ML070710023: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 20: | Line 20: | ||
Carolina Power & Light Company | Carolina Power & Light Company | ||
ATTN: Mr. Robert Duncan, II, | ATTN: Mr. Robert Duncan, II, | ||
Vice President - Harris Plant | |||
Shearon Harris Nuclear Power Plant | Shearon Harris Nuclear Power Plant | ||
P. O. Box 165, Mail Code: Zone 1 | P. O. Box 165, Mail Code: Zone 1 | ||
New Hill, NC 27562-0165 | New Hill, NC 27562-0165 | ||
SUBJECT: | SUBJECT: | ||
SHEARON HARRIS NUCLEAR POWER PLANT - REACTOR AND SENIOR | |||
REACTOR OPERATOR INITIAL EXAMINATIONS 05000400/2007301 | |||
Dear Mr. Duncan: | Dear Mr. Duncan: | ||
In a telephone conversation on March 8, 2007, between Mr. Greg Kilpatrick, Superintendent of | In a telephone conversation on March 8, 2007, between Mr. Greg Kilpatrick, Superintendent of | ||
Operations Training, and Mr. Frank Ehrhardt, Senior Operations Engineer, arrangements were | Operations Training, and Mr. Frank Ehrhardt, Senior Operations Engineer, arrangements were | ||
made for the administration of licensing examinations at the Shearon Harris Nuclear Power | made for the administration of licensing examinations at the Shearon Harris Nuclear Power | ||
Plant. The operating test is scheduled to be administered during the weeks of August 6 and | Plant. The operating test is scheduled to be administered during the weeks of August 6 and | ||
August 13, 2007. The written examination is scheduled to be administered on August 20, 2007. | August 13, 2007. The written examination is scheduled to be administered on August 20, 2007. | ||
The on-site preparatory week is scheduled for the week of July 9, 2007. | The on-site preparatory week is scheduled for the week of July 9, 2007. | ||
As agreed during the telephone conversation, your staff will prepare both the written | As agreed during the telephone conversation, your staff will prepare both the written | ||
examination and operating test based on the guidelines in Revision 9 of NUREG-1021, | examination and operating test based on the guidelines in Revision 9 of NUREG-1021, | ||
"Operator Licensing Examination Standards for Power Reactors." The NRC regional office will | "Operator Licensing Examination Standards for Power Reactors." The NRC regional office will | ||
discuss with your staff any changes that might be necessary before the examination is | discuss with your staff any changes that might be necessary before the examination is | ||
administered. Your staff has also agreed to make all copies of examination materials that are | administered. Your staff has also agreed to make all copies of examination materials that are | ||
necessary for administering the exam. | necessary for administering the exam. | ||
To meet the above schedule, it will be necessary for your staff to furnish the examination | To meet the above schedule, it will be necessary for your staff to furnish the examination | ||
outlines by May 23, 2007. The written examinations, operating tests, and the supporting | outlines by May 23, 2007. The written examinations, operating tests, and the supporting | ||
reference materials identified in NUREG 1021, ES-201, Attachment 2, Reference Material | reference materials identified in NUREG 1021, ES-201, Attachment 2, Reference Material | ||
Guidelines For Initial Licensing Examinations, will be due by June 15, 2007. Pursuant to | Guidelines For Initial Licensing Examinations, will be due by June 15, 2007. Pursuant to | ||
10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the | 10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the | ||
outlines, examinations, and tests before they are submitted to the NRC for review and approval. | outlines, examinations, and tests before they are submitted to the NRC for review and approval. | ||
All materials shall be complete and ready-to-use. We request that any personal, proprietary, | All materials shall be complete and ready-to-use. We request that any personal, proprietary, | ||
sensitive unclassified, or safeguards information in your response be contained in a separate | sensitive unclassified, or safeguards information in your response be contained in a separate | ||
enclosure and appropriately marked. Any delay in receiving the required examination and | enclosure and appropriately marked. Any delay in receiving the required examination and | ||
reference materials, or the submittal of inadequate or incomplete materials, may cause the | reference materials, or the submittal of inadequate or incomplete materials, may cause the | ||
examinations to be rescheduled. | examinations to be rescheduled. | ||
| Line 53: | Line 54: | ||
