 RCIC-4-D-7PL-1 THRU 8 2E51-RCIC-R115 AUG 1 E51 OWN PRE B-K H2 2E51-1 RCIC-4-D-9PL-1 THRU 4 A-27 IS1 810.20 2E51-1 RCIC-4-D-9PL-1 THRU 4 2E51 -RCIC-HI 12 AUG 1 E51 OWN PRE B-K H2 2G31-1 RWCUM-6-D-11PL-1 THRU 8 ISllPTl A-28 IS1 810.20 2G31-1RWCUM-6-D-11PL-1 THRU 8 2G31-RWCU-H24 AUG 1 G31 OWN PRE B-K H2 2G31-1 RWCUMS-D-3PL-1 THRU 4 A-28 IS1 810.20 2G31-1 RWCUM-6-D-3PL-1 THRU 4 2G31-RWCU-H23 AUG 1 G31 OWN PRE B-K LUG ISIIMTINMP-ES-024-401 A-4 IS1 810.30 LUG 2RC-A PUMP LUG-1 AUG 1 831 OWN PRE B-K LUG A-4 IS1 810.30 LUG 2RC-A PUMP LUG-2 AUG 1 83 1 OWN PRE B-K H2 2831URC-A PUMP LUG-3 A-4 IS1 810.30 2831 URC-A PUMP LUG-3 2RC-A PUMP LUG-3 AUG 1 83 1 OWN PRE B-K LUG A-4 IS1 810.30 LUG 2RC-B PUMP LUG-1 AUG 1 831 OWN PRE B-K LUG A-4 IS1 810.30 LUG 2RC-B PUMP LUG-2 AUG 1 831 OWN PRE
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating C o m p a n y Page 5 - 5 711412006 1 Period 1 Period 2 Period 3 Category, Iso No.
| |
| ItemNO, Comp. Desc.
| |
| Class Summary I ComplD I System Scope I Method I Procedure Code Case B-K H2 2831PRC-8 PUMP LUG3 A-4 IS1 810.30 2831PRC-8 PUMP LUG-3 2RC-8 PUMP LUG-3 AUG 1 831 OWN PRE
| |
| | |
| Revision: 1 HNP-2 F o u r t h Interval C l a s s 1 IS1 P l a n S o u t h e r n Nuclear O p e r a t i n g C o m p a n y Page 1 - 1 711712006 1 Period 1 Period 2 Period 3 Category, lso No. m o y N O ItemNO, Comp. Desc. z 2 2 2 2 Class Summary IComplD ISystem Scope / Method IProcedure Code Case 5 5 5 5 5 B-L-2 H2 2831PRC-A PUMP CASING A-4 IS1 t t - - t - - - t t - -
| |
| 81 2.20 2831 PRC-A PUMP CASING RC PUMP A INSIDE SURFACE AUG - - - - - - - - - - - -
| |
| 1 831 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-L-2 H2 2831PRC-B PUMP CASING A-4 IS1 t t - - t - - - t t - -
| |
| 812.20 2831 PRC-8 PUMP CASING RC PUMP 8 INSIDE SURFACE AIJG - - - - - - - - - - - -
| |
| 1 831 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class I IS1 Plan Page 1 - 6 Southern Nuclear Operating Company Period 1 Period 2 Period 3 Category, Iso No.
| |
| ItemNO, Comp. Desc.
| |
| Class Summary I ComplD I System Scope I Method I Procedure Code Case B-M-2 H2 2821-F010A BODIES A-1 2 IS1 81 2.50 2821-F010A BODIES GROUP 1 VALVE AUG 1 821 OWN PRE B-M-2 H2 2821-F01OB BODIES A-1 3 IS1 81 2.50 2821-F01OB BODIES GROUP 1 VALVE AUG 1 82 1 OWN PRE B-M-2 H2 2821-F011A BODIES A-1 2 IS1 81 2.50 2B21-F011A BODIES GROUP 2 VALVE AUG 1 82 1 OWN PRE B-M-2 H2 2821-F011 B BODIES A-1 3 IS1 81 2 50 2821-F011 B BODIES GROUP 2 VALVE AUG 1 821 OWN PRE B-M-2 H2 2821 -F013A BODIES A-5 IS1 812 50 2821 -F013A BODIES GROUP 3 VALVE AUG 1 821 OWN PRE B-M-2 H2 2821-F013B BODIES A-5 IS1 81 2.50 2821-F013B BODIES GROUP 3 VALVE AUG 1 821 OWN PR E B-M-2 H2 2821-F013C BODIES A-5 IS1 81 2 50 2B21 -F013C BODIES GROUP 3 VALVE AUG 1 821 OWN PRE B-M-2 H2 2821 -F013D BODIES A-5 IS1 81 2.50 2821-F013D BODIES GROUP 3 VALVE AUG 1 821 OWN PRE B-M-2 H2 2821-F013E BODIES A-5 IS1 81 2 50 2821 -F013E BODIES GROUP 3 VALVE AUG 1 821 OWN PR E B-M-2 H2 2821-F013F BODIES A-5 IS1 B12 50 2821-F013F BODIES GROUP 3 VALVE AUG 1 82 1 OWN PRE
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Page 2 - 6 711 712006 1 Period 1 Period 2 Period 3 Category, Iso No. r C)
| |
| ItemNO, Comp. Desc. 2 2 2 Class Summary 1 ComplD 1 System Scope 1 Method 1 Procedure Code Case 5 5 5 5 5 B-M-2 H2 2821-F013G BODIES A-5 IS1 t t - - t - - - t t - -
| |
| 81 2 50 2B21 -F013G BODIES GROUP 3 VALVE AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-M-2 H2 2B21-F013H BODIES A-5 IS1 t t - - t - - - t t - -
| |
| 81 2.50 2B21-F013H BODIES GROUP 3 VALVE AUG - - - - - - - - - - - -
| |
| 1 B21 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-M-2 H2 2821-F013K BODIES A-5 IS1 t t - - t - - - t t - -
| |
| B12.50 2821 -F013K BODIES GROUP 3 VALVE AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-M-2 H2 2B21-F013L BODIES A-5 IS1 t t - - t - - - t t - -
| |
| 81 2.50 2821 -F013L BODIES GROUP 3 VALVE AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-M-2 H2 2821-F013M BODIES A-5 IS1 t t - - t - - - t t - -
| |
| 81 2.50 2821 -F013M BODIES GROUP 3 VALVE AuG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-M-2 H2 2821-F022A BODIES A-6 IS1 t t - - t - - - t t - -
| |
| B12.50 2821 -F022A BODIES GROUP 4 VALVE AUG - - - - - - - - - - - -
| |
| 1 B21 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-M-2 H2 2B21-F022B BODIES A-7 IS1 t t - - t - - - t t - -
| |
| B12.50 2821 -F022B BODIES GROUP 4 VALVE AUG - - - - - - - - - - - -
| |
| 1 B21 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-M-2 H2 2B21-F022C BODIES A-8 IS1 t t - - t - - - t t - -
| |
| 81 2.50 2821 -F022C BODIES GROUP 4 VALVE AUG - - - - - - - - - - - -
| |
| 1 B21 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-M-2 H2 2B21-F022D BODIES A-9 IS1 t t - - t - - - t t - -
| |
| B12.50 2821 -F022D BODIES GROUP 4 VALVE AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-M-2 H2 2821-F028A BODIES A-6 IS1 t t - - t - - - t t - -
| |
| 81 2.50 2821 -F028A BODIES GROUP 4 VALVE AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Page 3 - 6 711 712006 1 Period 1 Period 2 Period 3 Category, Iso No. Q) o y CY ~0 ItemNO, Comp. Desc. 2 2 2 2 2 Class Summary IComplD ISystem Scope I~ e t h o I dProcedure Code Case 5 5 5 5 ff B-M-2 H2 2821-F028B BODIES A-7 IS1 t t - - t - - - t t - -
| |
| 81 2.50 2821 -F028B BODIES GROUP 4 VALVE AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-M-2 H2 2B21-F028C BODIES A-8 IS1 t t - - t - - - t t - -
| |
| 81 2.50 2821 -F028C BODIES GROUP 4 VALVE AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-M-2 H2 2B21-F028D BODIES A-9 IS1 t t - - t - - - t t - -
| |
| 81 2.50 2821-F028D BODIES GROUP 4 VALVE AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-M-2 H2 2B21-F077A BODIES A-1 2 IS1 t t - - t - - - t t - -
| |
| 81 2.50 2821 -F077A BODIES GROUP 1 VALVE AUG - - - - - - - - - - - -
| |
| 1 821 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-M-2 H2 2821-F077B BODIES A-1 3 IS1 t t - - t - - - t t - -
| |
| 81 2.50 2821 -F077B BODIES GROUP 4 VALVE AUG - - - - - - - - - - - -
| |
| 1 821 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-M-2 H2 2B31-F023A BODIES A-1 6 IS1 t t - - t - - - t t - -
| |
| 812.50 2831-F023A BODIES GROUP 5 VALVE AUG - - - - - - - - - - - -
| |
| 1 83 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-M-2 H2 2831-F023B BODIES A-1 8 IS1 t t - - t - - - t t - -
| |
| 81 2.50 2831-F023B BODIES GROUP 5 VALVE AUG - - - - - - - - - - - -
| |
| 1 831 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-M-2 H2 2B31-F031A BODIES A-1 7 IS1 t t - - t - - - t t - -
| |
| 81 2.50 2831 -F031A BODIES GROUP 5 VALVE AUG - - - - - - - - - - - -
| |
| 1 831 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-M-2 H2 2831-F031 B BODIES A-1 9 IS1 t t - - t - - - t t - -
| |
| 81 2.50 2831-F031 B BODIES GROUP 5 VALVE AUG - - - - - - - - - - - -
| |
| 1 831 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-M-2 H2 2E11-F008 BODIES A-21 IS1 t t - - t - - - t t - -
| |
| 81 2.50 2E11 -F008 BODIES GROUP 6 VALVE AUG - - - - - - - - - - - -
| |
| 1 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| Revision: 1 H N P - 2 F o u r t h I n t e r v a l C l a s s 1 IS1 P l a n Page 4 - 6 Southern Nuclear Operating Company Period 1 Period 2 Period 3 Category, Iso No.
| |
| ItemNO, Comp. Desc.
| |
| Class Summary I ComplD 1System Scope I Method I Procedure Code Case B-M-2 H2 2E11-F009 BODIES A-2 1 IS1 612.50 2E11-F009 BODIES GROUP 6 VALVE AUG 1 El1 OWN PRE B-M-2 H2 2E11-F015A BODIES A-22 IS1 B1 2.50 2E11 -F015A BODIES GROUP 7 VALVE AUG 1 El1 OWN PRE B-M-2 H2 2E11-F015B BODIES A-23 IS1 B1 2.50 2E11 -F015B BODIES GROUP 7 VALVE AUG 1 El1 OWN PRE B-M-2 H2 2E11-F050A BODIES A-22 IS1 81 2.50 2E11 -F050A BODIES GROUP 9 VALVE AUG 1 El1 OWN PRE B-M-2 H2 2E11-F050B BODIES A-23 IS1 B1 2.50 2E11-F050B BODIES GROUP 9 VALVE AUG 1 El1 OWN PRE B-M-2 H2 2E11 -F060A BODIES A-22 IS1 812.50 2E11-F060A BODIES GROUP 10 VALVE AUG 1 El1 OWN PRE B-M-2 H2 2E11 -F060B BODIES A-23 IS1 81 2.50 2E11-F060B BODIES GROUP 10 VALVE AUG 1 El1 OWN PRE B-M-2 H2 2E11-F067 BODIES A-21 IS1 812.50 2E11-F067 BODIES GROUP 8 VALVE AUG 1 El1 OWN PRE B-M-2 H2 2E21-F004A BODIES A-24 IS1 B12.50 2E21-F004A BODIES GROUP 11 VALVE AUG 1 E21 OWN PRE B-M-2 H2 2E21-F004B BODIES A-25 IS1 B1 2 50 2E21 -F004B BODIES GROUP 11 VALVE AUG 1 E21 OWN PRE
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Page 5 - 6 711 712006 1 Period 1 Period 2 Period 3 Category, Iso No. o) o r N P)
| |
| ItemNO, Comp. Desc. 2 2 ir" 2 2 Class Summary I ComplD I System Scope I Method I Procedure Code Case 5 5 5 5 5 B-M-2 H2 2E21-F005A BODIES A-24 IS1 t t - - t - - - I t - -
| |
| B12.50 2E21-F005A BODIES GROUP 11 VALVE AUG - - - - - - - - - - - -
| |
| 1 E21 om - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-M-2 H2 2E21-F005B BODIES A-25 IS1 t t - - t - - - t t - -
| |
| B12.50 2E21-F005B BODIES GROUP 11 VALVE AUG - - - - - - - - - - - -
| |
| 1 E21 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-M-2 H2 2E21-F006A BODIES A-24 IS1 t t - - t - - - I t - -
| |
| 812.50 2E21-F006A BODIES GROUP 13 VALVE AIJG - - - - - - - - - - - -
| |
| 1 E21 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-M-2 H2 2E21-F006B BODIES A-25 IS1 t t - - t - - - I t - -
| |
| B12.50 2E21-F006B BODIES GROUP 13 VALVE AUG - - - - - - - - - - - -
| |
| 1 E21 o m - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| B-M-2 H2 2E21-F007A BODIES A-24 IS1 t t - - t - - - I t - -
| |
| B12.50 2E21 -F007A BODIES GROUP 12 VALVE AUG - - - - - - - - - - - -
| |
| 1 E21 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-M-2 H2 2E21-F007B BODIES A-25 IS1 t t - - I - - - I t - -
| |
| B12.50 2E21 -F007B BODIES GROUP 12 VALVE AUG - - - - - - - - - - - -
| |
| 1 E21 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-M-2 H2 2E41-F002 BODIES A-26 IS1 t t - - t - - - t t - -
| |
| B12.50 2E41-F002 BODIES GROUP 14 VALVE AUG - - - - - - - - - - - -
| |
| 1 E41 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| 6-M-2 H2 2E41-F003 BODIES A-26 IS1 t t - - t - - - t i - -
| |
| B12.50 2E41-F003 BODIES GROUP 14 VALVE AUG - - - - - - - - - - - -
| |
| 1 E41 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-M-2 H2 2G31 -Fool BODIES A-28 IS1 t t - - t - - - I t - -
| |
| B12.50 2G31-F001 BODIES GROUP 15 VALVE AUG - - - - - - - - - - - -
| |
| 1 G31 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-M-2 H2 2G31-F004 BODIES A-28 IS1 t t - - t - - - I t - -
| |
| B12.50 2G31-F004 BODIES GROUP 15 VALVE AUG - - - - - - - - - - - -
| |
| 1 G31 o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Page 6 - 6 711 712006 (
| |
| : Category, ItemNO, Class B-M-2 Summary I ComplD I System H2 2G31-F027 BODIES Scope I Method I Procedure Iso No.
| |
| Comp. Desc.
| |
| Code Case A-28 IS1 Period 1 B5 H5 :1 Period 2 Period 3 t t - - t - - -
| |
| 81 2.50 2G31-F027 BODIES GROUP 16 VALVE AUG 1 G31 OWN PRE
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Page 1 - 8 Southern Nuclear Operating Company Period 1 Period 2 Period 3 Category, Iso No.
| |
| ItemNO, Comp. Desc.
| |
| Class Summary I ComplD ISystem Scope IMethod IProcedure Code Case 814.1 0 261 1P-02-19-1 PIPE-TO-PIPE WELD AUG 1 61 1 OWN PRE B -0 H2 281 1U-02-19-2 A-29 IS1 61 4.1 0 281 1P-02-19-2 PIPE-TO-FLANGE WELD AUG 1 B11 OWN PRE B-0 H2 2B11 P-02-23-1 A-29 IS1 B14.10 281 1P-02-23-1 PIPE-TO-PIPE WELD AUG 1 61 1 OWN PRE B-0 H2 281 1P-02-23-2 A-29 IS1 614.10 2B11P-02-23-2 PIPE-TO-FLANGE WELD AUG 1 B11 OWN PRE B-0 H2 281 1P-02-27-1 A-29 IS1 B14.10 2B11 P-02-27-1 PIPE-TO-PIPE WELD AUG 1 61 1 OWN PRE B-0 H2 28 11P-02-27-2 A-29 IS1 61 4.1 0 2B11P-02-27-2 PIPE-TO-FLANGE WELD AUG 1 B11 OWN PRE B -0 H2 281 1P-02-31-1 A-29 IS1 81 4.1 0 281 1P-02-31-1 PIPE-TO-PIPE WELD AUG 1 61 1 OWN PRE B -0 H2 2B11 P-02-31-2 A-29 IS1 614.10 2B11P-02-31-2 PIPE-TO-FLANGE WELD AUG 1 B11 OWN PRE B -0 H2 2B11 P-02-35-1 A-29 IS1 614.10 2B11P-02-35-1 PIPE-TO-PIPE WELD AUG 1 81 1 OWN PRE B -0 H2 281 1P-02-35-2 A-29 IS1 61 4.1 0 281 1P-02-35-2 PIPE-TO-FLANGE WELD AUG 1 B11 OWN PRE
| |
| | |
| w w HNP-2 Fourth Interval Class 1 IS1 Plan Page 2 - 8 w 711 712006 1 Revision: 1 Southern Nuclear Operating Company
| |
| : Category, IternNO, Iso No.
| |
| Cornp. Desc.
| |
| m Period 1 2 2 o .-
| |
| N P:
| |
| Period 2 N
| |
| 2 2 Period 3 e
| |
| Class Summary ICornplD /System Scope IMethod IProcedure Code Case 5 5 5 5 5 B-0 H2 281 1P-06-11-1 A-29 IS1 - - - - - - - - - - - -
| |
| 81410 2811P-06-11-1 PIPE-TO-PIPEWELD AUG - - - - - - - - - - - -
| |
| 1 81 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-0 H2 281 1P-06-11-2 A-29 IS1 - - - - - - - - - - - -
| |
| 81410 2B11P-06-11-2 PIPE-TO-FLANGEWELD AUG - - - - - - - - - - -
| |
| 1 B11 om - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| B-0 H2 281 1P-06-15-1 A-29 IS1 - - - - - - - - - - - -
| |
| 814.10 281 1P-06-15-1 PIPE-TO-PIPE WELD AUG - - - - - - - - - - - -
| |
| 1 81 1 o m - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| B-0 H2 281 1P-06-15-2 A-29 IS1 - - - - - - - - - - - -
| |
| 814.10 2B11P-06-15-2 PIPE-TO-FLANGE WELD AUG - - - - - - - - - - - -
| |
| 1 Bll om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-0 H2 281 1P-06-39-1 A-29 IS1 - - - - - - - - - - - -
| |
| 81 4 10 281 1P-06-39-1 PIPE-TO-PIPEWELD AUG - - - - - - - - - - - -
| |
| 1 811 om - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| B-0 H2 281 1P-06-39-2 A-29 IS1 - - - - - - - - - - - -
| |
| 814.1 0 281 1P-06-39-2 PIPE-TO-FLANGE WELD AUG - - - - - - - - - - - -
| |
| 1 811 om - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| B-0 H2 281 1E-06-43-1 A-29 ISI - - - - - - - - - - - -
| |
| 814.10 281 1P-06-43-1 PIPE-TO-PIPEWELD AUG - - - - - - - - - - - -
| |
| 1 Bl 1 o w - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-0 H2 281 1E-06-43-2 A-29 IS1 - - - - - - . . - - - - -
| |
| 814 10 281 1P-06-43-2 PIPE-TO-FLANGE WELD AUG - - - - - - - - - - - -
| |
| 1 Bl 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-0 H2 281 1E-10-07-1 A-29 IS1 - - - - - - - - - - - -
| |
| 814.10 281 1P-10-07-1 PIPE-TO-PIPE WELD AUG - - - - - - - - - - - -
| |
| 1 B11 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-0 HZ 281 1P-10-07-2 A-29 IS1 - - - - - - - - - - - -
| |
| 814.10 2B11P-10-07-2 PIPE-TO-FLANGE WELD AUG - - - - - - - - - - - -
| |
| 1 Bll om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| 4 Revision: 1 3
| |
| HNP-2 Fourth Interval Class 1 IS1 Plan Page 3 - 8 711712006 1 Southern Nuclear Operating Company Period 1 Period 2 Period 3 Category, Iso No. Q) o r N o ItemNO, Comp. Desc. 2 2 2 2 2 i5 i5 5 5 5 Class B-0 Summary I ComplD I System H2 281 1Q-10-47-1 Scope I Method I Procedure Code Case A-29
| |
| - -
| |
| - - - - - - - - - - - -
| |
| -
| |
| 81 4 10 281 1Q-10-47-1 PIPE-TO-PIPE WELD AUG - - - - - - - - - - - -
| |
| 1 Bl1 ow - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-O H2 281 1Q-10-47-2 A-29 IS1 - - - - - - - - - - - -
| |
| 81 4 10 281 1Q-10-47-2 PIPE-TO-FLANGE WELD AUG - - - - - - - - - - - -
| |
| 1 81 1 ow - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-O H2 281 1'2-1 4-07-1 A-29 IS1 - - - - - - - - - - - -
| |
| 81 4 10 281 1Q-14-07-1 PIPE-TO-PIPE WELD AIJG - - - - - - - - - - - -
| |
| 1 81 1 ow - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B- 0 H2 281 1Q-14-07-2 A-29 IS1 - - - - - - - - - - - -
| |
| B14 10 281 1Q-14-07-2 PIPE-TO-FLANGEWELD AIJG - - - - - - - - - - - -
| |
| 1 811 o w - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B- 0 H2 281 1Q-14-47-1 A-29 IS1 - - - - - - - - - - - -
| |
| 814 10 281 1U-14-47-1 PIPE-TO-PIPE WELD AUG - - - - - - - - - - - -
| |
| 1 811 ow - - - - - - - - - - - -
| |
| I PRE - - - - - - - - - - - -
| |
| B- 0 H2 281 1Q-14-47-2 A-29 IS1 - - - - - - - - - - - -
| |
| 81410 2811Q-14-47-2 PIPE-TO-FLANGEWELD AIJG - - - - - - - - - - - -
| |
| 1 81 1 ow - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-0 H2 2B11Q-18-03-1 A-29 IS1 - - - - - - - - - - - -
| |
| 81 4.1 0 281 1Q-18-03-1 PIPE-TO-PIPE WELD AUG - - - - - - - - - - - -
| |
| 1 81 1 ow - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-0 H2 281 1Q-18-03-2 A-29 IS1 - - - - - - - - - - - -
| |
| 81410 2811Q-18-03-2 PIPE-TO-FLANGE WELD AIJG - - - - - - - - - - - -
| |
| 1 81 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-O H2 2B11Q-18-51-1 A-29 IS1 - - - - - - - - - - - -
| |
| 814.10 281 1Q-18-51-1 PIPE-TO-PIPE WELD AUG - - - - - - - - - - - -
| |
| 1 811 ow - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-0 H2 281 1Q-18-51-2 A-29 IS1 - - - - - - - - - - - -
| |
| 814 10 2B11Q-18-51-2 PIPE-TO-FLANGEWELD AUG - - - - - - - - - - - -
| |
| 1 81 1 o w - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| | |
| CI Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Page 4 - 8 Southern Nuclear Operating Company Period 1 Period 2 Period 3 Category, Iso No.
| |
| ItemNO, Comp. Desc.
| |
| Class Summary I ComplD I System Scope I Method I Procedure Code Case B- 0 H2 281 1U-22-03-1 A-29 IS1 81 4.1 0 281 1U-22-03-1 PIPE-TO-PIPE WELD AUG 1 Bll OWN PRE B-0 H2 281 1P-22-03-2 A-29 IS1 814.10 2B11U-22-03-2 PIPE-TO-FLANGE WELD AUG 1 Bll OWN PRE B-O H2 281 1U-22-51-1 A-29 IS1 814.10 2B11P-22-51-1 PIPE-TO-PIPE WELD AUG 1 Bll OWN PRE B- 0 H2 281 1P-22-51-2 A-29 IS1 81410 2B11P-22-51-2 PIPE-TO-FLANGE WELD AUG 1 Bll OWN PRE - - - -
| |
| B- 0 H2 281 1P-26-03-1 A-29 IS1 - - - -
| |
| 814.10 2B11P-26-03-1 PIPE-TO-PIPE WELD AUG - - - -
| |
| 1 Bll OWN - - - -
| |
| PRE - - - -
| |
| B- 0 H2 281 1P-26-03-2 A-29 IS1 - - - -
| |
| 81 4.10 281 1P-26-03-2 PIPE-TO-FLANGE WELD AUG - - - -
| |
| 1 Bll OWN - - - -
| |
| PRE - - - -
| |
| B- 0 H2 281 1P-26-51-1 A-29 IS1 - - - -
| |
| 81 4.1 0 281 1U-26-51-1 PIPE-TO-PIPE WELD AUG - - - -
| |
| 1 Bll OWN - - - -
| |
| PRE - - - -
| |
| B-O H2 281 1U-26-51-2 A-29 IS1 - - - -
| |
| 814.10 2B11U-26-51-2 PIPE-TO-FLANGE WELD AUG - - - -
| |
| 1 B11 OWN - - - -
| |
| PRE - - - -
| |
| B- 0 H2 281 1P-30-03-1 A-29 IS1 - - - -
| |
| 81 4.1 0 281 1U-30-03-1 PIPE-TO-PIPE WELD AUG - - - -
| |
| 1 Bll OWN - - - -
| |
| PRE - - - -
| |
| B-0 H2 28 11U-30-03-2 A-29 IS1 - - - -
| |
| 81 4.1 0 281 1U-30-03-2 PIPE-TO-FLANGE WELD AUG - - - -
| |
| 1 B11 OWN - - - -
| |
| PRE - - - -
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Page 5 - 8 Southern Nuclear Operating Company Period 1 Period 2 Period 3 I
| |
| Category, lso No. 0) 0 ItemNO, Cornp. Desc. E 2 Class Summary 1 CornplD 1 System Scope 1 Method 1 Procedure Code Case :: ::
| |
| B-0 H2 281 1P-30-51-1 A-29 IS1 814.10 2811P-30-51-1 PIPE-TO-PIPE WELD AUG 1 81 1 OWN PRE B-0 H2 281 1P-30-51-2 A-29 IS1 81410 2811P-30-51-2 PIPE-TO-FLANGE WELD AUG 1 81 1 OWN PRE B-0 H2 281 1P-34-03-1 A-29 IS1 PIPE-TO-PIPE WELD AUG OWN PRE -
| |
| B-0 H2 281 1P-34-03-2 A-29 IS1 81 4.10 281 1P-34-03-2 PIPE-TO-FLANGE WELD AUG 1 81 1 OWN PRE B-0 H2 281 1P-34-51-1 A-29 IS1 PIPE-TO-PIPE WELD AUG OWN PRE B-0 H2 281 1U-34-51-2 A-29 IS1 814.10 2811Q-34-51-2 PIPE-TO-FLANGE WELD AUG 1 81 1 OWN PRE B-0 H2 281 1P-38-07-1 A-29 IS1 814.10 281 1P-38-07-1 PIPE-TO-PIPE WELD AUG 1 81 1 OWN PRE -
| |
| B -0 H2 281 1P-38-07-2 A-29 IS1 814.10 2811P-38-07-2 PIPE-TO-FLANGE WELD AUG 1 81 1 OWN PRE B-0 H2 281 1P-38-47-1 A-29 IS1 81 4.10 281 1U-38-47-1 PIPE-TO-PIPE WELD AUG 1 81 1 OWN PRE B-0 H2 281 1P-38-47-2 A-29 IS1 81 4.10 28 11P-38-47-2 PIPE-TO-FLANGE WELD AUG 1 81 1 OWN PRE
| |
| | |
| d 4 Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Page 6 - 8 711 712006 1 Period 1 Period 2 Period 3 Category, Iso No. m o F
| |
| ' CY P)
| |
| IternNO, Cornp. Desc. E 2 2 2 2 Class Summary I CornplD I System Scope I Method I Procedure Code Case 5 5 :: 5 5 B- 0 H2 281 1P-42-07-1 A-29 IS1 - - - - - - - - - - - -
| |
| 814.10 2811P-42-07-1 PIPE-TO-PIPE WELD AUG - - - - - - - - - - - -
| |
| 1 B11 om - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| B- 0 H2 281 1P-42-07-2 A-29 IS1 - - - - - - - - - - - -
| |
| 81 4.1 0 281 1P-42-07-2 PIPE-TO-FLANGE WELD AUG - - - - - - - - - - - -
| |
| 1 B11 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-0 H2 281 1P-42-47-1 A-29 IS1 - - - - - - - - - - - -
| |
| 814.10 2811P-42-47-1 PIPE-TO-PIPE WELD AUG - - - - - - - - - - - -
| |
| 1 B11 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B- 0 H2 281 1\2-42-47-2 A-29 IS1 - - - - - - - - - - - -
| |
| 814.10 2B11P-42-47-2 PIPE-TO-FLANGE WELD AUG - - - - - - - - - - - -
| |
| 1 81 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B- 0 H2 281 1P-46-11-1 A-29 IS1 - - - - - - - - - - - -
| |
| 814.10 2811P-46-11-1 PIPE-TO-PIPE WELD AUG - - - - - - - - - - - -
| |
| 1 81 1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-0 H2 281 1P-46-11-2 A-29 IS1 - - - - - - - - - - - -
| |
| 814.10 2811P-46-11-2 PIPE-TO-FLANGE WELD AUG - - - - - - - - - - - -
| |
| 1 Bll om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-0 H2 281 1P-46-15-1 A-29 IS1 - - - - - - - - - - - -
| |
| 814.10 2811U-46-15-1 PIPE-TO-PIPE WELD AUG - - - - - - - - - - - -
| |
| 1 B11 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-0 H2 281 1P-46-15-2 A-29 IS1 - - - - - - - - - - - -
| |
| 81 4.1 0 281 1P-46-15-2 PIPE-TO-FLANGE WELD AUG - - - - - - - - - - - -
| |
| 1 B11 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B- 0 H2 281 1P-46-39-1 A-29 IS1 - - - - - - - - - - - -
| |
| 814.10 2B11P-46-39-1 PIPE-TO-PIPE WELD AUG - - - - - - - - - - - -
| |
| 1 B11 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B- 0 H2 281 1P-46-39-2 A-29 IS1 - - - - - - - - - - - -
| |
| 81 4.1 0 281 1P-46-39-2 PIPE-TO-FLANGE WELD AUG - - - - - - - - - - - -
| |
| 1 811 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| 4 Revision: 1 HNP-2 Fourth Interval Class 1 IS1 Plan Southern Nuclear Operating Company Page 7 - 8 7/17/2006 1 Period 1 Period 2 Period 3 Category, Iso No. m o ,- (Y o IternNO, Cornp. Desc. E 2 2 2 2 Class Summary 1 ComplD 1 System Scope 1 Method 1 Procedure Code Case A A A A A B-O H2 281 1P-46-43-1 A-29 IS1 - - - - - - - - - - - -
| |
| 81 4.10 281 1P-46-43-1 PIPE-TO-PIPE WELD AUG - - - - - - - - - - - -
| |
| 1 811 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B- 0 H2 281 1P-46-43-2 A-29 IS1 - - - - - - - - - - - -
| |
| 8 14.10 2 8 11P-46-43-2 PIPE-TO-FLANGE WELD AUG - - - - - - - - - - - -
| |
| 1 811 om - - - - - - - - - - - -
| |
| PRE - -- - - - - - - - - - -
| |
| B-0 H2 281 1P-50-19-1 A-29 IS1 - - - - - - - - - - - -
| |
| 814.10 281 1P-50-19-1 PIPE-TO-PIPE WELD AUG - - - - - - - - - - - -
| |
| 1 811 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-0 H2 281 1P-50-19-2 A-29 IS1 - - - - - - - - - - - -
| |
| 814.10 281 1P-50-19-2 PIPE-TO-FLANGE WELD AUG - - - - - - - - - - - -
| |
| 1 811 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B- 0 H2 281 1P-50-23-1 A-29 IS1 - S - - - - - - - - - -
| |
| 814.10 2811P-50-23-1 PIPE-TO-PIPE WELD AUG - - - - - - - - - - - -
| |
| 1 811 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B- 0 H2 281 1P-50-23-2 A-29 IS1 - s - - - - - - - - - -
| |
| 814.10 2811P-50-23-2 PIPE-TO-FLANGE WELD AUG - - - - - - - - - - - -
| |
| 1 811 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B- 0 H2 281 1P-50-27-1 A-29 IS1 - - - - s - - - - - - -
| |
| 814.1 0 281 1P-50-27-1 PIPE-TO-PIPE WELD AUG - - - - - - - - - - - -
| |
| 1 811 . o m - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B-O H2 281 1P-50-27-2 A-29 IS1 - - - - s - - - - - - -
| |
| 814.10 2811P-50-27-2 PIPE-TO-FLANGE WELD AUG - - - - - - - - - - - -
| |
| 1 811 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B- 0 H2 281 1P-50-31-1 A-29 IS1 - - - - - - - - - - - -
| |
| 814.10 281 1P-50-31-1 PIPE-TO-PIPE WELD AUG - - - - - - - - - - - -
| |
| 1 811 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| B- 0 H2 281 1P-50-31-2 A-29 IS1 - - - - - - - - - - - -
| |
| 814.10 2811P-50-31-2 PIPE-TO-FLANGE WELD AUG - - - - - - - - - - - -
| |
| 1 811 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 2 COMPONENTS SCOPE OF EXAMINATIONS Per IWA-1400 of the Section XI Code, the Owner is responsible for determining the appropriate Code Class, for identifying the system boundaries for each class of component subject to examination, and for identifying the components exempt from examination. This requirement is met by the following:
| |
| Appropriate Code Class The determination of the appropriate Code Class for each component is made by SNC Design Organization and designated on the ISI Boundary Diagrams. These Boundary Diagrams are controlled by SNC Design Organization.
| |
| System Boundaries The system boundaries for each Code Class are designated on the ISI Boundary Diagrams.
| |
| EXAMINATION REQUIREMENTS The examination requirements for the Class 2 components identified on the Boundary Diagrams are defined in IWC-2500 for each examination category. Categories are:
| |
| * Category C-A Pressure Retaining Welds in Pressure Vessels
| |
| * Category C-B Pressure Retaining Nozzle Welds in Vessels
| |
| * Category C-C Integral Attachments for Vessels, Piping, Pumps, and Valves
| |
| * Category C-F-2 Pressure Retaining Welds in Carbon or Low Alloy Steel Piping
| |
| * Category C-G Pressure Retaining Welds in Pumps The following Categories are not applicable to HNP.
| |
| * Category C-D Pressure Retaining Bolting Greater than 2 Diameter
| |
| * Category C-F-1 Pressure Retaining Welds in Austenitic Stainless Steel or High Alloy Steel Piping
| |
| * Category C-G Pressure Retaining Welds in Valves These examination requirements are not applicable to components exempt from examination per IWC-1220. Components exempt from examination are only subject to pressure testing requirements. (See the Exemptions Section below for more detail).
| |
| H2 Basis Doc - Class 2 Page 1 of 33 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 2 COMPONENTS EXEMPTIONS IWC-1220 defines the components that are exempt from the examination requirements of IWC-2500. Applicable Class 2 exemptions used during the 4th Interval include:
| |
| : 1. Size Exemption - All components less than or equal to 4 in diameter and their associated supports may be exempted from examination.
| |
| : 2. Pressure/Temperature Exemption - All components other than RHR, Emergency Core Cooling (ECC), and Containment Heat Removal (CHR) systems that operate at a pressure <
| |
| 275 psig and at a temperature < 2000F may be exempted from examination.
| |
| : 3. Open Ended Exemption - Components of any size beyond the last shutoff valve in open ended portions of systems that do not contain water during normal operation may be exempted.
| |
| The use of these three exemptions was evaluated and discussed below for application at HNP-2.
| |
| : 1. Size Exemption - For a BWR, the size exemption applies to all Class 2 components less than or equal to 4 in diameter.
| |
| : 2. Pressure/Temperature Exemption - This exemption applies only to Class 2 systems or portions of systems that do not have an RHR ECC, or CHR function. The RHR, ECC, and CHR function for HNP-2 is described below.
| |
| * Residual Heat Removal (RHR) Function - Per Section 5.5.7.3 of the UFSAR, portions of the RHR System are designed to remove decay and residual heat from the reactor core to achieve and maintain a cold shutdown condition. Therefore, the pressure/temperature exemption is not applied to these portions of piping.
| |
| * Emergency Core Cooling (ECC) Function - Per Section 6.3 of the UFSAR, four ECC subsystems protect the core against various sizes of hypothetical pipe breaks. Three subsystems inject emergency core cooling water into the reactor pressure vessel (RPV),
| |
| and one subsystem depressurizes the RPV. The three injection subsystems are Class 2 high-pressure coolant injection (HPCI), Class 2 low-pressure coolant injection - LPCI mode of RHR, and Class 2 core spray (CS). The fourth ECCS subsystem is the Class 3 automatic depressurization system. Therefore, the pressure/temperature exemption is not applied to these portions of piping.
| |
| * Containment Heat Removal (CHR) Function - Per Section 6.1 of the UFSAR, the containment heat removal system consists of the shutdown cooling and the suppression pool cooling modes of the residual heat removal (RHR) system for planned and abnormal operation, as well as the core spray (CS) system and the low-pressure coolant injection (LPCI) mode of RHR for accident mitigation. Therefore, the pressure/temperature exemption is not applied to these portions of piping.
| |
| H2 Basis Doc - Class 2 Page 2 of 33 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 2 COMPONENTS
| |
| : 3. Open Ended Exemption The open ended exemption is applied to the following lines which normally do not contain water. Instead, they see a nitrogen atmosphere which is not conducive to cracking. The test lines and turbine exhaust lines were not included because they are subjected to quarterly pump testing. The relief valves discharge lines were conservatively not included because they could potentially have water in them.
| |
| * Figure B RHR Containment Spray piping from 2E11-F021A through the containment spray header. Includes welds 2E11-2RHR-16A-DS-10, 11, 12, 13, 14, and 15.
| |
| * Figure B RHR Torus Spray piping from MOV 2E11-F027A to the top of the Torus.
| |
| Includes welds 2E11-2RHR-6A-TSP-7, 8, 9, 10, and 11.
| |
| * Figure B RHR Containment Spray piping from 2E11-F021B through the containment spray header. Includes welds 2E11-2RHR-16B-DS-16, 17, and 18.
| |
| * Figure B RHR Torus Spray piping from MOV 2E11-F027B to the top of the Torus.
| |
| Includes welds 2E11-2RHR-6B-TSP-7, 8, 9, 10, and 11.
| |
| * Figure B Purge and Inerting piping from MOV 2T48-F308 to the containment penetration. Includes welds 2T48-2CPI-18-PID-1, 2, and 3.
| |
| * Figure B Purge and Inerting piping from MOVs 2T48-F310, 2T48-F309, and 2T48-F311 to the top of the Torus. Includes welds 2T48-2CPI-20-PIT-1 through 9 and welds 2T48-2CPI-18-PIT-8&9.
| |
| * Figure B Purge and Inerting piping from MOV 2T48-F319 to the containment penetration. Includes welds 2T48-2CPI-18-POD-1, 2, and 3.
| |
| * Figure B Purge and Inerting piping from MOV 2T48-F318 to the top of the Torus.
| |
| Includes welds 2T48-2CPI-18-POT-2, 3, and 4.
| |
| By system, the above exemptions were applied as follows:
| |
| : 1. 2C11 Control Rod Drive (CRD) System (See Boundary Diagram HB-26006 Sheets 1 and
| |
| : 2) - The Class 2 portion of this system is less than 4 in diameter and exempt from examination, except for the 8 Scram Discharge Header. In the March 5, 1982 response to NUREG-0803, it was stated in part, The headers are not exempted because of size, but are not presently included in Georgia Powers ISI weld examination program because they are rarely pressurized during normal operation, and then only to a pressure far below design pressure. This position has been continued through the 1st, 2nd, 3rd and 4th Intervals.
| |
| However, these welds do receive augmented exams per the March 5, 1982 letter, thus the 8 scram discharge header receives the same examinations as required by Code. The only difference is that the exams are augmented exams, not Code exams.
| |
| : 2. 2C41- Standby Liquid Control (SLC) System (See Boundary Diagram HB-26009). All components are exempt from examination because all piping is 4 NPS and less in diameter.
| |
| : 3. 2C71 Reactor Protection System (See Boundary Diagram HB-28001). All components are exempt from examination because all piping is 4 NPS and less in diameter.
| |
| H2 Basis Doc - Class 2 Page 3 of 33 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 2 COMPONENTS
| |
| : 4. 2E11 Residual Heat Removal (RHR) System (See Boundary Diagrams HB-26014&15) -
| |
| This system has ECC, CHR, and reactor residual heat removal functions; therefore, the pressure/temperature exemption cannot be applied. Exemptions are open-ended piping and the 4 NPS and less size exemption.
| |
| : 5. 2E21 Core Spray (CS) System (See Boundary Diagrams HB-26018&19). This system has ECC and CHR functions; therefore, the pressure/temperature exemption cannot be applied.
| |
| There is not any open-ended piping; therefore, the only exemption is the 4 NPS and less size exemption.
| |
| : 6. 2E41 High Pressure Coolant Injection (HPCI) System (See Boundary Diagrams HB-26020&21 and HB-26046). This system has an ECC function; therefore, the pressure/temperature exemption cannot be applied. It is SNCs position that the steam exhaust lines contain water; therefore, the open-ended exemption cannot be applied. The only exemption applied is the 4 NPS and less size exemption.
| |
| : 7. 2E51 Reactor Core Isolation Cooling (See Boundary Diagrams HB-26023&24 and HB-26046). Only a small portion of RCIC is classified as Class 2 per Boundary Diagram HB-26023, with the remainder designated as Class S (see augmented section). Per Section 5.5.6.1 of the UFSAR, the function of this system is to ensure that adequate core cooling takes place to prevent the reactor fuel from overheating in the event that reactor isolation is accompanied by loss of flow from the reactor feedwater system. This is not an RHR, ECC, or CHR function; therefore, all piping 4 and less in diameter is considered exempt from examination per IWC-1222(a) and all piping operating at a temperature equal to or less than 2000 F is considered exempt per IWC-1220(c). Non-exempt Class 2 RCIC piping is:
| |
| Welds 2E51-2RCIC-6-TS-3 through 10 on the 6 portion of piping from the Torus connection out to valve 2E51-F031. (Shown on Figure B-86). This piping is potentially subject to temperatures greater than 2000F during accident conditions; therefore, the pressure and temperature exemption cannot be applied. Since the size exemption and open-ended exemption cannot be applied, these 9 welds are not exempt. However, this is Class HLB, Schedule 40 piping which is less than 0.375 thick and not subject to examination, but is part of the total number of non-exempt welds.
| |
| The 6 portion of piping (welds 2E51-2RCIC-6-D-1&2) that connects the RCIC discharge to Class 2 Feedwater. (Shown on Figure B-66B). This system functions with the pressure above 275 psig and at a temperature greater than 2000F; therefore, the pressure and temperature exemption can not be applied. Since the size exemption and open-ended exemption cannot be applied, these two welds are not exempt.
| |
| H2 Basis Doc - Class 2 Page 4 of 33 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 2 COMPONENTS The 10portion of piping (2E51-2RCIC-10-TD-16A through 21) from the Torus connection out to valve 2E51-F040. (Shown on Figure B-82). This piping is subject to temperatures greater than 2000F; therefore, the pressure and temperature exemption cannot be applied. The open-ended exemption was not used because while the welds in question may not be under water the environment in the pipe is water or vapor. Since the size exemption and open-ended exemption cannot be applied, these welds are not exempt. However, this is Class HLB, Schedule 40 piping which is 0.365 thick and not subject to examination, but is part of the total number of non-exempt welds.
| |
| For the above listed Class 2 piping, only the 6 piping is subject to examination. The other welds are not subject to examination (but are listed in the total C-F-2 weld count) due to the wall-thickness; however, the associated component supports and welded attachments are subject to examination.
| |
| The remainder of the RCIC piping is designated as Class S (see Class 2 augmented).
| |
| : 8. 2G31 Reactor Water Cleanup (RWCU) System (See Boundary Diagram HB-26036). All components are exempt from examination because all piping is 4 NPS and less in diameter.
| |
| : 9. 2G41 Fuel Pool Cooling System (See Boundary Diagram HB-26039). There are no Class 2 components in the 2G41 system. The Class 2 inter-tie to RHR is shown on RHR drawing HB-26014.
| |
| : 10. 2G51 Torus Drain (See Boundary Diagram HB-26042) - This system provides no safety function except for a containment function. However, since it is connected to the Torus it may see an elevated temperature during accident conditions. The open-ended exemption cannot be used since the piping contains water and the piping is 8 so the size exemption cannot be used.
| |
| : 11. 2N11/2N37 Main Steam (MS) System (See Boundary Diagrams HB-21012 and the Class 2 portions of the Nuclear Boiler System Boundary Diagrams HB-26000, HB-26001, and HB-26189). This system functions with the pressure above 275 psig and at a temperature greater than 2000F; therefore, the pressure/temperature exemption cannot be applied. The only exemption applied to this piping is the 4 NPS and less size exemption.
| |
| : 12. 2N21 Feedwater System between the second and third feedwater check valve (See Nuclear Boiler System boundary Diagram HB-26000). This system functions with the pressure above 275 psig and at a temperature greater than 2000F; therefore, the pressure/temperature exemption cannot be applied. The only exemption applied to this piping is the 4 NPS and less size exemption.
| |
| H2 Basis Doc - Class 2 Page 5 of 33 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 2 COMPONENTS
| |
| : 13. 2N22 Main Steam Drain Lines - Per page 12 of the SER [regarding MSIV Leakage Control System (LCS)], the licensee has committed to include the alternate LCS in the ASME Section XI inservice inspection program. The piping (drain line piping downstream of 2B21-F021 to the condenser) will be treated as ASME Code Section III, Class 2. Any repairs or replacement of this piping should also be performed in accordance with Section XI requirements. All of this piping is exempt per the 4 NPS and less size exemption.
| |
| : 14. 2P42 Reactor Building Closed Cooling Water (RBCCW) System (See Boundary Diagram HB-26055). Per Boundary Diagram HB-26055 the piping from the outboard isolation valve, the piping through the penetration, and the piping inside containment are designated as Class 2 because of the containment function. This piping provides cooling water to the reactor recirculation pump motor bearings inside containment. Per Section 9.2.2 of the UFSAR, the RBCCW system is not required to be operable following a LOCA.
| |
| This is not an RHR, ECC, or CHR function; therefore, the size exemption and pressure/temperature exemption may be used where applicable. Since the piping experiences low pressure and low temperature, both the size exemption and the pressure/temperature exemption may by applied. Therefore, all Class 2 RBCCW components are exempt from examination.
| |
| : 15. 2T48 Containment Purge and Inerting (See Boundary Diagram HB-26084 and HB-26083). This system allows the containment pressure to be controlled in case of a pipe rupture, allows any hydrogen buildup to be vented, and allows heat to be removed from the containment. Since heat may be removed from the containment by this system, it is considered as having a CHR function and the pressure and temperature exemption was not used. Much of this piping could be exempted using the open-ended exemption; however, only the size exemption was used during the 3rd Interval. The use of the open-ended exemption during the 4th Interval should be evaluated.
| |
| : 16. 2T45 Primary Containment Valve and Equipment Drainage System (See Boundary Diagram HB-26077). All components are exempt from examination because all piping is 4 NPS and less in diameter.
| |
| : 17. 2T49 Post LOCA Hydrogen Recombiner System (See Boundary Diagram HB-26068) -
| |
| This purpose of this was to maintain hydrogen levels below combustion levels during Post-LOCA conditions. Credit is not taken for this function; therefore, only the piping functioning as a Containment Isolation function will be considered. However, all of this piping may be exempted using the open-ended exemption.
| |
| : 18. Containment Isolation Piping. This piping is designated as Class 2 only because it penetrates containment and may have both the 4 exemption and the pressure/temperature exemption applied. The applicable containment penetrations, their function, the Boundary Diagram, and the size are listed below in Table 1:
| |
| H2 Basis Doc - Class 2 Page 6 of 33 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 2 COMPONENTS TABLE 1 Penetration Description Drawing Dia Evaluation X-3 H2 O2 Sample HB-26048 1 Size Exempt X-18 Radwaste HB-26026 3 Size Exempt X-19 Radwaste HB-26026 4 Size Exempt X-21 Service Air HB-26058 2 Size Exempt X-22 Drywell Pneumatic HB-26023 <4 Size Exempt X-23 RBCCW HB-26055 6 PT Exempt X-24 RBCCW HB-26055 6 PT Exempt X-28 H2 O2 Sample HB-26048 1 Size Exempt X-32A,C Drywell Pressure HB-26014 1 Size Exempt X-34C, D ILRT HB-26057 1 Size Exempt X-35A-E Neutron Monitoring HB-26993 <4 Size Exempt X-44 Nitrogen Inerting HB-26083 2 Size Exempt X-45D, 52F PASS HB-26384 2 Size Exempt X-46 Demin. Water HB-26047 2 Size Exempt X-47, 48 Chilled Water HB-26081 2, 3, 2, 3, 4are 4, 6 size exempt. 6 is PT Exempt.
| |
| X-51C, D Drywell Pneumatic HB-26066 Size Exempt HB-28023 X-54A,C Drywell Pressure HB-26015 1 Size Exempt X-55 Radwaste HB-26026 1-1/2 Size Exempt X-60A H2 O2 Sample HB-26048 1 Size Exempt X-60B, 62 Fission Prod. Mon. HB-26016 1 Size Exempt X-63 Drywell Pneumatic HB-26066 1 Size Exempt X-64 H2 O2 Sample HB-26048 1 Size Exempt X-69 Differential Press. HB-26079 4 Size Exempt X-81 Nitrogen Inerting HB-26083 2 Size Exempt X-206A,C,F,H Instrument Lines HB-26084 1 Size Exempt X-209A-D Instrument Lines HB-26084 1 Size Exempt X-216A,C,D H2 O2 Sample HB-26048 1 Size Exempt X-217A,B H2 O2 Sample HB-26048 1 Size Exempt X-217C Fission Prod. Mon. HB-26016 1 Size Exempt X-230, 231 Nitrogen Inerting HB-26083 2 Size Exempt X-233 Differential Press. HB-26079 8 Open-Ended Exemption X-234A Torus Drainage HB-26042 3 Size Exempt H2 Basis Doc - Class 2 Page 7 of 33 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 2 COMPONENTS DEVIATIONS TO CLASS 2 ISI CODE REQUIREMENTS IWC-2500 provides the examination requirements for Class 2 components. These Code requirements may be deviated from by:
| |
| * The use of NRC approved alternatives to Code requirements per 10 CFR 50.55a(a)(3).
| |
| * The use of NRC approved Relief Requests per 10 CFR 50.55a(g)(6) when an examination requirement by the Code is determined to be impractical.
| |
| * The use of Code Cases approved for use by the NRC through publication in Regulatory Guide 1.147.
| |
| Significant deviations from IWC-2500 Code requirements at HNP-1 are:
| |
| (Note: See Volume 1 for listing of Relief Requests, Alternatives, and NRC Safety Evaluations).
| |
| Code Case N-663 Code Case N- 663 provides that ... in lieu of the surface examination requirements for piping welds of Examination Category C-F-1 and C-F-2 ,surface examinations may be limited to areas identified by the Owner as susceptible to outside surface attack. The susceptibility criteria are listed in Table 1 of Code Case N- 663 for two types of degradation mechanisms. No Class 2 welds have been identified as being susceptible to outside surface attack. The basis is discussed below:
| |
| External (O. D.) Chloride Stress Corrosion Cracking of Austenitic Stainless Steel NA - There is not any Austenitic Stainless Steel in Class 2 piping.
| |
| Other Outside Surface Initiated Mechanisms Per Code Case N-663, items that are susceptible to an outside attack should be identified by a plant-specific service history review. This review should include plant-specific processes and programs that minimize chlorides and other contaminants.
| |
| For carbon steel piping, chlorides are not a issue. During 30 years of Inservice Inspection of Class 2 components, outside attack of Class 2 components has not been identified.
| |
| Plant-specific processes and programs that minimize chlorides and other contaminants are:
| |
| The SNC Chemical Product Control Program provides procedure guidance for control of contaminants from chemical products to be used on site. Reference Hatch procedure 60 AC HPX-008-0, E. I. Hatch Chemical Control.
| |
| H2 Basis Doc - Class 2 Page 8 of 33 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 2 COMPONENTS Category C-A Pressure Retaining Welds in Pressure Vessels 1st Interval Not Evaluated 2nd Interval The examinations are shown in Interval 3 table for information purposes only.
| |
| 3rd Interval There are two Class 2 vessels at Hatch - the two RHR Heat Exchangers. Per Table IWC-2500-1, Category C-A of the 1989 Code only the welds on one of the two heat exchangers need to be volumetrically examined. (Alternately the number of welds on one heat exchanger may be distributed over two heat exchangers). Welds to be volumetrically examined on the one heat exchanger include:
| |
| * Circumferential shell welds at a structural discontinuity (Item C1.10).
| |
| * Head-to-shell welds (Item C1.20).
| |
| * Tubesheet-to-shell welds (Item C1.30). NA to Hatch because the tubesheet is flanged in.
| |
| The HNP-2 Category C-A examinations are shown below in Table 2:
| |
| TABLE 2 - CATEGORY C-A PRESSURE VESSEL WELDS Item Component ISI I2/P1 I2/P2 I2/P3 I3/P1 I3/P2 I3/P3 Comments No. Fig C1.20 2E11\2HX-A-1 B-1 1992 2001 Limited coverage Shell Head To Upper due to brackets.
| |
| Shell Ring See RR-5.
| |
| C1.10 2E11\2HX-A-2 B-1 1995 2005 Upper Shell Ring To Lower Shell Ring C1.10 2E11\2HX-A-3 B-1 9/86 1998 Lower Shell Ring To Flange C1.20 2E11\2HX-B-1 B-1 Examination Shell Head To Upper required only on Shell Ring RHR A C1.10 2E11\2HX-B-2 B-1 Examination Upper Shell Ring To required only on Lower Shell Ring RHR A C1.10 2E11\2HX-B-3 B-1 Examination Lower Shell Ring To required only on Flange RHR A H2 Basis Doc - Class 2 Page 9 of 33 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 2 COMPONENTS 4th Interval Examinations performed during the 3rd Interval will be repeated during the 4th Interval.
| |
| The HNP-2 Category C-A examinations are shown below in Table 3:
| |
| TABLE 3 - CATEGORY C-A PRESSURE VESSEL WELDS Item Component ISI I3/P1 I3/P2 I3/P3 I4/P1 I4/P2 I4/P3 Comments No. Fig C1.20 2E11\2HX-A-1 B-1 2001 2R21 Limited coverage Shell Head To Upper due to brackets.
| |
| Shell Ring C1.10 2E11\2HX-A-2 B-1 2005 2R23 Upper Shell Ring To Lower Shell Ring C1.10 2E11\2HX-A-3 B-1 1998 2R20 Lower Shell Ring To Flange C1.20 2E11\2HX-B-1 B-1 Examination Shell Head To Upper required only on Shell Ring RHR A C1.10 2E11\2HX-B-2 B-1 Examination Upper Shell Ring To required only on Lower Shell Ring RHR A C1.10 2E11\2HX-B-3 B-1 Examination Lower Shell Ring To required only on Flange RHR A 1 2 3 Number of 4th Interval Examinations and Cumulative Percentage (33%) (66%) (100)%
| |
| H2 Basis Doc - Class 2 Page 10 of 33 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 2 COMPONENTS Category C-B Nozzle Examinations in Class 2 Pressure Vessels 1st Interval Not Evaluated 2nd Interval The A outlet nozzle weld, the A nozzle inner radius, and the B Inlet nozzle weld were examined as shown in Interval 3 Table. The B Inlet nozzle inner radius was not examined because of an SNC interpretation that the configuration had a rounded corner instead of an actual inner radius configuration.
| |
| 3rd Interval There are two Class 2 vessels at Hatch - the RHR Heat Exchangers. Each RHR heat exchanger has one inlet and one outlet nozzle on each heat exchanger. The nozzles do not have reinforcement plates. For nozzles without reinforcement plates Table IWC-2500-1, Category C-B of the 1989 Code requires that only the nozzles on one of the two heat exchangers be examined. (Alternately the number of nozzles on one heat exchanger may be distributed over two heat exchangers). The nozzles initially selected for examination shall be re-examined over the life of the heat exchangers. Because of the pattern established in the 2nd Interval the A outlet nozzle and the B inlet nozzle will be examined. Examinations include surface and volumetric examinations of the two nozzle-to-shell welds and a volumetric examination of the inner radius volume on the two nozzles.
| |
| As discussed above in the 2nd Interval write-up, an interpretation was made that there was a rounded corner instead of an inner radius configuration. However, a 2004 review of drawings in manual S-25700 indicates that the configuration is similar to that shown in examination Figure IWC-2500-4(b) in the 1989 Code. While not exactly the same configuration, the Code figures are representative figures and it was not the intent of the Section XI Code to have an exact match of every configuration in the nuclear industry. While there is some debate as to the accuracy of the design drawing as compared to the actual configuration and there is additional debate regarding the ability to perform meaningful examinations, a somewhat more conservative approach was used for the 3rd Interval and the examinations were performed.
| |
| However, as shown in Table 4 below, the 3rd Interval examinations were performed significantly more than 10-years after the previous examinations. There was no cracking, so the structural integrity of the nozzle inner radii was verified for both the 2nd and 3rd Intervals. Therefore, there is not be a technical or safety issue. The basis for this determination is that since they were not cracked during 2R18, then they were not cracked during the 2nd Interval.
| |
| H2 Basis Doc - Class 2 Page 11 of 33 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 2 COMPONENTS TABLE 4 - CATEGORY C-B PRESSURE VESSEL NOZZLE EXAMINATIONS Item Component ISI I2/P1 I2/P2 I2/P3 I3/P1 I3/P2 I3/P3 Comments Number Figure Number C2.21 2E11\2HX-A-I B-1A Inlet Nozzle C2.22 2E11\2HX-A-I-IRS B-1A Inlet Nozzle Inner Radius C2.21 2E11\2HX-A-O B-1A 1986 1998 Outlet Nozzle C2.22 2E11\2HX-A-O-IRS B-1B 1986 2R18 Outlet Nozzle Inner Radius C2.21 2E11\2HX-B-I B-1B 1992 2R18 Inlet Nozzle C2.22 2E11\2HX-B-I-IRS B-1B 2R18 Inlet Nozzle Inner Radius C2.21 2E11\2HX-B-O B-1B Outlet Nozzle C2.22 2E11\2HX-B-O-IRS B-1B Outlet Nozzle Inner Radius H2 Basis Doc - Class 2 Page 12 of 33 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 2 COMPONENTS 4th Interval The HNP-2 Category C-B examinations are shown below in Table 5:
| |
| TABLE 5 - CATEGORY C-B PRESSURE VESSEL NOZZLE EXAMINATIONS Item Component ISI I3/P1 I3/P2 I3/P3 I4/P1 I4/P2 I4/P3 Comments Number Figure Number C2.21 2E11\2HX-A-I B-1A Inlet Nozzle C2.22 2E11\2HX-A-I-IRS B-1A Inlet Nozzle Inner Radius C2.21 2E11\2HX-A-O B-1A 1998 2R20 Outlet Nozzle C2.22 2E11\2HX-A-O-IRS B-1B 2R18 2R21 Outlet Nozzle Inner Radius C2.21 2E11\2HX-B-I B-1B 2R18 2R22 Inlet Nozzle C2.22 2E11\2HX-B-I-IRS B-1B 2R18 2R22 Inlet Nozzle Inner Radius C2.21 2E11\2HX-B-O B-1B Outlet Nozzle C2.22 2E11\2HX-B-O-IRS B-1B Outlet Nozzle Inner Radius 1 2 4 Number of 4th Interval Examinations and Cumulative Percentage (25%) (50%) (100)%
| |
| H2 Basis Doc - Class 2 Page 13 of 33 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 2 COMPONENTS Category C-C Integral Attachments for Class 2 Vessels, Piping, Pumps, and Valves 1st and 2nd Interval Not evaluated.
| |
| 3rd Interval Table IWC-2500-1, Category C-C of the 1989 Code defines the examination requirements for Class 2 integrally welded attachments. In lieu of these requirements, HNP examines Class 2 welded attachments per the requirements of Code Case N-509, which was originally adopted for use at HNP through relief request RR-4. Relief Request RR-4 was superseded via the endorsement of Code Case N-509 in Revision 12 to Regulatory Guide 1.147. Revision 13 subsequently annulled the Code Case; however, it may be used until the end of the 3rd interval.
| |
| Revision 12 had a condition for use, in that, at least 10% of each Item No. was required to be examined (for those items not already requiring 100%). Each Class 2 Code Case N-509 Item is discussed below.
| |
| Code Case N-509, Item C3.10 - Pressure Vessels - As shown in Table 6, the only Class 2 pressure vessels are the two RHR Heat Exchangers. With multiple vessels, Code Case N-509 allows the examination of one of the welded attachment on one of the vessels. 2E11\2HX-A-2S-4 was examined in the 1st Period (2R14).
| |
| Table 6 - CATEGORY C-C, ITEM C3.10 PRESSURE VESSEL WELDED ATTACHMENTS Component ISI Figure I3/P1 I3/P2 I3/P3 Comments 2E11\2HX-A-2S-1 B-1 2E11\2HX-A-2S-2 B-1 2E11\2HX-A-2S-3 B-1 2E11\2HX-A-2S-4 B-1 -2R14 One welded attachment on one vessel required to be examined per Code Case N-509 2E11\2HX-A-3S-1 B-1 2E11\2HX-A-3S-2 B-1 2E11\2HX-A-3S-3 B-1 2E11\2HX-A-3S-4 B-1 2E11\2HX-B-2S-1 B-1 2E11\2HX-B-2S-2 B-1 2E11\2HX-B-2S-3 B-1 2E11\2HX-B-2S-4 B-1 2E11\2HX-B-3S-1 B-1 2E11\2HX-B-3S-2 B-1 2E11\2HX-B-3S-3 B-1 2E11\2HX-B-3S-4 B-1 H2 Basis Doc - Class 2 Page 14 of 33 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 2 COMPONENTS Code Case N-509, Item C3.30 (Pumps) and C3.40 (Valves)
| |
| None Identified Code Case N-509, Item C3.20 - Piping - Per the NRC condition of use in Revision 12 of Reg.
| |
| Guide 1.147, 10% of the piping attachments must be examined.
| |
| There are 150 sets of non-exempt welded attachments in the Class 2 scope, as shown in Schedule Works. For the purpose of this discussion, a set is a group of welded attachments associated with a specific location. For instance, a hanger clamp may have four welded lugs but it is considered one set. When a set of welded attachments is selected for examination all of the welded attachments in that set should be examined.
| |
| A minimum of 15 sets of welded attachments is required; however, 17 sets of welded attachments were examined. Six sets of welded attachments were examined during the 1st Period, six sets during the 2nd Period, and 5 sets during the 3rd Period.
| |
| Note:
| |
| A review of the Indication Notification Forms for 3rd Period, 2nd Interval outages 2R11 and 2R12, and 3rd Interval outages 2R13, 2R14, 2R15, 2R16, and 2R17 did not identify any cases requiring additional examinations of piping welded attachments (e.g., scope expansion or re-examination). Therefore, all examinations are for Code credit.
| |
| Examinations were performed as shown in the attached Hatch Unit No. 2 Code Compliance Scheduling Summary - 3rd Interval for Item C3.20.
| |
| Additionally, examination of an integrally welded attachment is required if the associated component support member has deformation identified during operation, refueling, maintenance, examination, inservice inspection, or testing. An example of component support deformation is broken parts, bent parts, or pulled out parts.
| |
| H2 Basis Doc - Class 2 Page 15 of 33 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 2 COMPONENTS 4th Interval Table IWC-2500-1, Category C-C of the 2001 Edition of ASME Section XI through the 2003 Addenda defines the examination requirements for Class 2 integrally welded attachments. These requirements mirror those in Code Case N-509 used during the 3rd Interval.
| |
| Item C3.10 - Pressure Vessels - As shown in Table 7, the only Class 2 pressure vessels are the two RHR Heat Exchangers. With multiple vessels, the Code allows the examination of one of the welded attachment on one of the vessels.
| |
| 2E11\2HX-A-2S-4 was examined in the 1st Period of the 3rd Interval and will be re-examined during the 1st Period of the 4th Interval.
| |
| TABLE 7 - CATEGORY C-C, ITEM C3.10 PRESSURE VESSEL WELDED ATTACHMENTS Component ISI Figure I4/P1 I4/P2 I4/P3 Comments 2E11\2HX-A-2S-1 B-1 2E11\2HX-A-2S-2 B-1 2E11\2HX-A-2S-3 B-1 2E11\2HX-A-2S-4 B-1 2R20 One welded attachment on one vessel required to be examined.
| |
| 2E11\2HX-A-3S-1 B-1 2E11\2HX-A-3S-2 B-1 2E11\2HX-A-3S-3 B-1 2E11\2HX-A-3S-4 B-1 2E11\2HX-B-2S-1 B-1 2E11\2HX-B-2S-2 B-1 2E11\2HX-B-2S-3 B-1 2E11\2HX-B-2S-4 B-1 2E11\2HX-B-3S-1 B-1 2E11\2HX-B-3S-2 B-1 2E11\2HX-B-3S-3 B-1 2E11\2HX-B-3S-4 B-1 Item C3.30 (Pumps) and C3.40 (Valves)
| |
| None Identified Item C3.20 - Piping - There are 150 sets of non-exempt welded attachments in the Class 2 scope, as shown in Schedule Works. For the purpose of this discussion, a set is a group of welded attachments associated with a specific location. For instance, a hanger clamp may have four welded lugs but it is considered one set. When a set of welded attachments is selected for examination all of the welded attachments in that set should be examined.
| |
| H2 Basis Doc - Class 2 Page 16 of 33 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 2 COMPONENTS A minimum of 15 sets of welded attachments is required and 16 are scheduled. Five sets of welded attachments (31%) will be examined during the 1st Period, 6 sets during the 2nd Period (cumulative percentage of 69%), and 5 sets during the 3rd Period (Cumulative percentage of 100%).
| |
| Examinations were performed as shown in the attached Hatch Unit No. 2 Code Compliance Scheduling Summary - 3rd Interval for Item C3.20.
| |
| Additionally, examination of an integrally welded attachment is required if the associated component support member has deformation identified during operation, refueling, maintenance, examination, inservice inspection, or testing. An example of component support deformation is broken parts, bent parts, or pulled out parts.
| |
| H2 Basis Doc - Class 2 Page 17 of 33 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 2 COMPONENTS Category C-F-1 Pressure Retaining Welds in Austenitic Stainless Steel None Identified Category C-F-2 Pressure Retaining Welds in Carbon or Low Alloy Steel 1st and 2nd Intervals - Not Evaluated 3rd Interval - See 3rd Interval ISI Plan 4th Interval Table IWC-2500-1, Category C-F-2 of the 2001 Edition of Section XI with Addenda through 2003 defines the examination requirements for these piping welds.
| |
| : 1. The Code requires that welds selected for examination shall include 7.5% , but not less than 28 circumferential welds not exempted by IWC-1220. Long-seam welds are not required for examination by the Code.
| |
| : 2. The Code indicates in Table IWC-2500-1, Category C-F-2, Footnote 2 that some welds that are not exempted by IWC-1220 are not required to be examined, because they are less than 3/8 (0.375) thick, but they are required to be included in the total weld count to which the 7.5% sample will be applied. Per the Code Compliance Scheduling Summary for C-F-2 welds there are 1170 welds in the population, requiring 88 examinations. For Category C-F-2, not all of the roundup will be used because the welds were broken out by system in order to facilitate the implementation of (the below listed) proration requirements. Allowing all of the roundup would require an excess number of examinations. Additionally, there is not a Code requirement to meet the 7.5% percentage requirements for each Code Item, but only for the total category C-F-2 welds. Using the below listed proration requirements the Code requirements will be met. (Note: 94 welds were selected.)
| |
| : 3. Table IWC-2500-1, Category C-F-2, Footnote 2 of the Code requires that the exams be distributed (prorated) among Class 2 systems, to the degree practicable using the following criteria:
| |
| the number of non-exempt welds in each system as compared to the total number of non-exempt welds.
| |
| the number of non-exempt welds for each line size (e.g., 10, 12 and 16) to the degree practicable.
| |
| : 4. Per Table IWC-2420-B, a review of the Indication Notification Forms for 3rd Period, 2nd Interval outages 2R11 and 2R12, and 3rd Interval outages 2R13, 2R14, 2R15, 2R16, and 2R17 did not identify any cases requiring additional examinations of piping welds (e.g.,
| |
| scope expansion or re-examination). Therefore, all examinations are for Code credit H2 Basis Doc - Class 2 Page 18 of 33 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 2 COMPONENTS RHR (2E11) - RHR has a total of 531 C-F-2 welds versus a total of 1170 total welds; therefore about 40 of the 88 welds need to be selected in RHR (more may be selected if desired). These 40 welds are prorated through the line sizes as follows.
| |
| TABLE 8 RHR SYSTEM C-F-2 WELDS RHR Line Size Number of Prorated Comments Welds > Number of 0.375 Welds To Be Examined 1E11 6 4 (1%) 0 8 6 (1%) 0 16 122 (31%) 14 20 122 (31%) 13 24 145 (36%) 15 399 42 CS (2E21) - CS has a total of 199 C-F-2 welds versus a total of 1170 welds; therefore about 15 of the 88 welds need to be selected in CS (more may be selected if desired). These 15 welds are prorated through the line sizes as follows.
| |
| TABLE 9 CORE SPRAY SYSTEM C-F-2 WELDS CS Line Size Number of Prorated Comments Welds > Number of 0.375 Welds To Be Examined 12 75 (54%) 8 14 18 (13%) 2 20 46 (33%) 5 139 15 HPCI (2E41)- HPCI has a total of 194 C-F-2 welds versus a total of 1170 welds; therefore about 15 of the 88 welds need to be selected in HPCI (more may be selected if desired).
| |
| These 15 welds are prorated through the line sizes as follows.
| |
| TABLE 10 HPCI SYSTEM C-F-2 WELDS HPCI Line Size Number of Prorated Comments Welds > Number of 0.375 Welds To Be Examined 6 2 (1%) 1 10 51 (30%) 4 12 7 (4%) 1 14 52 (30%) 4 16 31 (18%) 3 18 4 (2%) 0 20 24 (14%) 3 24 1 (<1%) 0 172 16 H2 Basis Doc - Class 2 Page 19 of 33 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 2 COMPONENTS RCIC (2E51) - RCIC has a total of 17 C-F-2 welds versus a total of 1170 welds; therefore about 1 of the 88 welds need to be selected in RCIC.
| |
| TABLE 11 RCIC SYSTEM C-F-2 WELDS RCIC Line Size Number of Prorated Comments Welds > Number of 0.375 Welds To Be Examined 6 2 1 Torus Drainage (2G51) - TDP has a total of 10 C-F-2 welds versus a total of 1170 welds; therefore one of the 88 welds could be selected in TDP. However, all welds are less than
| |
| .375 thick, so none were selected.
| |
| TABLE 12 TORUS DRAINAGE SYSTEM C-F-2 WELDS TDP Line Size Number of Prorated Comments Welds > Number of 0.375 Welds To Be Examined 8 0 0 0 0 Main Steam (2N11) - MS has a total of 165 C-F-2 welds versus a total of 1170 welds; therefore about 12 of the 88 welds need to be selected in MS (more may be selected if desired). These 12 welds are prorated through the line sizes as follows.
| |
| TABLE 13 MAIN STEAM SYSTEM C-F-2 WELDS MS Line Size Number of Prorated Comments Welds > Number of 0.375 Welds To Be Examined 6 3 (2%) 0 8 12 (7%) 1 10 4 (2%) 0 14 6 (4%) 1 16 58 (35%) 4 24 82 (50%) 6 165 12 Feedwater (2N21): There are six 18 non-exempt welds versus a total of 1170 welds; therefore, one weld will be examined.
| |
| TABLE 14 FEEDWATER SYSTEM C-F-2 WELDS Aux Line Size Number of Prorated Comments Steam Welds > Number of 0.375 Welds To Be Examined 18 6 (100%) 1 6 1 H2 Basis Doc - Class 2 Page 20 of 33 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 2 COMPONENTS Purge and Inerting (T48) - This system has a total of 51 C-F-2 welds versus a total of 1170 welds; therefore about 4 of the 88 welds need to be selected in T48 (more may be selected if desired). These 4 welds are prorated through the line sizes as follows.
| |
| TABLE 15 PURGE AND INERTING SYSTEM C-F-2 WELDS Purge Line Size Number of Prorated Comments Welds > Number of 0.375 Welds To Be Examined 18 18 (75%) 3 20 6 (25%) 2 1 extra weld selected 24 5
| |
| : 5. Footnote 2 indicates that this prorated number of weld examinations determined for each system as shown in the above tables should then be distributed among terminal ends and structural discontinuities prorated, to the degree practicable, on the number of non-exempt terminal ends and structural discontinuities within a system. Structural discontinuities include pipe weld joints to vessel nozzles, valve bodies, pump casings, pipe fittings (such as elbows, tees, reducers, flanges, etc.), and pipe branch connections and fittings. Terminal ends would be those structural discontinuities where a piping connects to structures, components, or pipe anchors An evaluation of the Footnote 2 requirements is performed below for each system.
| |
| 2E11 - RHR: Per Schedule Works there are there are 531 non-exempt welds. Removing the pipe-to-pipe welds and the welds less than 0.375 thick, there are 366 welds subject to examination. Of these 366 welds, the following 18 welds (4.9% of the 366 welds) are considered terminal end welds and the remainder are structural discontinuities:
| |
| Piping Welds Connecting to the Torus 2E11-2RHR-24A-TS-A-2 (Note: weld A-1 is in the IWE scope) 2E11-2RHR-24A-TS-C-2 (Note: weld C-1 is in the IWE scope) 2E11-2RHR-24B-TS-B-2 (Note: weld B-1 is in the IWE scope) 2E11-2RHR-24B-TS-D-2 (Note: weld D-1 is in the IWE scope) 2E11-2RHR-16A-SH-15 (Note: weld SH-16 is in the IWE scope) 2E11-2RHR-16B-SH-19 (Note: weld SH-20 is in the IWE scope)
| |
| H2 Basis Doc - Class 2 Page 21 of 33 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 2 COMPONENTS Piping Welds Connecting to Pump Nozzles 2E11-2RHR-16A-PD-A-1 2E11-2RHR-16A-PD-C-1 2E11-2RHR-16B-PD-B-1 2E11-2RHR-16B-PD-D-1 2E11-2RHR-24A-TS-A-18 2E11-2RHR-24A-TS-C-19 2E11-2RHR-24B-TS-B-18 2E11-2RHR-24B-TS-D-19 Piping Welds Connecting to RHR Heat Exchanger Nozzles 2E11-2RHR-20A-HXI-1 2E11-2RHR-20A-HXO-1 2E11-2RHR-20B-HXI-1 2E11-2RHR-20B-HXO-1 Since 4.9% of the RHR population are terminal ends, two terminal ends (or 4.8% of the 42 welds defined in Table 8) are scheduled for examination. These are 2E11-2RHR-24A-TS-A-2 and 2E11-2RHR-24B-TS-B-18. The remaining welds scheduled for examination are structural discontinuities.
| |
| 2E21 - Core Spray - Per Schedule Works there are 199 non-exempt welds. Removing the pipe-to-pipe welds and the welds less than 0.375 thick, there are 130 welds subject to examination. Of these 130 welds, the following 4 welds (3.1% of the 130 welds) are considered terminal end welds and the remainder are structural discontinuities:
| |
| Piping Welds Connecting to the Torus 2E21-2CS-20A-TS-2 (Note: weld TS-1 is in the IWE scope) 2E21-2CS-20B-TS-2 (Note: weld TS-1 is in the IWE scope)
| |
| Piping Welds Connecting to Pump Nozzles 2E21-2CS-12A-1 2E21-2CS-20A-TS-22 2E21-2CS-12B-1 2E21-2CS-20B-TS-21 Since 3.1% of the Core Spray population are terminal ends, one terminal end (or 6.7% of the 15 welds defined in Table 9) is scheduled for examination. This weld is 2E21-2CS-20B-TS-
| |
| : 2. The remaining welds scheduled for examination are structural discontinuities.
| |
| H2 Basis Doc - Class 2 Page 22 of 33 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 2 COMPONENTS 2E41 - HPCI: Per Schedule Works there are 194 non-exempt welds. (This includes an estimate of the welds on the 16 suction line from the Condensate Storage Tank to the Reactor Building wall. Per drawings H-21084 and H-21110 there is about 65 of piping that is greater than or equal to 0.375 thick and there is about 10 fitting welds. Assuming 5 pipe-to-pipe welds in the run of pipe and adding this number to the 10 fitting welds would yield a total of 15 welds. This is piping is HAC, Schedule 10S piping not subject to examinations, but the welds must be accounted for in the total). Removing the pipe-to-pipe welds and the welds less than 0.375 thick, there are 157 welds subject to examination. Of these 157 welds, the following 7 welds (4.5% of the 157 welds) are considered terminal end welds and the remainder are structural discontinuities:
| |
| Piping Weld Connecting to the CST One unnumbered weld.
| |
| Piping Welds Connecting to the Torus 2E41-2HPCI-16-TS-2 (Note: weld TS-1 is in the IWE scope) 2E41-2HPCI-24-TD-1 (Note: weld TD-2 is in the IWE scope)
| |
| Piping Welds Connecting to Pump Nozzles 2E41-2HPCI-10-R-1 (discharge) 2E41-2HPCI-16-TS-25 (suction) 2E41-2HPCI-12-PC-1 (booster pump connection) 2E41-2HPCI-12-PC-5 (booster pump connection)
| |
| Since 4.5% of the HPCI population are terminal ends, one terminal end (or 6.3% of the 16 welds defined in Table 10) is scheduled for examination. This is weld 2E41-2HPCI-16TS-2.
| |
| Weld 2E41-2HPCI-12-PC-5 which is both a terminal end and a structural discontinuity is also scheduled for examination. The remaining welds scheduled for examination are structural discontinuities.
| |
| 2E51 - RCIC. Per Schedule Works there are 17 non-exempt welds. Removing the pipe-to-pipe welds and the welds less than 0.375 thick there are 2 welds subject to examination.
| |
| One is scheduled for examination.
| |
| 2G51 - Torus Cleanup. Per Schedule Works there are 7 non-exempt welds. Removing the welds less than 0.375 thick, leaves zero welds subject to examination.
| |
| 2N11 - Main Steam: Per Schedule Works there are 165 non-exempt welds. Removing the pipe-to-pipe welds there are 142 welds subject to examination (there are no thin-wall welds).
| |
| Of these 142 welds, the 4 welds to the Main Stop and Control valves are considered as terminal ends (about 2.8% of the 142 welds) since the Class 2 piping run ends at the valves.
| |
| The remaining 138 welds are considered as structural discontinuities.
| |
| H2 Basis Doc - Class 2 Page 23 of 33 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 2 COMPONENTS Since 2% of the population are terminal ends, one terminal end (or 5% of the 12 welds defined in Table 13) is scheduled for examination. The remaining welds scheduled for examination are structural discontinuities.
| |
| 2N21 - Feedwater: Per Schedule Works there are six 18 non-exempt welds, of which, zero are pipe to pipe. Of these 6 non-exempt welds, all 6 are structural discontinuities (not pipe-to-pipe), with none considered as terminal ends. One structural discontinuity is scheduled for examination (See Table 14).
| |
| 2T48 - Purge and Inerting. Per Schedule Works there are 51 non-exempt welds.
| |
| Removing the pipe-to-pipe welds and the welds less than 0.375 thick, there are 22 welds subject to examination. Of these 22 welds, the following 2 welds (9.1% of the 22 welds ) are considered terminal end welds:
| |
| Piping Welds Dead-ending at the Vacuum Breakers 2T48-2CPI-20A-VB-1 2T48-2CPI-20B-VB-1 Since 9.1% of the Purge and Inerting population are terminal ends, one terminal end (or 50%
| |
| of the 5 welds defined in Table 15) is scheduled for examination. This is weld 2T48-20A-VB-1. The remaining welds scheduled for examination are structural discontinuities.
| |
| H2 Basis Doc - Class 2 Page 24 of 33 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 2 COMPONENTS Category C-G Pressure Retaining Welds in Pumps and Valves 1st and 2nd Interval Not Evaluated 3rd Interval - See 3rd Interval ISI Plan 4th Interval (No welds have been identified in valve casings at Hatch)
| |
| Table IWC-2500-1, Category C-G of the 2001 Edition of Section XI with Addenda through 2003 defines the examination requirements for these welds. For pump welds, the Code requires that in the case of multiple pumps of similar design, function, and service in a system, only the pressure retaining welds on one pump needs to be examined. As shown in Table 16 for Interval 4, Hatch has four Class 2 RHR pumps and two Class 2 Core Spray pumps that have pressure-retaining welds. The welds in RHR Pump A and Core Spray Pump A are scheduled for examination during the 4th Interval as shown in Schedule Works.
| |
| H2 Basis Doc - Class 2 Page 25 of 33 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 2 COMPONENTS TABLE 16 4th INTERVAL CATEGORY C-G PUMP WELD EXAMINATIONS Component Fig I4/P1 I4/P2 I4/P3 Notes 2E11-2RHR-PLP-A-1 thru 6 B-2 These internal welds are not 2E11-2RHR-PLP-B-1 thru 6 considered Category C-G pump 2E11-2RHR-PLP-C-1 thru 6 welds.
| |
| 2E11-2RHR-PLP-D-1 thru 6 2E11-2RHR-PMI-A B-2 X RHR Pump A - For multiple pumps only the pressure retaining welds on one pump needs to be examined.
| |
| 2E11-2RHR-POP-A-1 B-2 X 2E11-2RHR-POP-A-1BC/ B-2 X 2E11-2RHR-POP-A-2 B-2 X 2E11-2RHR-PMI-B B-2 RHR Pump B 2E11-2RHR-POP-B-1 B-2 2E11-2RHR-POP-B-1BC/ B-2 2E11-2RHR-POP-B-2 B-2 2E11-2RHR-PMI-C B-2 RHR Pump C 2E11-2RHR-POP-C-1 B-2 2E11-2RHR-POP-C-1BC/ B-2 2E11-2RHR-POP-C-2 B-2 2E11-2RHR-PMI-D B-2 RHR Pump D 2E11-2RHR-POP-D-1 B-2 2E11-2RHR-POP-D-1BC/ B-2 2E11-2RHR-POP-D-2 B-2 2E21-2CS-PLP-A-1 thru 6 B-2A These internal welds are not 2E21-2CS-PLP-B-1 thru 6 considered Category C-G pump welds.
| |
| 2E21-2CS-PMI-A B-2A X Core Spray Pump A - For multiple pumps only the pressure retaining welds on one pump needs to be examined 2E21-2CS-POP-A-1 B-2A X 2E21-2CS-POP-A-1BC/ B-2A X 2E21-2CS-POP-A-2 B-2A X 2E21-2CS-PMI-B B-2A Core Spray Pump B 2E21-2CS-POP-B-1 B-2A 2E21-2CS-POP-B-1BC/ B-2A 2E21-2CS-POP-B-2 B-2A H2 Basis Doc - Class 2 Page 26 of 33 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 2 COMPONENTS AUGMENTED EXAMINATIONS The NRCs safety evaluation dated 6/16/97 of the 3rd Interval Program listed several augmented programs that will be maintained during the 4th Interval.
| |
| NUREG-0803 The NRCs safety evaluation dated 6/16/97 of the 3rd Interval Program indicated, that in addition to the Code required examinations, the examination of the Scram Discharge Volume (SDV) piping in accordance with NUREG-0803 would be examined. NUREG-0803 contends that since the SDV was designed and fabricated in accordance with Class 2 piping that it should be subjected to the ISI requirements for Class 2 piping. By letter dated March 5, 1982 GPC committed to the following, We will include weld examination of the SD (scram discharge) headers in the ISI program ..
| |
| The 2nd Interval update was performed effective 12/31/85 and these welds were included as required. As permitted in 10CFR50.55a, examination locations were selected by the 1974 Code with addenda through Summer 1975 and the examinations were performed per the 1980 Edition of Section XI through Winter 1981. As shown on ISI Figures B-84 and B-85 there are thirty-three (EBB, 0.5 thick, schedule 80 carbon steel), welds.
| |
| The 1974 Code required examination of 100% of welds that circulate reactor coolant to be examined over the 40-year life. For those systems not circulating reactor coolant the examinations could be reduced to 50% of the welds. These welds are outside the Reactor Coolant Pressure Boundary and per NEDO-24342, GE Evaluation in Response to NRC Request Regarding BWR Scram System Pipe Breaks they are pressurized less than 1% of the time.
| |
| Therefore, these welds were designated as not circulating Reactor Coolant. Additionally, because there are two similar CRD headers only the equivalent of 50% of one the headers needed to be examined during the 40-years. Since the largest header has 18 welds, 50% or nine welds have to be examined during the 40-year life or three welds per 10-year interval. The 1980 Code required a surface examination technique for 0.5 thick piping.
| |
| For the 3rd Interval, a 7.5% sample (3 welds) were volumetrically examined. The 1989 Code requirement to perform both a volumetric and surface examination was not followed for this augmented requirement, since RR-40 was issued to eliminate piping surface examinations.
| |
| Welds and examinations are shown in Table 17. (Note: Two welds had a surface examination during the 3rd Interval, but were not counted toward this requirement). Code credit (i.e., C-F-2) was not taken for these examinations.
| |
| For the 4th Interval, a 7.5% sample (volumetric) is required. Welds and examinations are shown below in Table 17. This piping is designated as Class 2S in Schedule Works.
| |
| H2 Basis Doc - Class 2 Page 27 of 33 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 2 COMPONENTS AUGMENTED EXAMINATIONS TABLE 17 AUGMENTED CRD WELD EXAMINATIONS Component I3/P1 I3/P2 I3/P3 I4/P1 14/P2 I4/P3 2C11-2CRD-8N-SDV-1 2C11-2CRD-8N-SDV-2 2C11-2CRD-8N-SDV-3 2C11-2CRD-8N-SDV-4 2C11-2CRD-8N-SDV-5 2R17 (Surf) 2C11-2CRD-8N-SDV-6 2C11-2CRD-8N-SDV-7 2C11-2CRD-8N-SDV-8 2C11-2CRD-8N-SDV-9 2C11-2CRD-8N-SDV-10 2C11-2CRD-8N-SDV-11 2C11-2CRD-8N-SDV-12 2C11-2CRD-8N-SDV-13 2C11-2CRD-8N-SDV-14 2C11-2CRD-8N-SDV-15 2C11-2CRD-8S-SDV-1 2R18 X 2C11-2CRD-8S-SDV-2 2C11-2CRD-8S-SDV-3 2C11-2CRD-8S-SDV-4 2R15 (Surf) 2C11-2CRD-8S-SDV-5 2C11-2CRD-8S-SDV-6 2C11-2CRD-8S-SDV-7 2C11-2CRD-8S-SDV-8 2C11-2CRD-8S-SDV-9 2C11-2CRD-8S-SDV-10 2C11-2CRD-8S-SDV-11 2C11-2CRD-8S-SDV-12 2R18 X 2C11-2CRD-8S-SDV-13 2R18 X 2C11-2CRD-8S-SDV-14 2C11-2CRD-8S-SDV-15 2C11-2CRD-8S-SDV-16 2C11-2CRD-8S-SDV-17 2C11-2CRD-8S-SDV-18 H2 Basis Doc - Class 2 Page 28 of 33 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 2 COMPONENTS AUGMENTED EXAMINATIONS Thin-Wall Piping The NRCs safety evaluation dated 6/16/97 of the 3rd Interval Program also indicated, that in addition to the 1989 Code required examinations, volumetric examination of a 7.5% sample of a portion of thin-wall, non-exempt piping within the RHR, CS, and HPCI systems would be performed. Per Table IWC-2500-1, Category C-F-2 only carbon steel welds 3/8 (0.375) thick require examination; however, SNC agreed to volumetrically examine a 7.5% sample of the welds in this thin wall piping. The Class 2 augmented section of the 3rd Interval ISI Program indicates that the portion of thin-wall, non exempt piping subject to examination is:
| |
| : a. The thin-wall piping on the downstream side of pumps whose integrity is needed to maintain the pressure boundary for the system to perform its intended RHR, ECC, or CHR safety function.
| |
| : b. The Branch connection piping out to the first normally closed valve, or to the first valve capable of automatic closure, or to a flange when the piping downstream of the valve or flange has a non-ECCS, non-RHR, or non-CHR function.
| |
| Per pipe schedule tables, this thin wall piping is limited to Schedule 40 (or thinner) piping 6, 8, or 10 in diameter. Table 18 shows the Class 2 welds in the thin wall scope and defines the welds that meet criteria a or criteria b. There are approximately 75 welds that meet criteria a or criteria b; therefore, at least six welds are required to be examined to meet the 7.5% requirement.
| |
| For the 4th Interval, a 7.5% sample (volumetric) is required. As shown in Table 18 six welds were selected. Code credit (i.e., C-F-2) was not taken for these examinations.
| |
| H2 Basis Doc - Class 2 Page 29 of 33 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 2 COMPONENTS TABLE 18 THIN-WALL PIPING AUGMENTED EXAMINATIONS Weld Fig I3/P1 I3/P2 I3/P3 14/P1 14/P2 14/P3
| |
| : 1. 2E11-2RHR-6A-DS-1 B-14
| |
| : 2. 2E11-2RHR-6A-DS-2 B-14
| |
| : 3. 2E11-2RHR-6B-DS-1 B-18
| |
| : 4. 2E11-2RHR-6B-DS-2 B-18
| |
| : 5. 2E11-2RHR-6A-TSP-1 B-17
| |
| : 6. 2E11-2RHR-6A-TSP-2 B-17
| |
| : 7. 2E11-2RHR-6A-TSP-3 B-17
| |
| : 8. 2E11-2RHR-6A-TSP-4 B-17
| |
| : 9. 2E11-2RHR-6A-TSP-5 B-17
| |
| : 10. 2E11-2RHR-6A-TSP-6 B-17 2R14 X
| |
| : 11. 2E11-2RHR-6A-TSP-7 B-17
| |
| : 12. 2E11-2RHR-6A-TSP-8 B-17
| |
| : 13. 2E11-2RHR-6A-TSP-9 B-17
| |
| : 14. 2E11-2RHR-6A-TSP-10 B-17
| |
| : 15. 2E11-2RHR-6A-TSP-11 B-17
| |
| : 16. 2E11-2RHR-6B-TSP-1 B-21
| |
| : 17. 2E11-2RHR-6B-TSP-2 B-21
| |
| : 18. 2E11-2RHR-6B-TSP-3 B-21
| |
| : 19. 2E11-2RHR-6B-TSP-4 B-21
| |
| : 20. 2E11-2RHR-6B-TSP-5 B-21 2R16 X
| |
| : 21. 2E11-2RHR-6B-TSP-6 B-21
| |
| : 22. 2E11-2RHR-6B-TSP-7 B-21
| |
| : 23. 2E11-2RHR-6B-TSP-8 B-21
| |
| : 24. 2E11-2RHR-6B-TSP-9 B-21
| |
| : 25. 2E11-2RHR-6B-TSP-10 B-21
| |
| : 26. 2E11-2RHR-6B-TSP-11 B-21
| |
| : 27. 2E11-2RHR-6B-TSP-12 B-21
| |
| : 28. 2E11-2RHR-8-FPD-1 B-22
| |
| : 29. 2E11-2RHR-8-FPD-2 B-22 2R18 X
| |
| : 30. 2E11-2RHR-8-FPD-3 B-22
| |
| : 31. 2E11-2RHR-8-FPD-4 B-22
| |
| : 32. 2E11-2RHR-8-FPD-5 B-22
| |
| : 33. 2E11-2RHR-8-FPD-6 B-22
| |
| : 34. 2E11-2RHR-8-FPD-7 B-22
| |
| : 35. 2E11-2RHR-8-FPD-8 B-22 -2R16 X
| |
| : 36. 2E11-2RHR-10A-SWDS-1 B-24
| |
| : 37. 2E11-2RHR-10A-SWDS-3 B-24 2R14 X
| |
| : 38. 2E11-2RHR-10A-SWDS-4 B-24
| |
| : 39. 2E11-2RHR-10A-SWDS-5 B-24
| |
| : 40. 2E11-2RHR-10A-SWDS-6 B-24
| |
| : 41. 2E11-2RHR-10A-SWDS-7 B-24
| |
| : 42. 2E11-2RHR-10A-SWDS-8 B-24
| |
| : 43. 2E11-2RHR-10A-SWDS-9 B-24 H2 Basis Doc - Class 2 Page 30 of 33 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 2 COMPONENTS TABLE 18 THIN-WALL PIPING AUGMENTED EXAMINATIONS Weld Fig I3/P1 I3/P2 I3/P3 14/P1 14/P2 14/P3
| |
| : 44. 2E11-2RHR-10A-SWDS- B-24
| |
| : 45. 2E11-2RHR-10B-SWDS-1 B-25
| |
| : 46. 2E11-2RHR-10B-SWDS-2 B-25
| |
| : 47. 2E11-2RHR-10B-SWDS-3 B-25
| |
| : 48. 2E11-2RHR-10B-SWDS-4 B-25
| |
| : 49. 2E11-2RHR-10B-SWDS-5 B-25
| |
| : 50. 2E11-2RHR-10B-SWDS-6 B-25
| |
| : 51. 2E11-2RHR-10B-SWDS-7 B-25
| |
| : 52. 2E11-2RHR-10B-SWDS-8 B-25
| |
| : 53. 2E21-2CS-10A-1 B-52
| |
| : 54. 2E21-2CS-10A-2 B-52
| |
| : 55. 2E21-2CS-10A-3 B-52
| |
| : 56. 2E21-2CS-10A-4 B-52
| |
| : 57. 2E21-2CS-10A-5 B-52
| |
| : 58. 2E21-2CS-10A-6 B-52 2R18 X
| |
| : 59. 2E21-2CS-10A-7 B-52
| |
| : 60. 2E21-2CS-10A-8 B-52
| |
| : 61. 2E21-2CS-10A-9 B-52
| |
| : 62. 2E21-2CS-10A-10 B-52
| |
| : 63. 2E21-2CS-10B-1 B-54
| |
| : 64. 2E21-2CS-10B-2 B-54
| |
| : 65. 2E21-2CS-10B-3 B-54
| |
| : 66. 2E21-2CS-10B-4 B-54
| |
| : 67. 2E21-2CS-10B-5 B-54
| |
| : 68. 2E21-2CS-10B-6 B-54
| |
| : 69. 2E21-2CS-10B-7 B-54
| |
| : 70. 2E21-2CS-10B-8 B-54
| |
| : 71. 2E21-2CS-10B-9 B-54
| |
| : 72. 2E21-2CS-10B-10 B-54
| |
| : 73. 2E21-2CS-10B-11 B-54
| |
| : 74. 2E41-2HPCI-10-TD-1 B-69
| |
| : 75. 2E41-2HPCI-10-TD-2 B-69 H2 Basis Doc - Class 2 Page 31 of 33 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 2 COMPONENTS AUGMENTED EXAMINATIONS Portions of the Reactor Core Isolation Cooling are designated as Class S on Boundary Diagrams H-26023 and H-26024. Because this piping has importance, it will be treated using Section XI as a guideline (not as a requirement). As discussed for the Class 2 portion of this piping, this system does not have an RHR, ECC, or CHR function; therefore, the size exemption and pressure/temperature exemption will also be used for this Class S piping. Lines within Class S are evaluated below for examination potential.
| |
| 8 and 10 Steam Exhaust (Figure B-82) - This 8 and 10piping is not pressure temperature exempt because of the steam conditions and it is not size exempt. However, all of this HBB piping is 0.365 (.322 for the 8 weld) nominal wall thickness and therefore does not require examination of the piping welds. The five welded attachments on this line are subject to Category CC type examinations are shown in Table 19. They are designated as Category CC-R in Schedule Works.
| |
| 6 Suction Line from valve 2E51-F031 and the Condensate Storage Tank (Figure B-86).
| |
| This piping is pressure/temperature exempt because it is highly unlikely that it would ever exceed the prescribed pressure/temperature. Therefore, examination of piping welds and integrally welded attachments are not required. (Note: Even if this piping was considered as non-exempt this HBB piping is only .280 thick and not subject to examination).
| |
| 3, 4 and 6 Suction Line from valve 2E51-F031, the Condensate Tank, and the RHR Heat Exchanger (Figure B-87). The 6 piping is pressure/temperature exempt because it is highly unlikely that the RHR function would be used and the piping would never exceed the prescribed pressure/temperature. The 3 and 4 piping is size exempt. Therefore, examination of piping welds and integrally welded attachments are not required. (Note:
| |
| Even if the 6 piping was considered as non-exempt this 6 HBB piping is only .280 thick and not subject to examination).
| |
| 4 piping from RHR (Figure B-88). Size exempt 6 Suction Line from Condensate Storage Tank (Figure B-89). This piping is pressure/temperature exempt because it is highly unlikely that it would ever exceed the prescribed pressure/temperature. Therefore, examination of piping welds and integrally welded attachments are not required. (Note: Even if this piping was considered as non-exempt this HAB piping is only .134 thick and not subject to examination).
| |
| 6 Suction Line from Condensate Storage Tank (Figure B-90). This piping is pressure/temperature exempt because it is highly unlikely that it would ever exceed the prescribed pressure/temperature. Therefore, examination of piping welds and integrally welded attachments are not required. (Note: Even if this piping was considered as non-exempt this HAB piping is only .134 thick and not subject to examination).
| |
| 2 and 4 piping (Figure B-91) - Size exempt.
| |
| H2 Basis Doc - Class 2 Page 32 of 33 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 2 COMPONENTS 4 Steam Supply (Figure B-95) - This piping is size exempt; therefore, examination of piping welds and integrally welded attachments in not required.
| |
| 3 and 4 Steam Supply (Figure B-96) - This piping is size exempt; therefore, examination of piping welds and integrally welded attachments in not required.
| |
| 4 Pump Discharge Line - This piping is size exempt; therefore, examination of piping welds and integrally welded attachments in not required.
| |
| Table 19 Class S Non-Exempt RCIC Integrally Welded Attachments Welded Attachment I3/P1 I3/P2 13/P3 I4/P1 I4/P2 I4/P3 2E51-2RCIC-10-TD-3PL-1 THRU 4 2E51-2RCIC-10-TD-7PS-1 2R16 X 2E51-2RCIC-10-TD-7PS-2 2E51-2RCIC-10-TD-9PS-1 THRU 4 2E51-2RCIC-10-TD-12PS-1 AND 2 H2 Basis Doc - Class 2 Page 33 of 33 Rev. 1
| |
| | |
| Southern Nuclear operating Company Page 1 - 1 111012006 Code Compliance Scheduling Summary - 4th Interval IS1 - Code Edition - 2001 Edition with 2003 Addenda PERIOD 1 PERIOD 2 PERIOD 3 PERCENT ACTUAL ROUND TOTAL ACTUAL ROUND ACTUAL ROUND ACTUAL ROUND CAT ITEM CODECASE POPULATION REQUIRED REQUIRED UP EXAMS COUNT PERIOD UP COUNT PERIOD UP COUNT PERIOD UP C-A C1.10 4 50% 2 2 2 1 50.00% 50% 0 50.00% 50% 1 100.00% 100%
| |
| C-A C1.20 2 50% 1 1 1 0 0% 0% 1 100.00% 100% 0 100.00% 100%
| |
| Total: 6 3 3 3 1 33.30% 34% 1 66.60% 67% 1 100% 100%
| |
| Rev. 1.0
| |
| | |
| Southern Nuclear Operating Company Page I - 1111012006 Code Compliance Scheduling Summary - 4th Interval IS1 - Code Edition - 2001 Edition with 2003 Addenda PERIOD 1 PERIOD 2 PERIOD 3 PERCENT ACTUAL ROUND TOTAL ACTUAL ROUND ACTUAL ROUND ACTUAL ROUND CAT ITEM CODECASE POPULATION REQUIRED REQUIRED UP EXAMS COUNT PERIOD UP COUNT PERIOD UP COUNT PERIOD UP C-B C2.21 4 50% 2 2 2 1 50.00% 50% 0 50.00% 50% 1 100.00% 100%
| |
| C-B C2.22 4 50% 2 2 2 0 0% 0% 1 50.00% 50% 1 100.00% 100%
| |
| Total. 8 4 4 4 1 25% 25% 1 50% 50% 2 100% 100%
| |
| Rev. 1.O
| |
| | |
| Southern Nuclear Operating Company Page 1 - 1111012006 Code Compliance Scheduling Summary - 4th Interval IS1 - Code Edition - 2001 Edition with 2003 Addenda PERIOD 1 PERIOD 2 PERIOD 3 PERCENT ACTUAL ROUND TOTAL ACTUAL ROUND ACTUAL ROUND ACTUAL ROUND CAT ITEM CODECASE POPULATION REQUIRED REQUIRED UP EXAMS COUNT PERIOD UP COUNT PERIOD UP COUNT PERIOD UP C-C C3.10(2) 16 6.25% 1 1 1 1 100.00% 100% 0 100.00% 100% 0 100.00% 100%
| |
| C-C C3.20 150 10% 15 15 16 5 33.33% 34% 6 73.33% 74% 5 106.67% 107%
| |
| Total: 166 16 16 17 6 37.50% 38% 6 75% 75% 5 106.00% 106%
| |
| Rev. 1.0
| |
| | |
| d Southern Nuclear Operating Company Page 1 - 1111012006 Code Compliance Scheduling Summary - 4th Interval IS1 - Code Edition - 2001 Edition with 2003 Addenda PERIOD 1 PERIOD 2 PERIOD 3 PERCENT ACTUAL ROUND TOTAL ACTUAL ROUND ACTUAL ROUND ACTUAL ROUNI CAT ITEM CODECASE POPULATION REQUIRED REQUIRED UP EXAMS COUNT PERIOD UP COUNT PERIOD UP COUNT PERIOD UP C-F-2 C5.51CPI 49 7.50% 3.68 4 5 2 54.35% 50% 1 81.52% 75% 2 135.87% 125%
| |
| C-F-2 C5.51 CS 187 7.50% 14.03 15 15 6 42.77% 40% 2 57.02% 54%
| |
| C-F-2 C5.51 FW 5 7.50% 0.38 1 1 0 0% 0% 0 0.00% 0%
| |
| C-F-2 C5.51HPCI 187 7.50% 14.03 15 15 7 49.89% 47% 5 85.53% 80%
| |
| C-F-2 C5.51 MS 154 7.50% 11.55 12 12 2 17.32% 17% 5 60.61 % 59%
| |
| C-F-2 C5.51 RCIC 16 7.50% 1.2 2 1 0 0% 0% 0 0.00% 0%
| |
| C-F-2 C5.51 RHR 486 7.50% 36.45 37 38 14 38.41% 38% 10 65.84% 65%
| |
| C-F-2 C5.51TDP 7 7.50% 0.53 1 0 0 0% 0% 0 0.00% 0%
| |
| C-F-2 C5.81CPI 2 7.50% 0.15 1 1 1 666.67% 100% 0 666.67% 100%
| |
| C-F-2 C5.81CS 12 7.50% 0.9 1 1 0 0% 0% 1 111.11% 100%
| |
| C-F-2 C5.81 FW 1 7.50% 0.08 1 0 0 0% 0% 0 0.00% 0%
| |
| C-F-2 C5.81HPCI 8 7.50% 0.6 1 1 1 166.67% 100% 0 166.67% 100%
| |
| C-F-2 C5.81 MS 10 7.50% 0.75 1 0 0 0% 0% 0 0.00% 0%
| |
| C-F-2 C5.81 RCIC 2 7.50% 0.15 1 0 0 0% 0% 0 0.00% 0%
| |
| C-F-2 C5.81 RHR 45 7.50% 3.38 4 4 0 0% 0% 2 59.17% 50%
| |
| Total: 1171 88 97 94 33 37.50% 34% 26 67.00% 61%
| |
| The required percentage for each period is based on Table IWC-2412-1 and applies only to the total, not each item number.
| |
| Only 88 total C-F-2 examinations are required. 94 were scheduled to allow flexibility to drop an exam during an outage if needed.
| |
| Rev. 1.0
| |
| | |
| Revision: 1 3
| |
| HNP-2 Fourth Interval Class 2 IS1 Plan Page I - I 81312006 1 Southern Nuclear Operating Company Period 1 Period 2 Period 3 Category, Iso No. m o F N m IternNO, Cornp. Desc. 2 2 2 2 2 Class Summary IComplD ISystem Scope IMethod IProcedure Code Case 5 5 L N 5 5 C-A H2 2E11UHX-A-1 ISIIUTI B-1 IS1 C1.20 2E11 UHX-A-1 SHELL HEAD TO UPPER SHELL RING AUG 2 El1 OWN PRE C -A H2 2E11 UHX-A-2 ISIIUTI 8-1 IS1 C1.10 2E11 UHX-A-2 RING AUG 2 El1 OWN PRE C-A H2 2E11 UHX-A-3 ISllUTl B-1 IS1 C1.10 2E11 UHX-A-3 LOWER SHELL RING TO FLANGE AUG 2 El1 OWN PRE C -A H2 2E11UHX-B-1 8-1 IS1 C1.20 2E11 UHX-B-1 SHELL HEAD TO UPPER SHELL RING AUG 2 El1 OWN PRE C -A H2 2E11 UHX-B-2 B-1 IS1 C1 . I 0 2E11 UHX-B-2 RING AUG 2 El1 OWN
| |
| .PRF
| |
| . .-
| |
| C -A H2 2E11 UHX-B-3 B-1 IS1 C1.10 2E11 UHX-B-3 LOWER SHELL RING TO FLANGE AUG 2 E lI OWN
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 2 IS1 Plan Southern Nuclear Operating Company Page I- I 8/3/2006 1 Period 1 Period 2 Period 3 I
| |
| Category, Iso No.
| |
| ItemNO. Comp. Desc.
| |
| Class Summary 1ComplD 1System Scope IMethod IProcedure Code Case C-B H2 2E11PHX-A-I B-1A IS1 C2.21 2E11 PHX-A-I INLET NOZZLE TO RHR HX SHELL AUG 2 El1 OWN PRE C -B HZ 2E11PHX-A-I-IRS B-1A IS1 C2.22 2E11 PHX-A-I-IRS INLET NOZZLE INNER RADIUS AUG 2 El1 OWN PRE C-B H2 2E11 PHX-A-0 ISllMTl B-1A IS1 C2.21 2E11 PHX-A-0 ISllUTl RHR HX SHELL TO OUTLET NOZZLE AUG 2 El1 OWN PRE C-B H2 2EllPHX-A-0-IRS ISllUTl B-1A IS1 C2.22 2E11 PHX-A-0-IRS OUTLET NOZZLE INNER RADIUS AUG 2 El1 OWN PRE C-B H2 2EllPHX-B-I ISIIMTI B-1 B IS1 C2.21 2E11 PHX-B-I ISIIUTI INLET NOZZLE TO RHR HX SHELL AUG 2 El1 OWN PRE C-B H2 2E11PHX-B-I-IRS lSllUT1 B-1 B IS1 C2.22 2E11 PHX-B-I-IRS INLET NOZZLE INNER RADIUS AUG 2 El1 OWN PRE C-B H2 2E11PHX-B-0 B-1 B IS1 C2.21 2E11 PHX-B-0 RHR HX SHELL TO OUTLET NOZZLE AUG 2 E l1 OWN PRE C-B H2 2E11 PHX-B-0-IRS B-1 B IS1 C2.22 2E11 PHX-B-0-IRS OUTLET NOZZLE INNER RADIUS AUG 2 El1 OWN PRE
| |
| | |
| 3 Revision: 1 HNP-2 Fourth Interval Class 2 IS1 Plan Southern Nuclear Operating Company Page 1 - 17 81312006 1 Period 1 Period 2 Period 3 Category, Iso No. m o F N o ItemNO, Cornp. Desc. 2 2 2 2 2 Class Summary I ComplD I System Scope I Method I Procedure Code Case 5 z 5 5 5 I
| |
| C -C H2 2E11 EHX-A-2s-1 - - - - - - - - - - - -
| |
| C3.1O(2) 2E11 QHX-A-2s-1 UPPER SHELL RING SUPPORT AIJG - - - - - - - - - - - -
| |
| 2 E lI OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C H2 2E11 EHX-A-2s-2 B-1 IS1 - - - - - - - - - - - -
| |
| C3.1 O(2) 2EllQHX-A-2s-2 UPPER SHELL RING SUPPORT AUG - - - - - - - - - - - -
| |
| 2 E l1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C H2 2E11EHX-A-2s-3 B-1 IS1 - - - - - - - - - - - -
| |
| C3 10(2) 2E11 QHX-A-2s-3 UPPER SHELL RING SUPPORT AUG - - - - - - - - - - - -
| |
| 2 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C H2 2E11 QHX-A-2s-4 ISllMTl B-1 IS1 - s - - - - - - - - - -
| |
| C3.1 O(2) 2E11 QHX-A-2s-4 UPPER SHELL RING SUPPORT AIJG - - - - - - - - - - - -
| |
| 2 El1 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C-C H2 2E11 QHX-A-3s-1 B-1 IS1 - - - - - - - - - - - -
| |
| C3.10(2) 2E1 IEHX-A-3s-1 LOWER SHELL RING SUPPORT AIJG - - - - - - - - - - - -
| |
| 2 E lI om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C H2 2E11QHX-A-3s-2 B-1 IS1 - - - - - - - - - - - -
| |
| C3.1O(2) 2E11 QHX-A-3s-2 LOWER SHELL RING SUPPORT AUG - - - - - - - - - - - -
| |
| 2 El1 om - - - - - - - - - - - -
| |
| -
| |
| PRE - - - - - - - - - - - -
| |
| C -C H2 2E11 EHX-A-3s-3 B-1 IS1 - - - - - - - - - - - -
| |
| C3.1O(2) 2E11 QHX-A-3s-3 LOWER SHELL RING SUPPORT AUG - - - - - - - - - - - -
| |
| 2 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C H 2 2E11QHX-A-3s-4 8-1 IS1 - - - - - - - - - - - -
| |
| C3.10(2) 2EllQHX-A-3s-4 LOWER SHELL RING SUPPORT AIJG - - - - - - - - - - - -
| |
| 2 E l1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C H2 2E11 EHX-B-2s-1 B-1 IS1 - - - - - - - - - - - -
| |
| C3.1 O(2) 2E11 EHX-B-2s-1 UPPER SHELL RING SUPPORT AIJG - - - - - - - - - - - -
| |
| 2 E lI om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C H2 2E1 IEHX-B-2s-2 B-1 IS1 - - - - - - - - - - - -
| |
| C3.1 O(2) 2E11 EHX-B-2s-2 UPPER SHELL RING SUPPORT AUG - - - - . - - - - - - -
| |
| 2 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 2 IS1 Plan Southern Nuclear Operating Company Page 2 - 17 81312006 1 Period 1 Period 2 Period 3 Category, Iso No. o r ItemNO, Comp. Desc. z 2 N a
| |
| Class Summary I ComplD I System Scope I Method I Procedure Code Case 5 5 5 5 5 C-C H2 2E11 QHX-B-2s-3 B-1 IS1 - - - - - - - - - - - -
| |
| C3 1O(2) 2E11 QHX-B-2s-3 UPPER SHELL RING SUPPORT AUG - - - - - - - - - - - -
| |
| 2 E lI om - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| C-C H2 2E11 QHX-B-2s-4 8-1 IS1 - - - - - - - - - - - -
| |
| C3.1 O(2) 2E11 QHX-B-2s-4 UPPER SHELL RING SUPPORT AUG - - - - - - - - - - - -
| |
| 2 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C-C H2 2E11QHX-B-3s-1 B-1 IS1 - - - - - - - - - - - -
| |
| C3 lO(2) 2E11QHX-B-3s-1 LOWER SHELL RING SUPPORT AUG - - - - - - - - - - - -
| |
| 2 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C-C H2 2E11 QHX-B-3s-2 B-1 IS1 - - - - - - - - - - - -
| |
| C3 lO(2) 2E11QHX-B-3s-2 LOWER SHELL RING SUPPORT AUG - - - - - - - - - - - -
| |
| 2 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C-C H2 2E1 IQHX-B-3s-3 B-1 IS1 - - - - - - - - - - - -
| |
| C3 1O(2) 2E1 1QHX-B-3s-3 LOWER SHELL RING SUPPORT AUG - - - - - - - - - - - -
| |
| 2 ElI om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C-C H2 2EllQHX-B-3s-4 B-1 IS1 - - - - - - - - - - - -
| |
| C3 lO(2) 2EllQHX-B-3s-4 LOWER SHELL RING SUPPORT AUG - - - - - - - - - - - -
| |
| 2 ElI om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C-C H2 2E11-2RHR-16A-DS-7APL-1 THRU 8 B-14 IS1 - - - - - - - - - - - -
| |
| C3 20 2E11-2RHR-16A-DS-7APL-1 THRU 8 2E11 -RHR-H321 AUG - - - - - - - - - - - -
| |
| 2 El1 om - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| C -C H2 2E11-2RHR-16A-DS-7APS-1 AND 2 ISllMTl 0-1 4 IS1 - s - - - - - - - - - -
| |
| C3 20 2E11-2RHR-16A-DS-7APS-1 AND 2 2E11 -RHR-H321 AUG - - - - - - - - - - - -
| |
| 2 El1 om - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| C-C H2 2E11-2RHR-16A-DS-7PS B-14 IS1 - - - - - - - - - - - -
| |
| C3 20 2E11-2RHR-16A-DS-7PS 2E11 -RHR-R327 AUG - - - - - - - - - - - -
| |
| 2 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C-C H2 2E11-2RHR-16A-HXI-2PL-5 THRU 8 B-26 IS1 - - - - - - - - - - - -
| |
| C3 20 2E11-2RHR-l6A-HXI-2PL-5 THRU 8 2E11-2RHR-R250 AUG - - - - - - - - - - - -
| |
| 2 El1 om - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| | |
| 4 Revision: 1 3
| |
| HNP-2 Fourth Interval Class 2 IS1 Plan Page 3 - 17 d
| |
| 81312006 1 Southern Nuclear Operating Company Period 1 Period 2 Period 3 Category, Iso No. m o y N ~3 ItemNO, Comp. Desc. 2 2 2 2 2 Class Summary I ComplD I System Scope I Method I Procedure Code Case z 5 5 5 5 C -C H2 2E11-2RHR-l6A-PD-C-3PL-1 THRU 4 8-29 IS1 - - - - - - - - - - - -
| |
| C3.20 2E11-2RHR-16A-PD-C-3PL-1 THRU 4 2Ell-RHR-HI80 AUG - - - - - - - - - - - -
| |
| 2 El1 o w - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C H2 2E11-2RHR-16A-SH-6PL-1 THRU 8 B-17 IS1 - - - - - - - - - - - -
| |
| C3.20 2E11-2RHR-16A-SH-6PL-1 THRU 8 2E11 -RHR-R91 AUG - - - - - - - - - - - -
| |
| 2 El 1 o w - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C H2 2E11-2RHR-16B-DS-5PL-1 THRU 8 0-18 IS1 - - - - - - - - - - - -
| |
| C3.20 2E11-2RHR-16B-DS-5PL-1 THRU 8 2Ell-RHR-R129 AUG - - - - - - - - - - - -
| |
| 2 El1 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C-C H2 2E11-2RHR-16B-DS-8PS-1 THRU 3 B-18 IS1 - - - - - - - - - - - -
| |
| C3.20 2E11-2RHR-168-DS-8PS-1 THRU 3 2 E l l -RHR-A58 AUG - - - - - - - - - - - -
| |
| 2 El1 o w - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C H2 2E11-2RHR-168-HXI-2PL-1 THRU 4 8-30 IS1 - - - - - - - - - - - -
| |
| C3.20 2E11-2RHR-16B-HXI-2PL-1 THRU 4 2Ell-RHR-R269 AUG - - - - - - - - - - - -
| |
| 2 El1 o w - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C H2 2E11-2RHR-l6B-HXI-2PL-5 THRU 8 8-30 IS1 - - - - - - - - - - - -
| |
| C3.20 2E11-2RHR-16B-HXI-2PL-5 THRU 8 2Ell-2RHR-R269 AUG - - - - - - - - - - - -
| |
| 2 ElI o w - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C-C H2 2E11-2RHR-16B-SH-6PL-1 THRU 8 8-21 IS1 - - - - - - - - - - - -
| |
| C3.20 2E11-2RHR-16B-SH-6PL-1 THRU 8 2Ell-RHR-R103 AUG - - - - - - - - - - - -
| |
| 2 El1 o w - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C H2 2E11-2RHR-16B-SH-6PS-1 AND 2 8-21 IS1 - - - - - - - - - - - -
| |
| C3.20 2E11-2RHR-16B-SH-6PS-1 AND 2 2 E l I-RHR-R103 AUG - - - - - - - - - - - -
| |
| 2 El1 o w - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C H2 2E11-2RHR-16B-SH-8PS B-21 IS1 - - - - - - - - - - - -
| |
| C3.20 2El1-2RHR-16B-SH-8PS 2 E l l -RHR-H68 AUG - - - - - - - - - - - -
| |
| 2 ElI OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C H 2 2E11-2RHR-20A-D-IOPL-1 THRU 4 B-35 IS1 - - - - - - - - - - - -
| |
| C3 20 2E11-2RHR-20A-D-1OPL-1 THRU 4 2Ell-RHR-HI63 AUG - - - - - - - - - - - -
| |
| 2 ElI OWN - - - - - - - - - - - -
| |
| PRE - - . - . - - - - - - -
| |
| | |
| u Revision: 1 HNP-2 Fourth Interval Class 2 IS1 P l a n Page 4 - 17 3
| |
| 8/3/2006 1 S o u t h e r n Nuclear Operating C o m p a n y
| |
| : Category, ItemNO, Iso No.
| |
| Comp. Desc.
| |
| o) z 2 Period 1 o .-2 Period 2 N
| |
| 2 2 Period 3 O
| |
| Class Summary I ComplD I System Scope I Method I Procedure Code Case 5 5 5 5 5 C -C H2 2E11-2RHR-20A-D-10PL-5 THRU 12 6-35 IS1 - - - - - - - - - - - -
| |
| C3 20 2E11-2RHR-20A-D-1 OPL-5 THRU 12 2 E l l -RHR-R231 AUG - - - - - - - - - - - -
| |
| 2 E lI o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C H2 2E11-2RHR-20A-D-1 PS-1 THRU 4 6-35 IS1 - - - - - - - - - - - -
| |
| C3 20 2E11-2RHR-20A-D-1 PS-1 THRU 4 2E11-RHR-HR165 -. AUG - - - - - - - - - - - -
| |
| 2 E lI o m - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C H2 2E11-2RHR-20A-PD-A-1 PL-1 THRU 4 6-28 IS1 - - - - - - - - - - - -
| |
| C3 20 2E11-2RHR-20A-PD-A-1 PL-1 THRU 4 2E11-RHR-HI82 AUG - - - - - - - - - - - -
| |
| 2 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C H2 2E11-2RHR-20A-PD-A-8PS-1 AND 2 8-28 IS1 - - - - - - - - - - - -
| |
| C3 20 2E11-2RHR-20A-PD-A-8PS-1 AND 2 2E11-RHR-R375 AUG - - - - - - - - - - - -
| |
| 2 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C H2 2E11-2RHR-20A-PD-C-5PS 6-29 IS1 - - - - - - - - - - - -
| |
| C3 20 2E11-2RHR-20A-PD-C-5PS 2E11-RHR-HI79 AUG - - - - - - - - - - - -
| |
| 2 El1 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C H2 2E11-2RHR-20A-PD-C-8PL-1 THRU 4 8-29 IS1 - - - - - - - - - - - -
| |
| C3 20 2E11-2RHR-20A-PD-C-8PL-1 THRU 4 2Ell-RHR-R374 AUG - - - - - - - - - - - -
| |
| 2 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C-C H2 2E11-2RHR-20B-BP-1 PS-1 8-34 IS1 - - - - - - - - - - - -
| |
| C3 20 2E11-2RHR-20B-BP-1 PS-1 2Ell-RHR-H98 AUG - - - - - - - - - - - -
| |
| 2 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C-C H2 2E11-2RHR-20B-BP-IPS-2 B-34 IS1 - - - - - - - - - - - -
| |
| C3 20 2E11-2RHR-20B-BP-1 PS-2 2 E l l -RHR-A50 AUG - - - - - - - - - - - -
| |
| 2 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C-C H2 2E11-2RHR-206-0-11 PL-1 THRU 4 6-36 IS1 - - - - - - - - - - - -
| |
| C3 20 2E11-2RHR-206-D-11 PL-1 THRU 4 2 E l l -RHR-HI69 AUG - - - - - - - - - - - -
| |
| 2 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C H2 2E11-2RHR-206-0-11 PL-5 THRU 12 6-36 IS1 - . - - - - - - - - - -
| |
| C3 20 2E11-2RHR-206-D-11 PL-5 THRU 12 2E11 -RHR-R241 AUG - - - - - - . - - - - -
| |
| 2 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| | |
| r) 3 d Revision: 1 HNP-2 Fourth Interval Class 2 IS1 Plan Southern Nuclear Operating Company Page 5 - 17 8/3/2006 1 Period 1 Period 2 Period 3 Category, Iso No. O) o v- N m ItemNO, Comp. Desc. 2 2 2 2 2 Class Summary I ComplD I System Scope I Method I Procedure Code Case 5 5 5 5 5 C -C H2 2E11-2RHR-208-PD-8-1 PL-1 THRU 4 8-32 ISI - - - - - - - - - - - -
| |
| C3.20 2E11-2RHR-208-PD-8-1 PL-1 THRU 4 2E11-RHR-HI90 AUG - - - - - - - - - - - -
| |
| 2 E lI om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C HZ 2E11-2RHR-208-PD-8-8PL-1 THRU 4 8-32 IS1 - - - - - - - - - - - -
| |
| C3.20 2E11-2RHR-208-PD-8-8PL-1 THRU 4 2E11 -RHR-R378 AUG - - - - - - - - - - - -
| |
| 2 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C HZ 2E11-2RHR-208-PD-D-5PS 8-33 IS1 - - - - - - - - - - - -
| |
| C3 20 2E11-2RHR-208-PD-D-5PS 2E11-RHR-HI87 AUG - - - - - - - - - - - -
| |
| 2 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C H2 2E11-2RHR-208-PD-D-8PL-1 THRU 4 8-33 IS1 - - - - - - - - - - - -
| |
| C3.20 2E11-2RHR-208-PD-D-8PL-1 THRU 4 2E11 -RHR-R377 AUG - - - - - - - - - - - -
| |
| 2 El1 om - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| C -C HZ 2E11-2RHR-20C-D-1OPL-1 THRU 4 8-37 IS1 - - - - - - - - - - - -
| |
| C3.20 2E11-2RHR-20C-D-1OPL-1 THRU 4 2E11-RHR-HI68 AUG - - - - - - - - - - - -
| |
| 2 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C HZ 2E11-2RHR-20C-D-3PS-1 AND 2 8-37 IS1 - - - - - - - - - - - -
| |
| C3.20 2E11-2RHR-20C-D-3PS-1 AND 2 2E11-RHR-HI67 AUG - - - - - - - - - - - -
| |
| 2 ElI om - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| C -C H2 2E11-2RHR-20C-D-5PS-1 AND 2 8-37 IS1 - - - - - - - - - - - -
| |
| C3.20 2E11-2RHR-20C-D-5PS-1 AND 2 2Ell-RHR-R238 AUG - - - - - - - - - - - -
| |
| 2 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C H 2 2E11-2RHR-20D-D-1OPL-1 THRU 4 lSllMTl 8-38 IS1 - - - - s - - - - - - -
| |
| C3.20 2E11-2RHR-20D-D-1 OPL-1 THRU 4 2E11-RHR-HI74 AUG - - - - - - - - - - - -
| |
| 2 El1 om - - - - - - - - - - - -
| |
| pRE - - - - - - - - - - - -
| |
| C -C H 2 2E11-2RHR-20D-D-3PS-1 AND 2 8-38 IS1 - - - - - - - - - - - -
| |
| C3.20 2E11-2RHR-20D-D-3PS-1 AND 2 2E11-RHR-HI73 AUG - - - - - - - - - - - -
| |
| 2 El1 om - - - - - - - - - - - -
| |
| PRE - . - - - - - - - - - -
| |
| C -C HZ 2E11-2RHR-20D-D-5PS-1 AND 2 8-38 IS1 - - - - - - - - - - - -
| |
| C3.20 2E11-2RHR-20D-D-5PS-1 AND 2 2E11 -RHR-R245 AUG - - - - - - . - - - - -
| |
| 2 ElI om - - - - - - . - - - - -
| |
| pRE - - - - - - - . - - - -
| |
| | |
| b Revision: 1 HNP-2 Fourth Interval Class 2 IS1 Plan Southern Nuclear Operating Company I Period 1 Period 2 Period 3 Category, Iso No.
| |
| ItemNO, Comp. Desc.
| |
| Class Summary I ComplD I System Scope I Method I Procedure Code Case
| |
| - - --
| |
| C-C H 2 2E11-2RHR-20-RS-2PL-1 THRU 4 ISIIMTI 6-39 IS1 C3.20 2E11-2RHR-20-RS-2PL-1 THRU 4 2Ell-RHR-H314 AUG 2 E l1 OWN PRE C-C H 2 2E11-2RHR-20-RS-2PS-1 AND 2 6-39 IS1 C3.20 2E11-2RHR-20-RS-2PS-1 AND 2 2 E l l -RHR-R317 AUG 2 E l1 OWN PRE C-C H 2 2E11-2RHR-20-RS-5PL-1 THRU 8 6-39 IS1 C3.20 2E11-2RHR-20-RS-5PL-1 THRU 8 AUG 2 El1 OWN PR E C-C H 2 2E11-2RHR-24A-BP-7PS-1 AND 2 6-40 IS1 C3.20 2E11-2RHR-24A-BP-7PS-1 AND 2 2E11 -RHR-A177 AUG 2 E l1 OWN PRE C-C H 2 2E11-2RHR-24A-HXI-4PS-1 AND 2 6-41 IS1 C3.20 2E11-2RHR-24A-HXI-4PS-1 AND 2 2El1-RHR-HI76 AUG 2 E l1 OWN PRE C-C H2 2E11-2RHR-24A-TS-A-1OPS-1 THRU 3 6-42 IS1 C3.20 2E11-2RHR-24A-TS-A-1 OPS-1 THRU 3 2E11-RHR-HI57 AUG 2 El1 OWN PRE C-C H2 2E11-2RHR-24A-TS-A-1 OPS-4 6-42 IS1 C3.20 2E11-2RHR-24A-TS-A-1 OPS-4 2Ell-RHR-R225 AUG 2 E l1 OWN PRE C -C H 2 2E11-2RHR-24A-TS-A-12PS-1 AND 2 6-42 IS1 C3.20 2E11-2RHR-24A-TS-A-12PS-1 AND 2 2Ell-RHR-H719 AUG 2 E l1 OWN PRE C-C HZ 2E11-2RHR-24A-TS-A-12PS-3 AND 4 6-42 IS1 C3.20 2E11-2RHR-24A-TS-A-12PS-3 AND 4 2E11 -RHR-R226 AUG 2 E l1 OWN PRE C-C HZ 2E11-2RHR-24A-TS-A-17PS 6-43 IS1 C3.20 2E11-2RHR-24A-TS-A-17PS 2Ell-RHR-HI55 AUG 2 El1 OWN PRE
| |
| | |
| 3 3 d Revision: 1 HNP-2 Fourth Interval Class 2 IS1 Plan Southern Nuclear Operating Company Page 7 - 17 8/3/2006 (
| |
| Period 1 Period 2 Period 3 Category, Iso No.
| |
| ItemNO, Comp. Desc. lx a
| |
| lx F
| |
| 2 N
| |
| 2 2 o
| |
| Class Summary I ComplD I System Scope I Method I Procedure Code Case 5 5 5 5 5 C -C H2 2E11-2RHR-24A-TS-A-4PS 8-42 IS1 - - - - - - - - - - - -
| |
| C3.20 2E11-2RHR-24A-TS-A-4PS 2Ell-RHR-H715 AUG - - - - - - - - - - - -
| |
| 2 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C H2 2E1 I-2RHR-24A-TS-A-6PS 8-42 IS1 - - - - - - - - - - - -
| |
| C3.20 2E11-2RHR-24A-TS-A-6PS 2E11-RHR-HI58 AUG - - - - - - - - - - - -
| |
| 2 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C H2 2E11-2RHR-24A-TS-C-1 OPS-1 AND 2 8-44 IS1 - - - - - - - - - - - -
| |
| C3.20 2E11-2RHR-24A-TS-C-1 OPS-1 AND 2 2E11-RHR-HIS0 AUG - - - - - - - - - - - -
| |
| 2 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C H2 2E11-2RHR-24A-TS-C-IOPS-3 AND 4 8-44 IS1 - - - - - - - - - - - -
| |
| C3.20 2E11-2RHR-24A-TS-C-1 OPS-3 AND 4 2E11-RHR-R221 AUG - - - - - - - - - - - -
| |
| 2 El1 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C H2 2E11-2RHR-24A-TS-C-15PL-1 THRU 4 8-44 IS1 - - - - - - - - - - - -
| |
| C3.20 2El1-2RHR-24A-TS-C-15PL-1 THRU 4 2 E l l -RHR-HR149 AUG - - - - - - - - - - - -
| |
| 2 El1 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C H2 2E11-2RHR-248-BP-7PS lSllMT1 8-46 IS1 - - - - s - - - - - - -
| |
| C3.20 2E11-2RHR-24B-BP-7PS 2El I-RHR-A185 AUG - - - - - - - - - - - -
| |
| 2 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C H2 2E11-2RHR-248-HXI-4PS 8-47 IS1 - - - - - - - - - - - -
| |
| C3 20 2E11-2RHR-24B-HXI-4PS 2E11-RHR-HI84 AUG - - - - - - - - - - - -
| |
| 2 El1 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C H2 2E11-2RHR-248-TS-8-IOPS-1 THRU 3 8-48 IS1 - - - - - - - - - - - -
| |
| C3.20 2E11-2RHR-24B-TS-8-1 OPS-1 THRU 3 2E11-RHR-HI61 AUG - - - - - - - - - - - -
| |
| 2 El1 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C H2 2E11-2RHR-248-TS-8-1 OPS-4 8-48 IS1 - - - - - - - - - - - -
| |
| C3.20 2E11-2RHR-24B-TS-8-1 OPS-4 2 E l l -RHR-R229 AUG - - - - - - - - - - - -
| |
| 2 El1 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C H2 2E11-2RHR-248-TS-8-12PS-1 AND 2 8-48 IS1 - - - - - - - - - - - -
| |
| C3.20 2E11-2RHR-24B-TS-8-12PS-1 AND 2 2E11-RHR-H718 AUG - - - - - - - - - - - -
| |
| 2 El1 OWN - . - - - - - . - - - -
| |
| pRE - - - - - - - - - - - -
| |
| | |
| Revision: 1 HNP-2 Fourth Interval Class 2 IS1 Plan Southern Nuclear Operating Company Period 1 Period 2 Period 3 Category, lso No. r ItemNO, Comp. Desc. 2 Class Summary I ComplD I System Scope I Method I Procedure Code Case 5 C-C H2 2E11-2RHR-24B-TS-B-12PS-3 AND 4 8-48 IS1 C3 20 2E11-2RHR-248-TS-B-12PS-3 AND 4 2 E l l-RHR-R233 AUG 2 El1 OWN PRE C -C H 2 2E11-2RHR-246-TS-6-17PS 8-49 IS1 C3.20 2Ell-2RHR-248-TS-B-17PS 2El l-RHR-HI59 AUG 2 El1 OWN PRE C -C H 2 2E11-2RHR-24B-TS-B-4PS 8-48 IS1 C3.20 2Ell-2RHR-248-TS-B-4PS 2 E l l -RHR-H714 AUG 2 El1 OWN PRE C -C H2 2E11-2RHR-24B-TS-B-6PS 8-48 IS1 C3.20 2E11-2RHR-248-TS-B-6PS 2 E l 1-RHR-HI62 AUG 2 El1 OWN PRE C -C H 2 2E11-2RHR-24B-TS-D-IOPS-1 AND 2 8-50 IS1 C3.20 2E11-2RHR-248-TS-D-1OPS-1 AND 2 2El l-RHR-HI53 AUG 2 El1 OWN PRE C -C H2 2E11-2RHR-24B-TS-D-10PS-3 AND 4 8-50 IS1 C3.20 2E11-2RHR-248-TS-D-1OPS-3 AND 4 2 E l 1-RHR-R222 AUG 2 El1 OWN PRE C -C H2 2E11-2RHR-24B-TS-D-15PS-1 AND 2 8-50 IS1 C3.20 2E11-2RHR-248-TS-D-15PS-1 AND 2 2 E l 1-RHR-H717 AUG 2 El1 OWN PRE C -C H2 2E11-2RHR-6A-RVD-12PL-1 THRU 8 8-1 5 IS1 C3.20 2E11-2RHR-6A-RVD-12PL-1 THRU 8 2 E l l-RHR-R291 AUG 2 El1 OWN PRE C -C H2 2E11-2RHR-6A-RVD-14PL-1 THRU 8 8-1 5 IS1 C3.20 2E11-2RHR-6A-RVD-14PL-1 THRU 8 2E11 -RHR-R292 AUG 2 El1 OWN PRE C -C H 2 2E11-2RHR-6A-RVD-1 PL-1 THRU 4 8-1 5 IS1 C3.20 2E11-2RHR-6A-RVD-1 PL-1 THRU 4 AUG 2 El1 OWN PRE
| |
| | |
| 3 Revision: 1 w
| |
| HNP-2 Fourth Interval Class 2 IS1 Plan Page 9 - 17 3
| |
| 8/3/2006 1 Southern Nuclear Operating Company Period 1 Period 2 Period 3 Category, Iso No. m o r N -
| |
| ItemNO, Cornp. Desc. 2 2 2 2 2 Class Summary ICornplD ISystem Scope IMethod IProcedure Code Case 5 5 5 5 5 C -C H2 2E11-2RHR-6A-RVD-7PL-1 THRU 8 6-1 5 IS1 - - - - - - - - - - - -
| |
| C3.20 2E11-2RHR-6A-RVD-7PL-1 THRU 8 2Ell-RHR-R290 AUG - - - - - - - - - - - -
| |
| 2 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C H2 2E11-2RHR-6A-TSP-5PL-1 THRU 8 6-1 7 IS1 - - - - - - - - - - - -
| |
| C3.20 2E11-2RHR-6A-TSP-5PL-1 THRU 8 2Ell-RHR-R93 AUG - - - - - - - - - - - -
| |
| 2 El1 OWN - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C-C H2 2E11-2RHR-6A-TSP-5PS-1 AND 2 6-1 7 IS1 - - - - - - - - - - - -
| |
| C3.20 2E11-2RHR-6A-TSP-5PS-1 AND 2 2E11 -RHR-R93 AUG - - - - - - - - - - - -
| |
| 2 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C H2 2E11-2RHR-66-RVD-12PL-1 THRU 8 6-1 9 IS1 - - - - - - - - - - - -
| |
| C3.20 2E11-2RHR-66-RVD-12PL-1 THRU 8 2Ell-RHR-R296 AUG - - - - - - - - - - - -
| |
| 2 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C H2 2E11-2RHR-66-RVD-14PL-1 THRU 8 6-1 9 IS1 - - - - - - - - - - - -
| |
| C3.20 2E11-2RHR-66-RVD-14PL-1 THRU 8 2Ell-RHR-R297 AUG - - - - - - - - - - - -
| |
| 2 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C-C H2 2E11-2RHR-66-RVD-3PL-1 THRU 4 ISllMTl 6-1 9 IS1 - - - - s - - - - - - -
| |
| C3.20 2E11-2RHR-66-RVD-3PL-1 THRU 4 2E11-RHR-HMO AUG - - - - - - - - - - - -
| |
| 2 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C-C H2 2E11-2RHR-66-RVD-8PL-1 THRU 8 6-1 9 IS1 - - - - - - - - - - - -
| |
| C3.20 2E11-2RHR-66-RVD-BPL-1 THRU 8 2Ell-RHR-R295 AUG - - - - - - - - - - - -
| |
| 2 El1 om - - - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C H2 2E11-2RHR-66-TSP-1 PS 8-21 IS1 - - - - - - - - - - - -
| |
| C3.20 2E11-2RHR-66-TSP-1 PS 2E11 -RHR-H70 AUG - - - - - - - - - - - -
| |
| 2 El1 OWN - . - - - - - - - - - -
| |
| PRE - - - - - - - - - - - -
| |
| C -C H2 2E11-2RHR-66-TSP-5PS-1 AND 2 6-21 IS1 - - - - - - - - - - - -
| |
| C3.20 2E11-2RHR-66-TSP-5PS-1 AND 2 2 E l I-RHR-H712 AUG - - - - - - - - - - - -
| |
| 2 El1 OWN - - - - - - - - - - - -
| |
| PRE . - - - - - - - - - - -
| |
| C -C H2 2E11-2RHR-66-TSP-5PS-3 AND 4 6-21 IS1 - - - - - - - - - - - -
| |
| 2E11 -RHR-R105 AUG - - - - - - - - - - - -
| |
| C3.20 2E11-2RHR-66-TSP-5PS-3 AND 4 om . - - - - - - - - - - -
| |
| 2 El1 PRE - - - - - - - - - - - -
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 3 COMPONENTS Scope The only Class 3 ISI examinations required by IWD are the examination of integrally welded attachments (of supports and restraints) to the pressure boundary of Class 3 piping and components. Class 3 piping and equipment are defined on the HNP-2 Boundary Diagrams listed below:
| |
| HB-21033 Plant Service Water HB-21035 Plant Service Water HB-21039 RHR Service Water HB-26000 Main Steam Relief Valve Lines HB-26019 Jockey Pump Seal Cooling HB-26046 Condensate Transfer HB-26050 Plant Service Water HB-26051 Plant Service Water For the 4th Interval, examinations are performed in accordance with IWD-1000 of the 2001 Edition of Section XI with Addenda through 2003. Therefore, the examination scope shall apply to Class 3 systems piping and equipment that support the following safety functions:
| |
| : 1. Reactor shutdown
| |
| : 2. Emergency core cooling
| |
| : 3. Containment heat removal
| |
| : 4. Atmosphere cleanup
| |
| : 5. Reactor residual heat removal.
| |
| : 6. Spent fuel pool residual heat removal.
| |
| Exemptions Per IWD-1220 not all of the integrally welded attachments are subject to examination -
| |
| some are exempt from the examination requirements. These are:
| |
| * Integral attachments of supports and restraints on piping that are NPS 4 and smaller.
| |
| * Integral attachments of supports and restraints on vessels, pump, and valves and their connections in piping NPS 4 and smaller.
| |
| * Integral attachments located on components in systems (or portions of systems) whose function is not required in support of reactor residual heat removal, containment heat removal, and emergency core cooling and that operate at a pressure equal to or less than 275 psig and at a temperature equal to or less than 2000F.
| |
| * Integral attachments that are inaccessible due to being encased in concrete, buried underground, located inside a penetration, or encapsulated by guard pipe.
| |
| Hatch 2 Basis Doc - Class 3 Page 1 of 4 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 3 COMPONENTS Plant Service Water (PSW) Evaluation Equipment required to be cooled during emergency conditions by PSW includes:
| |
| : 1. HB-21033 describes the Class 3 intake structure Division I and Division II Supply Piping. This is the source of all safety-relate PSW water to the essential components and thus must be included. All of the Class 3 piping is in the examination scope for welded attachments except for 4 and under piping. The 18 discharge from the PSW pumps and the Division I and Division II 30 headers are shown on C-29. C-28 shows the 30 Division I and II supply lines to the point where they go underground..
| |
| Also shown is the 30 dilution line out to MOV F310 (Class 0 beyond this valve).
| |
| After going underground, an 8 supply line from the 30 Division I supply line enters the Diesel Generator Building through the floor and supplies cooling water to Diesel Generator 2A as shown on C-46. Similarly, an 8 supply line from the 30 Division II supply line enters the Diesel Generator Building through the floor and supplies cooling water to Diesel Generator 2C as shown on C-46. C-45 shows the 6 return lines from the two diesel to the building floor.
| |
| The 6 Standby Diesel Service Water from the pump to the point it goes underground is shown on C-39. The 6 pipe from the Diesel Generator Building wall (coming from the underground piping) to the HNP-1 Diesel Generator 1B is shown on C-37.
| |
| C-38 shows the 6 return line from Diesel Generator 1B to the building floor.
| |
| : 2. HB-21035 shows a small portion of 6 line that is a header for the discharge side of the Essential LPCI Inverter Room Coolers. This header turns into Seismic II; therefore, this piping is not safety-related. (Note: H-26904 indicates that the PSW is Seismic I on the inlet side of the Inverter Room coolers).
| |
| : 3. Per HB-26039 (Note 5) there is an NRC commitment to maintain a certain portion of fuel pool cooling piping as Class 3. Per HB-26039 and HB-26050 this is the piping that functions as the fuel pool makeup source from the Plant Service Water system. It includes the piping from Plant Service Water to the point downstream of 2G41-F054 where it becomes imbedded in concrete. This piping is shown on C-17B.
| |
| : 4. HB-26050 describes the cooling water supply to equipment in the reactor building.
| |
| This 10 supply enters the reactor building through the wall from Division I underground piping as shown on C-49. The line branches into a 8 line to fire protection which terminates at valve F109 and it branches to a 6 line which continues on C-32 to a 4 reducer. The 10 line ties continues from C-49 to C-17.
| |
| On C-17 there is a 10 intertie to Division II (See C-15), a 10 supply to C-17A, a 4 fuel pool make up line that continues on C-17B, and an 8 supply to C-23. The intertie to Division II is described below. On C-17A the 10 line goes though P41-F074 and terminates at a cap. The 8 supply line on C-23 provides cooling water to the drywell coolers. C-23 also shows the return lines which continue on C-23a and terminate on C-23B where the piping goes underground just past P41-F063. Note:
| |
| Hatch 2 Basis Doc - Class 3 Page 2 of 4 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 3 COMPONENTS the fuel pool make up line is part of an NRC commitment to maintain the pressure boundary (designated as Class N on HB-26039).
| |
| : 5. HB-26051 describes the cooling water supply to emergency core cooling equipment in the reactor building. This 10 supply enters the reactor building through the wall from Division II underground piping as shown on C-15. This piping is exempt except for the 6 supply line up to the 4 reducer and the 10 intertie line with the Division I supply on HB-26050 (See C-17).
| |
| RHR Service Water Evaluation HB-21039 describes the Class 3 intake structure Division I and Division II Supply Piping. The piping is in the examination scope for welded attachments except for 4 and under piping. C-2 and C-3 show inlet piping to RHR Heat Exchanger B001A. C-4 and C-5 show inlet piping to RHR Heat Exchanger B001B. C-7 and C-8 show outlet piping for RHR Heat Exchanger B001A and B001B, respectively. C-9, C-10, and C-11 show the RHR Service Water Pumps and the associated piping in the intake structure.
| |
| Main Steam Relief Piping Evaluation HB-26000 describes the Main Seam relief Valve piping. Isometric Sketches C-109 through C-124 show the scope of the Class 3 portion of the Main Steam Relief valve piping (supports reactor shutdown). Because of the temperature at which they operate, the pressure and temperature exemption cannot be used. All piping is greater than 4 in diameter thus all welded attachments are in the examination scope.
| |
| Fuel Pool Makeup Water HB-26039 indicates that the Fuel Pool Cooling and Cleanup System is out of the ISI scope (designated as Class 0 on the Boundary Diagram). Instead, an Emergency Makeup source is maintained through the Plant Service Water system.
| |
| Jockey Pump Seal Cooling Per HB-26019, all piping is 4 and less in diameter.
| |
| Condensate Transfer As shown on HB-26026, suction is above the safety-related level.
| |
| Hatch 2 Basis Doc - Class 3 Page 3 of 4 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN CLASS 3 COMPONENTS EXAMINATION Those integrally welded attachments that meet the following three criteria are subject to examination requirements.
| |
| : 1. The integrally welded attachments are located in systems (or portions of systems) that are shown on the referenced Boundary Diagrams, and
| |
| : 2. the system or portions of systems perform the listed safety functions, and
| |
| : 3. they are not exempt.
| |
| Each Category D-A Item is discussed below.
| |
| Item D1.10, D1.30, & D1.40 None Identified.
| |
| Item D1.20 - Piping As shown in Schedule Works, Hatch 2 has 133 sets of Class 3 welded attachments.
| |
| Footnote 3 requires a 10% sample; therefore, 14 sets of welded attachments require examination The cumulative examination percentages meet the requirements of Table IWD-2412-1.
| |
| Additionally, examination of an integrally welded attachment is required if the associated component support member has deformation identified during operation, refueling, maintenance, examination, inservice inspection, or testing. An example of component support deformation is broken parts, bent parts, or pulled out parts.
| |
| Hatch 2 Basis Doc - Class 3 Page 4 of 4 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN COMPONENT SUPPORTS SCOPE For the 4th Interval, the determination of the Class 1, 2, and 3 supports to be examined will be performed using Subsection IWF of the 2001 Edition of Section XI through the 2003 Addenda. (The rules in IWF are similar to those used during the 3rd Interval per NRC approved Code Case N-491-1). (Note: IWE supports are not included here).
| |
| Per the IWA-9000 Glossary a component support is defined as a metal support designed to transmit loads from a component to the load-carrying building or foundation structure. Component supports include piping supports and encompass those structural elements relied upon to support the weight or provide structural stability to components.
| |
| Examinations apply to all component supports that are in the scope of the Class 1, 2, and Boundary Diagrams and are not exempt. Supports exempt from examination requirements are those connected to piping or other items exempted from volumetric, surface, VT-1, or VT-3 examinations by IWX-1220. In addition, portions of supports that are inaccessible by being encased in concrete, buried underground, or encapsulated by guard pipe are also exempt from the examination requirements of IWF-2000.
| |
| Component supports should be selected for examination as follows:
| |
| : 1. Supports should be characterized to identify its support type/function. For HNP-2, the support type/functions include the following:
| |
| Spring Cans - Supports weight while allowing movement due to thermal changes.
| |
| Hanger - Supports the weight of the piping system.
| |
| Restraint/struts - Prevents movement of the piping system in one or more degrees of motion.
| |
| Anchors - Prevents movement in all six degrees of motion.
| |
| : 2. 25% of the non-exempt Class 1 piping supports, 15% of the non-exempt Class 2 piping supports, and 10% of the non-exempt Class 3 piping supports shall be examined per Table IWF-2500-1.
| |
| : 3. The supports selected for examination shall be prorated such that the individual sample sizes for each system are proportional to the number of non-exempt supports in each system.
| |
| : 4. For multiple components other than piping, within a system of similar design, function, and service, the supports of only one of the multiple component are required to be examined.
| |
| Hatch 2 Basis Doc -Supports.doc Page 1 of 13 Rev. 1
| |
| | |
| HATCH UNIT 2 FOURTH INTERVAL ISI PLAN COMPONENT SUPPORTS ISI PLAN TABLES Beginning in 2005, ISI Plan Tables are generated by the industry standard ScheduleWorks ISI software. The following tables were generated using a standard format provided by ScheduleWorks. It should be noted that the Scope/Method/Procedure field is for information only. This information may be changed during an outage by IDDEAL users at the site, but it will not be reflected in the ISI Plan until the plan is issued after the outage.
| |
| When using these tables the user needs to understand the following symbols:
| |
| Scheduled "s" To schedule a component, place the identifier "s" in the required period/outage.
| |
| Completed "c" Upon exam completion for a scheduled component and by uploading the outage scope from IDDEAL back to ScheduleWorks, an "s" will be updated to completed "c".
| |
| Re- "r" Once a component has been scheduled, and you wish to reschedule to another outage, replace the scheduled scheduled "s" with a rescheduled "r" and enter an "s" in the new outage schedule.
| |
| Expanded "e" To increase a work scope without taking code credit in the percentage calculations, enter an Scope expanded "e".
| |
| Expanded "E" Upon exam completion of an expanded scope and by either uploading the outage scope from Scope IDDEAL or manually changing the letter to an upper case "E" the exam scope is completed.
| |
| Completed Additional "a" After an initial expanded work scope has been identified and you wish to add an increased Scheduled expanded work scope, enter an additional expanded scope "a".
| |
| Additional "A" Upon exam completion of an additional expanded scope and by either uploading the outage scope Completed from IDDEAL or manually changing the letter to an upper case "A" the exam scope is completed.
| |
| Partial "p" To track partially completed component examination requirements enter a partial "p".
| |
| Deferred "d" Once a component has been scheduled, and you wish to defer the inspection to another Outage, or Period, replace the scheduled "s" with a deferred "d" and enter an "s" in the new Outage.
| |
| Limited "l" To track limited component examinations or limited completions of requirements enter "l".
| |
| Multiple "b For multiple scheduling of the same component in successive Outages or Periods within an Interval Scheduled enter "b".
| |
| Multiple "B" Upon exam completion of a multiple scope in the same Interval and by either uploading the outage Completed scope from IDDEAL or manually changing the letter to an upper case "B" the exam scope is completed. This multiple scheduling scope will not count as completed for code calculations.
| |
| Tickler "t" To track exam scopes or use as reminder or identifier to confirm scheduling enter "t".
| |
| Successive "h" Successive examinations.
| |
| Exams Successive "H" Upon exam completion of a successive scope and by either uploading the outage scope from Exams Com IDDEAL or manually changing the letter to an upper case "H" the exam scope is completed.
| |
| Hatch 2 Basis Doc -Supports.doc Page 2 of 13 Rev. 1
| |
| | |
| HATCH UNIT 1 FOURTH INTERVAL ISI PLAN COMPONENT SUPPORTS EXAMINATION OF SNUBBERS IWF-1220 of the 2001 Edition of Section XI with Addenda through 2003 requires that the inservice inspection requirements for snubbers be in accordance with the requirements of IWF-5000, which states:
| |
| (a) Inservice examinations shall be performed in accordance with ASME/ANSI OM, Part 4, using the VT-3 visual examination method described in IWA-2213.
| |
| (b) Inservice tests shall be performed in accordance with ASME/ANSI OM, Part 4.
| |
| 10 CFR 50.55a(b)(3)(v) provides an alternative to these two requirements. Licensees may use Subsection ISTD, "Inservice Testing of Dynamic Restraints (Snubbers) in Light-Water Reactor Power Plants," ASME OM Code, 1995 Edition through the 2003 Addenda, in place of the requirements of IWF-5300(a) and (b) by making appropriate changes to their technical specifications or licensee-controlled documents (if required).
| |
| Inservice examinations must be performed using the VT-3 visual examination method described in IWA-2213.
| |
| However, per IWF-5300(c) integral and non-integral attachments for snubbers including bolting, pins, and clamps, shall be examined in accordance with the requirements of this Subsection (IWF). (Attachments to the pressure boundary such as lugs will be examined per Category B-K, C-C, or D-A). IWF allows a percentage of the integral and non-integral attachments for snubbers to be examined as follows:
| |
| Attachment welds will be examined in accordance with IWB, IWC, or IWD.
| |
| The snubber unit including the pins that secure the snubber unit into the support structure will be examined as required by OM requirements.
| |
| The support structure (bolting, pin, and clamps outside of the snubber unit), will be VT-3 examined and reported as required by IWF. Therefore, for Class 1 snubbers, 25% of the support structures will be scheduled and VT-3 examined; 15% of the Class 2 support structures will be scheduled and VT-3 examined, and 10% of the Class 3 support structures will be scheduled and VT-3 examined. For non-piping snubbers, Footnote 3 of Table IWF-2500-1 must be used to determine the scope.
| |
| Personnel performing the VT-3 examinations may be qualified and certified per IWA-2310 through IWA-2314 (the standard qualification/certification process) or per IWA-2317. IWA-2317 allows the use of plant personnel with at least 40 hours of plant experience in installation, maintenance, or examination of pumps, valves, and supports to perform the VT-3 examinations. These personnel must have 8 hour of training in the Section XI requirements and procedures for VT-3 visual examinations, meet the vision test requirements of IWA-2321, have an initial exam, and have a followup exam every three years. If using these alternate requirements they shall be described in the appropriate written practice. (Note: The official list of snubbers is shown in HNP site procedures 52SV-SUV-001-0S and 52SV-SUV-002-0S).
| |
| Hatch 2 Basis Doc -Supports.doc Page 3 of 13 Rev. 1
| |
| | |
| HATCH UNIT 1 FOURTH INTERVAL ISI PLAN COMPONENT SUPPORTS Determination of Class 1 Piping Supports to be Examined Per IWF-1230 supports exempt from examination are those connected to piping and other items exempted from examination by IWB. These include supports on lines:
| |
| NPS 1 and smaller for Schedule 80 and Schedule 160 water lines.
| |
| NPS 2and smaller for Schedule 80 steam lines and NPS 2.5 for Schedule 160 steam lines.
| |
| Per Schedule Works there are 80 Category F-A, Item F1.10 piping supports, plus 39 Item F1.10N supports on small diameter lines that were that were exempt during the 3rd Interval. The N designation was used for the new supports added during the 4th Interval. It should be noted that, in many cases, the HNP-2 design isometric drawing shows a containment penetration as being an anchor point for the purpose of stress analysis because it is a rigid point. This anchor is not labeled except for the penetration number and it is not a component support.
| |
| Table IWF-2500-1, Category F-A, Item F1.10 requires that 25% of the (80 + 39) non-exempt Class 1 supports be examined (30 supports). Additionally, per Footnote 2 of Table IWF-2500-1, the examinations should be prorated among the Class 1 systems based on the number of supports shown for each system versus the total number of non-exempt supports. These proportional values are listed below for each Class 1 system and are shown as exact values only to eliminate the compounding of round-up/down errors.
| |
| The number examined for each system may have a slight variance from the prorated number as long as the 30 examinations were performed.
| |
| CLASS 1 (Item F1.10)
| |
| System No. of Non- Calculated No. of Exempt No. of Supports Supports in Supports Selected System Examined 2B21 51 12.75 12 2B31 12 3 2 2C41 29 7.25 8 2E11 6 1.5 2 2E21 6 1.5 2 2E41 2 0.5 1 2E51 4 1 1 2G31 9 2.25 3 TOTAL 119 29.75 31 Hatch 2 Basis Doc -Supports.doc Page 4 of 13 Rev. 1
| |
| | |
| HATCH UNIT 1 FOURTH INTERVAL ISI PLAN COMPONENT SUPPORTS Many of these same systems have snubbers. While the examination of the snubber unit is performed per OM, not Section XI; the remainder of the support is effectively examined the same as any other support. As shown in the table below, there are 54 snubbers in the Class 1 piping systems; therefore, 14 require examination per Section XI. The snubbers to be examined are prorated through the Class 1 piping systems as shown below.
| |
| CLASS 1 (Item F1.10S)
| |
| System No. of Non- Calculated No. of Exempt No. of Supports Snubbers in Snubbers Selected System Examined 2B21 22 5.5 6 2B31 8 2 3 2E11 5 1.25 2 2E21 0 0 0 2E41 6 1.5 2 2E51 3 .75 1 2G31 1 .25 1 TOTAL 54 13.5 15 Because of the potential changes in the snubber population during the 4th Interval, one additional 2B31 snubber has been added to the examination scope to account for any variances. Since 15 examinations at a 25% sample rate will cover a population of 60 snubbers, 6 additional snubbers (60-54) would need to be added to the scope before there would be a Code issue.
| |
| Hatch 2 Basis Doc -Supports.doc Page 5 of 13 Rev. 1
| |
| | |
| HATCH UNIT 1 FOURTH INTERVAL ISI PLAN COMPONENT SUPPORTS Determination of Class 2 Piping Supports to be Examined Per IWF-1230 supports exempt from examination are those connected to piping and other items exempted from examination by IWC. These include:
| |
| * Supports located on components less than or equal to 4 in diameter. (Reference Class 2 portion of this document for IWB-1220 exemptions used at HNP-2).
| |
| * Supports located on components in systems (or portions of systems) whose function is not required in support of reactor residual heat removal, containment heat removal, and emergency core cooling and that operate at a pressure equal to or less than 275 psig and at a temperature equal to or less than 2000F. (Reference Class 2 portion of this document for IWB-1220 exemptions used at HNP-2).
| |
| * Supports located on components of any size beyond the last shutoff valve in open ended portions of systems that do not contain water during normal operation.
| |
| (Reference Class 2 portion of this document for IWB-1220 exemptions used at HNP-2).
| |
| Portions of supports that are inaccessible by being encased in concrete, buried underground, or encapsulated by guard pipe.
| |
| Per Schedule Works there are 326 non-exempt Category F-A, Item F1.20 piping supports (excluding snubbers). It should be noted that, in many cases, the HNP-2 design isometric shows a containment penetration, torus penetration, pump nozzle, etc. as being an anchor point for the purpose of stress analysis because it is a rigid point. This anchor is not labeled except for the penetration number and it is not a component support.
| |
| Table IWF-2500-1, Category F-A, Item F1.20 requires that 15% of the 326 non-exempt Class 2 supports (or 49) be examined. Additionally, per Footnote 2 of Table IWF-2500-1, the examinations should be prorated among the Class 2 systems based on the number of supports shown for each system versus the total number of non-exempt supports. These proportional values are listed below for each Class 2 system and are shown as exact values only to eliminate the compounding of round-up/down errors. The number examined for each system may have a slight variance from the prorated number as long as the 49 examinations were performed.
| |
| Hatch 2 Basis Doc -Supports.doc Page 6 of 13 Rev. 1
| |
| | |
| HATCH UNIT 1 FOURTH INTERVAL ISI PLAN COMPONENT SUPPORTS CLASS 2 (Item F1.20)
| |
| System No. of Non- Calculated No. of Exempt No. of Supports Supports in Supports Selected System Examined 2E11 132 19.8 19 2E21 75 11.25 11 2E41 63 9.45 10 2E51 1 .15 1 2G51 1 .15 1 2N11 41 6.15 6 2N37 3 .45 1 2T48 10 1.5 1 TOTAL 326 48.9 50 Some of these same systems have snubbers. While the examination of the snubber unit is performed per OM, not Section XI; the remainder of the support is effectively examined the same as any other support. As shown in the table below, there are 102 snubbers in Class 2 piping systems; therefore, about 16 require examination per Section XI. The snubbers to be examined are prorated through the Class 2 piping systems as shown below.
| |
| CLASS 2 (Item F1.20S)
| |
| System No. of Non- Calculated No. of Exempt No. of Supports Snubbers in Snubbers Selected System Examined 2E11 58 8.7 10 2E21 9 1.35 2 2E41 9 1.35 1 2N11 22 3.3 4 2T48 4 .6 1 TOTAL 102 15.3 18 Because of the potential changes in the snubber population during the 4th Interval, one additional 2E11 snubber examination has been added to the examination scope to account for any variances. This additional weld plus one extra examination due to roundup yields an excess of 2 examinations. Since 18 examinations at a 15% sample rate will cover a population of 120 snubbers, 18 additional snubbers (120-102) would need to be added to the scope before there would be a Code issue.
| |
| Hatch 2 Basis Doc -Supports.doc Page 7 of 13 Rev. 1
| |
| | |
| HATCH UNIT 1 FOURTH INTERVAL ISI PLAN COMPONENT SUPPORTS Determination of Class 3 Piping Supports to be Examined Per IWF-1230 supports exempt from examination are those connected to piping and other items exempted from examination by IWC. These include:
| |
| * Supports located on components less than or equal to 4 in diameter. (Reference Class 3 portion of this document for IWB-1220 exemptions used at HNP-2).
| |
| * Supports located on components in systems (or portions of systems) whose function is not required in support of reactor residual heat removal, containment heat removal, and emergency core cooling and that operate at a pressure equal to or less than 275 psig and at a temperature equal to or less than 2000F. (Reference Class 2 portion of this document for IWB-1220 exemptions used at HNP-2).
| |
| Portions of supports that are inaccessible by being encased in concrete, buried underground, or encapsulated by guard pipe.
| |
| Per Schedule Works there are 295 non-exempt Category F-A, Item F1.30 piping supports (excluding snubbers). It should be noted that, in many cases, the HNP-2 design isometric shows a pump nozzle, etc. as being an anchor point for the purpose of stress analysis because it is a rigid point. This anchor is not labeled except for the penetration number and it is not a component support.
| |
| Table IWF-2500-1, Category F-A, Item F1.30 requires that 10% of the 295 non-exempt Class 3 supports be examined. Therefore, at least 30 Class 3 piping supports are required to be examined. Additionally, per Footnote 2 of Table -2500-1, the examinations should be prorated among the Class 3 systems based on the number of supports shown for each system versus the total number of non-exempt supports. These proportional values are listed below for each Class 3 system and are shown as exact values only to eliminate the compounding of round-up/down errors. The number examined for each system may have a slight variance from the prorated number as long as the 30 examinations were performed.
| |
| CLASS 3 (Item F1.30)
| |
| System No. of Non- Calculated No. of Exempt No. of Supports Supports in Supports Selected System Examined 2B21 64 6.4 7 2E11 66 6.6 7 2G41 9 .9 1 2P41 156 15.6 16 TOTAL 295 29.5 31 Hatch 2 Basis Doc -Supports.doc Page 8 of 13 Rev. 1
| |
| | |
| HATCH UNIT 1 FOURTH INTERVAL ISI PLAN COMPONENT SUPPORTS Many of these same systems have snubbers. While the examination of the snubber unit is performed per OM, not Section XI; the remainder of the support is effectively examined the same as any other support. As shown in the table below, there are 37 snubbers in Class 3 piping systems; therefore, 4 require examination per Section XI. The snubbers to be examined are prorated through the Class 3 systems as shown below.
| |
| CLASS 3 (Item F1.30S)
| |
| System No. of Non- Calculated No. of Exempt No. of Supports Snubbers in Snubbers Selected System Examined B21 63 6.3 7 TOTAL 63 6.3 7 Because of the potential changes in the snubber population during the 4th Interval the number of snubbers selected was rounded up to 7. This would allow the addition of 7 Class 3 snubbers before there would be a Code issue.
| |
| Hatch 2 Basis Doc -Supports.doc Page 9 of 13 Rev. 1
| |
| | |
| HATCH UNIT 1 FOURTH INTERVAL ISI PLAN COMPONENT SUPPORTS Determination of Supports Other Than Piping to be Examined Per Schedule Works there are 62 non-exempt Category F-A, Item F1.40 equipment supports. These 62 supports are shown in the below listed table. Table IWF-2500-1 requires the examination of each equipment support except when there are multiple components within a system that have a similar design, function, and service. For this case, Note 3 of Table 2500-1 indicates that only the supports on one of the similar components needs to be examined. For example each of the two RC pumps has three supports for a total of six supports. Only three of the supports are required to be examined. The examination selection is listed in the table shown below.
| |
| The support structure around each RPV stabilizer brackets was not included as a support, because there are no loads transmitted to them unless there is movement of the RPV due to a significant seismic event. They are considered analogous to pipe whip restraints which are not included as supports (See Interpretation XI-80-02).
| |
| Interpretation Number: XI-80-02 Date: 10-APR-80
| |
| | |
| ==Subject:==
| |
| Section XI, Division 1, IWF-1100, Examination of Pipe Restraints Question: Does Section IX, Division 1, IWF-1100 exclude pipe whip restraints from the inservice inspection requirements of Subsection IWF?
| |
| Reply: The scope of IWF is limited to those supports which are required to be constructed in accordance with Subsection NF. Since pipe whip restraints are exempt from the requirements of NF, they are also exempt from the requirements of IWF.
| |
| The Recirculation Pumps are the only Class 1, 2, or 3 equipment that has snubbers.
| |
| While the examination of the snubber unit is performed per OM, not Section XI; the remainder of the support is effectively examined the same as any other support. There are six snubbers on each pump, with only the snubbers on one of the pumps requiring examination.
| |
| Hatch 2 Basis Doc -Supports.doc Page 10 of 13 Rev. 1
| |
| | |
| HATCH UNIT 1 FOURTH INTERVAL ISI PLAN COMPONENT SUPPORTS Equipment Supports (Excluding Snubbers)
| |
| Code Case N-491 Item F1.40 Component Fig Description P1 P2 P3 Notes 2B11-A001-S01 2B11-SK1 RPV Skirt X 2B31-HA5 A-16 RC PUMP A - SPRING 2B31-HA6 A-16 RC PUMP A - SPRING 2B31-HA7 A-16 RC PUMP A - SPRING X 2B31-HB5 A-18 RC PUMP B - SPRING 2B31-HB6 A-18 RC PUMP B - SPRING 2B31-HB7 A-18 RC PUMP B - SPRING 2C41-A001-S01 2C41-SK2 Tank X 2C41-C001A-S01 2C41-SK3 SBLC Pump X 2C41-C001B-S01 2C41-SK3 SBLC Pump 2E11-B001A-S01 2E11-SK4 RHR Heat Exchanger X 2E11-B001B-S01 2E11-SK4 RHR Heat Exchanger 2E11-C002D-S01 2E11-SK5 RHR Pump 2E11-C002A-S01 2E11-SK5 RHR Pump X 2E11-C002B-S01 2E11-SK5 RHR Pump 2E11-C002C-S01 2E11-SK5 RHR Pump 2E21-C001B-S01 2E21-SK6 CS Pump 2E21-C001A-S01 2E21-SK6 CS Pump X 2E41-C001-S01 2E41-SK7 HPCI Pump X 2E51-C001-S01 2E51-SK8 RCIC Pump X 2T47-B007A-S01 2T47-SK9 Cooling Unit X 2T47-B007B-S01 2T47-SK9 Cooling Unit 2T47-B008A-S01 2T47-SK9 Cooling Unit 2T47-B008B-S01 2T47-SK9 Cooling Unit 2T47-B009A-S01 2T47-SK9 Cooling Unit 2T47-B009B-S01 2T47-SK9 Cooling Unit 2T47-B010A-S01 2T47-SK9 Cooling Unit 2T47-B010B-S01 2T47-SK9 Cooling Unit 2E11-C001A-S01 2E11-SK10 RHRSW Pump X 2E11-C001A-S02 2E11-SK10 RHRSW Pump 2E11-C001B-S01 2E11-SK10 RHRSW Pump 2E11-C001B-S02 2E11-SK10 RHRSW Pump Hatch 2 Basis Doc -Supports.doc Page 11 of 13 Rev. 1
| |
| | |
| HATCH UNIT 1 FOURTH INTERVAL ISI PLAN COMPONENT SUPPORTS Equipment Supports (Excluding Snubbers)
| |
| Code Case N-491 Item F1.40 Component Fig Description P1 P2 P3 Notes 2E11-C001C-S01 2E11-SK10 RHRSW Pump 2E11-C001C-S02 2E11-SK10 RHRSW Pump 2E11-C001D-S01 2E11-SK10 RHRSW Pump 2E11-C001D-S02 2E11-SK10 RHRSW Pump 2E11-D002A-S01 2E11-SK11 RHRSW Strainer X 2E11-D002B-S01 2E11-SK11 RHRSW Strainer 2E11-D003A-S01 2E11-SK11 RHRSW Strainer 2E11-D003B-S01 2E11-SK11 RHRSW Strainer 2P41-C001C-S01 2P41-SK12 PSW Pump 2P41-C001D-S02 2P41-SK12 PSW Pump 2P41-C001C-S02 2P41-SK12 PSW Pump 2P41-C001B-S02 2P41-SK12 PSW Pump 2P41-C001B-S01 2P41-SK12 PSW Pump 2P41-C001A-S02 2P41-SK12 PSW Pump 2P41-C001A-S01 2P41-SK12 PSW Pump X 2P41-C001D-S01 2P41-SK12 PSW Pump 2P41-C002-S02 2P41-SK13 Standby PSW Pump X Different Pump Type Than C001 Pumps 2P41-C002-S01 2P41-SK13 Standby PSW Pump Different Pump Type Than C001 Pumps 2P41-D001A-S01 2P41-SK14 PSW Strainer X 2P41-D001B-S01 2P41-SK14 PSW Strainer 2P64-B006B-S01 2P64-SK15 Chiller-Condenser 2P64-B006A-S01 2P64-SK15 Chiller-Condenser X 2T41-B002A-S01 2T41-SK16 RHR/CS Room Cooler X 2T41-B002B-S01 2T41-SK16 RHR/CS Room Cooler 2T41-B003B-S01 2T41-SK17 RHR/CS Room Cooler 2T41-B003A-S01 2T41-SK17 RHR/CS Room Cooler 2T41-B005B-S01 2T41-SK18 HPCI Room Cooler 2T41-B005A-S01 2T41-SK18 HPCI Room Cooler 2Z41-B020A-S01 2Z41-SK19 LPCI Inv Room Cooler X 2Z41-B020B-S01 2Z41-SK19 LPCI Inv Room Cooler TOTAL-62 5 7 6 Hatch 2 Basis Doc -Supports.doc Page 12 of 13 Rev. 1
| |
| | |
| HATCH UNIT 1 FOURTH INTERVAL ISI PLAN COMPONENT SUPPORTS TOTAL CLASS 1, 2, AND 3 PIPING SUPPORTS AND EQUIPMENT SUPPORTS Code requirements were met as shown in the Code Compliance Scheduling Summary for F-A supports and snubbers.
| |
| SCOPE EXPANSION Component support examinations that reveal flaws or relevant conditions exceeding the acceptance standards of IWF-3400 shall be extended to include the component supports immediately adjacent to those component supports for which corrective action is required.
| |
| Additional examinations shall be extended to include additional supports within the same system, equal in number and of the same type and function as those scheduled for examination during the period.
| |
| Alternately, per IWF-3122.3 the component support with the flaw or relevant condition may be accepted for continued service without corrective actions if an evaluation or test demonstrates that the component support is acceptable for service. Since corrective actions are not required, scope expansion is not required.
| |
| SUCCESSIVE EXAMINATIONS Acceptance of IWF-3410 Conditions by Corrective Measures or Repair Replacement Per IWF-2220(a), when a component support is accepted for continued service by corrective measures (e.g., adjustment for conditions such as loosened mechanical connections, improper hot/cold settings, etc.) or is accepted through repair/replacement activities the component support shall be re-examined prior to returning the system to service.
| |
| Per IWF-2220(b), when a component support is in a system that operates above 2000 F and is accepted for continued service by corrective measures (e.g., adjustment for conditions such as loosened mechanical connections, improper hot/cold settings, etc.) or is accepted through repair/replacement activities the component support shall be re-examined during the following heatup and cooldown cycle unless determined unnecessary by evaluation. This examination shall be performed during operation or the next refueling outage.
| |
| Per IWF-2420, the component support shall also be re-examined during the next inspection period.
| |
| Acceptance of IWF-3410 Conditions by Evaluation or Test When a component support is accepted for continued service by evaluation or test in accordance with IWF-3122.3 re-examination is not required during the next inspection period. If evaluated or tested and determined acceptable for continued service corrective measures may be used to restore the support to it original design condition re-examination is not required prior to returning the system to service.
| |
| Hatch 2 Basis Doc -Supports.doc Page 13 of 13 Rev. 1
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 SCOPE This report describes the revised inspection criteria for stainless steel and dissimilar metal weld piping subject to Generic Letter 88-01, NRC Position on Intergranular Stress Corrosion Cracking in BWR Austenitic Stainless Steel Piping requirements based on the revised criteria in BWRVIP-075. Included are new inspection frequencies and new sample expansion criteria.
| |
| BACKGROUND Due to extensive Intergranular Stress Corrosion Cracking (IGSCC), the stainless steel piping for the Recirculation System, the RHR System, and the RWCU System was replaced with IGSCC resistant 316NG material during the mid-1980s. However, components such as the stainless steel RPV safe-ends and the RWCU containment penetration piping were not replaced. Each of the welds (where the configuration allowed) was subsequently stress improved to reduce the tensile residual stresses at the weldment inside surface. An inspection program was set up per the requirements Generic Letter 84-11 which was subsequently superseded by Generic Letter 88-01 (GL 88-01), NRC Position on Intergranular Stress Corrosion Cracking in BWR Austenitic Stainless Steel Piping and NUREG-0313, Technical Report on Material Selection and Processing Guidelines for BWR Coolant Pressure Boundary Piping. Inspection Categories were established based on GL 88-01 requirements. GL 88-01 Categories currently applicable to HNP-2 are:
| |
| Category A - Welds are made from materials that are resistant to IGSCC due to their metallurgical properties. As such, the current required inspection scope and frequency per GL 88-01 is 25% of the population every 10 years.
| |
| Category C - Welds are made from material that is considered susceptible to IGSCC, but the IGSCC was mitigated by stress improvement after more than two cycles of operation.
| |
| GL 88-01 specifies that the entire population is to be examined once every ten years.
| |
| Category D - Welds are those made of susceptible material that have not been treated with an IGSCC remedy and in which cracks have not been reported. GL 88-01 specifies that all welds be examined every two refueling cycles.
| |
| Category E- Welds that have been overlayed with IGSCC resistant material. GL 88-01 specifies that all overlays be examined every two refueling outages.
| |
| Because of improved water chemistry that significantly reduced the propensity for initiation and growth of IGSCC, and due to improved examination procedures/techniques for the detection and sizing of IGSCC, new inspection criteria were proposed in BWRVIP-075 and subsequently accepted by the NRC for each of these categories. This report describes the revised inspection criteria for Category A, Category C, Category D, and Category E piping subject to GL 88-01 requirements based on the revised criteria in BWRVIP-075. Included are new inspection frequencies and new sample expansion criteria. Table 1 lists key dates Hatch 2 Basis Doc-VIP75.doc Page 1 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 and actions associated with the transition from GL 88-01 to BWRVIP-075 requirements at HNP-2.
| |
| Table 1 Transition From GL-88-01 To BWRVIP-05 DATE ITEM 6/23/2000 HNP requested the use of BWRVIP-075 in lieu of GL 88-01 and requested an alternative to Code requirements to allow reduced B-J and B-F Code requirements.
| |
| 10/10/2000 The NRC issued a safety evaluation for the HNP request allowing HNP a one cycle use of BWRVIP-075 in lieu of GL 88-01 and Code relaxation from B-F (100%) and B-J (25%) provided that surface examinations were performed.
| |
| 10/2000 The NRC issued a safety evaluation (with caveats) allowing the use of BWRVIP-075 in lieu of the existing GL 88-01 requirements. The NRC noted that the safety evaluation could be used as a reference for a 10CFR50.55a alternative to reduce Code exams for welds in GL 88-01 scope.
| |
| 6/2001 Structural Integrity Associates issues Weld Prioritization for Adoption of BWRVIP-075 at Edwin I. Hatch Unit 1 and Unit 2.
| |
| 5/2002 The NRC issues the final BWRVIP-075 safety evaluation after evaluation of BWRVIP responses to open items.
| |
| 4/2003 The BWRVIP issues the initial draft A-Version of BWRVIP-075 to incorporate the NRCs comments in their final safety evaluation.
| |
| 2004 SNC seeks approval in RR-39 to reduce the Code exams associated with this piping.
| |
| 7/2005 NRC grants approval of RR-39.
| |
| 10/2005 BWRVIP-75-A Final report issued.
| |
| 12/2005 NRC grants approval of ISI-ALT-3 to continue during the 4th Interval with the alternatives originally set forth in RR-39.
| |
| 3/2006 NRC issues approval letter for BWRVIP-75-A.
| |
| 4/2006 EPRI issues letter from Robin Dyle/Tom Mulford regarding inspection relief for hydrogen water chemistry.
| |
| VIP-75 IMPLEMENTATION The NRC issued a final Safety Evaluation for BWRVIP-075 dated May 14, 2002 with several comments. Subsequently, the BWRVIP developed a draft version of BWRVIP-075-A to incorporate the NRC comments and this document was found acceptable by NRC letter dated March 16, 2006.
| |
| This bases document is based on BWRVIP-75-A dated October 2005.
| |
| Hatch 2 Basis Doc-VIP75.doc Page 2 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 The sample size required to be examined by BWRVIP-075-A is smaller than that required by ASME Section XI. Therefore, ISI-ALT-3 was submitted to the NRC and subsequently approved by an NRC Safety Evaluation dated 12/22/05. This request allows the use of the new sample sizes specified in BWRVIP-075 as an alternative to 10 CFR 50.55a and Section XI Code requirements for Category B-J and B-F welds.
| |
| Note:
| |
| The associated ScheduleWorks Tables have been assigned an Item Number equivalent to the Table Numbers listed in the below write-up to allow comparison of the written text to the ScheduleWorks Tables.
| |
| For example, Table 2 in the below written text and tables lists 67 Category A welds.
| |
| There is an equivalent Item Number designated as Table 2 in the ScheduleWorks Tables with 67 welds.
| |
| Evaluation of OE22809- Operating Experience where Perry GL 88-01 Exams Were Not Performed Within Required Frequency. Dated 6/19/2006 Upon receipt of a letter from the Boiling Water Reactor Vessel and Internals Project (BWRVIP) alerting utilities that they should ensure that generic inspection relief for Hydrogen Water Chemistry is not being taken, the implementation of Generic Letter (GL) 88-01 inspection schedules, as modified by EPRI Technical Report TR-113932, "BWR Vessel and Internals Project Technical Basis for Revisions to Generic Letter 88-01 Inspection Schedules (BWRVIP-75)," was reviewed by Perry and it was found that a GL 88-01 Category E weld had been erroneously put on a 10 year schedule rather than the required six year schedule. Examination of the weld by the six year point was missed.
| |
| Discovery of this scheduling error resulted in a full review of the scheduling for GL 88-01 exams. The review found that GL 88-01 Category C weld examinations, identified as having an "every 10 years" frequency in GL 88-01 and BWRVIP-75, had been incorporated into Perry's augmented Inservice examination program on a "10-year interval" frequency consistent with normal ASME Section XI scheduling. That is, they were scheduled to meet Section XI successive examination requirements, which allow for extension by as much as a year to enable an inspection to coincide with an outage. As such, some Category C welds were not examined by the 10 year point, which was in-between refueling outages, and thus did not meet a literal interpretation of "every 10 years."
| |
| SNC Position - SNC has specific relief as defined in Appendix B of this document.
| |
| Regarding the "every 10 years" versus the "10-year interval" frequency, Robin Dyle who is the author of BWVIP-075 stated that it was his intent to use a 10-year interval frequency as defined in Section XI. Therefore, the length of time to perform an examination can be up to 11 years if needed to coincide with a scheduled outage.
| |
| Hatch 2 Basis Doc-VIP75.doc Page 3 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 Review of SNC Scheduling Table 2 includes 67 Category A welds with hydrogen water protection. A 10% sample was used; therefore, 7 welds were selected and will be examined on a 10-year interval frequency. Three welds were examined in Spring 2000 and will be re-examined Spring 2009; one weld was examined in Spring 2003 and will be re-examined in 2009; and three welds were examined in Spring 2005 and will be re-examined in Spring 2015.
| |
| Table 3 includes 12 Category C welds without effective hydrogen water chemistry. A 25%
| |
| sample was used; therefore 3 welds were selected and will be examined on a 10-year interval frequency. Two welds were examined in Spring 2000 and will be re-examined in Spring 2009. One weld was examined in Spring 2005 and will be re-examined in Spring 2015.
| |
| Table 4 includes 12 Category C welds with effective hydrogen water chemistry. A 10%
| |
| sample was used; therefore 2 welds were selected and will be examined on a 10-year interval frequency. Two welds were examined in Spring 2005 and will be re-examined in Spring 2015.
| |
| Table 5 includes 5 Category welds without effective hydrogen water chemistry. A 25%
| |
| sample was used; therefore 2 welds were selected and will be examined on a 10-year interval frequency. Two were examined in Spring 2000 and will be re-examined in 2009.
| |
| Table 6 includes 18 Category C welds with effective hydrogen water chemistry. A 10%
| |
| sample was used; therefore 2 welds were selected and will be examined on a 10-year interval frequency. Two were examined in Spring 2000 and will be re-examined in 2009.
| |
| Table 7 includes 4 Category D welds without effective hydrogen water chemistry. These four welds are listed as Category D because there is a potential that they are not fully stress improved. The three RHR welds were examined in 2005 and are scheduled for examination every 2nd outage (2009 and 2013). The feedwater weld is a special case because it cannot be inspected per Appendix VIII since it adjoins a weld overlay. It is conservatively listed as Category D because of relaxation issues due to the application of the adjacent weld overlay; however, some compressive forces will be observed at the ID due to the overlay. An Appendix VIII, automated examination will be attempted in 2009.
| |
| Future recommendations will be made at that time.
| |
| Table 8 includes one Category E overlaid weld without effective hydrogen water chemistry.
| |
| It will be examined on a 10-year interval frequency. This overlay was examined in 2005 and will be re-examined in 2015.
| |
| Hatch 2 Basis Doc-VIP75.doc Page 4 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 CATEGORY A WELDS The materials in Category A are resistant to IGSCC due their metallurgical properties. As such, the current required inspection scope and frequency per NUREG-0313 and GL 88-01 is 25% of the population every 10 years.
| |
| New Category A Examination Frequency Per BWRVIP-075-A, the new examination frequency for Category A welds is a function of their ASME Section XI Code classification.
| |
| B-F Scope (N/A to Hatch 2)
| |
| Category A welds, that are currently classified as Section XI Category B-F welds, will be examined at a rate of 25% over ten years. For welds that are protected by effective HWC, the BWRVIP proposed that the sample size for Category B-F welds is 10%. Fifty percent (50%) of these examinations must be completed during the first six years of the ten-year interval. Hatch 2 does not have any welds with this designation.
| |
| B-J Scope The BWRVIP proposed that welds that are currently classified as Category A and are classified as Section XI Category B-J per Section XI be examined at a rate of 10% over ten years. Fifty percent (50%) of these examinations must be completed during the first six years of the ten-year interval.
| |
| New Category A Scope of Examinations As shown in Table 2, there are 67 HNP-2 Category A welds; therefore seven welds require examination during the 4th Interval. Four of these welds must be examined prior to the end of 2011.
| |
| Risk Insights Used During Selection of the Category A Welds Per Section 4.1 of BWRVIP-75-A the most risk significant piping is the reactor coolant pressure boundary that supports the ECCS function or containment outside the drywell and that are subject to thermal fatigue or crevice corrosion in addition to IGSCC. Piping that functions only as the RCPB would generally have lower risk.
| |
| As shown in Table 2, there are 30 Category A HNP-2 welds that form the pressure boundary for RHR Injection (which is an ECCS function). None of the welds have an outboard containment isolation function or have been identified as being susceptible to thermal fatigue. Therefore, the welds to be examined will be selected out of the 30 weld ECCS subset. Twenty-four welds are located in the Reactor Recirculation system on the Hatch 2 Basis Doc-VIP75.doc Page 5 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 12 risers, the 22 headers, and the 28 piping downstream of the 2B31-F031A&B valves.
| |
| Six welds are located in the RHR LPCI lines.
| |
| Category A Weld Selection Per Section 4.1 of BWRVIP-75-A, during the selection of locations for inspection, consideration should be given regarding locations where IGSCC could be accelerated by crevice corrosion or thermal fatigue. In addition, locations having attributes that would promote IGSCC should have higher priority for inspection. The attributes that may be considered include: high carbon or low ferrite content, crevice or stagnant flow conditions, evidence of weld repair, surface cold work, and high fit-up, residual and operating stresses.
| |
| For the 24 Reactor Recirculation system welds that have an ECCS function, all have received an effective stress improvement and all are subject to effective hydrogen water chemistry (HWC). For the 6 RHR welds all received an effective stress, but none are subject to effective HWC because they are located in stagnant lines.
| |
| In the report, Weld Prioritization for Adoption of BWRVIP-075 at Edwin I. Hatch Unit 1 and Unit 2, dated June 2001, Structural Integrity Associates (SIA) stated in Section 3.0, Weld Selection Process that, consideration should be given to those locations having attributes that would promote IGSCC, or where IGSCC could be accelerated by crevice corrosion or thermal fatigue. These attributes include: high carbon or low ferrite content, crevice or stagnant flow conditions, evidence of weld repair, surface cold work, and high fit-up, residual and operating stresses. Each weld was assigned a rank of 1 to 5, with a Priority 1 being considered to be the most susceptible to IGSCC. These attributes are very similar to those in BWRVIP-75-A; therefore, the SIA document was used for guidance in selecting welds. This prioritization is shown in column 4 (SIA Priority) of Table 2. The welds in Table 2 were designated by SIA as either Priority 2 or Priority 4.
| |
| Two Priority 4 welds in the RHR lines were selected even though they had a lower SIA priority because they are located in stagnant flow lines and are not subject to the additional mitigating effects of HWC. Five Priority 2 welds in the Recirculation system (with effective HWC) were also selected. Four welds (57%) were selected for the 1st Period and three welds (43%) were selected for the 3rd Period.
| |
| New Category A Scope Expansion The sample expansion criteria to be used for Category A are similar to those specified in GL 88-01. If one or more welds are determined to be cracked by this examination program, an additional sample of equal size and approximately the same distribution will be examined during the same outage. If cracking is detected in the second sample, 25% of the remaining population will be examined. If additional cracking is detected, the entire Category A population will be examined. The size or distribution of the expanded sample may be altered if technical justification exists. If this option is used, the NRC will be notified when the expanded scope examinations begin.
| |
| Hatch 2 Basis Doc-VIP75.doc Page 6 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 CATEGORY C WELDS Category C welds are made from material that is considered susceptible to IGSCC, but mitigated by stress improvement after more than two cycles of operation. GL 88-01 specifies that the entire population is to be examined once every ten years.
| |
| New Category C Examination Frequency Category C welds that satisfy the following criteria may be examined at a rate of 25% per ten years. The licensee must ensure that an effective stress improvement was achieved.
| |
| Additionally, there must have been either:
| |
| a) a preservice (post-stress improvement) and inservice examination with a qualified procedure with no cracking identified, or b) For welds that were stress improved prior to the publication of BWRVIP-75-A but did not receive a preservice examination, at least one examination performed with a qualified procedure after more than two operating cycles and no cracking detected.
| |
| With effective hydrogen water chemistry (HWC), the scope may be further reduced to 10%
| |
| of the population.
| |
| For HNP-2, each Category C weld has had an effective stress improvement and received a post-stress improvement examination and with at least one examination using qualified procedures. See Appendix A for the basis for Qualified Examinations and Appendix C for the basis for Effective Stress Improvement.
| |
| New Category C Scope of Examinations Category C welds consist of similar metal (SM) welds and dissimilar metal (DM) welds, and are listed in the following tables:
| |
| Table 3 - DM Welds With Effective Stress Improvement Without Effective HWC Table 4 - DM Welds With Effective Stress Improvement With Effective HWC Table 5 - SM Welds With Effective Stress Improvement Without Effective HWC Table 6 - SM Welds With Effective Stress Improvement With Effective HWC Risk Insights Used During Selection of the Category C Welds Per Section 4.1 of BWRVIP-75-A the most risk significant piping is the reactor coolant pressure boundary that supports the ECCS function or containment outside the drywell and that are subject to thermal fatigue or crevice corrosion in addition to IGSCC. Piping that functions only as the RCPB would generally have lower risk. Applicable ECCS functions for this piping are HPCI, RHR Injection, and Core Spray. None of the welds have an outboard containment isolation function or have been identified as being susceptible to thermal fatigue.
| |
| Hatch 2 Basis Doc-VIP75.doc Page 7 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 Category C Weld Selection Per Section 4.1 of BWRVIP-75-A, during the selection of locations for inspection, consideration should be given regarding locations where IGSCC could be accelerated by crevice corrosion or thermal fatigue. In addition, locations having attributes that would promote IGSCC should have higher priority for inspection. The attributes that may be considered include: high carbon or low ferrite content, crevice or stagnant flow conditions, evidence of weld repair, surface cold work, and high fit-up, residual and operating stresses.
| |
| In the report, Weld Prioritization for Adoption of BWRVIP-075 at Edwin I. Hatch Unit 1 and Unit 2, dated June 2001, Structural Integrity Associates (SIA) stated in Section 3.0, Weld Selection Process that, consideration should be given to those locations having attributes that would promote IGSCC, or where IGSCC could be accelerated by crevice corrosion or thermal fatigue. These attributes include: high carbon or low ferrite content, crevice or stagnant flow conditions, evidence of weld repair, surface cold work, and high fit-up, residual and operating stresses. Each weld was assigned a rank of 1 to 5, with a Priority 1 being considered to be the most susceptible to IGSCC. These attributes are very similar to those in BWRVIP-75-A; therefore, the SIA document was used for guidance in selecting welds. All dissimilar metal welds are Priority 1; therefore, the following additional information was considered:
| |
| : 1. Issues with previous examinations based on a review of the previous data by Level III personnel. (See Column 2).
| |
| : 2. Issues with weld crowns or taper that would prevent an Appendix VIII examination from being performed. (See Column 3).
| |
| : 3. Evidence of Repair Work. (See Column 4).
| |
| The weld selection are discussed below.
| |
| Table 3 - There are 12 dissimilar metal welds that had an effective stress improvement mitigator as defined in Appendix C but do not have effective hydrogen water chemistry as defined in Appendix B. (The Feedwater welds may not have effective hydrogen water chemistry because there may be insufficient time for proper mixing from the injection point to these welds. The CRD weld and the Core Spray welds are in stagnant lines). Those welds highlighted in yellow are the one or more prerequisite examinations with a qualified procedure (as defined in Appendix A) prior to implementing the reduced scope.
| |
| The ECCS welds are the seven Feedwater welds which form a portion of the pressure boundary for HPCI and the two Core Spray welds. The sample size is 25% or three welds.
| |
| Two Feedwater welds were selected during the 1st Period and two Core Spray welds were selected for examination during the 3rd Period.
| |
| Hatch 2 Basis Doc-VIP75.doc Page 8 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 Table 4 - There are 12 dissimilar metal welds that had an effective stress improvement mitigator as defined in Appendix C and have effective hydrogen water chemistry as defined in Appendix B. Those welds highlighted in yellow are the prerequisite examinations with a qualified procedure (as defined in Appendix A) prior to implementing the reduced scope.
| |
| The ECCS welds consist of the 10 safe-end to nozzle welds which form a portion of the pressure boundary for LPCI. Six of the welds 2B31-1RC-12AR-F-5, 2B31-1RC-12AR-H-5, 2B31-1RC-12AR-J-5, 2B31-1RC-12BR-B-5, 2B31-1RC-12BR-C-5, and 2B31-1RC-12BR-D-5 had records of repair by Combustion Engineering. The sample size is 10% or two welds. Two of the six welds were selected during the 3rd Period.
| |
| Table 5 - There are 5 similar metal welds that had an effective stress improvement mitigator as defined in Appendix C but do not have effective hydrogen water chemistry as defined in Appendix B. (The Feedwater welds may not have effective hydrogen water chemistry because there may be insufficient time for proper mixing from the injection point to these welds. The Jet Pump welds are in stagnant lines). Those welds highlighted in yellow are the prerequisite examinations with a qualified procedure (as defined in Appendix A) prior to implementing the reduced scope. The ECCS welds are the three Feedwater welds which form a portion of the pressure boundary for HPCI. The sample size is 25% or two welds. Two Feedwater welds were selected during the 1st Period.
| |
| Table 6 - There are 18 similar metal welds that had an effective stress improvement mitigator as defined in Appendix C and have effective hydrogen water chemistry as defined in Appendix B. Those welds highlighted in yellow are the prerequisite examinations with a qualified procedure (as defined in Appendix A) prior to implementing the reduced scope. The ECCS welds consist of the ten 12 Recirculation system riser welds which form a portion of the pressure boundary for LPCI. Additionally, there are two RWCU welds (2G31-1RWCUM-6-D-15 and 16) that are located outside of containment. The sample size is 10% or two welds. Two 12 welds were selected during the 1st Period. Additionally, welds 2G31-1RWCUM-6-D-15, 16, and 17 are high-energy lines in a no-break zone that must be examined each ten years. Therefore, five welds will be examined during the 4th Interval.
| |
| Summary The number of welds to be examined for each table was calculated based on the 10% or 25% criteria. The number of welds to be examined within a table is the calculated value rounded up to the next whole number. Because each table is rounded up, conservatism is built into the sample size as shown below.
| |
| There are 17 Category C welds (see Tables 3 and 5) that do not have hydrogen water protection and that are in the 25% sample (5 welds). Within this group there are 10 Feedwater ECCS welds, 2 Core Spray ECCS welds, 4 RC non-ECCS welds, and 1 CRD non-ECCS weld. Selecting from the ECCS scope, as required by BWRVIP-75-A, welds 2B21-1FW-12AB-11, 2B21-1FW-12AB-12, 2B21-1FW-12AB-13, and 2B21-1FW-12BD-9 were selected for examination during the 1st Period of the 4th Interval. Welds 2E21-1CS-Hatch 2 Basis Doc-VIP75.doc Page 9 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 10A-21 and 2E21-1CS-10B-20 were selected for the 3rd Period. Additionally, weld 2B21-1FW-12AA-8 will be re-examined in 2R20. Therefore, 7 welds or 41% of the scope of welds without hydrogen water protection will be examined during the 4th Interval.
| |
| There are 30 Category C welds (see Tables 4 and 6) that have effective hydrogen water protection and that are in the 10% sample (3 welds). Within this group there are 20 RC ECCS welds, 2 RC non-ECCS welds, 2 Outboard Isolation RWCU welds, and 4 RWCU welds inside containment. Selecting from the ECCS and Outboard Isolation welds, as required by BWRVIP-75-A, welds 2B31-1RCM-12AK-3, 2G31-1RWCU-6-D-15, and 2G31-1RWCUM-6-D-16 were selected for examination during the 1st Period. Note:
| |
| 2G31-1RWCUM-6-D-17 will also be examined as an augmented high-energy line.
| |
| Welds 2B31-1RC-12AR-H-5 and 2B31-1RC-12AR-J-5 will be examined during the 3rd Period. Therefore, 6 welds or 20% of the population with hydrogen water protection will be examined during the 4th Interval.
| |
| New Category C Scope Expansion The sample expansion criteria to be used for Category C are identical to Category A.
| |
| Hatch 2 Basis Doc-VIP75.doc Page 10 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 CATEGORY D WELDS Category D welds are those made of susceptible material that have not been treated with an IGSCC remedy and in which cracks have not been reported.
| |
| New Category D Examination Frequency Category D welds are required to be examined at a frequency of 100% of the population every six years. For plants on two year fuel cycles, this is 100% every three outages.
| |
| For welds that are effectively protected with HWC, the inspection interval can be increased so that the entire Category D population will be examined every 10 years, with at least 50% inspected during the first six years. See Table 7.
| |
| Category D Scope Weld 2E11-1RHRM-24A-10 Per drawing S-28482, ISI weld number 2E11-1RHRM-24A-10 was originally field weld 2FW-6419.
| |
| 2FW-6419 joined 304 stainless steel (Pullman-Kellogg Spool 2E11-RHR-184) to carbon steel piping (Pullman-Kellogg Spool 2E11-RHR-184A). Spool drawing 2E11-RHR-184A indicates that the carbon steel piping was buttered in the shop per SK#92, machined, and then stress relieved. The butter material (not identified), most likely, would have been Inconel 82 using machine welding or Inconel 182 using stick welding. Per S-28483, 2FW-6419 had a GTAW root (Inconel 82) and was SMAW (stick welded Inconel 182) welded out. Note: NUREG-0313 considers Inconel 82 to be resistant to stress corrosion cracking (not Inconel 182).
| |
| During the 1984 pipe replacement (see DCR 83-173) to change out the 304 SS piping to 316 NG SS, a cut was made at 2FW-6419. The Inconel butter remained and possibly a portion of the original weld remained as a safe-end. This safe-end was then machined and welded to the 316NG SS (without having to perform additional stress relieving of the carbon steel pipe, since the carbon steel piping was not welded on). Actual details of the cut requires the weld traveler sheet which has not been located. The replacement spool for 2E11-RHR-184 is shown on drawing S-60048. Per the Newport News Weld History Record archived on Spool 004737, Sheet 256, the weld material is
| |
| .035 diameter Bare Wire ERNiCr-3 (Inconel 82). This weld history record also indicates that there was a root repair requiring the excavation of an area and subsequent re-welding. After welding, this weld underwent Induction Heat Stress Improvement (IHSI); however the IHSI process used a short active heating coil to prevent heating of the carbon steel piping and the determination that an effective stress improvement process has not been made.
| |
| This weld is not effectively protected by HWC because it is located in a stagnant line, it contains unidentified Inconel butter material, and it may not have had a successful IHSI process. Therefore, it was conservatively classified as Category D. The first examination using the Performance Demonstration Initiative (PDI) requirements was performed in February 2005 with a total coverage of 67% (no scans for axial flaws were possible) This weld consists of a thick elbow with the weld Hatch 2 Basis Doc-VIP75.doc Page 11 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 tapering down to the thinner carbon steel piping. Additionally, there is dip on the carbon steel side near the edge of the weld butter. This configuration does not meet PDI requirements for examination of dissimilar metal welds. However, if stress corrosion cracking occurs in this weld it should originate at the ID of the butter material, because the rest of the material in the weld joint (carbon steel, 316NG SS, and Inconel 82) have minimal susceptibility to stress corrosion cracking.
| |
| From the 2005 coverage plots, there was no coverage for scans looking for axial flaws. For scans for circumferential cracking the following coverage was obtained:
| |
| 45-degree shear wave - 100% of the base metal 45-degree RL - 78% of the required volume 60-degree RL - 91% of the required volume Most importantly, the area of interest was scanned with the 45-degree RL transducer from the stainless elbow side and scanned from both sides with the 60-degree RL transducer. Therefore, while not meeting PDI requirements, an adequate technical examination was achieved and reasonable assurance of structural integrity was maintained. As a Category D weld, it will need to be re-examined in 2011, but was scheduled for 2009 to coincide with the SMART exams.
| |
| Note:
| |
| If it is determined that this weld had an effective IHSI it may be re-categorized as Category C.
| |
| Additionally, if documentation is found that shows that the weld butter is Inconel 82, then the weld may be re-categorized as Category A.
| |
| Weld 2E11-1RHRM-24B-10 Per drawing S-28470, ISI weld number 2E11-1RHRM-24B-10 was originally field weld 2FW-5818.
| |
| 2FW-5818 joined 304 stainless steel (Pullman-Kellogg Spool 2E11-RHR-169) to carbon steel piping (Pullman-Kellogg Spool 2E11-RHR-169A). Spool drawing 2E11-RHR-169A indicates that the carbon steel piping was buttered in the shop per SK#92, machined, and then stress relieved. The butter material (not identified), most likely, would have been Inconel 82 using machine welding or Inconel 182 using stick welding. Per S-28471, 2FW-5818 had a GTAW root (Inconel 82) and was SMAW (stick welded Inconel 182) welded out. Note: NUREG-0313 considers Inconel 82 to be resistant to stress corrosion cracking (not Inconel 182).
| |
| During the 1984 pipe replacement (see DCR 83-173) to change out the 304 SS piping to 316 NG SS, a cut was made at 2FW-5818. The Inconel butter remained and possibly a portion of the original weld remained as a safe-end. This safe-end was then machined and welded to the 316NG SS (without having to perform additional stress relieving of the carbon steel pipe, since the carbon steel piping was not welded on). Actual details of the cut requires the weld traveler sheet which has not been located. Per the Newport News Weld History Record archived on Spool 001762, Sheet 252, the weld material is .035 diameter Bare Wire ERNiCr-3 (Inconel 82). This weld history record also indicates that there was a root repair requiring the excavation of an area and subsequent re-welding.
| |
| After welding, this weld underwent Induction Heat Stress Improvement (IHSI); however the IHSI Hatch 2 Basis Doc-VIP75.doc Page 12 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 process used a short active heating coil to prevent heating of the carbon steel piping and the determination that an effective stress improvement process has not been made.
| |
| This weld is not effectively protected by HWC because it is located in a stagnant line, it contains unidentified Inconel butter material, and it may not have had a successful IHSI process. Therefore, it was conservatively classified as Category D. The first examination using the Performance Demonstration Initiative (PDI) requirements was performed in February 2005 with a total coverage of 67% (no scans for axial flaws were possible) This weld consists of a thick elbow with the weld tapering down to the thinner carbon steel piping. Additionally, there is dip on the carbon steel side near the edge of the weld butter. This configuration does not meet PDI requirements for examination of dissimilar metal welds. However, if stress corrosion cracking occurs in this weld it should originate at the ID of the butter material, because the rest of the material in the weld joint (carbon steel, 316NG SS, and Inconel 82) have minimal susceptibility to stress corrosion cracking.
| |
| From the 2005 coverage plots, there was no coverage for scans looking for axial flaws. For scans for circumferential cracking the following coverage was obtained:
| |
| 45-degree shear wave - 100% of the base metal 45-degree RL - 78% of the required volume 60-degree RL - 91% of the required volume Most importantly, the area of interest was scanned with the 45-degree RL transducer from the stainless elbow side and scanned from both sides with the 60-degree RL transducer. Therefore, while not meeting PDI requirements, an adequate technical examination was achieved and reasonable assurance of structural integrity was maintained. As a Category D weld, it will need to be re-examined in 2011, but was scheduled for 2009 to coincide with the SMART exams.
| |
| Note:
| |
| If it is determined that this weld had an effective IHSI it may be re-categorized as Category C.
| |
| Additionally, if documentation is found that shows that the weld butter is Inconel 82, then the weld may be re-categorized as Category A.
| |
| Weld 2E11-1RHRM-20-3 Per drawing S-28478, ISI weld number 2E11-1RHRM-20-3 was originally field weld 2FW-6219.
| |
| 2FW-6219 joined 304 stainless steel (Pullman-Kellogg Spool 2E11-RHR-179) to carbon steel piping (Pullman-Kellogg Spool 2E11-RHR-179A). Spool drawing 2E11-RHR-179A indicates that the carbon steel piping was buttered in the shop per SK#93, machined, and then stress relieved. The butter material (not identified), most likely, would have been Inconel 82 using machine welding or Inconel 182 using stick welding. Per S-28479, 2FW-6219 had a GTAW root (Inconel 82) and was SMAW (stick welded Inconel 182) welded out. Note: NUREG-0313 considers Inconel 82 to be resistant to stress corrosion cracking (not Inconel 182).
| |
| During the 1984 pipe replacement (see DCR 83-173) to change out the 304 SS piping to 316 NG SS, a cut was made at 2FW-6219. The Inconel butter remained and possibly a portion of the original Hatch 2 Basis Doc-VIP75.doc Page 13 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 weld remained as a safe-end. This safe-end was then machined and welded to the 316NG SS (without having to perform additional stress relieving of the carbon steel pipe, since the carbon steel piping was not welded on). Actual details of the cut requires the weld traveler sheet which has not been located. The replacement spool for 2E11-RHR-184 is shown on drawing S-60048. Per the Newport News Weld History Record archived on Spool 004762, Sheet 127, the weld material is
| |
| .035 diameter Bare Wire ERNiCr-3 (Inconel 82). This weld history record also indicates that there was a root repair requiring the excavation of areas and subsequent re-welding. After welding, this weld underwent Induction Heat Stress Improvement (IHSI); however the IHSI process used a short active heating coil to prevent heating of the carbon steel piping and the determination that an effective stress improvement process has not been made.
| |
| This weld is not effectively protected by HWC because it is located in a stagnant line, it contains unidentified Inconel butter material, and it may not have had a successful IHSI process. Therefore, it was conservatively classified as Category D. The first examination using the Performance Demonstration Initiative (PDI) requirements was performed in February 2005 and 100% coverage was obtained. As a Category D weld, it will need to be re-examined in 2011, but was scheduled for 2009 to coincide with the SMART exams.
| |
| Note: If it is determined that this weld had an effective IHSI it may be re-categorized as Category C.
| |
| Additionally, if documentation is found that shows that the weld butter is Inconel 82, then the weld may be re-categorized as Category A.
| |
| Weld 2B21-1FW-12AA-8 This Inconel weld joins a carbon steel pipe to a Inconel extension piece. On the Inconel side of the weld, there is a weld overlay which extends up to the edge of the weld. During the 3rd Interval examination was from both sides as shown in Figure 1. However, during the 4th Interval, the examination through the overlay has not been qualified per the Performance Demonstration Initiative and the taper on the carbon steel side will limit coverage. This weld had a mechanical stress improvement process (MSIP) performed on it in 1994. However, in the Flaw Tolerance Evaluation for this weld performed by Structural Integrity Associates (SIA) as documented in their August 25, 2006 letter SIR-06-357, Rev. 0, SIA concluded that during the weld overlay repair, because weld #8 is in close proximity to the weld overlay, the weld #8 induced residual stress may be relieved, if not completely relieved, due to the large number of elastic-plastic thermal stress cycling from the weld overlay repair process at weld #9. The as-welded stresses at weld #8 could be replaced by the stress induced by the weld overlay. Therefore, it is considered conservative in the present flaw tolerance evaluation to use the weld #8 as-welded residual stresses with an inside surface residual stress magnitude equal to the yield strength of the material. Additionally, the effects of hydrogen are probably limited in feedwater, therefore this weld has been designated as Category D.
| |
| Hatch 2 Basis Doc-VIP75.doc Page 14 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 FIGURE 1 New Category D Sample Expansion NA since 100% of the population is being examined.
| |
| Hatch 2 Basis Doc-VIP75.doc Page 15 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 CATEGORY E WELDS Category E welds are those welds that have been overlayed with IGSCC resistant material.
| |
| New Category E Examination Frequency Category E welds that have received one qualified inservice examination after the post-overlay baseline examination and that have subsequently received one qualified examination will be examined using a 25% sample each 10-years.
| |
| Category E Scope There is one full structural Category E Inconel overlay as shown in Table 8 (weld 2B21-1FW-12AA-9). While previous examinations were performed, an Appendix VIII examination was performed in 2005 to meet the prerequisite of one qualified examination. A re-examination will be scheduled during the 4th Interval.
| |
| Hatch 2 Basis Doc-VIP75.doc Page 16 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 TABLE 2 HATCH 2 CATEGORY A WELDS WITH EFFECTIVE HYDROGEN WATER CHEMISTRY (ASME Category B-J) 10% Sample of 67 Welds or 7 welds Each 10 Years PERIOD 1 PERIOD 2 PERI0D 3 P1 P2 P3 Category A Welds Effective SIA ECCS 3/1/1 3/1/2 3/2/1 3/2/2 3/3/1 3/3/2 4/1/1 4/1/2 4/2/1 4/3/1 4/3/2 316 NG Material H2 ? Prior Note 2 2R13 2R14 2R15 2R16 2R17 2R18 2R19 2R20 2R21 2R22 2R23 1997 1998 2000 2001 2003 2005 2007 2009 2011 2013 2015
| |
| : 1. 2B31-1RCM-12AF-1 Yes 4 YES V&S
| |
| : 2. 2B31-1RCM-12AF-2 Yes 4 YES
| |
| : 3. 2B31-1RCM-12AG-1 Yes 4 YES
| |
| : 4. 2B31-1RCM-12AH-1 Yes 2 YES V V
| |
| : 5. 2B31-1RCM-12AJ-1 Yes 4 YES
| |
| : 6. 2B31-1RCM-12AK-1 Yes 4 YES
| |
| : 7. 2B31-1RCM-12AK-2 Yes 4 YES
| |
| : 8. 2B31-1RCM-12BA-1 Yes 4 YES V
| |
| : 9. 2B31-1RCM-12BA-2 Yes 4 YES V
| |
| : 10. 2B31-1RCM-12BB-1 Yes 4 YES
| |
| : 11. 2B31-1RCM-12BC-1 Yes 2 YES
| |
| : 12. 2B31-1RCM-12BD-1 Yes 4 YES
| |
| : 13. 2B31-1RCM-12BE-1 Yes 4 YES
| |
| : 14. 2B31-1RCM-12BE-2 Yes 4 YES
| |
| : 15. 2B31-1RCM-22A-1 Yes 2 YES V V
| |
| : 16. 2B31-1RCM-22A-2 Yes 2 YES
| |
| : 17. 2B31-1RCM-22B-1 Yes 2 YES
| |
| : 18. 2B31-1RCM-22B-2 Yes 2 YES
| |
| : 19. 2B31-1RCM-28AD-1 Yes 2 NO V
| |
| : 20. 2B31-1RCM-28AD-2 Yes 2 NO
| |
| : 21. 2B31-1RCM-28AD-3 Yes 2 YES V V
| |
| : 22. 2B31-1RCM-28AD-4 Yes 4 YES
| |
| : 23. 2B31-1RCM-28AD-5 Yes 2 YES V V
| |
| : 24. 2B31-1RCM-28BD-1 Yes 2 NO
| |
| : 25. 2B31-1RCM-28BD-2 Yes 2 NO
| |
| : 26. 2B31-1RCM-28BD-3 Yes 2 YES V
| |
| : 27. 2B31-1RCM-28BD-4 Yes 4 YES
| |
| : 28. 2B31-1RCM-28BD-5 Yes 2 YES V V
| |
| : 29. 2B31-1RCM-28AS-3 Yes 4 NO Hatch 2 Basis Doc-VIP75.doc Page 17 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 TABLE 2 HATCH 2 CATEGORY A WELDS WITH EFFECTIVE HYDROGEN WATER CHEMISTRY (ASME Category B-J) 10% Sample of 67 Welds or 7 welds Each 10 Years PERIOD 1 PERIOD 2 PERI0D 3 P1 P2 P3 Category A Welds Effective SIA ECCS 3/1/1 3/1/2 3/2/1 3/2/2 3/3/1 3/3/2 4/1/1 4/1/2 4/2/1 4/3/1 4/3/2 316 NG Material H2 ? Prior Note 2 2R13 2R14 2R15 2R16 2R17 2R18 2R19 2R20 2R21 2R22 2R23 1997 1998 2000 2001 2003 2005 2007 2009 2011 2013 2015
| |
| : 30. 2B31-1RCM-28AS-4 Yes 4 NO
| |
| : 31. 2B31-1RCM-28AS-5 Yes 4 NO
| |
| : 32. 2B31-1RCM-28AS-6 Yes 2 NO
| |
| : 33. 2B31-1RCM-28AS-7 Yes 4 NO
| |
| : 34. 2B31-1RCM-28AS-8 Yes 4 NO V
| |
| : 35. 2B31-1RCM-28AS-9 Yes 2 NO V&S
| |
| : 36. 2B31-1RCM-28AS- Yes 4 NO 9BC-2
| |
| : 37. 2B31-1RCM-28AS- Yes 4 NO 9BC-4
| |
| : 38. 2B31-1RCM-28AS-10 Yes 2 NO V
| |
| : 39. 2B31-1RCM-28BS-3 Yes 4 NO
| |
| : 40. 2B31-1RCM-28BS-4 Yes 4 NO
| |
| : 41. 2B31-1RCM-28BS-5 Yes 4 NO
| |
| : 42. 2B31-1RCM-28BS-6 Yes 4 NO
| |
| : 43. 2B31-1RCM-28BS-7 Yes 2 NO
| |
| : 44. 2B31-1RCM-28BS-8 Yes 2 NO
| |
| : 45. 2B31-1RCM-28BS- Yes 4 NO 8BC-2
| |
| : 46. 2B31-1RCM-28BS- Yes 4 NO 8BC-4
| |
| : 47. 2B31-1RCM-28BS-9 Yes 2 NO
| |
| : 48. 2E11-1RHRM-20RS-1 Yes 4 NO
| |
| : 49. 2E11-1RHRM-20RS- Yes 4 NO 1BC-1
| |
| : 50. 2G31-1RWCUM-6-D-1 Yes 4 NO V
| |
| : 51. 2G31-1RWCUM-6-D-2 Yes 4 NO
| |
| : 52. 2G31-1RWCUM-6-D-3 Yes 4 NO
| |
| : 53. 2G31-1RWCUM-6-D-4 Yes 4 NO
| |
| : 54. 2G31-1RWCUM-6-D-5 Yes 4 NO Hatch 2 Basis Doc-VIP75.doc Page 18 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 TABLE 2 HATCH 2 CATEGORY A WELDS WITH EFFECTIVE HYDROGEN WATER CHEMISTRY (ASME Category B-J) 10% Sample of 67 Welds or 7 welds Each 10 Years PERIOD 1 PERIOD 2 PERI0D 3 P1 P2 P3 Category A Welds Effective SIA ECCS 3/1/1 3/1/2 3/2/1 3/2/2 3/3/1 3/3/2 4/1/1 4/1/2 4/2/1 4/3/1 4/3/2 316 NG Material H2 ? Prior Note 2 2R13 2R14 2R15 2R16 2R17 2R18 2R19 2R20 2R21 2R22 2R23 1997 1998 2000 2001 2003 2005 2007 2009 2011 2013 2015
| |
| : 55. 2G31-1RWCUM-6-D-8 Yes 4 NO V&S
| |
| : 56. 2G31-1RWCUM-6-D-9 Yes 4 NO
| |
| : 57. 2G31-1RWCUM-6-D-10 Yes 4 NO
| |
| : 58. 2G31-1RWCUM-6-D-11 Yes 4 NO
| |
| : 59. 2G31-1RWCUM-6-D-12 Yes 4 NO
| |
| : 60. 2G31-1RWCUM-6-D-13 Yes 4 NO
| |
| : 61. 2E11-1RHRM-20RS-2 No(1) 4 NO V
| |
| : 62. 2E11-1RHRM-24A-11 No(1) 4 YES
| |
| : 63. 2E11-1RHRM-24A-12 No(1) 4 YES
| |
| : 64. 2E11-1RHRM-24A-13 No(1,3) 4 YES V&S V
| |
| : 65. 2E11-1RHRM-24B-11 No(1,3) 4 YES V&S V
| |
| : 66. 2E11-1RHRM-24B-12 No(1) 4 YES
| |
| : 67. 2E11-1RHRM-24B-13 No(1) 4 YES 10% 3rd Interval Reduced Scope Sample 10% 4th Interval Reduced Scope Sample Table 2 Notes (1) These welds do not have effective HWC because of their location in stagnant lines, but they had an effective stress improvement (no deviations noted in the IHSI evaluation)
| |
| (2) None of the welds in this table are located between the drywell and the outboard isolation valve.
| |
| (3) Two of the welds without hydrogen protection were selected in the examination sample, even though there SIA Priority was low.
| |
| Hatch 2 Basis Doc-VIP75.doc Page 19 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 TABLE 3 DISSIMILAR METAL WELDS WITH EFFECTIVE STRESS IMPROVEMENT WITHOUT EFFECTIVE HYROGEN WATER CHEMISTRY (Note 1) 25% Sample of 12 Welds After Qualified Weld Examinations (3 welds)
| |
| PERIOD 1 PERIOD 2 PERIOD 3 P1 P2 P3 Crown or E 3/1/1 3/1/2 3/2/1 2R15 3/2/2 3/3/1 3/3/2 4/1/1 4/1/2 4/2/1 4/3/1 4/3/2 Cat C (B-F) Taper C 2R11 2R13 2R14 2000 2R16 2R17 2R18 2R19 2R20 2R21 2R22 2R23
| |
| ? C S 94 S 97 F 98 S 01 S 03 S 05 2007 2009 2011 2013 2015 S
| |
| : 1. 2B21-1FW-12AA-10 No Yes BASE UT-HAT- Note 3 MSIP-94 SIA-1 UT-HAT-208V0/0 208V0/1
| |
| : 2. 2B21-1FW-12AB-11 No Yes BASE UT-HAT- Note 3 MSIP-94 SIA-1 UT-HAT-208V0/0 208V0/1
| |
| : 3. 2B21-1FW-12AB-13 No Yes BASE UT-HAT- Note 3 MSIP-94 SIA-1 UT-HAT-208V0/0 208V0/1
| |
| : 4. 2B21-1FW-12BC-11 No Yes BASE UT-HAT- GE-UT- Note 4 V MSIP-94 SIA-1 UT-HAT-209V0/0 208V0/1 209/6
| |
| : 5. 2B21-1FW-12BC-13 No Yes BASE UT-HAT- GE-UT- Note 4 V MSIP-94 SIA-1 UT-HAT-209V0/0 208V0/1 209/6
| |
| : 6. 2B21-1FW-12BD-10 No Yes BASE UT-HAT- GE-UT- Note 4 MSIP-94 SIA-1 UT-HAT-208V0/0 208V0/1 209/6
| |
| : 7. 2B21-1FW-12BD-8 No Yes BASE UT-HAT- GE-UT- V MSIP-94 SIA-1 UT-HAT-208V0/0 208V0/1 209/6 Note 5
| |
| : 8. 2B31-1RC-4JP-A-1 No No BASE UT-H- UT-H- Note 6 MSIP-94 SIA-1 UT-H-409/08 409/10 409/10
| |
| : 9. 2B31-1RC-4JP-B-1 No No BASE UT-H- UT-H- Note 6 MSIP-94 SIA-1 UT-H-409/08 409/10 409/10
| |
| : 10. 2C11-1CRD-3-R-1 No No BASE UT-H- UT-H- V MSIP-94 SIA-4 UT-H-409/8 409/10 409/10 Note 7
| |
| : 11. 2E21-1CS-10A-21 No Yes BASE UT-HAT- UT-H- V V MSIP-94 SIA-1 UT-HAT-209V0/0 209V0/1 409/10 Note 8
| |
| : 12. 2E21-1CS-10B-20 No Yes BASE UT-HAT- UT-H- V MSIP-94 SIA-1 UT-HAT-209V0/0 209V0/1 409/10 Note 9 Qualified weld exam to satisfy BWRVIP-075 pre-requisite for reduced scope 25% 3rd Interval Reduced Scope Sample 25% 4th Interval Reduced Scope Sample (Note: All of the FW welds are SIA Priority 1; therefore, there is not a special basis for selecting any one of the welds. The two core spray welds were selected because they are in stagnant lines. Six of the 12 welds will receive Appendix VIII exams by 2009.
| |
| Re-examined for cause after evaluation of previous data and found acceptable by Appendix VIII examination.
| |
| Hatch 2 Basis Doc-VIP75.doc Page 20 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 Table 3 Notes
| |
| : 1. To have effective hydrogen water chemistry at Hatch requires a combination of noble metal addition and a reduced hydrogen injection rate. The Feedwater nozzle safe-ends (2B21) are not believed to have totally effective hydrogen water chemistry because the hydrogen is injected into the Feedwater lines and sufficient mixing may not have occurred. The Core Spray (2E21) safe-ends, the Jet Pump Instrument nozzle (2B31) safe-ends, and the CRD Return nozzle (2C11) safe-end are not protected by hydrogen water chemistry because of stagnant conditions due to the geometrical configuration.
| |
| : 2. Not Used
| |
| : 3. Two automated examinations were performed (1994 baseline and 1997) on welds 2B21-1FW-12AA-10, 2B21-1FW-12AB-11, and 2B21-1FW-12AB-13 using a qualified procedure and personnel qualified for IGSCC detection.
| |
| : 4. Three automated examinations were performed (1994 baseline, 1997, and 2000) on welds 2B21-1FW-12BC-11, 2B21-1FW-12BC-13, and 2B21-1FW-12BD-10 using a qualified procedure and personnel qualified for IGSCC detection. 2B21-1FW-12BC-11 and 2B21-1FW-12BC-13 will be re-examined in 2009.
| |
| : 5. Three automated examinations were performed (1994 baseline, 1997, and 2000) on weld 2B21-1FW-12BD-8 using a qualified procedure and personnel qualified for IGSCC detection. A review of the previous data indicated the need for a re-examination in 2005. The re-examination was performed in 2005. A review of the data did not indicate any basis for re-examination.
| |
| : 6. Three manual examinations were performed (1994 baseline, 1997, and 2000) on welds 2B31-1RC-4JP-A-1 and 2B31-1RC-4JP-B-1 using a qualified procedure and personnel qualified for IGSCC detection. A review of the data did not indicate any basis for re-examination.
| |
| : 7. Three examinations were performed (1994 baseline, 1997, and 2000) on weld 2C11-1CRD-3-R-1 using a qualified procedure and personnel qualified for IGSCC detection. An Appendix VIII examination was performed in 2005 with 100% coverage. It should be noted that this weld was stress improved in 1994, but effective hydrogen water chemistry is not achieved because of the stagnant configuration.
| |
| : 8. Three examinations were performed (1994 automated baseline, 1997 automated, and 2000 manual) on weld 2E21-1CS-10A-21 using a qualified procedure and personnel qualified for IGSCC detection. It should be noted that this weld was stress improved in 1994, but effective hydrogen water chemistry is not achieved because of the stagnant configuration. There were some questions regarding previous examinations; however, the weld was re-examined in 2005 without issues and will be re-examined in 2015.
| |
| : 9. Three examinations were performed (1994 automated baseline, 1997 automated, and 2000 manual) on weld 2E21-1CS-10B-20 using a qualified procedure and personnel qualified for IGSCC detection. It should be noted that this weld was stress improved in 1994, but effective hydrogen water chemistry is not achieved because of the stagnant configuration. In 2005 an Appendix VIII examination of this weld was performed with 100% coverage and this weld will be re-examined in 2015.
| |
| Hatch 2 Basis Doc-VIP75.doc Page 21 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 TABLE 4 DISSIMILAR METAL WELDS WITH EFFECTIVE STRESS IMPROVEMENT AND HYDROGEN WATER CHEMISTRY (Note 1) 10% Sample of 12 Welds After Two Qualified Weld Examinations (2 Welds)
| |
| PERIOD 1 PERIOD 2 PERIOD 3 P1 P2 P3 Cat C (B-F) Welds E 2 3 3/1/1 3/1/2 3/2/1 3/2/2 3/3/1 3/3/2 4/1/1 4/1/2 4/2/1 4/3/1 4/3/2 2R19 2R20 2R21 2R22 2R23 C 2R11 2R13 2R14 2R15 2R16 2R17 2R18 2007 2009 2011 2013 2015 C S 94 S 97 F 98 2000 S 01 S 03 S 05 S
| |
| : 1. 2B31-1RC-12AR-F-5 Y UT-H-409/5(89) UT-HAT- V IHSI-86&UT Baseline 209V0/0 Note 2 SIA Priority 1
| |
| : 2. 2B31-1RC-12AR-G-5 Y UT-H-409/5(89) UT-HAT- UT-HAT- UT-H- Note 3 IHSI-86&UT Baseline 209V0/0 209V0/1 409/10 SIA Priority 1 1997 Pickup
| |
| : 3. 2B31-1RC-12AR-H-5 Y UT-H-409/5(89) UT-HAT- GE-UT- V V IHSI-86&UT Baseline 209V0/0 209/6 Note 4 SIA Priority 1
| |
| : 4. 2B31-1RC-12AR-J-5 Y UT-H-409/5(89) UT-HAT- V V IHSI-86&UT Baseline 209V0/0 Note 2 SIA Priority 1
| |
| : 5. 2B31-1RC-12AR-K-5 Y UT-H-409/5(89) UT-HAT- UT-HAT- UT-H- V IHSI-86&UT Baseline 209V0/00 209V0/1 409/10 Note 5 SIA Priority 1 1997 Pickup
| |
| : 6. 2B31-1RC-12BR-A-5 Y UT-H-409/5(89) - UT-HAT- UT-H- Note 6 IHSI-86&UT Baseline UT-H-810/0 + 209V0/1 409/10 SIA Priority 1 UT-H-409/7(91) 1997 Pickup
| |
| : 7. 2B31-1RC-12BR-B-5 Y UT-H-409/5(89) - GE-UT- V IHSI-86&UT Baseline UT-H-810/0 + 209/6 Note 7 SIA Priority 1 UT-H-409/7(91) UT-H-409/10
| |
| : 8. 2B31-1RC-12BR-C-5 Y UT-H-409/5(89) - GE-UT- V IHSI-86&UT Baseline UT-H-810/0 + 209/6 Note 7 SIA Priority 1 UT-H-409/7(91)
| |
| Hatch 2 Basis Doc-VIP75.doc Page 22 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 TABLE 4 DISSIMILAR METAL WELDS WITH EFFECTIVE STRESS IMPROVEMENT AND HYDROGEN WATER CHEMISTRY (Note 1) 10% Sample of 12 Welds After Two Qualified Weld Examinations (2 Welds)
| |
| PERIOD 1 PERIOD 2 PERIOD 3 P1 P2 P3 Cat C (B-F) Welds E 2 3 3/1/1 3/1/2 3/2/1 3/2/2 3/3/1 3/3/2 4/1/1 4/1/2 4/2/1 4/3/1 4/3/2 2R19 2R20 2R21 2R22 2R23 C 2R11 2R13 2R14 2R15 2R16 2R17 2R18 2007 2009 2011 2013 2015 C S 94 S 97 F 98 2000 S 01 S 03 S 05 S
| |
| : 9. 2B31-1RC-12BR-D-5 Y UT-H-409/5(89) - UT-HAT- UT-H- V IHSI-86&UT Baseline UT-H-810/0 + 209V0/1 409/10 Note 7 SIA Priority 1 UT-H-409/7(91) UT-H- 1997 409/10 Pickup
| |
| : 10. 2B31-1RC-12BR- Y UT-H-409/5(89) - GE-UT- Note 6 E-5 UT-H-810/0 + 209/6 IHSI-86&UT Baseline UT-H-409/7(91)
| |
| SIA Priority 1
| |
| : 11. 2B31-1RC-28A-1 N UT-H-409/5(89) - GE-UT- Note 6 IHSI-86&UT Baseline UT-H-810/0 + 209/6 SIA Priority 1 UT-H-409/7(91)
| |
| : 12. 2B31-1RC-28B-1 N UT-H-409/5(89) - GE-UT- Note 6 IHSI-86&UT Baseline UT-H-810/0 + 209/6 SIA Priority 1 UT-H-409/7(91)
| |
| Qualified weld exam to satisfy BWRVIP-075 pre-requisite for reduced scope 10% 3rd Interval Reduced Scope Sample 10% 4th Interval Reduced Scope Sample Dissimilar metal welds that do not meet examination criteria Re-examined for cause after evaluation of previous data and found acceptable by Appendix VIII examination.
| |
| Hatch 2 Basis Doc-VIP75.doc Page 23 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 Table 4 Notes
| |
| : 1. Each weld had an effective IHSI stress improved in 1986 and effective hydrogen water chemistry is implemented.
| |
| : 2. Welds 2B31-1RC-12AR-F-5 and 2B31-1RC-12AR-J-5 have been examined twice using a qualified procedure and personnel qualified for IGSCC detection. A manual examination was performed in 1989 and an automated examination was performed in 1994. These welds have a CE repair history and have an ECCS function. After evaluation of the data it was determined that with the repair history and some issues with the data, an additional automated examination would be performed in 2005.
| |
| These welds were Appendix VIII examined in 2005 with no issues. 2B31-1RC-12AR-J-5 will be re-examined in 2015.
| |
| : 3. Weld 2B31-1RC-12AR-G-5 has been examined three times using a qualified procedure and personnel qualified for IGSCC detection. A manual examination was performed in 1989. Automated examinations were performed in 1994 and 1997. The exam shown in 2000 is a manual pickup to complete the 1997 exam. This weld does not have a CE repair history. After evaluation of the data, with a 1994 and 1997 automated examination and with no repair history, this weld was not selected for future examinations.
| |
| : 4. Weld 2B31-1RC-12AR-H-5 has been examined three times using a qualified procedure and personnel qualified for IGSCC detection. A manual examination was performed in 1989 and automated examinations were performed in 1994 and 2000. This weld has a CE repair history and has an ECCS function. After evaluation of the data it was determined that with the repair history and NDE data issues, an automated examination would be performed in 2005. This weld was Appendix VIII examined in 2005 with no issues. It will be re-examined in 2015.
| |
| : 5. Weld 2B31-1RC-12AR-K-5 has been examined three times using a qualified procedure and personnel qualified for IGSCC detection. A manual examination was performed in 1989. Automated examinations were performed in 1994 and 1997. The exam shown in 2000 is a manual pickup to complete the 1997 exam. This weld does not have a CE repair history. After evaluation of the data it was determined that due to issues with the NDE data, an automated examination would be performed in 2005. This weld was Appendix VIII examined in 2005 with no issues.
| |
| : 6. Welds 2B31-1RC-12BR-A-5, 2B31-1RC-12BR-E-5, 2B31-1RC-28A-1, and 2B31-1RC-28B-1 have been examined three times using a qualified procedure and personnel qualified for IGSCC detection.
| |
| A manual examination was performed in 1989. PSCAN automated examinations were performed in 1991 on all the welds. Weld A-5 had a GE automated examination in 1997 and the other welds had a GE automated examination in 2000. These welds do not have a CE repair history. There are no issues with the data and there is no repair history; therefore, these welds were not selected for future examinations
| |
| : 7. Welds 2B31-1RC-12BR-B-5, 2B31-1RC-12BR-C-5 ,and 2B31-1RC-12AR-D-5 have been examined three times using a qualified procedure and personnel qualified for IGSCC detection. A manual examination was performed in 1989. PSCAN automated examinations were performed in 1991 on all the welds. Weld D-5 had a GE automated examination in 1997 and the other welds had a GE automated examination in 2000. These welds have a CE repair history and have an ECCS function.
| |
| There were no issues with the data; however, because of the repairs they were selected for an additional examination in 2005. This weld was Appendix VIII examined in 2005 with no issues..
| |
| Hatch 2 Basis Doc-VIP75.doc Page 24 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 TABLE 5 SIMILAR METAL WELDS WITH EFFECTIVE STRESS IMPROVEMENT WITHOUT EFFECTIVE HYROGEN HWC (Note 1) 25% Sample of 5 Welds After Two Qualified Weld Examinations (2 Welds)
| |
| PERIOD 1 PERIOD 2 PERIOD 3 P1 P2 P3 Category C (B-J) Welds E 1 2 3 3/1/1 3/1/2 3/2/1 2R15 3/2/2 3/3/1 3/3/2 4/1/1 4/1/2 4/2/1 4/3/1 4/3/2 C 2R11 2R13 2R14 2000 2R16 2R17 2R18 2R19 2R20 2R21 2R22 2R23 C S 94 S 97 F 98 S 01 S 03 S 05 2007 2009 2011 2013 2015 S
| |
| : 1. 2B21-1FW-12AB-12 Y NA NA BASE UT-HAT- Note 2 MSIP-1994 UT-HAT- 208V0/1 SIA Priority 1 208V0/0
| |
| : 2. 2B21-1FW-12BC-12 Y NA NA BASE UT-HAT- GE-UT-230/2 Note 2 V MSIP-1994 UT-HAT- 208V0/1 SIA Priority 4 208V0/0
| |
| : 3. 2B21-1FW-12BD-9 Y NA NA BASE UT-HAT- UT-H-402/1 Note 2 V MSIP-1994 UT-HAT- 208V0/1 SIA Priority 4 208V0/0
| |
| : 4. 2B31-1RC-4JP-A-2 N NA NA BASE UT-H- Note 3 MSIP-1994 UT-H- 400/16 400/12
| |
| : 5. 2B31-1RC-4JP-B-2 N NA NA BASE UT-H- Note 3 MSIP-1994 UT-H- 400/16 400/12 Qualified weld exam to satisfy BWRVIP-075 pre-requisite for reduced scope 25% 3rd Interval Reduced Scope Sample 25% 4th Interval Reduced Scope Sample (moved exams to a higher SIA Priority)
| |
| Hatch 2 Basis Doc-VIP75.doc Page 25 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 Table 5 Notes
| |
| : 1. Each weld was stress improved with MSIP in 1994. MSIP is considered to be an effective stress improvement process. Effective hydrogen water chemistry at Hatch is implemented using noble metal addition and a reduced hydrogen injection rate. The Feedwater nozzle safe-ends (2B21) are not believed to have totally effective hydrogen water chemistry because the hydrogen is injected into the Feedwater lines and sufficient mixing may not have occurred.
| |
| The Jet Pump Instrument nozzle (2B31) safe-ends are not protected by hydrogen water chemistry because of stagnant conditions due to the geometrical configuration. With a stagnant condition it is unlikely that the welds were coated with noble metal.
| |
| : 2. Two examinations were performed using NDE personnel qualified for IGSCC detection.
| |
| These examinations were a 1994 automated baseline using GE procedure UT-HAT-208V0/0 and a 1997 automated inservice examination using GE procedure UT-HAT-208V0/1. As discussed in the Qualified Examination section of this report UT-HAT-208V0/0 and UT-HAT-208V0/1 both utilized the same essential variables as were later used for PDI demonstrations (on dissimilar metal welds). Therefore, these examinations met the BWRVIP-075 requirement for qualified examinations. In addition, welds 2B21-1FW-12BC-12 and 2B21-1FW-12BD-9 were re-examined in 2000 using a qualified procedure and personnel qualified for IGSCC detection. These 2000 examinations were performed after the March 1, 1996 (transition letter) and about the time Appendix VIII stainless was implemented for stainless steel piping (5/22/2000). Welds 2B21-1FW-12BC-12 and 2B21-1FW-12BD-9 have an ECCS function (HPCI injection path) and their re-examination satisfies the 25% sample rate during the 3rd 10-year interval. They will be re-examined in 2015.
| |
| : 3. Two examinations were performed using SNC manual examination procedures and NDE personnel qualified for IGSCC detection. These examinations were a 1994 manual baseline using procedure UT-H-400/12 (pre-1996 transition letter) and a 1997 inservice examination using procedure UT-H-400/16 (post-1996 transition letter). While UT-H-400/12 was developed and used prior to the 1996 transition letter, it used similar techniques to those used later in UT-H-400/16, and therefore it is also considered to meet the intent of the BWRVIP-075 requirements for a qualified examination.
| |
| Hatch 2 Basis Doc-VIP75.doc Page 26 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 TABLE 6 SIMILAR METAL WELDS WITH EFFECTIVE STRESS IMPROVEMENT AND HYDROGEN WATER CHEMISTRY (Note 1) 10% Sample of 18 Welds After Two Qualified Weld Examinations (2 Welds)
| |
| PERIOD 1 PERIOD 2 PERIOD 3 P1 P2 P3 Category C (B-J) Welds E 1 2 3 3/1/1 3/1/2 3/2/1 2R15 3/2/2 3/3/1 3/3/2 4/1/1 4/1/2 4/2/1 4/3/1 4/3/2 C 2R11 2R13 2R14 S 00 2R16 2R17 2R18 2R19 2R20 2R21 2R22 2R23 C S 94 S 97 F 98 S 01 S 03 S 05 2007 2009 2011 2013 2015 S
| |
| : 1. 2B31-1RCM-12AF-3 Y UT-H- - - GE-UT- Note 2 IHSI-84(1) 401/6 (88) 230/2 SIA Priority 4
| |
| : 2. 2B31-1RCM-12AG-2 Y UT-H- - - UT-HAT- Note 3 IHSI-84(1) 401/6 (88) 208V0/1 SIA Priority 4
| |
| : 3. 2B31-1RCM-12AH-2 Y UT-H- - - GE-UT- Note 2 IHSI-84(1) 401/6 (88) 230/2 SIA Priority 4
| |
| : 4. 2B31-1RCM-12AJ-2 Y UT-H- - - GE-UT- Note 2 IHSI-84(1) 401/6 (88) 230/2 SIA Priority 4
| |
| : 5. 2B31-1RCM-12AK-3 Y UT-H- - - UT-HAT- GE-UT- Note 3 V IHSI-84(1) 401/6 (88) 208V0/1 230/2 SIA Priority 4
| |
| : 6. 2B31-1RCM-12BA-3 Y UT-H- - - UT-HAT- Note 3 IHSI-84(1) 401/6 (88) 208V0/1 SIA Priority 4
| |
| : 7. 2B31-1RCM-12BB-2 Y UT-H- - - GE-UT- Note 2 IHSI-84(1) 401/6 (88) 230/2 SIA Priority 4
| |
| : 8. 2B31-1RCM-12BC-2 Y UT-H- - - GE-UT- Note 2 IHSI-84(1) 401/6 (88) 230/2 SIA Priority 4
| |
| : 9. 2B31-1RCM-12BD-2 Y UT-H- - - UT-HAT- GE-UT- Note 3 V IHSI-84(1) 401/6 (88) 208V0 230/2 SIA Priority 4
| |
| : 10. 2B31-1RCM-12BE-3 Y UT-H- - - GE-UT- Note 2 IHSI-84(1) 401/6 (88) 230/2 SIA Priority 4 Hatch 2 Basis Doc-VIP75.doc Page 27 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 TABLE 6 SIMILAR METAL WELDS WITH EFFECTIVE STRESS IMPROVEMENT AND HYDROGEN WATER CHEMISTRY (Note 1) 10% Sample of 18 Welds After Two Qualified Weld Examinations (2 Welds)
| |
| PERIOD 1 PERIOD 2 PERIOD 3 P1 P2 P3 Category C (B-J) Welds E 1 2 3 3/1/1 3/1/2 3/2/1 2R15 3/2/2 3/3/1 3/3/2 4/1/1 4/1/2 4/2/1 4/3/1 4/3/2 C 2R11 2R13 2R14 S 00 2R16 2R17 2R18 2R19 2R20 2R21 2R22 2R23 C S 94 S 97 F 98 S 01 S 03 S 05 2007 2009 2011 2013 2015 S
| |
| : 11. 2B31-1RCM-28AS-2 N UT-H- - - GE-UT- Note 2 IHSI-84(1) 401/6 (88) 230/2 SIA Priority 4
| |
| : 12. 2B31-1RCM-28BS-2 N UT-H- - - GE-UT- Note 2 IHSI-84(1) 401/6 (88) 230/2 SIA Priority 4
| |
| : 13. 2G31-1RWCUM-6-D-6 N UT-H- - - UT-H- Note 4 IHSI-84(1) 401/6 (88) 400/16 SIA Priority 2
| |
| : 14. 2G31-1RWCUM-6-D-7 N UT-H- UT-H- Note 4 IHSI-84(1) 401/6 (88) 400/16 SIA Priority 2
| |
| : 15. 2G31-1RWCUM-6-D-14 N UT-H- - - UT-H- Note 4 IHSI-84(1) 401/6 (88) 402/1 SIA Priority 2
| |
| : 16. 2G31-1RWCUM-6-D-15 Y UT-H- - - UT-H- Note 4 V V IHSI-84(1) 401/6 (88) 402/1 SIA Priority 4
| |
| : 17. 2G31-1RWCUM-6-D-16 Y UT-H- - - UT-H- Note 4 V V IHSI-84(1) 401/6 (88) 402/1 SIA Priority 2
| |
| : 18. 2G31-1RWCU-6-D-17 N UT-H- - - UT-H- Note 4 V V IHSI-84(1) 400/7 (88) 402/1 SIA Priority 2 Qualified weld exam to satisfy BWRVIP-075 pre-requisite for reduced scope 10% 3rd Interval Reduced Scope Sample 10% 4th Interval Reduced Scope Sample High Energy - Examine 100%
| |
| (1) Baseline examination performed in 1984 after IHSI using UT-H-401/3, Dev. 1.
| |
| Hatch 2 Basis Doc-VIP75.doc Page 28 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 Table 6 Notes
| |
| : 1. Each weld had an effective IHSI stress improved in 1986 and effective hydrogen water chemistry is implemented.
| |
| : 2. Two examinations were performed using NDE personnel qualified for IGSCC detection. These examinations were a 1988 inservice examination using SNC manual procedure UT-H-401/6 (pre-1996 transition letter) and a 2000 automated inservice examination using GE procedure GE-UT-230/2 (post-1996 transition letter). While UT-H-401/6 was developed and used prior to the 1996 transition letter, it used similar techniques to those used in post-1996 implementation letter IGSCC detection procedures ,
| |
| and therefore it is also considered to meet the intent of the BWRVIP-075 requirements for a qualified examination. The 2000 automated examinations were performed after the March 1, 1996 transition letter and about the time Appendix VIII was implemented for stainless steel piping (5/22/2000) and also meet the BWRVIP-075 requirements for a qualified examination.
| |
| : 3. Two examinations were performed using NDE personnel qualified for IGSCC detection. These examinations were a 1988 inservice examination using SNC manual procedure UT-H-401/6 (pre-1996 transition letter) and a 1997 automated inservice examination using GE procedure UT-HAT-208V0/1(post-1996 transition letter). While UT-H-401/6 was developed and used prior to the 1996 transition letter, it used similar techniques to those used in post-1996 implementation letter IGSCC detection procedures , and therefore it is also considered to meet the intent of the BWRVIP-075 requirements for a qualified examination. The 1997 post-1996 transition letter examinations using UT-HAT-208V0/1 utilized the same essential variables as were later used for PDI demonstrations (on dissimilar metal welds). Therefore, these examinations met the BWRVIP-075 requirement for two qualified examinations.
| |
| Additionally, welds 2B31-1RCM-12AK-3 and 2B31-1RCM-12BD-2 (which have an ECCS function) were re-examined in 2000 using GE automated procedure GE-UT-230/2. These 2000 automated examinations were performed after the March 1, 1996 transition letter and about the time Appendix VIII was implemented for stainless steel piping (5/22/2000). These two examinations satisfied the 10%
| |
| examination requirement.
| |
| : 4. These six Category C welds join replacement piping made from resistant material (316NG) to original RWCU valves (or the containment penetration in one case). Two examinations were performed on each weld using NDE personnel qualified for IGSCC detection. In 1988 an inservice examination using SNC manual procedure UT-H-401/6 (pre-1996 transition letter) was performed on all six welds. While UT-H-401/6 was developed and used prior to the 1996 transition letter, it used similar techniques to those used in post-1996 implementation letter IGSCC detection procedures , and therefore it is also considered to meet the intent of the BWRVIP-075 requirements for a qualified examination.
| |
| : 5. 2G31-1RWCUM-6-D-6&7 were re-examined in 1997 using SNC manual procedure UT-H-400/16.
| |
| These examinations were performed after the March 1, 1996 transition letter and are considered as qualified examinations. In 2000, an inservice examination was performed on the remaining four welds using SNC manual procedure UT-H-402/1. These 2000 automated examinations were performed after the March 1, 1996 transition letter and about the time Appendix VIII was implemented for stainless steel piping (5/22/2000).
| |
| Hatch 2 Basis Doc-VIP75.doc Page 29 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 TABLE 7 CATEGORY D WELDS Cat D Welds C S E 1 2 3 3/1/1 3/1/2 3/2/1 3/2/2 3/3/1 3/3/2 4/1/1 4/1/2 4/2/1 4/3/1 4/3/2 R I C 2R11 2R13 2R14 2R15 2R16 2R17 2R18 2R19 2R20 2R21 2R22 2R23 (Limited Hydrogen O A C S 94 S 97 F 98 2000 S 01 S 03 S 05 2007 2009 2011 2013 2015 Protection) W S N
| |
| : 1. 2E11-1RHRM-20RS-3 1 N UT-H- UT-H- - UT-H- V V V IHSI-84(1) 401/6 409/5 409/10 (88) (89)
| |
| : 2. 2E11-1RHRM-24A-10 Y 1 Y UT-H- UT-H- - UT-H- V V V IHSI-84(1) 401/6 409/5 409/10 (88) (89)
| |
| : 3. 2E11-1RHRM-24B-10 Y 1 Y UT-H- UT-H- UT-H- V V V IHSI-84(1) 401/6 409/5 409/10 (88) (89)
| |
| : 4. 2B21-1FW-12AA-8 Y UT- V V MSIP-94 SIA-1 HAT-208V0/
| |
| 1 Hatch 2 Basis Doc-VIP75.doc Page 30 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 TABLE 8 CATEGORY E WELDS Category E Welds Description 2/1 2/2 2/3 3/1 3/1 3/3 4/1/1 4/1/2 4/2/1 4/3/1 4/3/2 2R19 2R20 2R21 2R22 2R23 2007 2009 2011 2013 2013 2B21-1FW-12AA-9 SAFE-END EXTENSION 86 89 92 1997 using 2005 V TO SAFE-END OVERLAY 91 94 UT-HAT-212V0 (App.
| |
| UT-H-408 VIII)
| |
| Hatch 2 Basis Doc-VIP75.doc Page 31 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 APPENDIX A DETERMINATION OF QUALIFIED EXAMINATIONS Per BWRVIP-075, the training and qualification of examiners and procedures for application to BWR stainless steel piping welds was established in the mid 1980s and governed under the IGSCC/NDE Coordination Plan, also referred to as the Three Party Agreement. The IGSCC/NDE Coordination Plan was jointly developed and approved by the NRC, EPRI, and the BWR Owners Group on IGSCC Research and was documented in GL88-01 and NUREG-0313, Rev 2. GL 88-01 states in part: the detailed procedure, equipment and examination personnel shall be qualified by a formal program approved by the NRC such as that being conducted in accordance with the NDE Coordination Plan agreed upon by NRC, EPRI and the BWROG. The most significant improvements in inspection methods were well implemented by 1988, and the examinations performed since that time (and in accordance with GL 88-01) are considered very reliable. Per BWRVIP-075, personnel and procedures used for the examination of piping must have been and will continue to be in accordance with one of the following two documents.
| |
| o The program identified in William T. Russell, Transition From the IGSCC Qualification Program to the Performance Demonstration Initiative Program, letter to K. P. Donovan, March 1, 1996.
| |
| o Performance Demonstration Initiative (PDI), Performance Description, Revision 1, Change 1, December 1996 (or later).
| |
| For HNP-2, the timing of the implementation of these improved inspection methods is contingent on the type of weld. Dependent upon the type of weld (dissimilar or similar), the improvements in inspection methods may have been adopted prior to the William T. Russell 1996 letter. These weld types are addressed below.
| |
| Dissimilar Metal Welds - These welds have historically been difficult to examine for IGSCC detection due to their configuration. Because of this difficulty, GE issued SIL-455 which incorporated L-wave techniques and other improvements for the detection of IGSCC. Since the issuance of SIL-455, other issues have been identified concerning the weld crown configuration. It is the position of M&IS Level III personnel, that when NDE personnel qualified for IGSCC detection used NDE procedures incorporating SIL-455, that the examinations were qualified provided that the existing weld crown contours would now be acceptable for Appendix VIII examinations. In general, those examinations performed on welds that would not meet Appendix VIII requirements for weld crowns would not be considered as qualified examinations. Acceptable procedures are:
| |
| : a. GE procedure UT-HAT-208 Version 0, Revision 0 and up, Procedure for Automated Ultrasonic Examination of Similar and Dissimilar Metal Piping Welds used the same essential variables that were used for Appendix VIII qualification.
| |
| Hatch 2 Basis Doc-VIP75.doc Page 32 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 This procedure was used in 1994 and 1997 and meets the BWRVIP-075 intent for a qualified procedure.
| |
| : b. GE procedure UT-HAT-209 Version 0, Procedure for Automated Ultrasonic Examination of Dissimilar Metal Piping Welds used the improved refracted L wave inspection techniques per GE SIL 455 and examination personnel were qualified for IGSCC detection. This procedure was used in 1994 and 1997 and meets the BWRVIP-075 intent for a qualified procedure.
| |
| : c. GE procedure GE-UT-209 Revision 6, Procedure for Automated Ultrasonic Examination of Dissimilar Metal Piping Welds used the same essential variables that were used for Appendix VIII qualification. This procedure was used in 2000 and meets the BWRVIP-075 intent for a qualified procedure.
| |
| : d. SNC Procedure UT-H-409, Revisions 5 and up used the improved refracted L wave inspection techniques per GE SIL 455, Revision 1 and examination personnel were qualified for IGSCC detection. Versions of this procedure were used in 1989, 1994, 1997, and 2000 and meets the BWRVIP-075 intent for a qualified procedure.
| |
| : e. SNC Procedure UT-H-810/0 used the P-SCAN and used the improved refracted L wave inspection techniques per GE SIL 455, Revision 1 and examination personnel were qualified for IGSCC detection. This procedure was used in 1991 and meets the BWRVIP-075 intent for a qualified procedure.
| |
| Similar Metal Welds - For similar metal welds, it is the position for HNP-2 that the NDE techniques (personnel and procedures) used from 1988 until the present are considered acceptable for the detection of IGSCC. Therefore, those welds receiving an examination by IGSCC qualified personnel using one of the below listed procedures has received a qualified examination.
| |
| : a. GE procedure UT-HAT-208 Version 0, Revision 0 and up, Procedure for Automated Ultrasonic Examination of Similar and Dissimilar Metal Piping Welds used the same essential variables that were used for Appendix VIII qualification.
| |
| This procedure was used in 1994 and 1997 and meets the BWRVIP-075 intent for a qualified procedure.
| |
| : b. GE procedure GE-UT-230/2. This procedure was used in 2000 after the issuance of the Transition From the IGSCC Qualification Program to the Performance Demonstration Initiative Program, 1996 letter and thus meets the BWRVIP-075 intent for a qualified procedure.
| |
| : c. SNC procedure UT-H-402/1. This procedure was used in 2000 after the issuance of the Transition From the IGSCC Qualification Program to the Performance Demonstration Initiative Program, 1996 letter and thus meets the BWRVIP-075 intent for a qualified procedure.
| |
| Hatch 2 Basis Doc-VIP75.doc Page 33 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2
| |
| : d. SNC procedure UT-H-400/16. This procedure was used in 1997 after the issuance of the Transition From the IGSCC Qualification Program to the Performance Demonstration Initiative Program, 1996 letter and thus meets the BWRVIP-075 intent for a qualified procedure.
| |
| : e. SNC procedure UT-H-400/12. This procedure was used in 1994 before the issuance of the Transition From the IGSCC Qualification Program to the Performance Demonstration Initiative Program, 1996 letter. However, the techniques are similar to that for Revision 16; therefore, it meets the BWRVIP-075 intent for a qualified procedure.
| |
| : f. SNC procedure UT-H-401/8. This procedure was used in 1988 before the issuance of the Transition From the IGSCC Qualification Program to the Performance Demonstration Initiative Program, 1996 letter. However, the techniques are similar to that for current revisions; therefore, it meets the BWRVIP-075 intent for a qualified procedure.
| |
| Hatch 2 Basis Doc-VIP75.doc Page 34 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 APPENDIX B DETERMINATION OF EFFECTIVE HYDROGEN WATER (HWC)
| |
| Per BWRVIP-075, plants that operate with effective HWC may further reduce their inspection frequency. The definition of effective HWC is provided in Section 3.6 of BWRVIP-075. BWRVIP states that licensees that take credit for HWC should verify and validate that an effective HWC program, in accordance with the staff-approved BWRVIP-62 guidelines, has been achieved. BWRVIP-62, titled Technical Basis for Inspection Relief for BWR Internal Components with Hydrogen Injection, provides the technical bases and criteria for an effective HWC/NMCA program to mitigate IGSCC of BWR internals and to demonstrate that inspection relief is justified for BWR internals. HNP-2 will follow the guidance in BWRVIP-62 for an effective HWC program in regards to piping and vessel internals inspection relief.2 HNP-2 has overall effective hydrogen water chemistry (HWC) as determined by the measured ECP value at the bottom of the RPV. To achieve effective HWC, HNP-2 periodically injects noble metal and continuously injects a reduced level of hydrogen.
| |
| Issue By EPRI letter dated April 27, 2006 from Robin Dyle and Tom Mulford, the BWRVIP issued instructions to the industry that generic application of inspection relief for HWC or NMCA should not be used until the NRC SE on BWRVIP-62 is issued. The letter also indicated that the application of BWRVIP-62 to BWRVIP-75-A inspections is not generically authorized, but plant-specific application can be pursued with the NRC as noted on Footnote 1 of Table 3-1 or in Section 3.6 of BWRVIP-75-A.
| |
| | |
| ===Response===
| |
| HNP is using specific relief.
| |
| Evaluation By letter dated June 23, 2000, SNC submitted a request to adopt the guidance contained in the October 1999 version of BWRVIP-75 for weld examination sample determination and scope expansion criteria, beginning with the Unit 1 Fall 2000 outage. By letter dated October 10, 2000 the NRC issued a letter enclosing the HNP Safety Evaluation (SE).
| |
| Within the HNP SE the NRC indicated that the NRC staff had reviewed the BWRVIP-75 report (and issued its generic Safety Evaluation (SE) in a letter dated September 15, 2000) and found VIP-75 acceptable except for certain open items. One of these open items dealt with defining effective hydrogen water chemistry (HWC). Section 3.6 of BWRVIP-75 stated, for the purposes of this report, effective HWC (including NMCA) is any combination of electrochemical corrosion potential(ECP) and percent availability that results in a factor of improvement of 3, or higher on crack growth as defined using the means described in BWRVIP-62. To address the NRC questions SNC provided justification in the form of an attachment to the June 23, 2000 letter. It stated:
| |
| Hatch 2 Basis Doc-VIP75.doc Page 35 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 The Chemistry Monitoring Program at Plant Hatch provides guidance for operating both Units in accordance with the EPRI BWR Water Chemistry guidelines. Water chemistry control parameters are monitored and action levels are used by plant staff members to correct water chemistry conditions and evaluated those conditions, as required.
| |
| Hatch Unit 2 has been operating with HWC since September of 1991. From May 1994 to March 2000 (Cycles 12, 13, 14, &15), Unit 2 has operated under moderate HWC with hydrogen injection at 35 - 55 SCFM, conductivity measured in the 0.08 to 0.14 S/cm range, and Electro-Chemical Potential (ECP) measurements in the -400 to -450 SHE range. HWC availability has been maintained at > 80% since the initial implementation. At the shutdown of Cycle 15 (Spring 2000), NobleChem (NMCA) was added to Unit 2. The NobleChem addition was implemented with both reactor coolant system (RCS) recirculation pumps in operation to achieve as much distribution to the RCS piping as possible. During Cycle 16 (current cycle), hydrogen injection has been maintained at 6 to 8 SCFM and ECP is measured at -450 to -480 SHE.
| |
| Within the HNP SE, the NRC concluded that SNCs response to the open item in the BWRVIP-75 SE was acceptable. Therefore specific relief regarding the HWC/NMCA program at Hatch was granted.
| |
| Footnote 1 of Table 3-1 of BWRVIP-75-A states, For the examination sample percentages that are less than required by ASME Section XI, a licensee will need to pursue an alternative to 10 CFR 50.55a requirements for category B-J and B-F welds pursuant to 10 CFR 50.55a(a)(3)(i).
| |
| Pursuant to 10 CFR 50.55a(a)(3)(i), SNC submitted alternative RR-39 for the 3rd Interval and approval was granted by the NRC on January 7, 2005. For the 4th Interval SNC submitted ISI-ALT-3 which was approved by the NRC on December 22, 2005.
| |
| Current Implementation of HWC and NMCA ISI-ALT-3 was submitted to continue use of the guidance contained in the Electric Power Research Institute (EPRI) proprietary report TR-113932, "BWR Vessel and lnternals Project, Technical Basis for Revisions to Generic Letter 88-01 Inspection Schedules (BWRVIP-75)," dated October 1999, as revised by the Nuclear Regulatory Commission (NRC) staff's final Safety Evaluation dated May 14, 2002, in lieu of the licensee's commitments to Generic Letter 88-01 and NUREG-0313, Revision 2. The NRC staff concluded that the licensee's proposed alternative provides an acceptable level of quality and safety. The NRC staff authorized the proposed alternative for the fourth 10-year inservice inspection interval. Dennis Rickertson was requested to compare the HWC/NMCA program at Hatch versus the NRC Open Item 3.8 in the NRCs SE and subsequently supplied the following information.
| |
| Hatch 2 Basis Doc-VIP75.doc Page 36 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 Information Summary To provide verification and validation of the effective HWC program at Hatch - May 3, 2006
| |
| | |
| ==References:==
| |
| | |
| NRC SE for BWRVIP-75-A and the NRC BWRVIP-75-A report NRC Letter
| |
| | |
| ==Subject:==
| |
| SE for BWRVIP-62 January 30, 2001 BWRVIP letter to the NRC
| |
| | |
| ==Subject:==
| |
| Supplementary Information on Implementation of BWRVIP-62 December 17, 2004 Hatch IGSCC Mitigation History and Strategy Hydrogen Water Chemistry was initiated to mitigate IGSCC of Recirculation System piping (Unit 1 Sept 1987, Unit 2 Sept 1991). From 1992 to 1995, hydrogen injection flow rates were gradually increased from 22 SCFM to 50 SCFM to mitigate IGSCC of reactor vessel internal lower plenum area. From 1995 to 1999, Hatch operated with moderate hydrogen injection rates of 45 to 55 SCFM. NMCA was applied to Unit 1 at the End of Cycle (EOC) 18 in March of 1999 and Unit 2 at the EOC 15 in March of 2000. For the operating cycle after NMCA, the target hydrogen injection flow rates were set at 10 SCFM (0.26 ppm) in the feedwater. From 1998 to 2002, SNC participated in the Japanese Owners Group (JOG) program which evaluated HNP-2 reactor vessel lower head region for protection via extensive ECP monitoring.
| |
| Current HNP IGSCC Mitigation Strategy is to continue to use NMCA with hydrogen injection at 10 SCFM. The primary methods of monitoring hydrogen water chemistry effectiveness of mitigating IGSCC are ECP monitoring and Noble Metal durability monitoring. Also the feedwater hydrogen injection flow rate is monitored and the Molar Ratio of Hydrogen to Oxidants is calculated using the BWRVIA computer model. These two methods are secondary methods of monitoring HWC effectiveness. At a hydrogen injection flowrate of 10 SCFM, ECP values are normally -450 to -490 mV (SHE) at the Bottom Head Drain Line, Recirculating System piping, and MMS.
| |
| Also with the feedwater hydrogen injection flow rate of 10 SFFM, the results of the BWRVIA model indicate Molar Ratios greater than 3 in the recirculation piping and reactor internals (except the mixing plenum) locations. A Molar Ratio greater than 3 indicates ECP values are in the - 400 mV range. The BWRVIA model indicates that at a Feedwater hydrogen injection rate of 10 SCFM the Molar Ratio in the Recirculating System piping is greater than 10. The NRC SE for BWRVIP-62 (letter of Jan 30, 2001) indicates: for an acceptable NMCA program the Molar Ratio should be 4 and above, and that HWC % availability should be > 90%. Supplementary information was provided to the NRC (BWRVIP letter of December 17, 2004) indicating that a molar ratio of > 3 is sufficient to mitigate IGSCC (ECP < -230 mV).
| |
| Results of the Hatch HWC Percent Availability calculations indicate that for Unit 1 since November 1997, the percent availability has been greater than 80 %. For Unit 2, since April 1997, the percent availability has been greater than 80 %. Both Units have HWC percent availability > 90 % after the NMCA applications: Unit 1 1999 EOC18, and Unit 2 2000 EOC15.
| |
| Hatch 2 Basis Doc-VIP75.doc Page 37 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 Unit 1 Unit 2 Cycle % HWC Availability Cycle % HWC Availability 18 98.2 14 93 19 91.1 15 84.5 20 94 16 97.2 21 98 17 96.9 22 97.6 18 98.8 23 86.5 (current cycle) 19 98.14 (current cycle)
| |
| Water Chemistry and durability monitoring results will be reviewed periodically with GE to determine when NMCA should be re-applied.
| |
| Locations Where Effective HWC/NMCA is Not Credited It should be noted that while HNP-1 has effective HWC, individual welds may or may not have effective HWC because of their location. To have effective HWC at each weld of interest, the noble metal must have plated out on each weld to provide protection for the weld, and the water chemistry at each weld must have sufficient hydrogen to sufficiently lower the oxygen content. For HNP-1, all welds are considered to have effective HWC except for the following.
| |
| o Welds located in stagnant areas, including:
| |
| Core Spray nozzles - carbon steel pipe to stainless safe-end extension (1 dissimilar metal weld per nozzle), stainless steel safe-end extension to stainless steel safe-end (1 similar metal weld per nozzle), and stainless steel safe-end to Inconel buttered nozzle (1 dissimilar metal weld per nozzle).
| |
| Jet Pump Instrument safe-end welds (2 nozzles with 2 welds on each nozzle).
| |
| CRD nozzle to cap weld (1 nozzle with 1 weld).
| |
| o Welds located in piping with no flow during power operation including:
| |
| * RHR Suction Line - Welds downstream of the RWCU connection.
| |
| * RHR Injection Lines - All welds.
| |
| The Recirculation Inlet nozzle to safe-end welds were also evaluated because they are covered by a thermal sleeve. Per drawing 2-BF-2, the thermal sleeve is open-ended on the downstream side. Therefore, flow turbulence inside the RPV can cause flow under the thermal sleeve and these welds are considered as protected by hydrogen water chemistry.
| |
| Hatch 2 Basis Doc-VIP75.doc Page 38 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 APPENDIX C DETERMINATION OF EFFECTIVE STRESS IMPROVEMENT Processes used at HNP-2 were Induction Heating Stress Improvement (IHSI) and the Mechanical Stress Improvement Process (MSIP). Internal meetings were held on August 2-3, 2003 to assess compliance with the Draft A-Version of BWRVIP-075 that, The Owner must ensure that an effective stress improvement was achieved. It was agreed that those welds receiving an MSIP treatment had an effective stress improvement; however, it was concluded that SNC had not performed sufficient actions to ensure that an effective stress improvement was achieved for those welds receiving the IHSI process. To provide this assurance, it was recommended that the NUTECH process for IHSI at Hatch be evaluated against later BWRVIP-61 recommendations for an effective stress improvement using the following criteria:
| |
| o If the NUTECH procedures met the BWRVIP-61 guidelines, then an effective IHSI was considered to have been performed.
| |
| o For those welds where the NUTECH procedure did not meet BWRVIP-61 guidance, if the NUTECH data complied with the BWRVIP-61 parameters, then an effective stress improvement was considered to have been performed.
| |
| o For those welds whose data did not meet the BWRVIP-61 parameters, an evaluation was to be performed to determine the effectiveness of the stress improvement.
| |
| As a result, the IHSI process for each weld was independently evaluated by Martin B.
| |
| Sims in Southern Company Generation and Energy Marketing Power Engineering -
| |
| Metallurgy & Material Applications. Report Number 04-MT-086, Plant Hatch Units 1
| |
| & 2 IHSI Effectiveness Review is being issued by Metallurgy & Material Applications to document the results. An E-Mail from M. B. Sims to M. Belford dated April 23, 2004 gave preliminary results which are shown below in italics. This E-Mail indicates that there is an issue with proving that the three dissimilar metal RHR welds had an effective IHSI process. Until other evidence is provided, these three RHR welds (2E11-1RHRM-20RS-3, 2E11-1RHRM-24A-10, and 2E11-1RHRM-24B-10) are considered as not having a effective IHSI process and are conservatively designated as Category D.
| |
| Some minor deviations from the recommended IHSI process parameters were noted, however, these deviations were either supported by mockup testing or not detrimental to IHSI effectiveness. As an example, the induction frequency was less than recommended 3-4 kHz range of BWRVIP-61 for all but one weld, but within the NUTECH procedure limit of 3-4 kHz +/-10%. Based on discussion with Tony Giannuzzi at Structural Integrity Associates (author of BWRVIP-61), a small reduction in induction frequency would produce deeper heating in the weld and not reduce IHSI effectiveness.
| |
| Therefore, these minor deviations in induction frequency do not affect IHSI effectiveness.
| |
| Hatch 2 Basis Doc-VIP75.doc Page 39 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL VIP-75 AUGMENTED PLAN HATCH UNIT NO. 2 Several nozzle-to-safe-end welds had outside surface temperatures outside the recommended range of 450-550 ºC in BWRVIP-61. These were within the limits of the originally recommended parameters of EPRI NP-2527-LD and NP-3375 (42575 ºC). A conservative upper limit was established in the original EPRI recommendations to prevent sensitization of the pipe surface, even though the IHSI heating time was not long enough for this to occur and the outside surface of the pipe is not exposed to conditions conducive to IGSCC. Exceeding this limit has no effect on effectiveness of stress improvement and should be considered acceptable. The lower limit was established to ensure sufficient through-wall T with cooling water flows greater than the minimum recommended. Based on the IHSI Weld Package data, the minimum recommended 275 ºC through-wall T was determined to be met at surface temperatures of 438 ºC or greater. Therefore, these nozzle-to-safe end welds are considered to have an effective stress improvement.
| |
| There are seven remaining welds in RHR that had recorded surface temperatures outside the recommended range of 450-550 ºC in BWRVIP-61. These were in Type 316NG material and were supported by a separate IHSI qualification for 316NG materials. NUTECH evaluated the effectiveness of IHSI on type 316NG in a 1984 report prepared for Georgia Power Company (report XGP-08-111) and established IHSI parameters with expanded surface temperature ranges and a higher minimum T of 550 ºF (288 ºC) to achieve effective stress improvement in 316NG material. All other IHSI parameters were the same as previous EPRI recommendations. IHSI of type 316NG does not appear to be addressed by BWRVIP-61, however based on the NUTECH qualification of the revised parameters and compliance with the remaining recommended parameters of BWRVIP-61, these welds are considered to have an effective stress improvement.
| |
| An open issue remains on whether the induction coil length was effectively reduced by "shorting" the coils on the three dissimilar metal welds. There is no mention of this in the IHSI Weld Packages for the site implementation, however, Tony Giannuzzi recalled it was addressed in the IHSI calculation packages that SIA had reviewed for other sites.
| |
| I have not been able to locate any IHSI calculation packages for Hatch to review this concern. I will check with the SNC Design Modifications Group to determine if these calculations were filed with the DCR files. Additional effort could be required to try to locate the original calculations at former NUTECH offices or by hand searches of plant records. This would be time consuming and expensive, so you would need to determine if the effort is warranted to reduce inspection frequency for the four welds that are impacted. (Note: These welds are currently listed as Category D welds, without credit being taken for IHSI).
| |
| Hatch 2 Basis Doc-VIP75.doc Page 40 of 40 Rev.1.0
| |
| | |
| FOURTH INTERVAL AUGMENTED OTHER PLAN HATCH UNIT NO. 2 The NRCs safety evaluation dated 6/16/97 of the 3rd Interval ISI Program indicated, that in addition to the 1989 Code required examinations, certain augmented examinations would be performed per GPC commitment. The commitments along with the current implementation methodology are listed below and will also be followed for the 4th Interval.
| |
| High Energy Lines Outside Containment Augmented examinations on the Unit 2 main steam, feedwater, HPCI (steam), RCIC (steam) and RWCU high energy piping outside containment (where pipe breaks were not postulated) in compliance with Branch Technical Position MEB 3-1. Per Section 3.6.2.2.3 of the HNP-2 UFSAR, pipe breaks were not postulated in portions of high-energy piping extending from the containment penetration to the first inside and/or outside isolation valve for specified conditions. Therefore, for the above mentioned systems, volumetric exams are required on the welds between the inboard and outboard isolation valves to the extent practical. See Class 1 for a detailed evaluation.
| |
| Because these lines are also Class 1 lines for Section XI purposes, the high-energy Category B-J and XB-J welds are an integral part of the Class 1 Schedule Works tables.
| |
| Examination of IGSCC Susceptible Welds These examinations were originally performed per NUREG-0313 as modified by Generic Letter 88-01 and are currently performed per BWRVIP-075. A detailed evaluation is presented the BWRVIP-075 Section of this plan.
| |
| These welds are designated as Category OL-1, XB-J, and XB-F in the Schedule Works tables located in the BWRVIP-075 Section of this plan.
| |
| Core Shroud Examination Examination of the core shroud in accordance with Generic Letter 94-03. These examinations were originally performed as required. They are currently performed per BWRVIP requirements.
| |
| Scram Discharge Volume Piping A detailed evaluation is presented the Class 2 Augmented portion of this plan. Schedule Works tables are listed in this section under Category C-0803.
| |
| These welds are designated as Category C-0803 in the Schedule Works tables located in this portion of the plan.
| |
| Hatch Basis Doc Aug Other.doc Page 1 of 6 Rev. 1
| |
| | |
| FOURTH INTERVAL AUGMENTED OTHER PLAN HATCH UNIT NO. 2 Feedwater Nozzles Augmented examination of the feedwater nozzles as specified by NUREG-0619 as modified by Generic Letter 81-11. These examinations were originally performed as required. They are currently performed per Alternate BWR Feedwater Nozzle Inspection Requirements, GE-NE-523-A71-0594-A, Revision 1, May 2000.
| |
| From 1974 to 1980, the inspection of feedwater nozzles by the industry indicated that there was some degree of cracking in the bore and inner radii of reactor vessel of reactor vessel feedwater nozzles in 18 of 23 commercially operating domestic BWRs. It was determined that most of the cracking was caused by lower temperature feedwater and CRD return line water leaking past interference fit spargers and initiating high-cycle thermal fatigue cracking in the clad nozzle inner radius and bore region. Startup and shutdown cycles would then drive the crack deeper into the nozzle. As a result, on November 13, 1980 the NRC issued NUREG-0619 detailing specific requirements to alleviate the cracking. Additional guidance was given in Generic Letter 88-11. The NRC staffs position was that the nozzles should be de-clad, the interference fit spargers replaced with an improved design, and the RWCU/CRD return lines re-routed such that the cooler water went through all the feedwater nozzles. The low-flow controllers should either be changed or a plant-specific fracture mechanics analysis should be performed that demonstrated that a crack would not grow to greater than one inch during the 40 year life of the plant. The history for HNP-2 is shown below in the bulleted paragraphs The HNP RPV was originally fabricated with clad feedwater nozzles with interference fit spargers. The original nozzle configuration is shown on CE drawing E 234-274 which can be found in the Hatch 1 Reactor Vessel Instruction Manual (S-19000). Because of cracking issues at other sites associated with the original configuration, the HNP-2 nozzle cladding was removed and a triple-sleeve, double piston sparger was installed per DCR 78-202. New feedwater nozzle configurations are shown in drawings SX-18920 and SX-18921.
| |
| Edwin I. Hatch Nuclear Power Station, Unit 1, Feedwater Fracture Mechanics Analysis to Show Compliance with NUREG-0619 (NEDE-30238) was issued on August 1983 and submitted to the NRC by letter dated September 19, 1984.
| |
| By Safety Evaluation dated January 21, 1986 the NRC concluded that during the forty year life, the amount of fatigue crack growth in the feedwater nozzles should be less than one inch, therefore, the existing Unit 1 flow controllers are in compliance with NUREG-0619 as amended by Generic Letter 88-11. Once compliance was determined, NUREG-0619 required (for the new triple-sleeve, double piston configuration) that a UT examination be performed on all feedwater nozzle bores and inside blend radii every 2nd refueling outage and a PT of the ID be performed every 6 refueling outages or 135 startup/shutdown cycles.
| |
| Hatch Basis Doc Aug Other.doc Page 2 of 6 Rev. 1
| |
| | |
| FOURTH INTERVAL AUGMENTED OTHER PLAN HATCH UNIT NO. 2 By letter dated October 19, 1992, SNC proposed to perform an automated UT during the Spring 1993 outage and then UT every 4th refueling outage in lieu of the NUREG-0619 requirements. The PT examination would thus be eliminated.
| |
| By NRC Safety Evaluation dated 10/21/94 and by SNC 10 CFR 50.59 Safety Evaluation dated 9/28/95 (HL-5040), the PT examination was eliminated and the frequency of the UT examinations was changed to every 4th refueling outage.
| |
| Because of significant advances in UT inspection technology in the 1990s, the BWROG (using GE) began the development of alternate inspection requirements for the feedwater nozzles. As a result, BWROG Licensing Topical Report, Alternate BWR feedwater Nozzle Inspection Requirements, (GE-NE-523-A71-0594, Revision
| |
| : 0) was issued in October 1995 to allow reduced inspection frequencies.
| |
| A report were prepared by GE in July 1997 for HNP-2 as part of the Extended Power Uprate effort, which (in part) provided feedwater nozzle fracture mechanics assessments based upon the existing low flow feedwater controller in conjunction with plant operating history available at the time. The Extended Power Uprate increased the nominal operating pressure by about 50 psi and the feedwater nozzle temperature about 60 F.
| |
| On February 9, 2000, GE issued a plant specific evaluation for HNP to provide justification for extending the UT examination frequency of the nozzle inner radii and elimination of the ID PT examination. The evaluation was based on Revision 0 of the BWROG Topical Report and the NRC Safety Evaluation dated June 5, 1998. The evaluation noted that Revision 1 of the Topical Report, which incorporated responses to six NRC criteria, was submitted to the NRC on September 24, 1999. The evaluation further noted that the NRCs approval of the September 24th submittal would have no effect on the evaluation. Key issues and results are:
| |
| * The evaluation per the BWROG Topical Report included consideration of the sparger type (triple-sleeve, double piston), UT inspection methodology (automated, full RF recording), and crack growth rate (based on the 1997 Extended Power Uprate feedwater nozzle fracture mechanics analysis).
| |
| * The 1997 Extended Power Uprate feedwater nozzle fracture mechanics was used in determining the length of time that it would take to grow a 0.25 crack to unacceptable limits. Two criterion were used.
| |
| : a. The first criterion was the time that it would take to grow the 0.25 crack to 1 in depth, which was the criteria found in NUREG-0619. It was concluded by the analysis that a crack would take greater than 40 years to grow to a depth of 1 and that it would reach 0.87 in depth in 36 years.
| |
| Hatch Basis Doc Aug Other.doc Page 3 of 6 Rev. 1
| |
| | |
| FOURTH INTERVAL AUGMENTED OTHER PLAN HATCH UNIT NO. 2
| |
| : b. The second criterion is more limiting and was based on the time it would take to grow a 0.25 crack to 10% of the blend radius thickness, which is the acceptable flaw depth per ASME Section XI. The blend radius was calculated by GE as 7.6 thick; therefore, the acceptable flaw depth would be 0.76. The time to grow a 0.25 crack to 0.76 deep was determined to be 32 years. GE indicated than a 10-year inspection frequency is appropriate based on the Extended Power Uprate fracture mechanics evaluation, a triple-sleeve, double-piston configuration, automated - full RF recording UT, and a blend radius thickness of 7.6.
| |
| On March 13, 2000 a letter was issued from D. M. Crowe (HNP Licensing Manager) to B. K. McLeod concluding that General Electric had performed the evaluation to change the inspection frequency to once per 10 years. The change was implemented per a 10 CFR 50.59 Evaluation dated 3/13/00.
| |
| In May 2000 GE issued, Alternate BWR feedwater Nozzle Inspection Requirements, GE-NE-523-A71-0594-A, Revision 1, which incorporated the NRCs safety evaluation.
| |
| By letter dated September 23, 2003, the NRC approved the change to increase licensed power level for Hatch, Units 1 and 2 by 1.5 percent from 2763 megawatts thermal (MWt) to 2804 MWt. In the RPV Structural Evaluation portion of the safety evaluation it is stated that, The proposed power uprate does not change the operating reactor pressure and temperature from the current operating condition. Therefore, this change should not affect the fracture mechanics evaluation performed after the Extended Power Uprate.
| |
| Per Table 6-1 of GE-NE-523-A71-0594-A (NRC approved Alternate BWR Feedwater Nozzle Inspection Requirements) the Required Time between UT examinations of the Feedwater may be calculated as the Allowable Time multiplied by a Factor which is based on the sparger configuration and the type of UT examination. HNP-2 has a triple sleeve, double piston sparger configuration and uses automated - full RF recording UT.
| |
| For an Allowable Time of 32 years the Required Time is 32 X 0.33 or 10.6 years ( 10 years). However, Note 2 of Table 6-1 indicates that a 10-year frequency is the maximum time between inspections for the blend radius area (region 1) and a portion of the nozzle bore (Region 2). Therefore, 10 years will be used as the frequency of examinations.
| |
| On December 3, 2003, discussions were held with Gary Stevens of Structural Integrity Associates. Per Gary Stevenss August 9, 1999 E-Mail (and reconfirmed during the 12/3/03 call) the use of 10% of wall thickness allowable flaw size for feedwater nozzles is based on Subsection IWB-3611 which permits an allowable flaw size of 10% of the critical size for normal operating conditions. In the case of the feedwater nozzle, the critical flaw size can be shown to be greater than the wall thickness, so the critical flaw size is set equal to the wall thickness, t. Thus, 0.10
| |
| * t is used for the allowable flaw size.
| |
| It was confirmed that the blend radius was the most limiting area for crack growth; Hatch Basis Doc Aug Other.doc Page 4 of 6 Rev. 1
| |
| | |
| FOURTH INTERVAL AUGMENTED OTHER PLAN HATCH UNIT NO. 2 therefore, GEs selection of 10% of the blend radius and a 10-year examination frequency was appropriate. Therefore, because the scheduling is the same as Code frequency these examinations will be treated as Category B-D, Item 3.100 Code examinations in ScheduleWorks. The only difference is that they are referred to as Nozzle Inner Radius and Bore examinations.
| |
| These welds are designated as Category B-D welds in the Class 1 portion of this document.
| |
| CRD Return Line NUREG-0619 also addressed the examination of the Thermal Mixing Tee where CRD is routed to Feedwater. In this case, water from CRD mixes with RWCU at the mixing tee.
| |
| There is a potential for cracking in the mixing zone. Therefore, the downstream thermal tee weld (2G31-2RWCU-4-2FW-33) is examined. This examination is not addressed in GE-NE-523-A71-0594-A; therefore, it will be continued each outage as required by NUREG-0619.
| |
| This weld is designated as Category C-0619 in Schedule Works in this portion of the plan.
| |
| Class 2 Thin-Wall Piping The NRCs safety evaluation dated 6/16/97 of the 3rd Interval Program also indicated, that in addition to the 1989 Code required examinations, volumetric examination of a 7.5% sample of a portion of thin-wall, non-exempt piping within the RHR, CS, and HPCI systems would be performed. See Class 2 Augmented for a detailed evaluation.
| |
| These welds are designated as Category C-0803 in Schedule Works in this portion of the plan.
| |
| RCIC Additionally, portions of the Reactor Core Isolation Cooling are designated as Class S on Boundary Diagram HB-16334 and HB-16335. It will be treated using Section XI as a guideline (not as a requirement). As discussed for the Class 2 portion of this piping, this system does not have an RHR, ECC, or CHR function; therefore, the size exemption and the pressure/temperature exemption will also be used for this Class S piping. Lines within Class S were evaluated below for examination potential.
| |
| 6 Suction Line from the Condensate Storage Tank (Designated as 1E51-2RCIC-6PS-1 thru 24 on Figure B-88 and listed as Category CF-R in Schedule Works). This piping is pressure/temperature exempt because it is at static pressure and ambient temperature; therefore, examination of piping welds, integrally welded attachments, and supports is not required.
| |
| Hatch Basis Doc Aug Other.doc Page 5 of 6 Rev. 1
| |
| | |
| FOURTH INTERVAL AUGMENTED OTHER PLAN HATCH UNIT NO. 2 6 Suction Line from valve 1E51-F031 through valve 1E51-F029 (Designated as 1E51-2RCIC-6TS-10, 11, 12, 13, and 14 on Figure B-89 and listed as Category CF-R in Schedule Works). This piping is pressure/temperature exempt because it is highly unlikely that it would ever exceed the prescribed pressure/temperature. Therefore, examination of piping welds, integrally welded attachments, and supports is not required.
| |
| 4 Pump Discharge Line - This piping is size exempt; therefore, examination of piping welds, integrally welded attachments, and supports is not required. (Not shown in Schedule Works).
| |
| 4 (and less) Steam Supply - This piping is size exempt; therefore, examination of piping welds, integrally welded attachments, and supports is not required.. (Not shown in Schedule Works).
| |
| 10 Steam Exhaust from the turbine to valve 1E51-F040 (Designated as 1E51-2RCIC-1 thru 24 and shown as Category CF-R in Schedule Works). This piping is shown on Figures B-24 and B-25 and is not pressure/temperature exempt because of the steam conditions. However, all of this piping is 0.365 nominal wall thickness and therefore does not require examination of the piping welds. The welded attachments and supports on this line are not subject to examination.
| |
| As discussed above, when applying Section XI requirements to Category S RCIC there are no requirements for examination. However, RCIC is an important system when considering PRA; therefore, a small sample of welds (designated as Category CF-R),
| |
| Category supports (designated as Category FA-R), and welded attachments (designated as Category CC-R) were selected.
| |
| Hatch Basis Doc Aug Other.doc Page 6 of 6 Rev. 1}}
| |