| issue date = 02/05/2007
| issue date = 02/05/2007
| title = Intro February 5-6, 2007, Program for the Inspection of Nickel Alloy Components (Pinc) 8th Meeting
| title = Intro February 5-6, 2007, Program for the Inspection of Nickel Alloy Components (Pinc) 8th Meeting
| author name = Moyer C E
| author name = Moyer C
| author affiliation = NRC/RES/DFERR
| author affiliation = NRC/RES/DFERR
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:United States Nuclear Regulatory Commission United States Nuclear Regulatory Commission Program for the Inspection of Nickel Alloy Components (PINC) 8 th Meeting February 5-6, 2007 Rockville, Maryland, USA Carol E. Moyer
{{#Wiki_filter:United States Nuclear Regulatory Commission United States Nuclear Regulatory Commission Program for the Inspection of Nickel Alloy Components (PINC) 8th Meeting February 5-6, 2007 Rockville, Maryland, USA Carol E. Moyer, Materials Engineer US NRC Office of Nuclear Regulatory Research 301-415-6764 cem3@nrc.gov
, Materials Engineer US NRC O f fice of Nuclear Regulatory Research 301-415-6764   cem3@nrc.gov 5-6 February 2007PINC-8 2 Objectives for PINC Cooperative Research Project
 
*D ocument the range of locations and crack morphologies associated with PWSCC and observed NDE responses
5-6 February 2007 PINC-8 2
*F abricate / obtain representative NDE mock-ups with flaws to simulate tight PWSCC cracks  
Objectives for PINC Cooperative Research Project
*I dentify and quantitatively assess NDE methods for accurately detecting, sizing and characterizing tight cracks such as PWSCC
* Document the range of locations and crack morphologies associated with PWSCC and observed NDE responses
*I ncorporate findings from other ongoing PWSCC research programs, as appropriate 5-6 February 2007PINC-8 3 Project Organization
* Fabricate / obtain representative NDE mock-ups with flaws to simulate tight PWSCC cracks
*T ask 1 -M orphology Atlas (TG-Atlas)
* Identify and quantitatively assess NDE methods for accurately detecting, sizing and characterizing tight cracks such as PWSCC
-C ompile exis ting work on crack morphology of PWSCC
* Incorporate findings from other ongoing PWSCC research programs, as appropriate
-C orrelate with NDE data, when available
 
-D evelop an electronic Atlas (database) of NDE and metallography information  
5-6 February 2007 PINC-8 3
-P erform new NDE, fractography, metallography  
Project Organization
*T ask 2 -N DE Technology Assessment (TG-NDE)
* Task 1 - Morphology Atlas (TG-Atlas)
-R ound Robin of NDE techni ques on PWSCC and simulated cracks-A ssess techniques to de tect an d size cracks
- Compile existing work on crack morphology of PWSCC
-A ssess techniques to manufacture test blocks
- Correlate with NDE data, when available
-C onsider relevant materials, geometries
- Develop an electronic Atlas (database) of NDE and metallography information  
-I ntegrate findings for regul atory applic ation, process qualification 5-6 February 2007PINC-8 4 Status of Agreements
- Perform new NDE, fractography, metallography
*S igned Members
* Task 2 - NDE Technology Assessment (TG-NDE)
-SKI-J N E S-T ohoku University
- Round Robin of NDE techniques on PWSCC and simulated cracks
-K ansai Electric Power Co. (Japanese PWR Industry)
- Assess techniques to detect and size cracks
-V TT / HUT (Finland)
- Assess techniques to manufacture test blocks
-K INS / KAERI (Korea)
- Consider relevant materials, geometries
*C ommitted Members (Agreements in Process)
- Integrate findings for regulatory application, process qualification
-EPRI 5-6 February 2007PINC-8 5 Meeting Agenda: February 5 th Opening of meeting, introductions, logistics C. Moyer Welcome, opening comments J. Wiggins Review of minutes from PINC-7 meeting P. Merck Review of action items from PINC-7 meeting P. Merck/G. Schuster Lessons learned from Piping RRT in Japan I. Komura Break Proposed CRDM and BMI mockups G. Schuster Lunch Discussion -
 
RRT schedule development S. Doctor/P. Merck Data analysis group (DAG)
5-6 February 2007 PINC-8 4
C. Moyer/S. Doctor Break Discussion -
Status of Agreements
p lans for subsequent RRTs Finland program update P. Kauppinen Adjourn for the day 5-6 February 2007PINC-8 6 Meeting Agenda: February 6th Resume meeting, introductions, logistics C. Moyer TG-Atlas update G. Schuster Break TG-NDE summary S. Doc t or Rev i ew of action items P. Merck/G. Schuster Lunch Steering Committee Meeting C. Moyer Discussion -
* Signed Members
p rogram extension through 2008 Discussion -
- SKI
D AG Discussion -
- JNES
RRT schedule Schedule for future meetings Adjourn}}
- Tohoku University
- Kansai Electric Power Co. (Japanese PWR Industry)
- VTT / HUT (Finland)
- KINS / KAERI (Korea)
* Committed Members (Agreements in Process)
- EPRI
 
5-6 February 2007 PINC-8 5
Meeting Agenda: February 5th Opening of meeting, introductions, logistics C. Moyer Welcome, opening comments J. Wiggins Review of minutes from PINC-7 meeting P. Merck Review of action items from PINC-7 meeting P. Merck/G. Schuster Lessons learned from Piping RRT in Japan I. Komura Break Proposed CRDM and BMI mockups G. Schuster Lunch Discussion - RRT schedule development S. Doctor/P. Merck Data analysis group (DAG)
C. Moyer/S. Doctor Break Discussion - plans for subsequent RRTs Finland program update P. Kauppinen Adjourn for the day
 
5-6 February 2007 PINC-8 6
Meeting Agenda: February 6th Resume meeting, introductions, logistics C. Moyer TG-Atlas update G. Schuster Break TG-NDE summary S. Doctor Review of action items P. Merck/G. Schuster Lunch Steering Committee Meeting C. Moyer Discussion - program extension through 2008 Discussion - DAG Discussion - RRT schedule Schedule for future meetings Adjourn}}

Latest revision as of 02:34, 15 January 2025

Intro February 5-6, 2007, Program for the Inspection of Nickel Alloy Components (Pinc) 8th Meeting
ML070860321
Person / Time
Site: North Anna Dominion icon.png
Issue date: 02/05/2007
From: Carol Moyer
NRC/RES/DFERR
To:
Shared Package
ML070860236 List:
References
Download: ML070860321 (6)


Text

United States Nuclear Regulatory Commission United States Nuclear Regulatory Commission Program for the Inspection of Nickel Alloy Components (PINC) 8th Meeting February 5-6, 2007 Rockville, Maryland, USA Carol E. Moyer, Materials Engineer US NRC Office of Nuclear Regulatory Research 301-415-6764 cem3@nrc.gov

5-6 February 2007 PINC-8 2

Objectives for PINC Cooperative Research Project

  • Document the range of locations and crack morphologies associated with PWSCC and observed NDE responses
  • Fabricate / obtain representative NDE mock-ups with flaws to simulate tight PWSCC cracks
  • Identify and quantitatively assess NDE methods for accurately detecting, sizing and characterizing tight cracks such as PWSCC
  • Incorporate findings from other ongoing PWSCC research programs, as appropriate

5-6 February 2007 PINC-8 3

Project Organization

  • Task 1 - Morphology Atlas (TG-Atlas)

- Compile existing work on crack morphology of PWSCC

- Correlate with NDE data, when available

- Develop an electronic Atlas (database) of NDE and metallography information

- Perform new NDE, fractography, metallography

  • Task 2 - NDE Technology Assessment (TG-NDE)

- Round Robin of NDE techniques on PWSCC and simulated cracks

- Assess techniques to detect and size cracks

- Assess techniques to manufacture test blocks

- Consider relevant materials, geometries

- Integrate findings for regulatory application, process qualification

5-6 February 2007 PINC-8 4

Status of Agreements

  • Signed Members

- SKI

- JNES

- Tohoku University

- Kansai Electric Power Co. (Japanese PWR Industry)

- VTT / HUT (Finland)

- KINS / KAERI (Korea)

  • Committed Members (Agreements in Process)

- EPRI

5-6 February 2007 PINC-8 5

Meeting Agenda: February 5th Opening of meeting, introductions, logistics C. Moyer Welcome, opening comments J. Wiggins Review of minutes from PINC-7 meeting P. Merck Review of action items from PINC-7 meeting P. Merck/G. Schuster Lessons learned from Piping RRT in Japan I. Komura Break Proposed CRDM and BMI mockups G. Schuster Lunch Discussion - RRT schedule development S. Doctor/P. Merck Data analysis group (DAG)

C. Moyer/S. Doctor Break Discussion - plans for subsequent RRTs Finland program update P. Kauppinen Adjourn for the day

5-6 February 2007 PINC-8 6

Meeting Agenda: February 6th Resume meeting, introductions, logistics C. Moyer TG-Atlas update G. Schuster Break TG-NDE summary S. Doctor Review of action items P. Merck/G. Schuster Lunch Steering Committee Meeting C. Moyer Discussion - program extension through 2008 Discussion - DAG Discussion - RRT schedule Schedule for future meetings Adjourn