for your staff to provide adequate space and accommodations in accordance with NUREG | for your staff to provide adequate space and accommodations in accordance with NUREG | ||
1021, ES-402, Administering Initial Written Examinations, and to make the simulation facility | 1021, ES-402, Administering Initial Written Examinations, and to make the simulation facility | ||
available on the dates noted above. In accordance with NUREG 1021, ES-302, Administering | available on the dates noted above. In accordance with NUREG 1021, ES-302, Administering | ||
Operating Tests To Initial License Applicants, your staff should retain the original simulator | Operating Tests To Initial License Applicants, your staff should retain the original simulator | ||
CP&L | CP&L | ||
2 | |||
performance data (e.g., system pressures, temperatures, and levels) generated during the | performance data (e.g., system pressures, temperatures, and levels) generated during the | ||
dynamic operating tests until the examination results are final. | dynamic operating tests until the examination results are final. | ||
Appendix E of NUREG 1021, Policies and Guidelines For Taking NRC Examinations, | Appendix E of NUREG 1021, Policies and Guidelines For Taking NRC Examinations, | ||
contains a number of NRC policies and guidelines that will be in effect while the written | contains a number of NRC policies and guidelines that will be in effect while the written | ||
examinations and operating tests are being administered. | examinations and operating tests are being administered. | ||
| Line 66: | Line 68: | ||
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), | (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), | ||
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first | and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first | ||
examination date. If the applications are not received at least 30 days before the examination | examination date. If the applications are not received at least 30 days before the examination | ||
date, a postponement may be necessary. Signed applications certifying that all training has | date, a postponement may be necessary. Signed applications certifying that all training has | ||
been completed should be submitted at least 14 days before the first examination date. | been completed should be submitted at least 14 days before the first examination date. | ||
This letter contains information collections that are subject to the Paperwork Reduction Act of | This letter contains information collections that are subject to the Paperwork Reduction Act of | ||
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of | 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of | ||
Management and Budget, approval number Part 55 (3150-0018), which expires on June 30, | Management and Budget, approval number Part 55 (3150-0018), which expires on June 30, | ||
2009. The public reporting burden for this collection of information is estimated to average 500 | 2009. The public reporting burden for this collection of information is estimated to average 500 | ||
hours per response, including the time for writing the examinations, and reviewing instructions, | hours per response, including the time for writing the examinations, and reviewing instructions, | ||
gathering and maintaining the data needed, and completing and reviewing the collection of | gathering and maintaining the data needed, and completing and reviewing the collection of | ||
information. Send comments on any aspect of this collection of information, including | information. Send comments on any aspect of this collection of information, including | ||
suggestions for reducing the burden, to the Information and Records Management Branch (T-6 | suggestions for reducing the burden, to the Information and Records Management Branch (T-6 | ||
F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet | F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet | ||
| Line 85: | Line 87: | ||
In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter will be | In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter will be | ||
available electronically for public inspection in the NRC Public Document Room or from the | available electronically for public inspection in the NRC Public Document Room or from the | ||
Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS | Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS | ||
is accessible from the NRC Web site at http://www/nrc.gov/readingrm/adams.html (the Public | is accessible from the NRC Web site at http://www/nrc.gov/readingrm/adams.html (the Public | ||
Electronic Reading Room). | Electronic Reading Room). | ||
Thank you for your cooperation in this matter. Mr. Kilpatrick has been advised of the policies | Thank you for your cooperation in this matter. Mr. Kilpatrick has been advised of the policies | ||
and guidelines referenced in this letter. If you have any questions regarding the NRC's | and guidelines referenced in this letter. If you have any questions regarding the NRC's | ||
examination procedures and guidelines, please contact Mr. Frank Ehrhardt (404) 562-4611, | examination procedures and guidelines, please contact Mr. Frank Ehrhardt (404) 562-4611, | ||
(Internet E-mail: fje@nrc.gov), or me at (404) 562-4607, (Internet E-mail: rch@nrc.gov). | (Internet E-mail: fje@nrc.gov), or me at (404) 562-4607, (Internet E-mail: rch@nrc.gov). | ||
Sincerely, | |||
\\\\RA\\\\ | |||
Robert C. Haag, Chief | |||
Operations Branch | |||
Division of Reactor Safety | |||
Docket No.: 400 | Docket No.: 400 | ||
License No.: NPF-63 | License No.: NPF-63 | ||
cc: (See Page 3) | cc: (See Page 3) | ||
CP&L | CP&L | ||
3 | |||
cc contd: | cc contd: | ||
Paul Fulford, Manager | Paul Fulford, Manager | ||
Performance Evaluation and | Performance Evaluation and | ||
Regulatory Affairs CPB 9 | |||
Carolina Power & Light Company | Carolina Power & Light Company | ||
P. O. Box 1551 | P. O. Box 1551 | ||
Raleigh, NC 27602-1551 | Raleigh, NC 27602-1551 | ||
Chris L. Burton | Chris L. Burton | ||
Director of Site Operations | Director of Site Operations | ||
Carolina Power & Light Company | Carolina Power & Light Company | ||
Shearon Harris Nuclear Power Plant | Shearon Harris Nuclear Power Plant | ||
P. O. Box 165 | P. O. Box 165 MC: Zone 1 | ||
New Hill, NC 27562-0165 | New Hill, NC 27562-0165 | ||
Christos Kamilaris | |||
Manager, Nuclear Assessment | |||
Progress Energy Carolinas, Inc. | |||
Shearon Harris Nuclear Power Plant | |||
P. O. Box 165, Mail Zone 3 | |||
New Hill, NC 27562-0165 | |||
Eric McCartney | |||
Plant General Manager--Harris Plant | Plant General Manager--Harris Plant | ||
Progress Energy Carolinas, Inc. | Progress Energy Carolinas, Inc. | ||
Shearon Harris Nuclear Power Plant | Shearon Harris Nuclear Power Plant | ||
P. O. Box 165, Mail Zone 3 | P. O. Box 165, Mail Zone 3 | ||
New Hill, NC 27562-0165 | New Hill, NC 27562-0165 | ||
Thomas Natale, Manager | Thomas Natale, Manager | ||
Support Services | Support Services | ||
Carolina Power & Light Company | Carolina Power & Light Company | ||
Shearon Harris Nuclear Power Plant | Shearon Harris Nuclear Power Plant | ||
P. O. Box 165, Mail Zone 1 | P. O. Box 165, Mail Zone 1 | ||
New Hill, NC 27562-0165 | New Hill, NC 27562-0165 | ||
David H. Corlett, Supervisor | David H. Corlett, Supervisor | ||
Licensing/Regulatory Programs | Licensing/Regulatory Programs | ||
Carolina Power & Light Company | Carolina Power & Light Company | ||
Shearon Harris Nuclear Power Plant | Shearon Harris Nuclear Power Plant | ||
P. O. Box 165, Mail Zone 1 | P. O. Box 165, Mail Zone 1 | ||
New Hill, NC 27562-0165 | New Hill, NC 27562-0165 | ||
David T. Conley | |||
David T. Conley | Associate General Counsel - Legal | ||
Associate General Counsel - Legal | Department | ||
Department | Progress Energy Service Company, LLC | ||
Progress Energy Service Company, LLC | P. O. Box 1551 | ||
P. O. Box 1551 | Raleigh, NC 27602-1551 | ||
Raleigh, NC 27602-1551 | |||
John H. O'Neill, Jr. | John H. O'Neill, Jr. | ||
Shaw, Pittman, Potts & Trowbridge | Shaw, Pittman, Potts & Trowbridge | ||
2300 N. Street, NW | 2300 N. Street, NW | ||
Washington, DC 20037-1128 | Washington, DC 20037-1128 | ||
Beverly Hall, Chief, Radiation | |||
Protection Section | |||
N. C. Department of Environmental | |||
Commerce & Natural Resources | |||
3825 Barrett Drive | |||
Raleigh, NC 27609-7721 | |||
Peggy Force | |||
Assistant Attorney General | |||
State of North Carolina | |||
P. O. Box 629 | |||
Raleigh, NC 27602 | |||
Public Service Commission | |||
State of South Carolina | |||
P. O. Box 11649 | |||
Columbia, SC 29211 | |||
Chairman of the North Carolina | |||
Utilities Commission | |||
P. O. Box 29510 | |||
Raleigh, NC 27626-0510 | |||
Robert P. Gruber | |||
Executive Director | |||
Public Staff NCUC | |||
4326 Mail Service Center | |||
Raleigh, NC 27699-4326 | |||
Herb Council, Chair | |||
Board of County Commissioners | |||
of Wake County | |||
P. O. Box 550 | |||
Raleigh, NC 27602 | |||
Tommy Emerson, Chair | |||
Board of County Commissioners | |||
of Chatham County | |||
186 Emerson Road | |||
Siler City, NC 27344 | |||
Mr. J. Wayne Gurganious | |||
Training Manager - Harris Plant | |||
Progress Energy Carolinas, Inc. | |||
Harris Energy & Environmental Center | |||
P. O. Box 327, State Road 1127 | |||
New Hill, NC 27562-0327 | |||
TVA | TVA | ||
Appendix E of NUREG 1021, Policies and Guidelines For Taking NRC Examinations, | 4 | ||
Appendix E of NUREG 1021, Policies and Guidelines For Taking NRC Examinations, | |||
contains a number of NRC policies and guidelines that will be in effect while the written | contains a number of NRC policies and guidelines that will be in effect while the written | ||
examinations and operating tests are being administered. | examinations and operating tests are being administered. | ||
| Line 162: | Line 202: | ||
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), | (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), | ||
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first | and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first | ||
examination date. If the applications are not received at least 30 days before the examination | examination date. If the applications are not received at least 30 days before the examination | ||
date, a postponement may be necessary. Signed applications certifying that all training has | date, a postponement may be necessary. Signed applications certifying that all training has | ||
been completed should be submitted at least 14 days before the first examination date. | been completed should be submitted at least 14 days before the first examination date. | ||
This letter contains information collections that are subject to the Paperwork Reduction Act of | This letter contains information collections that are subject to the Paperwork Reduction Act of | ||
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of | 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of | ||
Management and Budget, approval number Part 55 (3150-0018), which expires on June 30, | Management and Budget, approval number Part 55 (3150-0018), which expires on June 30, | ||
2009. The public reporting burden for this collection of information is estimated to average 500 | 2009. The public reporting burden for this collection of information is estimated to average 500 | ||
hours per response, including the time for writing the examinations, and reviewing instructions, | hours per response, including the time for writing the examinations, and reviewing instructions, | ||
gathering and maintaining the data needed, and completing and reviewing the collection of | gathering and maintaining the data needed, and completing and reviewing the collection of | ||
information. Send comments on any aspect of this collection of information, including | information. Send comments on any aspect of this collection of information, including | ||
suggestions for reducing the burden, to the Information and Records Management Branch (T-6 | suggestions for reducing the burden, to the Information and Records Management Branch (T-6 | ||
F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet | F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet | ||
| Line 181: | Line 221: | ||
In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter will be | In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter will be | ||
available electronically for public inspection in the NRC Public Document Room or from the | available electronically for public inspection in the NRC Public Document Room or from the | ||
Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS | Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS | ||
is accessible from the NRC Web site at http://www/nrc.gov/readingrm/adams.html (the Public | is accessible from the NRC Web site at http://www/nrc.gov/readingrm/adams.html (the Public | ||
Electronic Reading Room). | Electronic Reading Room). | ||
Thank you for your cooperation in this matter. Mr. Dalton has been advised of the policies and | Thank you for your cooperation in this matter. Mr. Dalton has been advised of the policies and | ||
guidelines referenced in this letter. If you have any questions regarding the NRC's examination | guidelines referenced in this letter. If you have any questions regarding the NRC's examination | ||
procedures and guidelines, please contact Mr. Frank J. Ehrhardt at (404) 562- 4611, (internet | procedures and guidelines, please contact Mr. Frank J. Ehrhardt at (404) 562- 4611, (internet | ||
E-mail fje@nrc.gov) or me at (404) 562-4607, (Internet E-mail: rch@nrc.gov). | E-mail fje@nrc.gov) or me at (404) 562-4607, (Internet E-mail: rch@nrc.gov). | ||
Sincerely, | |||
\\\\RA\\\\ | |||
Robert C. Haag, Chief | |||
Operations Branch | |||
Division of Reactor Safety | |||
Docket Nos.: 50-400 | Docket Nos.: 50-400 | ||
License Nos.: NPF-63 | License Nos.: NPF-63 | ||
cc: (See Page 3) | cc: (See Page 3) | ||
______ML070710023___________________ | ______ML070710023___________________ | ||
OFFICE | |||
RII:DRS | |||
RII:DRS | |||
RII:DRP | |||
SIGNATURE | |||
FJE | |||
RCH | |||
RXM1 | |||
NAME | |||
FEhrhardt | |||
RHaag | |||
RMusser | |||
DATE | |||
3/8/2007 | |||
3/8/2007 | |||
3/9/2007 | |||
3/ /2007 | |||
3/ /2007 | |||
3/ /2007 | |||
3/ /2007 | |||
E-MAIL COPY? | |||
YES | |||
NO YES | |||
NO YES | |||
NO YES | |||
NO YES | |||
NO YES | |||
NO YES | |||
NO | |||
}} | }} | ||
Latest revision as of 03:50, 15 January 2025
| ML070710023 | |
| Person / Time | |
|---|---|
| Site: | Harris (NPF-063) |
| Issue date: | 03/09/2007 |
| From: | Haag R NRC/RGN-II/DRS/OLB |
| To: | Duncan R Carolina Power & Light Co |
| References | |
| 50-400/07-301 | |
| Download: ML070710023 (7) | |
See also: IR 05000400/2007301
Text
March 9, 2007
Carolina Power & Light Company
ATTN: Mr. Robert Duncan, II,
Vice President - Harris Plant
Shearon Harris Nuclear Power Plant
P. O. Box 165, Mail Code: Zone 1
New Hill, NC 27562-0165
SUBJECT:
SHEARON HARRIS NUCLEAR POWER PLANT - REACTOR AND SENIOR
REACTOR OPERATOR INITIAL EXAMINATIONS 05000400/2007301
Dear Mr. Duncan:
In a telephone conversation on March 8, 2007, between Mr. Greg Kilpatrick, Superintendent of
Operations Training, and Mr. Frank Ehrhardt, Senior Operations Engineer, arrangements were
made for the administration of licensing examinations at the Shearon Harris Nuclear Power
Plant. The operating test is scheduled to be administered during the weeks of August 6 and
August 13, 2007. The written examination is scheduled to be administered on August 20, 2007.
The on-site preparatory week is scheduled for the week of July 9, 2007.
As agreed during the telephone conversation, your staff will prepare both the written
examination and operating test based on the guidelines in Revision 9 of NUREG-1021,
"Operator Licensing Examination Standards for Power Reactors." The NRC regional office will
discuss with your staff any changes that might be necessary before the examination is
administered. Your staff has also agreed to make all copies of examination materials that are
necessary for administering the exam.
To meet the above schedule, it will be necessary for your staff to furnish the examination
outlines by May 23, 2007. The written examinations, operating tests, and the supporting
reference materials identified in NUREG 1021, ES-201, Attachment 2, Reference Material
Guidelines For Initial Licensing Examinations, will be due by June 15, 2007. Pursuant to
10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the
outlines, examinations, and tests before they are submitted to the NRC for review and approval.
All materials shall be complete and ready-to-use. We request that any personal, proprietary,
sensitive unclassified, or safeguards information in your response be contained in a separate
enclosure and appropriately marked. Any delay in receiving the required examination and
reference materials, or the submittal of inadequate or incomplete materials, may cause the
examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with NUREG 1021, ES-402, Administering Initial Written Examinations, and to make the simulation facility
available on the dates noted above. In accordance with NUREG 1021, ES-302, Administering
Operating Tests To Initial License Applicants, your staff should retain the original simulator
2
performance data (e.g., system pressures, temperatures, and levels) generated during the
dynamic operating tests until the examination results are final.
Appendix E of NUREG 1021, Policies and Guidelines For Taking NRC Examinations,
contains a number of NRC policies and guidelines that will be in effect while the written
examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications (Office of Management and Budget
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget, approval number Part 55 (3150-0018), which expires on June 30,
2009. The public reporting burden for this collection of information is estimated to average 500
hours per response, including the time for writing the examinations, and reviewing instructions,
gathering and maintaining the data needed, and completing and reviewing the collection of
information. Send comments on any aspect of this collection of information, including
suggestions for reducing the burden, to the Information and Records Management Branch (T-6
F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet
electronic mail at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and
Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,
Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS
is accessible from the NRC Web site at http://www/nrc.gov/readingrm/adams.html (the Public
Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. Kilpatrick has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRC's
examination procedures and guidelines, please contact Mr. Frank Ehrhardt (404) 562-4611,
(Internet E-mail: fje@nrc.gov), or me at (404) 562-4607, (Internet E-mail: rch@nrc.gov).
Sincerely,
\\\\RA\\\\
Robert C. Haag, Chief
Operations Branch
Division of Reactor Safety
Docket No.: 400
License No.: NPF-63
cc: (See Page 3)
3
cc contd:
Paul Fulford, Manager
Performance Evaluation and
Regulatory Affairs CPB 9
Carolina Power & Light Company
P. O. Box 1551
Raleigh, NC 27602-1551
Chris L. Burton
Director of Site Operations
Carolina Power & Light Company
Shearon Harris Nuclear Power Plant
P. O. Box 165 MC: Zone 1
New Hill, NC 27562-0165
Christos Kamilaris
Manager, Nuclear Assessment
Progress Energy Carolinas, Inc.
Shearon Harris Nuclear Power Plant
P. O. Box 165, Mail Zone 3
New Hill, NC 27562-0165
Eric McCartney
Plant General Manager--Harris Plant
Progress Energy Carolinas, Inc.
Shearon Harris Nuclear Power Plant
P. O. Box 165, Mail Zone 3
New Hill, NC 27562-0165
Thomas Natale, Manager
Support Services
Carolina Power & Light Company
Shearon Harris Nuclear Power Plant
P. O. Box 165, Mail Zone 1
New Hill, NC 27562-0165
David H. Corlett, Supervisor
Licensing/Regulatory Programs
Carolina Power & Light Company
Shearon Harris Nuclear Power Plant
P. O. Box 165, Mail Zone 1
New Hill, NC 27562-0165
David T. Conley
Associate General Counsel - Legal
Department
Progress Energy Service Company, LLC
P. O. Box 1551
Raleigh, NC 27602-1551
John H. O'Neill, Jr.
Shaw, Pittman, Potts & Trowbridge
2300 N. Street, NW
Washington, DC 20037-1128
Beverly Hall, Chief, Radiation
Protection Section
N. C. Department of Environmental
Commerce & Natural Resources
3825 Barrett Drive
Raleigh, NC 27609-7721
Peggy Force
Assistant Attorney General
State of North Carolina
P. O. Box 629
Raleigh, NC 27602
Public Service Commission
State of South Carolina
P. O. Box 11649
Columbia, SC 29211
Chairman of the North Carolina
Utilities Commission
P. O. Box 29510
Raleigh, NC 27626-0510
Robert P. Gruber
Executive Director
Public Staff NCUC
4326 Mail Service Center
Raleigh, NC 27699-4326
Herb Council, Chair
Board of County Commissioners
of Wake County
P. O. Box 550
Raleigh, NC 27602
Tommy Emerson, Chair
Board of County Commissioners
of Chatham County
186 Emerson Road
Siler City, NC 27344
Mr. J. Wayne Gurganious
Training Manager - Harris Plant
Progress Energy Carolinas, Inc.
Harris Energy & Environmental Center
P. O. Box 327, State Road 1127
New Hill, NC 27562-0327
4
Appendix E of NUREG 1021, Policies and Guidelines For Taking NRC Examinations,
contains a number of NRC policies and guidelines that will be in effect while the written
examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications (Office of Management and Budget
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget, approval number Part 55 (3150-0018), which expires on June 30,
2009. The public reporting burden for this collection of information is estimated to average 500
hours per response, including the time for writing the examinations, and reviewing instructions,
gathering and maintaining the data needed, and completing and reviewing the collection of
information. Send comments on any aspect of this collection of information, including
suggestions for reducing the burden, to the Information and Records Management Branch (T-6
F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet
electronic mail at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and
Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,
Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS
is accessible from the NRC Web site at http://www/nrc.gov/readingrm/adams.html (the Public
Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. Dalton has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRC's examination
procedures and guidelines, please contact Mr. Frank J. Ehrhardt at (404) 562- 4611, (internet
E-mail fje@nrc.gov) or me at (404) 562-4607, (Internet E-mail: rch@nrc.gov).
Sincerely,
\\\\RA\\\\
Robert C. Haag, Chief
Operations Branch
Division of Reactor Safety
Docket Nos.: 50-400
License Nos.: NPF-63
cc: (See Page 3)
______ML070710023___________________
OFFICE
RII:DRS
RII:DRS
RII:DRP
SIGNATURE
FJE
RCH
RXM1
NAME
FEhrhardt
RHaag
RMusser
DATE
3/8/2007
3/8/2007
3/9/2007
3/ /2007
3/ /2007
3/ /2007
3/ /2007
E-MAIL COPY?
YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO