ML070710023: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 20: Line 20:
Carolina Power & Light Company
Carolina Power & Light Company
ATTN: Mr. Robert Duncan, II,
ATTN: Mr. Robert Duncan, II,
        Vice President - Harris Plant
Vice President - Harris Plant
Shearon Harris Nuclear Power Plant
Shearon Harris Nuclear Power Plant
P. O. Box 165, Mail Code: Zone 1
P. O. Box 165, Mail Code: Zone 1
New Hill, NC 27562-0165
New Hill, NC 27562-0165
SUBJECT:         SHEARON HARRIS NUCLEAR POWER PLANT - REACTOR AND SENIOR
SUBJECT:
                REACTOR OPERATOR INITIAL EXAMINATIONS 05000400/2007301
SHEARON HARRIS NUCLEAR POWER PLANT - REACTOR AND SENIOR
REACTOR OPERATOR INITIAL EXAMINATIONS 05000400/2007301  
Dear Mr. Duncan:
Dear Mr. Duncan:
In a telephone conversation on March 8, 2007, between Mr. Greg Kilpatrick, Superintendent of
In a telephone conversation on March 8, 2007, between Mr. Greg Kilpatrick, Superintendent of
Operations Training, and Mr. Frank Ehrhardt, Senior Operations Engineer, arrangements were
Operations Training, and Mr. Frank Ehrhardt, Senior Operations Engineer, arrangements were
made for the administration of licensing examinations at the Shearon Harris Nuclear Power
made for the administration of licensing examinations at the Shearon Harris Nuclear Power
Plant. The operating test is scheduled to be administered during the weeks of August 6 and
Plant. The operating test is scheduled to be administered during the weeks of August 6 and
August 13, 2007. The written examination is scheduled to be administered on August 20, 2007.
August 13, 2007. The written examination is scheduled to be administered on August 20, 2007.  
The on-site preparatory week is scheduled for the week of July 9, 2007.
The on-site preparatory week is scheduled for the week of July 9, 2007.  
As agreed during the telephone conversation, your staff will prepare both the written
As agreed during the telephone conversation, your staff will prepare both the written
examination and operating test based on the guidelines in Revision 9 of NUREG-1021,
examination and operating test based on the guidelines in Revision 9 of NUREG-1021,
"Operator Licensing Examination Standards for Power Reactors." The NRC regional office will
"Operator Licensing Examination Standards for Power Reactors." The NRC regional office will
discuss with your staff any changes that might be necessary before the examination is
discuss with your staff any changes that might be necessary before the examination is
administered. Your staff has also agreed to make all copies of examination materials that are
administered. Your staff has also agreed to make all copies of examination materials that are
necessary for administering the exam.
necessary for administering the exam.
To meet the above schedule, it will be necessary for your staff to furnish the examination
To meet the above schedule, it will be necessary for your staff to furnish the examination
outlines by May 23, 2007. The written examinations, operating tests, and the supporting
outlines by May 23, 2007. The written examinations, operating tests, and the supporting
reference materials identified in NUREG 1021, ES-201, Attachment 2, Reference Material
reference materials identified in NUREG 1021, ES-201, Attachment 2, Reference Material
Guidelines For Initial Licensing Examinations, will be due by June 15, 2007. Pursuant to
Guidelines For Initial Licensing Examinations, will be due by June 15, 2007. Pursuant to
10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the
10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the
outlines, examinations, and tests before they are submitted to the NRC for review and approval.
outlines, examinations, and tests before they are submitted to the NRC for review and approval.  
All materials shall be complete and ready-to-use. We request that any personal, proprietary,
All materials shall be complete and ready-to-use. We request that any personal, proprietary,
sensitive unclassified, or safeguards information in your response be contained in a separate
sensitive unclassified, or safeguards information in your response be contained in a separate
enclosure and appropriately marked. Any delay in receiving the required examination and
enclosure and appropriately marked. Any delay in receiving the required examination and
reference materials, or the submittal of inadequate or incomplete materials, may cause the
reference materials, or the submittal of inadequate or incomplete materials, may cause the
examinations to be rescheduled.
examinations to be rescheduled.
Line 53: Line 54:
for your staff to provide adequate space and accommodations in accordance with NUREG
for your staff to provide adequate space and accommodations in accordance with NUREG
1021, ES-402, Administering Initial Written Examinations, and to make the simulation facility
1021, ES-402, Administering Initial Written Examinations, and to make the simulation facility
available on the dates noted above. In accordance with NUREG 1021, ES-302, Administering
available on the dates noted above. In accordance with NUREG 1021, ES-302, Administering
Operating Tests To Initial License Applicants, your staff should retain the original simulator
Operating Tests To Initial License Applicants, your staff should retain the original simulator


CP&L                                               2
CP&L
2
performance data (e.g., system pressures, temperatures, and levels) generated during the
performance data (e.g., system pressures, temperatures, and levels) generated during the
dynamic operating tests until the examination results are final.
dynamic operating tests until the examination results are final.
Appendix E of NUREG 1021, Policies and Guidelines For Taking NRC Examinations,
Appendix E of NUREG 1021, Policies and Guidelines For Taking NRC Examinations,  
contains a number of NRC policies and guidelines that will be in effect while the written
contains a number of NRC policies and guidelines that will be in effect while the written
examinations and operating tests are being administered.
examinations and operating tests are being administered.
Line 66: Line 68:
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
examination date. If the applications are not received at least 30 days before the examination  
date, a postponement may be necessary. Signed applications certifying that all training has
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget, approval number Part 55 (3150-0018), which expires on June 30,
Management and Budget, approval number Part 55 (3150-0018), which expires on June 30,
2009. The public reporting burden for this collection of information is estimated to average 500
2009. The public reporting burden for this collection of information is estimated to average 500
hours per response, including the time for writing the examinations, and reviewing instructions,
hours per response, including the time for writing the examinations, and reviewing instructions,
gathering and maintaining the data needed, and completing and reviewing the collection of
gathering and maintaining the data needed, and completing and reviewing the collection of
information. Send comments on any aspect of this collection of information, including
information. Send comments on any aspect of this collection of information, including
suggestions for reducing the burden, to the Information and Records Management Branch (T-6
suggestions for reducing the burden, to the Information and Records Management Branch (T-6
F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet
F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet
Line 85: Line 87:
In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter will be
In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS
Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS
is accessible from the NRC Web site at http://www/nrc.gov/readingrm/adams.html (the Public
is accessible from the NRC Web site at http://www/nrc.gov/readingrm/adams.html (the Public
Electronic Reading Room).
Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. Kilpatrick has been advised of the policies
Thank you for your cooperation in this matter. Mr. Kilpatrick has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRC's
and guidelines referenced in this letter. If you have any questions regarding the NRC's
examination procedures and guidelines, please contact Mr. Frank Ehrhardt (404) 562-4611,
examination procedures and guidelines, please contact Mr. Frank Ehrhardt (404) 562-4611,
(Internet E-mail: fje@nrc.gov), or me at (404) 562-4607, (Internet E-mail: rch@nrc.gov).
(Internet E-mail: fje@nrc.gov), or me at (404) 562-4607, (Internet E-mail: rch@nrc.gov).
                                                Sincerely,
Sincerely,
                                                \\RA\\
\\\\RA\\\\
                                                Robert C. Haag, Chief
Robert C. Haag, Chief
                                                Operations Branch
Operations Branch
                                                Division of Reactor Safety
Division of Reactor Safety
Docket No.: 400
Docket No.: 400
License No.: NPF-63
License No.: NPF-63
cc: (See Page 3)
cc: (See Page 3)


CP&L                                 3
CP&L
3
cc contd:
cc contd:
Paul Fulford, Manager                 Beverly Hall, Chief, Radiation
Paul Fulford, Manager
Performance Evaluation and             Protection Section
Performance Evaluation and
Regulatory Affairs CPB 9             N. C. Department of Environmental
  Regulatory Affairs   CPB 9
Carolina Power & Light Company         Commerce & Natural Resources
Carolina Power & Light Company
P. O. Box 1551                         3825 Barrett Drive
P. O. Box 1551
Raleigh, NC 27602-1551                 Raleigh, NC 27609-7721
Raleigh, NC 27602-1551
Chris L. Burton                       Peggy Force
Chris L. Burton
Director of Site Operations           Assistant Attorney General
Director of Site Operations
Carolina Power & Light Company         State of North Carolina
Carolina Power & Light Company
Shearon Harris Nuclear Power Plant    P. O. Box 629
P. O. Box 165 MC: Zone 1              Raleigh, NC 27602
New Hill, NC 27562-0165
                                      Public Service Commission
Christos Kamilaris                    State of South Carolina
Manager, Nuclear Assessment            P. O. Box 11649
Progress Energy Carolinas, Inc.        Columbia, SC 29211
Shearon Harris Nuclear Power Plant
Shearon Harris Nuclear Power Plant
P. O. Box 165, Mail Zone 3            Chairman of the North Carolina
P. O. Box 165   MC:  Zone 1
New Hill, NC 27562-0165                 Utilities Commission
New Hill, NC 27562-0165
                                      P. O. Box 29510
Christos Kamilaris
Eric McCartney                        Raleigh, NC 27626-0510
Manager, Nuclear Assessment
Progress Energy Carolinas, Inc.
Shearon Harris Nuclear Power Plant
P. O. Box 165, Mail Zone 3
New Hill, NC 27562-0165
Eric McCartney
Plant General Manager--Harris Plant
Plant General Manager--Harris Plant
Progress Energy Carolinas, Inc.       Robert P. Gruber
Progress Energy Carolinas, Inc.
Shearon Harris Nuclear Power Plant     Executive Director
Shearon Harris Nuclear Power Plant
P. O. Box 165, Mail Zone 3             Public Staff NCUC
P. O. Box 165, Mail Zone 3
New Hill, NC 27562-0165               4326 Mail Service Center
New Hill, NC 27562-0165
                                      Raleigh, NC 27699-4326
Thomas Natale, Manager
Thomas Natale, Manager
Support Services                       Herb Council, Chair
Support Services
Carolina Power & Light Company         Board of County Commissioners
Carolina Power & Light Company
Shearon Harris Nuclear Power Plant     of Wake County
Shearon Harris Nuclear Power Plant
P. O. Box 165, Mail Zone 1             P. O. Box 550
P. O. Box 165, Mail Zone 1
New Hill, NC 27562-0165               Raleigh, NC 27602
New Hill, NC 27562-0165
David H. Corlett, Supervisor           Tommy Emerson, Chair
David H. Corlett, Supervisor
Licensing/Regulatory Programs         Board of County Commissioners
Licensing/Regulatory Programs
Carolina Power & Light Company         of Chatham County
Carolina Power & Light Company
Shearon Harris Nuclear Power Plant     186 Emerson Road
Shearon Harris Nuclear Power Plant
P. O. Box 165, Mail Zone 1             Siler City, NC 27344
P. O. Box 165, Mail Zone 1
New Hill, NC 27562-0165
New Hill, NC 27562-0165
                                      Mr. J. Wayne Gurganious
David T. Conley
David T. Conley                           Training Manager - Harris Plant
Associate General Counsel - Legal
Associate General Counsel - Legal     Progress Energy Carolinas, Inc.
Department
Department                             Harris Energy & Environmental Center
Progress Energy Service Company, LLC
Progress Energy Service Company, LLC   P. O. Box 327, State Road 1127
P. O. Box 1551
P. O. Box 1551                         New Hill, NC 27562-0327
Raleigh, NC 27602-1551
Raleigh, NC 27602-1551
John H. O'Neill, Jr.
John H. O'Neill, Jr.
Shaw, Pittman, Potts & Trowbridge
Shaw, Pittman, Potts & Trowbridge
2300 N. Street, NW
2300 N. Street, NW
Washington, DC 20037-1128
Washington, DC 20037-1128
Beverly Hall, Chief, Radiation
Protection Section
N. C. Department of Environmental
  Commerce & Natural Resources
3825 Barrett Drive
Raleigh, NC  27609-7721
Peggy Force
Assistant Attorney General
State of North Carolina
P. O. Box 629
Raleigh, NC  27602
Public Service Commission
State of South Carolina
P. O. Box 11649
Columbia, SC  29211
Chairman of the North Carolina
  Utilities Commission
P. O. Box 29510
Raleigh, NC  27626-0510
Robert P. Gruber
Executive Director
Public Staff NCUC
4326 Mail Service Center
Raleigh, NC  27699-4326
Herb Council, Chair
Board of County Commissioners
  of Wake County
P. O.  Box 550
Raleigh, NC  27602
Tommy Emerson, Chair
Board of County Commissioners
  of Chatham County
186 Emerson Road
Siler City, NC  27344
Mr.  J. Wayne Gurganious
      Training Manager - Harris Plant
Progress Energy Carolinas, Inc.
Harris Energy & Environmental Center
P. O. Box 327, State Road 1127
New Hill, NC  27562-0327 


TVA                                               4
TVA
Appendix E of NUREG 1021, Policies and Guidelines For Taking NRC Examinations,
4
Appendix E of NUREG 1021, Policies and Guidelines For Taking NRC Examinations,  
contains a number of NRC policies and guidelines that will be in effect while the written
contains a number of NRC policies and guidelines that will be in effect while the written
examinations and operating tests are being administered.
examinations and operating tests are being administered.
Line 162: Line 202:
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
examination date. If the applications are not received at least 30 days before the examination  
date, a postponement may be necessary. Signed applications certifying that all training has
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget, approval number Part 55 (3150-0018), which expires on June 30,
Management and Budget, approval number Part 55 (3150-0018), which expires on June 30,
2009. The public reporting burden for this collection of information is estimated to average 500
2009. The public reporting burden for this collection of information is estimated to average 500
hours per response, including the time for writing the examinations, and reviewing instructions,
hours per response, including the time for writing the examinations, and reviewing instructions,
gathering and maintaining the data needed, and completing and reviewing the collection of
gathering and maintaining the data needed, and completing and reviewing the collection of
information. Send comments on any aspect of this collection of information, including
information. Send comments on any aspect of this collection of information, including
suggestions for reducing the burden, to the Information and Records Management Branch (T-6
suggestions for reducing the burden, to the Information and Records Management Branch (T-6
F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet
F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet
Line 181: Line 221:
In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter will be
In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS
Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS
is accessible from the NRC Web site at http://www/nrc.gov/readingrm/adams.html (the Public
is accessible from the NRC Web site at http://www/nrc.gov/readingrm/adams.html (the Public
Electronic Reading Room).
Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. Dalton has been advised of the policies and
Thank you for your cooperation in this matter. Mr. Dalton has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRC's examination
guidelines referenced in this letter. If you have any questions regarding the NRC's examination
procedures and guidelines, please contact Mr. Frank J. Ehrhardt at (404) 562- 4611, (internet
procedures and guidelines, please contact Mr. Frank J. Ehrhardt at (404) 562- 4611, (internet
E-mail fje@nrc.gov) or me at (404) 562-4607, (Internet E-mail: rch@nrc.gov).
E-mail fje@nrc.gov) or me at (404) 562-4607, (Internet E-mail: rch@nrc.gov).
                                                Sincerely,
Sincerely,
                                                \\RA\\
\\\\RA\\\\
                                                Robert C. Haag, Chief
Robert C. Haag, Chief
                                                Operations Branch
Operations Branch
                                                Division of Reactor Safety
Division of Reactor Safety
Docket Nos.: 50-400
Docket Nos.: 50-400
License Nos.: NPF-63
License Nos.: NPF-63
cc: (See Page 3)
cc: (See Page 3)




______ML070710023___________________
______ML070710023___________________
OFFICE             RII:DRS       RII:DRS       RII:DRP
OFFICE
SIGNATURE         FJE           RCH           RXM1
RII:DRS
NAME               FEhrhardt     RHaag         RMusser
RII:DRS
DATE                   3/8/2007       3/8/2007     3/9/2007     3/   /2007     3/   /2007   3/ /2007     3/ /2007
RII:DRP
E-MAIL COPY?         YES      NO   YES       NO YES       NO   YES     NO   YES     NO  YES   NO   YES     NO
SIGNATURE
FJE
RCH
RXM1
NAME
FEhrhardt
RHaag
RMusser
DATE
3/8/2007
3/8/2007
3/9/2007
3/     /2007
3/     /2007
3/     /2007
3/     /2007
E-MAIL COPY?
    YES
NO     YES
NO     YES
NO     YES
NO     YES
NO      YES
NO     YES
NO
}}
}}

Latest revision as of 03:50, 15 January 2025

Reactor and Senior Reactor Operator Initial Examinations - 05000400-07301
ML070710023
Person / Time
Site: Harris 
(NPF-063)
Issue date: 03/09/2007
From: Haag R
NRC/RGN-II/DRS/OLB
To: Duncan R
Carolina Power & Light Co
References
50-400/07-301
Download: ML070710023 (7)


See also: IR 05000400/2007301

Text

March 9, 2007

Carolina Power & Light Company

ATTN: Mr. Robert Duncan, II,

Vice President - Harris Plant

Shearon Harris Nuclear Power Plant

P. O. Box 165, Mail Code: Zone 1

New Hill, NC 27562-0165

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT - REACTOR AND SENIOR

REACTOR OPERATOR INITIAL EXAMINATIONS 05000400/2007301

Dear Mr. Duncan:

In a telephone conversation on March 8, 2007, between Mr. Greg Kilpatrick, Superintendent of

Operations Training, and Mr. Frank Ehrhardt, Senior Operations Engineer, arrangements were

made for the administration of licensing examinations at the Shearon Harris Nuclear Power

Plant. The operating test is scheduled to be administered during the weeks of August 6 and

August 13, 2007. The written examination is scheduled to be administered on August 20, 2007.

The on-site preparatory week is scheduled for the week of July 9, 2007.

As agreed during the telephone conversation, your staff will prepare both the written

examination and operating test based on the guidelines in Revision 9 of NUREG-1021,

"Operator Licensing Examination Standards for Power Reactors." The NRC regional office will

discuss with your staff any changes that might be necessary before the examination is

administered. Your staff has also agreed to make all copies of examination materials that are

necessary for administering the exam.

To meet the above schedule, it will be necessary for your staff to furnish the examination

outlines by May 23, 2007. The written examinations, operating tests, and the supporting

reference materials identified in NUREG 1021, ES-201, Attachment 2, Reference Material

Guidelines For Initial Licensing Examinations, will be due by June 15, 2007. Pursuant to

10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the

outlines, examinations, and tests before they are submitted to the NRC for review and approval.

All materials shall be complete and ready-to-use. We request that any personal, proprietary,

sensitive unclassified, or safeguards information in your response be contained in a separate

enclosure and appropriately marked. Any delay in receiving the required examination and

reference materials, or the submittal of inadequate or incomplete materials, may cause the

examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with NUREG 1021, ES-402, Administering Initial Written Examinations, and to make the simulation facility

available on the dates noted above. In accordance with NUREG 1021, ES-302, Administering

Operating Tests To Initial License Applicants, your staff should retain the original simulator

CP&L

2

performance data (e.g., system pressures, temperatures, and levels) generated during the

dynamic operating tests until the examination results are final.

Appendix E of NUREG 1021, Policies and Guidelines For Taking NRC Examinations,

contains a number of NRC policies and guidelines that will be in effect while the written

examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications (Office of Management and Budget

(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first

examination date. If the applications are not received at least 30 days before the examination

date, a postponement may be necessary. Signed applications certifying that all training has

been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget, approval number Part 55 (3150-0018), which expires on June 30,

2009. The public reporting burden for this collection of information is estimated to average 500

hours per response, including the time for writing the examinations, and reviewing instructions,

gathering and maintaining the data needed, and completing and reviewing the collection of

information. Send comments on any aspect of this collection of information, including

suggestions for reducing the burden, to the Information and Records Management Branch (T-6

F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet

electronic mail at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and

Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,

Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection

of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS

is accessible from the NRC Web site at http://www/nrc.gov/readingrm/adams.html (the Public

Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Kilpatrick has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRC's

examination procedures and guidelines, please contact Mr. Frank Ehrhardt (404) 562-4611,

(Internet E-mail: fje@nrc.gov), or me at (404) 562-4607, (Internet E-mail: rch@nrc.gov).

Sincerely,

\\\\RA\\\\

Robert C. Haag, Chief

Operations Branch

Division of Reactor Safety

Docket No.: 400

License No.: NPF-63

cc: (See Page 3)

CP&L

3

cc contd:

Paul Fulford, Manager

Performance Evaluation and

Regulatory Affairs CPB 9

Carolina Power & Light Company

P. O. Box 1551

Raleigh, NC 27602-1551

Chris L. Burton

Director of Site Operations

Carolina Power & Light Company

Shearon Harris Nuclear Power Plant

P. O. Box 165 MC: Zone 1

New Hill, NC 27562-0165

Christos Kamilaris

Manager, Nuclear Assessment

Progress Energy Carolinas, Inc.

Shearon Harris Nuclear Power Plant

P. O. Box 165, Mail Zone 3

New Hill, NC 27562-0165

Eric McCartney

Plant General Manager--Harris Plant

Progress Energy Carolinas, Inc.

Shearon Harris Nuclear Power Plant

P. O. Box 165, Mail Zone 3

New Hill, NC 27562-0165

Thomas Natale, Manager

Support Services

Carolina Power & Light Company

Shearon Harris Nuclear Power Plant

P. O. Box 165, Mail Zone 1

New Hill, NC 27562-0165

David H. Corlett, Supervisor

Licensing/Regulatory Programs

Carolina Power & Light Company

Shearon Harris Nuclear Power Plant

P. O. Box 165, Mail Zone 1

New Hill, NC 27562-0165

David T. Conley

Associate General Counsel - Legal

Department

Progress Energy Service Company, LLC

P. O. Box 1551

Raleigh, NC 27602-1551

John H. O'Neill, Jr.

Shaw, Pittman, Potts & Trowbridge

2300 N. Street, NW

Washington, DC 20037-1128

Beverly Hall, Chief, Radiation

Protection Section

N. C. Department of Environmental

Commerce & Natural Resources

3825 Barrett Drive

Raleigh, NC 27609-7721

Peggy Force

Assistant Attorney General

State of North Carolina

P. O. Box 629

Raleigh, NC 27602

Public Service Commission

State of South Carolina

P. O. Box 11649

Columbia, SC 29211

Chairman of the North Carolina

Utilities Commission

P. O. Box 29510

Raleigh, NC 27626-0510

Robert P. Gruber

Executive Director

Public Staff NCUC

4326 Mail Service Center

Raleigh, NC 27699-4326

Herb Council, Chair

Board of County Commissioners

of Wake County

P. O. Box 550

Raleigh, NC 27602

Tommy Emerson, Chair

Board of County Commissioners

of Chatham County

186 Emerson Road

Siler City, NC 27344

Mr. J. Wayne Gurganious

Training Manager - Harris Plant

Progress Energy Carolinas, Inc.

Harris Energy & Environmental Center

P. O. Box 327, State Road 1127

New Hill, NC 27562-0327

TVA

4

Appendix E of NUREG 1021, Policies and Guidelines For Taking NRC Examinations,

contains a number of NRC policies and guidelines that will be in effect while the written

examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications (Office of Management and Budget

(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first

examination date. If the applications are not received at least 30 days before the examination

date, a postponement may be necessary. Signed applications certifying that all training has

been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget, approval number Part 55 (3150-0018), which expires on June 30,

2009. The public reporting burden for this collection of information is estimated to average 500

hours per response, including the time for writing the examinations, and reviewing instructions,

gathering and maintaining the data needed, and completing and reviewing the collection of

information. Send comments on any aspect of this collection of information, including

suggestions for reducing the burden, to the Information and Records Management Branch (T-6

F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet

electronic mail at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and

Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,

Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection

of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS

is accessible from the NRC Web site at http://www/nrc.gov/readingrm/adams.html (the Public

Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Dalton has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRC's examination

procedures and guidelines, please contact Mr. Frank J. Ehrhardt at (404) 562- 4611, (internet

E-mail fje@nrc.gov) or me at (404) 562-4607, (Internet E-mail: rch@nrc.gov).

Sincerely,

\\\\RA\\\\

Robert C. Haag, Chief

Operations Branch

Division of Reactor Safety

Docket Nos.: 50-400

License Nos.: NPF-63

cc: (See Page 3)

______ML070710023___________________

OFFICE

RII:DRS

RII:DRS

RII:DRP

SIGNATURE

FJE

RCH

RXM1

NAME

FEhrhardt

RHaag

RMusser

DATE

3/8/2007

3/8/2007

3/9/2007

3/ /2007

3/ /2007

3/ /2007

3/ /2007

E-MAIL COPY?

YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO